Tubular glass kiln device

By designing a tube-type glass kiln device, using base beam to connect the feed pipe and the discharge pipe, and using the structure of graphite tube-covered corundum pipe, the existing kiln is not suitable for small-scale production and high cost, achieving the effect of simple structure, easy installation and cost reduction.

CN120097611AInactive Publication Date: 2025-06-06BEICHUAN QIANGLANG GLASS TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510113830.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-24
Publication Date
2025-06-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing glass kilns are not suitable for small-scale production and are expensive, which makes it impossible for small and medium-sized enterprises to build and use glass kilns. At the same time, the existing tube-type kiln structure is difficult to process at high temperatures, the accuracy is difficult to meet the needs, and it is easy to cause liquid leakage.

Method used

A tube-type glass kiln device is designed, which directly connects the feed pipe and the first discharge pipe through the base beam to form the main structure of the kiln. It adopts a double-layer casing structure of graphite tube-covered corundum tube, combined with threaded connections and hole coordination to achieve accurate positioning and installation.

Benefits of technology

The device is simple in structure, easy to install and process, reduces production costs, solves the problem of temperature resistance and assembly accuracy of materials at high temperatures, is suitable for small-scale production, and has strong adaptability and flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120097611A_ABST
    Figure CN120097611A_ABST
Patent Text Reader

Abstract

A tubular glass kiln device comprises a base beam arranged in the first direction X, a feeding pipe and a first discharging pipe, the feeding pipe and the first discharging pipe are arranged in the second direction Y. The base beam is transversely connected between the feeding pipe and the first discharging pipe, and the interiors of the base beam, the feeding pipe and the first discharging pipe are communicated to form a glass liquid flowing channel. The base beam made of the first high-temperature material is directly connected with the feeding pipe and the first discharging pipe to form the main body structure of the kiln, the structure is simple, installation is easy, and the production cost can be greatly reduced. Besides, the structure of each part in direct contact with the molten glass is arranged in the form of sleeving the corundum tube with the graphite tube, so that the advantages of low cost and higher processing and assembling precision of the graphite tube can be exerted, the defects of high-temperature easy oxidation and easy slag falling of the graphite tube can be avoided, and the practicability is very high. The tubular glass kiln device can meet small-scale production, and is high in flexibility and adaptability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to glass production equipment, in particular to a tubular glass furnace device. Background Art

[0002] Glass kilns are high-temperature furnaces used to make glass. They melt raw materials at high temperatures to form molten glass, which is then made into the desired glass products through various processes (such as blowing, pressing, drawing, etc.). The furnace bodies of existing glass kilns are usually made of bricks, cement, steel bars and other materials, which are suitable for large-scale production, and the construction cost of glass kilns is very high, easily costing tens of millions.

[0003] Therefore, the existing construction method of glass kilns is not suitable for small-batch production, and due to its high cost, only companies with very strong funds can build glass kilns for glass production, while other small and medium-sized enterprises cannot build glass kilns for glass production due to limited funds.

[0004] Therefore, if a glass kiln suitable for small-batch production and with greatly reduced costs can be provided, it will surely meet the actual needs of the market. To this end, the applicant developed a tubular glass kiln. During the research and development process, it was found that since the melting temperature of the glass raw materials is between 1400 and 1680 degrees Celsius, the temperature of the corresponding heating body exceeds that of the existing metal materials. Among the existing metal materials, it is difficult to find a material that can withstand such high temperatures, is easy to process, and is reasonably priced. Experiments have found that materials that can withstand temperatures above 1400 degrees Celsius are difficult to process, and the accuracy after processing is difficult to grasp. The existing assembly structure has large intervals, and the accuracy is difficult to meet the requirements, which easily leads to leakage. Therefore, the existing tubular kiln structure still needs to be improved to solve the problems of processing accuracy and cost. Summary of the invention

[0005] The present invention aims to solve the above problems and provides a tubular glass furnace device.

[0006] In order to solve the above problems, the present invention provides a tubular glass kiln device, characterized in that it includes a base beam arranged along a first direction X and a feed pipe and a first discharge pipe arranged along a second direction Y, the base beam is transversely connected between the feed pipe and the first discharge pipe, the interiors of the base beam, the feed pipe and the first discharge pipe are connected to form a glass liquid circulation channel, and the base beam, the feed pipe and the first discharge pipe are tubular components.

[0007] Furthermore, the feed pipe, the first discharge pipe and the base beam are single-tube structures, which are all tubular components made of the first high-temperature material.

[0008] Further, the feed pipe includes an outer feed pipe and an inner feed pipe, and the outer feed pipe is sleeved outside the inner feed pipe; the first discharge pipe includes a first outer discharge pipe and a first inner discharge pipe, and the first outer discharge pipe is sleeved outside the first inner discharge pipe; the base beam includes an outer base beam pipe and an inner base beam pipe, and the outer base beam pipe is sleeved outside the inner base beam pipe, and the inner base beam pipe is arranged along a third direction Z; the feed outer pipe, the base beam outer pipe, and the first discharge outer pipe are made of a first high-temperature material, and the feed inner pipe, the base beam inner pipe, and the first discharge inner pipe are made of a second high-temperature material, and the first high-temperature material is different from the second high-temperature material.

[0009] Furthermore, the feed outer tube, the base beam outer tube, and the first discharge outer tube are graphite tubes, and the feed inner tube, the base beam inner tube, and the first discharge inner tube are corundum tubes.

[0010] Furthermore, a first hole portion and a second hole portion arranged along a second direction Y are provided on the base beam, the first end of the feed pipe is threadedly connected to the first hole portion, and the first end of the first discharge pipe is threadedly connected to the second hole portion.

[0011] Furthermore, a first partition and a first connecting pipe are provided in the first hole portion. The first partition is transversely arranged between the first connecting pipe and the feed pipe. A plurality of through holes are provided on the first partition. The first connecting pipe is connected with the feed pipe and the base beam.

