Intelligent construction cost control method and system

Through intelligent construction cost control methods and systems, real-time collection and analysis of construction cost data, predict environmental impacts, and perform abnormal scheduling, the problem of difficulty in achieving full life cycle cost planning and control in the existing technology is solved, and the accuracy and efficiency of cost control are improved.

CN120181490AInactive Publication Date: 2025-06-20安阳市智慧城市运行中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510290923.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-12
Publication Date
2025-06-20
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing construction cost control methods are difficult to achieve full life cycle cost planning and control, and it is impossible to detect construction cost abnormalities in a timely manner. The authenticity, completeness and timeliness of cost data are not guaranteed, which affects decision-making accuracy and cost control efficiency.

Method used

Intelligent construction cost control methods and systems are adopted, including construction inspection end, cost prediction end and impact dispatch end. The construction inspection end collects cost parameters in real time, judges whether the costs of different construction cycles are abnormal, and checks the authenticity of the data. The cost prediction side predicts construction stagnation under the influence of the environment by collecting explicit and implicit costs in real time. Influence the dispatching end to perform abnormal scheduling and supplementation, and adjust construction decisions when delays or stagnation occur.

Benefits of technology

Real-time control and abnormal judgment of the entire life cycle cost of construction is achieved, the accuracy and efficiency of cost control is improved, the authenticity and reliability of cost data is ensured, and decision-making errors and cost out of control are avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120181490A_ABST
    Figure CN120181490A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent construction cost control method and system, and relates to the technical field of cost control, and the system comprises a construction detection end, a cost prediction end and an influence scheduling end. The construction detection end is used for formulating a planning scheme of a construction project and timely judging whether the construction cost in different periods is abnormal or not; the cost prediction terminal predicts whether construction stagnation occurs in advance; and the influence scheduling end is used for performing abnormal scheduling and complementing on the construction cost of the project cost in real time through the planning scheme of the construction project when construction delay or construction stagnation occurs, and adjusting the construction decision of the planning scheme in time. According to the intelligent construction cost control method and system, real-time control and abnormity judgment are carried out on the cost planning of the whole life cycle of the project in time, whether the construction time is prolonged or not is predicted according to the influence of the environment on construction, and abnormity scheduling and complementing can be carried out on the construction cost of the project in time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of cost control, and particularly relates to an intelligent construction cost control method and system. Background Technique

[0002] Construction cost control refers to the process of, during the implementation of a project, based on the prediction of the project cost, through a series of effective management and control measures, strictly supervising and regulating the human, material, financial and other resources consumed during the construction process, promptly discovering and correcting deviations, so as to ensure that the actual cost of the project does not exceed the predetermined planned scope and achieve the cost target.

[0003] During the construction of building construction and municipal engineering, there are some deficiencies in the construction cost control in the project cost process of the construction party: 1. Project managers often overly focus on the cost control during the construction process, but the cost control during the construction process is often closely related to the cost management in the initial planning and design, bidding stage, and later acceptance and operation and maintenance stages of the project. As a result, there is a lack of cost planning and control for the entire life cycle of the project during construction cost control, making it difficult to optimize the overall cost, resulting in the inability to promptly discover whether there are abnormalities in different construction cycles, and at the same time, the authenticity, integrity, and timeliness of cost data cannot be guaranteed, and reliable support for cost control cannot be provided, causing decision-making mistakes or cost out-of-control for personnel; 2. Construction costs include explicit costs and implicit costs. Implicit costs include the extension of construction time caused by the construction being affected by the environment. Such construction costs cannot be predicted in a timely manner, resulting in a weakened accuracy of construction cost control; 3. When there are abnormalities in construction cost control, it is impossible to perform abnormal scheduling and supplementation of the construction costs of the project cost, further affecting the control efficiency and control convenience of construction costs.

[0004] Therefore, an intelligent construction cost control method and system are proposed to solve the above problems. Summary of the Invention

[0005] The main purpose of the present invention is to provide an intelligent construction cost control method and system to solve the problems mentioned in the above background.

