Rapid installation box body mechanism device of offshore platform natural gas differential pressure generator set

By designing the rapid installation of the box mechanism device of the natural gas pressure differential generator set on the offshore platform, the cooperation of the dual roller assembly and the load-bearing assembly is used to solve the problem of difficult and high cost of installation on the offshore platform, and the split lifting and rapid installation and disassembly are realized, reducing labor costs and workload.

CN119934343AActive Publication Date: 2025-05-06HAINAN BRANCH OF CHINA NATIONAL OFFSHORE OIL (CHINA) CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202510108559.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-23
Publication Date
2025-05-06
Estimated Expiration
2045-01-23

AI Technical Summary

Technical Problem

During the installation and maintenance of natural gas pressure differential generator sets on offshore platform, due to space and crane weight limits, the traditional skid installation structure cannot be applied, resulting in high installation difficulty and high cost. The equipment is installed in a compact production process area and operation is limited.

Method used

A rapid installation of box mechanism device for natural gas pressure differential generator sets on offshore platform is designed, including box base and unit base. Through the cooperation of dual roller components and load-bearing components, the split lifting and rapid installation and disassembly of the unit base are realized.

Benefits of technology

It realizes split lifting that meets the weight limit of offshore platform lifting, simplifies the installation and disassembly process, reduces labor costs and workload, and adapts to the operating space and direction limitations of offshore platform.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119934343A_ABST
    Figure CN119934343A_ABST
Patent Text Reader

Abstract

The invention discloses an offshore platform natural gas differential pressure generator set rapid installation box body mechanism device which comprises a box body base and a unit base, and the width of the unit base is smaller than that of the inner wall of the box body base. The rapid installation box body mechanism device comprises a unit base, a box body base and a double-rolling-wheel assembly, the double-rolling-wheel assembly is arranged below the unit base and used for installation of the unit base and the box body base, and the double-rolling-wheel assembly comprises a plurality of sets of supporting pieces arranged on the two sides of the lower portion of the unit base respectively. Through cooperation of the double-roller assembly and the bearing assembly, the problems that an original natural gas differential pressure generator set is large in transportation, hoisting, installation and disassembly process difficulty and high in cost, differential pressure power generation equipment is usually installed in a production process area with compact layout on a platform and is close to production process facilities, installation and maintenance operation is limited by the overall space size, and the cost is low are solved. The weight, the direction and the like are limited.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of generator set installation, and in particular to a box mechanism device for quickly installing a natural gas pressure difference generator set on an offshore platform. Background Art

[0002] The installation and maintenance space of the traditional natural gas differential pressure generator set used on land is sufficient. When installing the equipment, repairing faults or disassembling for regular maintenance, tools such as cranes or forklifts can usually be used for operation, which is convenient and efficient. Therefore, the skid-mounted design of the natural gas differential pressure generator usually adopts an integrated structural design, which is simple and reliable.

[0003] However, due to space constraints, crane weight limits, installation equipment and other conditions on offshore platforms, if the weight of the skid-mounted generator set exceeds the platform crane limit and the entire skid cannot be lifted by the platform crane, the skid-mounted equipment needs to be disassembled, and the box, prime mover or generator needs to be removed and lifted separately, and then aligned and assembled after being lifted to the platform. This process is time-consuming and labor-intensive.

[0004] Similarly, the transportation, hoisting, installation and disassembly of natural gas differential pressure generator sets have the same problems, which makes installation difficult and costly. In addition, differential pressure generators are usually installed in the compact production process area of ​​the platform, close to the production process facilities. Installation and maintenance operations are not only limited by the overall space size, but also by weight, direction, etc. Therefore, the traditional skid-mounted structure is no longer applicable, and it is necessary to design an innovative split structure that can be hoisted separately to meet the weight limit of the offshore platform crane, and on the other hand, can be easily and quickly installed and disassembled to meet the restrictions on the size and direction of the offshore platform operating space. To this end, we propose a quick installation box mechanism device for natural gas differential pressure generator sets on offshore platforms. Summary of the invention

[0005] The object of the present invention is to provide a quick installation box mechanism device for a natural gas pressure difference generator set on an offshore platform to solve the problems raised in the above background technology.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a quick installation box mechanism device for a natural gas pressure difference generator set on an offshore platform, comprising a box base and a unit base, the unit base is installed inside the box base, and the width of the unit base is less than the width of the inner wall of the box base; a double roller assembly, the double roller assembly is arranged below the unit base and is used for the installation of the unit base and the box base, and comprises a plurality of groups of support members respectively arranged at both sides below the unit base, a plurality of groups of rolling shafts are rotatably connected to the support members, the rolling shafts are all provided with bearings, and rollers are connected through the bearings; a load-bearing assembly, the load-bearing assembly is arranged below the support members and is adapted to the box base, so as to solve the problems that the transportation, hoisting, installation and disassembly processes of the original natural gas pressure difference generator set are difficult and costly, and the pressure difference power generation equipment is usually installed in a compact production process area on the platform, close to the production process facilities, and the installation and maintenance operations are not only limited by the overall space size, but also by weight, direction, etc.