[0012] Furthermore, a center hole is provided in the outer tube of the base beam and extends from the first end along the third direction Z, and the center hole passes through the first hole portion and is connected with the second hole portion; first docking holes corresponding to the center hole are respectively provided on the portion of the first connecting tube away from the first end of the base beam, and the inner tube of the base beam is inserted into the center hole by the first end of the outer tube of the base beam, and the first end of the inner tube of the base beam is connected to the first docking hole.

[0013] Furthermore, a second partition, a second connecting tube and a sealing plate are provided in the second hole portion; the second connecting tube is sleeved in the second hole portion along the second direction Y, and a second docking hole corresponding to the center hole is provided at a portion of the second connecting tube away from the end of the base beam, the second partition is transversely arranged between the second connecting tube and the first discharge pipe, and a plurality of through holes are provided on the second partition; the sealing plate is arranged at the end of the second connecting tube opposite to the first discharge pipe, and the second end of the base beam inner tube is connected to the second docking hole, and the glass liquid can flow from the base beam inner tube into the second connecting tube and flow to the first discharge pipe.

[0014] Furthermore, a second discharge pipe is provided in the first discharge pipe and is arranged along the second direction Y. The first discharge pipe and the second discharge pipe are spaced apart to form a first discharge channel L1. A second discharge channel L2 is formed inside the second discharge pipe. The first discharge channel L1 and the second discharge channel L2 are connected at the end away from the second connecting pipe. The first end of the second discharge pipe passes through the second partition plate, the second connecting pipe and the sealing plate in sequence to provide a discharge port. The glass liquid can flow from the first connecting pipe through the first discharge channel L1 against the direction of gravity and flow into the second discharge channel L2, and flow out from the discharge port along the direction of gravity.

[0015] Furthermore, the first connecting tube includes a first connecting outer tube and a first connecting inner tube which are coaxially sleeved, and the first connecting outer tube is sleeved outside the first connecting inner tube; the second connecting tube includes a second connecting outer tube and a second connecting inner tube which are coaxially sleeved, and the second connecting outer tube is sleeved outside the second connecting inner tube; the first connecting outer tube and the second connecting outer tube are one-piece tubular components made of a first high-temperature material, and the first connecting inner tube and the second connecting inner tube are one-piece tubular components made of a second high-temperature material.

[0016] Furthermore, the second direction Y is perpendicular to the first direction X; the third direction Z is the same as or inclined to the first direction X.

[0017] A first heating device is provided outside the feed pipe; a second heating device is provided outside the first discharge pipe; a plug is provided at the end of the first hole opposite to the feed pipe, the plug can close the end of the first hole and can be opened for unloading.

[0018] The beneficial contribution of the present invention is that it effectively solves the above-mentioned problems. The present invention directly connects the feed pipe and the first discharge pipe through a base beam made of a first high-temperature material to form the main structure of the kiln. The structure is simple, easy to install, and can greatly reduce the production cost. The feed pipe in the melting zone and the first discharge pipe in the clarification zone are directly connected to the base beam, and can be accurately positioned and installed through hole matching and threaded connection. In addition, the present invention sets the structure of each part in direct contact with the glass liquid in the form of a graphite tube sleeve corundum tube, which can not only give play to the advantages of the graphite tube-low cost, easy processing, and high processing and assembly accuracy, but also avoid the disadvantages of the graphite tube-easy oxidation at high temperature and easy slag, which has strong practicality. On the other hand, the thermal expansion coefficient of the graphite tube is much lower than that of metal, and it will not soften or deform at 2000 degrees Celsius. Using the graphite tube as a base beam for connection can ensure both installation accuracy and structural reliability, which can solve the problems of temperature resistance and assembly accuracy in the prior art. The tubular glass furnace device of the present invention has the characteristics of simple structure, easy processing and assembly, low cost, small size, etc. It can meet the needs of small-scale production, has strong flexibility and adaptability, and is suitable for vigorous promotion. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a principle cross-sectional view of the present invention;

[0020] Figure 2 It is a schematic diagram of the structure of the present invention;

[0021] Figure 3 It is a structural schematic diagram of the outer tube of the base beam.

[0022] Figure ID:

[0023] Feed pipe 10: feed outer pipe 11, feed inner pipe 12;

[0024] The base beam 20 includes a base beam outer tube 21, a center hole 211, a base beam inner tube 22, a first hole portion 23, a first threaded hole portion 231, a first light hole portion 232, and a second hole portion 24;

[0025] The first discharge pipe 30: a first discharge outer pipe 31 and a first discharge inner pipe 32;

[0026] The first connecting pipe 40 includes a first connecting outer pipe 41, a first connecting inner pipe 42, and a first docking hole 43;

[0027] A first partition plate 51, a second partition plate 52, a third partition plate 53, and a plug 60;

[0028] The second connecting pipe 70 includes a second connecting outer pipe 71, a second connecting inner pipe 72, and a second docking hole 73;

[0029] Sealing plate 80;

[0030] The second discharge pipe 90 includes a second discharge outer pipe 91, a second discharge inner pipe 92, and a discharge port 93;

[0031] The first direction X, the second direction Y, the third direction Z, the first discharge channel L1, and the second discharge channel L2. DETAILED DESCRIPTION

[0032] The following examples are provided to further explain and supplement the present invention and do not constitute any limitation to the present invention.

[0033] like Figure 1 to Figure 3 As shown, the tubular glass furnace device of the present invention comprises a base beam 20, a feed pipe 10 and a first discharge pipe 30. The base beam 20 is arranged along a first direction X, the feed pipe 10 and the first discharge pipe 30 are arranged along a second direction Y, the base beam 20 is transversely connected between the first feed pipe 10 and the first discharge pipe 30, and the base beam 20, the feed pipe 10 and the first discharge pipe 30 are connected to form a glass liquid circulation channel.