[0006] To achieve the above purpose, the technical solution adopted by the present invention is: an intelligent construction cost control method and system, including a construction detection end, a cost prediction end, and an impact scheduling end; The construction detection end is used for formulating a planning scheme for a construction project, setting a standard budget for the construction execution cost of the project cycle for the planning scheme, collecting cost parameters of different life cycles of the project in real time, promptly judging whether the costs in different construction cycles are abnormal, and verifying the authenticity of the data in real time during the construction cost accounting; The cost prediction end is used to collect the explicit costs and implicit costs during the construction process in real time, and conduct real-time accounting of the implicit costs according to the environmental impact on the construction, and predict in advance whether there will be a construction stagnation situation through the environment; The impact scheduling end is used to, when construction delay or construction stagnation occurs, conduct abnormal scheduling and make up for the construction costs of the project cost in real time through the planning scheme of the construction project, and timely adjust the construction decision of the planning scheme to ensure the adaptive control of the construction costs.

[0007] The construction detection end includes a planning scheme module, a cost collection module and a judgment tracking module; The planning scheme module includes a project cycle unit and a construction execution unit; The project cycle unit is used to formulate the planning scheme of the construction project. The planning scheme includes the standard budget of the full-cycle construction costs during the construction process of building construction and municipal engineering, the standard budget of construction costs in different cycles, the construction time in different cycles, the corresponding construction quantity in different cycles, and the project cost materials in different cycles. The planning scheme also includes the accident budget of the construction project, and the accident pre-review is set at 1 million; The construction execution unit is used to track the project execution status of building construction and municipal engineering in real time through data sensors and data trackers. The project execution status includes the standard budget of construction costs in different cycles, the construction time in different cycles, the corresponding construction quantity in different cycles, and the project cost materials in different cycles.

[0008] The cost collection module includes a construction cost unit and a planning cost unit; The construction cost unit is used to conduct project cost accounting of the construction costs according to building construction and municipal engineering, and set the construction costs. The construction costs include the labor salary costs, construction material costs, construction equipment costs, construction management costs, construction accident costs and land use costs; The planning cost unit is used to set the construction costs of different construction processes in different cycles according to the planning scheme of building construction and municipal engineering. The construction costs here include the labor salary costs, construction material costs, construction equipment costs, construction management costs, construction accident costs and land use costs corresponding to different construction projects in different cycles.

[0009] The judgment tracking module includes a cost judgment unit, a cycle tracking unit, a data inspection unit and an abnormal identification unit; The cost judgment unit is used to set the standard construction costs corresponding to different construction processes in different cycles, calculate the difference between the construction costs corresponding to the current moment and the standard construction costs. If the construction costs corresponding to the current moment are greater than or equal to the standard construction costs, it means that the construction costs are abnormal. If the construction costs corresponding to the current moment are less than the standard construction costs, it means that the construction costs are normal; The cycle tracking unit is used to track in real time the difference between the construction costs of different construction processes and the standard construction costs according to the data tracker, and track the construction status in real time; The data inspection unit is used to inspect the authenticity of the construction cost accounting data in real time through the Cronbach's alpha coefficient, set the standard value of the Cronbach's alpha coefficient, and calculate the Cronbach's alpha coefficient of the cost accounting data at the current moment in real time through the calculation formula. The calculation formula is as follows: ; Wherein, is the variance of the cost accounting data, is the variance of the overall cost accounting data, is the quantity of the cost accounting data. Calculate the difference between and the standard value. If the difference is equal to 0, it means the data is true. If the difference is not equal to 0, it means the data is abnormal; The abnormal identification unit is used to abnormally identify the construction costs with abnormal data in the construction cost accounting data, and the abnormal identification is displayed by using origin points of different colors.

[0010] The cost prediction end includes a cost classification module, a hidden prediction unit, and a construction anomaly module; The cost classification module includes an explicit cost unit and a hidden cost unit; The explicit cost unit is used to set the worker salary cost, construction material cost, construction equipment cost, and land use cost as explicit costs, and set the construction management cost and construction accident cost as hidden costs; The hidden cost unit is used to set that the construction accident cost includes the accidental occurrence cost of construction safety events and the construction delay cost affected by the environment.

[0011] The hidden prediction unit includes an environment collection unit and an environment judgment unit; The environment collection unit is used to monitor the construction environment parameters at the current moment in real time through environmental monitoring equipment. The environmental monitoring equipment includes earthquake monitoring equipment, landslide monitoring equipment, debris flow monitoring equipment, ground settlement monitoring equipment, volcanic eruption monitoring equipment, temperature sensors, humidity sensors, rain detectors, and light sensors; The environment judgment unit is used to judge in real time whether the construction environment parameters at the current moment affect the normal execution of the construction. The judgment method is as follows: Calculate the difference between the environmental parameters in the corresponding area and the environmental standard parameters. If the difference = ±6, it is determined that the environmental parameters are within the safe value, indicating that the construction environmental parameters at the current moment are normal and do not affect the normal execution of construction. If the difference > 6 or < -6, it is determined that the construction environmental parameters exceed the safe value, indicating that the construction environmental parameters at the current moment are abnormal and affect the normal execution of construction, and the reporting system issues an environmental anomaly warning signal.

