Project bidding matching method and system

Through automated analysis of bidding project information and bidding company historical data, the bidding company's strength assessment and project matching is solved, and the problems of high labor consumption and low winning rate during the bidding process are improved, and the bid success rate is improved.

CN120450837AInactive Publication Date: 2025-08-08CHINA RAILWAY FIRST GROUP CO LTD +4
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202510518059.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-04-24
Publication Date
2025-08-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, the bid matching process requires a lot of manpower and requires high strength of bidders, making it difficult to efficiently ensure the chance of winning.

Method used

By obtaining bidding project information from various regions, analyzing project types and bidding requirements, and combining the bidding company's past project experience, it automatically matches the project index of the bidding company, and realizes the numerical comparison of bidding requirements with the company's strength, ensuring the chance of winning.

Benefits of technology

It has achieved automated bid matching, reduced labor consumption, increased the chance of winning bids, and reduced the requirements for understanding the strength of bidders.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120450837A_ABST
    Figure CN120450837A_ABST
Patent Text Reader

Abstract

The invention discloses a project bidding matching method and system, and the method comprises the steps: obtaining the bidding project information of each region, extracting a project type according to the bidding project information, and screening out a proper to-be-bid project through combining the previous projects of a to-be-bid company; extracting bid invitation content of the to-be-bid invitation project to obtain a bidding requirement of the to-be-bid invitation project and an evaluation standard corresponding to the bidding requirement; previous project experience of a company to be bid is obtained, and project indexes of the company to be bid and corresponding index indexes are obtained according to the project experience; and matching the bidding requirements of the to-be-bid-invitation project and the corresponding evaluation standard with the project index of the to-be-bid-invitation company and the corresponding index, and determining the bidding winning probability of bidding. According to the method, numerical representation is performed on strength of a bidding company through previous project experience, and bidding matching is automatically completed in combination with requirements of a bidding project, so that the bidding winning probability of bidding is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of bidding management systems, and in particular to a project bidding matching method and system. Background Art

[0002] Project bidding is one of the primary ways to secure projects. It involves obtaining project information through various channels, matching the project requirements with the actual bidding companies, and then preparing bid documents to complete the project bidding. Typically, companies have dedicated bidding departments to manage bidding matters and follow up on bidding projects. These steps are performed at the start of the bidding process, and after completing the bidding process, bidders await the results. Therefore, the bid matching process requires significant manpower and requires a thorough understanding of the bidding companies' capabilities to properly match the project. This places extremely high demands on bidders. Summary of the Invention

[0003] The technical problem to be solved by the present invention is to address the deficiencies in the above-mentioned existing technologies and provide a project bid matching method and system, which numerically represents the strength of the bidding companies through past project experience, and automatically completes the bid matching in combination with the requirements of the bidding project to ensure the chance of winning the bid.

[0004] To solve the above technical problems, the present invention adopts a technical solution: a project bid matching method and system, comprising:

[0005] A project bid matching method, comprising:

[0006] Obtain bidding project information in various regions, extract project types based on the bidding project information, and screen out suitable projects based on the previous projects of the bidding companies;

[0007] Extracting the bidding content of the project to be bid, obtaining the bidding requirements of the project to be bid and the evaluation criteria corresponding to the bidding requirements;

[0008] Obtaining previous project experience of the company to be bid, and obtaining the project indicators and corresponding indicator indexes of the company to be bid based on the project experience;

[0009] The bidding requirements and corresponding evaluation criteria of the project to be tendered are matched with the project indicators and corresponding indicator indexes of the company to be tendered to determine the probability of winning the bid.

[0010] Furthermore, extracting the project type based on the bidding project information includes:

[0011] Converting the bidding project information into text format;

[0012] Extracting the bidding project name from the bidding project information;

[0013] Decomposing the bidding project name into words using a stop word list;

[0014] According to the part of speech and position of each word, the project type in the bidding project information is obtained.

