AI Technical Summary
The existing pyrolysis carbonization process has problems such as low production efficiency, low energy utilization rate and unstable product quality.
A pyrolysis carbonization system including a carbonization furnace, a flue gas treatment mechanism and a slewing track mechanism is designed. Continuous production is achieved through a three-stage structure carbonization furnace and a slewing track mechanism, and combustible gas reflux is used to improve energy utilization.
It improves the production efficiency of the pyrolysis carbonization process, saves energy, ensures the stability of product quality, and reduces environmental pollution.
Smart Images

Figure CN119912953A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pyrolysis carbonization, and in particular to a pyrolysis carbonization system and a continuous production method for biomass and solid waste. Background Art
[0002] Pyrolysis carbonization refers to the technology of converting organic matter into carbon residue liquid and gas products by heating under oxygen-free or low-oxygen environment. It is widely used in energy production, carbon material preparation, and waste treatment. Its advantages are: it can not only realize the resource utilization of waste, but also reduce environmental pollution and greenhouse gas emissions. With the growing global demand for renewable energy and environmental protection technology, pyrolysis carbonization technology has received widespread attention as an effective method to convert organic waste into high-value-added products; especially for the current treatment of biomass and solid waste, it provides a more reasonable solution.
[0003] At present, the pyrolysis carbonization process is carried out under heating conditions of 200℃ to 900℃, which also requires an oxygen-free or low-oxygen process environment. The conventional pyrolysis carbonization production method is to use a small carbonization furnace and produce in batches. Although the process parameters of a small carbonization furnace are easy to meet, the conventional small carbonization furnace still has the following shortcomings: 1. Low production efficiency: Traditional equipment is mostly intermittent operation, which makes it difficult to achieve continuous production, resulting in low production efficiency; 2. Low energy utilization rate: The heat generated during the pyrolysis process cannot be effectively recycled, resulting in energy waste.
[0004] 3. Unstable product quality: due to inaccurate temperature and oxygen control, the product Summary of the invention
[0005] In order to solve the technical problems existing in the background technology, the present invention provides a pyrolysis carbonization system and a continuous production method for biomass and solid waste, which has high production efficiency, is more energy-saving, and has more stable process parameters.
[0006] The technical solution adopted by the present invention is: A pyrolysis carbonization system for biomass and solid waste, comprising: A carbonization furnace for pyrolyzing and carbonizing raw materials; The carbonization furnace is connected to a flue gas treatment mechanism; A rotary track mechanism is provided from outside and is inserted into the carbonization furnace; A forming mechanism and a raw material loading mechanism are arranged on one side of the rotary track mechanism.
[0007] Furthermore, the carbonization furnace comprises: The front pre-setting bin, pyrolysis carbonization bin and rear pre-setting bin are arranged in parallel.
[0008] Furthermore, the front pre-placed warehouse includes: A cylindrical preheating chamber, the front of which is sealed with a front chamber door; The rear pre-positioned warehouse comprises: A cylindrical cooling bin body is provided, wherein the rear portion of the cooling bin body is sealed with a rear bin door, and a cooling sleeve is provided on the outer cover of the cooling bin body.
[0009] Furthermore, the pyrolysis carbonization bin comprises: A cylindrical pyrolysis carbonization bin connected between the preheating bin and the cooling bin; The pyrolysis carbonization bin comprises: A combustion bin body and a carbonization bin body are arranged in parallel from front to back, one side of the combustion bin body and the carbonization bin body is connected to a protruding extension bin body with a spoiler, the upper end of the combustion bin body is connected to a smoke exhaust port, the front end of the combustion bin body is provided with a front gate, the upper end of the carbonization bin body is connected to a gas exhaust port, the rear end of the carbonization bin body is provided with a rear gate, the side walls of the combustion bin body, the carbonization bin body and the spoiler extension bin body are connected to each other with a gas inlet, and the bottom of the combustion bin body and the carbonization bin body are provided with a track base, the track base is used to carry a revolving track mechanism, and a movable shuttle bus is provided on the revolving track mechanism.
