A wastewater treatment method

By setting up a circulation loop and a flow meter in the wastewater treatment device to detect the patency of the filter screen, the problem of unmonitored sludge accumulation on the filter screen is solved, improving treatment efficiency and maintenance convenience.

CN120423734BActive Publication Date: 2026-11-17ANHUI DONGZHI GUANGXIN AGROCHEMICAL CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202510722430.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-05-30
Publication Date
2026-11-17
Estimated Expiration
2045-05-30

AI Technical Summary

Technical Problem

Existing wastewater treatment devices cannot monitor the sludge accumulated on the filter screen in real time, resulting in a decrease in treatment efficiency.

Method used

By setting up a circulation loop and flow meter in the settling mechanism, the filter screen patency can be detected in real time. Combined with the filter screen clamp and sealing ring, the airtightness is ensured, which facilitates filter screen maintenance.

Benefits of technology

It enables real-time monitoring of filter patency, ensuring efficient operation of wastewater treatment and simplifying filter replacement and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120423734B_ABST
    Figure CN120423734B_ABST
Patent Text Reader

Abstract

This invention discloses a wastewater treatment method, including a wastewater storage tank, a sedimentation mechanism, a MABR main reactor, a gas balance mechanism, an MBfR main reactor, and a filter mechanism. The method involves closing both the inlet and outlet valves, creating a circulation loop between the sedimentation tank, connecting pipe 1, and connecting pipe 2. A pump is started, causing the wastewater in the sedimentation mechanism to circulate within this loop. A flow meter in a velocity measuring tube detects the flow velocity within the circulation loop to determine the patency of the filter mechanism. This flow meter allows for real-time monitoring of the patency within the sedimentation mechanism. The degree of sludge accumulation on the filter mechanism can be determined based on the water flow patency, facilitating the assessment of whether sludge treatment is necessary and ensuring the device's wastewater treatment efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of wastewater treatment technology, and more specifically to a wastewater treatment method. Background Technology

[0002] Wastewater is often generated in industrial production. This wastewater cannot be discharged directly and needs to be purified to avoid polluting the environment.

[0003] Chinese Patent CN112062277B discloses a device for treating p-nitrophenol-containing wastewater using a combination of MABR and CH4-MBfR. The device comprises a wastewater storage unit, a MABR unit, and a CH4-MBfR unit connected in sequence, with an intermediate effluent tank connecting the MABR and CH4-MBfR units. This invention fully combines the advantages of both membrane reactors, effectively degrading p-nitrophenol, achieving deep denitrification, and ensuring effluent meets discharge standards. Because the MABR uses bubble-free aeration, it has a high oxygen utilization rate (up to 100%) and a relatively small oxygen mass transfer range. The anaerobic bacteria first perform hydrolysis and acidification to reduce its toxicity, followed by metabolic mineralization and degradation by aerobic and facultative anaerobic bacteria. The denitrifying anaerobic methanogenic bacteria biofilm within the CH4-MBfR main reactor effectively performs deep denitrification. The biofilm contains a large number of methanogenic bacteria, which can supply some methane to the biofilm, saving carbon source addition costs and reducing methane greenhouse gas emissions.

[0004] The shortcomings of the existing technical solutions are: during the treatment process, sludge in the wastewater needs to be settled and filtered. The existing wastewater treatment devices cannot monitor the sludge accumulated on the filter screen in real time, and cannot remind staff to treat the sludge in a timely manner, which is not conducive to improving the wastewater treatment efficiency. Summary of the Invention

[0005] The purpose of this invention is to provide a wastewater treatment method to solve the technical problem in the prior art that the sludge accumulated on the filter screen cannot be monitored in real time, and the staff cannot be reminded to treat the sludge in a timely manner, which is not conducive to improving the wastewater treatment efficiency.

[0006] The technical problem to be solved by this invention can be achieved through the following technical solution:

[0007] A wastewater treatment method includes the following steps:

[0008] Step 1: The wastewater to be treated is transported to the wastewater storage tank. The wastewater to be treated is then transported to the sedimentation mechanism through the water supply pipe 1. The on / off valve 1 on the inlet pipe and the on / off valve 2 on the outlet pipe are opened, and the wastewater to be treated enters the sedimentation tank through the inlet pipe.

[0009] Step 2: Both the pipe on / off valve 1 on connecting pipe 1 and the pipe on / off valve 2 on connecting pipe 2 are closed. Wastewater flows to the MABR main reactor through the inlet pipe, settling tank, filter screen mechanism and outlet pipe.

