Auxiliary tower mounting device and tower positioning and mounting method

By designing the tower auxiliary installation device, the auxiliary rotating assembly and electric hoist can be used to achieve synchronous rotation of the tower, so that the threaded holes at the bottom of the tower are aligned with the anchor bolts of the tower base, solving the problems of difficulty in installing large towers and high safety risks, and improving installation efficiency and safety.

CN119911854APending Publication Date: 2025-05-02PETROCHINA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411531854.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-30
Publication Date
2025-05-02

AI Technical Summary

Technical Problem

The installation of large towers is difficult. Affected by cross wind, the installation and alignment time of threaded holes and anchor bolts is extended, and multiple people need to assist in positioning, which is inefficient in operation and high safety risks.

Method used

A tower auxiliary installation device is designed, including multiple auxiliary rotation components, each component consisting of a roadbed box and an electric hoist. The movement of the electric hoist is synchronously controlled through the electrical control component, driving the tower rotation, and aligning the threaded holes at the bottom of the tower with the anchor bolts of the tower base.

Benefits of technology

It reduces the number of workers, improves installation efficiency, reduces safety hazards, and achieves faster and more precise positioning and installation of tower gear.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119911854A_ABST
    Figure CN119911854A_ABST
Patent Text Reader

Abstract

The invention discloses a tower auxiliary installation device and a tower positioning installation method.The tower auxiliary installation device comprises a plurality of auxiliary rotating assemblies, the auxiliary rotating assemblies are evenly and annularly arranged in the circumferential direction of a tower at intervals, and each auxiliary rotating assembly comprises a roadbed box and an electric hoist; the fixed ends of the electric hoists are arranged on the roadbed box, the movable ends of the electric hoists are used for being connected with the tower so as to drive the tower to rotate in the axial direction of the tower, the tower installation device further comprises an electric control assembly, and the electric control assembly is electrically connected with the multiple electric hoists and used for synchronizing movement of the multiple electric hoists. According to the auxiliary installation device for the tower, the number of operators can be greatly reduced, electric operation is adopted, the installation efficiency is improved, and potential safety hazards are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tower installation, and in particular to a tower auxiliary installation device and a tower positioning installation method. Background Art

[0002] Large towers, such as distillation towers and absorption towers in the petrochemical industry, are important equipment for mass transfer and heat transfer between gas and liquid or liquid and liquid. They are usually composed of a cylinder, a head (or cover) and a support. The design and manufacture of towers must meet specific process requirements and are widely used in chemical, petrochemical and oil refining production. With the continuous expansion of the production capacity of petrochemical plants, the application of large towers in fields such as oil refining and coal chemical industry is increasing. In the petrochemical industry, tower equipment is becoming increasingly large and unconventional, which puts higher requirements on equipment installation. Large towers usually refer to towers with an inner diameter of ≥3600mm. Due to the high height and large diameter of large towers, there are more factors to consider, and the installation difficulty is much greater than that of ordinary towers.

[0003] The diameter and weight of tower equipment in the current integrated project are getting bigger and bigger, and the number of anchor bolts is also increasing, which brings many problems to the equipment installation. Affected by the crosswind, the time required to align the threaded holes on the tower with the anchor bolts is extended, and a large number of people are required to assist in positioning the equipment. The operators are in the hoisting area for a long time, and the operation efficiency is low. It is quite difficult to align all the bolts and the threaded holes of the anchor at the same time in a short period of time, which requires the operators to stay in the hoisting area for a long time, increasing the safety risk of the operation. Summary of the invention

[0004] The main purpose of the present invention is to provide a tower auxiliary installation device and a tower positioning and installation method, aiming to provide a tower auxiliary installation device which consumes less manpower and is easier to position and install.

[0005] To achieve the above-mentioned purpose, the tower auxiliary installation device proposed in the present invention comprises a plurality of auxiliary rotating components, which are evenly spaced and arranged in a ring around the circumference of the tower, each of which comprises a roadbed box and an electric hoist, wherein the fixed end of the electric hoist is arranged on the roadbed box, and the movable end of the electric hoist is used to connect with the tower to drive the tower to rotate along the axial direction of the tower;

[0006] Wherein, the tower installation device also includes an electric control component, and the electric control component is electrically connected to the multiple electric hoists respectively, and the electric control component is used to synchronize the movements of the multiple electric hoists.

