Processing equipment and processing technology for wick-biased heat pipe
Through the shrinking pipe and brazing rod insertion process of the liquid absorbent core bias heat pipe processing equipment, the problem of unevenness of the liquid absorbent core caused by the random position of the brazing rod is solved, and high positioning accuracy and stable heat transfer performance of the heat pipe are achieved.
Patent Information
- Application Number
- CN202510894972.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-30
- Publication Date
- 2025-08-15
AI Technical Summary
The prior art cannot effectively solve the problem that the position of the brazing rod in the copper tube is very random, resulting in poor consistency of the structure and performance of the liquid absorbent core biased heat pipe, and cannot meet the processing requirements of high positioning accuracy.
The liquid-absorbent core bias heat pipe processing equipment is adopted, including a tube shrinking device, a rod insertion device and a sintering device. Through the precise shrinking tube and brazing rod insertion process, an eccentric tube section is formed and high-temperature sintering is carried out to form a liquid-absorbent core bias heat pipe.
The positioning accuracy of the brazing rod is improved, ensuring uniformity of the thickness of the liquid absorbent core, and improving the heat dissipation effect stability and overall heat transfer performance of the heat pipe.
Smart Images

Figure CN120488836A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of heat pipe processing equipment, and in particular to a liquid wick biased heat pipe processing equipment and a processing technology. Background Art
[0002] In the current computer hardware world, CPU cooling performance is crucial for stable operation and optimal performance. Currently, air cooling remains the mainstream cooling method for consumer-grade CPUs. Heat pipes, as key components in air-cooled cooling modules, are responsible for efficiently transferring heat generated by the CPU to the cooling fins. Their processing directly determines their heat transfer performance, which in turn affects the overall cooling effect of the entire cooling module.
[0003] The related art discloses a preparation method of a high-temperature heat pipe liquid wick, which includes the following steps: step 1, straightening the hollow tube shell, selecting a hollow tube shell and performing a straightening operation; step 2, winding the support layer, selecting a support layer, and winding the support layer on the central mold; step 3, fitting the support layer, inserting the central mold with the wrapped support layer into the hollow tube shell, and after the support layer is tightly fitted to the inner wall of the hollow tube shell, pulling out the central mold; step 4, installing the right plug, installing the right plug at the right end of the hollow tube shell; step 5, adjusting the size of the central mold, inserting the central mold into the hollow tube shell again, adjusting the size of the central mold, and determining the size of the gap between the central mold and the support layer; step 6, filling the porous layer material, adding metal, alloy powder or Fiber is filled in the gap between the central mold and the supporting layer, and the filler is the component material of the porous layer; step seven, installing the left plug, and installing the left plug on the left end of the hollow tube shell; step eight, high-temperature sintering, placing the assembly of the hollow tube shell, supporting layer, porous layer, central mold, left plug and right plug in a sintering furnace for high-temperature sintering, and introducing a reducing protective atmosphere or an inert protective atmosphere or vacuum sintering during the sintering process, and the supporting layer and the porous layer are metallurgically combined to form a high-temperature heat pipe liquid wick; step nine, removing the high-temperature heat pipe liquid wick, after the sintering operation is completed, first, remove the left plug and the right plug of the hollow tube shell assembly; then, remove the central mold; finally, remove the high-temperature heat pipe liquid wick from the hollow tube shell to complete the preparation of the high-temperature heat pipe liquid wick.
[0004] The positioning accuracy of the brazing rod in the copper tube mainly depends on the guarantee of the shrink tube side. The longer the shrink tube length and the smaller the difference between the brazing rod and the inner diameter of the shrink tube, the more fixed the position of the brazing rod, and the higher the consistency of the structure and performance of the heat pipes in the same batch. However, an overly long eccentric tube section will cause waste of raw materials. In actual production, the length of the eccentric tube section is limited, which causes a certain degree of randomness in the position of the brazing rod in the copper tube. The preparation method of the high-temperature heat pipe wick in the related art cannot realize the processing of such biased heat pipes. Summary of the Invention
[0005] In order to overcome the problem that the position of the brazing rod in the copper tube in the traditional preparation method is random due to excessive reliance on the shrinkage side, resulting in poor consistency in the structure and performance of heat pipes in the same batch and inability to meet the high positioning precision processing requirements of the brazing rod for the liquid wick biased heat pipe, the present application provides a liquid wick biased heat pipe processing equipment and processing technology.
[0006] The present application provides a wick biased heat pipe processing device and processing technology using the following technical solutions: In the first aspect, the present application discloses a liquid-wick biased heat pipe processing device, including a tube shrinking device, a rod insertion device and a sintering device; the tube shrinking device is used to shrink the tube to form an eccentric tube section; the rod insertion device is used to insert a brazing rod into the interior of the shrunken tube; the sintering device is used to perform high-temperature sintering on the tube with the brazing rod inserted and copper powder poured in to form a liquid-wick biased heat pipe.
[0007] By adopting the above technical solution, the liquid wick offset heat pipe processing equipment shrinks the tube through the tube shrinking device to form an eccentric tube section, providing a basis for the positioning of the braze rod; the rod insertion device accurately inserts the braze rod into the shrunken tube, overcoming the problem that the traditional braze rod positioning mainly relies on the guarantee of the tube shrinking side and the position is highly random, and effectively improves the positioning accuracy of the braze rod; the sintering device performs high-temperature sintering on the tube with the braze rod inserted and copper powder filled in to form a liquid wick offset heat pipe. The equipment works together with various devices to not only solve the problems of uneven liquid wick thickness caused by uncertain braze rod position, uneven liquid wick offset amount and offset direction of the same batch of heat pipe products, and affecting the stability of the heat dissipation effect, but also meet the liquid wick offset heat pipe's demand for high positioning accuracy of the braze rod, effectively reduce the thermal conductivity resistance of the heat pipe evaporation section, and improve the overall heat transfer performance of the heat pipe.
[0008] Optionally, the tube shrinking device includes a first frame, a first tube clamping mechanism, a first sliding seat, a first sliding drive mechanism, a second sliding seat, a second sliding drive mechanism, a lifting mechanism and a tube shrinking mechanism; the first tube clamping mechanism is arranged on the first frame for clamping and fixing the tube; the first sliding seat is slidably matched with the first frame; the first sliding drive mechanism is arranged on the first frame for driving the first sliding seat to move in a first direction; the second sliding seat is slidably matched with the first sliding seat; the second sliding drive mechanism is arranged on the first sliding seat for driving the second sliding seat to move in a second direction; the lifting seat is slidably matched with the second sliding seat; the lifting mechanism is arranged on the second sliding seat for driving the tube shrinking mechanism to rise and fall; the tube shrinking mechanism includes a plurality of tube shrinking mold sleeves, and the plurality of tube shrinking mold sleeves are fixed on a side of the lifting seat close to the first tube clamping mechanism, and the plurality of tube shrinking mold sleeves are arranged at intervals along the second direction.
[0009] By adopting the above technical solution, the tube shrinking device firmly clamps and fixes the tube through the first tube clamping mechanism, providing a stable foundation for subsequent tube shrinking operations; the first sliding seat is slidably coordinated with the first frame and driven by the first sliding drive mechanism to move along the first direction, the second sliding seat is slidably coordinated with the first sliding seat and driven by the second sliding drive mechanism to move along the second direction, and the tube shrinking mechanism is driven to rise and fall by the lifting mechanism. Through the cooperation of multi-dimensional sliding and lifting drive, the position of the tube shrinking mechanism in space can be flexibly adjusted; and the tube shrinking mechanism is provided with a plurality of tube shrinking mold sleeves arranged at intervals along the second direction and fixed on the side of the lifting seat close to the first tube clamping mechanism, which can accurately locate and select the appropriate tube shrinking mold sleeve to shrink the tube according to actual processing requirements, thereby effectively realizing the precise tube shrinkage of the specific position of the tube, forming an eccentric tube section that meets the processing requirements of the liquid absorption core offset heat pipe, improving the flexibility and accuracy of the tube shrinkage processing, and providing guarantee for the subsequent precise insertion of the brazing rod and the improvement of the overall performance of the heat pipe.
[0010] Optionally, the rod insertion device includes a second frame, a second tube clamping mechanism, a storage and unloading mechanism and a transfer insertion mechanism; the second tube clamping mechanism is arranged on the second frame, for clamping and fixing the tube after shrinkage; the storage and unloading mechanism is arranged on the second frame, for storing multiple drill rods at the same time and releasing a single drill rod in sequence; the transfer insertion mechanism is arranged on the second frame, located between the second tube clamping mechanism and the storage and unloading mechanism, for transferring the drill rods released by the storage and unloading mechanism to a side close to the second tube clamping mechanism in sequence, and for inserting the drill rods into the tube.
