Terrain surveying and mapping equipment for bridge dam construction in water conservancy project
By introducing movable components and pressing components into the topographic surveying and mapping equipment for bridge embankment construction in water conservancy projects, the problems of inconvenience and poor stability of single persons are solved, and more efficient and safe surveying and mapping operations are achieved.
Patent Information
- Application Number
- CN202510218931.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-26
- Publication Date
- 2025-06-20
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the construction of bridge embankments in water conservancy projects, existing topographic surveying and mapping equipment is inconvenient and has poor stability when operated by a single person, which affects the surveying and mapping accuracy and safety.
A device is designed including a mapper body, a bracket, a moving assembly and a pressing assembly. The movable assembly is arranged on the surface of the bracket, and the pressing assembly includes a circular pressing block and an L-shaped fixing rod. Through pressing blocks and driving the L-shaped fixing rod, the stable placement and operation of the mapper is achieved.
This equipment allows operators to stably operate the mapper by assisting the pressing of the foot, improving operational convenience and stability, reducing the reduction in mapping accuracy and safety hazards caused by instability.
Smart Images

Figure CN120175978A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of water conservancy projects, and particularly to a topographic surveying and mapping device for the construction land of bridges and dams in water conservancy projects. Background Art
[0002] A water conservancy project is a project built to control and allocate surface water and groundwater in nature to achieve the purpose of eliminating disasters and bringing benefits, and is also called a water project.
[0003] Currently, when building bridges and dams in water conservancy projects, it is necessary to conduct surveying and mapping operations on the construction site, and topographic surveying and mapping equipment is required for auxiliary operations during the surveying and mapping of the construction site.
[0004] However, the current surveying instrument will be installed on a bracket and cooperate with the operating instrument for auxiliary operations. However, when the surveying instrument is installed on the bracket and the operating instrument is used, it is easy to cause inconvenience when used by a single operator and problems with the stability of the surveying instrument during use.
[0005] Therefore, it is necessary to provide a topographic surveying and mapping device for the construction land of bridges and dams in water conservancy projects to solve the above technical problems. Summary of the Invention
[0006] The present invention provides a topographic surveying and mapping device for the construction land of bridges and dams in water conservancy projects, which solves the problems of inconvenience when used by a single operator and the stability of the surveying instrument during use when the surveying instrument is installed on a bracket and the operating instrument is used.
[0007] To solve the above technical problems, a topographic surveying and mapping device for the construction land of bridges and dams in water conservancy projects provided by the present invention includes:
[0008] A surveying instrument main body, the bottom of the surveying instrument main body is connected with a bracket;
[0009] A movable component, the movable component is arranged on the surface of the bracket;
[0010] A stepping component, the stepping component is arranged below the movable component, the stepping component includes a circular stepping block and two L-shaped fixing rods, and the two L-shaped fixing rods are symmetrically connected to the left and right sides of the surface of the circular stepping block.
[0011] Preferably, the movable component includes a fixing frame, two fixing rods, two movable sleeves, two springs and two stoppers, the fixing frame is sleeved on the surface of the bracket, and the two fixing rods are symmetrically connected to the left and right sides of the bottom of the fixing frame.
[0012] Preferably, the two movable sleeves are sleeved on the surfaces of the two fixing rods, and the two L-shaped fixing rods are respectively connected to one side of the two movable sleeves.
[0013] Preferably, the two springs are sleeved on the surfaces of the two fixed rods and located below the two movable sleeves.
[0014] Preferably, the two stoppers are respectively connected to the bottom ends of the two fixed rods.
[0015] Preferably, a placement rack is installed on the surface of the support.
[0016] Preferably, two fixing components are arranged between the mounting rack and the support. The fixing components include fixing rings and bolts. The fixing rings are sleeved on the surface of the support and connected to the surface of the mounting rack, and the bolts are arranged between the fixing rings and the support.
[0017] Compared with the related art, a topographic surveying device for the construction land of bridges and dams in water conservancy projects provided by the present invention has the following beneficial effects:
[0018] The present invention provides a topographic surveying device for the construction land of bridges and dams in water conservancy projects. By using a movable component on the surface of a support with a surveying instrument main body and a circular pressing block with two L-shaped fixed rods, it is convenient for an operator to place the tester main body on a designated position through the support and then perform an auxiliary stabilizing operation by stepping on it with the foot, so as to facilitate the operator to operate the surveying instrument main body and the operating instrument simultaneously and prevent instability during operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 is a schematic structural diagram of a first embodiment of a topographic surveying device for the construction land of bridges and dams in water conservancy projects provided by the present invention;
[0020] Figure 2 is Figure 1 an enlarged schematic view of part A shown in;
[0021] Figure 3 is Figure 1 a three-dimensional structural schematic diagram of the topographic surveying device shown in;
[0022] Figure 4 is a schematic structural diagram of a second embodiment of a topographic surveying device for the construction land of bridges and dams in water conservancy projects provided by the present invention.
