A method for controlling settlement and deformation of the transition section between railway turnout area and road bridge in railway station yard

By setting track slabs in the transition section between the road and the bridge and having them share the load with the frame bridge, and by combining this with the segmented cast-in-place construction of the temporary beam structure, the problem of turnout track deformation caused by uneven settlement between the bridge and the roadbed was solved, thus improving the safety of railway operation.

CN120486181BActive Publication Date: 2026-11-17CHINA RAILWAY SHANGHAI DESIGN INST GRP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202510867351.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-06-26
Publication Date
2026-11-17
Estimated Expiration
2045-06-26

AI Technical Summary

Technical Problem

Uneven settlement of bridges and roadbeds caused by urban construction can lead to track deformation exceeding permissible limits, potentially causing train derailment accidents.

Method used

Track slabs are installed in the roadbed section of the road-bridge transition section and are made to share the load with the frame bridge section. By installing track slabs in the roadbed section to cover the entire length of the turnout, and combining them with the temporary beam structure for segmented cast-in-place construction, the track slabs and the frame bridge are ensured to share the load synchronously.

Benefits of technology

Effectively control the settlement and deformation of the transition section between the turnout and the road bridge, prevent the turnout track deformation from exceeding the allowable value, and improve the safety of railway operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120486181B_ABST
    Figure CN120486181B_ABST
Patent Text Reader

Abstract

This invention relates to the field of frame bridge structure technology, and in particular to a method for controlling settlement and deformation of the transition section between the road and bridge in a railway station turnout area. A track slab is installed within the roadbed section corresponding to the turnout location, supported beneath the turnout and covering its entire length. The top slab of the frame bridge directly bears the railway live load of the bridge section. Corbels are installed on both sides of the frame bridge, prefabricated synchronously with the frame bridge to form an integral structure, bearing the track slab and its upper load. A concrete pad is placed beneath the track slab. The advantages of this invention are: strong practicality; the use of track slabs in the transition section solves the problem of uneven settlement between the road and bridge, leading to track deformation exceeding allowable values ​​when the frame bridge passes under a railway station turnout area. The track slab is made of steel fiber reinforced concrete, and its installation must cover the entire length of the turnout. It is implemented through segmented open-cut and cast-in-place construction after reinforcing the line with temporary beams; it has high promotion and application value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of frame bridge structure technology, and in particular to a method for controlling the settlement and deformation of the transition section between railway turnout areas and bridges in railway stations. Background Technology

[0002] When a train enters a station, it often needs to switch from one track to another. This track connection device is called a turnout. Turnouts are one of the weakest links in the track, and their static geometric dimensions require high precision. Due to scheduling needs, a large number of turnouts are laid in the throat area of ​​railway stations. Turnouts are generally laid entirely on top of the roadbed or entirely on top of bridges.

[0003] With the rapid development of urban construction, when urban roads pass under railway stations, there are often situations where part of the turnout is located on the bridge structure and part is located on the adjacent roadbed structure. The bridge is a rigid structure and the roadbed is a flexible structure. Uneven settlement between the two can easily cause the turnout track deformation to exceed the allowable deviation management value, which can lead to serious accidents such as train derailment. Summary of the Invention

[0004] The purpose of this invention is to address the shortcomings of the prior art by providing a method for controlling the settlement and deformation of the transition section between railway turnouts and bridges in railway stations. This method involves adding a track slab at the roadbed section of the transition section and having the track slab and the frame bridge section work together to bear the load, thereby solving the problem of uneven settlement between rigid and flexible structures causing the turnout track deformation to exceed the allowable value.

[0005] The objective of this invention is achieved through the following technical solutions: A method for controlling settlement and deformation of a road-bridge transition section in a railway station turnout area, wherein the railway line of the railway station passes through a road-bridge transition section, the transition section comprising a frame bridge section and a roadbed section, the frame bridge section being a frame bridge passing under the railway line, and the roadbed section located on both sides of the frame bridge section along the line direction, with turnouts installed within the roadbed section, characterized in that: a track slab is installed in the roadbed section corresponding to the position of the turnout, the track slab being supported below the turnout, and the track slab covering the entire length of the turnout; the top plate of the frame bridge directly bears the railway live load of the frame bridge section, corbels are installed on both sides of the frame bridge, the corbels being prefabricated synchronously with the frame bridge to form an integral structure, the corbels bearing the track slab and its upper load, and a concrete pad layer is installed below the track slab.