[0012] The construction anomaly module includes a construction impact unit and a construction warning unit; The construction impact unit is used to predict whether the construction execution in the next cycle is normal based on the construction environmental parameters at the current moment. The prediction method is as follows: Taking three days as a cycle, predict the construction environmental parameters in building construction and municipal construction based on the construction environmental parameters of three cycles. If the difference between the average value of the construction environmental parameters of three cycles and the environmental standard parameters is greater than 10, it is determined that the construction execution in the next cycle is abnormal, indicating that there is a construction stagnation situation in the next cycle, and the reporting system issues a voice alarm; The construction warning unit is used to receive the prediction results of the construction impact unit in real time through a data receiver, and when the construction execution in the next cycle is abnormal, the reporting system issues a voice alarm.

[0013] The impact dispatching end includes a result receiving module, an abnormal dispatching module, a make-up calculation module, and a make-up tracking module; The result receiving module is used to receive the construction costs and construction execution prediction results corresponding to different cycles and different construction processes in real time through a data receiver; The abnormal dispatching module includes a cycle dispatching unit and a personnel dispatching unit; The cycle dispatching unit is used to set construction cost dispatching decisions based on the construction costs and construction execution prediction results corresponding to different cycles and different construction processes. The initial state of the construction cost dispatching decision is formulated according to the planning scheme, and the current state of the construction cost dispatching decision is formulated according to the construction cost anomaly results and construction execution prediction results; The personnel dispatching unit is used to report to the system when the environmental parameters in the next cycle are predicted to be abnormal, make a dispatching adjustment of the construction space, convert outdoor work to indoor work, convert the construction personnel for outdoor work to construction personnel for indoor work, and extend the working hours of the construction personnel for outdoor work.

[0014] The make-up calculation module is used to calculate the construction delay costs caused by environmental anomalies in real time, make up the costs for different cycles and different construction processes for the construction delay costs, and repeat the real-time calculation of construction costs; The make-up tracking module includes a make-up self-tracking unit and a cost control tracking unit; The supplementary self-tracking unit is used to track the construction cost caused by the current state of the construction cost scheduling decision in real time through a data tracker, calculate the difference between the construction cost caused by the current state of the construction cost scheduling decision and the construction cost caused by the initial state of the construction cost scheduling decision. If the difference is less than 0, it means that the construction cost scheduling is effective; if the difference is greater than 0, it means that the construction cost scheduling is ineffective. The cost control tracking unit is used to track the construction cost scheduling tracking results of building construction and municipal engineering in real time through a data tracker.

[0015] An intelligent construction cost control method includes the following steps: Step 1: Configure the IP address information of the remote control area server for construction costs. Step 2: Enter the construction detection end. By formulating a construction project planning scheme, the cost parameters of the entire project life cycle are detected in real time, and it is timely judged whether the costs in different construction cycles are abnormal. The authenticity of the data is verified in real time. If it is abnormal, the system is reported to issue a cost control exception warning reminder and make an abnormal cycle identification signal. Step 3: Enter the cost prediction end. By collecting the explicit costs and implicit costs during the construction process in real time, where the implicit costs are set according to the environmental impact on the construction, it is predicted in advance through the environment whether construction stagnation will occur. Step 4: Enter the impact scheduling end. When construction delay or construction stagnation occurs, the construction costs of the project cost are abnormally scheduled and supplemented in real time through the construction project planning scheme, and the construction decision of the planning scheme is adjusted to ensure construction cost control.

[0016] The present invention has the following beneficial effects: 1. In the present invention, by setting up a construction detection end, when performing intelligent construction cost control operations, by collecting the cost parameters of different life cycles of the project in real time, it is timely judged whether the costs in different construction cycles are abnormal, and the authenticity of the data is verified in real time during the construction cost accounting, so that during construction cost control, the cost planning of the entire project life cycle can be timely and real-time controlled and abnormal judged, realizing the optimization and control of the overall cost. At the same time, based on the real-time verification of the authenticity of the cost data, it can provide reliable support for cost control and avoid mistakes in construction cost control decisions or abnormal cost accounting.