[0034] The main point of the present invention is that the feed pipe 10 and the first discharge pipe 30 are directly connected through the base beam 20, thereby forming the main structure of the tubular glass furnace, which is the minimum structure constituting the tubular glass furnace device, that is, the raw materials for producing glass liquid can enter from the feed pipe 10, melt into glass liquid in the feed pipe 10, and then flow to the first discharge pipe 30 through the base beam 20, and then flow out from the first discharge pipe 30, completing the melting, clarification, cooling and other processes of glass liquid production. The tubular glass furnace device of the present invention has a simple structure, is easy to process and assemble, and is therefore easy to produce and can reduce costs.

[0035] Furthermore, the first direction X is perpendicular to the second direction Y. In this embodiment, the first direction X is a horizontal direction, and the second direction Y is a vertical direction. In this way, when the feed pipe 10 and the first discharge pipe 30 are installed on the base beam 20, the external support structure can be greatly saved, which is conducive to the installation of the feed pipe 10 and the first discharge pipe 30 and saves costs.

[0036] The base beam 20, the feed pipe 10, and the first discharge pipe 30 are all tubular components, and thus are easy to assemble and install without the need for on-site masonry.

[0037] In some embodiments, the feed pipe 10, the base beam 20, and the first discharge pipe 30 are single-tube structures, which are tubular components made of the first high-temperature material. The base beam 20 can be an integrated tubular component, or a tubular component formed by segmented tubular components fixedly connected together by a fastening structure or fasteners. When the base beam 20 is a segmented tubular component, it is preferably configured to be spliced ​​at the position where the feed pipe 10 and the first discharge pipe 30 need to be connected, so that it is convenient to connect the feed pipe 10 and the first discharge pipe 30. For example, when the first hole portion 23 and the second hole portion 24 are provided on the base beam 20 to connect the feed pipe 10 and the first discharge pipe 30, the segmented portion of the base beam 20 can be provided at the first hole portion 23 and / or the second hole portion 24, and the first hole portion 23 and / or the second hole portion 24 are matched by matching the two-segment structure, and the matching portions are fixedly connected by fasteners.

[0038] Among them, the first high temperature material mainly refers to non-metallic high temperature resistant materials containing carbon elements, which mainly include graphite materials, silicon carbide materials, and silicon carbide-graphite composite materials. In the present invention, the first high temperature material is a graphite material with a lower cost, and the tubular component made of the first high temperature material is a graphite tube. In other embodiments, the first high temperature material can also be a slightly higher cost silicon carbide, silicon carbide-graphite composite material, etc.

[0039] In this embodiment, the feed pipe 10, the base beam 20, and the first discharge pipe 30 are double-layer sleeve structures:

[0040] The feed pipe 10 includes an outer feed pipe 11 and an inner feed pipe 12, wherein the outer feed pipe 11 is sleeved outside the inner feed pipe 12;

[0041] The first discharge pipe 30 includes a first discharge outer pipe 31 and a first discharge inner pipe 32, wherein the first discharge outer pipe 31 is sleeved outside the first discharge inner pipe 32;

[0042] The base beam 20 includes a base beam outer tube 21 and a base beam inner tube 22 , and the base beam outer tube 21 is sleeved outside the base beam inner tube 22 .

[0043] When the feed pipe 10, the base beam 20, and the first discharge pipe 30 are double-layer sleeve structures, the feed outer pipe 11, the base beam outer pipe 21, and the first discharge outer pipe 31 are tubular components made of a first high-temperature material, and the feed inner pipe 12, the base beam inner pipe 22, and the first discharge inner pipe 32 are tubular components made of a second high-temperature material.

[0044] Furthermore, the feed pipe outer tube 11, the base beam outer tube 21, the first discharge outer tube 31, the feed inner tube 12, the base beam inner tube 22, and the first discharge inner tube 32 are all integrated tubes. Of course, it can also be a segmented tube instead of an integrated tube. For example, the base beam outer tube 21 and the base beam inner tube 22 can be set as segmented tubes, which are assembled together by multiple sections to form an integral structure. For the convenience of explanation, the present embodiment is preferably described as the feed pipe outer tube 11, the base beam outer tube 21, the first discharge outer tube 31, the feed inner tube 12, the base beam inner tube 22, and the first discharge inner tube 32 are integrated tubes.

[0045] The second high temperature material is a corundum material (mainly composed of Al2O3), and the tubular component made of the second high temperature material is a corundum tube.

[0046] By setting the feed tube 10, the base beam 20, and the first discharge tube 30 as a double-layer sleeve structure, not only can the high-temperature oxidation of the graphite tube be avoided, but also the graphite particles of the graphite tube can be prevented from falling into the glass liquid and affecting the quality of the glass liquid. In this way, the advantages of the graphite tube can be brought into play: high temperature resistance, low cost, and high processing and assembly accuracy, while the disadvantages of the graphite tube can be avoided: easy high-temperature oxidation and easy slagging at high temperature.

[0047] When the feed tube 10, the base beam 20, and the first discharge tube 30 are single-tube structures, they are suitable for producing special glass, such as microcrystalline glass. At this time, the graphite particles of the graphite tube fall into the glass liquid, which helps the production of microcrystalline glass. Therefore, the graphite tube can directly contact the glass liquid without the need to set a corundum tube inside the graphite tube.

[0048] For the production of conventional ultra-thin glass, the feed tube 10, the base beam 20, and the first discharge tube 30 are preferably set as a double-layer sleeve structure: a graphite tube is used as an outer tube, a corundum tube is used as an inner tube, and a corundum tube is sleeved inside the graphite tube. In other embodiments, when the selection of the first high-temperature material changes, it can be adaptively adjusted.

