Method for calculating seabed erosion amount under vertical drainage action of underground water of underwater delta

By calculating the impact of seabed groundwater discharge on the seabed and dynamically computing the depth of seabed erosion, the problem of existing models neglecting groundwater discharge factors and improving the accuracy of seabed erosion calculation.

CN120163027AActive Publication Date: 2025-06-17OCEAN UNIV OF CHINA
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202510637332.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-19
Publication Date
2025-06-17
Estimated Expiration
2045-05-19

AI Technical Summary

Technical Problem

The existing calculation model of seabed erosion ignores the impact of seabed groundwater discharge on seabed erosion, resulting in the calculation results that are inconsistent with the actual situation, and it is impossible to accurately evaluate the amount of seabed erosion in complex hydrodynamic environments such as underwater delta.

Method used

By calculating the pressure distribution, effective stress changes and critical shear stress correction on the seabed by vertical discharge of groundwater undersea, the depth of seabed erosion caused by groundwater discharge is dynamically calculated, and a more accurate calculation model for seabed erosion is established.

Benefits of technology

It improves the accuracy of seabed erosion depth prediction, and can more accurately evaluate the impact of groundwater discharge on seabed erosion. It is suitable for areas with developed groundwater discharge such as underwater delta.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120163027A_ABST
    Figure CN120163027A_ABST
Patent Text Reader

Abstract

The invention provides a method for calculating the seabed erosion amount under the action of vertical drainage of underground water of an underwater delta. Comprising the steps of data acquisition and preliminary analysis, calculation of influence of underground water drainage on seabed pressure transmission, calculation of critical shear stress corrected by underground water drainage, calculation of seabed erosion amount caused by seabed underground water drainage, simulation result and application, verification method and optimization scheme. Through the technical scheme of the invention, the problem that the calculation result may not conform to the actual situation because the existing seabed erosion amount calculation model does not consider the submarine groundwater drainage factor is solved. By calculating seabed pressure distribution changes and seabed soil body effective stress changes caused by vertical drainage of seabed underground water, the critical shear stress generated by seabed erosion is corrected, the seabed erosion depth under the influence of underground water drainage is calculated, and the method plays an important role in areas such as underwater delta where underground water drainage is developed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of marine geological engineering, and more particularly, to a method for calculating the seabed erosion amount under the vertical discharge of groundwater in an underwater delta. Background Art

[0002] The existing technologies mainly focus on the calculation of seabed erosion amount caused by hydrodynamic conditions such as waves, tides and water currents, and ignore the seabed erosion amount caused by groundwater discharge within the seabed soil mass. And quite a lot of research shows that in areas such as large river estuaries and underwater deltas, submarine groundwater discharge is very developed, with large discharge rates and fluxes. Moreover, when groundwater vertically discharges from the land aquifer into seawater, it will affect the stress state of the seabed soil mass, promote seabed erosion and affect the seabed stability. Therefore, a calculation model of seabed erosion amount lacking consideration of groundwater discharge factors may lead to a large error between the calculation result and the actual situation, and it is impossible to accurately evaluate the seabed erosion amount under the complex hydrodynamic environment of the underwater delta. Summary of the Invention

[0003] To make up for the deficiencies of the existing technologies, the present invention provides a method for calculating the seabed erosion amount under the vertical discharge of groundwater in an underwater delta, which solves the problem that the existing calculation model of seabed erosion amount lacks consideration of submarine groundwater discharge factors and may lead to calculation results that do not conform to the actual situation. By calculating the change of seabed pressure distribution, the change of effective stress of seabed soil mass, correcting the critical shear stress for seabed erosion occurrence and calculating the seabed erosion depth under the influence of groundwater discharge, it has an important role in areas with developed groundwater discharge such as underwater deltas.