[0010] Step 3: When it is necessary to test the unobstructed flow of the settling mechanism, close valve 1 on the inlet pipe and valve 2 on the outlet pipe to form a circulation loop between the settling tank, connecting pipe 1, and connecting pipe 2. Start the pump to make the wastewater in the settling mechanism circulate within the circulation loop between the settling tank, connecting pipe 1, and connecting pipe 2. Use the flow meter in the velocity measuring tube to detect the flow rate in the circulation loop to determine the unobstructed flow of the filter mechanism in the settling mechanism.

[0011] Step 4: The primary treated wastewater after denitrification treatment in the MABR main reactor enters the intermediate water storage tank through water pipe 2. The primary treated wastewater in the intermediate water storage tank enters the MBfR main reactor for secondary treatment through water pipe 3. The secondary treated wastewater enters the main effluent tank for storage through water pipe 4.

[0012] A wastewater treatment apparatus, comprising:

[0013] The settling mechanism has a feed end connected to a wastewater storage tank and a discharge end connected to the MABR main reactor. A water supply pipe connects the settling mechanism and the wastewater storage tank.

[0014] The MBfR main reactor is connected to the MABR main reactor via an intermediate water storage tank. The intermediate water storage tank is connected to the MABR main reactor via a water supply pipe 2. The intermediate water storage tank is connected to the MBfR main reactor via a water supply pipe 3. A gas balancing mechanism is connected to the MBfR main reactor. A main outlet water tank is located on one side of the MBfR main reactor. The MBfR main reactor is connected to the main outlet water tank via a water supply pipe 4.

[0015] As a further aspect of the present invention: the settling mechanism includes a cylindrical settling tank, with an inlet pipe connected to the upper end of the settling tank and an outlet pipe connected to the lower end of the settling tank. A first on / off valve is fixedly installed on the inlet pipe, and a second on / off valve is fixedly installed on the outlet pipe.

[0016] As a further embodiment of the present invention: a filter screen channel is fixedly connected to the side end face of the settling tank, the filter screen channel is connected to the inside of the settling tank, a filter screen clamp plate 1 is fixedly connected to the bottom surface of the inner wall of the filter screen channel, and a filter screen clamp plate 2 is fixedly connected to the top surface of the inner wall of the filter screen channel. Both the filter screen clamp plate 1 and the filter screen clamp plate 2 are provided with circular through holes.

[0017] As a further embodiment of the present invention: a connecting pipe 1 is fixedly connected and connected to the settling tank, and a connecting pipe 2 is fixedly connected and connected to the outlet pipe. A pipeline on / off valve 1 is fixedly installed at the end of the connecting pipe 1 near the settling tank, and a pipeline on / off valve 2 is fixedly installed at the end of the connecting pipe 2 near the outlet pipe. A speed measuring tube is connected between the connecting pipe 1 and the connecting pipe 2, and a flow meter is fixedly installed inside the speed measuring tube. A pump is fixedly installed at the end of the connecting pipe 2 near the speed measuring tube.

[0018] As a further embodiment of the present invention: the filter mechanism includes a channel cover plate, a mechanism connecting plate is fixedly connected to one end face of the channel cover plate, a filter screen hoop is fixedly connected to the mechanism connecting plate, a filter screen is fixedly connected to the filter screen hoop, sealing rings are fixedly connected to both the upper and lower ends of the filter screen hoop, and a cover sealing ring corresponding to the opening of the filter screen channel is fixedly connected to the channel cover plate.

[0019] As a further embodiment of the present invention: fixed protrusions are fixedly connected to both ends of the outer side of the filter channel, and docking protrusions corresponding to the fixed protrusions are fixedly connected to both ends of the channel cover plate. Threaded holes are opened on the fixed protrusions, and connecting through holes are opened through the docking protrusions. A screw is provided between the fixed protrusions and the docking protrusions, and the screw passes through the connecting through holes on the docking protrusions and is threadedly connected to the threaded holes on the fixed protrusions.

[0020] As a further aspect of the present invention: the gas balance mechanism includes a storage tank, which is connected to a connecting pipe 1 and a connecting pipe 2. The storage tank is connected to the MBfR main reactor through the connecting pipe 1 and the connecting pipe 2. A first conveying pump is fixedly installed on the first connecting pipe, and a second conveying pump is fixedly installed on the second connecting pipe.