[0049] Further, when the base beam inner tube 22 is disposed in the base beam outer tube 21, the base beam inner tube 22 is disposed along a third direction Z, and the third direction Z may be the same as the first direction X, or may be different from the first direction X. For example, in some embodiments, the base beam inner tube 22 is disposed horizontally, and the third direction Z is the same as the first direction X. For another example, in some embodiments, the base beam inner tube 22 is disposed at a certain angle relative to the horizontal plane, and the third direction Z is inclined with respect to the first direction X.

[0050] The base beam outer tube 21 is arranged horizontally along the first direction X, which is convenient for setting the feed pipe 10 and the first discharge pipe 30. The base beam inner tube 22 is arranged along the third direction Z, so that the flow direction of the glass liquid can be flexibly set according to needs, so that the glass liquid does not have to flow into the first discharge pipe 30 in the horizontal direction.

[0051] Furthermore, the base beam 20 is connected to the feed pipe 10 and the first discharge pipe 30 by threads. The base beam 20 is provided with a first hole portion 23 and a second hole portion 24 arranged along the second direction Y. The first hole portion 23 and the second hole portion 24 are through holes, and the two are spaced a certain distance apart.

[0052] The first end of the feed pipe 10 is threadedly connected to the first hole portion 23, and the first end of the first discharge pipe 30 is threadedly connected to the second hole portion 24. The feed pipe 10 and the first discharge pipe 30 are parallel and spaced apart.

[0053] When the feed pipe 10, the first discharge pipe 30, and the base beam 20 are double-layer sleeve structures, external threads can be processed on the first ends of the feed outer tube 11 and the first discharge outer tube 31, and corresponding internal threads can be processed at the first hole portion 23 and the second hole portion 24, so that the feed outer tube 11 and the first discharge outer tube 31 are threadedly connected to the first hole portion 23 and the second hole portion 24.

[0054] Since the graphite tube has a high processing precision, the feed pipe 10, the base beam 20 and the first discharge pipe 30 can be stably connected together through threaded connection.

[0055] Furthermore, in order to save space, the feed pipe 10 and the first discharge pipe 30 are arranged on the same side of the base beam 20, and the base beam 20 is transversely connected to the bottom of the feed pipe 10 and the first discharge pipe 30. Of course, in other embodiments, the feed pipe 10 and the first discharge pipe 30 can also be arranged on different sides of the base beam 20.

[0056] Furthermore, in order to facilitate the insertion of the base beam inner tube 22 into the base beam outer tube 21, a center hole 211 is provided in the base beam outer tube 21. The center hole 211 is extended from the first end of the base beam outer tube 21 along the third direction Z, passes through the first hole portion 23 and is connected to the second hole portion 24.

[0057] The base beam inner tube 22 may be inserted into the central hole 211 from the first end of the base beam outer tube 21 , so as to be assembled inside the base beam outer tube 21 .

[0058] In order to prevent the glass liquid from flowing out from the central hole 211 and causing leakage, a first connecting tube 40 is provided in the first hole portion 23 along the second direction Y. A first docking hole 43 is provided at a portion of the first connecting tube 40 away from the first end of the base beam 20. A solid structure is provided at a position corresponding to the first docking hole 43, which can block the central hole 211, so that the glass liquid flowing into the first connecting tube 40 cannot flow out from the first end of the base beam 20, but can only flow to the base beam inner tube 22 through the first docking hole 43.

[0059] During installation, the base beam inner tube 22 is first inserted into the center hole 211 from the first end of the base beam 20, and the first end of the base beam inner tube 22 does not extend into the range of the first hole portion 23; then the first connecting tube 40 is installed into the first hole portion 23, and the first docking hole 43 faces the base beam inner tube 22 and is aligned with the center hole 211, and then the base beam inner tube 22 is moved along the third direction Z, so that the first end of the base beam inner tube 22 is inserted into the first docking hole 43 and connected with the first docking hole 43. Preferably, the first end of the base beam inner tube 22 extends into the first connecting tube 40.

[0060] In this way, when the high-temperature molten glass flows into the first connecting tube 40, it can flow to the base beam inner tube 22, while the remaining positions are sealed and cannot flow out.

[0061] The first connecting pipe 40 may be a single-tube structure or a double-tube structure.

[0062] When the feed pipe 10, the base beam 20, and the first discharge pipe 30 are single-tube structures, the first connecting pipe 40 is preferably a single-tube structure, which is a tubular component made of a first high-temperature material, such as a graphite tube.

[0063] In this embodiment, the feed pipe 10, the base beam 20, and the first discharge pipe 30 are double-layer sleeve structures, and the first connecting pipe 40 is also set to a double-layer sleeve structure, which includes a first connecting outer tube 41 and a first connecting inner tube 42. The first connecting outer tube 41 is sleeved outside the first connecting inner tube 42. Among them, the first connecting outer tube 41 is an integrated tubular component made of a first high-temperature material, and the first connecting inner tube 42 is an integrated tubular component made of a second high-temperature material. In this embodiment, the first connecting outer tube 41 is a graphite tube, and the first connecting inner tube 42 is a corundum tube.

[0064] Correspondingly, through holes are respectively provided at corresponding positions of the first connecting outer tube 41 and the first connecting inner tube 42 to form the first docking hole 43 .

[0065] In this embodiment, the first connecting tube 40 is configured as a double-layer sleeve structure, also to prevent the graphite tube from being oxidized at high temperature and the graphite particles of the graphite tube from entering the glass liquid.

