Frame type support carrier transportation large chain improvement process

By using the connection method between the butterfly ring and the fixed lifting ring on the frame bracket truck, combined with the precise positioning auxiliary system and intelligent monitoring system, the problems of unstable connection, inconvenient operation and insufficient safety guarantees of the transportation large chain are solved, and the stable connection and efficient transportation of the large chain bucket are achieved.

CN120207872APending Publication Date: 2025-06-27SHAANXI COAL IND GRP SHENNAN IND DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510506665.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-04-22
Publication Date
2025-06-27

AI Technical Summary

Technical Problem

When used with traditional large-size large chain buckets, the frame bracket truck cannot firmly hang the hook into the lifting hole, resulting in unstable connections of the transportation chain, inconvenient operation, and insufficient safety guarantees.

Method used

Through the connection between the butterfly ring and the fixed suspension ring, the large chain bucket is securely fixed, and the precise positioning auxiliary system and intelligent monitoring system are adopted to ensure the firmness and safety of the connection.

Benefits of technology

The stable connection of the large chain bucket is achieved, the hidden danger of hook falling off is eliminated, the transportation risks are reduced, and the transportation efficiency and safety are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure SMS_1
    Figure SMS_1
Patent Text Reader

Abstract

The invention relates to the technical field of transport large chain improvement processes, in particular to a frame type support carrier transport large chain improvement process which comprises the following steps: SI, preparation work; s2, the lifting hook is taken down; s3, connecting a lifting chain with a butterfly ring; s4, the large chain bucket and the lifting chain are fixed; s5, the large chain bucket is lifted; according to the improved technology of the large transportation chain, the butterfly ring is connected with the fixed hanging ring, the large chain bucket is fixed more firmly, the hidden danger that a hook falls off is eliminated, accidents such as equipment damage and casualties caused by accidental sliding of the large chain bucket are prevented, the large chain bucket is more stable in the transportation process, shaking and deviation caused by factors such as vibration and turning are reduced, and the transportation risk is reduced; loading time is shortened, large-chain transportation is smoother, more transportation tasks can be completed in unit time, and production continuity is guaranteed; when a driver transports a large chain, the problem that the hook falls off in the transportation process does not need to be worried about, the loading time of the driver is shortened, and the large chain can be transported in place more stably and safely.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of improved processes for transport large chains, and particularly to an improved process for the transport large chain of a frame-type support carrier vehicle. Background Art

[0002] In the material transportation links of industries such as coal mining and heavy machinery manufacturing, the transportation of the conveyor large chain and the transfer machine large chain is an extremely important part. As a key component, the safety and efficiency of the large chain transportation directly affect the smooth progress of subsequent production operations.

[0003] The conveyor large chain and the transfer machine large chain are usually loaded by a special large chain bucket. The current transport large chain bucket is relatively large in size and requires an 80-ton frame-type support carrier vehicle or a scraper-type support carrier vehicle for transportation. During the use of the frame-type support carrier vehicle, due to the narrow gap between the U-shaped frame and the large chain bucket and the small lifting holes, the hook cannot be firmly hung into the lifting holes.

[0004] Therefore, aiming at the problem that when the frame-type support carrier vehicle is used in combination with the traditional large-sized large chain bucket, the hook cannot be firmly hung into the lifting hole, resulting in unstable connection of the transport large chain, inconvenient operation, and insufficient safety guarantee, an improved process for the transport large chain of the frame-type support carrier vehicle can be designed. Summary of the Invention

[0005] In order to overcome the problem that when the frame-type support carrier vehicle is used in combination with the traditional large-sized large chain bucket, the hook cannot be firmly hung into the lifting hole, resulting in unstable connection of the transport large chain, inconvenient operation, and insufficient safety guarantee.