[0021] The beneficial effects of this invention are:

[0022] 1. When using this invention, if it is necessary to test the unobstructed flow of the settling mechanism, the on / off valve one on the inlet pipe is closed, and the on / off valve two on the outlet pipe is closed at the same time, so that a circulation loop is formed between the settling tank, connecting pipe one, and connecting pipe two. The pump is started, so that the wastewater in the settling mechanism circulates in the circulation loop formed between the settling tank, connecting pipe one, and connecting pipe two. The flow rate in the circulation loop is detected by the flow meter in the velocity measuring tube to determine the unobstructed flow of the filter mechanism in the settling mechanism. The unobstructed flow of the settling mechanism can be detected in real time by the flow meter in the velocity measuring tube. The degree of sludge accumulation on the filter mechanism can be judged by the degree of water flow in the settling mechanism, so as to facilitate the determination of whether the sludge on the filter mechanism needs to be treated, and to ensure the wastewater treatment efficiency of the device.

[0023] 2. The filter channel of the present invention is fixed with filter clamp plate one and filter clamp plate two for clamping and fixing the filter mechanism. The sealing rings on both ends of the filter clamp ring of the filter mechanism can ensure the sealing of the connection between the filter mechanism and filter clamp plate one and filter clamp plate two, thereby ensuring the filtration effect of the filter mechanism. When the filter mechanism needs to be replaced, the bolts between the fixing protrusion and the docking protrusion are removed, and the filter mechanism is pulled out from the filter channel to complete the maintenance and replacement of the filter mechanism. This makes it convenient for the staff to maintain the filter mechanism and helps to ensure the production efficiency of the device. Attached Figure Description

[0024] The invention will now be further described with reference to the accompanying drawings.

[0025] Figure 1 This is a schematic diagram of the overall structure of the present invention;

[0026] Figure 2 This is a schematic diagram of the connection relationship between the settling mechanism and the filter screen mechanism in this invention;

[0027] Figure 3 This is a three-dimensional structural diagram of the settling mechanism of the present invention;

[0028] Figure 4 This is a schematic diagram of a portion of the settling mechanism of the present invention;

[0029] Figure 5 This is a three-dimensional structural diagram of the filter mechanism of the present invention;

[0030] Figure 6 This is a schematic diagram of the connection structure between the gas balance mechanism and the MBfR main reactor of the present invention.

[0031] In the diagram: 1. Wastewater storage tank; 2. Water supply pipe one; 3. Settling mechanism; 31. Settling tank body; 32. Inlet pipe; 33. Outlet pipe; 34. Filter screen channel; 35. Fixing protrusion; 36. Filter screen clamp one; 37. Filter screen clamp two; 38. On / off valve one; 39. On / off valve two; 310. Connecting pipe one; 311. Connecting pipe two; 312. Velocity measuring tube; 313. Pump; 4. MABR main reactor; 5. Water supply pipe two; 6. Intermediate water storage tank. 7. Water tank; 8. Water supply pipe three; 9. Gas balance mechanism; 10. Storage tank; 11. Connecting pipe one; 12. Connecting pipe two; 13. Transfer pump one; 14. Transfer pump two; 15. MBfR main reactor; 16. Water supply pipe four; 17. Main outlet water tank; 18. Filter screen mechanism; 19. Channel cover plate; 10. Connecting protrusion; 11. Cover plate sealing ring; 12. Mechanism connecting plate; 13. Filter screen hoop ring; 14. Sealing rubber ring. Detailed Implementation

[0032] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0033] like Figures 1-6 As shown, a wastewater treatment apparatus includes:

[0034] The settling mechanism 3 has a feed end connected to a wastewater storage tank 1 and a discharge end connected to a MABR main reactor 4. A water supply pipe 2 connects the settling mechanism 3 and the wastewater storage tank 1.

[0035] MBfR main reactor 9, an intermediate water storage tank 6 is provided between MBfR main reactor 9 and MABR main reactor 4, intermediate water storage tank 6 is connected to MABR main reactor 4 by a water supply pipe 2 5, intermediate water storage tank 6 is connected to MBfR main reactor 9 by a water supply pipe 3 7, a gas balance mechanism 8 is connected to MBfR main reactor 9, a total outlet water tank 11 is provided on one side of MBfR main reactor 9, and a water supply pipe 4 10 is connected between MBfR main reactor 9 and total outlet water tank 11.

[0036] MBfR main reactor 9 is a CH4-MBfR main reactor. MBfR main reactor 9 is equipped with MBfR main reactor reaction column, methane aeration system, CH4-MBfR sludge circulation system and CH4-MBfR water circulation system. The MABR main reactor is equipped with hollow fiber membrane for reaction.