[0011] By adopting the above technical solution, the rod insertion device firmly clamps and fixes the shrunk pipe through the second pipe clamping mechanism on the second frame, providing reliable positioning for the drill rod insertion operation; the storage and unloading mechanism is arranged on the second frame, and has the function of storing multiple drill rods at the same time and releasing individual drill rods in sequence, ensuring the continuity and orderliness of the drill rod supply, and avoiding the inefficiency and operational errors caused by manual material retrieval one by one; the transfer insertion mechanism is located between the second pipe clamping mechanism and the storage and unloading mechanism, and not only plays the role of a bridge to sequentially transfer the drill rods released by the storage and unloading mechanism to the side close to the second pipe clamping mechanism, but also accurately completes the action of inserting the drill rod into the pipe. The three work together to realize the integrated automated operation process of the drill rod from storage, transfer to insertion into the pipe, which greatly improves the efficiency and accuracy of the drill rod insertion, and effectively solves the problem that the traditional drill rod insertion position is highly random, affecting the uniformity of the liquid absorption core and the heat transfer performance of the heat pipe.
[0012] Optionally, the second pipe clamping mechanism includes a first base, a second support base, a clamping block and a second lifting cylinder; the first base is fixed to the upper surface of the second frame, and the upper surface of the first base is provided with a third positioning groove and a fourth positioning groove that are connected to each other, the third positioning groove and the fourth positioning groove both extend along the first direction, the depth of the third positioning groove is greater than the depth of the fourth positioning groove, and both are semicircular grooves, the third positioning groove is used to position the original pipe section, and the fourth positioning groove is used to position the eccentric pipe section; the second support base is fixed to the second frame; the second lifting cylinder is fixed to the second support base, the piston rod of the second lifting cylinder passes through the second support base and slides with the second support base, the piston rod of the second lifting cylinder is fixedly connected to the clamping block, and the lower surface of the clamping block is provided with a fifth positioning groove and a sixth positioning groove, the fifth positioning groove is used to position the original pipe section, and the sixth positioning groove is used to position the eccentric pipe section, and the fifth positioning groove and the sixth positioning groove both extend along the first direction, are semicircular grooves, and the depth of the fifth positioning groove is greater than the depth of the sixth positioning groove.
[0013] By adopting the above technical solution, the second tube clamping mechanism preliminarily positions the original tube segment and the eccentric tube segment formed after the tube shrinkage by providing a semicircular third positioning groove and a fourth positioning groove of different depths, interconnected, and extending in the first direction on the upper surface of the first base. The positioning grooves are used to adapt to the characteristics of different tube segments by using the differences in shape and depth, thereby ensuring the stability and accuracy of tube placement. At the same time, with the help of a second lifting cylinder fixed to the second support seat, its piston rod drives a clamping block having a fifth positioning groove and a sixth positioning groove provided on its lower surface to move up and down. The fifth and sixth positioning grooves are also semicircular grooves extending in the first direction and have different depths, respectively adapting to the original tube segment and the eccentric tube segment. When the clamping block descends, it can accurately cooperate with the positioning grooves on the first base to firmly clamp the tube, thereby achieving segmented precise positioning and reliable clamping of the original tube segment and the eccentric tube segment, effectively preventing the tube from displacement or shaking during the insertion of the drill rod, providing a solid guarantee for the precise insertion of the drill rod, and thereby improving the quality and consistency of the wick offset heat pipe processing.
[0014] Optionally, the storage and unloading mechanism includes a material storage component, a screening component and a material receiving component; the material storage component includes a first support plate and two material storage plates, the first support plate is fixed to the upper surface of the second frame, the two material storage plates are fixed to the side of the first support plate close to the transfer insertion mechanism, the first support plate and the two material storage plates form a material cavity, the top and bottom ends of the material cavity are both open; the screening component is arranged at the bottom of the material cavity, and during operation, the screening component only allows one brazing rod in the material cavity to fall into the material receiving component at a time.
[0015] By adopting the above technical solution, the storage and unloading mechanism forms a material cavity with openings at both the top and the bottom ends by enclosing the first support plate and the two storage plates on the upper surface of the second frame, thereby realizing the centralized storage of multiple brazing rods. The structure is simple and convenient for unified management. The screening component is arranged at the bottom of the material cavity, which can accurately control the falling of the brazing rods during operation, and only allows one brazing rod to fall into the receiving component at a time. This design cleverly combines the storage of a large number of brazing rods with the orderly unloading function, which not only ensures an adequate supply of brazing rods, but also ensures that the brazing rods are output one by one and in an orderly manner through the screening mechanism, effectively avoiding the confusion and operational errors caused by the simultaneous falling of multiple brazing rods, and providing a reliable guarantee for the subsequent transfer insertion mechanism to accurately and efficiently obtain the brazing rods, thereby improving the automation and accuracy of the brazing rod insertion link in the entire liquid-wick biased heat pipe processing process, which helps to improve production efficiency and product quality stability.
[0016] Optionally, the material connecting assembly includes a material connecting block and two guide blocks, the material connecting block is fixed to the upper surface of the second frame, the material connecting block is located on the side of the first support plate close to the transfer insertion mechanism, the upper surface of the material connecting block is provided with a seventh positioning groove for positioning the brazing rod, the bottom ends of the two guide blocks are fixedly connected to the material connecting block, the two guide blocks are inclined, and the inclination angle is 30°-45°. The spacing between the tops of the two guide blocks is greater than the spacing between the bottoms, and the bottom spacing is adapted to the width of the seventh positioning groove.
[0017] By adopting the above technical solution, the material receiving assembly fixes the material receiving block to the upper surface of the second frame and is located on the side of the first support plate close to the transfer insertion mechanism, and opens a seventh positioning groove on the upper surface of the material receiving block, which provides a place for precise positioning of the drill rod falling from the screening assembly, ensuring that the drill rod is stable and does not roll at will during the material receiving stage; the bottom ends of the two guide blocks with an inclination angle of 30°-45° and a top spacing greater than the bottom spacing are fixedly connected to the material receiving block, and the bottom spacing thereof is adapted to the width of the seventh positioning groove, and utilizes the changes in the inclination angle and spacing to guide and buffer the drill rod in the process of falling from the screening assembly to the material receiving block. On the one hand, the drill rod can fall smoothly and accurately into the seventh positioning groove, avoiding the drill rod from scattering due to falling angle or position deviation; on the other hand, the inclined guide block can reduce the impact force of the drill rod falling, prevent the drill rod from colliding and being damaged by the material receiving block, ensure the integrity of the drill rod, and provide a reliable premise for the subsequent transfer insertion mechanism to stably grasp and insert the pipe, thereby effectively improving the efficiency and accuracy of the drill rod insertion link.
[0018] Optionally, the screening assembly includes a fixed seat, a screening column and a second driving member; the fixed seat is fixed to the side of the first support plate close to the transfer insertion mechanism; the screening column is rotatably arranged on the side of the first support plate close to the screening mechanism, and the screening column is circumferentially provided with a plurality of screening grooves for positioning the drill rod, and the plurality of screening grooves 2424 are arranged at equal intervals along the circumference of the screening column, and the side of the fixed seat close to the screening column is also provided with an arc-shaped discharge channel; the second driving member is arranged on the first support plate for driving the screening column to rotate.
[0019] By adopting the above technical solution, the screening component provides basic support for the installation and operation of the screening column by firmly setting the fixed seat on the side of the first support plate close to the transfer insertion mechanism; the screening column is rotatably set on the first support plate and has a plurality of equally spaced screening slots arranged along the circumference, which can accurately position the brazing rod in the material cavity. When the second driving member drives the screening column to rotate, only one screening slot rotates to the position corresponding to the bottom of the material cavity at a time, so that a single brazing rod falls into the screening slot, and as the screening column continues to rotate, the brazing rod is transported to the arc-shaped unloading channel opened on the side of the fixed seat close to the screening column, so that the brazing rods are unloaded one by one in an orderly manner; this design utilizes the rotation of the screening column and the positioning function of the screening slot to cleverly solve the problem of multiple brazing rods falling at the same time, ensure the regularity and accuracy of brazing rod unloading, and provide reliable guarantees for the subsequent material receiving assembly to stably receive the brazing rod and the transfer insertion mechanism to accurately grasp and insert, which helps to improve the automation level and production efficiency of the brazing rod insertion link in the processing of the liquid-absorbing core biased heat pipe.
[0020] Optionally, the transfer insertion mechanism includes a rotating seat, a rotating drive assembly and an insertion assembly; the rotating seat is rotatably connected to the second frame, the rotating drive assembly is arranged in a cavity on one side of the second frame, and the rotating drive assembly is used to drive the rotating seat to rotate; there are multiple insertion assemblies, and multiple insertion assemblies are all arranged on the rotating seat, and multiple insertion assemblies are evenly distributed along the circumference.
[0021] By adopting the above technical solution, the rotating seat is rotatably connected to the second frame, and a rotating drive component is arranged in the cavity on one side of the second frame to drive the rotating seat to rotate. At the same time, multiple insertion components are evenly distributed along the circumference of the rotating seat, so that the rotating drive component can drive the rotating seat and multiple insertion components to rotate together. This design can flexibly adjust the position and working angle of the insertion component to realize multi-station or different direction insertion operations, effectively improve work efficiency and operational flexibility, meet diversified production needs, and enhance the overall performance and practicality of the equipment.