[0006] The track slab is constructed by segmented cast-in-place casting without interrupting the operation of the railway line.

[0007] Longitudinal beams are constructed on both sides of the railway line in a direction parallel to the railway line. The bottom ends of the longitudinal beams are supported by temporary supports. Cross beams are set between the longitudinal beams to connect them. The railway live load is transferred to the temporary supports and then to the ground. The longitudinal beams, the cross beams and the temporary supports are combined to form a temporary beam structure. The track slab is constructed under the temporary support of the temporary beam structure.

[0008] When the track slab is cast in sections, after one section of track slab is cast, the longitudinal beam is moved along the track direction, and then the track is excavated and the next section of track slab is cast.

[0009] The frame bridge and the corbels on both sides are made of reinforced concrete, prefabricated outside the railway line and jacked into the underside of the railway line.

[0010] During the casting of the track slab, the concrete cushion layer is used to support the formwork.

[0011] The advantages of this invention are: it has strong practicality; setting track slabs in the transition section between road and bridge can solve the problem of uneven settlement between the road and bridge causing track deformation exceeding the allowable value when a frame bridge passes under a railway station turnout area. The track slabs are made of steel fiber reinforced concrete, and their installation must cover the entire length of the turnout. After reinforcing the line with temporary beams, the project is implemented in sections using open-cut and cast-in-place methods; it has high value for promotion and application. Attached Figure Description

[0012] Figure 1 This is a layout plan view of the present invention; Figure 2 This is an elevation view of the layout of the present invention; Figure 3 This is a schematic diagram of construction step I in this invention; Figure 4 This is a schematic diagram of construction step II in this invention; Figure 5 This is a schematic diagram of construction step III in this invention. Detailed Implementation

[0013] The features and other related features of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments, so as to facilitate understanding by those skilled in the art: like Figure 1-5 As shown in the figure, 1-16 represent: the center line of the first railway line 1, the center line of the second railway line 2, the center line of the third railway line 3, the center line of the fourth railway line 4, the center line of the fifth railway line 5, the center line of the sixth railway line 6, the center line of the seventh railway line 7, the track slab 8, the frame bridge 9, the corbel 10, the concrete cushion layer 11, the steel temporary beam 12, the temporary support pier of the temporary beam 13, the first turnout 14, the second turnout 15, and the third turnout 16.

[0014] Example: Figures 1 to 5 As shown, the method for controlling the settlement and deformation of the transition section between railway turnouts and bridges in this embodiment involves several railway lines. In this embodiment, the center lines include the first railway line centerline 1, the second railway line centerline 2, the third railway line centerline 3, the fourth railway line centerline 4, the fifth railway line centerline 5, the sixth railway line centerline 6, and the seventh railway line centerline 7. Between some of the lines, the line is switched through the corresponding first turnout 14, second turnout 15, and third turnout 16.

[0015] Each railway line is supported by a frame bridge 9, forming a rigidly supported frame bridge section on the top slab of the frame bridge 9, while the remaining railway lines are directly supported on a flexible roadbed section. Therefore, each railway line forms a road-bridge transition section in the area between the frame bridge 9 and its two sides. Consequently, uneven settlement deformation occurs at these road-bridge transition sections.

[0016] This embodiment specifically includes the following steps: 1) During the prefabrication of the frame bridge 9, corbels 10 are installed on both sides of the frame bridge 9. The corbels 10 are prefabricated simultaneously with the frame bridge 9 to form an integral structure. The top slab of the frame bridge 9 directly bears the railway live load of the frame bridge section. The frame bridge 9 is prefabricated outside the railway line and is jacked into place under the railway line.

[0017] 2) Construct steel temporary beams 12 and temporary beam supports 13 at the locations of the second railway line centerline 2, third railway line centerline 3, and fourth railway line centerline 4, which involve the first turnout 14, the second turnout 15, and the third turnout 16. The steel temporary beam 12 includes longitudinal beams and transverse beams. Longitudinal beams are constructed on both sides of the railway line in a direction parallel to the railway line. Temporary beam supports 13 are constructed at the bottom of both ends of the longitudinal beams. Transverse beams connect the temporary beams, allowing the live load of the railway in the corresponding turnout area to be transferred to the temporary beam supports 13 and then to the ground. The steel temporary beams 12 and temporary beam supports 13 together constitute the temporary beam structure.