[0023] Reference numerals in the drawings: 1, surveying instrument main body; 2, support;
[0024] 3, movable component; 31, fixing frame; 32, fixed rod; 33, movable sleeve; 34, spring; 35, stopper;
[0025] 4, pressing component; 41, circular pressing block; 42, L-shaped fixed rod;
[0026] 5. Placing rack
[0027] 6. Fixing component; 61. Fixing ring; 62. Bolt Specific implementation manner
[0028] The present invention will be further described below in conjunction with the drawings and the implementation manner
[0029] First embodiment
[0030] Please refer to Figure 1 , Figure 2 and Figure 3 , where Figure 1 is a schematic structural diagram of the first embodiment of a topographic surveying device for the construction land of a bridge dam in a water conservancy project provided by the present invention; Figure 2 is Figure 1 an enlarged schematic diagram of part A shown in; Figure 3 is Figure 1 a three - dimensional structural schematic diagram of the topographic surveying device shown in. A topographic surveying device for the construction land of a bridge dam in a water conservancy project includes:
[0031] A surveying instrument main body 1, and a bracket 2 is connected to the bottom of the surveying instrument main body 1;
[0032] A moving component 3, and the moving component 3 is arranged on the surface of the bracket 2;
[0033] A stepping component 4, and the stepping component 4 is arranged below the moving component 3. The stepping component 4 includes a circular stepping block 41 and two L - shaped fixing rods 42. The two L - shaped fixing rods 42 are symmetrically connected to the left and right sides of the surface of the circular stepping block 41.
[0034] The moving component 3 includes a fixing frame 31, two fixing rods 32, two moving sleeves 33, two springs 34 and two stoppers 35. The fixing frame 31 is sleeved on the surface of the bracket 2, and the two fixing rods 32 are symmetrically connected to the left and right sides of the bottom of the fixing frame 31.
[0035] The two moving sleeves 33 are sleeved on the surfaces of the two fixing rods 32, and the two L - shaped fixing rods 42 are respectively connected to one side of the two moving sleeves 33.
[0036] The use of the stopper 35 can prevent the spring 34 and the moving sleeve 33 from falling off, and the size of the stopper 35 is larger than the size of the spring 34.
[0037] The two springs 34 are sleeved on the surfaces of the two fixing rods 32 and are located below the two moving sleeves 33.
[0038] The use of the spring 34 allows the circular pressing block 41 to return to its original position after loosening. The circular pressing block 41 is sleeved on the surface of the bracket 2 and moves up and down. The use of the fixed rod 32 and the movable sleeve 33 can drive the circular pressing block 41 to move.
[0039] The two stoppers 35 are respectively connected to the bottom ends of the two fixed rods 32.
[0040] A placement rack 5 is installed on the surface of the bracket 2.
[0041] The working principle of a topographic surveying device for the construction land of bridges and dams in water conservancy projects provided by the present invention is as follows:
[0042] During use, after adjusting the position of the tester main body 1, the operator moves the circular pressing block 41 downward towards the ground by stepping on it with the foot. When the circular pressing block 41 moves downward towards the ground, it drives the movable sleeve 33 to move downward on the surface of the fixed rod 32 through the L-shaped fixed rod 42. When the movable sleeve 33 moves downward on the surface of the fixed rod 32, it squeezes the spring 34 on the surface until the circular pressing block 41 moves to contact the ground and continues to be stepped on for use. At this time, the operator can operate the surveying instrument main body 1 and other operating instruments.
[0043] Compared with the related technology, a topographic surveying device for the construction land of bridges and dams in water conservancy projects provided by the present invention has the following beneficial effects:
[0044] The present invention provides a topographic surveying device for the construction land of bridges and dams in water conservancy projects. By using the movable assembly 3 and the circular pressing block 41 with two L-shaped fixed rods 42 on the surface of the bracket 2 with the surveying instrument main body 1, it is convenient for the operator to place the tester main body 1 on the designated position through the bracket 2 and then perform auxiliary and stable operations by stepping on it with the foot. Thus, it is convenient for the operator to operate the surveying instrument main body 1 and the operating instrument simultaneously, preventing instability during operation.