[0066] In addition, setting the pipe fittings of the feed part in the form of a segmented feed pipe 10 and a first connecting pipe 40 is not only conducive to reducing costs, but also conducive to installation, as well as disassembly and replacement of parts and reuse of the feed pipe 10. It is well known that the longer the length of the graphite tube, the higher the cost. The cost of one feed outer tube 11 and one first connecting outer tube 41 is lower than that of a whole tube of equivalent length. Therefore, this structure can reduce costs. In addition, if disassembly and assembly is required (during maintenance), the feed pipe 10 can be removed first, and then the first connecting pipe 40 can be disassembled and assembled separately. Even if the first connecting pipe 40 is stuck inside the base beam 20 and cannot be removed, only the first connecting pipe 40 can be broken, so that the feed pipe 10 can be reused, which can reduce the overall cost.

[0067] Furthermore, in order to fully melt the glass raw material in the feed pipe 10, a first partition plate 51 is provided in the first hole portion 23. The first partition plate 51 is transversely arranged between the feed pipe 10 and the first connecting pipe 40, and is provided with a plurality of through holes for the glass liquid to flow through. The first partition plate 51 is made of a second high temperature material, and in this embodiment, it is a corundum plate.

[0068] The first partition plate 51 can slow down the speed of the glass liquid flowing downward, thereby prolonging the time that the glass raw materials stay in the feed pipe 10. In this way, the glass raw materials can stay in the feed pipe 10 for a longer time, so that they are melted at high temperature in the feed pipe 10, avoiding incomplete melting of the raw materials and flowing into the next process.

[0069] Further, for easy installation, the first hole portion 23 is set to a stepped hole form, which includes a first threaded hole portion 231 and a first light hole portion 232. The diameter of the first light hole portion 232 is smaller than the diameter of the first threaded hole portion 231 to form a stepped hole. The center hole 211 vertically penetrates the first light hole portion 232.

[0070] Furthermore, the first connecting tube 40 is sleeved in the first light hole portion 232 , the first partition plate 51 is disposed in the first threaded hole portion 231 and abuts against the first light hole portion 232 , and the first end of the feeding tube 10 is threadedly connected to the first threaded hole portion 231 .

[0071] Further, a plug 60 is provided at one end of the first hole portion 23 opposite to the feed pipe 10. The plug 60 can block the first hole portion 23 and can be opened to discharge slag when necessary. The plug 60 is sealed and connected to the first hole portion 23, and an openable plug structure is provided on it. When it is necessary to clean the slag in the first connecting pipe 40, the plug 60 can be opened to discharge the slag.

[0072] Furthermore, a second connecting pipe 70 is provided in the second hole portion 24 and is arranged along the second direction Y. The second connecting pipe 70 is used to connect the first discharge pipe 30 and the base beam 20. A second docking hole 73 is provided at the end of the second connecting pipe 70 away from the base beam 20. The position corresponding to the second docking hole 73 is a solid structure.

[0073] During installation, before the base beam inner tube 22 is installed, the second connecting tube 70 can be installed into the second hole portion 24, and the second docking hole 73 can be aligned with the center hole 211. Subsequently, the base beam inner tube 22 can be inserted into the center hole 211, and the second end of the base beam inner tube 22 can be inserted into the second docking hole 73 and connected to the second docking hole 73. Alternatively, after the base beam inner tube 22 and the first connecting tube 40 are installed, the base beam inner tube 22 can be moved along the third direction Z so that the base beam inner tube 22 does not extend into the range of the second hole portion 24, and then the second connecting tube 70 can be installed into the second hole portion 24, and the second docking hole 73 can be aligned with the center hole 211; then the base beam inner tube 22 can be moved along the third direction Z so that the second end of the base beam inner tube 22 can be inserted into the second docking hole 73 and connected to the second docking hole 73.

[0074] In this embodiment, after the first connecting tube 40, the second connecting tube 70 and the base beam inner tube 22 are installed, both ends of the base beam inner tube 22 extend into the first connecting tube 40 and the second connecting tube 70 respectively, so as to avoid leakage at the interface.

[0075] The second connecting pipe 70 can be a single-tube structure or a double-tube structure.

[0076] When the feed pipe 10, the base beam 20 and the first discharge pipe 30 are single-tube structures, the second connecting pipe 70 is preferably a single-tube structure, which is an integral tubular component made of a first high-temperature material, such as a graphite tube.

[0077] In this embodiment, the feed pipe 10, the base beam 20, and the first discharge pipe 30 are double-layer sleeve structures, and the second connecting pipe 70 is also set to a double-layer sleeve structure, which includes a second connecting outer tube 71 and a second connecting inner tube 72. The second connecting outer tube 71 is sleeved outside the second connecting inner tube 72. Among them, the second connecting outer tube 71 is an integral tubular component made of a first high-temperature material, and the second connecting inner tube 72 is an integral tubular component made of a second high-temperature material. In this embodiment, the second connecting outer tube 71 is a graphite tube, and the second connecting inner tube 72 is a corundum tube.

[0078] Correspondingly, through holes are respectively provided at corresponding positions of the second connecting outer tube 71 and the second connecting inner tube 72 to form the second docking hole 73 .

[0079] The second connecting tube 70 is configured as a double-layer sleeve structure, also to prevent the graphite tube from being oxidized at high temperature and to prevent the graphite particles of the graphite tube from entering the glass liquid.

[0080] In addition, setting the pipe fittings of the discharge part in the form of a segmented first discharge pipe 30 and a second connecting pipe 70 is not only conducive to reducing costs, but also conducive to installation, as well as disassembly and replacement of parts and reuse of the feed pipe 10. It is generally known that the longer the length of the graphite tube, the higher the cost. The cost of one first discharge outer tube 31 and one second connecting outer tube 71 is lower than that of a whole tube of equivalent length. Therefore, this structure can reduce costs. In addition, if disassembly and assembly is required (during maintenance), the first discharge pipe 30 can be removed first, and then the second connecting pipe 70 can be disassembled and assembled separately. Even if the second connecting pipe 70 is stuck inside the base beam 20 and cannot be removed, only the second connecting pipe 70 can be broken, so that the first discharge pipe 30 can be reused, which can reduce production costs.