[0022] Optional, The sintering device includes a sintering mechanism, a horizontal feeding mechanism and a lifting and towing mechanism; the sintering mechanism includes a sintering furnace, two second support plates are fixedly provided at the bottom, the bottom of the sintering furnace is open, and a heating element is provided inside the sintering furnace; the horizontal feeding mechanism is provided below the sintering furnace, and the lifting and towing mechanism is provided on the second support plate. The lifting and towing mechanism is used to drive the container to rise and fall, and the container is used to hold multiple pipes at the same time.
[0023] By adopting the above technical solution, the transfer insertion mechanism is rotatably connected to the second frame through the rotating seat, and cooperates with the rotating drive component arranged in the cavity on one side of the second frame to realize flexible rotational drive of the rotating seat, providing a dynamic conversion basis for the transmission and insertion operations of the drill rod; multiple insertion components are evenly distributed along the circumference of the rotating seat, and when the rotating drive component drives the rotating seat to rotate, each insertion component can be accurately positioned to the corresponding work station in turn, realizing the continuous automation of a series of actions of grabbing the drill rod from the material receiving component, transferring it to the side close to the second pipe clamping mechanism, and then inserting the drill rod into the pipe; this design combining circumferential distribution of multiple insertion components with rotary drive not only greatly improves the efficiency of drill rod insertion and shortens the processing cycle, but also ensures the accuracy of the insertion position and depth of each drill rod through the precise positioning of the rotating seat and the coordinated operation of the insertion component, effectively solving the problems of random position and low efficiency in the traditional drill rod insertion process, providing strong support for the efficient and high-quality processing of the wick biased heat pipe, and ensuring the consistency and stability of the product.
[0024] In a second aspect, the present application further discloses a processing technology based on the above-mentioned wick biased heat pipe processing equipment, comprising the following steps: S1: Pipe shrinking processing: The pipe to be processed is placed in the first pipe clamping mechanism of the pipe shrinking device. The position of the pipe shrinking mechanism is adjusted by the first sliding drive mechanism, the second sliding drive mechanism and the lifting mechanism, so that the pipe shrinking die sleeve is aligned with the part to be processed of the pipe, and the pipe shrinking operation is performed to form an eccentric pipe section. S2: Inserting the drill rod: The shrunken pipe is placed in the second clamping mechanism of the rod insertion device. The storage and unloading mechanism releases individual drill rods in sequence. The transfer insertion mechanism transfers the drill rods to the side close to the second clamping mechanism and inserts the drill rods into the eccentric pipe section of the pipe. S3: Install the positioning fins. Remove the pipe with the drill rod inserted from the second pipe clamping mechanism, and sequentially install four positioning fins of different shapes inside the original pipe section away from the end of the eccentric pipe section to further fix the drill rod. S4: Copper powder pouring and sintering. Pour copper powder into the pipe that has been inserted with the brazing rod and installed with the positioning fins, so that the copper powder fills the area between the brazing rod and the inner wall of the pipe. Place multiple pipes filled with copper powder in a heat-conducting container at the same time, and feed the pipes into the sintering furnace through the horizontal feeding mechanism. Lift the pipes to the sintering area of the sintering furnace through the lifting and transporting mechanism, start the heating element for high-temperature sintering, and sinter the copper powder to form a liquid-absorbing core. After sintering is completed, send the pipes out of the sintering area through the lifting and transporting mechanism, and send the pipes out of the sintering furnace through the horizontal feeding mechanism.
[0025] By adopting the above technical solution, first, in the tube shrinking processing stage, with the help of the flexible adjustment of the position of the tube shrinking mechanism by each driving mechanism in the tube shrinking device, the tube shrinking operation of the specific part of the tube is accurately completed, forming an eccentric tube section that meets the offset requirements of the liquid wick, laying the foundation for subsequent processing; then, in the drill rod insertion stage, the tube is firmly clamped after shrinking, and the storage and unloading mechanism is used to release individual drill rods in an orderly manner, and then the transfer insertion mechanism is used to accurately transfer and insert them into the eccentric tube section, ensuring the accurate positioning of the drill rod, and improving the automation and accuracy of the drill rod insertion process. degree; Subsequently, the positioning fin installation step further strengthens the fixing effect on the brazing rod. Four positioning fins of different shapes are installed inside the original pipe section, effectively preventing the brazing rod from shifting during subsequent processing and use; Finally, during the copper powder filling and sintering stage, the pipe with the brazing rod inserted and the positioning fins installed is filled with copper powder. Through the coordinated cooperation of the horizontal feeding mechanism and the lifting and transporting mechanism, the pipe is accurately fed into the sintering area of the sintering furnace for high-temperature sintering, so that the copper powder forms a liquid wick. After sintering is completed, it is efficiently fed out, and the entire sintering process is efficient and orderly. This technical solution effectively solves the problems of low brazing rod positioning accuracy and poor liquid wick uniformity in traditional heat pipe processing through the close connection and synergy of each step, significantly improves the processing quality and production efficiency of liquid wick biased heat pipes, and ensures the consistency and stability of product performance.
[0026] In summary, this application includes at least one of the following beneficial technical effects: 1. The processing equipment forms an eccentric tube section through the tube reduction device, providing a precise basis for drill rod positioning. The rod insertion device adopts an automated and integrated operation process, which effectively solves the problem that traditional drill rod positioning mainly relies on the guarantee of the tube reduction side and has a large random position, and greatly improves the drill rod positioning accuracy.
[0027] 2. Precise brazing rod positioning ensures uniform wick thickness, avoiding variations in wick offset and direction across the same batch of heat pipes due to uncertain brazing rod positioning, thereby improving the stability of the heat pipe's cooling effect. 3. Through the coordinated work of various devices, the processing equipment meets the requirements of the wick biased heat pipe for high positioning accuracy of the brazing rod, effectively reduces the thermal resistance of the evaporation section of the heat pipe, and improves the overall heat transfer performance of the heat pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 Schematic diagram of the structure of the wick biased heat pipe in the embodiment of the present application.
[0029] Figure 2 It is a half-section view of the wick-biased heat pipe in an embodiment of the present application.
[0030] Figure 3 It is a structural schematic diagram of the liquid wick biased heat pipe processing equipment in an embodiment of the present application.
[0031] Figure 4 It is a structural schematic diagram of the tube shrinking device in an embodiment of the present application.
[0032] Figure 5 It is a structural schematic diagram of the rod insertion device in an embodiment of the present application.
[0033] Figure 6 It is a structural schematic diagram of the second tube clamping mechanism in an embodiment of the present application.
[0034] Figure 7 It is a structural schematic diagram of the sintering device in the embodiment of the present application.
[0035] Description of reference numerals: 1. Tube shrinking device; 11. First frame; 12. First tube clamping mechanism; 121. Positioning seat; 1211. First positioning slot; 122. Mounting seat; 123. Pushing assembly; 1231. Pushing cylinder; 1232. Pushing block; 124. First clamping assembly; 1241. First clamping block; 1242. First lifting cylinder; 1243. Second positioning slot; 13. First sliding seat; 14. First sliding drive mechanism; 141. First supporting seat; 142. First driving member; 15. Second sliding seat; 16. Second sliding drive mechanism; 161. First motor; 162. First screw rod; 163. Linkage 164, first support; 17, lifting mechanism; 171, lifting seat; 172, bearing block; 173, lifting drive; 18, tube shrinking mechanism; 181, tube shrinking die sleeve; 2, rod insertion device; 21, second frame; 211, cavity; 22, second tube clamping mechanism; 221, first base; 2211, third positioning groove; 2212, fourth positioning groove; 222, second support seat; 223, clamping block; 2231, fifth positioning groove; 2232, sixth positioning groove; 224, second lifting cylinder; 23, transfer insertion mechanism; 231, rotating seat; 2311, rotating disk; 2312, rotating disk Rotating rod; 232, rotary drive assembly; 2321, adjustment seat; 2322, second motor; 2323, active bevel gear; 2324, driven bevel gear; 2325, adjustment slot; 233, insertion assembly; 2331, driving cylinder; 2332, clamping cylinder; 24, storage and unloading mechanism; 241, storage assembly; 2411, first support plate; 2412, storage plate; 242, screening assembly; 2421, fixed seat; 2422, screening column; 2423, second driving member; 2424, screening slot; 243, material receiving assembly; 2431, material receiving block; 2432, guide block; 2433, Seventh positioning groove; 3. Sintering device; 31. Sintering mechanism; 311. Sintering furnace; 312. Second support plate; 32. Horizontal feeding mechanism; 321. Second base; 322. Rotating roller; 323. Feeding wheel; 324. Protective cover; 325. Fourth motor; 33. Lifting and transporting mechanism; 331. Third motor; 332. Second screw rod; 333. Support seat; 334. Second support; 34. Baffle mechanism; 341. Third lifting cylinder; 342. Baffle member; 4. Liquid wick biased heat pipe; 41. Pipe; 411. Original pipe section; 412. Eccentric pipe section; 42. Brazing rod; 43. Positioning fin. DETAILED DESCRIPTION
[0036] The following is combined with Figure 1-7 This application is described in further detail.