[0006] The technical solution of the present invention is as follows: an improved process for the transport large chain of a frame-type support carrier vehicle, and the steps are as follows: S1: Preparation Work First, check whether the frame-type support carrier vehicle, the lifting chain, the butterfly ring, the large chain bucket and its fixed lifting rings are intact and in normal performance; S2: Remove the Lifting Hook Operate the disassembly tool to remove the lifting hook of the frame-type support carrier vehicle from the original connection part; S3: Connect the Lifting Chain and the Butterfly Ring Reliably connect the lower end of the lifting chain with the butterfly ring to ensure firm connection without the risk of loosening or slipping; S4: Fix the Large Chain Bucket and the Lifting Chain The driver controls the frame-type support carrier vehicle to accurately align the 4 fixed lifting rings on the side of the large chain bucket with the butterfly rings of the 4 lifting chains respectively, and then uses manual assistance or a supporting connection device to firmly fix the fixed lifting rings and the butterfly rings to ensure that both sides of the large chain bucket are firmly installed; S5: Lift the Large Chain Bucket After confirming that the large chain bucket is firmly fixed, the driver operates the lifting handle of the frame-type support transporter to slowly lift the large chain bucket to 200mm off the ground, and observes the balance and fixation of the large chain bucket during the process; S6; transport large chain bucket After the large chain bucket reaches the specified lifting height and is in a stable state, the driver drives the frame-type support truck to transport the large chain bucket to the target location according to the established transportation route.

[0007] Preferably, in step S2, the disassembly tool is selected according to the specific connection structure between the lifting hook and the frame-type bracket transporter. For the lifting hook connected with the standard hexagonal bolt, a wrench of the corresponding specification is selected; for the connection with the hexagonal bolt, a socket wrench is selected; for the scenario that requires quick disassembly, a ratchet wrench is selected.

[0008] Preferably, in step S3, the connection portion between the lower end of the lifting chain and the butterfly ring is cleaned before connection to remove oil, rust and other impurities to ensure that the connection surface fits tightly.

[0009] Preferably, in step S3, a torque wrench is used to perform the connection operation according to the specified tightening torque to ensure uniform connection strength. Anti-loosening nuts and spring washers are used as anti-loosening measures to prevent the connection from loosening due to vibration during transportation. Tensile testing equipment is used to perform a tensile test on the entire connection to verify the firmness of the connection and ensure that there is no risk of loosening or slipping.

[0010] Preferably, the supporting connection device in step S4 uses bolts and pins that have undergone high-strength heat treatment and surface anti-corrosion treatment, and the specifications of the bolts and pins are accurately selected according to the load-bearing weight of the large chain bucket and the connection size of the fixed lifting ring and the butterfly ring.

[0011] Preferably, in step S4, an electric wrench is used to tighten the bolts according to the specified tightening torque to ensure that the tightening degree of each bolt is consistent to avoid connection failure due to uneven force; or a hydraulic pin installer is used to accurately drive the pin into the pin hole to ensure that the pin is firmly installed; and during the installation process, a diagonal detection method is used to ensure that both sides of the large chain bucket are firmly installed, including using an angle measuring instrument to measure the inclination angle on both sides of the large chain bucket.

[0012] Preferably, in step S4, the driver can use the precise positioning auxiliary system equipped on the frame-type support transporter, including a laser positioning device, to emit a laser beam to accurately mark the alignment position of the fixed lifting ring and the butterfly ring; use the camera monitoring system to transmit the image of the connection between the large chain bucket and the lifting chain in real time, and the driver can clearly observe the connection status through the display screen inside the vehicle.

[0013] Preferably, in step S5, an angle sensor installed on the large chain bucket is used to real-time monitor the inclination angle of the large chain bucket, and a displacement sensor is used to real-time monitor the lifting height and horizontal displacement of the large chain bucket. These sensors are connected to the central control system of the frame-mounted support vehicle. Once the detected inclination angle or displacement of the large chain bucket exceeds the preset threshold, the central control system will automatically issue an alarm and stop the lifting operation, and the driver can make timely adjustments according to the feedback information to ensure good balance and fixation of the large chain bucket during the lifting process.

[0014] Preferably, in step S6, the intelligent monitoring system equipped on the vehicle can real-time monitor the status of the large chain bucket, including monitoring the connection condition between the fixed lifting ring and the butterfly ring of the large chain bucket through image recognition technology, and once any abnormality is found, the driver will be reminded to take measures in a timely manner.