[0081] In order to allow the molten glass flowing out of the base beam 20 to enter the second connecting pipe 70 and then flow to the first discharge pipe 30 , a sealing plate 80 for sealing the second connecting pipe 70 is provided in the second hole 24 .

[0082] The sealing plate 80 is disposed at one end of the second connecting tube 70 opposite to the first discharge tube 30. In other words, the first discharge tube 30 and the sealing plate 80 are respectively disposed at both ends of the second connecting tube 70. The sealing plate 80 can seal one end of the second connecting tube 70, thereby preventing the glass liquid from flowing in the opposite direction to the first discharge tube 30, so that the glass liquid can only flow in the direction of the first discharge tube 30.

[0083] The sealing plate 80 is in direct contact with the glass liquid and is preferably made of the second high-temperature material. In this embodiment, it is a corundum plate.

[0084] Furthermore, in order to reduce the flow rate of the glass liquid, a second partition plate 52 is provided in the second hole portion 24. The second partition plate 52 is transversely arranged between the first discharge pipe 30 and the second connecting pipe 70, and is provided with a plurality of through holes for the glass liquid to flow through. The second partition plate 52 is made of a second high temperature material, and in this embodiment, it is a corundum plate.

[0085] The second partition plate 52 can slow down the flow of the molten glass and prevent the incompletely melted residue from flowing through, which is beneficial to the cooling of the molten glass and the sedimentation of the residue.

[0086] Furthermore, in order to cool down the temperature better, a second discharge pipe 90 is provided inside the first discharge pipe 30, which is coaxial with and spaced from the first discharge pipe 30. The first discharge pipe 30 and the second discharge pipe 90 are spaced to form a first discharge channel L1, and the second discharge channel L2 is formed inside the second discharge pipe 90. The first discharge channel L1 and the second discharge channel L2 are connected, so that the glass liquid can flow from the second connecting pipe 70 to the first discharge channel L1, and then flow into the second discharge channel L2.

[0087] Furthermore, the second end of the first discharge pipe 30, i.e., the end opposite to the second connecting pipe 70, is connected to the second end of the second discharge pipe 90, so that the second end of the first discharge channel L1, i.e., the end away from the second connecting pipe 70, is connected to the second discharge channel L2. In this way, the molten glass can flow through a longer path as much as possible.

[0088] The first end of the second discharge pipe 90 passes through the second connecting pipe 70 and the sealing plate 80 to form a discharge port 93 for allowing the glass liquid in the second discharge channel L2 to flow out.

[0089] In this embodiment, the second ends of the first discharge pipe 30 and the second discharge pipe 90 are the top ends, and the first ends are the bottom ends. In this way, when the glass liquid flows from the base beam 20 into the second connecting pipe 70, it first flows toward the first discharge channel L1 against gravity, then flows into the second discharge pipe 90 and flows through the second discharge channel L2, and finally flows out from the bottom discharge port 93 of the second discharge pipe 90.

[0090] By disposing a second discharge pipe 90 inside the first discharge pipe 30, the flow channel of the glass liquid can be extended within a sufficiently small space range, so that the travel distance of the glass liquid is increased, which is beneficial to the cooling of the glass liquid, so that the temperature of the glass liquid flowing out from the discharge port 93 is reduced to the required discharge temperature. In addition, the upward flow of the glass liquid against gravity in the first discharge channel L1 also has the following benefits: it is beneficial for the bubbles in the glass liquid to overflow and eliminate the bubbles in the glass liquid; it is beneficial for the impurities in the glass liquid to sink to the bottom, thereby improving the quality of the glass liquid and improving the clarification effect. In the present invention, the structural design of the first discharge pipe 30 and the second discharge pipe 90 can balance the cooling demand and the clarification demand before the glass liquid is discharged, so that the discharged glass liquid can meet the temperature requirement and can be clarified (improving the quality of the glass liquid).

[0091] In order to support the second discharge pipe 90, a third partition plate 53 is provided between the first discharge pipe 30 and the second discharge pipe 90. The third partition plate 53 is transversely arranged between the first discharge pipe 30 and the second discharge pipe 90, and can support the second discharge pipe 90 to prevent the second discharge pipe 90 from shaking in the first discharge pipe 30. The third partition plate 53 is provided with a plurality of through holes for the glass liquid to flow through.

[0092] The third partition plate 53 is in direct contact with the glass liquid, so the third partition plate 53 is made of the second high temperature material. In this embodiment, the third partition plate 53 is a corundum plate with holes.

[0093] In this embodiment, the third partition plate 53 is disposed near the second end of the first discharge pipe 30 and the second discharge pipe 90. In other words, the second end of the second discharge pipe 90 passes through the third partition plate 53 to form a free end and is connected to the inside of the first discharge pipe 30.

[0094] In some embodiments, the second discharge pipe 90 is a single-tube structure, the second end of which extends out of the third partition plate 53 to form a free end, and the first end of which is inserted into the sealing plate 80. The second discharge pipe 90 is in direct contact with the glass liquid, and is a tubular component made of a second high-temperature material, preferably a corundum tube.

[0095] In this embodiment, the second discharge pipe 90 is a double-layer sleeve structure, which includes a second discharge inner pipe 92 and a second discharge outer pipe 91. The second discharge outer pipe 91 is sleeved outside the second discharge inner pipe 92. The second discharge outer pipe 91 and the second discharge inner pipe 92 are both in direct contact with the glass liquid, and are both tubular components made of the second high-temperature material. In this embodiment, they are both corundum tubes.

[0096] The second end of the second discharge inner tube 92 passes through the third partition plate 53 and extends into the first discharge tube 30 to form a free end, and the first end of the second discharge inner tube 92 passes through the second partition plate 52, the second connecting tube 70, and the sealing plate 80 in sequence and is inserted into the sealing plate 80. The second discharge inner tube 92 is an integrated tube.