[0010] Furthermore, a refractory brick layer is provided inside the combustion bin body, the carbonization bin body and the spoiler extension bin body, and a partition wall is provided inwardly extending from the refractory brick layer. Lightweight insulation brick layers are provided at the front and rear ends of the combustion bin body and the carbonization bin body respectively, and a concrete reinforcement layer is provided outside the refractory brick layer and the lightweight insulation brick layer, and a plurality of concrete anchor columns are provided outside the concrete reinforcement layer.
[0011] Furthermore, the gas inlet is arranged in parallel in a front-to-rear direction and is arranged between the partition walls of the refractory brick layer, including: The spoiler ports are arranged on the spoiler extension bin body, and the combustion-supporting ports are arranged on the combustion bin body and the carbonization bin body. The spoiler ports and the combustion-supporting ports are arranged alternately along the front-rear direction.
[0012] Furthermore, the flue gas treatment mechanism comprises: A smoke exhaust pipe is connected to the smoke exhaust port, and the end of the smoke exhaust pipe is connected to a water filter tower, an electrostatic precipitator, a bag filter, an induced draft fan, and a chimney in sequence.
[0013] Furthermore, the rotary track mechanism comprises: A horizontal rail runs through the carbonization furnace, the horizontal rail extends outside the carbonization furnace, and is connected with a front longitudinal rail and a rear longitudinal rail at the front and rear ends respectively. A connecting horizontal rail connected to the front longitudinal rail and the rear longitudinal rail is arranged on one side of the carbonization furnace, and a vehicle inspection rail and a vehicle unloading rail are connected to the rear longitudinal rail.
[0014] Furthermore, the forming mechanism comprises: A conveyor belt is arranged on one side of the connecting cross rail, a rod extruder is arranged on the discharge side of the conveyor belt, a small silo is arranged at the output outlet of the rod extruder, a feeding belt is arranged at the outlet of the small silo, a screw conveyor is arranged on the discharge side of the feeding belt, a storage silo is arranged at the outlet of the screw conveyor, a silo top conveyor is arranged on the top of the storage silo, and a bucket elevator is arranged outside the storage silo.
[0015] A continuous production method for a pyrolysis carbonization system for biomass and solid waste, comprising: A. Raw material supply: The shuttle car moves along the rotary track mechanism to the raw material loading mechanism, and the raw materials are loaded into the shuttle car; The front gate is in the closed state, the front door is opened, the shuttle car moves along the rotary track mechanism into the preheating chamber, and the front door is closed; B. Preheating: When the front door is closed, open the front gate to allow the heat from the pyrolysis carbonization bin to enter the preheating bin and preheat the raw materials on the shuttle bus until the preheating temperature is reached; C. Pyrolysis carbonization: The shuttle car moves from the preheating bin to the pyrolysis carbonization bin; The raw materials on the shuttle bus are burned in the combustion chamber and produce flue gas, which is then treated by the flue gas treatment mechanism and then discharged; The raw materials burned on the shuttle bus are carbonized in the carbonization bin and produce combustible gas, which is then fed back into the pyrolysis carbonization bin from the gas inlet through the blower to improve the oxygen-free and low-oxygen environment in the pyrolysis carbonization bin. D. Cooling: The front gate and rear door are closed, open the rear gate, move the shuttle bus into the cooling bin, and close the rear gate; The cooling bin is cooled by the cooling sleeve until the cooling temperature is reached; E. Carbonized product output: The front gate is closed, the rear door is opened, the shuttle bus drives out and the carbonized materials on the shuttle bus are packaged; F. Carbonized material processing and storage; The shuttle car moves along the horizontal rail, the rear longitudinal rail, and the connecting horizontal rail to the forming mechanism; The carbonized material on the shuttle car is sent to the conveyor belt. The carbonized material on the conveyor belt is extruded and formed by multiple rod extruders and sent to a small silo. The carbonized profiles temporarily stored in the small silo are sent to the screw conveyor through the feeding belt and transported to the storage silo through the screw conveyor. The multiple storage silos are connected through the silo top conveyor and bucket elevator for material balance and external delivery.