[0004] The present invention is realized through the following technical solutions: A method for calculating the seabed erosion amount under the vertical discharge of groundwater in an underwater delta, specifically including the following steps: Step S1, Data collection and preliminary analysis: Step S1-1, Groundwater discharge data collection: Collect the groundwater discharge flux , the discharge rate , and the groundwater pressure ; Step S1-2, Analysis of seabed sediment characteristics: Obtain the median grain size D (cm), porosity , and permeability coefficient of the seabed sediment; Step S1-3, Preliminary hydrogeological modeling: Calculate the groundwater flow and pressure field, and simulate the groundwater flow equation in one dimension. Without considering non-uniform media and porosity, it is expressed by the hydraulic gradient as:

[0005] Among them, is the permeability coefficient of seabed sediments, S is the source term of groundwater (natural recharge, human activities, etc., which can be calculated by the groundwater discharge flux Q), t is time, x is the spatial coordinate in the horizontal direction, and h is the hydraulic gradient; Step S2: Calculate the influence of groundwater discharge on seabed pressure transmission: Step S2-1: Pressure transmission model: The pressure change Δ caused by groundwater discharge affects the effective stress of the soil mass: Δ

[0006] Among them, is the density of groundwater, g is the acceleration due to gravity, is the final hydraulic gradient, is the initial hydraulic gradient; Step S2-2: Effective stress corrected by submarine groundwater discharge: The effective stress of the soil mass considering submarine groundwater discharge Calculation formula:

[0007] Among them, is the total stress, is the hydrostatic pressure, Δ is the pressure change caused by groundwater discharge; Step S3: Calculate the critical shear stress corrected by groundwater discharge: Step S3-1: Corrected critical Shields parameter considering groundwater discharge

[0008] Among them, h is the hydraulic gradient, is the critical hydraulic gradient, is the classical Shields parameter; Step S3-2: Critical shear stress formula considering groundwater discharge: Critical shear stress Calculation formula:

[0009] Among them, is the corrected critical Shields parameter considering groundwater discharge, is the density of sediment particles, is the density of groundwater, g is the acceleration due to gravity, D is the median grain size of seabed sediments, is the effective stress ratio factor, is the groundwater discharge rate; Step S4. Calculate the seabed erosion amount caused by submarine groundwater discharge: Step S4-1. Calculate the seabed erosion rate:

[0010] where, is the erosion depth, is the actual bed shear stress, is the critical shear stress considering the influence of groundwater discharge, and are empirical coefficients, is the effective stress ratio factor.

[0011] Step S4-2. Calculate the seabed erosion depth: Substitute the formula for the change of critical shear stress with time into the erosion depth calculation model and integrate with respect to time to obtain the change of erosion depth with time:

[0012] where, is the initial erosion depth; Step S5. Simulation results and applications: Step S5-1. Preparation before simulation: Step S5-1-1. Set initial conditions: Initial groundwater pressure Initial hydraulic gradient Initial groundwater discharge rate Particle density of seabed sediment Permeability coefficient of seabed sediment Porosity of seabed sediment Median diameter D of seabed sediment, relative density s of seabed sediment and its change range, time step ; Step S5-1-2. Simulation area and grid division: According to the research area, conduct grid division in the horizontal and vertical directions; Step S5-2. Simulation process: Use the following steps to calculate the seabed erosion depth at different times in the simulation: Step S5-2-1. Calculate the change of groundwater pressure with time According to the groundwater flow equation and the aforementioned formula for the change of groundwater pressure:

[0013] Calculate the groundwater pressure at each time step step by step ; use the finite difference method for spatial and temporal discretization, and calculate it with the following formula:

[0014] where is the groundwater pressure at position x at the next time step ; is the groundwater pressure at position x at the current time step ; Step S5-2-2, calculate the effective stress: The change in effective stress is due to the change in pressure difference caused by groundwater discharge; the effective stress within each time step can be calculated by the following formula:

[0015] Step S5-2-3, calculate the critical shear stress: Calculate the hydraulic gradient at different positions x and different times t according to the above formula , and then calculate the Shields parameter corrected by groundwater discharge , and finally calculate the value of the critical shear stress .