[0097] The second discharge outer pipe 91 can be an integral pipe or a segmented pipe.

[0098] When the second discharge outer tube 91 is an integrated tube, two ends thereof are respectively abutted between the third partition plate 53 and the sealing plate 80 .

[0099] When the second discharge outer tube 91 is a segmented tube, it can be divided into two sections, with both ends of one section abutting between the third partition plate 53 and the second partition plate 52 , and both ends of the other section abutting between the second partition plate 52 and the sealing plate 80 .

[0100] The second discharge outer tube 91 is disposed in contact with the third partition 53 and the sealing plate 80 and the second partition 52, which is conducive to the installation of the third partition 53. Specifically, the second end of the second discharge outer tube 91 can provide support for the installation of the third partition 53, so that the third partition 53 can be overlapped on the end of the second discharge outer tube 91 without the need for an additional positioning step structure. The second discharge inner tube 92 is inserted into the third partition 53 and is sleeved inside the second discharge outer tube 91. In this way, the positioning of each component can be achieved through a simple assembly structure without the need for additional fasteners, and the stability of the structure can be maintained by relying on its own structure. Moreover, the double-layer structure is more conducive to improving the life of the second discharge tube 90, avoiding high-temperature erosion of the inner and outer surfaces of the same pipe fitting, thereby improving the service life.

[0101] Furthermore, in order to control the temperature in each channel, a first heating device is provided outside the feed pipe 10, and a second heating device 100 is provided outside the first discharge pipe 30. The first heating device and the second heating device 100 are electromagnetic induction heating devices, which are arranged outside the tube in the form of a spiral tube, and can heat the graphite tube. When the graphite tube of the feed pipe 10 is heated, the temperature inside the feed pipe 10 can be raised to the required temperature, so as to melt the glass raw materials and melt the glass raw materials into glass liquid in the feed pipe 10. The second heating device 100 can be used for pre-kiln baking and for adjusting the process temperature during continuous production. For example, when the tubular glass kiln is just started, the kiln needs to be heated as a whole. At this time, the second heating device 100 can be started for heating to heat the first discharge pipe 30 to the required temperature. In this way, it is possible to avoid excessive waste of glass liquid due to the temperature difference between the temperature in the first discharge pipe 30 and the temperature of the molten glass liquid being too large, and the first discharge pipe 30 is gradually heated during the heating process, which can avoid the high temperature glass liquid suddenly applying high temperature to the first discharge pipe 30 when it flows in, thereby preventing the first discharge pipe 30 from being damaged, such as causing the internal corundum tube of the first discharge pipe 30 to burst. On the other hand, by heating the first discharge pipe 30 with the second heating device 100, the first discharge pipe 30 can be preheated to prevent the glass liquid that has just flowed in from losing temperature too quickly, thereby preventing the melted glass liquid from losing fluidity and blocking the flow channel.

[0102] Furthermore, the spiral tube of the second heating device 100 is configured as a hollow copper tube, and a coolant flows inside the spiral tube, which can be used for both electromagnetic induction heating of the graphite tube and cooling.

[0103] When the glass kiln is started for the first time, if it is necessary to heat the kiln to raise the room temperature of the kiln to the required temperature, the first heating device and the second heating device 100 can be turned on. At this time, the second heating device 100 can be used to heat the first discharge pipe 30. When the kiln is working normally, the second heating device 100 can be controlled to heat or not heat according to the requirements of the glass production process. When heating is required, the second heating device 100 is turned on, which can heat the first discharge pipe 30 to maintain the temperature inside the first discharge pipe 30. When heating is not required, the second heating device 100 is turned off. At this time, the coolant inside the second heating device 100 can circulate and take away the heat, and the glass liquid in the first discharge pipe 30 can be cooled, so as to facilitate cooling the glass liquid to the required temperature for discharge.

[0104] By setting the spiral tube of the second heating device 100 as a hollow copper tube and passing coolant, the function of the second heating device 100 can be flexibly adjusted so that it can be used for both heating and temperature regulation, and cooling, thereby meeting the adjustment needs of the glass production process.

[0105] Furthermore, in order to prevent the tubular component made of the first high-temperature material from being oxidized at high temperatures, a high-temperature anti-oxidation material is applied to the outer walls of the feed outer tube 11, the base beam outer tube, and the first discharge outer tube 31, which can seal the surface of the graphite tube and prevent the graphite tube from being oxidized at high temperatures. The high-temperature anti-oxidation material can be a known coating.

[0106] In the most preferred embodiment of the present invention, the feed outer tube 11, the base beam outer tube 21, and the first discharge outer tube 31 made of graphite tubes are connected to form a main structure, and then corundum tubes (feed inner tube 12, base beam inner tube 22, and first discharge inner tube 32) are respectively arranged inside the graphite tubes to prevent the glass liquid from directly contacting the graphite tubes, thereby both giving play to the advantages of the graphite tubes and avoiding the disadvantages of the graphite tubes. In order to facilitate the installation of the base beam inner tube 22, small sections of connecting tubes, namely the first connecting tube 40 and the second connecting tube 70, are respectively arranged in the holes where the feed tube 10, the first discharge tube 30 and the base beam 20 are connected. The first connecting tube 40 and the second connecting tube 70 also adopt the structure of a graphite tube sleeved with a corundum tube, which is convenient for installation and helps to reduce costs.

[0107] Although the present invention is disclosed through the above embodiments, the scope of the present invention is not limited thereto, and the above components may be replaced with similar or equivalent elements known to those skilled in the art without departing from the concept of the present invention.