[0007] In one embodiment, the tower auxiliary installation device includes four auxiliary rotating components, which are arranged around the tower and spaced apart from the tower. The four auxiliary rotating components are arranged opposite to each other on both sides of the tower, and the auxiliary rotating components are spaced equally apart from the tower and are evenly arranged around the tower.

[0008] In one embodiment, the electric control assembly includes a first electric control module and a second electric control module, and the first electric control module and the second electric control module respectively control two oppositely arranged electric hoists.

[0009] In one embodiment, the tower auxiliary installation device further comprises a guide member, one end of which is formed with a mounting hole, and the other end of which is formed with a guide cone surface, and the mounting hole is used to be sleeved on a tower base anchor bolt of the tower.

[0010] In one embodiment, the inner diameter of the mounting hole is larger than the outer diameter of the anchor bolt.

[0011] In one embodiment, the hole depth of the mounting hole is 120 mm to 150 mm.

[0012] The present invention also provides a tower positioning and installation method, which is applied to the above-mentioned tower auxiliary installation device and comprises the following steps:

[0013] Determine the installation reference point based on the center of the tower base, and use the installation reference point as the center of a circle to arrange roadbed boxes at four locations around the installation reference point so that the four roadbed boxes are evenly arranged;

[0014] An electric hoist is arranged on the side of the roadbed box facing the tower base with the roadbed box as an anchor point, and the movable end of the electric hoist is connected to the lifting lugs on the circumference of the tower;

[0015] Controlling each group of two oppositely disposed electric hoists to work synchronously, driving the tower to rotate so that the vertex of each guide cone surface is exposed to the threaded hole at the bottom of the tower;

[0016] The hoisting machine is controlled to retract the hook so that the tower base is arranged on the tower base, and each anchor bolt on the tower base is penetrated into one of the threaded holes.

[0017] In one embodiment, before the step of controlling each group of two oppositely disposed electric hoists to work synchronously and drive the tower to rotate so that the vertex of each guide cone surface is exposed in the threaded hole at the bottom of the tower, the step further includes:

[0018] The guide members are installed on the anchor bolts, and two anchor bolts are spaced between every two adjacent guide members.

[0019] In one embodiment, after the step of arranging an electric hoist on a side of the roadbed box facing the tower base with the roadbed box as an anchor point and connecting the movable end of the electric hoist to the lifting lug on the circumference of the tower, the step further includes:

[0020] The distance between each electric hoist and the tower is controlled to be 6m.

[0021] In one embodiment, after the step of controlling the lifting machinery to hook back so that the tower base is arranged on the tower base, and each anchor bolt on the tower base is inserted into one of the threaded holes, the step further includes:

[0022] Remove the guide, install a nut on each anchor bolt, and withdraw the auxiliary rotation assembly.

[0023] The technical solution of the present invention proposes a tower auxiliary installation device for installation of a heavy tower and a tower positioning and installation method for the tower auxiliary installation device. The tower auxiliary installation device includes a plurality of auxiliary rotating components, which are evenly spaced and arranged in a ring around the circumference of the tower. The auxiliary rotating components include a roadbed box and an electric hoist. The fixed end of the electric hoist is arranged on the roadbed box, and the movable end of the electric hoist is used to connect with the tower to drive the tower to rotate along the axial direction of the tower. The roadbed box can serve as an anchor point for the electric hoist due to its large mass and large contact area with the ground. The electric hoist is gradually tightened by the electric control component to make the tower move and rotate radially, so that each threaded hole at the bottom of the tower is aligned with a foundation bolt of the tower base, thereby realizing auxiliary installation positioning. The use of the tower auxiliary installation device can greatly reduce the number of operators, improve installation efficiency and reduce safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0025] Figure 1 A schematic structural diagram of an embodiment of a tower auxiliary installation device provided by the present invention;

[0026] Figure 2 This is a schematic diagram of the tower base;

[0027] Figure 3 It is a structural schematic diagram of a guide member in a tower auxiliary installation device;

[0028] Figure 4 This is the control circuit diagram of the tower auxiliary installation device.

