Large-scale venue fabricated building curtain wall quick mounting device and using method
By designing the base, placement table and vacuum suction cup mechanism of the quick loader, combined with sponge layer protection and shock absorption mechanism, the time-consuming and labor-intensive equipment movement and positioning during the installation of curtain walls of prefabricated buildings in large venues is solved, and efficient and safe installation of the curtain wall is achieved.
Patent Information
- Application Number
- CN202510717523.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-30
- Publication Date
- 2025-07-18
AI Technical Summary
During the installation of curtain walls of prefabricated buildings in existing large venues, frequent equipment movement and positioning are time-consuming and labor-intensive, increasing construction complexity and risk of errors, and reducing construction quality and efficiency.
A quick loader including a base, a placement table, a moving plate, a vacuum suction cup mechanism and a shock absorber mechanism is designed. Through the motor drive gear meshing and long stud transmission, the curtain wall is accurately moved, adsorbed and installed, and combined with sponge layer protection and hydraulic cylinder adjustment, it meets the multi-angle installation needs.
It improves the efficiency and quality of curtain wall installation, reduces the complexity of equipment movement and positioning, protects the integrity of curtain wall during transportation and installation, and ensures the stability and safety of the installation process.
Smart Images

Figure CN120331497A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of curtain wall installation for large venues, and particularly to a quick-installer for prefabricated building curtain walls in large venues and a using method thereof. Background Technique
[0002] The prefabricated building curtain wall for large venues is an outer building envelope structure that uses prefabricated components produced in a factory and then transported to the site for rapid assembly. Its installation process mainly includes factory production of prefabricated components, on-site hoisting and assembly, as well as necessary sealing and waterproofing treatments. This curtain wall structure can meet the aesthetic, safety and energy-saving requirements of large venues.
[0003] Although some installation devices are relied on to improve efficiency during the installation process of the existing prefabricated building curtain walls in large venues, the use of these devices has many inconveniences. After each curtain wall is installed, these devices need to be moved to the placement location of the curtain wall, and then the next one is taken to the predetermined installation position for the next round of installation. This frequent device movement and positioning process is not only time-consuming and laborious, but also increases the complexity of construction and the risk of errors, reducing the construction quality and efficiency. This cumbersome installation process undoubtedly brings unnecessary troubles and costs to the construction of large venues and urgently needs to be improved and optimized. Therefore, we propose a quick-installer for prefabricated building curtain walls in large venues. Summary of the Invention
[0004] The purpose of the present invention is to provide a quick-installer for prefabricated building curtain walls in large venues, so as to solve the problem raised in the above background technique that although some installation devices are relied on to improve efficiency during the installation process of the existing prefabricated building curtain walls in large venues, the use of these devices has many inconveniences. After each curtain wall is installed, these devices need to be moved to the placement location of the curtain wall, and then the next one is taken to the predetermined installation position for the next round of installation. This frequent device movement and positioning process is not only time-consuming and laborious, but also increases the complexity of construction and the risk of errors, reducing the construction quality and efficiency. This cumbersome installation process undoubtedly brings unnecessary troubles and costs to the construction of large venues and urgently needs to be improved and optimized.
[0005] To achieve the above object, the present invention provides the following technical solution: A quick-installer for an assembled building curtain wall in a large venue, including a base. One side inside the base is provided with a transmission cavity. One side of the upper end of the base is provided with a placement table. The top of the placement table is provided with a slot. The inner wall of the slot is fixedly installed with a sponge layer. The top of one side inside the transmission cavity is provided with a moving plate. A toothed groove is opened at the center of the bottom of the moving plate. The front end and the rear end of the bottom of the moving plate are both provided with transverse guide rods. One side of the lower end of the toothed groove is meshed with a first gear. The front surface of the base is fixedly installed with a first motor corresponding to the front end of the first gear. The top of the moving plate respectively corresponds to the positions near the four corners of the bottom of the placement table, and installation cylinders are fixedly installed. The top of the installation cylinder is provided with a telescopic column. The bottom of the installation cylinder is fixedly installed with a damper. A spring is sleeved on the surface of the damper. The top of both sides inside the installation cylinder is provided with a chute. The bottom of both sides of the telescopic column is fixedly connected with a slider.