[0016] Step S5-2-4, update the seabed erosion depth: The calculation formula for the seabed erosion rate considering groundwater discharge is

[0017] The calculation formula for the seabed erosion depth at different positions and different times is ; also use the finite difference method to discretize the differential equation for calculating the seabed erosion depth in time, and get:

[0018] where is the erosion depth at the next time step , is the erosion depth at the current time step , is the time step, is the bed shear stress at the current time step , is the critical shear stress at the current time step ; Step S5-2-5, output and display the simulation results: The seabed erosion depth at different time points is obtained through the calculated ; Step S6, Verification method and optimization solution: Step S6-1, Verification method: Step S6-1-1, Collect data: Collect the groundwater discharge flux , the discharge rate , the pressure , and the seabed erosion depth ; Measure the bed shear stress of the seabed on-site ; Step S6-1-2, Compare the simulation calculation results with the measured data: Take the average of the simulation results in space to obtain

[0019]

[0020] In the formula, X is the total number of spatial grids, x is the length of each spatial grid, is the seabed erosion depth at different spatial positions and different times.

[0021] The actual monitoring data is , compare the two; Calculate the error:

[0022] Or use the root mean square error RMSE to evaluate the error:

[0023] where N is the total number of data points; Step S6-1-3, Error analysis: According to the error calculation, adjust the model parameters to make the simulation results closer to the measured data; Step S6-2, Optimization solution: Step S6-2-1, Adjust the model parameters: According to the verification results, adjust the following key parameters: The permeability coefficient of the seabed sediment : Adjust the permeability coefficient of the seabed sediment so that the simulated groundwater discharge rate is more in line with the measured value :

[0024] where A is the cross-sectional area of the groundwater discharge area, is the groundwater pressure difference.

[0025] Empirical coefficient and : Adjust the empirical coefficient to improve the erosion rate formula:

[0026] Step S6-2-2: Improve the simulation accuracy: Time step: Adjust the time step To improve the simulation accuracy:

[0027] Among them, is the total number of simulation steps; Spatial step: Optimize the spatial step To improve the spatial resolution and ensure the accurate simulation of the relevant parameters of groundwater discharge.

[0028] As a preferred solution, in step S1-1, the groundwater discharge flux Q is obtained by direct measurement with a piezometer, calculation by constructing a hydrological model, or calculation by isotope tracing method As a preferred solution, the calculation formula of h in step S1-3 is , where is the groundwater pressure, is the density of groundwater, g is the acceleration of gravity, and z is the ground height).

[0029] As a preferred solution, in step S3-2, is the effective stress after correction of submarine groundwater discharge, is the initial effective stress without submarine groundwater discharge, .

[0030] Due to the adoption of the above technical solutions, the present invention has the following beneficial effects compared with the prior art: 1. By introducing multiple dynamic parameters such as groundwater discharge rate, flux, and pressure, the present application establishes a more accurate seabed erosion amount calculation model, which can dynamically calculate the seabed pressure change, effective stress change, and seabed erosion depth change caused by vertical groundwater discharge.

[0031] 2. Compared with the current seabed erosion calculation models that mainly consider factors such as waves, tides, and currents, the method proposed in the present application introduces the factor of submarine groundwater discharge, corrects and improves the existing models, and can improve the accuracy of seabed erosion depth prediction.

[0032] 3. This application can be applied to different scenarios. It is not only applicable to underwater deltas where the groundwater discharge rate and discharge volume are relatively large, but also can provide solutions for calculating seabed erosion and analyzing seabed stability in other hydrodynamic environments. By adjusting parameters according to the groundwater discharge characteristics of different regions, it can be applied to different environments.

[0033] 4. This application provides a result verification and optimization scheme. By comparing with in-situ observation data, calculating the calculation error of the model, and further adjusting the calculation results by modifying the model parameters, the accuracy of the simulation can be effectively improved.

[0034] In summary, this application is applicable to underwater delta regions with developed submarine groundwater discharge and can be applied to other scenarios by adjusting parameters. By comparing with in-situ observation data, the calculation results are corrected and the prediction accuracy is improved.