[0029] Description of Figure Numbers:

[0030] 100. Auxiliary installation device for tower; 1. Auxiliary rotation component; 11. Roadbed box; 12. Electric hoist; 2. Electric control component; 21. First electric control module; 211. First control signal line; 22. Second electric control module; 221. Second control signal line; 3. Guide member; 31. Guide cone surface; 32. Mounting hole; 200. Tower; 210. Ring plate; 220. Threaded hole; 300. Tower base; 310. Anchor bolt.

[0031] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.

[0034] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features limited to "first" and "second" may explicitly or implicitly include at least one of the features. In addition, if "and / or" or "and / or" appears in the full text, its meaning includes three parallel solutions. Taking "A and / or B" as an example, it includes solution A, solution B, or solutions that satisfy both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0035] Large towers, such as distillation towers and absorption towers in the petrochemical industry, are important equipment for mass transfer and heat transfer between gas and liquid or liquid and liquid. They are usually composed of a cylinder, a head (or cover) and a support. The design and manufacture of towers must meet specific process requirements and are widely used in chemical, petrochemical and oil refining production. With the continuous expansion of the production capacity of petrochemical plants, the application of large towers in fields such as oil refining and coal chemical industry is increasing. In the petrochemical industry, tower equipment is becoming increasingly large and unconventional, which puts higher requirements on equipment installation. Large towers usually refer to towers with an inner diameter of ≥3600mm. Due to the high height and large diameter of large towers, there are more factors to consider, and the installation difficulty is much greater than that of ordinary towers.

[0036] The diameter and weight of tower equipment in the current integrated project are getting bigger and bigger, and the number of anchor bolts is also increasing, which brings many problems to the equipment installation. Affected by the crosswind, the time required to align the threaded holes on the tower with the anchor bolts is extended, and a large number of people are required to assist in positioning the equipment. The operators are in the hoisting area for a long time, and the operation efficiency is low. It is quite difficult to align all the bolts and the threaded holes of the anchor at the same time in a short period of time, which requires the operators to stay in the hoisting area for a long time, increasing the safety risk of the operation.

[0037] In order to solve the above technical problems, the present invention proposes a tower auxiliary installation device, which aims to provide a tower auxiliary installation device that consumes less manpower and is easier to position and install. Figures 1 to 4 The present invention provides a schematic structural diagram of an embodiment of a tower auxiliary installation device.

[0038] Please refer to Figures 1 to 4 The present invention proposes a tower auxiliary installation device 100, which is used for the installation of heavy towers, including multiple auxiliary rotating components 1, which are evenly spaced and arranged in a ring around the circumference of the tower. Each auxiliary rotating component 1 includes a roadbed box 11 and an electric hoist 12. The fixed end of the electric hoist 12 is arranged on the roadbed box 11, and the movable end of the electric hoist 12 is used to connect with the tower to drive the tower to rotate along the axial direction of the tower.

[0039] The tower installation device further includes an electric control component 2 , which is electrically connected to the multiple electric hoists 12 , and the electric control component 2 is used to synchronize the movements of the multiple electric hoists 12 .

[0040] The technical solution of the present invention proposes a tower auxiliary installation device 100 for installation of a heavy tower and a tower positioning and installation method for the tower auxiliary installation device 100. The tower auxiliary installation device 100 includes a plurality of auxiliary rotating components 1, which are evenly spaced and arranged in a ring around the circumference of the tower. The auxiliary rotating component 1 includes a roadbed box 11 and an electric hoist 12. The fixed end of the electric hoist 12 is arranged on the roadbed box 11, and the movable end of the electric hoist 12 is used to connect with the tower to drive the tower to rotate along the axial direction of the tower. The roadbed box 11 can serve as an anchor point of the electric hoist 12 due to its large mass and large contact area with the ground. The electric hoist 12 is gradually tightened by the electric control component 2 so that the tower moves and rotates in the radial direction, so that each threaded hole 220 at the bottom of the tower is aligned with a foundation bolt 310 of the tower base 300, thereby realizing auxiliary installation positioning. The tower auxiliary installation device 100 can greatly reduce the number of operators, improve the installation efficiency and reduce safety hazards.