[0018] In this embodiment, the temporary steel beam 12 can be made of steel, with D16 and D24 beams being commonly used. The temporary support pier 13 for the temporary beam is made of reinforced concrete and is located beside the track.

[0019] 3) Excavation is carried out under the temporary reinforcement support of the temporary beam structure along the railway line to reserve an area for the cast-in-place construction of track slab 8.

[0020] 4) The track slab 8 is constructed using segmented cast-in-place construction, covering the entire length of each turnout. Under the design requirements, a concrete subbase 11 is constructed on the roadbed. This subbase 11 is made of plain concrete and serves as the formwork for casting the track slab 8, while also leveling and hardening the site. The first track slab section is cast on the concrete subbase 11, with the casting supported by temporary steel beams 12.

[0021] 5) Position the movable steel beam 12 so that it corresponds to the pouring range of the second track slab, ensuring that the railway line above can always be operated; excavate the corresponding section of the second track slab; pour the second track slab.

[0022] 6) Move the steel temporary beam 12 back and forth and excavate the track slabs section by section. At this time, the corbels 10 on both sides of the frame bridge 9 bear the load of the track slab 8 and its upper part, so that the track slab 8 and the frame bridge 9 are stressed together, thereby making the stiffness of the railway line under the frame bridge section and the roadbed section consistent, thus avoiding uneven settlement and deformation in the road-bridge transition section.

[0023] 7) Turnouts are pre-laid and pushed into the designated position within the track maintenance window.

[0024] Although the above embodiments have described the concept and embodiments of the present invention in detail with reference to the accompanying drawings, those skilled in the art will recognize that various improvements and modifications can still be made to the present invention without departing from the scope of the claims, and therefore will not be elaborated here.

Claims

1. A method for controlling settlement and deformation of a road-bridge transition section in a railway station turnout area, wherein the railway line of the railway station passes through a road-bridge transition section, the road-bridge transition section comprising a frame bridge section and a roadbed section, the frame bridge section being a frame bridge passing under the railway line, the roadbed section being located on both sides of the frame bridge section along the line direction, and a turnout being installed within the area of ​​the roadbed section, characterized in that: A track slab is installed at the location corresponding to the turnout within the roadbed section. The track slab supports the turnout and covers its entire length. The top slab of the frame bridge directly bears the railway live load of the frame bridge section. Corbels are installed on both sides of the frame bridge. The corbels are prefabricated simultaneously with the frame bridge to form an integral structure. One end of the track slab overlaps the corbel, and the corbel bears the track slab and its upper load. A concrete pad is provided below the track slab. The track slab is installed without interrupting the operation of the railway line. The track slab is constructed using a segmented cast-in-place method. Longitudinal beams are constructed on both sides of the railway line in a direction parallel to the railway line. The bottom ends of the longitudinal beams are supported by temporary supports. Crossbeams connect the longitudinal beams, and the railway live load is transferred to the temporary supports and then to the ground. The longitudinal beams, crossbeams, and temporary supports together form a temporary beam structure. The track slab is constructed under the temporary support of this temporary beam structure. When the track slab is cast in segments, after one section of track slab is cast, the longitudinal beam is moved along the line direction, and then the track is excavated below the line and the next section of track slab is cast.

2. The method for controlling settlement and deformation of the transition section between railway turnouts and bridges in a railway station area according to claim 1, characterized in that: The frame bridge and the corbels on both sides are made of reinforced concrete, prefabricated outside the railway line and jacked into the underside of the railway line.

3. The method for controlling settlement and deformation of the transition section between railway turnout areas and bridges in railway stations according to claim 1, characterized in that: During the casting of the track slab, the concrete pad layer is used to support the formwork.

Citation Information

Patent Citations

  • Design and construction method of track-laying base bridge

    CN114875771A

  • Ballastless track road and bridge transition structure, design method and construction method

    CN115852810A