[0016] Beneficial effects of the pyrolysis carbonization system for biomass and solid waste and the continuous production method thereof of the present invention: 1. The three-stage structure and rotary track mechanism of the carbonization furnace make the pyrolysis carbonization process more continuous, thereby increasing the output; 2. Reusing the produced combustible gas into the process can save energy and ensure the process temperature, reduce external emissions and reduce pollution to the environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the main cross-section of a carbonization furnace according to an example of the present invention; Figure 2 This invention is an example Figure 1 A magnified schematic diagram of part A; Figure 3 It is a top view and cutaway schematic diagram of a carbonization furnace according to an example of the present invention; Figure 4 is a schematic side view of a carbonization furnace according to an example of the present invention; Figure 5 is a schematic diagram of the system layout of an example of the present invention; Figure 6 This invention is an example Figure 5 A local enlarged schematic diagram of the .
[0018] In the figure: 1. Front pre-set bin, 10. Preheat bin, 11. Front bin door, 2. Pyrolysis carbonization chamber, 20. Pyrolysis carbonization chamber body, 201. Combustion chamber body, 202. Carbonization chamber body, 203, spoiler extension chamber, 211, smoke outlet, 212, gas outlet, 221, front gate, 222, rear gate, 23. Gas inlet, 231. Turbine port, 232. Combustion-supporting port, 241. Refractory brick layer, 242. Concrete reinforcement layer, 243, lightweight insulation brick layer, 244, concrete anchor column, 251, track base, 253, shuttle bus, 3. Rear pre-set bin, 30. Cooling bin body, 31. Rear bin door, 32. Cooling spacer, 4. Flue gas treatment mechanism, 41. Smoke exhaust pipe, 42. Water filter tower, 43. Electrostatic precipitator, 44. Bag filter, 45. induced draft fan, 46. chimney, 5. Rotating track mechanism, 51. Horizontal rail, 52. Front longitudinal rail, 53. Rear longitudinal rail, 54. Connecting horizontal rail, 55. Inspection rail, 56. Unloading rails, 6. Forming mechanism, 61. Conveyor belt, 62. Rod extruder, 63. Small silo, 64. Feeding belt, 65. Screw conveyor, 66. Storage silo, 67. Silo top conveyor, 68. Bucket elevator, 7. Raw material loading mechanism. DETAILED DESCRIPTION
[0019] In order to more clearly and specifically explain the specific implementation purpose and implementation mode of the present invention, the technical solution of the present invention will be fully described below. The described embodiments are part of the embodiments of the present invention, but not all of them. Without making creative work, all other embodiments based on the embodiments described in the present invention belong to the protection scope of the present invention.
[0020] The present invention provides a pyrolysis carbonization system for biomass and solid waste, such as Figure 5 As shown, including: Carbonization furnace used for pyrolysis and carbonization of raw materials, such as Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown, including: The front pre-setting chamber 1, the pyrolysis carbonization chamber 2, and the rear pre-setting chamber 3 are arranged in parallel in sequence, and the front pre-setting chamber 1, the pyrolysis carbonization chamber 2, and the rear pre-setting chamber 3 are respectively provided with a temperature monitoring component and an oxygen content monitoring component.
[0021] Front pre-positioned warehouse 1, including: A cylindrical preheating chamber 10, the front of which is sealed with a front chamber door 11; Rear preset compartment 3, including: The cooling bin body 30 is cylindrical, and a rear bin door 31 is provided at the rear of the cooling bin body 30 . A cooling sleeve 32 is provided on the outer cover of the cooling bin body 30 .
[0022] Pyrolysis carbonization chamber 2, including: The cylindrical pyrolysis carbonization bin body 20 is connected between the preheating bin body 10 and the cooling bin body 30 .