[0037] The terms used in this application are for the purpose of describing specific embodiments only and are not intended to limit this application. Unless otherwise defined, technical or scientific terms used in this application should have the common meanings understood by those skilled in the art to which this application belongs. The terms "first," "second," and similar terms used in this application do not indicate any order, quantity, or importance, but are simply used to distinguish different components.
[0038] For ease of understanding, in the horizontal direction of this embodiment, the length direction of the processing equipment is defined as the first direction, and the length direction of the first screw rod 162 is defined as the second direction, based on which the liquid wick biased heat pipe processing equipment and processing technology are described.
[0039] Reference Figure 1 and Figure 2 In this embodiment, the wick biased heat pipe 4 includes a tube 41, a brazing rod 42, and four positioning fins 43. The tube 41 includes an original tube section 411 and an eccentric tube section 412, wherein the eccentric tube section 412 is formed by processing the tube 41 through the tube shrinking device 1. One end of the original tube section 411 and one end of the eccentric tube section 412 are integrally formed and internally interconnected. The axis of the original tube section 411 does not coincide with the axis of the eccentric tube section 412. The brazing rod 42 is inserted into the eccentric tube section 412. One end of the brazing rod 42 is flush with the end of the eccentric tube section 412 away from the original tube section 411, and the other end of the brazing rod 42 is flush with the end of the circular tube away from the eccentric tube section 412. Each positioning fin 43 has a fan-shaped structure, and the four positioning fins 43 are used to fix the end of the brazing rod away from the eccentric tube section 412. Each positioning fin 43 includes an outer arc profile, an inner arc profile, and two perpendicular edges. The shapes of the four positioning fins 43 vary. The inner arc profile of each positioning fin 43 abuts the outer sidewall of the brazing rod, and the outer arc profile of each positioning fin 43 abuts the inner sidewall of the original tube section 411, thereby securing the other end of the brazing rod.
[0040] The embodiment of the present application discloses a device for processing a liquid wick biased heat pipe. Figure 1 The liquid wick biased heat pipe processing equipment includes a tube shrinking device 1, a rod inserting device 2 and a sintering device 3.
[0041] Reference Figure 2 、 Figure 3 and Figure 4The tube reduction device 1 includes a first frame 11, a first tube clamping mechanism 12, a first sliding seat 13, a first sliding drive mechanism 14, a second sliding seat 15, a second sliding drive mechanism 16, a lifting seat 171, a lifting mechanism 17, and a tube reduction mechanism 18. The first sliding seat 13 is in sliding engagement with the first frame 11. The first sliding drive mechanism 14 is disposed on the first frame 11 and is configured to drive the first sliding seat 13 to move in a first direction. The second sliding seat 15 is in sliding engagement with the first sliding seat 13. The second sliding drive mechanism 16 is disposed on the first sliding seat 13 and is configured to drive the second sliding seat 15 to move in a second direction. The lifting mechanism 17 is disposed on the second sliding seat 15 and is configured to drive the tube reduction mechanism 18 to move upward and downward. The tube shrinking mechanism 18 includes a plurality of shrinking mold sleeves 181 . Each of the shrinking mold sleeves 181 is fixed to a side of the lifting base 171 near the first clamping mechanism 12 . The shrinking mold sleeves 181 are spaced apart along the second direction. The first clamping mechanism 12 is mounted on the first frame 11 and is used to clamp and secure the tubing 41 .
[0042] Reference Figure 4 The first sliding drive mechanism 14 includes a first support base 141 and a first drive member 142. The first support base 141 is fixed to the upper surface of the first frame 11. The first drive member 142 is disposed on the first support base 141 and is configured to drive the first sliding base 13 to move in the first direction. Specifically, the first drive member 142 may be a pneumatic cylinder, a hydraulic cylinder, or an oil cylinder. Driven by the first drive member 142, the first sliding base 13 can be precisely displaced in the first direction, thereby adjusting the position of the tube reduction mechanism 18 in the first direction to accommodate the processing requirements of tubes 41 of varying lengths.
[0043] Continue to refer to Figure 4 The second sliding drive mechanism 16 includes a first motor 161, a first screw rod 162, a linkage 163, and two first supports 164. The two first supports 164 are integrally formed on the second sliding seat 15. The first screw rod 162 extends along the second direction. The two ends of the first screw rod 162 are rotatably connected to the two first supports 164 respectively. The first motor 161 is fixed to one of the first supports 164, and the output shaft of the first motor 161 is fixedly connected to the end of the first screw rod 162. The linkage 163 is fixedly connected to the second sliding seat 15. The first screw rod 162 passes through the linkage 163, and the first screw rod 162 and the linkage 163 are threadedly engaged. When the first motor 161 is working, it drives the first screw rod 162 to rotate. Since the first screw rod 162 and the linkage 163 are threadedly engaged, the second sliding seat 15 is driven to move along the second direction, thereby adjusting the position of the tube shrinking mechanism 18 in the second direction and ensuring the accuracy of the tube shrinking process.
[0044] Continue to refer to Figure 4 The lifting mechanism 17 includes a lifting seat 171, a bearing block 172, and a lifting drive 173. The lifting seat 171 slides in conjunction with the second sliding seat 15. The bearing block 172 is fixed to the second sliding seat 15. The lifting drive 173 is disposed on the bearing block 172 and is used to drive the lifting seat 171 up and down. The specific lifting drive can be a cylinder, hydraulic, or motor screw structure. Driven by the lifting drive 173, the lifting seat 171 can be raised and lowered in the vertical direction, thereby adjusting the height of the tube reduction mechanism 18 to accommodate the processing requirements of pipes 41 of different diameters.
[0045] Continue to refer to Figure 4 To ensure smooth and accurate movement between components, guide mechanisms are installed between the first sliding seat 13 and the first frame 11, between the second sliding seat 15 and the first sliding seat 13, and between the lifting seat 171 and the second sliding seat 15. These guide mechanisms include guide rails and sliders. The guide rails utilize high-precision linear guides, and the sliders are fixedly connected to the corresponding components. The cooperation between the guide rails and sliders achieves precise guidance between the components, reduces friction and vibration during movement, and improves machining accuracy.
[0046] Reference Figure 2 and Figure 4 The first tube clamping mechanism 12 includes a positioning seat 121, a mounting seat 122, a pusher assembly 123, and a first clamping assembly 124. Both the positioning seat 121 and the mounting seat 122 are fixed to the upper surface of the first frame 11, with the positioning seat 121 located between the tube shrinking mechanism 18 and the mounting seat 122. A first positioning groove 1211 is defined on the upper surface of the positioning seat 121 for positioning the tube 41. The length of the first positioning groove 1211 is oriented in a first direction. Both ends of the first positioning groove 1211 are open, and the cross-section of the first positioning groove 1211 is semicircular. When the tube 41 is positioned within the first positioning groove 1211, the outer wall of the tube 41 abuts against the outer wall of the tube 41. The pushing assembly 123 includes a pushing cylinder 1231 and a pushing block 1232. The pushing cylinder 1231 is fixed on the mounting seat 122. The pushing cylinder 1231 drives the pushing block 1232 to move toward the direction close to the positioning seat 121. In the process of the pushing block 1232 moving toward the direction close to the positioning seat 121, the pushing block 1232 pushes one end of the pipe 41 toward the direction close to the tube shrinking mechanism 18, so that the length of the end of the pipe 41 close to the tube shrinking mechanism 18 extending from the side wall of the positioning seat 121 is the same as the length of the eccentric pipe section 412 to be processed, and then the pipe 41 is clamped and fixed by the first clamping assembly 124.
[0047] Continue to refer to Figure 2 and Figure 4In this embodiment, the first clamping assembly 124 includes a first clamping block 1241 and a first lifting cylinder 1242. The first lifting cylinder 1242 is fixed to the mounting seat 122. The piston rod of the first lifting cylinder 1242 passes through the mounting seat 122 and slides with the mounting seat 122. The piston rod of the first lifting cylinder 1242 is fixedly connected to the first clamping block 1241. The first lifting cylinder 1242 is used to drive the first clamping block 1241 to move up and down. The lower surface of the first clamping block 1241 is provided with There is a second positioning groove 1243 for positioning the pipe 41. The second groove is located directly above the first positioning groove 1211. The second positioning groove 1243 has the same shape as the first positioning groove 1211 and is symmetrical to each other. The first clamping block 1241 is driven down by the first lifting cylinder 1242. When the bottom end of the first clamping block 1241 abuts against the top end of the first positioning block, the first clamping block 1241 and the first positioning block have a clamping effect on the pipe 41, ensuring the stability of the pipe 41 during the tube shrinking process.