[0015] Furthermore, the project type is extracted based on the bidding project information, and suitable projects to be bid are screened out in combination with the previous projects of the bidding company, including:

[0016] Based on the project type in the bidding project information, select projects of the same type from the previous projects of the bidding company;

[0017] When the number of screened projects is not less than the set number of projects, output the projects to be tendered corresponding to the tender project information;

[0018] When the number of screened projects is less than the set number of projects, the projects to be tendered corresponding to the tender project information are deleted.

[0019] Furthermore, extracting the bidding content of the project to be tendered to obtain the bidding requirements of the project to be tendered and the evaluation criteria corresponding to the bidding requirements include:

[0020] Convert the bidding content of the project to be tendered into text format;

[0021] Split the bidding requirements in the bidding content of the project to be bid according to the set keywords to obtain paragraphs of each bidding requirement;

[0022] Decompose the paragraph of the bidding requirement using a stop word list to obtain individual words;

[0023] According to the part of speech and position of each word, combined with the bidding requirement database, the evaluation criteria corresponding to the bidding requirement are obtained;

[0024] The bidding requirement database is used to store various evaluation indicators of the bidding requirements and the words corresponding to each evaluation indicator.

[0025] Furthermore, the evaluation criteria corresponding to the bidding requirements are obtained based on the part of speech and position of each word in combination with the bidding requirements database, including:

[0026] According to the words corresponding to the evaluation indicators in the bidding requirements database, filter out the words in the paragraphs of the bidding requirements that are the same as the words corresponding to the evaluation indicators;

[0027] According to the positions of the identical words, the sentences containing the identical words are selected;

[0028] According to the part of speech of each word in the sentence where the same word is located, the evaluation criteria corresponding to the bidding requirements are obtained.

[0029] Furthermore, the acquisition of previous project experience of the company to be bid, and obtaining the project indicators and corresponding indicator indexes of the company to be bid based on the project experience, include:

[0030] Obtain the completion status of previous projects of the bidding company, each of the previous projects corresponds to a completion status, and each complete status constitutes the project experience;

[0031] Extracting a project completion report from the completion status and converting the project completion report into a text format;

[0032] Extracting project indicators and corresponding indicator indexes corresponding to the completion status from the project completion report;

[0033] The project indicators and corresponding indicator indexes corresponding to the various completion conditions are combined to obtain the project indicators and corresponding indicator indexes of the company to be bid.

[0034] Furthermore, the bidding requirements and corresponding evaluation criteria of the project to be tendered are matched with the project indicators and corresponding indicator indices of the company to be tendered to determine the probability of winning the bid, including:

[0035] Comparing the bidding requirements of the project to be tendered and the project indicators of the company to be tendered with a synonym comparison method to obtain the degree of similarity between the two;

[0036] Screening out the bidding requirements and project indicators whose degree of similarity exceeds a set value;

[0037] Comparing the selected bidding requirements and corresponding evaluation criteria with the selected project indicators and corresponding indicator indices to obtain a comparison result;

[0038] The probability of winning the bid is determined based on the result of the comparison.

[0039] Furthermore, the screened bidding requirements and corresponding evaluation criteria are compared with the screened project indicators and corresponding indicator indices to obtain comparison results, including:

[0040] Determining whether the index is within the range of the evaluation criteria based on the selected bidding requirements and corresponding evaluation criteria, and the selected project indicators and corresponding indicator indices;

[0041] When the indicator index is within the range of the evaluation standard, the comparison result is within the evaluation range;

[0042] When the indicator index is not within the range of the evaluation standard, the comparison result is not within the evaluation range, and a deviation value of the indicator index from the evaluation standard is given.

[0043] A project bidding matching system, comprising:

[0044] The module for acquiring projects to be tendered is used to obtain information on tendered projects in various regions, extract project types based on the information, and screen out suitable projects to be tendered based on the previous projects of the companies to be tendered.