[0041] It should be noted that in the actual construction process, adaptive adjustments can be made according to the weight and diameter of the tower. When the tower has a large size and a large mass, an electric hoist 12 is generally used for construction. The benefits of using an electric hoist 12 for auxiliary tower installation include improving work efficiency, reducing manpower requirements, and reducing operational safety risks. The electric hoist 12 is driven by electricity and can control the movement of heavy objects more quickly and accurately. Compared with a hand-pulled hoist, it reduces the need for manual operation, thereby reducing the labor intensity of the operator and shortening the operation time. In addition, the electric hoist 12 can be synchronously controlled by the electronic control component 2 to ensure that multiple hoists work in coordination, further improving the efficiency and safety of the installation process. These advantages of the electric hoist 12 make it very useful in the installation of heavy towers, especially when it is necessary to quickly and accurately align the threaded holes and the anchor bolts 310. The electric hoist 12 in the tower auxiliary installation device 100 can also be replaced by a hand chain hoist. When the hand chain hoist is used to replace the electric hoist 12, at least four staff members need to be arranged to be located at the 0°, 90°, 180° and 270° positions of the tower respectively, and the hand chain hoist is pulled by manpower to move the tower radially. In this way, since the hand chain hoist in each direction needs to be equipped with two staff members, compared with the electric hoist 12 driving method, although eight more labors are added, compared with the previous method of more than ten or even twenty manual auxiliary positioning, it can still achieve the effect of saving labor. The advantages of using a hand chain hoist for tower auxiliary installation include simple operation, convenient maintenance, high mechanical efficiency, small hand chain tension, excellent overall strength, and high transmission efficiency, especially in open-air and power-free working occasions. The hand chain hoist is small in size, light in weight, easy to carry and operate, and is particularly suitable for radial adjustment of medium-sized towers. At this time, the tower is in a suspended state, and only a small radial force needs to be applied to make the tower rotate around the central axis or move radially. In addition, the hand chain hoist is safe, reliable and easy to maintain. It shows its superiority in open-air and power-free working environments.

[0042] In addition, the number of auxiliary rotating components 1 can also be adaptively adjusted according to the size and quality of the tower. Four or more even-numbered auxiliary rotating components 1 can be set, so that it can be ensured that the opposite side of each auxiliary rotating component 1 has another auxiliary rotating component 1 that is balanced with it. The two oppositely arranged auxiliary rotating components 1 are retracted and released to ensure the smooth movement of the equipment. However, when arranging the auxiliary rotating components 1, it is necessary to ensure that the angles of each adjacent auxiliary rotating component 1 around the tower are equal, that is, they are evenly arranged. In one embodiment of the present invention, the tower auxiliary installation device 100 is provided with a total of four auxiliary rotating components 1. For details, please refer to Figure 1, four auxiliary rotating components 1 are arranged around the tower and spaced apart from the tower. The four auxiliary rotating components 1 are respectively located at 0°, 90°, 180° and 270° positions of the tower. When laying out the auxiliary rotating components 1, the roadbed box 11 should be laid out first, and the roadbed box 11 weighing several tons is lifted to the four positions of the tower by a lifting machinery. Then, an electric hoist 12 is installed on the side of the roadbed box 11 facing the tower. The electric hoist 12 is fixed with the roadbed box 11 as an anchor point, and the movable end of the electric hoist 12 is connected to the lifting lug around the tower. When the electric hoist 12 starts to pull the tower, the roadbed box 11 relies on the huge friction generated by its own weight to ensure that it does not move, so that the tower can be radially adjusted.

[0043] Based on the above embodiments, if an electric hoist 12 is used to pull the tower, it is necessary to ensure that every two relative electric hoists 12 work synchronously to ensure that the tower is installed correctly. In view of this, this solution respectively controls two groups of auxiliary rotating components 1 by setting a first electric control module 21 and a second electric control module 22. The first electric control module 21 connects the two electric hoists 12 at the 0° and 180° positions through a first control signal line 211, and the second electric control module 22 connects the two electric hoists at the 90° and 270° positions through a second control signal line 221, so as to achieve synchronous operation of the two auxiliary rotating components 1 of each group.