[0037] The settling mechanism 3 includes a cylindrical settling tank 31. An inlet pipe 32 is connected to the upper end of the settling tank 31, and an outlet pipe 33 is connected to the lower end of the settling tank 31. A first on / off valve 38 is fixedly installed on the inlet pipe 32, and a second on / off valve 39 is fixedly installed on the outlet pipe 33. A filter screen channel 34 is fixedly connected to the side end face of the settling tank 31, and the filter screen channel 34 communicates with the interior of the settling tank 31. A first filter screen clamp 36 is fixedly connected to the bottom surface of the inner wall of the filter screen channel 34, and a second filter screen clamp 37 is fixedly connected to the top surface of the inner wall of the filter screen channel 34. The filter screen clamp 36 and the second filter screen clamp are also included in the settling mechanism. Both pipes 37 and 2 are provided with circular through holes. A connecting pipe 310 is fixedly connected to and connected to the settling tank 31. A connecting pipe 311 is fixedly connected to and connected to the outlet pipe 33. A pipeline on / off valve 1 is fixedly installed at the end of the connecting pipe 310 near the settling tank 31. A pipeline on / off valve 2 is fixedly installed at the end of the connecting pipe 311 near the outlet pipe 33. A speed measuring tube 312 is connected between the connecting pipe 310 and the connecting pipe 311. A flow meter is fixedly installed inside the speed measuring tube 312. A pump 313 is fixedly installed at the end of the connecting pipe 311 near the speed measuring tube 312.

[0038] The filter mechanism 12 includes a channel cover plate 121. A mechanism connecting plate 124 is fixedly connected to one end face of the channel cover plate 121. A filter screen hoop ring 125 is fixedly connected to the mechanism connecting plate 124. A filter screen is fixedly connected to the filter screen hoop ring 125. Sealing rings 126 are fixedly connected to both the upper and lower ends of the filter screen hoop ring 125. A cover sealing ring 123 corresponding to the opening of the filter channel 34 is fixedly connected to the channel cover plate 121.

[0039] Both ends of the outer side of the filter channel 34 are fixedly connected to fixing protrusions 35, and both ends of the channel cover plate 121 are fixedly connected to mating protrusions 122 corresponding to the fixing protrusions 35. The fixing protrusions 35 are provided with threaded holes, and the mating protrusions 122 are provided with connecting through holes. A screw is provided between the fixing protrusions 35 and the mating protrusions 122. The screw passes through the connecting through holes on the mating protrusions 122 and is threadedly connected to the threaded holes on the fixing protrusions 35.

[0040] The gas balance mechanism 8 includes a storage tank 81, which is connected to a first connecting pipe 82 and a second connecting pipe 83. The storage tank 81 is connected to the MBfR main reactor 9 through the first connecting pipe 82 and the second connecting pipe 83. A first transfer pump 84 is fixedly installed on the first connecting pipe 82, and a second transfer pump 85 is fixedly installed on the second connecting pipe 83.

[0041] In some specific implementation schemes, a conveying pump for driving water flow is fixedly installed on water pipe 1 (2), water pipe 2 (5), water pipe 3 (7), and water pipe 4 (10).

[0042] A wastewater treatment method includes the following steps:

[0043] Step 1: The wastewater to be treated is transported to the wastewater storage tank 1, and then transported to the settling mechanism 3 through the water supply pipe 2. The on / off valve 38 on the inlet pipe 32 and the on / off valve 39 on the outlet pipe 33 are opened, and the wastewater to be treated enters the settling tank 31 through the inlet pipe 32.

[0044] Step 2: Both the pipe on / off valve 1 on connecting pipe 1 310 and the pipe on / off valve 2 on connecting pipe 2 311 are closed. Wastewater flows to the MABR main reactor through the inlet pipe 32, settling tank 31, filter screen mechanism 12 and outlet pipe 33.

[0045] Step 3: When it is necessary to test the unobstructed flow of the settling mechanism 3, close the on / off valve 38 on the inlet pipe 32 and close the on / off valve 39 on the outlet pipe 33, so that a circulation loop is formed between the settling tank 31, the connecting pipe 310, and the connecting pipe 311. Start the pump 313 so that the wastewater in the settling mechanism 3 circulates in the circulation loop formed between the settling tank 31, the connecting pipe 310, and the connecting pipe 311. The flow rate of the water in the circulation loop is detected by the flow meter in the velocity measuring tube 312 to determine the unobstructed flow of the filter mechanism 12 in the settling mechanism 3.