[0006] One side of the top of the base is provided with a vertical frame. The center of the bottom of the vertical frame is fixedly connected with a shaft rod. The center of the surface of the shaft rod is fixedly installed with a second gear. One side of the second gear is meshed with a third gear. An installation groove is opened at the lower end corresponding to the third gear inside the base. The inner bottom of the installation groove is fixedly installed with a second motor. The upper end of the vertical frame is fixedly installed with a third motor. A long screw rod is arranged in the middle of the vertical frame. A lifting plate is threadedly connected to the position near the bottom of the surface of the long screw rod. The front end and the rear end of one side of the top inside the vertical frame are both fixedly installed with vertical guide rods. The lower ends of the two vertical guide rods both penetrate to the outside of the lifting plate and are respectively fixedly connected with the inner bottom of the vertical frame. One end of the lifting plate is fixedly installed with a hinge frame. One end of the hinge frame is hingedly connected with an adjusting plate. One side of the adjusting plate is fixedly installed with a vacuum suction cup mechanism. One side of the top of the lifting plate is fixedly connected with a fixed block. One side of the fixed block is provided with a hydraulic cylinder.
[0007] The number of the slots is eight. The inner wall of the sponge layer is provided with a curtain wall body. The upper end of the curtain wall body penetrates to the outside of the slot. The positions near the four corners of the bottom of the base are all fixedly installed with walking wheels. One side of the base is fixedly installed with a hand push plate.
[0008] The inner bottom of the transmission cavity is respectively fixedly connected with a connecting block on the opposite sides of the two side support plates. The two ends of the two transverse guide rods respectively penetrate to the outside of the two side support plates and are respectively fixedly connected with the opposite sides of the two connecting blocks.
[0009] The first motor is fixedly connected with a first main shaft through an output end on its rear surface. The rear end of the first main shaft penetrates into the interior of the transmission cavity and is fixedly connected with the center of the front surface of a first gear. The second motor is fixedly connected with a second main shaft through an output end on its top. The upper end of the second main shaft penetrates to the outside of the installation groove and is fixedly connected with the center of the bottom of a third gear. The third motor is fixedly connected with a third main shaft through an output end on its bottom. The lower end of the third main shaft penetrates to the outside of the vertical frame and is fixedly connected with the top of a long stud.
[0010] A rectangular groove is formed in one side of the top of the transmission cavity. The tops of the four telescopic columns all penetrate to the outside of the rectangular groove and are respectively fixedly connected with the positions near the four corners of the bottom of the placing table. The tops of the damper and the spring are both fixedly connected with the bottom of the telescopic column. The bottom of the spring is fixedly connected with the inner bottom of the installation cylinder. The opposite sides of the two sliders respectively extend into the two sliding grooves and are slidably connected with the inner walls of the sliding grooves.
[0011] The bottom of the shaft rod is movably connected with a bearing fixedly installed on one side of the top of the base. The bottom of the long stud is movably connected with a bearing fixedly installed at the center of the inner bottom of the vertical frame.
[0012] A quick-installer for the curtain wall of a large-scale venue prefabricated building is characterized in that the hydraulic cylinder is obliquely arranged, and the two ends of the hydraulic cylinder are respectively movably hinged with one side of a fixed block and the top of an adjusting plate.
