Construction method for plugging base plate of foundation pit spring opening
By digging out the water collection pit in the foundation pit spring area, laying a filter layer and corrugated pipe, extracting water bodies and sealing the bottom plate, the problem of the spring affecting the foundation pit construction is solved, and a safe and stable construction effect is achieved.
Patent Information
- Application Number
- CN202510725417.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-03
- Publication Date
- 2025-07-29
AI Technical Summary
During foundation pit construction, due to the existence of springs, the requirement that the groundwater level is no less than 0.5m lower than the construction work surface, affecting the bottom plate and foundation construction, and the groundwater pumping is not timely affected to the foundation pit.
The method of drainage first and then sealing is adopted. By digging out the water collection hole in the spring area, laying a filter layer and corrugated pipe, extracting water bodies, and laying a cushion layer on the backfill layer, and finally closing the basement plate to ensure the safety and stability of the basement structure.
Effectively close the bottom plate of the spring area, reduce the impact on surrounding construction, improve construction efficiency, and ensure the safety and stability of the basement structure.
Smart Images

Figure CN120384551A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of foundation pit spring bottom plugging construction, and particularly refers to a construction method for plugging the bottom plate of a foundation pit spring eye. Background Art
[0002] During the foundation pit construction process, the spring eyes formed by the light well point dewatering in the foundation pit or the naturally formed spring eyes have a great impact on the foundation pit excavation, unable to meet the requirement that the groundwater level is not less than 0.5 m below the construction operation surface, unable to provide dry construction conditions for the basement floor slab and the foundation cushion, and at the same time, the untimely pumping of the groundwater flowing out of the spring eyes will also affect the foundation layer of the entire foundation pit. How to plug or divert the groundwater of the spring eyes to ensure that it does not affect the surrounding floor slab and foundation construction, and at the same time, the spring eyes can be effectively plugged to ensure that the subsequent basement floor slab does not leak is the key to solving the problem at present. Summary of the Invention
[0003] The purpose of the present invention is to overcome the defects of the prior art and provide a construction method for plugging the bottom plate of a foundation pit spring eye, so as to solve the problems that the spring eyes formed by the light well point dewatering in the existing foundation pit or the naturally formed spring eyes have a great impact on the foundation pit excavation, affect the surrounding floor slab and foundation construction, and will also affect the foundation layer of the entire foundation pit.
[0004] The technical solution to achieve the above purpose is: a construction method for plugging the bottom plate of a foundation pit spring eye, including the following steps: excavating a sump in the spring eye area, and laying a first filter layer at the bottom of the sump to filter out the water body; inserting a corrugated pipe into the sump, and pumping the water body through the corrugated pipe and a pumping assembly; constructing a backfill layer between the outer periphery of the corrugated pipe and the sump; laying a cushion layer on the backfill layer; constructing a bottom plate on the cushion layer to seal the sump.
[0005] In the construction method for plugging the bottom plate of a foundation pit spring eye of the present invention, by the method of first diverting and then plugging, the diversion adopts the methods of filtration, concentration, and pumping, which has less impact on the construction of the surrounding basement structure, ensures the safety and stability of the basement structure, saves the construction period, and improves the efficiency of sealing the bottom plate in the spring eye area.
[0006] A further improvement of the construction method for plugging the bottom plate of a foundation pit spring eye of the present invention is that the step of excavating a sump in the spring eye area and laying a gravel filter layer at the bottom of the sump to filter out the water body includes: setting the slope of the sump to 1:1.
[0007] A further improvement of the construction method for plugging the bottom plate of a foundation pit spring eye of the present invention is that the step of excavating a sump in the spring eye area and laying a gravel filter layer at the bottom of the sump to filter out the water body further includes: laying a second filter layer on the first filter layer.