[0017] 2. In the present invention, by setting up a cost prediction end, when performing intelligent construction cost control operations, it is predicted in advance through the environment whether construction stagnation will occur, so that during intelligent construction cost control, it can timely predict according to the environmental impact on the construction whether the construction time will be extended and whether the construction cost will increase. This kind of construction cost can be predicted in time, increasing the accuracy of construction cost control.

[0018] 3. In the present invention, by setting an impact scheduling end, when performing intelligent construction cost control operations, when construction delays or stagnations occur, by timely adjusting the construction decision of the planning scheme, the construction decision changes the duration and personnel scheduling according to different cycles of different project planning schemes, and can perform abnormal scheduling and compensation on the construction cost of the project cost in a timely manner, further improving the control efficiency of the construction cost and the convenience of cost control. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic flowchart of a method and system for intelligent construction cost control of the present invention; Figure 2 It is a schematic structural diagram of the construction detection end of a method and system for intelligent construction cost control of the present invention; Figure 3 It is a schematic structural diagram of the cost prediction end of a method and system for intelligent construction cost control of the present invention; Figure 4 It is a schematic structural diagram of the impact scheduling end of a method and system for intelligent construction cost control of the present invention. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0020] In order to make the technical means, creative features, achieved purposes and effects of the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.

[0021] Embodiment 1 Please refer to Figure 1 - Figure 2 As shown: Based on Embodiment 1, an intelligent construction cost control system includes a construction detection end, a cost prediction end and an impact scheduling end; The construction detection end is used to formulate a planning scheme for a construction project, set a standard budget for the construction execution cost of the project cycle for the planning scheme, timely judge whether the cost in different construction cycles is abnormal by collecting cost parameters in different life cycles of the project in real time, and verify the authenticity of the data in real time during construction cost accounting; The cost prediction end is used to collect explicit costs and implicit costs during the construction process in real time, and perform real-time accounting of implicit costs according to the environmental impact on the construction, and predict in advance whether there will be a construction stagnation situation through the environment; The impact scheduling end is used to perform abnormal scheduling and compensation on the construction cost of the project cost in real time through the planning scheme of the construction project when construction delays or stagnations occur, and timely adjust the construction decision of the planning scheme to ensure the adaptive control of the construction cost.

[0022] The construction detection end includes a planning scheme module, a cost collection module and a judgment tracking module; The planning scheme module includes a project cycle unit and a construction execution unit; The project cycle unit is used to formulate a construction project planning plan. The planning plan includes the standard budget of the full-cycle construction cost, the standard budget of construction costs for different cycles, the construction time for different cycles, the corresponding construction quantity for different cycles, and the project cost materials for different cycles during the construction process of building construction and municipal engineering. The planning plan also includes the budget for unexpected events in the construction project, and the pre-review of unexpected events is set at 1 million; The construction execution unit is used to track the project execution status of building construction and municipal engineering in real time through data sensors and data trackers. The project execution status includes the standard budget of construction costs for different cycles, the construction time for different cycles, the corresponding construction quantity for different cycles, and the project cost materials for different cycles.

[0023] The cost collection module includes a construction cost unit and a planned cost unit; The construction cost unit is used to conduct project cost accounting for the construction cost according to building construction and municipal engineering, and set the construction cost. The construction cost includes labor salary cost, construction material cost, construction equipment cost, construction management cost, construction accident cost, and land use cost; The planned cost unit is used to set the construction cost of different construction processes in different cycles according to the construction project planning plan of building construction and municipal engineering. The construction cost here includes the labor salary cost, construction material cost, construction equipment cost, construction management cost, construction accident cost, and land use cost corresponding to different construction projects in different cycles.