[0013] A quick-installer for the curtain wall of a large-scale venue prefabricated building comprises the following steps:
[0014] Step 1: First, place the curtain walls to be installed into the respective slots on the placing table. The sponge layer in the slot contacts the curtain wall body to protect it. Then, the installer moves the base to the curtain wall installation location through the push plate. When the base vibrates due to bumps during the movement of the base through the walking wheels, the placing table transmits the vibration force to the telescopic columns. The telescopic columns move downward in the installation cylinder, and at the same time compress the damper and the spring, thereby absorbing and reducing the vibration force from the placing table, and thus reducing the impact and vibration received by the curtain wall body placed on it. This is very important for protecting the integrity of the curtain wall body and preventing it from being damaged.
[0015] Step 2. After moving the base to the designated curtain wall installation area, control the second motor to make the third gear engage with the second gear and rotate. The second gear causes the shaft rod to drive the vertical frame to rotate 180 degrees, so that the vacuum suction cup mechanism is located at the curtain wall body. Next, control the first motor to drive the first gear to engage with the tooth groove and rotate, so that the movable plate drives the placement table and the curtain wall body to move toward the side of the vacuum suction cup mechanism until the outer wall of the first curtain wall body on the placement table is tightly attached to the suction cup of the vacuum suction cup mechanism. Then, the first curtain wall body is adsorbed by vacuuming the vacuum suction cup mechanism. Subsequently, control the third motor to drive the long stud to rotate, and through the threaded transmission of the lifting plate and the long stud, the lifting plate moves upward. The upward movement of the lifting plate drives the vacuum suction cup mechanism to pull the curtain wall body out of the slot.
[0016] Step three, after pulling the curtain wall body out of the slot, control the second motor again to rotate the vertical frame 180 degrees to reset it. At this time, the installer can control the third motor to adjust the installation height of the curtain wall body. At the same time, control the hydraulic cylinder to adjust the angle of the curtain wall body after adsorption and fixation during installation. After the adjustment, install the curtain wall body. After installing the first curtain wall body, repeat the above steps to install the curtain wall bodies in the remaining slots.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] The large-scale venue prefabricated building curtain wall quick installer, through the design of the placement platform, slots, sponge layer, installation cylinder, telescopic column, damper and spring, the design of the placement platform and slots enables the curtain wall to be placed on the quick installer in an orderly manner, which is convenient for carrying multiple curtain walls during the installation process. At the same time, when the curtain wall is placed, the protection of the sponge layer reduces the damage of the curtain wall during the placement and movement process. The shock absorbing mechanism composed of the installation cylinder, telescopic column, damper and spring effectively absorbs the vibration and impact force generated by the placement platform during the movement. This not only protects the curtain wall body from vibration, but also ensures the stability and safety of the entire installation process. The moving plate, tooth groove, side support The design of the plate, the lateral guide rod, the first gear, the first motor, the vertical frame, the shaft rod, the second gear, the second motor, the third gear, the third motor, the long stud, the vertical guide rod and the lifting plate, through the first motor driving the first gear to mesh with the tooth groove, can accurately control the movement of the moving plate, thereby driving the precise movement of the placement table and the curtain wall body, so that the curtain wall can be accurately moved to the position of the vacuum suction cup mechanism, which is convenient for subsequent adsorption and removal operations. The vacuum suction cup mechanism can quickly and firmly adsorb the curtain wall body, cooperate with the third motor to drive the rotation of the long stud, and through the threaded transmission of the lifting plate and the long stud, the curtain wall body is quickly and smoothly pulled out from the slot. This process is not only efficient, but also reduces the risk of damage to the curtain wall during the removal process. At the same time, it can accurately control the installation height of the curtain wall body and meet the needs of different installation heights. Brief Description of the Drawings
[0019] Figure 1 It is a schematic structural diagram of the present invention;
[0020] Figure 2 For the present invention Figure 1 A partial enlarged schematic view of A in the present invention;
[0021] Figure 3 It is the front view of the structure of the present invention;
[0022] Figure 4 It is a three-dimensional structure diagram of the moving plate of the present invention;
[0023] Figure 5 It is the bottom view of the structure of the moving plate of the present invention;
[0024] Figure 6 It is a three-dimensional structure diagram of the placement table of the present invention;
[0025] Figure 7 It is the left view of the structure of the vertical frame of the present invention.
