Sectional stacking method for thin plates of PCTC ship
By reasonably stacking the movable deck and fixed decks of the PCTC ship, and using appropriate tooling, the problem of large area occupies the site when the thin plate section is placed separately, achieving the effect of saving site area and preventing structural deformation.
Patent Information
- Application Number
- CN202510226332.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-27
- Publication Date
- 2025-05-09
AI Technical Summary
When the thin plate sections of PCTC ships are placed separately, the gantry shelf pier resources are required, which occupies a large area of the site, and structural deformation is easily caused when stacked.
A PCTC ship thin plate segment stacking method is adopted. By reasonably stacking and movable decks and fixed decks, using gantry shelving piers, flower shelving piers and protective railings, we ensure that the strong structure on the outermost periphery of the segmented frame surface can fall on the shelving piers, and prevent structural deformation through welding connections and limit plates.
It effectively saves the site area, reduces the demand for gantry shelving piers, avoids structural deformation when thin plates are stacked in sections, and improves the efficiency and quality of segment construction.
Smart Images

Figure CN119953529A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a PCTC ship thin plate segment stacking method. Background Art
[0002] The thin plate section of PCTC ship (RoRo car carrier) is an important part of it. The thin plate section includes movable deck and fixed deck. There are many of them in the whole ship, and they occupy a large area. Due to the special structure of the thin plate section, there is only one horizontal deck frame and no bulkhead structure. Before the general assembly, multiple decks need to be stacked on the gantry pier to save the site area.
[0003] There are many thin plate sections in the PCTC ship. If each thin plate section is placed on the gantry pier separately, more gantry pier resources are required and a larger site area is occupied. In order to save site resources, affect the construction period of sections, facilitate section painting, and avoid structural deformation when sections are stacked, a PCTC ship thin plate section stacking method is proposed. Summary of the invention
[0004] The object of the present invention is to overcome the existing defects and provide a PCTC ship thin plate segment stacking method, which effectively saves site area.
[0005] The technical solution to achieve the above purpose is: a PCTC ship thin plate segment stacking method, comprising:
[0006] Tooling preparation;
[0007] The thin plates are stacked in sections;
[0008] The stacking of thin plates in sections includes stacking with movable decks and stacking with fixed decks.
[0009] The tooling preparation includes:
[0010] Step 1: Select the portal frame piers. The size should ensure that the outermost strong structure of the segmented frame surface can fall on the portal frame piers.
[0011] Step 2: Prepare several flower stand piers with the dimensions of 1.0m long, 1.0m wide and 1.2m high;
[0012] Step 3: Select protective railings and install them around the door frame piers.
[0013] The movable deck stacking includes:
[0014] Step 1, placing the first movable deck on the portal frame pier;
[0015] Step 2: four flower rack piers are arranged on the first movable deck, and two flower rack piers at opposite corners are selected and welded to the first movable deck;
[0016] Step 3, place the second movable deck on the four flower stand piers;
[0017] Step 4: Set four flower rack piers on the second movable deck again, and select two flower rack piers at opposite corners to be welded to the second movable deck;
[0018] Step 5. Place the third sliding deck on the four flower stand piers.
[0019] The left and right side walls of the first movable deck are welded to the gantry piers with first cama.
[0020] A first thin wooden board is arranged on the upper end surface of each flower rack pier, and first limiting plates are arranged on both sides; the T-beams on the lower end surfaces of the second movable deck and the third sliding deck are connected to the first thin wooden board.
[0021] The fixed deck stacking includes:
[0022] Step 1, placing the first fixed deck on the portal frame pier;
[0023] Step 2, nine flower stand piers are set on the first fixed deck;
[0024] Step 3, placing a second fixed deck on the flower stand pier;
[0025] Step 4, setting nine flower stand piers on the second fixed deck;
[0026] Step 5: Place the third fixed deck on the flower stand piers.
[0027] The T-beam on the lower end surface of the first fixed deck is connected to the portal pier, and the second Cama connects the portal pier and the T-beam of the first fixed deck.
[0028] A second thin wooden board is arranged on the upper end surface of each flower rack pier, and second limiting plates are arranged on both sides; the T-beams on the lower end surfaces of the second fixed deck and the third fixed deck are connected to the second thin wooden board.
[0029] The beneficial effects of the present invention are as follows: the PCTC ship thin plate segment stacking method solves the existing problem that each thin plate segment is placed separately on the gantry pier, which requires a large number of gantry pier resources and occupies a large site area, by reasonably stacking and placing the movable deck and the fixed deck; it effectively saves the site area. At the same time, it prevents the thin plate segment stacking from causing structural deformation. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a detailed view of the gantry pier of the present invention;
[0031] Figure 2 It is a detailed view of the flower stand pier of the present invention;
[0032] Figure 3 is a detailed view of the protective railing of the present invention;
[0033] Figure 4 This is a detailed view of the connection of the flower stand piers of the present invention on the first movable deck;
[0034] Figure 5 This is a front view of the stacked movable deck of the present invention;
[0035] Figure 6 is a cross-sectional view of a stacked movable deck of the present invention;
[0036] Figure 7 is a detailed view of the position of the first thin wood board of the present invention;
[0037] Figure 8 It is a detailed diagram of the position of the first kama of the present invention;
[0038] Fig. 9 It is a detailed view of the connection of the flower stand piers of the present invention on the first fixed deck;
[0039] Fig.10 is a front view of a stacked fixed deck of the present invention;
[0040] Fig.11 is a cross-sectional view of a stacked fixed deck of the present invention;
[0041] Fig.12 is a detailed view of the position of the second thin wood board of the present invention;
[0042] Fig.13 It is a detailed diagram of the position of the second kama of the present invention;
[0043] Fig.14 yes Fig.10 Enlarged view of point A in the middle.