[0035] The additional aspects and advantages of the present invention will become apparent in the following description section or be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] The above and / or additional aspects and advantages of the present invention will become apparent and be readily understood from the description of the embodiments in conjunction with the following drawings, wherein: Figure 1 is a schematic flow chart of the present invention; Figure 2 is a diagram of the calculation results of seabed erosion simulation (groundwater pressure, corrected effective stress, erosion depth). DETAILED DESCRIPTION OF THE EMBODIMENTS

[0037] In order to more clearly understand the above objects, features, and advantages of the present invention, the present invention will be further described in detail below with reference to the drawings and specific embodiments. It should be noted that, without conflict, the embodiments of the present application and the features in the embodiments may be combined with each other.

[0038] In the following description, many specific details are set forth in order to fully understand the present invention. However, the present invention may be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited by the specific embodiments disclosed below.

[0039] The following combines Figures 1 to 2 to specifically illustrate the calculation method of seabed erosion amount under the vertical discharge of groundwater in the underwater delta of the embodiments of the present invention.

[0040] As Figure 1 , Figure 2 shown, the present invention proposes a calculation method of seabed erosion amount under the vertical discharge of groundwater in the underwater delta, which is characterized in that it specifically includes the following steps: Step S1, Data Collection and Preliminary Analysis: Step S1-1, Groundwater Discharge Data Collection: Collect the groundwater discharge flux , the discharge rate , the groundwater pressure ; For example, the groundwater discharge flux Q can be directly measured by a seepage meter, calculated by constructing a hydrological model, or calculated by the isotope tracer method.

[0041] Step S1-2, Analysis of Seabed Sediment Characteristics: Obtain the median grain size D (cm), porosity , and permeability coefficient ; Step S1-3, Preliminary Hydrogeological Modeling: Calculate the groundwater flow and pressure field, and simulate the groundwater flow equation in one dimension. Without considering the inhomogeneous medium and porosity, it is expressed by the hydraulic gradient as:

[0042] Where is the permeability coefficient of the seabed sediment, S is the source term of groundwater (natural recharge, human activities, etc., which can be calculated by the groundwater discharge flux Q), t is the time, x is the spatial coordinate in the horizontal direction, and h is the hydraulic gradient; the calculation formula of h is , where is the groundwater pressure, is the density of groundwater, g is the acceleration due to gravity, and z is the ground height).

[0043] Step S2, Calculate the Influence of Groundwater Discharge on Seabed Pressure Transmission: Step S2-1, Pressure Transmission Model: The pressure change Δ caused by groundwater discharge affects the effective stress of the soil mass: Δ

[0044] Where is the density of groundwater, g is the acceleration due to gravity, is the final hydraulic gradient, is the initial hydraulic gradient; Step S2-2, Revised Effective Stress of Submarine Groundwater Discharge: The effective stress of the soil mass considering submarine groundwater discharge Calculation formula:

[0045] Where is the total stress, is the hydrostatic pressure, Δ is the pressure change caused by groundwater discharge; Step S3: Calculate the critical shear stress corrected for groundwater discharge: Step S3-1: Considering groundwater discharge, the corrected critical Shields parameter

[0046] where h is the hydraulic gradient, is the critical hydraulic gradient, is the classical Shields parameter (obtained through the classical Shields curve or formula); Step S3-2: Critical shear stress formula considering groundwater discharge: Critical shear stress Calculation formula:

[0047] where, is the corrected critical Shields parameter considering groundwater discharge, is the density of sediment particles, is the density of groundwater, g is the acceleration due to gravity, D is the median grain size of seabed sediment, is the effective stress ratio factor, is the effective stress corrected for submarine groundwater discharge, is the initial effective stress without submarine groundwater discharge, . is the groundwater discharge rate; Step S4: Calculate the seabed erosion amount caused by submarine groundwater discharge: Step S4-1: Calculate the seabed erosion rate:

[0048] where, is the erosion depth, is the actual bed shear stress, is the critical shear stress considering the influence of groundwater discharge, and is the empirical coefficient, is the effective stress ratio factor.