[0045] A module for obtaining requirements of a project to be tendered, configured to extract the tender content of the project to be tendered, obtain the tender requirements of the project to be tendered and the evaluation criteria corresponding to the tender requirements;

[0046] The bidding company project evaluation module is used to obtain the previous project experience of the bidding company and obtain the project indicators and corresponding indicator index of the bidding company based on the project experience;

[0047] The bidding matching module is used to match the bidding requirements and corresponding evaluation criteria of the project to be bid, with the project indicators and corresponding indicator indexes of the company to be bid, to determine the winning probability of the bid.

[0048] Compared with the prior art, the present invention has the following advantages:

[0049] The present invention provides a project bid matching method and system, which automatically obtains bidding project information from various regions, analyzes the bidding project information, obtains its bidding requirements and corresponding evaluation standards, evaluates bidding companies based on previous projects, obtains project indicators and corresponding indicator indexes, uses previous project experience to numerically represent the strength of the bidding companies, and then compares the two based on the numerical values, automatically completes bid matching, and ensures the chance of winning the bid.

[0050] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 The present invention provides a schematic diagram of the overall process of a project bidding matching method.

[0052] Figure 2 This is a schematic diagram of the overall structure of a project bidding matching system provided by the present invention. DETAILED DESCRIPTION

[0053] like Figure 1-2 As shown, the present invention provides a project bid matching method and system, including a project bid matching method and a project bid matching system based on the project bid matching method. The system and method are matched and based on the same inventive concept. The system and method are introduced separately below.

[0054] A project bid matching method includes the following steps:

[0055] Step 1: Obtain bidding project information in various regions, extract project types based on the bidding project information, and screen out suitable projects based on the previous projects of the bidding company;

[0056] Step 2: Extract the bidding content of the project to be tendered to obtain the bidding requirements of the project to be tendered and the evaluation criteria corresponding to the bidding requirements;

[0057] Step 3: Obtain the previous project experience of the company to be bid, and obtain the project indicators and corresponding indicator index of the company to be bid based on the project experience;

[0058] Step 4: Match the bidding requirements and corresponding evaluation criteria of the project to be tendered with the project indicators and corresponding indicator indexes of the company to be tendered to determine the chance of winning the bid.

[0059] The present invention automatically obtains the bidding project information of various regions, analyzes the bidding project information, obtains its bidding requirements and corresponding evaluation standards, evaluates the bidding companies based on previous projects, obtains project indicators and corresponding indicator indexes, uses the previous project experience to numerically represent the strength of the bidding companies, and then compares the two based on the numerical values, automatically completes the bidding matching, and ensures the chance of winning the bid.

[0060] Below, we introduce each step in detail.

[0061] In step 1, the bidding project information of each region is obtained, and the project type is extracted based on the bidding project information. The appropriate bidding projects are screened out in combination with the previous projects of the bidding companies.

[0062] Among them, to obtain the bidding project information of various regions, you can enter multiple bidding websites and the system will regularly access to obtain the bidding project information. You can also use a web crawler program to automatically obtain the bidding project information on the Internet. The bidding project information obtained may be more than one, but multiple. After the bidding project information is released, proceed to the subsequent work.

[0063] The step of extracting the project type based on the bidding project information includes:

[0064] Converting the bidding project information into text format;

[0065] Extracting the bidding project name from the bidding project information;

[0066] Decomposing the bidding project name into words using a stop word list;

[0067] According to the part of speech and position of each word, the project type in the bidding project information is obtained.

[0068] The present invention converts the bidding project information into a text format, and obtains the project type by processing the text format. The project type is the construction object of the project, including road construction, tunnel construction, bridge construction and other project types. Among them, the bidding project names are, for example: 1. Urban road and bridge engineering 2. Water supply engineering and pipe network transformation 3. Drainage engineering and pipe network transformation 4. Power supply facility engineering and power grid transformation, etc. The stop word list can adopt the "Harbin Institute of Technology Stop Word List", disconnect each word, and then according to the magnetism of the word, this can be obtained from a word database, such as a dictionary. After obtaining, the part of speech of the word is extracted, and combined with the position where the word appears, generally at the head or tail of the bidding project name, the project type in the bidding project information can be obtained. With this basis, the following work can be carried out.