[0048] Reference Figure 3 and Figure 5 The rod insertion device 2 includes a second frame 21, on which a second tube clamping mechanism 22, a transfer insertion mechanism 23, and a storage and unloading mechanism 24 are sequentially arranged along a first direction. The transfer feeding mechanism is located between the drill rod 42 clamping mechanism and the storage and unloading mechanism 24. The clamping mechanism is used to clamp and fix the tube 41 after tube shrinkage. The storage and unloading mechanism 24 is used to simultaneously store multiple drill rods 42 and release individual drill rods 42 in sequence. The transfer insertion mechanism 23 is used to sequentially transfer the drill rods 42 released by the storage and unloading mechanism 24 to a side close to the second tube clamping mechanism 22 and to insert the drill rods 42 into the tube 41.
[0049] Reference Figure 5 and Figure 6The second tube clamping mechanism 22 includes a first base 221, a second support base 222, a clamping block 223, and a second lifting cylinder 224. The first base 221 is fixed to the upper surface of the second frame 21. The upper surface of the first base 221 is provided with a third positioning groove 2211 and a fourth positioning groove 2212 that are interconnected. The third positioning groove 2211 and the fourth positioning groove 2212 both extend along the first direction. The depth of the third positioning groove 2211 is greater than that of the fourth positioning groove 2212, and both are semicircular grooves. The third positioning groove 2211 is used to position the original tube section 411 and is located on the side of the first base 221 close to the second support base 222. The fourth positioning groove 2212 is used to position the eccentric tube section 412 and is located on the side of the first base 221 close to the transfer insertion mechanism 23. The second tube clamping mechanism 22 positions the original tube section 411 and the eccentric tube section 412 respectively through the third positioning groove 2211 and the fourth positioning groove 2212, and can accurately clamp and fix the tube 41 after shrinkage, providing stable support for the insertion of the drill rod 42, ensuring the accuracy and reliability of the insertion of the drill rod 42.
[0050] Reference Figure 2 、 Figure 5 and Figure 6 The second support base 222 is fixed to the second frame 21, and the second lifting cylinder 224 is fixed to the second support base 222. The piston rod of the second lifting cylinder 224 passes through the second support base 222 and slides with the second support base 222. The piston rod of the second cylinder is fixedly connected to the clamping block 223. The lower surface of the clamping block 223 is provided with a fifth positioning groove 2231 and a sixth positioning groove 2232. The fifth positioning groove 2231 is used to position the original pipe section 411, and the sixth positioning groove 2232 is used to position the eccentric pipe section 412. The fifth positioning groove 2231 and the sixth positioning groove 2232 both extend along the first direction and are semicircular grooves. The depth of the fifth positioning groove 2231 is greater than that of the sixth positioning groove 2232. The difference in size and structure between the original pipe section 411 and the eccentric pipe section 412 enables more precise positioning of the two. When the second lifting cylinder 224 is in operation, its piston rod drives the clamping block 223 to move up and down. During the descent process, the fifth and sixth positioning grooves 2231 and 2232 correspond to the third and fourth positioning grooves 2211 and 2212, respectively, on the first base 221. The fifth and third positioning grooves 2231, in conjunction with the third and fourth positioning grooves 2211, accurately clamp and secure the original pipe section 411 within the circular positioning space formed by the five positioning grooves 2231 and 2211. The sixth and fourth positioning grooves 2232, in conjunction with the fourth and fourth positioning grooves 2212, accurately clamp and secure the eccentric pipe section 412 within the circular positioning space formed by the six positioning grooves 2232 and 2212. This clamping method, utilizing multiple positioning grooves, provides extremely stable support for the insertion of the drill rod 42.
[0051] Reference Figure 3 and Figure 5The storage and unloading mechanism 24 includes a material storage assembly 241, a screening assembly 242, and a material receiving assembly 243. The material storage assembly 241 includes a first support plate 2411 and two material storage plates 2412. The first support plate 2411 is fixed to the upper surface of the second frame 21. The two material storage plates 2412 are both fixed to the side of the first support plate 2411 close to the transfer insertion mechanism 23. The first support plate 2411 and the two material storage plates 2412 enclose a material cavity, and the top and bottom ends of the cavity are both open. The screening assembly 242 is set at the bottom of the cavity. During operation, the screening assembly 242 only allows one drill rod 42 in the cavity to fall into the material receiving assembly 243 at a time.
[0052] Reference Figure 5 The screening assembly 242 includes a fixed seat 2421, a screening column 2422 and a second driving member 2423, wherein the fixed seat 2421 is fixed to the side of the first support plate 2411 close to the transfer insertion mechanism 23, and the screening column 2422 is rotatably arranged on the side of the first support plate 2411 close to the screening mechanism. The screening column 2422 is circumferentially provided with a plurality of screening slots 2424 for positioning the drill rod 42, and the plurality of screening slots 2424 are arranged at equal intervals along the circumference of the screening column 2422. The fixed seat 2421 is also provided with an arc-shaped material discharge channel on the side close to the screening column 2422. The second driving member 2423 is arranged on the first support plate 2411, and the second driving member 2423 is used to drive the screening column 2422 to rotate. During the rotation process, only one drill rod 42 falls into the material receiving assembly 243 at a time. The screening assembly 242 achieves the function of allowing only one drill rod 42 to fall at a time through the rotation of the screening column 2422 and the screening groove 2424, ensuring the accuracy and orderliness of the discharge of the drill rod 42, avoiding the confusion and failure caused by the simultaneous falling of multiple drill rods 42, and improving the processing quality and production efficiency.
[0053] Continue to refer to Figure 5 It is worth noting that there is a gap between the bottom ends of the two storage plates 2412 and the screening column 2422, with the gap size controlled to be between 0.5-1 mm. This prevents interference between the screening column 2422 and the two storage plates 2412 during rotation. At the same time, the small gap between the bottom ends of the storage plates 2412 and the screening column 2422 prevents the rods between the two storage plates 2412 from slipping through the gap onto the surface of the second workbench, ensuring stable storage and normal unloading of the brazing rods 42.
[0054] Continue to refer to Figure 5The material receiving assembly 243 includes a material receiving block 2431 and two guide blocks 2432. The material receiving block 2431 is fixed to the upper surface of the second frame 21. The material receiving block 2431 is located on the side of the first support plate 2411 close to the transfer insertion mechanism 23. The upper surface of the material receiving block 2431 is provided with a seventh positioning groove 2433 for positioning the drill rod 42. The bottom ends of the two guide blocks 2432 are fixedly connected to the material receiving block 2431. The two guide blocks 2432 are both tilted, and the tilt angle is generally 30°-45°. The spacing between the tops of the two guide blocks 2432 is greater than the spacing at the bottom. The top spacing is designed according to the bottom opening size of the material chamber and the possible falling range of the drill rod 42 to ensure that the drill rod 42 after screening by the screening assembly 242 can smoothly fall between the guide blocks 2432; the bottom spacing is adapted to the width of the seventh positioning groove 2433 to ensure that the drill rod 42 can accurately fall into the seventh positioning groove 2433. The material receiving assembly 243 realizes accurate material receiving and positioning of the drill rod 42 through the seventh positioning groove 2433 of the material receiving block 2431 and the inclined setting of the guide block 2432, ensuring that the drill rod 42 can accurately enter the subsequent processing link, thereby improving the accuracy and stability of the processing.
[0055] Continue to refer to Figure 5 The transfer insertion mechanism 23 includes a rotating base 231, a rotating drive assembly 232, and an insertion assembly 233. The rotating base 231 is rotatably connected to the second frame 21. A cavity 211 is defined on one side of the second frame 21. The rotating drive assembly 232 is disposed within the cavity 211 and is configured to rotate the rotating base 231. There are multiple insertion assemblies 233, each disposed on the rotating base 231 and evenly distributed along the circumference.
[0056] Continue to refer to Figure 5 The rotating seat 231 includes a rotating disk 2311 and a rotating rod 2312. The rotating disk 2311 is arranged horizontally, and the top of the rotating rod 2312 is fixedly connected to the lower surface of the rotating disk 2311. The rotating rod 2312 is located in the cavity 211 and extends in a vertical direction. The top of the rotating rod 2312 passes through the top of the second frame 21. The top of the rotating rod 2312 is fixedly connected to the lower surface of the rotating disk 2311. Both ends of the rotating rod 2312 are rotatably connected to the second frame 21. The rotation drive assembly 232 is arranged in the cavity 211 and is used to drive the rotating rod 2312 to rotate.