[0026] In the figure: 1, base; 2, transmission cavity; 3, rectangular groove; 4, placement table; 5, slot; 6, sponge layer; 7, curtain wall body; 8, moving plate; 9, tooth groove; 10, side support plate; 11, transverse guide rod; 12, connecting block; 13, first gear; 14, mounting cylinder; 15, telescopic column; 16, damper; 17, spring; 18, chute; 19, slider; 20, vertical frame; 21, shaft rod; 22, second gear; 23, mounting groove; 24, second motor; 25, third gear; 26, walking wheel; 27, third motor; 28, long stud; 29, vertical guide rod; 30, lifting plate; 31, adjusting plate; 32, vacuum suction cup mechanism; 33, hinge frame; 34, fixed block; 35, hydraulic cylinder; 36, first motor; 37, push plate. Detailed Description of the Preferred Embodiments
[0027] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
[0028] Please refer to Figure 1-7, the present invention provides a technical solution: a quick installer for an assembled building curtain wall of a large venue, including a base 1. A transmission cavity 2 is provided on one side inside the base 1. A placement table 4 is arranged on one side of the upper end of the base 1. A slot 5 is opened at the top of the placement table 4. A sponge layer 6 is fixedly installed on the inner wall of the slot 5. A moving plate 8 is arranged at the top of one side inside the transmission cavity 2. A tooth groove 9 is opened at the center of the bottom of the moving plate 8. Transverse guide rods 11 are arranged at the front end and the rear end of the bottom of the moving plate 8. One side of the lower end of the tooth groove 9 is meshed with a first gear 13. A first motor 36 is fixedly installed on the front surface of the base 1 corresponding to the front end of the first gear 13. At the positions corresponding to the four corners of the bottom of the placement table 4 respectively on the top of the moving plate 8, mounting cylinders 14 are fixedly installed. A telescopic column 15 is arranged at the top inside the mounting cylinder 14. A damper 16 is fixedly installed at the bottom inside the mounting cylinder 14. A spring 17 is sleeved on the surface of the damper 16. Sliding grooves 18 are opened at the top of both sides inside the mounting cylinder 14. The bottom of both sides of the telescopic column 15 is fixedly connected with sliders 19.
[0029] A vertical frame 20 is arranged on one side of the top of the base 1. A shaft rod 21 is fixedly connected to the center of the bottom of the vertical frame 20. A second gear 22 is fixedly installed at the center of the surface of the shaft rod 21. One side of the second gear 22 is meshed with a third gear 25. An installation groove 23 is opened inside the base 1 corresponding to the lower end of the third gear 25. A second motor 24 is fixedly installed at the inner bottom of the installation groove 23. A third motor 27 is fixedly installed at the upper end of the vertical frame 20. A long screw rod 28 is arranged in the middle of the vertical frame 20. A lifting plate 30 is threadedly connected to the position near the bottom of the surface of the long screw rod 28. Vertical guide rods 29 are fixedly installed at the front end and the rear end of one side of the top inside the vertical frame 20. The lower ends of both vertical guide rods 29 penetrate to the outside of the lifting plate 30 and are respectively fixedly connected to the inner bottom of the vertical frame 20. One end of the lifting plate 30 is fixedly installed with a hinge frame 33. One end of the hinge frame 33 is hingedly connected with an adjusting plate 31. A vacuum suction cup mechanism 32 is fixedly installed on one side of the adjusting plate 31. One side of the top of the lifting plate 30 is fixedly connected with a fixed block 34. A hydraulic cylinder 35 is arranged on one side of the fixed block 34.