[0046] Step 4: The primary treated wastewater after denitrification treatment in the MABR main reactor enters the intermediate water storage tank 6 through water pipe 2 5. The primary treated wastewater in the intermediate water storage tank 6 enters the MBfR main reactor 9 through water pipe 3 7 for secondary treatment. The secondary treated wastewater enters the total effluent tank 11 through water pipe 4 10 for storage.

[0047] To facilitate understanding of the embodiments of this solution by those skilled in the art, the working principle of this solution will now be briefly explained in conjunction with specific application scenarios:

[0048] When it is necessary to test the patency of the settling mechanism 3 during use, close the on / off valve 38 on the inlet pipe 32 and the on / off valve 39 on the outlet pipe 33, so that a circulation loop is formed between the settling tank 31, the connecting pipe 310, and the connecting pipe 311. Start the pump 313 so that the wastewater in the settling mechanism 3 circulates within the circulation loop formed between the settling tank 31, the connecting pipe 310, and the connecting pipe 311. The flow rate in the circulation loop is detected by the flow meter in the velocity measuring tube 312 to determine the patency of the filter screen mechanism 12 in the settling mechanism 3. The flow rate in the velocity measuring tube 312 can detect the patency of the settling mechanism 3 in real time. The degree of sludge accumulation on the filter screen mechanism 12 can be judged by the patency of the water flow in the settling mechanism 3. To facilitate the determination of whether sludge treatment is needed on the filter screen mechanism 12 and to ensure the efficiency of the device in treating wastewater, filter screen clamp plate 1 36 and filter screen clamp plate 2 37 are respectively fixed on the inner wall of the two channels of the filter screen channel 34 for clamping and fixing the filter screen mechanism 12. The sealing rubber rings 126 on both ends of the filter screen clamp ring 125 of the filter screen mechanism 12 can ensure the sealing of the connection between the filter screen mechanism 12 and the filter screen clamp plate 1 36 and the filter screen clamp plate 2 37, thereby ensuring the filtration effect of the filter screen mechanism 12. When the filter screen mechanism 12 needs to be replaced, the bolts between the fixing protrusion 35 and the docking protrusion 122 are removed, and the filter screen mechanism 12 is pulled out from the filter screen channel 34 to complete the maintenance and replacement of the filter screen mechanism 12. This facilitates the maintenance of the filter screen mechanism 12 by the staff and helps to ensure the production efficiency of the device.

[0049] The foregoing has described several embodiments of the present invention in detail, but these embodiments are not limited thereto and should not be considered as limiting the scope of the invention. All equivalent variations and improvements made within the scope of the claims of this invention should still fall within the patent coverage of this invention.

Claims

1. A method for treating wastewater, characterized in that, It is applied to a wastewater treatment device, the device comprising a wastewater storage tank (1), a sedimentation mechanism (3), a MABR main reactor (4), an intermediate water storage tank (6), and a CH4-MBfR main reactor (9) connected in sequence, the method comprising the following steps: S1: The wastewater to be treated is transported to the wastewater storage tank (1), and the wastewater to be treated is transported to the settling mechanism (3) through the water supply pipe (2). The on / off valve (38) on the inlet pipe (32) and the on / off valve (39) on the outlet pipe (33) are opened, and the wastewater to be treated enters the settling tank (31) through the inlet pipe (32). S2: The pipe shut-off valve 1 on the connecting pipe 1 (310) and the pipe shut-off valve 2 on the connecting pipe 2 (311) are both closed, and the wastewater flows to the MABR main reactor through the inlet pipe (32), the settling tank (31), the filter screen mechanism (12) and the outlet pipe (33); S3: When it is necessary to test the smoothness of the settling mechanism (3), close the on / off valve one (38) on the inlet pipe (32) and close the on / off valve two (39) on the outlet pipe (33) so that a circulation loop is formed between the settling tank (31), the connecting pipe one (310) and the connecting pipe two (311). Start the pump (313) fixedly installed on the connecting pipe two (311) near the end of the speed measuring tube (312) so that the wastewater in the settling mechanism (3) circulates in the circulation loop formed between the settling tank (31), the connecting pipe one (310) and the connecting pipe two (311). The flow rate of the water in the circulation loop is detected by the flow meter in the speed measuring tube (312) to determine the smoothness of the filter mechanism (12) in the settling mechanism (3). S4: The primary wastewater after denitrification treatment in the MABR main reactor enters the intermediate water storage tank (6) through water pipe two (5). The primary wastewater in the intermediate water storage tank (6) enters the CH4-MBfR main reactor (9) through water pipe three (7) for secondary treatment. The wastewater after secondary treatment enters the total effluent tank (11) through water pipe four (10) for storage.