[0049] Step S4-2: Calculate the seabed erosion depth: Substitute the formula for the variation of the critical shear stress with time into the erosion depth calculation model and integrate with respect to time to obtain the variation of the erosion depth with time:

[0050] Among them, is the initial erosion depth; Step S5, Simulation results and applications: Step S5-1, Preparations before simulation: Step S5-1-1, Before simulation, the following preparatory work needs to be carried out: Initial condition setting: Initial groundwater pressure , initial hydraulic gradient , initial groundwater discharge rate , particle density of seabed sediment , permeability coefficient of seabed sediment , porosity of seabed sediment , median grain size D of seabed sediment, relative density s of seabed sediment and its variation range, time step : In order to carry out dynamic simulation, a suitable time step is set , for example, one day or one week, so as to update the pressure and erosion amount in each step; Step S5-1-2, Simulation area and grid division: According to the research area (such as the Yellow River Estuary), grid division is carried out in the horizontal and vertical directions; the size of the grid cells is determined according to the seabed characteristics and the complexity of groundwater flow.

[0051] Step S5-2, Simulation process: Use the following steps to calculate the seabed erosion depth at different times in the simulation: Step S5-2-1, Calculate the change of groundwater pressure with time According to the groundwater flow equation and the aforementioned groundwater pressure change formula:

[0052] Gradually calculate the groundwater pressure at each time step ; Use the finite difference method (FDM) for spatial and temporal discretization, and calculate with the following formula:

[0053] Among them, is the groundwater pressure at position x at the next time step ; is the groundwater pressure at position x at the current time step ; Step S5-2-2, Calculate the effective stress: The change of effective stress is due to the change of pressure difference caused by groundwater discharge; the effective stress within each time step can be calculated by the following formula:

[0054] Step S5-2-3, calculate the critical shear stress: Calculate the hydraulic gradient at different positions x and different times t according to the above formula , and then calculate the Shields parameter after correcting for groundwater discharge , and finally calculate the critical shear stress .

[0055] Step S5-2-4, update the seabed erosion depth: The calculation formula for the seabed erosion rate considering groundwater discharge is

[0056] The calculation formula for the seabed erosion depth at different positions and different times is ; Similarly, use the finite difference method (FDM) to discretize the differential equation for calculating the seabed erosion depth in time, and obtain:

[0057] where, is the erosion depth at the next time step , is the erosion depth at the current time step , is the time step, is the bed shear stress at the current time step , is the critical shear stress at the current time step ; Step S5-2-5, output and display the simulation results: Obtain the seabed erosion depth at different time points through the calculated ; Step S6, verification method and optimization plan: Step S6-1, verification method: Step S6-1-1, collect data: Collect the groundwater discharge flux , discharge rate , pressure , and seabed erosion depth in the Yellow River Estuary area; Measure the bed shear stress of the seabed on-site ; Step S6-1-2, compare the simulated calculation results with the measured data: Take the average of the simulated results in space to obtain

[0058]

[0059] Wherein, X is the total number of spatial grids, and x is the length of each spatial grid. is the seabed erosion depth at different spatial positions and different times.

[0060] The actual monitoring data is , and compare the two; calculate the error:

[0061] Or use the root mean square error RMSE to evaluate the error:

[0062] Wherein, N is the total number of data points; Step S6-1-3, Error analysis: According to the error calculation, adjust the model parameters to make the simulation results closer to the measured data; Step S6-2, Optimization plan: Step S6-2-1, Adjust the model parameters: According to the verification results, adjust the following key parameters: The permeability coefficient of seabed sediment : Adjust the permeability coefficient of seabed sediment so that the simulated groundwater discharge rate is more in line with the measured value :

[0063] Wherein, A is the cross-sectional area of the groundwater discharge area, is the groundwater pressure difference.

[0064] Empirical coefficient and : Adjust the empirical coefficient to improve the erosion rate formula:

[0065] Step S6-2-2, Improve the simulation accuracy: Time step: Adjust the time step to improve the simulation accuracy:

[0066] Wherein, is the total number of simulation steps; Spatial step: Optimize the spatial step To improve the spatial resolution and ensure the accurate simulation of relevant parameters for groundwater discharge; Step S6-2-3, Cross-regional application Apply the optimized model to other underwater delta regions (such as the Pearl River Estuary or the Yangtze River Estuary), and adjust other regional parameters such as the local groundwater discharge flux Q and discharge rate v to verify the universality of the model. Embodiment

[0067] Suppose the calculation process of the vertical discharge of submarine groundwater proposed in this application is applied to the Yellow River underwater delta environment for simulation to evaluate the impact of submarine groundwater discharge on the seabed.