[0008] A further improvement of the construction method for plugging the bottom plate of a foundation pit spring eye of the present invention lies in that inserting a corrugated pipe into the sump and pumping the water body through the corrugated pipe and the pumping assembly includes: vertically inserting the lower port of the corrugated pipe into the first filter layer; placing a water pump on the second filter layer inside the corrugated pipe; extending one end of the first pipe body into the corrugated pipe and connecting it to the water pump; connecting the other end of the first pipe body to the lower port of the second pipe body, and arranging the second pipe body to pass through the first hole at the upper end of the corrugated pipe.
[0009] A further improvement of the construction method for plugging the bottom plate of a foundation pit spring eye of the present invention lies in that laying a cushion layer on the backfill layer further includes: laying a connecting plate on the cushion layer; opening a second hole in the center of the connecting plate for the second pipe body to pass through.
[0010] A further improvement of the construction method for plugging the bottom plate of a foundation pit spring eye of the present invention lies in that constructing a backfill layer between the outer periphery of the corrugated pipe and the sump includes: pouring a first backfill layer with concrete; compacting with plain soil on the first backfill layer to form a second backfill layer.
[0011] A further improvement of the construction method for plugging the bottom plate of a foundation pit spring eye of the present invention lies in that laying a cushion layer on the backfill layer includes: constructing a waterproof layer on the upper side of the cushion layer.
[0012] A further improvement of the construction method for plugging the bottom plate of a foundation pit spring eye of the present invention lies in that constructing a bottom plate above the cushion layer and closing the sump includes: dividing the outer peripheral bottom plate area and the central bottom plate area above the cushion layer; pouring the outer peripheral bottom plate in the outer peripheral bottom plate area; pouring the central bottom plate in the central bottom plate area.
[0013] A further improvement of the construction method for plugging the bottom plate of a foundation pit spring eye of the present invention lies in that before pouring the central bottom plate in the central bottom plate area includes: cutting off the part of the second pipe body extending above the connecting plate; covering the cut of the second pipe body with a cover plate.
[0014] A further improvement of the construction method for plugging the bottom plate of a foundation pit spring eye of the present invention lies in that pouring the central bottom plate in the central bottom plate area includes: pouring the central bottom plate with micro-expansion concrete. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 is a schematic flow chart of the construction method for plugging the bottom plate of a foundation pit spring eye of the present invention.
[0016] Figure 2 is a cross-sectional view of the plugging of the bottom plate of a foundation pit spring eye of the present invention.
[0017] Figure 3It is a schematic flow chart of step S110 of the present invention.
[0018] Figure 4 It is another schematic flow chart of step S110 of the present invention.
[0019] Figure 5 It is a schematic flow chart of step S120 of the present invention.
[0020] Figure 6 It is a schematic flow chart of step S140 of the present invention.
[0021] Figure 7 It is a schematic flow chart of step S130 of the present invention.
[0022] Figure 8 It is another schematic flow chart of step S140 of the present invention.
[0023] Figure 9 It is a schematic flow chart of step S150 of the present invention.
[0024] Figure 10 It is another cross-sectional view of the bottom plate plugging of the spring eye in the foundation pit of the present invention.
[0025] Figure 11 It is a schematic flow chart before step S153 of the present invention.
[0026] Figure 12 It is a schematic flow chart of step S153 of the present invention.
[0027] In the figure: 10, sump; 11, first filter layer; 12, second filter layer; 13, backfill layer; 131, first backfill layer; 132, second backfill layer; 14, cushion layer; 15, connecting plate; 16, waterproof layer; 17, cover plate; 20, spring eye area; 30, corrugated pipe; 31, water pump; 32, first pipe body; 33, second pipe body; 40, bottom plate; 41, peripheral bottom plate; 42, central bottom plate. Detailed implementation manners
[0028] The present invention will be further described below in conjunction with the accompanying drawings and specific implementation manners.