[0023] The pyrolysis carbonization bin 20 comprises: The combustion chamber 201 and the carbonization chamber 202 are arranged in parallel from front to back, and one side of the combustion chamber 201 and the carbonization chamber 202 is connected to a protruding extension chamber 203 with a spoiler, the upper end of the combustion chamber 201 is connected to a smoke exhaust port 211, and the front end of the combustion chamber 201 is provided with a front gate 221, and the upper end of the carbonization chamber 202 is connected to a gas exhaust port 212, and the gas exhaust port 212 is connected to a blower, and the outlet of the blower The rear end of the carbonization bin 202 is provided with a rear gate 222, and the combustion bin 201, the carbonization bin 202, and the side walls of the spoiler extension bin 205 are connected with a gas inlet 23, and an ignition mechanism is provided at the gas inlet 23. A plurality of gas inlets 23 are arranged in parallel along the front and rear directions and are arranged between the partition walls of the refractory brick layer 241, including: a spoiler port 231 arranged on the spoiler extension bin 205, and a spoiler port 232 arranged on the combustion bin 201, the carbonization bin 202, and the spoiler extension bin 205. The combustion-supporting port 232 on the carbonization bin body 202, the spoiler port 231 and the combustion-supporting port 232 are staggered in the front-to-back direction; the combustion bin body 201, the carbonization bin body 202, and the spoiler extension bin body 205 are provided with a refractory brick layer 241 inside, and the refractory brick layer 241 is extended inwardly to provide a partition wall, and the front and rear ends of the combustion bin body 201 and the carbonization bin body 202 are respectively provided with a lightweight insulation brick layer 243, and the refractory brick layer 241 and the lightweight insulation brick layer 243 are provided with a concrete reinforcement layer 2 42, a plurality of concrete anchoring columns 244 are arranged outside the concrete reinforcement layer 242; a track base 251 is arranged at the bottom of the combustion bin body 201 and the carbonization bin body 202, and the track base 251 is used to carry a rotating track mechanism 5, and a movable shuttle bus 253 is arranged on the rotating track mechanism 5, and the shuttle bus 253 is used to place organic matter. In addition, a placement barrel is placed on the shuttle bus 253, and the placement barrel is used to hold the organic matter, so that it is suitable for organic matter of different shapes.
[0024] The carbonization furnace is connected to a flue gas treatment mechanism 4, such as Figure 6 As shown, including: A smoke exhaust pipe 41 is connected to the smoke exhaust port 211, and a water filter tower 42, an electrostatic precipitator 43, a bag filter 44, an induced draft fan 45, and a chimney 46 are sequentially connected to the end of the smoke exhaust pipe 41.
[0025] The rotary track mechanism 5 is provided in the carbonization furnace from the outside, such as Figure 6 As shown, including: A horizontal rail 51 runs through the carbonization furnace, and the horizontal rail 51 extends outside the carbonization furnace, and is connected to a front longitudinal rail 52 and a rear longitudinal rail 53 at the front and rear ends respectively. A connecting horizontal rail 54 connected to the front longitudinal rail 52 and the rear longitudinal rail 53 is provided on one side of the carbonization furnace, and a vehicle inspection rail 55 and a vehicle unloading rail 56 are connected to the rear longitudinal rail 53.
[0026] like Figure 5 As shown, a forming mechanism 6 and a raw material loading mechanism 7 are arranged on one side of the rotary track mechanism 5 .
[0027] The forming mechanism 6, such as Figure 5 As shown, including: A conveyor belt 61 is arranged on one side of the connecting cross rail 54, and a plurality of rod extruders 62 are arranged on the discharge side of the conveyor belt 61, a small silo 63 is arranged at the output outlet of the rod extruder 62, a feeding belt 64 is arranged at the outlet of the small silo 63, a screw conveyor 65 is arranged on the discharge side of the feeding belt 64, a storage silo 66 is arranged at the outlet of the screw conveyor 65, there are a plurality of storage silos 66, and a silo top conveyor 67 is arranged between the tops of adjacent storage silos 66, and a bucket elevator 68 is arranged outside the storage silo 66.