[0068] For simulation, it is necessary to set the properties of seabed sediments and relevant parameters for submarine groundwater discharge in the Yellow River underwater delta. The relevant parameters are taken from the in-situ observation data and relevant literature of the Yellow River underwater delta. The simulation time is 10 days, set as normal periods (1-2 days, 7-10 days) and storm periods (3-6 days), and the corresponding parameters are modified. Specifically as follows: Fixed parameters: 1. Groundwater discharge parameters Groundwater density 、 (During storms).

[0069] Hydraulic gradient 。

[0070] Critical hydraulic gradient 。

[0071] Seabed sediment characteristics Sediment particle density 。

[0072] Porosity 、 (During storms)。

[0073] Initial stress conditions Total stress 。

[0074] Hydrostatic pressure 。

[0075] Initial effective stress 。

[0076] Erosion model parameters Classical Shields parameter =0.03。

[0077] Empirical coefficient 。

[0078] Bed shear stress , (During the storm).

[0079] Time step and simulation duration Time step days.

[0080] Simulation duration days.

[0081] Assignment of spatial coordinate x Assume the length of the simulation area is L = 100m, and the grid is divided into .

[0082] Assume the simulation area is uniformly distributed in space, and the spatial distribution does not need to be considered.

[0083] Data collection: 1. Groundwater discharge data collection Groundwater discharge rate , (During the storm) The groundwater discharge flux Q is calculated according to the unit volume groundwater discharge rate.

[0084] Groundwater pressure (Uniform distribution) During normal periods, the groundwater pressure increases by ; During storm periods, the groundwater pressure increases by .

[0085] Analysis of seabed sediment characteristics Median grain size of seabed sediment .

[0086] Permeability coefficient , (During the storm).

[0087] Initial erosion depth Initial erosion depth .

[0088] According to the calculation steps in this article, calculate the groundwater pressure, effective stress, critical shear stress, and erosion depth day by day. The following is the calculation process (taking the first day as an example): Step1 Update groundwater pressure

[0089] Step2 Calculate the change in effective stress caused by submarine groundwater discharge

[0090] Step3 Calculate the critical shear stress considering submarine groundwater discharge Pa

[0091] Step4 Calculate the erosion rate and erosion depth under the influence of submarine groundwater discharge

[0092]

[0093] The above is the overall calculation process of the analysis method for seabed erosion caused by vertical discharge of submarine groundwater proposed in this application. The flowchart is shown in Figure 1 , taking the simulation calculation of the seabed erosion volume on the first day as an example. Substitute the updated groundwater pressure, effective stress, etc. into the calculation of the seabed erosion volume from the second day to the tenth day, and the ten-day dynamic simulation results are shown in the following table.

[0094] Table 1 Simulation operation results

[0095] Figure 2 is the time series diagram of the seabed erosion depth under the influence of submarine groundwater discharge during calm sea conditions and storm periods obtained through simulation calculation. It can be intuitively seen that the seabed erosion volume caused by submarine groundwater discharge during calm sea conditions is small, while during storms, it promotes groundwater discharge, increases groundwater pressure, further reduces effective stress, and exacerbates seabed erosion.

[0096] Step5 Result verification and optimization plan Result verification: Measure relevant parameters such as seabed sediments and submarine groundwater discharge in the simulation calculation area through in-situ observation and other methods, such as groundwater discharge flux and groundwater discharge rate etc. By comparing the simulation results with the measured data, calculate the simulation error:

[0097] Optimization plan: Adjust the permeability coefficient , the classical Shields empirical coefficient and the empirical coefficient , to optimize the simulation results.