Claims

1. A tubular glass furnace device, characterized in that: The invention comprises a base beam (20) arranged along a first direction X, and a feed pipe (10) and a first discharge pipe (30) arranged along a second direction Y, wherein the base beam (20) is transversely connected between the feed pipe (10) and the first discharge pipe (30), and the interiors of the base beam (20), the feed pipe (10) and the first discharge pipe (30) are connected to form a glass liquid circulation channel. The base beam (20), the feed pipe (10) and the first discharge pipe (30) are tubular components.

2. The tubular glass furnace device according to claim 1, characterized in that: The feed pipe (10), the first discharge pipe (30) and the base beam (20) are single-tube structures, and are all tubular components made of a first high-temperature material.

3. The tubular glass furnace device according to claim 1, characterized in that: The feed pipe (10) comprises an outer feed pipe (11) and an inner feed pipe (12), wherein the outer feed pipe (11) is sleeved outside the inner feed pipe (12); The first discharge pipe (30) comprises a first discharge outer pipe (31) and a first discharge inner pipe (32), wherein the first discharge outer pipe (31) is sleeved outside the first discharge inner pipe (32); The base beam (20) comprises a base beam outer tube (21) and a base beam inner tube (22), wherein the base beam outer tube (21) is sleeved outside the base beam inner tube (22), and the base beam inner tube (22) is arranged along a third direction Z; The feed outer tube (11), the base beam outer tube (21), and the first discharge outer tube (31) are made of a first high-temperature material, and the feed inner tube (12), the base beam inner tube (22), and the first discharge inner tube (32) are made of a second high-temperature material, and the first high-temperature material is different from the second high-temperature material.

4. The tubular glass furnace device according to claim 3, characterized in that: The feed outer tube (11), the base beam outer tube (21), and the first discharge outer tube (31) are graphite tubes, and the feed inner tube (12), the base beam inner tube (22), and the first discharge inner tube (32) are corundum tubes.

5. The tubular glass furnace device according to claim 3, characterized in that: A first hole portion (23) and a second hole portion (24) are provided on the base beam (20) and are arranged along a second direction Y. The first end of the feed pipe (10) is threadedly connected to the first hole portion (23), and the first end of the first discharge pipe (30) is threadedly connected to the second hole portion (24).

6. The tubular glass furnace device according to claim 5, characterized in that: A first partition plate (51) and a first connecting pipe (40) are provided in the first hole portion (23). The first partition plate (51) is transversely arranged between the first connecting pipe (40) and the feed pipe (10), and a plurality of through holes are arranged on the first partition plate (51); The first connecting pipe (40) is connected to the feed pipe (10) and the base beam (20).

7. The tubular glass furnace device according to claim 5, characterized in that: The base beam outer tube (21) is provided with a center hole (211) extending from the first end along the third direction Z, and the center hole (211) passes through the first hole portion (23) and is connected to the second hole portion (24); First docking holes (43) corresponding to the central hole (211) are respectively provided at a portion of the first connecting pipe (40) away from the first end of the base beam (20). The base beam inner tube (22) is inserted into the central hole (211) from the first end of the base beam outer tube (21), and the first end of the base beam inner tube (22) is connected to the first docking hole (43).

8. The tubular glass furnace device according to claim 7, characterized in that: A second partition plate (52), a second connecting pipe (70) and a sealing plate (80) are provided in the second hole portion (24); The second connecting tube (70) is sleeved in the second hole portion (24) along the second direction Y, and a second docking hole (73) corresponding to the center hole (211) is provided at a portion of the second connecting tube (70) away from the end of the base beam (20). The second partition plate (52) is transversely arranged between the second connecting pipe (70) and the first discharge pipe (30), and a plurality of through holes are arranged on the second partition plate (52); The sealing plate (80) is disposed at an end of the second connecting pipe (70) opposite to the first discharge pipe (30). The second end of the base beam inner tube (22) is connected to the second docking hole (73), and the glass liquid can flow from the base beam inner tube (22) into the second connecting tube (70) and then flow to the first discharge tube (30).

9. The tubular glass furnace device according to claim 8, characterized in that: A second discharge pipe (90) is provided in the first discharge pipe (30) and is arranged along the second direction Y. The first discharge pipe (30) and the second discharge pipe (90) are spaced apart to form a first discharge channel L1. A second discharge channel L2 is formed inside the second discharge pipe (90). The first discharge channel L1 and the second discharge channel L2 are connected at an end away from the second connecting pipe (70). The first end of the second discharge pipe (90) passes through the second partition plate (52), the second connecting pipe (70), and the sealing plate (80) in sequence to provide a discharge port (93). The molten glass can flow from the first connecting pipe (90) through the first discharge channel L1 against the direction of gravity and flow into the second discharge channel L2, and then flow out from the discharge port (93) along the direction of gravity.

10. The tubular glass furnace device according to claim 8, characterized in that: The first connecting tube (40) comprises a first connecting outer tube (41) and a first connecting inner tube (42) which are coaxially sleeved, and the first connecting outer tube (41) is sleeved outside the first connecting inner tube (42); The second connecting tube (70) comprises a second connecting outer tube (71) and a second connecting inner tube (72) which are coaxially sleeved, and the second connecting outer tube (71) is sleeved outside the second connecting inner tube (72); The first connecting outer tube (41) and the second connecting outer tube (71) are integral tubular components made of a first high-temperature material, and the first connecting inner tube (42) and the second connecting inner tube (72) are integral tubular components made of a second high-temperature material.

11. The tubular glass furnace device according to claim 3, characterized in that: The second direction Y is perpendicular to the first direction X; The third direction Z is the same as or inclined to the first direction X A first heating device is provided outside the feed pipe (10); A second heating device (100) is provided outside the first discharge pipe (30); A plug (60) is provided at one end of the first hole (23) opposite to the feed pipe (10). The plug (60) can close the end of the first hole (23) and can be opened for unloading.