[0069] The project type is extracted based on the bidding project information, and suitable projects to be bid are screened out based on the previous projects of the bidding company, including:

[0070] Based on the project type in the bidding project information, select projects of the same type from the previous projects of the bidding company;

[0071] When the number of screened projects is not less than the set number of projects, output the projects to be tendered corresponding to the tender project information;

[0072] When the number of screened projects is less than the set number of projects, the projects to be tendered corresponding to the tender project information are deleted.

[0073] After obtaining the project type in the bidding project information, the present invention can match it with the bidding company's previous projects. For example, if the project type in the bidding project information is to build a hydropower station, the bidding company's previous projects for building a hydropower station can be found, that is, projects that are consistent with the project type. Since the company has experience in multiple projects, the chance of winning the bid after bidding is greater. The number of projects set in the present invention is generally 3, which can be modified according to actual conditions and can also be set to 1 or 2.

[0074] In step 2, the bidding content of the project to be tendered is extracted to obtain the bidding requirements of the project to be tendered and the evaluation criteria corresponding to the bidding requirements. This is to extract the text of the bidding content of the project to be tendered, specifically, by the following methods:

[0075] Convert the bidding content of the project to be tendered into text format;

[0076] Split the bidding requirements in the bidding content of the project to be bid according to the set keywords to obtain paragraphs of each bidding requirement;

[0077] Decompose the paragraph of the bidding requirement using a stop word list to obtain individual words;

[0078] According to the part of speech and position of each word, combined with the bidding requirement database, the evaluation criteria corresponding to the bidding requirement are obtained;

[0079] The bidding requirement database (which is pre-established) is used to store various evaluation indicators of the bidding requirements and the words corresponding to each evaluation indicator.

[0080] The present invention also processes the content of the bidding content by text processing, wherein the keywords are pre-set, and the keywords are the names of the bidding requirements and their synonyms. When the keywords are detected, they are split, so that the paragraphs of the various bidding requirements can be obtained, such as construction experience, construction efficiency, engineering quality, etc. For the evaluation criteria corresponding to the bidding requirements, we adopt a quantitative approach, evaluate the evaluation criteria according to the industry standards of construction, and express the evaluation criteria in the form of numerical ranges. For example, the construction period of a hydropower station is generally 2 years. If the evaluation criteria are required to be 3 years (greater than 2 years), then the numerical range of the evaluation criteria is defined as 2-3 years. If the evaluation criteria are required to be 2 years (equal to 2 years), then the numerical range of the evaluation criteria is defined as 2 years. If the evaluation criteria are required to be 1.8 years (less than 2 years), then the numerical range of the evaluation criteria is defined as 1.8-2 years. This concept needs to be used when comparing in the future. At this point, what we need to do is to make the evaluation criteria corresponding to the bidding requirements correspond.

[0081] The evaluation criteria corresponding to the bidding requirements are obtained based on the part of speech and position of each word in combination with the bidding requirements database, including:

[0082] According to the words corresponding to the evaluation indicators in the bidding requirements database, filter out the words in the paragraphs of the bidding requirements that are the same as the words corresponding to the evaluation indicators;

[0083] According to the positions of the identical words, the sentences containing the identical words are selected;

[0084] According to the part of speech of each word in the sentence where the same word is located, the evaluation criteria corresponding to the bidding requirements are obtained.

[0085] The present invention provides the source of the evaluation criteria. Generally, the evaluation criteria corresponding to the bidding requirements can be known based on the coherence of the sentences. Generally, there will be a numerical value after the bidding requirements as the evaluation criteria.