[0098] Improve the simulation accuracy by adjusting the time step and the spatial grid division .

[0099] In the description of the present invention, the term "a plurality of" means two or more, unless otherwise clearly defined. The orientation or positional relationship indicated by terms such as "upper", "lower", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as a limitation to the present invention; terms such as "connection", "installation", "fixation", etc. should all be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0100] In the description of this specification, the descriptions of terms such as "one embodiment", "some embodiments", "specific embodiments", etc. mean that the specific features, structures, materials, or characteristics described in connection with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or instance. Moreover, the specific features, structures, materials, or characteristics described can be combined in a suitable manner in any one or more embodiments or examples.

[0101] The above are only the preferred embodiments of the present invention and are not used to limit the present invention. For those skilled in the art, the present invention can have various changes and modifications. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included within the protection scope of the present invention.

Claims

1. A method for calculating the amount of seabed erosion under the vertical discharge of groundwater in an underwater delta, characterized in that , specifically including the following steps: Step S1: Data collection and preliminary analysis: Step S1-1, groundwater discharge data collection: Collecting groundwater discharge flux , excretion rate , groundwater pressure ; Step S1-2: Analysis of seabed sediment characteristics: Obtain the median particle size D (cm) and porosity of seabed sediments , Permeability coefficient ; Step S1-3, preliminary hydrogeological modeling: Calculate the groundwater flow and pressure field, simulate the groundwater flow equation in one dimension, ignore the inhomogeneous medium and porosity, and express the hydraulic gradient as: in, is the permeability coefficient of seabed sediments, S is the source term of groundwater (natural recharge, artificial activities, etc., which can be calculated using the groundwater discharge flux Q), t is time, x is the spatial coordinate in the horizontal direction, and h is the hydraulic gradient; Step S2: Calculate the impact of groundwater discharge on seabed pressure transmission: Step S2-1, pressure transmission model: Pressure change due to groundwater discharge Δ Effective stress affecting soil: D in, is the density of groundwater, g is the acceleration due to gravity, is the final hydraulic gradient, is the initial hydraulic gradient; Step S2-2, effective stress corrected by submarine groundwater discharge: Effective stress of soil considering submarine groundwater discharge Calculation formula: in, is the total stress, is the hydrostatic pressure, Δ Pressure changes caused by groundwater discharge; Step S3, calculating the critical shear stress of groundwater discharge correction: Step S3-1: Considering groundwater discharge, the modified critical shield parameters Where h is the hydraulic gradient, is the critical hydraulic gradient, is the classic Shields parameter; Step S3-2, critical shear stress formula considering groundwater discharge: Critical shear stress Calculation formula: in, is the modified critical Shields parameter considering groundwater discharge, is the density of sediment particles, is the density of groundwater, g is the acceleration of gravity, D is the median particle size of seabed sediment, is the effective stress proportionality factor, is the groundwater discharge rate; Step S4, calculating the amount of seabed erosion caused by submarine groundwater discharge: Step S4-1, calculating the seabed erosion rate: in, is the erosion depth, is the actual bed shear stress, is the critical shear stress considering the effect of groundwater discharge, and is the empirical coefficient, is the effective stress proportional factor; Step S4-2, calculating the seabed erosion depth: Substituting the formula of critical shear stress changing with time into the erosion depth calculation model and integrating the time, the erosion depth can be obtained. Changes over time: in, is the initial erosion depth; Step S5: simulation results and application: Step S5-1, preparation before simulation: Step S5-1-1, initial condition setting: Initial groundwater pressure , initial hydraulic gradient , initial groundwater discharge rate , particle density of seabed sediments , the permeability coefficient of seabed sediments , porosity of seabed sediments , median particle size D of seabed sediments, relative density s of seabed sediments and its range of variation, time step ; Step S5-1-2, simulation area and grid division: According to the study area, grid division is carried out in horizontal and vertical directions; Step S5-2, simulation process: Use the following steps to calculate the depth of seafloor erosion at different times in your simulation: Step S5-2-1: Calculate the change of groundwater pressure over time According to the groundwater flow equation and the aforementioned groundwater pressure change formula: Calculate each time step step by step The groundwater pressure under the condition of finite difference method is discretized in space and time and calculated as follows: in, For the next time step At time , the groundwater pressure at position x; At the current time step When , the groundwater pressure at position x; Step S5-2-2, calculate effective stress: The change in effective stress is the change in pressure difference due to groundwater discharge; the effective stress in each time step can be calculated by the following formula: Step S5-2-3, calculate the critical shear stress: According to the above formula, the hydraulic gradient at different positions x and different times t is calculated respectively. , and then calculate the Shields parameter after groundwater discharge correction , and finally calculate the critical shear stress The value of Step S5-2-4, updating of seabed erosion depth: The calculation formula for the seabed erosion rate considering groundwater discharge is: The calculation formula for the seabed erosion depth at different locations and times is: ; The finite difference method is also used to time discretize the differential equation for calculating the seabed erosion depth, and we get: in, For the next time step The depth of erosion, is the current time step The depth of erosion, is the time step, is the current time step The bed shear stress, is the current time step The critical shear stress of Step S5-2-5: Output and display of simulation results: Obtained by calculation Get the depth of seabed erosion at different time points; Step S6: Verification method and optimization scheme: Step S6-1, verification method: Step S6-1-1, collecting data: Collecting groundwater flux , excretion rate ,pressure , and the depth of seabed erosion ; On-site measurement of seabed shear stress ; Step S6-1-2, comparing the simulation calculation results with the measured data: The simulation results are averaged in space to obtain Where X is the total number of spatial grids, x is the length of each spatial grid, is the depth of seabed erosion at different spatial locations and at different times; the actual monitoring data is , compare the two; calculate the error: Or use the root mean square error RMSE to evaluate the error: Where N is the total number of data points; Step S6-1-3, error analysis: According to the error calculation, the model parameters are adjusted to make the simulation results closer to the measured data; Step S6-2, optimization scheme: Step S6-2-1, adjust model parameters: Based on the verification results, adjust the following key parameters: Hydraulicity coefficient of seabed sediments : Adjust the seabed sediment permeability so that the simulated groundwater discharge rate More consistent with the measured value : Where A is the cross-sectional area of ​​the groundwater discharge area, is the groundwater pressure difference; Empirical coefficient and : Adjust the empirical coefficients to improve the erosion rate formula: Step S6-2-2, improving simulation accuracy: Time step: Adjust the time step To improve the accuracy of the simulation: in, is the total number of simulation steps; Space step length: Optimize spatial step size This improves the spatial resolution and ensures accurate simulation of relevant parameters of groundwater discharge.