[0029] In this embodiment, since the foundation pit base layer is a sandy soil layer and the spring eye has become confined water through the confined layer and cannot be plugged in advance, a method of draining first and then plugging is adopted. The drainage adopts the methods of filtration, concentration and pumping, which not only ensures the construction of the bottom plate 40 and the foundation around the spring eye, but also improves the closing efficiency of the bottom plate 40 in the spring eye area 20.
[0030] Refer to Figure 1 , Figure 1 which shows a schematic flow chart of a construction method for plugging the bottom plate of a spring eye in a foundation pit of the present invention. Figure 2Shows a cross-sectional view of the plugging of the bottom plate of the spring eye in the foundation pit of the present invention. The present invention provides a construction method for plugging the bottom plate of the spring eye in the foundation pit, including the following steps:
[0031] Execute step S110: Dig a sump 10 in the spring eye area 20, and lay a first filter layer 11 at the bottom of the sump 10 to filter out the water body.
[0032] Among them, in order to achieve the filtration and concentration of groundwater, excavation is carried out with the spring eye as the center. The first filter layer 11 is selected as gravel to preliminarily filter the seepage water body. In this embodiment, the thickness of the first filter layer 11 is set to 300 mm. In other embodiments, it is specifically set according to the actual construction requirements and will not be specifically limited here. Then, execute step S120.
[0033] Execute step S120: Insert a corrugated pipe 30 into the sump 10, and pump out the water body through the corrugated pipe 30 and the pumping assembly.
[0034] Among them, a corrugated pipe 30 with a corresponding diameter is selected according to the water volume to pump and drain the gathered water body. A corrugated pipe 30 with a corresponding height is selected according to the size of the sump 10, which will not be specifically limited here.
[0035] In this embodiment, the corrugated pipe 30 is longitudinally and vertically inserted into the sump 10. Then, execute step S130.
[0036] Execute step S130: Construct a backfill layer 13 between the outer periphery of the corrugated pipe 30 and the sump 10.
[0037] Among them, the constructed backfill layer 13 wraps around the outer periphery of the corrugated pipe 30 and can provide lateral support force to the corrugated pipe 30. During construction, protective measures should be taken for the outer wall of the corrugated pipe 30 to prevent damage to the outer wall of the corrugated pipe 30 from affecting pumping. Then, execute step S140.
[0038] Execute step S140: Lay a cushion layer 14 on the backfill layer 13.
[0039] Among them, the height of the cushion layer 14 in the spring eye area 20 is set to be less than the height of the outer periphery of the spring eye. Then, execute step S150.
[0040] Execute step S150: Construct a bottom plate 40 on the cushion layer 14 to seal the sump 10.
[0041] Among them, corresponding to the setting of the above cushion layer 14, the bottom plate 40 at the spring eye can be set with local thickening. The construction steps of the bottom plate 40 will be described in detail below and will not be elaborated here.
[0042] Refer to Figure 3, which shows the flow diagram of step S110 of the present invention. The present invention provides a construction method for plugging the bottom plate of a foundation pit spring eye, and step S110 includes:
[0043] Execute step S111: Set the slope of the sump 10 to 1:1.
[0044] Among them, in order to ensure the safety of the foundation pit excavation, in this embodiment, the excavation depth is set to about 1.5 m, and the length and width of the excavation bottom are both 1000 mm.
[0045] In other embodiments, the depth of the sump 10 and the length, width and size of the bottom are set according to specific construction requirements, and no specific limitations are made here.
[0046] Refer to Figure 4 , which shows another flow diagram of step S110 of the present invention. The present invention provides a construction method for plugging the bottom plate of a foundation pit spring eye, and step S110 further includes:
[0047] Execute step S112: Lay the second filter layer 12 on the first filter layer 11.
[0048] Among them, the second filter layer 12 is a non-woven fabric, that is, a layer of non-woven fabric is laid on the top of the gravel to further filter the impurities in the water body, avoid excessive impurities in the water body pumped by the water pump 31 from affecting the service life of the water pump 31, and the filtered water body is output and collected after being pumped, which is convenient for subsequent diversified utilization of water resources and adheres to green and sustainable development.