[0044] Since there are many anchor bolts 310 in a large tower, in order to align each anchor bolt 310 with the threaded hole 220 on the ring plate 210, the tower auxiliary installation device 100 further includes a guide member 3. For details, please refer to Figure 2 and Figure 3One end of the guide member 3 is tapered as a whole and has a guide cone surface 31, and the guide cone surface 31 is arranged facing the bottom of the tower. A mounting hole 32 is arranged at the bottom of the guide member 3. First, the guide member 3 is sleeved on the anchor bolt 310, and can be adaptively adjusted according to the actual diameter of the tower. In this embodiment, two anchor bolts 310 are spaced between every two adjacent guide members 3. The radial movement of the tower is adjusted by the electric hoist 12 so that the top of the guide cone surface 31 is exposed at the threaded hole 220. Then, the lifting machinery is controlled to lower the tower so that the guide inclined surface of the guide member 3 abuts against the inner wall of the threaded hole 220. Under the action of the gravity of the tower, the threaded hole 220 is immediately in the guide cone. The anchor bolt 310 is inserted under the guiding action of the surface 31. The diameter of the mounting hole 32 of the guide member 3 is slightly larger than the outer diameter of the anchor bolt 310, so that the guide member 3 can be easily mounted on the anchor bolt 310. The hole depth of the mounting hole 32 is between 120 mm and 150 mm. Specifically, it can be adjusted according to the specifications of the anchor bolt 310. After the tower pipeline is installed on the surface of some tower devices, the center of gravity of the equipment may change, which will cause the bottom surface of the ring plate 210 to be non-parallel to the surface of the tower base 300 after the equipment is lifted. In this way, guide members of different depths can adjust the distance between the top of the guide member and the bottom surface of the ring plate 210 to be consistent, thereby ensuring the stability of its installation.

[0045] The guide member 3 is generally made of metal. In this embodiment, a high-strength steel material is selected to improve its durability and enable it to be recycled for multiple uses. The guide member 3 can accurately align the anchor bolts 310 of the large tower with the threaded holes 220 on the ring plate 210, thereby improving installation efficiency and accuracy. Through the tapered guide surface and adaptive adjustment, the guide member 3 ensures the stability and safety of the tower during the hoisting process, reduces the adjustment time and labor intensity during the installation process, and avoids damage to the external threads of the anchor bolts 310 caused by improper alignment, thereby ensuring the long-term stable operation of the tower.

[0046] A circle of protective structure can also be set on the inner wall of the installation hole 32. Flexible materials such as silicone, rubber, etc. can be used as the protective structure. The flexible buffer layer is placed on the inner wall of the installation hole by bonding. In this way, after the guide member is installed, the inner wall of the installation hole of the guide member 3 can be prevented from contacting with the external thread of the anchor bolt 310 to cause scratches and damage to the thread. The buffer layer can effectively solve this problem. It should be noted that the process of installing the guide member 3 can be installed by automated equipment or manually. The present invention does not limit this. In one embodiment of the present invention, the guide member 3 is installed manually, and the number of guide members 3 can also be adjusted according to the actual size of the tower.

[0047] Based on the above-mentioned tower auxiliary installation device 100, the present invention also proposes a tower positioning and installation method applied to the above-mentioned tower auxiliary installation device, including the following steps: S1: determine the installation reference point with the center of the tower base 300 as the reference, and arrange the roadbed box 11 at the 0° position, 90° position, 180° position and 270° position of the installation reference point with the installation reference point as the center of the circle; S2: set an electric hoist 12 on the side of the roadbed box 11 facing the tower base 300 with the roadbed box 11 as the anchor point, and connect the movable end of the electric hoist 12 to the lifting ear of the tower circumference; S3: control each group of two relatively arranged electric hoists 12 to work synchronously, drive the tower to rotate so that the vertex of each guide cone surface 31 is exposed in the threaded hole 220 at the bottom of the tower; S4: control the lifting machinery to hook back so that the tower base is set on the tower base 300, and each anchor bolt 310 on the tower base 300 is penetrated through a threaded hole 220. It can be understood that in step S2, the movable end of the electric hoist 12 can be connected to the lifting ear on the circumference of the tower, or it can be directly connected to the threaded hole 220 on the tower ring plate 210, and the connection position is confirmed at the 12 o'clock, 3 o'clock, 6 o'clock and 9 o'clock directions of the tower, so as to ensure that the interval angle of each connection is the same.

[0048] Furthermore, in one embodiment, in order to ensure high-precision alignment of the tower and the tower base 300, this solution is equipped with four auxiliary positioners at the four electric hoist 12 positions, that is, the four positions of the tower, which can ensure the safety of equipment and personnel in response to special circumstances in some operations. When encountering a large crosswind, the module operator can make an emergency stop, which further improves the safety of the tower equipment hoisting operation. When constructing under the tower, since the tower is in an unstable state before it is successfully installed, it is easy to cause safety accidents. In order to further improve the safety of the operation, this solution controls the distance between the electric hoist 12 and the tower to 6m, and reasonably arranges the roadbed box 11 based on the 6m safety distance.