2. The method for calculating the amount of seabed erosion under the vertical discharge of groundwater in an underwater delta according to claim 1 is characterized in that In step S1-1, the groundwater discharge flux Q is obtained by direct measurement by a seepage meter, calculation by building a hydrological model, or calculation by an isotope tracer method.

3. The method for calculating the amount of seabed erosion under the vertical discharge of groundwater in an underwater delta according to claim 1 is characterized in that , the calculation formula of h in step S1-3 is ,in, is the groundwater pressure, is the density of groundwater, g is the acceleration due to gravity, and z is the height from the ground.

4. The method for calculating the amount of seabed erosion under the vertical discharge of groundwater in an underwater delta according to claim 1 is characterized in that , the effective stress in step S3-2 is corrected for submarine groundwater discharge, and is the initial effective stress without submarine groundwater discharge, .

Citation Information

Patent Citations

  • Method for predicting influence of different climatic changes on shallow groundwater seawater invasion and application

    CN117131652A

  • Dynamic value calculation method for predicting seabed erosion and deposition and application

    CN119150727A

  • Rapid assessment method for seawater intrusion and sustainable freshwater exploitation in confined aquifer considering hydraulic boundary change

    CN119647343A

  • Method and apparatus for analyzing river sedimentation and flushing using quasi-two-dimensional quasi-steady model

    KR101497993B1

  • Method for determining hydraulic parameters and water inflow in erosion stage of gravel soil

    US20220307964A1