[0057] Continue to refer to Figure 5The rotation drive assembly 232 includes an adjustment base 2321, a second motor 2322, a driving bevel gear 2323, and a driven bevel gear 2324. The adjustment base 2321 is fixed within the cavity 211 of the second frame 21, and the second motor 2322 is fixed to the adjustment base 2321. The driving bevel gear 2323 is mounted on and fixedly connected to the output shaft of the second motor 2322. The driven bevel gear 2324 is mounted on and fixedly connected to the rotating rod 2312, and the driving bevel gear 2323 and the driven bevel gear 2324 mesh with each other. When the second motor 2322 is started, the output shaft drives the driving bevel gear 2323 to rotate. The driving bevel gear 2323 transmits power to the driven bevel gear 2324, thereby driving the rotating rod 2312 to rotate. The bevel gear transmission has the advantages of stable transmission ratio, high transmission efficiency, and compact structure, and can reliably transmit the rotational motion of the second motor 2322 to the rotating rod 2312. When the driven bevel gear 2324 drives the rotating rod 2312 to rotate, the rotating rod 2312 drives the rotating disk 2311 to rotate synchronously, thereby transmitting the rotational motion of the second motor 2322 to the insertion assembly 233 disposed on the rotating disk 2311.
[0058] Continue to refer to Figure 5 The adjustment seat 2321 is provided with four adjustment slots 2325 extending horizontally. Each adjustment slot 2325 is threaded with a bolt, which is threadedly engaged with the second frame 21. By adjusting the position of the bolt within the adjustment slot 2325, the second motor 2322 can be fine-tuned horizontally to ensure good meshing between the driving bevel gear 2323 and the driven bevel gear 2324, thereby reducing vibration and noise during transmission and improving transmission accuracy and stability.
[0059] Reference Figure 1 and Figure 5 In this embodiment, each insertion assembly 233 includes a drive cylinder 2331 and a clamping cylinder 2332. The drive cylinder 2331 is fixed to the upper surface of the rotating disk 2311. The piston rod of the drive cylinder 2331 is fixedly connected to the cylinder body of the clamping cylinder 2332. The two clamping components of the clamping cylinder 2332 are each provided with a positioning groove. The radius of the positioning groove matches the radius of the drill rod 42. The surface of the positioning groove is coated with a rubber material. The rubber material has good elasticity and friction, which can increase the contact area with the drill rod 42, improve the firmness of the clamping, and prevent the drill rod 42 from slipping or shaking during the insertion process. The clamping components of the clamping cylinder 2332 are opened and closed through pneumatic control, which can quickly and accurately clamp and release the drill rod 42.
[0060] Reference Figure 5 and Figure 6The second pipe clamping mechanism 22 respectively positions the original pipe section 411 and the eccentric pipe section 412 through the third positioning groove 2211 and the fourth positioning groove 2212 on the first base 221, and then the second lifting cylinder 224 drives the clamping block 223 to descend, and uses the fifth positioning groove 2231 and the sixth positioning groove 2232 to cooperate with the third positioning groove 2211 and the fourth positioning groove 2212 to accurately clamp and fix the pipe 41; in the storage and unloading mechanism 24, the material cavity of the material storage component 241 stores multiple drill rods 42, and the screening column 2422 of the screening component 242 rotates under the drive of the second driving member 2423, and the screening slot 2424 thereon only allows one drill rod 42 to fall into the material receiving component 2 at a time. 43. The receiving block 2431 of the receiving assembly 243 is accurately positioned for receiving the material through the seventh positioning groove 2433 and the two inclined guide blocks 2432; the rotating drive assembly 232 of the transfer insertion mechanism 23 drives the active bevel gear 2323 and the driven bevel gear 2324 through the second motor 2322, and then drives the rotating seat 231 to rotate, and rotates the insertion assembly 233 carrying the drill rod 42 to the side close to the second clamping mechanism 22. The driving cylinder 2331 of the insertion assembly 233 pushes the clamping cylinder 2332 to move toward the pipe 41. The clamping cylinder 2332 uses the clamping component with the rubber-coated positioning groove to clamp the drill rod 42 and accurately insert it into the clamped and fixed pipe 41.
[0061] Continue to refer to Figure 5 and Figure 6 After the brazing rod 42 is inserted into the eccentric section 412 of the tube 41, the second clamping mechanism 22 releases its grip on the tube 41. The worker removes the tube 41 with the brazing rod 42 inserted from the second clamping mechanism 22. Then, manually or automatically, four positioning fins 43 of different shapes are sequentially installed inside the original tube section 411, away from the eccentric section 412, to further secure the brazing rod 42. Copper powder is then poured in and sintered at high temperature to form the wick.
[0062] Reference Figure 3 and Figure 7The sintering device 3 includes a sintering mechanism 31 and a horizontal feeding mechanism 32. The sintering mechanism 31 includes a sintering mechanism 311. Two second support plates 312 are fixedly installed at the bottom of the sintering mechanism 311. The bottom of the sintering mechanism 311 is open. A heating element is installed inside the sintering mechanism 311 to provide a high-temperature sintering environment. The inner side walls of the two second support plates 312 are each provided with a lifting and towing mechanism 33. Each lifting and towing mechanism includes a third motor 331, a second screw rod 332, a support seat 333 and two second supports 334. One of the second supports 334 is fixed to the inner side wall of the sintering mechanism 311, and the other second support 334 is fixed to the inner side wall of the second support plate 312. The second screw rod 332 extends in the vertical direction. The two ends of the second screw rod 332 are respectively rotatably connected to the two second supports 334. The third motor 331 is fixed to the inner side wall of the second support plate 312 and is fixedly connected to the bottom end of the second screw rod 332. The second screw rod 332 passes through the supporting seat 333 , and the second screw rod 332 is threadedly engaged with the supporting seat 333 .
[0063] Reference Figure 7 The horizontal feeding mechanism 32 includes a second base 321, on which a plurality of rotating rollers 322 are rotatably mounted. The plurality of rotating rollers 322 are spaced apart along the second direction. Each rotating roller 322 extends along the first direction, and each rotating roller 322 is fixedly mounted with two feed wheels 323, which are spaced apart. A protective cover 324 is provided on one side of the second base 321. A belt mechanism is provided within the protective cover 324, and the plurality of rotating rollers 322 are linked together by the belt mechanism to ensure synchronous rotation. A fourth motor 325 is fixedly mounted on the outer wall of the protective cover 324, and the output shaft of the fourth motor 325 is fixedly connected to the end of one of the rotating rollers 322.
[0064] Reference Figure 7 The second base 321 is provided with a material blocking mechanism 34, which includes a third lifting cylinder 341 and a material blocking member 342. The third lifting cylinder 341 is fixed to the second base 321, and the piston rod of the third lifting cylinder 341 is fixedly connected to the material blocking member 342. When the pipe 41 is transported to the designated position by the feeding wheel 323, the third lifting cylinder 341 is activated, driving the material blocking member 342 to rise, preventing the pipe 41 from moving further, and ensuring that the container containing multiple pipes 41 is directly below the sintering mechanism 311. After sintering is completed, the third lifting cylinder 341 drives the material blocking member 342 to descend, releasing the pipe 41, so that the container containing multiple pipes 41 can be smoothly sent out of the sintering mechanism 31 by the feeding wheel 323.
[0065] Multiple tubes 41, which have been inserted with brazing rods 42 and filled with copper powder, are placed simultaneously in a heat-conducting container, and then the container is placed on the feed wheel 323 of the horizontal feed mechanism 32. The fourth motor 325 is started, driving all the rotating rollers 322 to rotate synchronously through the belt mechanism, and then driving the feed wheel 323 to feed the tubes 41 into the sintering mechanism 31. When the tubes 41 are transported to the designated position, the third lifting cylinder 341 of the blocking mechanism 34 is started, driving the blocking member 342 to rise, preventing the tubes 41 from moving further. The third motor 331 of the lifting and transporting mechanism 33 is started, driving the second screw 332 to rotate through the reducer, and then driving the supporting seat 333 to rise, lifting the tubes 41 to the sintering area in the sintering mechanism 31. The heating element is started, and the tubes 41 are sintered at high temperature, so that the copper powder is sintered to form a liquid-absorbing core. After sintering is completed, the heating element is turned off, and the third motor 331 of the lifting and transporting mechanism 33 rotates in the opposite direction, driving the support seat 333 to descend, and sending the tube 41 out of the sintering area. The third lifting cylinder 341 of the blocking mechanism 34 drives the blocking member 342 to descend, releasing the tube 41. The third motor 331 continues to start, and the feeding wheel 323 sends the tube 41 out of the sintering mechanism 31, completing the entire sintering process. The implementation principle of the above embodiment is as follows: through the coordinated work of the tube shrinking device 1, the rod insertion device 2 and the sintering device 3, efficient processing of the liquid wick offset heat pipe 4 is achieved. The tube shrinking device 1 can accurately shrink the tube 41 to form an eccentric tube section 412, providing an accurate positioning basis for the insertion of the brazing rod 42. The rod insertion device 2 solves the problem of large randomness in the position of the brazing rod 42 in the traditional method through automated storage, unloading and insertion operations, improves the positioning accuracy of the brazing rod 42, and thus ensures the uniformity of the liquid wick. The sintering device 3 realizes high-temperature sintering of the tube 41, so that the copper powder is sintered to form a liquid wick, thereby improving the heat transfer performance of the heat pipe. The entire equipment improves the quality and production efficiency of heat pipe processing through the reasonable combination and precise control of each device, meets the processing requirements of the liquid wick offset heat pipe 4 for high positioning accuracy of the brazing rod 42, and has been significantly improved and upgraded compared to traditional processing technology.