[0044] In the figure: 1. gantry pier; 2. flower rack pier; 3. guardrail; 4. first movable deck; 5. second movable deck; 6. third sliding deck; 7. first thin wooden board; 8. first limiting plate; 9. first fixed deck; 10. second fixed deck; 11. third fixed deck; 12. second cama; 13. second thin wooden board; 14. second limiting plate; 15. first cama. DETAILED DESCRIPTION
[0045] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0046] The present invention will be further described below in conjunction with the accompanying drawings.
[0047] like Figure 1-14 As shown, a PCTC ship thin plate segment stacking method includes:
[0048] Tooling preparation;
[0049] The thin plates are stacked in sections;
[0050] The stacking of thin plates in sections includes movable deck stacking and fixed deck stacking.
[0051] like Figure 1 , 2 As shown in 3, tooling preparation includes:
[0052] Step 1: Select the portal pier 1. The size should ensure that the outermost strong structure of the segmented frame surface can fall on the portal pier. The portal pier 1 can be a 10m or 14m portal pier. The 14m portal pier can be modified from the 10m portal pier, with both ends extended by 2m. When selecting the portal pier, ensure that the outermost strong structure of the segmented frame surface can fall on the portal pier.
[0053] Step 2, prepare a plurality of flower stand piers 2 with a length of 1.0m×width of 1.0m×height of 1.2m;
[0054] Step three, select and prepare guardrails 3 and install them around the door frame pier 1.
[0055] like Figure 5 , 6 As shown in , 7 and 8, the stacking of movable decks includes:
[0056] Step 1, placing the first movable deck 4 on the portal pier 1;
[0057] Step 2: four flower rack piers 2 are arranged on the first movable deck 4, and two flower rack piers 2 at opposite corners are selected and welded to the first movable deck 4;
[0058] Step 3, placing the second movable deck 5 on the four flower rack piers 2;
[0059] Step 4: four flower rack piers 2 are set on the second movable deck 5 again, and two flower rack piers 2 at opposite corners are selected to be welded to the second movable deck 5;
[0060] Step 5: Place the third sliding deck 6 on the four flower rack piers 2.
[0061] The left and right side walls of the first movable deck 4 and the gantry pier 1 are welded with first cama 15 .
[0062] A first thin wooden board 7 is arranged on the upper end surface of each flower rack pier 2 , and first limiting plates 8 are arranged on both sides. The T-beams on the lower end surfaces of the second movable deck 5 and the third sliding deck 6 are connected to the first thin wooden board 7 .
[0063] When stacking, the main scale of the sections should be followed, with the sections with larger normal projection areas at the bottom and the sections with smaller areas at the top; the order of assembly and loading should be taken into consideration, with the sections assembled or loaded first at the top. Sections of the same layer or the same section should be stacked together; the movable deck sections involved in the assembly should be stacked first on the same layer and in the same annular seam. The movable deck sections that are loaded separately should be stacked on the same layer. The fixed deck sections should be stacked first on the same side. After the sections are leveled, they can be stacked for transportation in a maximum of 3 layers, and the projections of the center of gravity of each section should basically overlap.
[0064] The flower rack pier 2 and the door frame pier 1 are arranged symmetrically according to the center of gravity of the segment. The flower rack pier 2 and the door frame pier 1 both support the segmented strong structure. When stacking under static load, use wooden blocks to pad the segments to prevent relative sliding and ensure that the outfitting does not interfere. No protective railings are provided. It is strictly forbidden to stack large segments on small segments. When stacking, the upper and lower segments, wooden blocks, and the strong ribs supported by the flower rack pier 2 should be aligned as much as possible. Use turnbuckle bolts (hooks hooked into the binding holes) to fix the flower rack in four directions.
[0065] like Fig. 9 , 10 , 11, 12, 13, 14, the fixed deck stacking includes:
[0066] Step 1, placing a first fixed deck 9 on the portal pier 1;
[0067] Step 2, nine flower stand piers 2 are arranged on the first fixed deck 9;
[0068] Step 3, placing a second fixed deck 10 on the flower stand pier 2;
[0069] Step 4, nine flower stand piers 2 are arranged on the second fixed deck 10;
[0070] Step 5: placing the third fixed deck 11 on the flower rack pier 2.
[0071] The T-beam on the lower end surface of the first fixed deck 9 is connected to the portal pier 1 , and the second Cama 12 connects the portal pier 1 and the T-beam of the first fixed deck 9 .