[0007] Preferably, the load-bearing assembly includes a plurality of jacks respectively arranged under the plurality of groups of support members, the outer side of the jack is detachably connected with a mounting ring, a telescopic rod is fixedly connected between the corresponding mounting rings on both sides below the base of the unit, a plug-in sleeve is fixedly connected to the mounting ring, the plug-in sleeve is provided with a plug-in groove, and the plug-in sleeve and the telescopic rod are vertically arranged, a plug-in rod is fixedly connected to the mounting ring in the opposite direction of the plug-in sleeve, and the plug-in rod is adapted to the plug-in groove.

[0008] Preferably, the support member includes two groups of support side plates arranged in a mirror image, a positioning sleeve is arranged between the two groups of support side plates, a stud bolt passing through the two groups of support side plates is arranged in the positioning sleeve, and fastening nuts are threadedly connected at both ends of the stud bolt.

[0009] Preferably, a positioning block which cooperates with the unit base for installation is fixedly connected to the box base, and a positioning screw for fixing the unit base is provided on the box base.

[0010] Preferably, there are six groups of support members in total, and they are evenly and symmetrically arranged below the base of the unit.

[0011] Preferably, four rollers are provided on each group of the support members, and the four groups of rollers are symmetrically arranged in pairs on the two groups of support side panels, which is beneficial to enhancing the support for the unit base.

[0012] Preferably, one end of the plug-in rod away from the mounting ring is configured to be tapered, which is beneficial for facilitating the insertion of the plug-in rod into the plug-in groove in the plug-in sleeve during docking.

[0013] Compared with the prior art, the present invention has the following beneficial effects:

[0014] The present invention solves the problems that the transportation, hoisting, installation and disassembly of the original natural gas pressure difference generator set are difficult and costly, and the pressure difference generator set is usually installed in a compact production process area on the platform, close to the production process facilities, and the installation and maintenance operations are not only limited by the overall space size, but also by weight, direction, etc. Through the cooperation of the double roller assembly and the load-bearing assembly, the box base is first hoisted to the installation position by the offshore platform crane, and then the load-bearing assembly is placed at the side entrance of the box base, and multiple sets of double roller assemblies are correspondingly placed on the load-bearing assembly. Then hoist the unit base to the side close to the box base and above the rollers, and finally push the unit base directly until it is translated to the installation position in the box base, and then fix it; no on-site disassembly and alignment operations are required during installation to reduce dynamic balance safety issues. At the same time, the unit base and the box base can be hoisted separately to meet the offshore platform hoisting weight limit. In addition, the maintenance operation space and direction restrictions of the accessories of the natural gas pressure difference power generation skid-mounted installation position are met, and installation and disassembly operations can be carried out conveniently and quickly, with small workload and low labor costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a side structural schematic diagram of the installation process of the unit base and the box base of the present invention;

[0016] Figure 2 This is a schematic diagram of the structure in which the unit base and the box base of the present invention are installed;

[0017] Figure 3 It is a schematic diagram of the overall structure of the double roller assembly of the present invention;

[0018] Figure 4 It is a schematic diagram of the side structure of the double roller assembly of the present invention;

[0019] Figure 5 It is a schematic diagram of the overall structure of the load-bearing assembly of the present invention;

[0020] Figure 6 It is a schematic diagram of the local structural coordination of the load-bearing components of the present invention.

[0021] In the figure: 1. Box base; 2. Unit base; 3. Double roller assembly; 4. Support; 5. Rolling shaft; 6. Bearing; 7. Roller; 8. Load-bearing assembly; 9. Jack; 10. Mounting ring; 11. Telescopic rod; 12. Plug-in sleeve; 13. Plug-in slot; 14. Plug-in rod; 15. Support side plate; 16. Positioning sleeve; 17. Stud bolt; 18. Fastening nut; 19. Positioning block; 20. Positioning screw. DETAILED DESCRIPTION

[0022] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the relevant invention, rather than to limit the invention. It should also be noted that, for ease of description, only the parts related to the invention are shown in the accompanying drawings.