[0024] The judgment and tracking module includes a cost judgment unit, a cycle tracking unit, a data inspection unit, and an exception identification unit; The cost judgment unit is used to set the standard construction cost corresponding to different construction processes in different cycles, calculate the difference between the construction cost corresponding to the current moment and the standard construction cost. If the construction cost corresponding to the current moment is greater than or equal to the standard construction cost, it indicates that the construction cost is abnormal; if the construction cost corresponding to the current moment is less than the standard construction cost, it indicates that the construction cost is normal; The cycle tracking unit is used to track the difference result between the construction cost and the standard construction cost of different construction processes in real time according to the data tracker, and track the construction status in real time; The data inspection unit is used to verify the authenticity of the construction cost accounting data in real time through the Cronbach's alpha coefficient, set the standard value of the Cronbach's alpha coefficient, and calculate the Cronbach's alpha coefficient of the cost accounting data at the current moment in real time through the calculation formula. The calculation formula is as follows: ; Among them, is the variance of the cost accounting data, is the variance of the overall cost accounting data, is the quantity of the cost accounting data, and Calculate the difference from the standard value. If the difference is equal to 0, it means the data is real. If the difference is not equal to 0, it means the data is abnormal; The abnormal identification unit is used to identify the construction costs with abnormal data in the construction cost accounting data. The abnormal identification is displayed using origin points of different colors. During the construction cost accounting, the authenticity of the data is checked in real time, enabling real-time control and abnormal judgment of the cost planning throughout the project life cycle during construction cost control, achieving the optimization and control of the overall cost. At the same time, based on the real-time inspection of the authenticity of the cost data, reliable support can be provided for cost control, avoiding mistakes in construction cost control decisions or abnormal cost accounting.

[0025] Embodiment 2 Please refer to Figure 3 as shown: Based on Embodiment 1, the cost prediction end includes a cost classification module, a hidden prediction unit, and a construction abnormality module; The cost classification module includes an explicit cost unit and a hidden cost unit; The explicit cost unit is used to set the worker salary cost, construction material cost, construction equipment cost, and land use cost as explicit costs, and set the construction management cost and construction accident cost as hidden costs; The hidden cost unit is used to set the construction accident cost to include the accidental occurrence cost of construction safety events and the construction delay cost affected by the environment.

[0026] The hidden prediction unit includes an environment collection unit and an environment judgment unit; The environment collection unit is used to monitor the construction environment parameters at the current moment in real time through environmental monitoring equipment. The environmental monitoring equipment includes earthquake monitoring equipment, landslide monitoring equipment, debris flow monitoring equipment, ground settlement monitoring equipment, volcanic eruption monitoring equipment, temperature sensors, humidity sensors, rain detectors, and light sensors; The environment judgment unit is used to judge in real time whether the construction environment parameters at the current moment affect the normal execution of the construction. The judgment method is as follows: Calculate the difference between the environmental parameters of the corresponding area and the environmental standard parameters. If the difference = ±6, it is judged that the environmental parameters are within the safety value, indicating that the construction environment parameters at the current moment are normal and do not affect the normal execution of the construction. If the difference > 6 or < -6, it is judged that the construction environment parameters exceed the safety value, indicating that the construction environment parameters at the current moment are abnormal and affect the normal execution of the construction, and the system is reported to issue an environmental abnormality warning signal (the unit of the difference here is °).

[0027] The construction abnormality module includes a construction impact unit and a construction warning unit; The construction impact unit is used to predict whether the construction execution in the next cycle is normal according to the construction environment parameters at the current moment. The prediction method is as follows: Taking three days as a cycle, predict the construction environment parameters in building construction and municipal construction according to the construction environment parameters of three cycles. If the difference between the average value of the construction environment parameters of the three cycles and the environmental standard parameters is greater than 10, it is determined that the construction execution in the next cycle is abnormal, indicating that there is a construction stagnation situation in the next cycle, and the system is reported to issue a voice alarm (the unit of this difference is °); The construction early warning unit is used to receive the prediction results of the construction impact unit in real time through a data receiver, and when the construction execution in the next cycle is abnormal, report to the system to issue a voice early warning, and predict whether there is a construction stagnation situation in advance through the environment, so that in the intelligent construction cost control, it can be timely predicted according to the impact of the environment on the construction whether the construction time is extended and whether the construction cost is increased. This construction cost can be predicted in time, increasing the accuracy of construction cost control.