[0049] Refer to Figure 5 , which shows the flow diagram of step S120 of the present invention. The present invention provides a construction method for plugging the bottom plate of a foundation pit spring eye, and step S120 includes:
[0050] Execute step S121: Vertically insert the lower port of the corrugated pipe 30 into the first filter layer 11.
[0051] Among them, the lower port of the corrugated pipe 30 is open. Since the first filter layer 11 is gravel, the corrugated pipe 30 can be inserted between the gravels to maintain stability, and the second filter layer 12 is a non-woven fabric that can wrap the lower port as the lower port of the corrugated pipe 30 descends, ensuring that the water body entering the inside of the corrugated pipe 30 is filtered twice. Then, execute step S122.
[0052] Execute step S122: Place the water pump 31 on the second filter layer 12 inside the corrugated pipe 30.
[0053] Among them, a water pump 31 is used to pump water. A water pump 31 with a suitable specification is selected according to the water volume and water pressure to calculate the water volume balance, so as to avoid the phenomenon that the groundwater gushes out due to the too small specification of the water pump 31 or the pump burning out due to the too large specification of the water pump 31 and pumping dry. Moreover, the water pump 31 needs to cut off the water supply after cutting off the power. Then, step S123 is executed.
[0054] Execute step S123: Insert one end of the first pipe body 32 into the corrugated pipe 30 and connect it to the water pump 31.
[0055] Among them, the first pipe body 32 is a flexible pipe. Using a flexible pipe connection can avoid the phenomenon of pipe detachment caused by water volume changes or foundation changes, and can maintain the stability of the structure. Then, step S124 is executed.
[0056] Execute step S124: Connect the other end of the first pipe body 32 to the lower port of the second pipe body 33, and set the second pipe body 33 to pass through the first hole at the upper end of the corrugated pipe 30.
[0057] Among them, the second pipe body 33 is a galvanized steel pipe. The upper port of the corrugated pipe 30 is set in a semi-closed state to allow the second pipe body 33 to pass through, and the corrugated pipe 30 is connected to the second pipe body 33.
[0058] Refer to Figure 2 and Figure 6 , Figure 2 which shows a cross-sectional view of the plugging of the bottom plate of the spring eye in the foundation pit of the present invention. Figure 6 which shows a schematic flow chart of step S140 of the present invention. The present invention provides a construction method for plugging the bottom plate of the spring eye in the foundation pit. Step S140 includes:
[0059] Execute step S141: Lay the connecting plate 15 on the cushion layer 14.
[0060] Among them, the connecting plate 15 is a steel plate. The connecting plate 15 is laid horizontally, and a hole is opened in the center of the connecting plate 15 for the second pipe body 33 to pass through. Then, step S142 is executed.
[0061] Execute step S142: Open a second hole in the center of the connecting plate 15 for the second pipe body 33 to pass through.
[0062] Among them, the connecting plate 15 is welded to the outer peripheral wall of the second pipe body 33.
[0063] Refer to Figure 7 , which shows a schematic flow chart of step S130 of the present invention. The present invention provides a construction method for plugging the bottom plate of the spring eye in the foundation pit. Step S130 includes:
[0064] Execute step S131: Pour the first backfill layer 131 with concrete.
[0065] Among them, to ensure the backfill quality around the corrugated pipe 30, after the water in the sump 10 is pumped out, the bottom is sealed with concrete. The bottom is poured with underwater C30 concrete for sealing. The upper end surface of the first backfill layer 131 is paved into a horizontal plane. The thickness of the first backfill layer 131 is set according to actual construction requirements and is not specifically limited here. Then, step S132 is executed.
[0066] Execute step S132: Compact the plain soil on the first backfill layer 131 to form the second backfill layer 132. The backfill thickness for sealing and water isolation is compacted with plain soil that meets the design requirements to the bottom of the cushion 14.