[0066] Example 2 This embodiment discloses a process for manufacturing a wick-biased heat pipe manufacturing device, comprising the following steps: S1: Pipe 41 shrinking process, the specific steps are as follows: 1. Place the tube 41 to be processed in the first tube clamping mechanism 12 of the tube shrinking device 1. Initially position the tube 41 using the first positioning groove 1211 on the positioning seat 121. The first positioning groove 1211 has a semicircular cross-section, with its length aligned with the first direction of the processing equipment, ensuring that the axis of the tube 41 is aligned with the processing direction.
[0067] 2. The first sliding drive mechanism 14 (the first drive member 142 is a cylinder or a hydraulic cylinder) drives the first sliding seat 13 to move in the first direction to adjust the position of the tube shrinking mechanism 18 in the first direction; the second sliding drive mechanism 16 (the first motor 161 drives the first screw 162) drives the second sliding seat 15 to move in the second direction to adjust the position of the tube shrinking mechanism 18 in the second direction; the lifting mechanism 17 (the lifting drive member 173 is a cylinder or a motor screw structure) drives the lifting seat 171 to rise and fall to adjust the height of the tube shrinking mechanism 18 so that the tube shrinking mold sleeve 181 is aligned with the part of the tube 41 to be processed.
[0068] 3. The multiple shrinking dies 181 of the shrinking mechanism 18 shrink one end of the tube 41 to form an eccentric tube section 412. During the shrinking process, the guide rails and sliders of the guide mechanism cooperate to ensure smooth and accurate movement between the components, reduce friction and vibration, and improve processing accuracy.
[0069] By precisely controlling the position of the tube reduction mechanism 18 in three directions (first, second, and vertical), one end of the tube 41 is precisely reduced, forming an eccentric tube segment 412. This provides a foundation for the subsequent insertion of the drill rod 42 and the formation of the wick. This improves the precision of the tube reduction process, ensuring the dimensional and shape accuracy of the eccentric tube segment 412, facilitating the subsequent positioning of the drill rod 42 and the formation of the wick. The use of the guide mechanism reduces friction and vibration during movement, thereby improving the stability and service life of the processing equipment.
[0070] S2: Insert the drill rod 42. The specific steps are as follows: 1. Place the shrunken tube 41 in the second tube clamping mechanism 22 of the rod insertion device 2. Use the third positioning groove 2211 and the fourth positioning groove 2212 on the first base 221 to position the original tube section 411 and the eccentric tube section 412, respectively. The second lifting cylinder 224 drives the clamping block 223 downward. The fifth and sixth positioning grooves 2231 and 2232 on the clamping block 223 engage with the third and fourth positioning grooves 2211 and 2212 on the first base 221, respectively, to precisely clamp and secure the tube 41.
[0071] 2. Multiple brazing rods 42 are stored in the material chamber of the storage and unloading mechanism 24. The screening column 2422 of the screening assembly 242 rotates under the drive of the second driving member 2423. The screening slot 2424 on the screening column 2422 allows only one brazing rod 42 to fall into the material receiving assembly 243 at a time. The material receiving block 2431 of the material receiving assembly 243 is precisely positioned for material receiving via the seventh positioning slot 2433 and two inclined guide blocks 2432.
[0072] 3. The rotary drive assembly 232 of the transfer insertion mechanism 23 drives the driving bevel gear 2323 and the driven bevel gear 2324 via the second motor 2322, which in turn drives the rotating base 231 to rotate, rotating the insertion assembly 233 carrying the drill rod 42 to the side close to the second pipe clamping mechanism 22. The drive cylinder 2331 of the insertion assembly 233 pushes the clamping cylinder 2332 toward the pipe 41. The clamping cylinder 2332 uses the clamping component with a rubber-coated positioning groove to clamp the drill rod 42 and accurately insert it into the eccentric pipe section 412 of the clamped and fixed pipe 41.
[0073] Through the precise clamping of the pipe 41 and the storage and unloading mechanism 24 for the brazing rod 42, as well as the rotation and insertion of the transfer insertion mechanism 23, the brazing rod 42 is precisely inserted into the eccentric pipe section 412 of the pipe 41. The rubber-coated positioning groove increases the friction between the clamping component and the brazing rod 42, improving the firmness of the clamping. This improves the accuracy and stability of the insertion of the brazing rod 42, ensures the accurate positioning of the brazing rod 42 within the pipe 41, and facilitates the subsequent formation of the wick and the improvement of the heat transfer performance of the heat pipe. The design of the screening component 242 and the material receiving component 243 ensures the accuracy and orderliness of the brazing rod 42 unloading, avoids the confusion and failure caused by the simultaneous drop of multiple brazing rods 42, and improves the processing quality and production efficiency.
[0074] S3: Position the fin 43 and install it. The specific steps are as follows: 1. After the drill rod 42 is inserted into the eccentric section 412 of the tube 41, the second clamping mechanism 22 releases its grip on the tube 41. The worker removes the tube 41 with the drill rod 42 inserted from the second clamping mechanism 22. Then, manually or automatically, four positioning fins 43 of different shapes are sequentially installed inside the original tube section 411, away from the eccentric section 412, to further secure the drill rod 42.
[0075] The installation of positioning fins 43 further secures the position of the brazing rod 42 within the tube 41, preventing movement of the brazing rod 42 during subsequent processing and use, thereby ensuring the stability and heat transfer performance of the heat pipe structure. This improves the stability of the heat pipe structure and reduces fluctuations in heat pipe performance caused by movement of the brazing rod 42. The four differently shaped positioning fins 43 better adapt to the shape of the interior of the tube 41, providing a more reliable fixation.
[0076] S4: Copper powder pouring and sintering, the specific steps are as follows: 1. Pour copper powder into the tube 41 with the brazing rod 42 inserted and the positioning fins 43 installed manually or automatically until the copper powder fills the area between the brazing rod 42 and the inner wall of the tube 41 (the wick area).
[0077] 2. Place multiple tubes 41 filled with copper powder in a heat-conducting container at the same time, and then place the container on the feeding wheel 323 of the horizontal feeding mechanism 32 of the sintering device 3.
[0078] 3. The third motor 331 starts, driving all the rotating rollers 322 to rotate synchronously via a belt mechanism, which in turn drives the feed wheel 323 to feed the tubes 41 into the sintering mechanism 31. When the tubes 41 are conveyed to the designated position, the third lifting cylinder 341 of the material blocking mechanism 34 starts, driving the material blocking member 342 upward, preventing the tubes 41 from moving further, ensuring that the container containing multiple tubes 41 is directly below the sintering mechanism 311.
[0079] 4. The second motor 2322 of the lifting and transporting mechanism 33 is activated, driving the second screw 332 to rotate through the reducer, thereby driving the support base 333 upward, lifting the tube 41 to the sintering area within the sintering mechanism 31. The heating element is activated, sintering the tube 41 at a high temperature, causing the copper powder to sinter and form a liquid wick.
[0080] 5. After sintering is complete, the heating element turns off, and the second motor 2322 of the lifting and transporting mechanism 33 rotates in the opposite direction, driving the support base 333 downward, thus transporting the tube 41 out of the sintering area. The third lifting cylinder 341 of the material retaining mechanism 34 then drives the retaining member 342 downward, releasing the tube 41. The third motor 331 then continues to operate, and the feed wheel 323 transports the tube 41 out of the sintering mechanism 31, completing the sintering process.
[0081] High-temperature sintering creates a metallurgical bond between the copper powder particles, forming a wick structure with a certain porosity and strength. Through capillary action, the wick replenishes the liquid lost in the evaporation section of the heat pipe due to vaporization from the condensation section, enabling liquid circulation within the heat pipe and continuously transferring heat away from the heat source. This creates a wick structure with excellent capillary and heat transfer properties, improving the heat transfer efficiency of the heat pipe. The precise control and automated operation of the sintering device 3 ensures the stability and consistency of the sintering process, enhancing product quality and production efficiency.
[0082] The above are all preferred embodiments of the present application, and are not intended to limit the scope of protection of the present application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the scope of protection of the present application.
Claims
1. A wick bias heat pipe processing device, characterized by: The invention comprises a tube shrinking device (1), a rod inserting device (2) and a sintering device (3); the tube shrinking device (1) is used for shrinking a tube (41) to form an eccentric tube section (412); the rod inserting device (2) is used for inserting a brazing rod (42) into the inside of the shrunken tube (41); and the sintering device (3) is used for high-temperature sintering the tube (41) into which the brazing rod (42) is inserted and copper powder is poured, to form a liquid-absorbing core biased heat pipe (4).