[0015] Advantages of the present invention: 1. The improved process of the transportation large chain of the present invention is connected through the butterfly ring and the fixed lifting ring, making the large chain bucket more firmly fixed, eliminating the hidden danger of the hook falling off, preventing accidents such as equipment damage and casualties caused by the accidental sliding of the large chain bucket, making the large chain bucket more stable during transportation, reducing the shaking and deviation caused by factors such as vibration and turning, and reducing the transportation risk; the loading time is shortened, the large chain transportation is smoother, more transportation tasks can be completed per unit time, improving the overall task execution efficiency and ensuring production continuity; when the driver transports the large chain, there is no need to worry about the hook falling off during transportation, and the driver's loading time is reduced, and the large chain can be transported to the destination more smoothly and safely, greatly improving the task execution efficiency, and having good promotion value. Specific embodiments

[0016] The present invention will be further described below in conjunction with embodiments.

[0017] Embodiment 1 When using the process of the present technical solution, the steps are as follows: SI: Preparation work First, check whether the frame-mounted support vehicle, lifting chain, butterfly ring, large chain bucket and its fixed lifting ring are intact and have normal performance; S2: Remove the lifting hook Operate the disassembly tool to remove the lifting hook of the frame-mounted support vehicle from the original connection part. The disassembly tool selects a suitable disassembly tool according to the specific connection structure between the lifting hook and the frame-mounted support vehicle. For the lifting hook connected by standard hexagon bolts, select a wrench of the corresponding specification; for the lifting hook connected by internal hexagon bolts, select a socket wrench; for the scenario that requires quick disassembly, select a ratchet wrench; S3: Connect the lifting chain and the butterfly ring Reliably connect the lower end of the lifting chain to the butterfly ring to ensure a firm connection without the risk of loosening or slipping. Before connection, clean the connection parts of the lower end of the lifting chain and the butterfly ring to remove oil stains, rust and impurities, and ensure that the connection surfaces fit tightly. Use a torque wrench to perform the connection operation according to the specified tightening torque to ensure uniform connection strength. At the same time, use lock nuts and spring washers as anti-loosening measures to prevent the connection from loosening due to vibration during transportation. And conduct a tensile test on the whole after connection through a tensile test device to verify the firmness of the connection and ensure there is no risk of loosening or slipping. S4: Fix the large chain bucket and the lifting chain The driver operates the framed support vehicle to accurately align the 4 fixed lifting rings on the side of the large chain bucket with the butterfly rings of the 4 lifting chains respectively. Then, use manual assistance or a supporting connection device to firmly fix the fixed lifting rings and the butterfly rings to ensure that both sides of the large chain bucket are firmly installed. The supporting connection device uses bolts that have undergone high-strength heat treatment and surface anti-corrosion treatment, and the specifications of the bolts are accurately selected according to the load-bearing weight of the large chain bucket and the connection dimensions of the fixed lifting rings and the butterfly rings. Use an electric wrench to tighten the bolts according to the specified tightening torque to ensure that the tightening degree of each bolt is the same and avoid connection failure caused by uneven stress. S5: Lift the large chain bucket After confirming that the above large chain bucket is firmly fixed, the driver operates the lifting handle of the framed support vehicle to slowly lift the large chain bucket so that it is 200 mm off the ground, and observe the balance and fixation of the large chain bucket during the process. S6; Transport the large chain bucket After the above large chain bucket reaches the specified lifting height and is in a stable state, the driver drives the framed support vehicle along the established transportation route to transport the large chain bucket to the target location.