[0072] A second thin wooden board 13 is arranged on the upper end surface of each flower rack pier 2 , and second limiting plates 14 are arranged on both sides. The T-beams on the lower end surfaces of the second fixed deck 10 and the third fixed deck 11 are connected to the second thin wooden board 13 .
[0073] When stacking, the main scale of the sections should be followed, with the sections with larger normal projection areas at the bottom and the sections with smaller areas at the top; the order of assembly and loading should be taken into consideration, with the sections assembled or loaded first at the top. Sections of the same layer or the same section should be stacked together; the movable deck sections involved in the assembly should be stacked first on the same layer and in the same annular seam. The movable deck sections that are loaded separately should be stacked on the same layer. The fixed deck sections should be stacked first on the same side. After the sections are leveled, they can be stacked for transportation in a maximum of 3 layers, and the projections of the center of gravity of each section should basically overlap.
[0074] The flower rack pier 2 and the portal frame pier 1 are arranged symmetrically according to the center of gravity of the section. The flower rack pier 2 and the portal frame pier 1 both support the section strong structure. When stacking under static load, use wooden blocks to pad the sections to prevent relative sliding and ensure that the outfitting does not interfere. No protective railings are provided. It is strictly forbidden to stack large sections on small sections. When stacking, the upper and lower sections, wooden blocks, and the strong ribs supported by the flower rack pier 2 should be aligned as much as possible. Use turnbuckle bolts (hook the binding holes) to fix the flower rack in four directions. When stacking, the fixed deck and the portal frame pier 1 must be padded, and the bow and stern ends between the sections must be firmly supported with supports (no less than 6 per layer).
[0075] The PCTC ship thin plate segment stacking method solves the existing problem that each thin plate segment is placed separately on the gantry pier, which requires a large number of gantry pier resources and occupies a large site area, by reasonably stacking and placing the movable deck and the fixed deck; it effectively saves the site area. At the same time, it prevents the structural deformation caused by the stacking of thin plate segments.
[0076] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the technical solutions described in the above embodiments may still be modified, or some or all of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. PCTC ship sheet stacking method, characterized in that: include: Tooling preparation; The thin plates are stacked in sections; The stacking of thin plates in sections includes stacking with movable decks and stacking with fixed decks.
2. The PCTC ship sheet stacking method according to claim 1 is characterized in that: The tooling preparation includes: Step 1: Select a portal frame pier (1) with a size that ensures that the outermost strong structure of the segmented frame surface can fall on the portal frame pier; Step 2, prepare a plurality of flower stand piers (2) with a length of 1.0 m, a width of 1.0 m, and a height of 1.2 m; Step 3: Select and prepare a guardrail (3) and install it around the door frame pier (1).
3. The PCTC ship sheet stacking method according to claim 2, characterized in that: The movable deck stacking includes: Step 1, placing a first movable deck (4) on the portal pier (1); Step 2: arranging four flower rack piers (2) on the first movable deck (4), and selecting two diagonal flower rack piers (2) to be welded to the first movable deck (4); Step 3, placing a second movable deck (5) on the four flower rack piers (2); Step 4, four flower rack piers (2) are arranged again on the second movable deck (5), and two flower rack piers (2) at opposite corners are selected and welded to the second movable deck (5); Step 5: Place the third sliding deck (6) on the four flower rack piers (2).
4. The PCTC ship sheet stacking method according to claim 3 is characterized in that: The left and right side walls of the first movable deck (4) are welded to the portal frame pier (1) with first cama (15).
5. The PCTC ship sheet stacking method according to claim 3 is characterized in that: A first thin wooden board (7) is arranged on the upper end surface of each flower rack pier (2), and first limiting plates (8) are arranged on both sides; the T-beams on the lower end surfaces of the second movable deck (5) and the third sliding deck (6) are connected to the first thin wooden board (7).
6. The PCTC ship sheet stacking method according to claim 2, characterized in that: The fixed deck stacking includes: Step 1, placing a first fixed deck (9) on the portal pier (1); Step 2: nine flower stand piers (2) are arranged on the first fixed deck (9); Step 3, placing a second fixed deck (10) on the flower stand pier (2); Step 4, nine flower stand piers (2) are arranged on the second fixed deck (10); Step 5: placing a third fixed deck (11) on the flower stand pier (2).
7. The PCTC ship sheet stacking method according to claim 6, characterized in that: The T-beam on the lower end surface of the first fixed deck (9) is connected to the portal pier (1), and the second Cama (12) connects the portal pier (1) and the T-beam of the first fixed deck (9).
8. The PCTC ship sheet stacking method according to claim 6, characterized in that: A second thin wooden board (13) is arranged on the upper end surface of each of the flower rack piers (2), and second limiting plates (14) are arranged on both sides; the T-beams on the lower end surfaces of the second fixed deck (10) and the third fixed deck (11) are connected to the second thin wooden board (13).
Citation Information
Patent Citations
Sheet deck segmented stacking transportation method
CN115108295A
Deck sheet transportation method
CN115258089A
Ship thin deck stacking tool
CN221068412U
Connector for Profile
KR1020240135992A
Cited By
Segmented deck stacking transportation method and device
CN120397738A