2. The wick bias heat pipe processing equipment according to claim 1, characterized in that: The tube shrinking device (1) comprises a first frame (11), a first tube clamping mechanism (12), a first sliding seat (13), a first sliding drive mechanism (14), a second sliding seat (15), a second sliding drive mechanism (16), a lifting mechanism (17) and a tube shrinking mechanism (18); the first tube clamping mechanism (12) is arranged on the first frame (11) and is used to clamp and fix the tube (41); the first sliding seat (13) is slidably matched with the first frame (11); the first sliding drive mechanism (14) is arranged on the first frame (11) and is used to drive the first sliding seat (13) to move along a first direction; The second sliding seat (15) is slidingly matched with the first sliding seat (13); the second sliding drive mechanism (16) is arranged on the first sliding seat (13) and is used to drive the second sliding seat (15) to move along the second direction; the lifting mechanism (17) is arranged on the second sliding seat (15) and is used to drive the tube shrinking mechanism (18) to rise and fall; the tube shrinking mechanism (18) includes a plurality of tube shrinking mold sleeves (181), and the plurality of tube shrinking mold sleeves (181) are all fixed on the side of the lifting seat (171) close to the first tube clamping mechanism (12), and the plurality of tube shrinking mold sleeves (181) are arranged at intervals along the second direction.
3. The wick bias heat pipe processing equipment according to claim 1, characterized in that: The rod insertion device (2) comprises a second frame (21), a second pipe clamping mechanism (22), a storage and unloading mechanism (24) and a transfer insertion mechanism (23); the second pipe clamping mechanism (22) is arranged on the second frame (21) and is used to clamp and fix the pipe (41) after shrinkage; the storage and unloading mechanism (24) is arranged on the second frame (21) and is used to store multiple drill rods (42) at the same time and release a single drill rod (42) in sequence; the transfer insertion mechanism (23) is arranged on the second frame (21) and is located between the second pipe clamping mechanism (22) and the storage and unloading mechanism (24), and is used to sequentially transfer the drill rods (42) released by the storage and unloading mechanism (24) to a side close to the second pipe clamping mechanism (22), and to insert the drill rods (42) into the pipe (41).
4. The wick biased heat pipe processing equipment according to claim 3, characterized in that: The second pipe clamping mechanism (22) comprises a first base (221), a second support base (222), a clamping block (223) and a second lifting cylinder (224); the first base (221) is fixed to the upper surface of the second frame (21); a third positioning groove (2211) and a fourth positioning groove (2212) are provided on the upper surface of the first base (221); the third positioning groove (2211) and the fourth positioning groove (2212) are both extended along the first direction; the depth of the third positioning groove (2211) is greater than the depth of the fourth positioning groove (2212), and both are semicircular grooves; the third positioning groove (2211) is used to position the original pipe section (411), and the fourth positioning groove (2212) is used to position the eccentric pipe section (412); the second support base (222) is fixed to the second frame (21); The second lifting cylinder (224) is fixed on the second support seat (222), the piston rod of the second lifting cylinder (224) passes through the second support seat (222) and slides with the second support seat (222), the piston rod of the second lifting cylinder (224) is fixedly connected to the clamping block (223), and the lower surface of the clamping block (223) is provided with a fifth positioning groove (2231) and a sixth positioning groove (2232), the fifth positioning groove (2231) is used to position the original pipe section (411), and the sixth positioning groove (2232) is used to position the eccentric pipe section (412), and the fifth positioning groove (2231) and the sixth positioning groove (2232) both extend along the first direction and are semicircular grooves, and the depth of the fifth positioning groove (2231) is greater than the depth of the sixth positioning groove (2232).
5. The wick biased heat pipe processing equipment according to claim 3, characterized in that: The storage and unloading mechanism (24) comprises a material storage component (241), a screening component (242) and a material receiving component (243); the material storage component (241) comprises a first support plate (2411) and two material storage plates (2412), the first support plate (2411) is fixed to the upper surface of the second frame (21), the two material storage plates (2412) are fixed to the side of the first support plate (2411) close to the transfer insertion mechanism (23), the first support plate (2411) and the two material storage plates (2412) are enclosed to form a material cavity, the top and bottom ends of the material cavity are both opened; the screening component (242) is arranged at the bottom of the material cavity, and during operation, the screening component (242) only allows one drill rod (42) in the material cavity to fall into the material receiving component (243) at a time.
6. The device for processing a wick-biased heat pipe according to claim 5, characterized in that: The material connection assembly (243) includes a material connection block (2431) and two guide blocks (2432), wherein the material connection block (2431) is fixed to the upper surface of the second frame (21), and the material connection block (2431) is located on the side of the first support plate (2411) close to the transfer insertion mechanism (23), and the upper surface of the material connection block (2431) is provided with a seventh positioning groove (2433) for positioning the drill rod (42), and the bottom ends of the two guide blocks (2432) are fixedly connected to the material connection block (2431), and the two guide blocks (2432) are both inclined, with an inclination angle of 30°-45°, and the spacing between the tops of the two guide blocks (2432) is greater than the spacing between the bottoms, and the spacing between the bottoms is adapted to the width of the seventh positioning groove (2433).
7. The device for processing a wick-biased heat pipe according to claim 5, characterized in that: The screening assembly (242) includes a fixed seat (2421), a screening column (2422) and a second driving member (2423); the fixed seat (2421) is fixed to the side of the first support plate (2411) close to the transfer insertion mechanism (23); the screening column (2422) is rotatably arranged on the side of the first support plate (2411) close to the screening mechanism, and the screening column (2422) is provided with a plurality of screening slots (2424) for positioning the drill rod (42) along the circumference, and the plurality of screening slots 2424 are arranged at equal intervals along the circumference of the screening column (2422), and the fixed seat (2421) is also provided with an arc-shaped discharge channel on the side close to the screening column (2422); the second driving member (2423) is arranged on the first support plate (2411) for driving the screening column (2422) to rotate.
8. The device for processing a wick-biased heat pipe according to claim 3, characterized in that: The transfer insertion mechanism (23) comprises a rotating seat (231), a rotating drive assembly (232) and an insertion assembly (233); the rotating seat (231) is rotatably connected to the second frame (21); the rotating drive assembly (232) is arranged in a cavity (211) on one side of the second frame (21); the rotating drive assembly (232) is used to drive the rotating seat (231) to rotate; there are multiple insertion assemblies (233), and the multiple insertion assemblies (233) are all arranged on the rotating seat (231), and the multiple insertion assemblies (233) are evenly distributed along the circumference.
9. The wick bias heat pipe processing equipment according to claim 1, characterized in that: The sintering device (3) comprises a sintering mechanism (31), a horizontal feeding mechanism (32), and a lifting and transporting mechanism (33); the sintering mechanism (31) comprises a sintering furnace (311), two second support plates (312) are fixedly provided at the bottom, the bottom of the sintering furnace (311) is open, and a heating element is provided inside the sintering furnace (311); the horizontal feeding mechanism (32) is provided below the sintering furnace (311), the lifting and transporting mechanism is provided on the second support plate (312), and the lifting and transporting mechanism (33) is used to drive a container to rise and fall, and the container is used to simultaneously contain a plurality of pipes (41).
10. A processing technology based on the liquid wick bias heat pipe processing equipment according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1: Pipe (41) shrinkage processing, the pipe (41) to be processed is placed in the first pipe clamping mechanism (12) of the pipe shrinkage device (1), and the position of the pipe shrinkage mechanism (18) is adjusted by the first sliding drive mechanism (14), the second sliding drive mechanism (16) and the lifting mechanism (17), so that the pipe shrinkage die sleeve (181) is aligned with the portion to be processed of the pipe (41), and the pipe shrinkage operation is performed to form an eccentric pipe section (412); S2: inserting the drill rod (42), placing the tube-shrinking pipe (41) in the second pipe clamping mechanism (22) of the rod insertion device (2), releasing individual drill rods (42) in sequence through the storage and unloading mechanism (24), transferring the drill rod (42) to the side close to the second pipe clamping mechanism (22), and inserting the drill rod (42) into the eccentric pipe section (412) of the pipe (41); S3: Installing the positioning fins (43), removing the pipe (41) with the drill rod (42) inserted from the second pipe clamping mechanism (22), and sequentially installing four positioning fins (43) of different shapes inside the original pipe section (411) away from the end of the eccentric pipe section (412), thereby further fixing the drill rod (42); S4: Copper powder filling and sintering. The pipe (41) into which the brazing rod (42) has been inserted and the positioning fin (43) has been installed is filled with copper powder so that the copper powder fills the area between the brazing rod (42) and the inner wall of the pipe (41). The multiple pipes (41) filled with copper powder are placed in a heat-conducting container at the same time. The pipes (41) are fed into the sintering furnace (311) by the horizontal feeding mechanism (32). The pipes (41) are lifted to the sintering area in the sintering furnace (311) by the lifting and transporting mechanism (33). The heating element is started for high-temperature sintering so that the copper powder is sintered to form a liquid-absorbing core. After sintering is completed, the pipes (41) are sent out of the sintering area by the lifting and transporting mechanism (33), and the pipes (41) are sent out of the sintering furnace (311) by the horizontal feeding mechanism (32).