[0018] Embodiment 2 When using the process of this technical solution, the steps are as follows: SI: Preparation work First, check whether the framed support vehicle, lifting chain, butterfly ring, large chain bucket and its fixed lifting rings are intact and have normal performance. S2: Remove the lifting hook Operate the disassembly tool to remove the lifting hook of the framed support vehicle from the original connection part. Select a suitable disassembly tool according to the specific connection structure between the lifting hook and the framed support vehicle. For a lifting hook connected by standard hexagonal bolts, select a wrench of the corresponding specification; for a lifting hook connected by internal hexagonal bolts, select a socket wrench; for a scenario that requires quick disassembly, select a ratchet wrench. S3: Connect the lifting chain and the butterfly ring Reliably connect the lower end of the lifting chain to the butterfly ring to ensure a firm connection without the risk of loosening or slipping. Before connection, clean the connection parts of the lower end of the lifting chain and the butterfly ring to remove oil, rust and impurities, and ensure that the connection surfaces fit closely. Use a torque wrench to perform the connection operation according to the specified tightening torque to ensure uniform connection strength. At the same time, use lock nuts and spring washers as anti-loosening measures to prevent loosening of the connection caused by vibration during transportation. Conduct a tensile test on the whole after connection through a tensile test device to verify the firmness of the connection and ensure no risk of loosening or slipping. S4: Fix the large chain bucket and the lifting chain The driver operates the framed support forklift to accurately align the 4 fixed lifting rings on the side of the large chain bucket with the butterfly rings of the 4 lifting chains respectively. Then, use manual assistance or a supporting connection device to firmly fix the fixed lifting rings and the butterfly rings to ensure that both sides of the large chain bucket are firmly installed. The supporting connection device uses pins that have undergone high-strength heat treatment and surface anti-corrosion treatment, and the specifications of the pins are accurately selected according to the load-bearing weight of the large chain bucket and the connection dimensions of the fixed lifting rings and the butterfly rings. Use a hydraulic pin installer to accurately drive the pins into the pin holes to ensure that the pins are firmly installed. And during the installation process, ensure that both sides of the large chain bucket are firmly installed through diagonal detection, including using an angle measuring instrument to measure the inclination angles of both sides of the large chain bucket. S5: Lift the large chain bucket After confirming that the above large chain bucket is firmly fixed, the driver operates the lifting handle of the framed support forklift to slowly lift the large chain bucket until it is 200 mm off the ground. Observe the balance and fixation of the large chain bucket during the process. The driver can rely on the precise positioning assistance system equipped on the framed support forklift, including a laser positioning device, to emit a laser beam to accurately mark the alignment positions of the fixed lifting rings and the butterfly rings. Use a camera monitoring system to transmit real-time images of the connection parts of the large chain bucket and the lifting chain, and the driver can clearly observe the connection situation through the in-vehicle display screen. Use angle sensors installed on the large chain bucket to monitor the inclination angle of the large chain bucket in real time, and displacement sensors to monitor the lifting height and horizontal displacement of the large chain bucket in real time. These sensors are connected to the central control system of the framed support forklift. Once the detected inclination angle or displacement of the large chain bucket exceeds the preset threshold, the central control system will automatically issue an alarm and stop the lifting operation, and the driver can adjust in time according to the feedback information to ensure good balance and fixation of the large chain bucket during the lifting process. S6; Transport the large chain bucket After the above large chain bucket reaches the specified lifting height and is in a stable state, the driver drives the framed support forklift to transport the large chain bucket to the target location according to the established transportation route. The intelligent monitoring system equipped on the vehicle can monitor the state of the large chain bucket in real time, including monitoring the connection situation of the fixed lifting rings and the butterfly rings of the large chain bucket through image recognition technology, and once an abnormality is found, it will promptly remind the driver to take measures.

[0019] Experimental Example Select actual operation sites such as underground coal mines or heavy machinery manufacturing workshops, demarcate a dedicated experimental area, ensure the site is flat and obstacle-free, simulate a real transportation environment, plan a standard transportation route within the site, including straight sections, turning sections, etc., with a length set at 500 meters. Prepare 2 80-ton frame-type support carriers with consistent performance parameters, one for the traditional transportation process and one for the above-mentioned improved process; prepare equipment and tools such as large chain buckets, large chains, lifting chains, and butterfly rings of the same specifications, and at the same time prepare various measuring instruments, such as an electronic stopwatch for recording the loading time, a laser rangefinder for measuring the sway amplitude of the large chain bucket, a pressure sensor for monitoring the force on the connection parts, etc.; Select 4 drivers with rich experience and similar proficiency levels, divide them into two groups evenly, with 2 drivers in each group, responsible for the operations of the traditional process and the improved process respectively. Arrange professional experimental recorders to be responsible for recording various experimental data and observing the phenomena during the transportation process. Conduct 50 experimental operations, and record the data such as the loading time, the number of hook disconnections, the sway amplitude of the large chain bucket, the number of driver operation errors, and the abnormal conditions of the equipment during the transportation process for each experiment as follows:

Claims

1. Improved process for transporting large chains by frame-type support carrier, characterized in that: The steps are as follows: SI: Preparation First, check whether the frame-type support truck, lifting chain, butterfly ring, large chain bucket and its fixed lifting ring are intact and functioning normally; S2: Remove the lifting hook Use the disassembly tool to remove the lifting hook of the frame-type support transporter from the original connection position; S3: Connecting lifting chain with butterfly ring Reliably connect the lower end of the lifting chain to the butterfly ring to ensure a firm connection without the risk of loosening or slipping; S4: Fixed large chain bucket and lifting chain The driver controls the frame-type support truck to accurately align the four fixed lifting rings on the sides of the large chain bucket with the butterfly rings of the four lifting chains, and then uses manual assistance or matching connection devices to firmly fix the fixed lifting rings and the butterfly rings to ensure that both sides of the large chain bucket are firmly installed; S5: Elevating large chain bucket After confirming that the large chain bucket is firmly fixed, the driver operates the lifting handle of the frame-type support transporter to slowly lift the large chain bucket to 200mm off the ground, and observes the balance and fixation of the large chain bucket during the process; S6; transport large chain bucket After the large chain bucket reaches the specified lifting height and is in a stable state, the driver drives the frame-type support truck to transport the large chain bucket to the target location according to the established transportation route.

2. The improved process for transporting large chains of frame-type support carriers according to claim 1 is characterized in that: In step S2, the disassembly tool is selected according to the specific connection structure between the lifting hook and the frame-type bracket transporter. For the lifting hook connected with the standard hexagonal bolt, a wrench of corresponding specifications is selected; for the connection with the hexagonal bolt, a socket wrench is selected; for the scene that requires quick disassembly, a ratchet wrench is selected.

3. The improved process for transporting large chains of frame-type support carriers according to claim 1 is characterized in that: In step S3, the connection between the lower end of the lifting chain and the butterfly ring is cleaned before connection to remove oil, rust and other impurities to ensure that the connection surface fits tightly.

4. The improved process for transporting large chains for frame-type support carriers according to claim 1 is characterized in that: In step S3, a torque wrench is used to perform the connection operation according to the specified tightening torque to ensure uniform connection strength. Anti-loosening nuts and spring washers are used as anti-loosening measures to prevent the connection from loosening due to vibration during transportation. Tensile testing equipment is used to perform a tensile test on the entire connection to verify the firmness of the connection and ensure that there is no risk of loosening or slipping.

5. The improved process for transporting large chains of frame-type support carriers according to claim 1 is characterized in that: The matching connection device in step S4 uses bolts and pins that have undergone high-strength heat treatment and surface anti-corrosion treatment, and the specifications of the bolts and pins are accurately selected according to the load-bearing weight of the large chain bucket and the connection size of the fixed lifting ring and the butterfly ring.

6. The improved process for transporting large chains of frame-type support carriers according to claim 4 is characterized in that: In step S4, use an electric wrench to tighten the bolts according to the specified tightening torque to ensure that each bolt is tightened to the same degree to avoid connection failure due to uneven force; or use a hydraulic pin installer to accurately drive the pin into the pin hole to ensure that the pin is firmly installed; and during the installation process, use diagonal detection to ensure that both sides of the large chain bucket are firmly installed, including using an angle measuring instrument to measure the inclination angle on both sides of the large chain bucket.

7. The improved process for transporting large chains of frame-type support carriers according to claim 1 is characterized in that: In step S4, the driver can use the precise positioning auxiliary system equipped on the frame-type support truck, including a laser positioning device, to emit a laser beam to accurately mark the alignment position of the fixed lifting ring and the butterfly ring; use the camera monitoring system to transmit the image of the connection between the large chain bucket and the lifting chain in real time, and the driver can clearly observe the connection status through the display screen inside the vehicle.

8. The improved process for transporting large chains of frame-type support carriers according to claim 1 is characterized in that: In step S5, the angle sensor installed on the large chain bucket is used to monitor the inclination angle of the large chain bucket in real time, and the displacement sensor is used to monitor the lifting height and horizontal displacement of the large chain bucket in real time. These sensors are connected to the central control system of the frame-type support transporter. Once it is detected that the inclination angle or displacement of the large chain bucket exceeds the preset threshold, the central control system will automatically issue an alarm and stop the lifting operation. The driver will make timely adjustments based on the feedback information to ensure that the large chain bucket is well balanced and fixed during the lifting process.

9. The improved process for transporting large chains of frame-type support carriers according to claim 1 is characterized in that: In step S6, the intelligent monitoring system equipped in the vehicle can monitor the status of the large chain bucket in real time, including monitoring the connection between the fixed lifting ring and the butterfly ring of the large chain bucket through image recognition technology, and promptly reminding the driver to take measures once an abnormality is found.