[0028] In order to ensure the process temperature of pyrolysis carbonization, According to the specific structure of a pyrolysis carbonization system for biomass and solid waste in the above embodiment, combined with Figure 5 As shown, a continuous production method for a pyrolysis carbonization system for biomass and solid waste is further described below: A. Raw material supply: The shuttle bus 253 moves along the connecting horizontal rail 54 to the raw material loading mechanism 7, and loads the organic raw material into the placement barrel in the shuttle bus 253; The shuttle bus 253 travels along the connecting transverse rail 54 and the front longitudinal rail 52 to the transverse rail 51; The front gate 221 is in a closed state, the front door 11 is opened, the shuttle bus 253 moves along the horizontal track 51 into the preheating bin body 10, and the front door 11 is closed.
[0029] B. Preheating: The front door 11 is closed, and the front gate 221 is opened to allow the heat of the pyrolysis carbonization bin 20 to enter the preheating bin 10 and preheat the raw materials on the shuttle bus 253 until the preheating temperature is reached.
[0030] C. Pyrolysis carbonization: The shuttle bus 253 moves along the horizontal track 51 from the preheating bin 10 to the pyrolysis carbonization bin 20; The raw materials on the shuttle bus 253 are burned in the combustion bin 201 and produce flue gas, which is treated by the flue gas treatment mechanism 4 and then discharged; The raw materials burned on the shuttle 253 are carbonized in the carbonization bin 202 and produce combustible gas, which is then fed back into the pyrolysis carbonization bin 20 through the gas inlet 23 by the blower to improve the oxygen-free and low-oxygen environment in the pyrolysis carbonization bin 20. The temperature and oxygen content in the combustion bin 201 and the carbonization bin 202 are monitored respectively by the temperature monitoring component and the oxygen content monitoring component to ensure the process conditions of pyrolysis and carbonization.
[0031] D. Cooling: The front gate 221 and the rear door 31 are in a closed state, the rear gate 222 is opened, the shuttle bus 253 moves along the horizontal track 51 into the cooling bin body 30, and the rear gate 222 is closed; The cooling chamber 30 is cooled by the cooling sleeve 32 until the cooling temperature is reached.
[0032] E. Carbonized product output: The front gate 221 is in a closed state, the rear door 31 is opened, and the shuttle bus 253 moves along the horizontal track 51; The ferry car 253 moves along the horizontal rail 51 and the rear longitudinal rail 53 to the unloading rail 56 to package the carbonized material on the ferry car 253; F. Carbonized material processing and storage; The shuttle bus 253 moves along the transverse rail 51, the rear longitudinal rail 53, and the connecting transverse rail 54 to the forming mechanism 6; The carbonized material on the shuttle bus 253 is sent to the conveyor belt 61, and the carbonized material on the conveyor belt 61 is extruded and formed by multiple rod extruders 62 and sent to a small silo 63. The carbonized profiles temporarily stored in the small silo 63 are sent to the screw conveyor 65 through the feeding belt 64, and are transported to the storage silo 66 through the screw conveyor 65. The multiple storage silos 66 are connected through the silo top conveyor 67 and the bucket elevator 68 to balance the materials and send them out.
[0033] In summary, the above are only preferred embodiments of the present invention and are not intended to limit the scope of the present invention. Through the above description, relevant staff can make various changes and modifications without departing from the technical concept of the present invention. The technical scope of the present invention is not limited to the contents of the specification. All so-called equal changes and modifications of the shapes, structures, features and spirits described in the scope of the claims of the present invention should be included in the scope of the claims of the present invention.