[0028] Embodiment 3 Please refer to Figure 4 As shown: Based on Embodiment 1, the impact scheduling end includes a result receiving module, an abnormal scheduling module, a replenishment calculation module, and a replenishment tracking module; The result receiving module is used to receive the construction cost and construction execution prediction results corresponding to different construction processes in different cycles in real time through a data receiver; The abnormal scheduling module includes a cycle scheduling unit and a personnel scheduling unit; The cycle scheduling unit is used to set the construction cost scheduling decision according to the construction cost and construction execution prediction results corresponding to different construction processes in different cycles. The initial state of the construction cost scheduling decision is formulated according to the planning scheme, and the current state of the construction cost scheduling decision is formulated according to the construction cost abnormal result and the construction execution prediction result; The personnel scheduling unit is used to report to the system when the environmental parameters in the next cycle are predicted to be abnormal, make a scheduling adjustment of the construction space, convert outdoor work to indoor work, convert the construction personnel for outdoor work to the construction personnel for indoor work, and extend the working hours of the construction personnel for outdoor work.

[0029] The replenishment calculation module is used to calculate the construction delay cost caused by environmental abnormalities in real time, make up the cost for different construction processes in different cycles for the construction delay cost, and repeat the real-time calculation of the construction cost; The replenishment tracking module includes a replenishment self-tracking unit and a cost control tracking unit; The supplementary self-tracking unit is used to track in real time the construction costs caused by the current state of the construction cost scheduling decision through a data tracker, calculate the difference between the construction costs caused by the current state of the construction cost scheduling decision and the construction costs caused by the initial state of the construction cost scheduling decision. If the difference is less than 0, it means that the construction cost scheduling is effective; if the difference is greater than 0, it means that the construction cost scheduling is ineffective. The cost control tracking unit is used to track in real time the construction cost scheduling tracking results of building construction and municipal engineering through a data tracker. The construction decision makes duration changes and personnel scheduling according to different cycles of different project planning schemes, timely ensuring the adaptive control of construction costs, and being able to perform abnormal scheduling and supplementation on the construction costs of project costs in a timely manner, further improving the control efficiency of construction costs and the convenience of cost control.

[0030] In the present invention, there is provided an intelligent construction cost control method and system. When the system operates, it first configures the IP address information of the remote control area server for construction costs; enters the construction detection end, formulates a planning scheme for the construction project, and real-time detects the cost parameters throughout the life cycle of the project, timely determines whether the costs in different construction cycles are abnormal, and real-time verifies the authenticity of the data. If it is abnormal, it reports to the system to issue a cost control exception warning reminder and makes an abnormal cycle identification signal. By formulating a planning scheme for the construction project and setting the standard budget for the construction execution costs of the project cycle in the planning scheme, through real-time collection of the cost parameters in different life cycles of the project, timely determines whether the costs in different construction cycles are abnormal, enabling real-time detection of whether the construction costs exceed the standard in different cycles of the construction plan, and real-time verifying the authenticity of the data during the construction cost accounting, so that real-time control and abnormal judgment of the cost planning throughout the life cycle of the project can be carried out during the construction cost control, realizing the optimization and control of the overall cost. At the same time, based on the real-time verification of the authenticity of the cost data, reliable support can be provided for cost control, avoiding mistakes in construction cost control decisions or abnormal cost accounting; enters the cost prediction end, real-time collects the explicit costs and implicit costs during the construction process, where the implicit costs are set according to the environmental impact on the construction. By predicting in advance whether there will be construction stagnation through the environment, real-time collects the explicit costs and implicit costs during the construction process, and accounts for the implicit costs according to the environmental impact on the construction, and predicts in advance whether there will be construction stagnation through the environment, enabling timely prediction of whether the construction time will be extended and whether the construction costs will increase due to the environmental impact on the construction during the intelligent construction cost control. Such construction costs can be predicted in a timely manner, increasing the accuracy of construction cost control; enters the impact scheduling end. When construction delays or construction stagnation occur, the construction costs of the project cost are abnormally scheduled and supplemented in real time through the planning scheme of the construction project, and the construction decision of the planning scheme is adjusted to ensure construction cost control. When construction delays or construction stagnation occur, the construction costs of the project cost are abnormally scheduled and supplemented in real time through the planning scheme of the construction project, and the construction decision of the planning scheme is adjusted in a timely manner. The construction decision changes the duration and personnel scheduling according to the different cycles of different project planning schemes, timely ensuring the adaptive control of the construction costs, being able to abnormally schedule and supplement the construction costs of the project cost in a timely manner, further improving the control efficiency of the construction costs and the convenience of cost control.

[0031] The foregoing has shown and described the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments, and what is described in the above embodiments and the specification is only to illustrate the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention will also have various changes and improvements, and these changes and improvements fall within the scope of the present invention claimed. The scope of the present invention claimed is defined by the appended claims and their equivalents.