[0086] In step 3, the previous project experience of the company to be bid is obtained, and the project indicators and corresponding indicator indexes of the company to be bid are obtained based on the project experience, including:

[0087] Obtain the completion status of previous projects of the bidding company, each of the previous projects corresponds to a completion status, and each complete status constitutes the project experience;

[0088] Extracting a project completion report from the completion status and converting the project completion report into a text format;

[0089] Extracting project indicators and corresponding indicator indexes corresponding to the completion status from the project completion report;

[0090] The project indicators and corresponding indicator indexes corresponding to the various completion conditions are combined to obtain the project indicators and corresponding indicator indexes of the company to be bid.

[0091] In the present invention, step 3 is an analysis of the bidding company's situation. Projects completed outside the bidding company are analyzed through analysis reports to determine project indicators and indexes. Generally, project indicators are the aforementioned indicator requirements, and indexes determine whether they fall within the assessment criteria. These indicators are expressed numerically, as detailed later. This step is used to map the project indicators and indexes of the bidding company. Text processing is still used, but for multiple projects, each project will have a project completion report. To demonstrate the bidding company's overall strength, data is extracted from multiple projects, and the project indicators and indexes corresponding to each completion status are merged to obtain the project indicators and indexes of the bidding company. This merging process first obtains the project indicators and indexes per unit area for each project. Then, the project indicators and indexes per unit area for each project are selected and merged. The indexes that meet the criteria (this criterion is calculated as a percentage, and the top 50% of the data can be used) can be selected. The merging method can be to remove the median or mode, or to calculate the average.

[0092] In step 4, the bidding requirements and corresponding evaluation criteria of the project to be tendered are matched with the project indicators and corresponding indicator indices of the bidding company to determine the winning probability of the bid, including the following methods:

[0093] Comparing the bidding requirements of the project to be tendered and the project indicators of the company to be tendered with a synonym comparison method to obtain the degree of similarity between the two;

[0094] Screening out the bidding requirements and project indicators whose degree of similarity exceeds a set value;

[0095] Comparing the selected bidding requirements and corresponding evaluation criteria with the selected project indicators and corresponding indicator indices to obtain a comparison result;

[0096] The probability of winning the bid is determined based on the result of the comparison.

[0097] Based on the data obtained above, this step of the present invention compares and processes the data, wherein the synonym comparison method is to query the synonyms of the bidding requirements and project indicators in the dictionary respectively, and then query the synonyms of the synonyms of the bidding requirements and project indicators. If after three rounds of query, if the synonyms of the two are one word, it is determined that the degree of synonymy between the two is low. If after two rounds of query, if the synonyms of the two are one word, it is determined that the degree of synonymy between the two is average. If after one round of query or no query, if the synonyms of the two are one word, it is determined that the degree of synonymy between the two is high, and these degrees are assigned values. The value of high degree of synonymy is 90%, the value of average degree of synonymy is 80%, and the value of low degree of synonymy is 50%. The set value in this step is 60%. After having this basis, we compare them. As mentioned above, the evaluation standard is a range value, and the index is a numerical value. Therefore, by comparing the index with the evaluation standard, we can determine whether it is within the range. If it is within the range, the chance of winning the bid is very high. If not, the chance of winning the bid will be reduced. The following is the process of comparing and obtaining the comparison results, that is, comparing the selected bidding requirements and corresponding evaluation standards with the selected project indicators and corresponding indexes, and obtaining the comparison results, including:

[0098] Determining whether the index is within the range of the evaluation criteria based on the selected bidding requirements and corresponding evaluation criteria, and the selected project indicators and corresponding indicator indices;

[0099] When the indicator index is within the range of the evaluation standard, the comparison result is within the evaluation range;

[0100] When the indicator index is not within the range of the evaluation standard, the comparison result is not within the evaluation range, and a deviation value of the indicator index from the evaluation standard is given.