Claims
1. A pyrolysis carbonization system for biomass and solid waste, characterized by: include: A carbonization furnace for pyrolyzing and carbonizing raw materials; The carbonization furnace is connected to a flue gas treatment mechanism (4); A rotary track mechanism (5) is provided from outside and penetrates into the carbonization furnace; A forming mechanism (6) and a raw material loading mechanism (7) are provided on one side of the rotary track mechanism (5).
2. A pyrolysis carbonization system for biomass and solid waste according to claim 1, characterized in that: The carbonization furnace comprises: A front pre-setting chamber (1), a pyrolysis carbonization chamber (2), and a rear pre-setting chamber (3) are arranged in sequence.
3. A pyrolysis carbonization system for biomass and solid waste according to claim 2, characterized in that: The front pre-positioning warehouse (1) comprises: A cylindrical preheating bin (10), the front portion of the preheating bin (10) being sealed and provided with a front bin door (11); The rear pre-placement bin (3) comprises: A cylindrical cooling bin body (30) is provided with a rear bin door (31) at the rear of the cooling bin body (30), and a cooling sleeve (32) is provided on the outer cover of the cooling bin body (30).
4. A pyrolysis carbonization system for biomass and solid waste according to claim 3, characterized in that: The pyrolysis carbonization bin (2) comprises: A cylindrical pyrolysis carbonization bin (20) connected between the preheating bin (10) and the cooling bin (30); The pyrolysis carbonization bin (20) comprises: A combustion chamber (201) and a carbonization chamber (202) are arranged in parallel from front to back, one side of the combustion chamber (201) and the carbonization chamber (202) is connected to a protruding extension chamber (203) with a spoiler, the upper end of the combustion chamber (201) is connected to a smoke outlet (211), the front end of the combustion chamber (201) is provided with a front gate (221), the upper end of the carbonization chamber (202) is connected to a gas outlet (212), and the carbonization chamber (202) is connected to a gas outlet (212). A rear gate (222) is provided at the rear end of the combustion bin body (202); a gas inlet (23) is provided on the side walls of the combustion bin body (201), the carbonization bin body (202) and the spoiler extension bin body (205); a track base (251) is provided at the bottom of the combustion bin body (201) and the carbonization bin body (202); the track base (251) is used to carry a rotating track mechanism (5); and a movable shuttle vehicle (253) is provided on the rotating track mechanism (5).
5. A pyrolysis carbonization system for biomass and solid waste according to claim 4, characterized in that: The combustion chamber (201), the carbonization chamber (202), and the spoiler extension chamber (205) are provided with a refractory brick layer (241) inside, and a partition wall is provided inwardly extending from the refractory brick layer (241). Lightweight thermal insulation brick layers (243) are provided at the front and rear ends of the combustion chamber (201) and the carbonization chamber (202), respectively. A concrete reinforcement layer (242) is provided outside the refractory brick layer (241) and the lightweight thermal insulation brick layer (243), and a plurality of concrete anchoring columns (244) are provided outside the concrete reinforcement layer (242).
6. A pyrolysis carbonization system for biomass and solid waste according to claim 5, characterized in that: The gas inlet (23) is arranged in parallel in a plurality along the front-to-back direction and is arranged between the partition walls of the refractory brick layer (241), including: The spoiler openings (231) are arranged on the spoiler extension chamber (205), and the combustion-supporting openings (232) are arranged on the combustion chamber (201) and the carbonization chamber (202), wherein the spoiler openings (231) and the combustion-supporting openings (232) are arranged alternately along the front-rear direction.
7. A pyrolysis carbonization system for biomass and solid waste according to claim 4, characterized in that: The flue gas treatment mechanism (4) comprises: A smoke exhaust pipe (41) is connected to the smoke exhaust port (211), wherein the end of the smoke exhaust pipe (41) is connected in sequence to a water filter tower (42), an electrostatic precipitator (43), a bag filter (44), an induced draft fan (45), and a chimney (46).