[0045] Second Embodiment
[0046] Please refer to Figure 4 Based on a topographic surveying device for the construction land of bridges and dams in water conservancy projects provided in the first embodiment of the present application, a second topographic surveying device for the construction land of bridges and dams in water conservancy projects is proposed in the second embodiment of the present application. The second embodiment is only a preferred mode of the first embodiment, and the implementation of the second embodiment will not affect the independent implementation of the first embodiment.
[0047] Specifically, the difference of a topographic surveying and mapping device for the construction land of a bridge dam in a water conservancy project provided by the second embodiment of the present application lies in that, for a topographic surveying and mapping device for the construction land of a bridge dam in a water conservancy project, two fixing components 6 are arranged between the mounting frame 31 and the support 1. The fixing component 6 includes a fixing ring 61 and a bolt 62. The fixing ring 61 is sleeved on the surface of the support 2 and connected to the surface of the mounting frame 31. The bolt 62 is arranged between the fixing ring 61 and the support 2.
[0048] Threaded holes adapted to the bolt 62 are formed in both the fixing ring 61 and the support 2.
[0049] The working principle of a topographic surveying and mapping device for the construction land of a bridge dam in a water conservancy project provided by the present invention is as follows:
[0050] During use, when installing the movable component 3 with the stepping component 4, first, the movable component 3 with the stepping component 4 is sleeved on the surface of the support 1 through the fixing ring 61 and its position is adjusted. After adjusting the position of the movable component 3 with the stepping component 4, the bolt 62 is used to pass through the fixing ring 61 and threadedly connect with the support 2.
[0051] Compared with the related art, a topographic surveying and mapping device for the construction land of a bridge dam in a water conservancy project provided by the present invention has the following beneficial effects:
[0052] The present invention provides a topographic surveying and mapping device for the construction land of a bridge dam in a water conservancy project. The arrangement of the fixing component 6 between the support 2 and the mounting frame 31 facilitates the installation and disassembly of the movable component 3 with the stepping component 4 and the support 2.
[0053] The above are only the embodiments of the present invention, and thus do not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, shall be equally included in the patent protection scope of the present invention.
Claims
1. A topographic surveying and mapping device for bridge and dam construction in water conservancy projects, characterized in that: include: A surveying and mapping instrument body, wherein a bracket is connected to the bottom of the surveying and mapping instrument body; A movable component, wherein the movable component is arranged on the surface of the bracket; The pressing assembly is arranged below the movable assembly, and the pressing assembly comprises a circular pressing block and two L-shaped fixing rods, wherein the two L-shaped fixing rods are symmetrically connected to the left and right sides of the surface of the circular pressing block.
2. The topographic surveying and mapping equipment for bridge and dam construction in water conservancy projects according to claim 1 is characterized in that: The movable assembly comprises a fixing frame, two fixing rods, two movable sleeves, two springs and two stoppers. The fixing frame is sleeved on the surface of the bracket, and the two fixing rods are symmetrically connected to the left and right sides of the bottom of the fixing frame.
3. The topographic surveying and mapping equipment for bridge and dam construction in water conservancy projects according to claim 2 is characterized in that: The two movable sleeves are arranged on the surfaces of the two fixing rods, and the two L-shaped fixing rods are respectively connected to one side of the two movable sleeves.
4. The topographic surveying and mapping equipment for bridge and dam construction in water conservancy projects according to claim 2 is characterized in that: The two spring sleeves are arranged on the surfaces of the two fixing rods and are located below the two movable sleeves.
5. The topographic surveying and mapping equipment for bridge and dam construction in water conservancy projects according to claim 2 is characterized in that: The two stoppers are respectively connected to the bottom ends of the two fixing rods.
6. The topographic surveying and mapping equipment for bridge and dam construction in water conservancy projects according to claim 1 is characterized in that: A placement rack is installed on the surface of the bracket.
7. The topographic surveying and mapping equipment for bridge and dam construction in water conservancy projects according to claim 2 is characterized in that: Two fixing components are arranged between the mounting frame and the bracket, and the fixing components include a fixing ring and a bolt. The fixing ring is sleeved on the surface of the bracket and connected to the surface of the mounting frame, and the bolt is arranged between the fixing ring and the bracket.