Claims

1. An intelligent construction cost control system, characterized in that: The system includes a construction detection end, a cost prediction end and an impact scheduling end; The construction detection terminal is used to formulate a planning scheme for the construction project, set a standard budget for the construction execution cost of the project cycle for the planning scheme, collect cost parameters of different life cycles of the project in real time, timely determine whether the costs of different construction cycles are abnormal, and verify the authenticity of the data in real time during construction cost accounting; The cost prediction end is used to collect explicit costs and implicit costs in the construction process in real time, and to calculate the implicit costs in real time according to the environmental impact of the construction, so as to predict in advance whether the construction will be stagnant through the environment; The impact scheduling end is used to perform abnormal scheduling and supplementation of the construction cost of the project in real time through the planning scheme of the construction project when construction delays or construction stagnation occurs, and to adjust the construction decisions of the planning scheme in time to ensure adaptive control of construction costs.

2. The system according to claim 1, characterized in that: The construction detection terminal includes a planning module, a cost collection module and a judgment and tracking module; The planning scheme module includes a project cycle unit and a construction execution unit; The project cycle unit is used to formulate a planning scheme for a construction project. The planning scheme includes a standard budget for the full-cycle construction cost of housing and municipal engineering construction, standard budgets for construction costs in different cycles, construction time in different cycles, construction quantities corresponding to different cycles, and engineering cost materials in different cycles. The planning scheme also includes a budget for unexpected events of the construction project, and the preliminary review of unexpected events is set at 1 million; The construction execution unit is used to track the project execution status of building construction and municipal engineering construction in real time through data sensors and data trackers. The project execution status includes standard budgets for construction costs in different periods, construction times in different periods, construction quantities corresponding to different periods, and engineering cost materials in different periods.

3. The system according to claim 2, characterized in that: The cost collection module includes a construction cost unit and a planning cost unit; The construction cost unit is used to calculate the construction cost of housing and municipal engineering and set the construction cost, which includes the worker salary cost, construction material cost, construction equipment cost, construction management cost, construction accident cost and land use cost; The planning cost unit is used to set the construction costs of different construction processes in different periods according to the planning scheme of building construction and municipal engineering construction. The construction costs here include the worker salary costs, construction material costs, construction equipment costs, construction management costs, construction accident costs and land use costs corresponding to different construction projects in different periods.

4. The system according to claim 3, characterized in that: The judgment and tracking module includes a cost judgment unit, a cycle tracking unit, a data verification unit and an abnormality identification unit; The cost judgment unit is used to set standard construction costs corresponding to different construction processes in different periods, and calculate the difference between the construction cost corresponding to the current moment and the standard construction cost. If the construction cost corresponding to the current moment is greater than or equal to the standard construction cost, it means that the construction cost is abnormal; if the construction cost corresponding to the current moment is less than the standard construction cost, it means that the construction cost is normal; The cycle tracking unit is used to track the difference between the construction cost of different construction processes and the standard construction cost in real time according to the data tracker, and to track the construction status in real time; The data verification unit is used to verify the authenticity of the construction cost accounting data in real time through the Cronbach alpha coefficient, set the Cronbach alpha coefficient standard value, and calculate the Cronbach alpha coefficient of the cost accounting data at the current moment in real time through a calculation formula. The calculation formula is as follows: ; in, is the variance of the cost accounting data, is the variance of the overall cost accounting data, is the quantity of cost accounting data, Calculate the difference with the standard value. If the difference is equal to 0, it means the data is true. If the difference is not equal to 0, it means the data is abnormal. The abnormality identification unit is used to identify the construction cost with abnormal data in the construction cost accounting data, and the abnormality identification is displayed using origins of different colors.

5. The system according to claim 1, characterized in that: The cost prediction end includes a cost classification module, an implicit prediction unit and a construction abnormality module; The cost classification module includes explicit cost units and implicit cost units; The explicit cost unit is used to set the worker salary cost, construction material cost, construction equipment cost and land use cost as explicit costs, and to set the construction management cost and construction accident cost as implicit costs; The implicit cost unit is used to set the unexpected construction costs, including the unexpected costs of construction safety incidents and the costs of construction delays due to environmental impacts.