[0030] The number of the slots 5 is eight. A curtain wall body 7 is arranged on the inner wall of the sponge layer 6. The upper end of the curtain wall body 7 penetrates to the outside of the slot 5. Traveling wheels 26 are fixedly installed at the positions corresponding to the four corners of the bottom of the base 1. A hand push plate 37 is fixedly installed on one side of the base 1. The number of the slots 5 is eight, allowing multiple curtain wall bodies 7 to be stored simultaneously, improving the efficiency of curtain wall storage and transportation. The inner wall of the sponge layer 6 contacts the curtain wall body 7, effectively preventing the curtain wall from being worn and collided during transportation and storage. The design of the traveling wheels 26 enables the entire quick installer to be easily moved to the designated installation position, improving the work efficiency. The setting of the hand push plate 37 makes the operation more convenient, reduces the labor burden, and improves the comfort and safety of the operation.
[0031] On the inner bottom of the transmission cavity 2, connection blocks 12 are fixedly connected to the opposite sides of the two side support plates 10 respectively. The two ends of the two transverse guide rods 11 respectively penetrate to the outside of the two side support plates 10 and are fixedly connected to the opposite sides of the two connection blocks 12. The combination of the connection blocks 12 and the transverse guide rods 11 provides a stable moving track for the moving plate 8, ensuring the smoothness and accuracy of the curtain wall body 7 during the moving process and reducing the risk of damage to the curtain wall.
[0032] The first motor 36 is fixedly connected with a first main shaft through the output end on its rear surface. The rear end of the first main shaft penetrates into the interior of the transmission cavity 2 and is fixedly connected to the center of the front surface of the first gear 13. The second motor 24 is fixedly connected with a second main shaft through the output end on its top. The upper end of the second main shaft penetrates to the outside of the installation groove 23 and is fixedly connected to the center of the bottom of the third gear 25. The third motor 27 is fixedly connected with a third main shaft through the output end on its bottom. The lower end of the third main shaft penetrates to the outside of the vertical frame 20 and is fixedly connected to the top of the long stud 28.
[0033] On one side of the top of the transmission cavity 2, a rectangular groove 3 is opened. The tops of the four telescopic columns 15 all penetrate to the outside of the rectangular groove 3 and are respectively fixedly connected to the positions near the four corners of the bottom of the placing table 4. The tops of the damper 16 and the spring 17 are both fixedly connected to the bottom of the telescopic column 15. The bottom of the spring 17 is fixedly connected to the inner bottom of the mounting cylinder 14. The opposite sides of the two sliders 19 respectively extend into the two sliding grooves 18 and are slidably connected to the inner walls of the sliding grooves 18.
[0034] The bottom of the shaft rod 21 is movably connected to a bearing fixedly installed on one side of the top of the base 1, and the bottom of the long stud 28 is movably connected to a bearing fixedly installed at the center of the inner bottom of the vertical frame 20.
[0035] The hydraulic cylinder 35 is inclined. The two ends of the hydraulic cylinder 35 are respectively movably hinged to one side of the fixed block 34 and the top of the adjusting plate 31, enabling the curtain wall body 7 to be adjusted at multiple angles during the installation process, meeting different installation environments and requirements, and improving the flexibility and adaptability of the installation.
[0036] A method for using a quick installer for an assembled building curtain wall in a large venue includes the following steps:
[0037] Step 1: First, place the curtain walls to be installed into the respective slots 5 on the placement table 4. The sponge layer 6 in the slot 5 contacts the curtain wall body 7 to protect it. Then, the installer moves the base 1 to the curtain wall installation location through the push plate 37. During the process of moving the base 1 through the walking wheels 26, if the base 1 vibrates due to bumps, the placement table 4 transmits the vibration force to the telescopic column 15. The telescopic column 15 moves downward in the installation cylinder 14, compressing the damper 16 and the spring 17 at the same time, thereby absorbing and reducing the vibration force from the placement table 4, and thus reducing the impact and vibration on the curtain wall body 7 placed on it. This is very important for protecting the integrity of the curtain wall body 7 and preventing it from being damaged.