[0101] In the present invention, there are two comparison results: one is within the scope of the evaluation criteria, and the other is not within the scope of the evaluation criteria. For the case of being within the scope of the evaluation criteria, it means that the actual situation of the bidding company meets the requirements of the tender and the winning bid is high. For the case of not being within the scope of the evaluation criteria, it means that the actual situation of the bidding company is somewhat different from the requirements of the tender. The difference between the two values is the deviation value from the range, which is the deviation value of the index index from the evaluation criteria, which is the discount ratio for the winning bid probability. Generally, the deviation value of the index index from the evaluation criteria is inversely proportional to the discount ratio for the winning bid probability. The larger the deviation value, the smaller the discount ratio. This ratio is pre-set according to the bidding requirements and corresponds one-to-one with the deviation value. The discount ratio is combined with the winning bid probability through multiplication. Of course, in actual work, each bidding requirement needs to be weighted to obtain the final winning bid probability. The setting of the weight is also pre-set according to the needs of the bidding and the actual situation of the industry.

[0102] Based on the above-mentioned project bid matching method, the present invention proposes a project bid matching system, which is used as an execution unit to execute the project bid matching method. The method and system are based on the same inventive concept. The project bid matching system includes:

[0103] The module for acquiring projects to be tendered is used to obtain information on tendered projects in various regions, extract project types based on the information, and screen out suitable projects to be tendered based on the previous projects of the companies to be tendered.

[0104] A module for obtaining requirements of a project to be tendered, configured to extract the tender content of the project to be tendered, obtain the tender requirements of the project to be tendered and the evaluation criteria corresponding to the tender requirements;

[0105] The bidding company project evaluation module is used to obtain the previous project experience of the bidding company and obtain the project indicators and corresponding indicator index of the bidding company based on the project experience;

[0106] The bidding matching module is used to match the bidding requirements and corresponding evaluation criteria of the project to be bid, with the project indicators and corresponding indicator indexes of the company to be bid, to determine the winning probability of the bid.

[0107] The above modules coordinate with each other and perform their respective tasks to complete various steps of a project bidding matching method.

[0108] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent structural change made to the above embodiment based on the technical essence of the present invention shall still fall within the scope of protection of the technical solution of the present invention.

Claims

1. A project bid matching method, characterized in that: include: Obtain bidding project information in various regions, extract project types based on the bidding project information, and screen out suitable projects based on the previous projects of the bidding companies; Extracting the bidding content of the project to be bid, obtaining the bidding requirements of the project to be bid and the evaluation criteria corresponding to the bidding requirements; Obtaining previous project experience of the company to be bid, and obtaining the project indicators and corresponding indicator indexes of the company to be bid based on the project experience; The bidding requirements and corresponding evaluation criteria of the project to be tendered are matched with the project indicators and corresponding indicator indexes of the company to be tendered to determine the probability of winning the bid.

2. A project bidding matching method according to claim 1, characterized in that: The project type is extracted based on the bidding project information, including: Converting the bidding project information into text format; Extracting the bidding project name from the bidding project information; Decomposing the bidding project name into words using a stop word list; According to the part of speech and position of each word, the project type in the bidding project information is obtained.

3. A project bid matching method according to claim 2, characterized in that: The project type is extracted based on the bidding project information, and suitable projects to be bid are screened out based on the previous projects of the bidding company, including: Based on the project type in the bidding project information, select projects of the same type from the previous projects of the bidding company; When the number of screened projects is not less than the set number of projects, output the projects to be tendered corresponding to the tender project information; When the number of screened projects is less than the set number of projects, the projects to be tendered corresponding to the tender project information are deleted.

4. A project bidding matching method according to claim 1, characterized in that: Extracting the bidding content of the project to be tendered to obtain the bidding requirements of the project to be tendered and the evaluation criteria corresponding to the bidding requirements include: Convert the bidding content of the project to be tendered into text format; Split the bidding requirements in the bidding content of the project to be bid according to the set keywords to obtain paragraphs of each bidding requirement; Decompose the paragraph of the bidding requirement using a stop word list to obtain individual words; According to the part of speech and position of each word, combined with the bidding requirement database, the evaluation criteria corresponding to the bidding requirement are obtained; The bidding requirement database is used to store various evaluation indicators of the bidding requirements and the words corresponding to each evaluation indicator.