6. The system according to claim 5, characterized in that: The implicit prediction unit includes an environment acquisition unit and an environment judgment unit; The environment collection unit is used to monitor the construction environment parameters at the current moment in real time through the environment monitoring equipment, which includes earthquake monitoring equipment, landslide monitoring equipment, mud-rock flow monitoring equipment, ground subsidence monitoring equipment, volcanic eruption monitoring equipment, temperature sensor, humidity sensor, rain detector and light sensor; The environment judgment unit is used to judge in real time whether the construction environment parameters at the current moment affect the normal execution of the construction. The judgment method is as follows: Calculate the difference between the environmental parameters of the corresponding area and the environmental standard parameters. If the difference = ±6, it is judged that the environmental parameters are at a safe value, indicating that the current construction environmental parameters are normal and will not affect the normal execution of the construction. If the difference is >6 or <-6, it is judged that the construction environmental parameters exceed the safe value, indicating that the current construction environmental parameters are abnormal, affecting the normal execution of the construction, and the reporting system issues an environmental abnormality warning signal.

7. The system according to claim 6, characterized in that: The construction abnormality module includes a construction impact unit and a construction early warning unit; The construction impact unit is used to predict whether the construction execution of the next cycle is normal according to the construction environment parameters at the current moment. The prediction method is as follows: Three days is a cycle. The construction environment parameters in housing construction and municipal construction are predicted based on the construction environment parameters of the three cycles. If the difference between the average value of the construction environment parameters of the three cycles and the environmental standard parameters is greater than 10, it is judged that the construction execution of the next cycle is abnormal, indicating that the construction of the next cycle is stagnant, and the reporting system sends a voice alarm; The construction early warning unit is used to receive the prediction results of the construction impact unit in real time through the data receiving instrument, and when the construction execution of the next cycle is abnormal, the reporting system sends a voice alarm.

8. The system according to claim 1, characterized in that: The impact scheduling end includes a result receiving module, an abnormal scheduling module, a supplement calculation module and a supplement tracking module; The result receiving module is used to receive the construction costs and construction execution prediction results corresponding to different construction processes in different periods in real time through a data receiving device; The abnormal scheduling module includes a periodic scheduling unit and a personnel scheduling unit; The periodic scheduling unit is used to set the construction cost scheduling decision according to the construction costs corresponding to different construction processes in different periods and the construction execution prediction results. The initial state of the construction cost scheduling decision is made according to the planning scheme, and the current state of the construction cost scheduling decision is made according to the abnormal construction cost results and the construction execution prediction results; The personnel scheduling unit is used to report to the system when abnormal environmental parameters are predicted for the next cycle, make scheduling adjustments to the construction space, convert outdoor work to indoor work, convert construction personnel working outdoors to construction personnel working indoors, and extend the working hours of construction personnel working outdoors.

9. The system according to claim 8, characterized in that: The supplementary calculation module is used to calculate the construction delay costs caused by environmental anomalies in real time, make up the construction delay costs for different construction processes in different periods, and repeat the real-time calculation of the construction costs; The replenishment tracking module includes a replenishment self-tracking unit and a cost control tracking unit; The complementary self-tracking unit is used to track the construction cost caused by the current state of the construction cost scheduling decision in real time through a data tracker, and calculate the difference between the construction cost caused by the current state of the construction cost scheduling decision and the construction cost caused by the initial state of the construction cost scheduling decision. If the difference is less than 0, it means that the construction cost scheduling is effective, and if the difference is greater than 0, it means that the construction cost scheduling is invalid; The cost control tracking unit is used to track the construction cost scheduling tracking results of building construction and municipal engineering in real time through a data tracker.

10. An intelligent construction cost control method according to any one of claims 1 to 9, characterized in that: The following steps are involved: Step 1: Configure the IP address information of the construction cost remote control area server; Step 2: Enter the construction detection end, formulate a planning scheme for the construction project, detect the cost parameters of the entire life cycle of the project in real time, promptly determine whether the costs of different construction cycles are abnormal, and verify the authenticity of the data in real time. If abnormal, the reporting system will issue a cost control abnormality warning reminder and make an abnormal cycle identification signal; Step 3: Enter the cost prediction end, collect explicit costs and implicit costs in the construction process in real time, where implicit costs are set according to the environmental impact of the construction, and predict in advance whether construction will be stagnant through the environment; Step 4: Enter the impact scheduling end. When construction delays or construction stagnation occurs, the construction cost of the project cost is abnormally scheduled and supplemented in real time through the planning plan of the construction project, and the construction decision of the planning plan is adjusted to ensure construction cost control.