[0038] Step 2: After moving the base 1 to the designated curtain wall installation area, control the second motor 24 to make the third gear 25 engage with the second gear 22 and rotate. The second gear 22 drives the shaft rod 21 to drive the vertical frame 20 to rotate 180 degrees, so that the vacuum suction cup mechanism 32 is located at the curtain wall body 7. Then, control the first motor 36 to drive the first gear 13 to engage with the tooth groove 9 and rotate, so that the moving plate 8 drives the placement table 4 and the curtain wall body 7 to move towards the vacuum suction cup mechanism 32 until the outer wall of the first curtain wall body 7 on the placement table 4 is closely attached to the suction cup of the vacuum suction cup mechanism 32. Then, evacuate the vacuum suction cup mechanism 32 to adsorb the first curtain wall body 7. Subsequently, control the third motor 27 to drive the long screw 28 to rotate. Through the threaded transmission of the lifting plate 30 and the long screw 28, the lifting plate 30 moves upward. The upward movement of the lifting plate 30 drives the vacuum suction cup mechanism 32 to extract the curtain wall body 7 from the slot 5.
[0039] Step 3: After extracting the curtain wall body 7 from the slot 5, control the second motor 24 again to rotate the vertical frame 20 180 degrees to reset. At this time, the installer can control the third motor 27 to adjust the installation height of the curtain wall body 7. At the same time, control the hydraulic cylinder 35 to adjust the angle of the adsorbed and fixed curtain wall body 7 during installation. After the adjustment is completed, install the curtain wall body 7. After installing the first curtain wall body 7, repeat the above steps to install the curtain wall bodies 7 in the remaining slots 5.
[0040] In summary: the large-scale venue prefabricated building curtain wall quick installer, through the design of the placement platform 4, slot 5, sponge layer 6, installation tube 14, telescopic column 15, damper 16 and spring 17, the design of the placement platform 4 and the slot 5 enables the curtain wall to be placed on the quick installer in an orderly manner, which is convenient for carrying multiple curtain walls during the installation process. At the same time, when the curtain wall is placed, the protection of the sponge layer 6 reduces the damage to the curtain wall during the placement and movement process. The shock absorbing mechanism composed of the installation tube 14, telescopic column 15, damper 16 and spring 17 effectively absorbs the vibration and impact force generated by the placement platform 4 during the movement, which not only protects the curtain wall body 7 from vibration, but also ensures the stability and safety of the entire installation process. The moving plate 8, tooth groove 9, side support plate 10, transverse guide rod 1 1. The design of the first gear 13, the first motor 36, the vertical frame 20, the shaft 21, the second gear 22, the second motor 24, the third gear 25, the third motor 27, the long stud 28, the vertical guide rod 29 and the lifting plate 30, the first motor 36 drives the first gear 13 to mesh with the tooth groove 9, the movement of the moving plate 8 can be accurately controlled, and then the placement table 4 and the curtain wall body 7 can be accurately moved to the position of the vacuum suction cup mechanism 32, which is convenient for subsequent adsorption and removal operations. The vacuum suction cup mechanism 32 can quickly and firmly adsorb the curtain wall body 7, cooperate with the third motor 27 to drive the rotation of the long stud 28, and through the threaded transmission of the lifting plate 30 and the long stud 28, the curtain wall body 7 is quickly and smoothly extracted from the slot 5. This process is not only efficient, but also reduces the risk of damage to the curtain wall during the removal process. At the same time, the installation height of the curtain wall body 7 can be accurately controlled to meet the requirements of different installation heights.