[0049] When the tower is successfully positioned, the guide member 3 on the anchor bolt 310 needs to be removed. This process is carried out by manual disassembly. After all the guide members 3 are removed, a nut needs to be installed on each anchor bolt 310. Usually, a wrench is used to tighten the nut to ensure that the nut is in close contact with the ring plate 210 at the bottom of the tower, thereby completing the fixing of the tower and ensuring the stability and safety of the tower during operation.

[0050] The above description is only an exemplary embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the technical concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. A tower auxiliary installation device, used for the installation of heavy towers, characterized in that: It comprises a plurality of auxiliary rotating components, which are evenly spaced and arranged in a ring around the circumference of the tower, each of which comprises a roadbed box and an electric hoist, wherein the fixed end of the electric hoist is arranged on the roadbed box, and the movable end of the electric hoist is used to connect with the tower to drive the tower to rotate along the axial direction of the tower; Wherein, the tower installation device also includes an electric control component, and the electric control component is electrically connected to the multiple electric hoists respectively, and the electric control component is used to synchronize the movements of the multiple electric hoists.

2. The tower auxiliary installation device according to claim 1, characterized in that: The tower auxiliary installation device includes four auxiliary rotating components, which are arranged around the tower and spaced apart from the tower. The four auxiliary rotating components are arranged opposite to each other on both sides of the tower in pairs, and the auxiliary rotating components are spaced equally apart from the tower and are evenly arranged around the tower.

3. The tower auxiliary installation device according to claim 2, characterized in that: The electric control assembly includes a first electric control module and a second electric control module, and the first electric control module and the second electric control module respectively control two oppositely arranged electric hoists.

4. The tower auxiliary installation device according to any one of claims 1 to 3, characterized in that: The tower auxiliary installation device also includes a guide member, one end of which is formed with a mounting hole, and the other end of which is formed with a guide cone surface, and the mounting hole is used to be sleeved on a tower base anchor bolt of the tower.

5. The tower auxiliary installation device according to claim 4, characterized in that: The inner diameter of the mounting hole is greater than the outer diameter of the anchor bolt.

6. The tower auxiliary installation device according to claim 4, characterized in that: The hole depth of the mounting hole is 120 mm to 150 mm.

7. A tower positioning and installation method, characterized in that: The tower auxiliary installation device used in any one of claims 1 to 4 comprises the following steps: Determine the installation reference point based on the center of the tower base, and use the installation reference point as the center of a circle to arrange roadbed boxes at four locations around the installation reference point so that the four roadbed boxes are evenly arranged; An electric hoist is arranged on the side of the roadbed box facing the tower base with the roadbed box as an anchor point, and the movable end of the electric hoist is connected to the lifting lugs on the circumference of the tower; Controlling each group of two oppositely disposed electric hoists to work synchronously, driving the tower to rotate so that the vertex of each guide cone surface is exposed to the threaded hole at the bottom of the tower; The hoisting machine is controlled to retract the hook so that the tower base is arranged on the tower base, and each anchor bolt on the tower base is penetrated into one of the threaded holes.

8. The tower positioning and installation method according to claim 7, characterized in that: Before the step of controlling each group of two oppositely arranged electric hoists to work synchronously and drive the tower to rotate so that the vertex of each guide cone surface is exposed in the threaded hole at the bottom of the tower, the method further includes: The guide members are installed on the anchor bolts, and two anchor bolts are spaced between every two adjacent guide members.

9. The tower positioning and installation method according to claim 7, characterized in that: After the step of arranging an electric hoist on the side of the roadbed box facing the tower base with the roadbed box as an anchor point and connecting the movable end of the electric hoist to the lifting lug on the circumference of the tower, the step further includes: The distance between each electric hoist and the tower is controlled to be 6m.

10. The tower positioning and installation method according to claim 7, characterized in that: After the step of controlling the lifting machinery to hook back so that the tower base is set on the tower base, and each anchor bolt on the tower base is inserted into one of the threaded holes, the step further includes: Remove the guide, install a nut on each anchor bolt, and withdraw the auxiliary rotation assembly.