2. A wastewater treatment apparatus for implementing the wastewater treatment method according to claim 1, characterized in that, include: A settling mechanism (3) is provided, with its feed end connected to a wastewater storage tank (1) and its discharge end connected to the MABR main reactor (4). A water supply pipe (2) connects the settling mechanism (3) and the wastewater storage tank (1). The settling mechanism (3) includes a cylindrical settling tank (31), with an inlet pipe (32) connected to the upper end of the settling tank (31). The lower end of the tank body (31) is connected to a water outlet pipe (33). A shut-off valve (38) is fixedly installed on the water inlet pipe (32), and a shut-off valve (39) is fixedly installed on the water outlet pipe (33). A filter screen channel (34) is fixedly connected to the side end face of the settling tank body (31). The filter screen channel (34) is connected to the inside of the settling tank body (31). A filter screen clamp is fixedly connected to the bottom surface of the inner wall of the filter screen channel (34). (36) A filter screen clamping plate two (37) is fixedly connected to the top surface of the inner wall of the filter screen channel (34). Both the filter screen clamping plate one (36) and the filter screen clamping plate two (37) are provided with circular through holes. A connecting pipe one (310) is fixedly connected and connected to the settling tank (31). A connecting pipe two (311) is fixedly connected and connected to the outlet pipe (33). A pipeline on / off valve one is fixedly installed at the end of the connecting pipe one (310) near the settling tank (31). A pipeline on / off valve two is fixedly installed at the end of the connecting pipe two (311) near the outlet pipe (33). A speed measuring tube (312) is connected between the connecting pipe one (310) and the connecting pipe two (311). A flow meter is fixedly installed inside the speed measuring tube (312). A pump (313) is fixedly installed at the end of the connecting pipe two (311) near the speed measuring tube (312). The CH4-MBfR main reactor (9) is connected to the MABR main reactor (4) by an intermediate water storage tank (6), a water supply pipe (2) (5) (5) (6) (6) (6) (7) (7) (6) (7) (8) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (11) (10) (11) (11) (9) (9) (11) (12) (13) (14) (15) (16) (17) (18) (19) (19) (19) (2 ...

3. The wastewater treatment apparatus according to claim 2, characterized in that, The filter mechanism (12) includes a channel cover plate (121), a mechanism connecting plate (124) is fixedly connected to one end face of the channel cover plate (121), a filter screen hoop ring (125) is fixedly connected to the mechanism connecting plate (124), a filter screen is fixedly connected to the filter screen hoop ring (125), a sealing ring (126) is fixedly connected to both the upper and lower ends of the filter screen hoop ring (125), and a cover sealing ring (123) corresponding to the opening of the filter screen channel (34) is fixedly connected to the channel cover plate (121).

4. The wastewater treatment apparatus according to claim 2, characterized in that, Fixed protrusions (35) are fixedly connected to both ends of the outer side of the filter channel (34). Corresponding mating protrusions (122) are fixedly connected to both ends of the channel cover plate (121). Threaded holes are opened on the fixed protrusions (35), and connecting through holes are opened through the mating protrusions (122). A screw is provided between the fixed protrusions (35) and the mating protrusions (122). The screw passes through the connecting through holes on the mating protrusions (122) and is threadedly connected to the threaded holes on the fixed protrusions (35).

5. The wastewater treatment apparatus according to claim 2, characterized in that, The gas balance mechanism (8) includes a storage tank (81), which is connected to a first connecting pipe (82) and a second connecting pipe (83). The storage tank (81) is connected to the CH4-MBfR main reactor (9) through the first connecting pipe (82) and the second connecting pipe (83). A first delivery pump (84) is fixedly installed on the first connecting pipe (82), and a second delivery pump (85) is fixedly installed on the second connecting pipe (83).

Citation Information

Patent Citations

  • A device for treating wastewater containing p-nitrophenol using a combination of MABR and CH4-MBfR.

    CN112062277B

  • Washing device and control method

    CN111676669A

  • MABR and CH4MBfR combined device for treating p-nitrophenol-containing wastewater

    CN112062277A

  • Anti-blocking water supply pipeline

    CN218719706U

  • MABR system for sewage treatment

    CN219539537U