5. A project bidding matching method according to claim 4, characterized in that: The evaluation criteria corresponding to the bidding requirements are obtained based on the part of speech and position of each word in combination with the bidding requirements database, including: According to the words corresponding to the evaluation indicators in the bidding requirements database, filter out the words in the paragraphs of the bidding requirements that are the same as the words corresponding to the evaluation indicators; According to the positions of the identical words, the sentences containing the identical words are selected; According to the part of speech of each word in the sentence where the same word is located, the evaluation criteria corresponding to the bidding requirements are obtained.

6. A project bid matching method according to claim 1, characterized in that: The obtaining of the previous project experience of the company to be bid, and obtaining the project indicators of the company to be bid and the corresponding indicator index based on the project experience, include: Obtain the completion status of previous projects of the bidding company, each of the previous projects corresponds to a completion status, and each complete status constitutes the project experience; Extracting a project completion report from the completion status and converting the project completion report into a text format; Extracting project indicators and corresponding indicator indexes corresponding to the completion status from the project completion report; The project indicators and corresponding indicator indexes corresponding to the various completion conditions are combined to obtain the project indicators and corresponding indicator indexes of the company to be bid.

7. A project bidding matching method according to claim 1, characterized in that: The matching of the bidding requirements and corresponding evaluation criteria of the project to be tendered with the project indicators and corresponding indicator indexes of the company to be tendered to determine the probability of winning the bid includes: Comparing the bidding requirements of the project to be tendered and the project indicators of the company to be tendered with a synonym comparison method to obtain the degree of similarity between the two; Screening out the bidding requirements and project indicators whose degree of similarity exceeds a set value; Comparing the selected bidding requirements and corresponding evaluation criteria with the selected project indicators and corresponding indicator indices to obtain a comparison result; The probability of winning the bid is determined based on the result of the comparison.

8. A project bid matching method according to claim 7, characterized in that: The screened bidding requirements and corresponding evaluation criteria are compared with the screened project indicators and corresponding indicator indices to obtain comparison results, including: Determining whether the index is within the range of the evaluation criteria based on the selected bidding requirements and corresponding evaluation criteria, and the selected project indicators and corresponding indicator indices; When the indicator index is within the range of the evaluation standard, the comparison result is within the evaluation range; When the indicator index is not within the range of the evaluation standard, the comparison result is not within the evaluation range, and a deviation value of the indicator index from the evaluation standard is given.

9. A project bidding matching system, characterized in that: include: The module for acquiring projects to be tendered is used to obtain information on tendered projects in various regions, extract project types based on the information, and screen out suitable projects to be tendered based on the previous projects of the companies to be tendered. A module for obtaining requirements of a project to be tendered, configured to extract the tender content of the project to be tendered, obtain the tender requirements of the project to be tendered and the evaluation criteria corresponding to the tender requirements; The bidding company project evaluation module is used to obtain the previous project experience of the bidding company and obtain the project indicators and corresponding indicator index of the bidding company based on the project experience; The bidding matching module is used to match the bidding requirements and corresponding evaluation criteria of the project to be bid, with the project indicators and corresponding indicator indexes of the company to be bid, to determine the winning probability of the bid.

Citation Information

Patent Citations

  • AI bidding automatic scoring method and system and storage medium

    CN114492368A

  • Method, device and medium for reviewing bidding document

    CN114595661A

  • Bidding-winning object recommendation method and device and computer readable storage medium

    CN116071124A

  • Intelligent current bid evaluation project system and method based on multi-level scoring logic

    CN119294646A

  • Bidding item recommendation method and device, equipment, medium and product

    CN119313425A