[0041] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
Claims
1. A quick installer for prefabricated building curtain walls in large venues, characterized in that, Including: A base (1), on one side inside the base (1), a transmission cavity (2) is provided. On one side of the upper end of the base (1), a placement table (4) is arranged. On the top of the placement table (4), a plurality of slots (5) are provided. Inside the wall of the slot (5), a sponge layer (6) is fixedly installed. On the top of one side inside the transmission cavity (2), a moving plate (8) is provided. At the center of the bottom of the moving plate (8), a tooth groove (9) is provided. At the front end and the rear end of the bottom of the moving plate (8), lateral guide rods (11) are respectively arranged. On one side at the lower end of the tooth groove (9), a first gear (13) is meshed and connected. On the front surface of the base (1), corresponding to the front end of the first gear (13), a first motor (36) is fixedly installed. On the top of the moving plate (8), corresponding to the positions at the four corners of the bottom of the placement table (4), mounting cylinders (14) are respectively fixedly installed. On the top inside the mounting cylinder (14), a telescopic column (15) is provided. On the bottom inside the mounting cylinder (14), a damper (16) is fixedly installed. A spring (17) is sleeved on the surface of the damper (16). On the top of both sides inside the mounting cylinder (14), sliding grooves (18) are provided. At the bottom of both sides of the telescopic column (15), sliding blocks (19) are fixedly connected respectively. On one side of the top of the base (1), a vertical frame (20) is provided. At the center of the bottom of the vertical frame (20), a shaft rod (21) is fixedly connected. At the center of the surface of the shaft rod (21), a second gear (22) is fixedly installed. On one side of the second gear (22), a third gear (25) is meshed and connected. Inside the base (1), corresponding to the lower end of the third gear (25), a mounting groove (23) is provided. On the inner bottom of the mounting groove (23), a second motor (24) is fixedly installed. On the upper end of the vertical frame (20), a third motor (27) is fixedly installed. Inside the vertical frame (20), in the middle part, a long screw rod (28) is provided. At the position near the bottom of the surface of the long screw rod (28), a lifting plate (30) is threadedly connected. At the front end and the rear end of one side of the top inside the vertical frame (20), vertical guide rods (29) are respectively fixedly installed. The lower ends of the two vertical guide rods (29) respectively penetrate to the outside of the lifting plate (30) and are fixedly connected to the inner bottom of the vertical frame (20). At one end of the lifting plate (30), a hinge frame (33) is fixedly installed. At one end of the hinge frame (33), an adjusting plate (31) is hinged. On one side of the adjusting plate (31), a vacuum suction cup mechanism (32) is fixedly installed. On one side of the top of the lifting plate (30), a fixed block (34) is fixedly connected. On one side of the fixed block (34), a hydraulic cylinder (35) is provided.
2. The quick installer for the prefabricated building curtain wall of large venues according to claim 1, characterized in that: The number of the slots (5) provided is eight. Inside the wall of the sponge layer (6), a curtain wall body (7) is provided. The upper end of the curtain wall body (7) penetrates to the outside of the slot (5). At the positions at the four corners of the bottom of the base (1), traveling wheels (26) are respectively fixedly installed. On one side of the base (1), a hand push plate (37) is fixedly installed.
3. The quick installer for the prefabricated building curtain wall of large venues according to claim 1, characterized in that: On the inner bottom of the transmission cavity (2), connection blocks (12) are fixedly connected to the opposite sides of the two side support plates (10) respectively. The two ends of the two transverse guide rods (11) penetrate to the outside of the two side support plates (10) respectively and are fixedly connected to the opposite sides of the two connection blocks (12).
4. The quick installer for the prefabricated building curtain wall of a large venue according to claim 1, characterized in that: The first motor (36) is fixedly connected to a first main shaft through the output end on its rear surface. The rear end of the first main shaft penetrates into the interior of the transmission cavity (2) and is fixedly connected to the center of the front surface of the first gear (13); the second motor (24) is fixedly connected to a second main shaft through the output end on its top. The upper end of the second main shaft penetrates to the outside of the installation groove (23) and is fixedly connected to the center of the bottom of the third gear (25); the third motor (27) is fixedly connected to a third main shaft through the output end on its bottom. The lower end of the third main shaft penetrates to the outside of the vertical frame (20) and is fixedly connected to the top of the long screw (28).