[0023] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0024] See also Figure 1-6 The present invention provides a technical solution: a quick installation box mechanism device for a natural gas pressure difference generator set on an offshore platform, comprising a box base 1 and a unit base 2, wherein the unit base 2 is installed inside the box base 1, and the width of the unit base 2 is smaller than the width of the inner wall of the box base 1; a double roller assembly 3, which is arranged below the unit base 2 and is used for the installation of the unit base 2 and the box base 1, and comprises a plurality of support members 4 respectively arranged at both sides below the unit base 2, and a plurality of rolling shafts are rotatably connected to the support member 4 5, bearings 6 are provided on the rolling shafts 5, and rollers 7 are connected through the bearings 6; load-bearing components 8, which are arranged below the support member 4 and matched with the box base 1, wherein a positioning block 19 installed in cooperation with the unit base 2 is fixedly connected to the box base 1, and the positioning block 19 is used to limit the final position of the unit base 2 after being pushed into the box base 1, and a positioning screw 20 for fixing the unit base 2 is provided on the box base 1, and the positioning screw 20 is used to fix the two after the position of the unit base 2 is determined.

[0025] Furthermore, the support member 4 includes two groups of support side panels 15 that are mirror-imaged, and the support side panels 15 are in a right-angle shape as a whole. A positioning sleeve 16 is arranged between the two groups of support side panels 15, and a stud bolt 17 that penetrates the two groups of support side panels 15 is arranged in the positioning sleeve 16. Both ends of the stud bolt 17 are threadedly connected with a fastening nut 18. Among them, according to the length of the existing unit base 2, a total of six groups of support members 4 are arranged, and they are evenly symmetrically arranged below the unit base 2. Without affecting the normal pushing of the unit base 2 into the box base 1, the number of support members 4 is saved. In addition, four rollers 7 are arranged on each group of support members 4, and the four groups of rollers 7 are symmetrically arranged on the two groups of support side panels 15 in pairs, so that the unit base 2 can be stably moved on the rollers 7, and it is convenient to disassemble the two sides for maintenance.

[0026] like Figure 1 , Figure 2 , Figure 5 as well as Figure 6As shown, the load-bearing assembly 8 includes a plurality of jacks 9 respectively arranged under the plurality of groups of support members 4, and a mounting ring 10 is detachably connected to the outer side of the jack 9, and a telescopic rod 11 is fixedly connected between the corresponding mounting rings 10 on both sides below the unit base 2, and a plug-in sleeve 12 is fixedly connected to the mounting ring 10, and a plug-in groove 13 is provided in the plug-in sleeve 12, and the plug-in sleeve 12 is vertically arranged to the telescopic rod 11, and a plug-in rod 14 is fixedly connected to the mounting ring 10 in the opposite direction of the plug-in sleeve 12, and the plug-in rod 14 is adapted to the plug-in groove 13, wherein the end of the plug-in rod 14 away from the mounting ring 10 is arranged to be conical.

[0027] In a specific implementation, during installation, the box base 1 is first hoisted to the installation position by an offshore platform crane, and then multiple groups of jacks 9 are symmetrically placed at the entrance of the side of the box base 1 in sequence, and the jacks 9 on both sides are pulled, and the telescopic rods 11 between the symmetrical mounting rings 10 on both sides cooperate to extend and retract, and are adjusted accordingly according to the width of the unit base 2, and the jacks 9 on the same side cooperate with the plug sleeves 12 and the plug rods 14 in the opposite directions of the mounting rings 10, and the plug rods 14 are inserted into the plug slots 13 on the plug sleeves 12, and the overall position is adjusted synchronously, which is convenient for operation and saves man-hours, and the end of the plug rod 14 is set to a cone, which is convenient for manual insertion into the plug slot 13;