[0067] Among them, the second backfill layer 132 around the upper port of the corrugated pipe 30 is set flush with the upper port. The thickness of the second backfill layer 132 is set according to actual construction requirements and is not specifically limited here.
[0068] Refer to Figure 8 , which shows another flow schematic diagram of step S140 of the present invention. The present invention provides a construction method for plugging the bottom plate of a foundation pit spring eye. Step S140 further includes:
[0069] Execute step S143: Construct a waterproof layer 16 on the upper side of the cushion 14.
[0070] Among them, to ensure that the force on the bottom plate 40 of the spring eye area 20 of the foundation pit meets the requirements, the bottom plate 40 of the spring eye area 20 of the foundation pit is set with local thickening. Correspondingly, the height of the cushion 14 in the spring eye area 20 is less than the height of the outer periphery of the spring eye, that is, the longitudinal section at the sump 10 shows that the cushion 14 is concave. The thickening size of the bottom plate 40 in the peripheral area of the spring eye is set according to actual construction requirements and is not specifically limited here.
[0071] Refer to Figure 9 and Figure 10 , Figure 9 which shows the flow schematic diagram of step S150 of the present invention, Figure 10 which shows another cross-sectional view of the plugging of the bottom plate of the foundation pit spring eye of the present invention. The present invention provides a construction method for plugging the bottom plate of a foundation pit spring eye. Step S150 includes:
[0072] Execute step S151: Divide the outer peripheral bottom plate 41 area and the central bottom plate area above the cushion 14.
[0073] Among them, reserve an area of 0.8m×0.8m of the bottom plate 40 for later pouring, and set the central bottom plate area above the connecting plate 15. In other embodiments, the range of the central bottom plate area can be set according to the actual size of the spring eye and specific construction requirements. Then, step S152 is executed.
[0074] Execute step S152: Pour the outer peripheral bottom plate 41 in the outer peripheral bottom plate 41 area.
[0075] Among them, the demarcation line between the outer peripheral bottom plate 41 and the central bottom plate 42 is located above the connecting plate 15, and the construction joint between the outer peripheral bottom plate 41 and the central bottom plate 42 is reserved above the connecting plate 15.
[0076] In this embodiment, the outer peripheral bottom plate 41 is connected to the basement bottom plate in the foundation pit. The pouring material of the outer peripheral bottom plate 41 is selected to be the same as that of the basement bottom plate, and no specific limitation is made here.
[0077] In other embodiments, the reserved central bottom plate area is set according to actual construction requirements, and no specific limitation is made here. Then, step S153 is executed.
[0078] Execute step S153: Pour the central bottom plate 42 in the central bottom plate area.
[0079] Among them, after the concrete strength at the outer peripheral bottom plate 41 reaches the design strength, stop the water pump 31 from pumping water, block the pumping channel, there is a pre-embedded water stop steel plate in the construction joint, and then pour the central bottom plate 42.
[0080] Refer to Figure 10 and Figure 11 , Figure 10 which shows another cross-sectional view of the plugging of the spring eye bottom plate in the foundation pit of the present invention. Figure 11 shows a schematic flow chart before step S153 of the present invention. The present invention provides a construction method for plugging the spring eye bottom plate in the foundation pit. Before step S153, it includes:
[0081] Execute step S15301: Cut off the part of the second pipe body 33 that extends above the connecting plate 15.
[0082] Among them, cut the second pipe body 33 horizontally along the upper end surface of the connecting plate 15. Then, execute step S15302.
[0083] Execute step S15302: Cover the cut of the second pipe body 33 with the cover plate 17.
[0084] Among them, the size of the cover plate 17 is set to be larger than that of the second pipe body 33. The outer periphery of the cover plate 17 covers the upper end surface of the connecting plate 15, and the cover plate 17 and the connecting plate 15 can be welded to seal the pumping pipeline.