8. A pyrolysis carbonization system for biomass and solid waste according to claim 4, characterized in that: The rotary track mechanism (5) comprises: A transverse rail (51) passes through the carbonization furnace, the transverse rail (51) extends outside the carbonization furnace, and is connected to a front longitudinal rail (52) and a rear longitudinal rail (53) at the front and rear ends, respectively; a connecting transverse rail (54) connected to the front longitudinal rail (52) and the rear longitudinal rail (53) is provided on one side of the carbonization furnace, and a vehicle inspection rail (55) and a vehicle unloading rail (56) are connected to the rear longitudinal rail (53).
9. A pyrolysis carbonization system for biomass and solid waste according to claim 4, characterized in that: The forming mechanism (6) comprises: A conveyor belt (61) is arranged on one side of the connecting cross rail (54); a rod extruder (62) is arranged on the discharge side of the conveyor belt (61); a small material bin (63) is arranged at the output outlet of the rod extruder (62); a feeding belt (64) is arranged at the outlet of the small material bin (63); a screw conveyor (65) is arranged on the discharge side of the feeding belt (64); a storage bin (66) is arranged at the outlet of the screw conveyor (65); a bin top conveyor (67) is arranged on the top of the storage bin (66); and a bucket elevator (68) is arranged outside the storage bin (66).
10. A continuous production method for a pyrolysis carbonization system for biomass and solid waste, according to claim 6, characterized in that: A. Raw material supply: The ferry car (253) travels along the rotary track mechanism (5) to the raw material loading mechanism (7), and the raw materials are loaded into the ferry car (253); The front gate (221) is in a closed state, the front warehouse door (11) is opened, the shuttle vehicle (253) moves along the rotary track mechanism (5) into the preheating warehouse body (10), and the front warehouse door (11) is closed; B. Preheating: When the front bin door (11) is closed, the front gate (221) is opened to allow the heat of the pyrolysis carbonization bin body (20) to enter the preheating bin body (10) and preheat the raw materials on the shuttle vehicle (253) until the preheating temperature is reached; C. Pyrolysis carbonization: The shuttle vehicle (253) moves from the preheating bin (10) to the pyrolysis carbonization bin (20); The raw materials on the shuttle vehicle (253) are burned in the combustion bin (201) to generate flue gas, which is then treated by the flue gas treatment mechanism (4) and then discharged; The raw materials burned on the shuttle vehicle (253) are carbonized in the carbonization bin (202) to produce combustible gas, which is then fed back into the pyrolysis carbonization bin (20) through the gas inlet (23) via a blower, thereby improving the oxygen-free or low-oxygen environment in the pyrolysis carbonization bin (20); D. Cooling: The front gate (221) and the rear door (31) are in a closed state, the rear gate (222) is opened, the shuttle vehicle (253) moves into the cooling bin body (30), and the rear gate (222) is closed; Cooling the cooling bin (30) by means of a cooling sleeve (32) until the cooling temperature is reached; E. Carbonized product output: The front gate (221) is in a closed state, the rear door (31) is opened, the shuttle bus (253) drives out and the carbonized material on the shuttle bus (253) is packaged; F. Carbonized material processing and storage; The ferry vehicle (253) moves along the transverse rail (51), the rear longitudinal rail (53), and the connecting transverse rail (54) to the forming mechanism (6); The carbonized material on the shuttle car (253) is sent to the conveyor belt (61), and the carbonized material on the conveyor belt (61) is extruded and formed by multiple rod extruders (62) and sent to a small silo (63). The carbonized profiles temporarily stored in the small silo (63) are sent to the screw conveyor (65) through the feeding belt (64), and are transported to the storage silo (66) through the screw conveyor (65). The multiple storage silos (66) are connected through the silo top conveyor (67) and the bucket elevator (68) to balance the materials and send them out.
Citation Information
Patent Citations
Meat corpse continuous pyrolysis carbonization method and device
CN105154112A
Biomass pyrolysis carbonization system
CN116064058A
High-capacity carbonization equipment
JP1999124582A