[0028] Put multiple sets of double roller assemblies 3 on the top surface of the jack 9 in sequence, and the support member 4 contacts the jack 9. By controlling the jack 9 to operate, the double roller assembly 3 is controlled to rise and fall, so that the roller 7 at the top of the support member 4 is higher than the installation surface of the box base 1. Then, the unit base 2 is hoisted to the side of the box base 1 and is located above the roller 7. At this time, the male channel steel at the bottom of the unit base 2 is located between the rollers 7 on both sides of the support member 4. Then, the unit base 2 is pushed to translate on the rollers 7 and gradually move into the inside of the box base 1. When the unit base 2 moves out from the rollers 7 on both sides of the outermost end, it contacts the other four sets of rollers 7. At this time, the plug-in sleeve 12 is pulled to move the plug-in rod 14 at the opposite direction of the mounting ring 10 out of the other group of plug-in sleeves 12, and carried to the other end of the box base 1, so that the plug-in sleeve 12 is plugged with the plug-in rod 14 inside the box base 1. According to the actual distance, this operation is repeated in a cycle until the unit base 2 moves to contact the positioning block 19. At this time, the unit base 2 reaches the installation position, and the unit base 2 is fixed to the current position in the box base 1 by the positioning screws 20, thereby completing the installation, and then the double roller assembly 3 and the load-bearing assembly 8 can be removed. When the expander generator on the unit base 2 is maintained later, the above operation is reversed.

[0029] It is worth noting that in order to facilitate the maintenance of the roller 7, the support member 4 is detachable. After unscrewing the fastening nuts 18 at both ends of the stud bolt 17, the stud bolt 17 is pulled out from between the positioning sleeve 16 and the two sets of support side plates 15. The two sets of mirror-image support side plates 15 have been separated, and the rolling shaft 5 and the bearing 6 in the roller 7 can be disassembled and maintained. After that, the two sets of rollers 7 on the support side plates 15 can be maintained separately.

[0030] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A quick installation box mechanism device for a natural gas pressure difference generator set on an offshore platform, characterized in that: include: A box base (1) and a unit base (2), wherein the unit base (2) is installed inside the box base (1), and the width of the unit base (2) is smaller than the width of the inner wall of the box base (1); A double roller assembly (3), the double roller assembly (3) being arranged below the unit base (2) and used for mounting the unit base (2) and the box base (1), comprising a plurality of support members (4) respectively arranged at two sides below the unit base (2), a plurality of rolling shafts (5) being rotatably connected to the support members (4), the rolling shafts (5) being each provided with a bearing (6), and being connected to a roller (7) via the bearing (6); A load-bearing component (8), wherein the load-bearing component (8) is arranged below the support member (4) and is adapted to the box base (1).

2. According to claim 1, a quick installation box mechanism device for a natural gas pressure difference generator set on an offshore platform is characterized in that: The load-bearing assembly (8) comprises a plurality of jacks (9) respectively arranged below the plurality of groups of support members (4); a mounting ring (10) is detachably connected to the outer side of the jack (9); a telescopic rod (11) is fixedly connected between the corresponding mounting rings (10) on both sides below the unit base (2); a plug-in sleeve (12) is fixedly connected to the mounting ring (10); the plug-in sleeve (12) is provided with a plug-in slot (13), and the plug-in sleeve (12) and the telescopic rod (11) are arranged vertically; a plug-in rod (14) is fixedly connected to the mounting ring (10) in the opposite direction of the plug-in sleeve (12), and the plug-in rod (14) is adapted to the plug-in slot (13).

3. The quick installation box mechanism device for the offshore platform natural gas pressure difference generator set according to claim 2 is characterized in that: The support member (4) comprises two groups of support side plates (15) arranged in a mirror image, a positioning sleeve (16) is arranged between the two groups of support side plates (15), a stud bolt (17) penetrating the two groups of support side plates (15) is arranged in the positioning sleeve (16), and fastening nuts (18) are threadedly connected at both ends of the stud bolt (17).

4. The quick installation box mechanism device for the offshore platform natural gas pressure difference generator set according to claim 3 is characterized in that: A positioning block (19) is fixedly connected to the box base (1) and is installed in coordination with the unit base (2). A positioning screw (20) for fixing the unit base (2) is arranged on the box base (1).

5. The quick installation box mechanism device for the offshore platform natural gas pressure difference generator set according to claim 4 is characterized in that: A total of six groups of support members (4) are provided, and are evenly and symmetrically arranged below the unit base (2).

6. The quick installation box mechanism device for the offshore platform natural gas pressure difference generator set according to claim 5 is characterized in that: Each group of the support members (4) is provided with four rollers (7), and the four groups of rollers (7) are symmetrically arranged in pairs on the two groups of support side plates (15).

7. The quick installation box mechanism device for the offshore platform natural gas pressure difference generator set according to claim 2 is characterized in that: One end of the plug-in rod (14) away from the mounting ring (10) is configured to be conical.

Citation Information

Patent Citations

  • Overall horizontal preloading-boarding system for offshore wind turbine and preloading-boarding method

    CN108019321A

  • Transportation system and method for transporting tower of wind turbine

    CN114941607A

  • Device of jacking in a truck

    KR1019970026891A