[0085] Refer to Figure 12 , which shows a schematic flow chart of step S153 of the present invention. The present invention provides a construction method for plugging the spring eye bottom plate in the foundation pit. Step S153 includes:
[0086] Execute step S1531: Pour the central bottom plate 42 with slightly expanding concrete.
[0087] Among them, the slightly expansive concrete can prevent and control concrete cracks, improve the performance of concrete, and ensure the sealing quality.
[0088] The present invention has been described in detail in combination with the embodiments of the accompanying drawings. Those of ordinary skill in the art can make various changes to the present invention according to the above description. Therefore, some details in the embodiments should not constitute a limitation to the present invention, and the protection scope of the present invention will be defined by the scope defined in the appended claims.
Claims
1. A construction method for plugging the bottom plate of a foundation pit spring eye, characterized in that, It includes the following steps: Dig a sump in the spring area and lay a first filter layer at the bottom of the sump to filter out water; Insert a corrugated pipe into the sump and pump out the water through the corrugated pipe and a pumping component; Construct a backfill layer between the outer periphery of the corrugated pipe and the sump; Lay a cushion layer on the backfill layer; Construct a bottom slab on the cushion layer to enclose the sump.
2. The construction method for plugging the bottom plate of a foundation pit spring eye according to claim 1, characterized in that, The step of digging a sump in the spring area and laying a gravel filter layer at the bottom of the sump to filter out water includes: Set the slope of the sump to 1:
1.
3. The construction method for plugging the bottom plate of a foundation pit spring eye according to claim 1, characterized in that, The step of digging a sump in the spring area and laying a gravel filter layer at the bottom of the sump to filter out water further includes: Lay a second filter layer on the first filter layer.
4. The construction method for plugging the bottom plate of a foundation pit spring eye according to claim 3, characterized in that, The step of inserting a corrugated pipe into the sump and pumping out the water through the corrugated pipe and a pumping component includes: Vertically insert the lower port of the corrugated pipe into the first filter layer; Place a water pump on the second filter layer inside the corrugated pipe; Insert one end of a first pipe body into the corrugated pipe to connect with the water pump; Connect the other end of the first pipe body to the lower port of a second pipe body and set the second pipe body to pass through a first hole at the upper end of the corrugated pipe.
5. The construction method for plugging the bottom plate of a foundation pit spring eye according to claim 4, characterized in that, The step of laying a cushion layer on the backfill layer includes: Lay a connecting plate on the cushion layer; Open a second hole at the center of the connecting plate for the second pipe body to pass through.
6. The construction method for plugging the bottom plate of a foundation pit spring eye according to claim 1, characterized in that, The step of constructing a backfill layer between the outer periphery of the corrugated pipe and the sump includes: Pour a first backfill layer with concrete; Compress the first backfill layer with plain soil to form a second backfill layer.
7. The construction method for plugging the bottom plate of a foundation pit spring eye according to claim 1, characterized in that, The step of laying a cushion layer on the backfill layer further includes: Construct a waterproof layer on the upper side of the cushion layer.
8. The construction method for plugging the bottom plate of a foundation pit spring eye according to claim 1, characterized in that, The step of constructing a bottom slab above the cushion layer to enclose the sump includes: Divide the outer bottom slab area and the central bottom slab area above the cushion layer; Pour the outer bottom slab in the outer bottom slab area; Pour the central bottom slab in the central bottom slab area.
9. The construction method for plugging the bottom plate of a foundation pit spring eye according to claim 8, characterized in that, Before pouring the central bottom slab in the central bottom slab area includes: Cut off the part of the second pipe body extending above the connecting plate; Cover the cut of the second pipe body with a cover plate.
10. A construction method for plugging the bottom plate of a foundation pit spring eye according to claim 8, characterized in that, The step of pouring the central bottom slab in the central bottom slab area includes: Pour the central bottom slab with slightly expanding concrete.