5. The quick installer for the prefabricated building curtain wall of a large venue according to claim 1, characterized in that: On one side of the top of the transmission cavity (2), a rectangular groove (3) is opened. The tops of the four telescopic columns (15) all penetrate to the outside of the rectangular groove (3) and are fixedly connected to the positions near the four corners of the bottom of the placement table (4) respectively. The tops of the damper (16) and the spring (17) are both fixedly connected to the bottom of the telescopic column (15). The bottom of the spring (17) is fixedly connected to the inner bottom of the mounting cylinder (14). The opposite sides of the two sliders (19) extend into the two sliding grooves (18) respectively and are slidably connected to the inner walls of the sliding grooves (18).
6. The quick installer for the prefabricated building curtain wall of a large venue according to claim 1, characterized in that: The bottom of the shaft rod (21) is movably connected to a bearing fixedly installed on one side of the top of the base (1), and the bottom of the long screw (28) is movably connected to a bearing fixedly installed at the center of the inner bottom of the vertical frame (20).
7. The quick installer for the prefabricated building curtain wall of a large venue according to claim 1, characterized in that: The hydraulic cylinder (35) is inclined. The two ends of the hydraulic cylinder (35) are movably hinged to one side of the fixed block (34) and the top of the adjusting plate (31) respectively.
8. The method for using the quick installer of the prefabricated building curtain wall for large venues according to any one of claims 1 to 7, characterized in that, It includes the following steps: Step 1: Place the curtain walls to be installed into the respective slots (5) on the placement table (4). The sponge layer (6) in the slot (5) contacts the curtain wall body (7) to protect it. Then, the installer moves the base (1) to the curtain wall installation location through the push plate (37). Step 2: After moving the base (1) to the designated curtain wall installation area, control the second motor (24) to make the third gear (25) engage with the second gear (22) and rotate. The second gear (22) makes the shaft rod (21) drive the vertical frame (20) to rotate 180 degrees, so that the vacuum suction cup mechanism (32) is located at the curtain wall body (7). Step 3: Control the first motor (36) to drive the first gear (13) to engage with the tooth groove (9) and rotate, so that the moving plate (8) drives the placement table (4) and the curtain wall body (7) to move towards the vacuum suction cup mechanism (32) until the outer wall of the first curtain wall body (7) on the placement table (4) is closely attached to the suction cup of the vacuum suction cup mechanism (32). Step 4: Evacuate the vacuum suction cup mechanism (32) to adsorb the first curtain wall body (7). Subsequently, control the third motor (27) to drive the long stud (28) to rotate. Through the threaded transmission between the lifting plate (30) and the long stud (28), the lifting plate (30) moves upward. The upward movement of the lifting plate (30) drives the vacuum suction cup mechanism (32) to extract the curtain wall body (7) from the slot (5). Step 5: After extracting the curtain wall body (7) from the slot (5), control the second motor (24) again to rotate the vertical frame (20) 180 degrees to reset. At this time, the installer can control the third motor (27) to adjust the installation height of the curtain wall body (7). Meanwhile, control the hydraulic cylinder (35) to adjust the angle of the adsorbed and fixed curtain wall body (7) during installation. After adjustment, install the curtain wall body (7). Step 6: After installing the first curtain wall body (7), repeat the above steps to install the curtain wall bodies (7) in the remaining slots (5).
9. The usage method of the quick-installer for the prefabricated building curtain wall of large venues according to claim 8, characterized in that: During the process of moving the base (1) through the walking wheels (26), if the base (1) vibrates due to bumps, the placing table (4) transmits the vibration force to the telescopic column (15). The telescopic column (15) moves downward in the installation cylinder (14), and at the same time compresses the damper (16) and the spring (17), thereby absorbing and reducing the vibration force from the placing table (4).