Household photovoltaic power station construction quality supervision method, system, medium and equipment

By setting up online audit modules, on-site acceptance modules, acquisition price accounting modules and asset evaluation audit modules, the problem of poor quality of household photovoltaic power station construction is solved, and the quality and progress supervision of the entire life cycle of power station construction is realized, and investment risks are reduced.

CN120494602APending Publication Date: 2025-08-15SPIC INTEGRATED SMART ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510538112.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-04-27
Publication Date
2025-08-15

AI Technical Summary

Technical Problem

The existing household photovoltaic power station construction management system lacks an effective regulatory mechanism, resulting in a sub-contracted construction quality and an increase in investment risks, making it difficult for investors to confirm whether the subcontracted power station is fully qualified.

Method used

By setting up online audit modules, on-site acceptance modules, acquisition price accounting modules and asset appraisal audit modules, supervision of survey design, construction grid connection, user signing, on-site acceptance and other links is realized to ensure transparency and compliance of settlement and acquisition links.

Benefits of technology

It has enhanced the guarantee of the quality of power station construction, ensured the quality and progress supervision of the entire life cycle of power station construction, and reduced investment risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120494602A_ABST
    Figure CN120494602A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of photovoltaic construction, and provides a construction quality supervision method, system, medium and equipment for a household photovoltaic power station, and the method comprises the steps: enabling an online auditing module to pass the reexamination result verification of survey data; the online auditing module verifies the construction data reexamination result and verifies the on-site acceptance necessity result, and the verification result is that on-site acceptance is needed and on-site acceptance is not needed; the field acceptance module verifies the field acceptance data auditing result; the online auditing module verifies the contract data auditing result; the purchase price accounting module passes the verification of the initial review result of the settlement bill; the asset evaluation auditing module verifies the settlement bill reexamination result; the EPC management module verifies the settlement bill price confirmation result and generates details of the current batch of settlement bills; and the construction quality of the current batch of power stations reaches the standard. The quality and progress in the power station construction process can be effectively supervised, and it is ensured that related links are transparent and compliant.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of photovoltaic construction, and in particular relates to a method, system, medium and equipment for quality supervision of household photovoltaic power station construction. Background Art

[0002] Currently, investors typically adopt an agency construction model when investing in household photovoltaic power plants (hereinafter referred to as "power plants"). This involves the investor reaching a cooperation agreement with a construction agent (hereinafter referred to as the "agent"). The agent, acting as the general contractor, coordinates the development and construction of the power plant with subcontractors in various regions. Upon completion, the investor purchases the entire plant at an agreed-upon unit price.

[0003] This model places high demands on the construction and management expertise of the agents. Since the agents' goal is to build as many power plants as possible within a short period of time, and they control both the digital platform and the construction process, substandard construction quality and investors' over-reliance on the agents are prone to problems. Therefore, investors and supervisors urgently need a system to effectively monitor the quality and progress of the construction process, ensuring compliance and efficiency of power plant construction.

[0004] The existing household photovoltaic construction and management system has the following deficiencies: there are functional gaps in the power station acquisition process; there is no role for supervisory reviewers, which makes it impossible for investors to effectively control construction quality and difficult to confirm whether the subcontracted power stations are fully qualified, increasing investment risks and uncertainties, which may affect project progress and subsequent operations. Summary of the Invention

[0005] The present invention provides a method, system, medium and equipment for quality supervision of construction of household photovoltaic power stations.

[0006] A method for supervising the construction quality of a household photovoltaic power station according to the present invention comprises:

[0007] The EPC management module receives the settlement request and sends a request for preliminary review of the settlement order to the purchase price calculation module;

[0008] The purchase price calculation module receives the settlement statement preliminary review request and the settlement statement preliminary review result, verifies the settlement statement preliminary review result, and sends a settlement statement review request to the asset evaluation and review module after passing the verification;

[0009] The asset evaluation and review module receives the settlement statement review request and the settlement statement review result, verifies the settlement statement review result, and sends a price confirmation request to the EPC management module after the verification passes;

[0010] The EPC management module receives the price confirmation request and the settlement order price confirmation result, verifies the settlement order price confirmation result, and generates details of the current batch of settlement orders after the verification passes; the construction quality of the current batch of power stations meets the standards.

[0011] Furthermore,

[0012] Before the EPC management module receives the settlement request, it includes:

[0013] The EPC business module receives the contract signing request and sends a contract document review request to the online review module;

[0014] The online review module receives the contract information review request and the contract information review result, verifies the contract information review result, and sends the settlement request to the EPC management module after the verification passes.

[0015] Furthermore,

[0016] Before the EPC management module receives the settlement request, the module further includes:

[0017] The EPC management module receives the on-site acceptance request and sends a request for on-site acceptance data review to the on-site acceptance module;

[0018] The on-site acceptance module receives the on-site acceptance document review request and the on-site acceptance document review result, verifies the on-site acceptance document review result, and sends the settlement request to the EPC management module after the verification passes.

[0019] Furthermore,

[0020] Before the EPC management module receives the settlement request, the module further includes:

[0021] The online review module receives the construction data review request, the construction data review result and the on-site acceptance necessity result, verifies the construction data review result, and after the verification is passed, verifies the on-site acceptance necessity result to obtain the verification result. If the verification result is that on-site acceptance is required, the on-site acceptance request is sent to the EPC management module; if the verification result is that on-site acceptance is not required, the settlement request is sent to the EPC management module.

[0022] Furthermore,

[0023] Before the EPC business module receives the contract signing request, it includes:

[0024] The online review module receives the results of the field investigation data review, verifies the results of the field investigation data review, and after passing the verification, sends a construction data review request and the contract signing request to the EPC business module.

[0025] Furthermore,

[0026] Before the online review module receives the construction data review request, it includes:

[0027] The online review module receives the results of the field survey data review, verifies the results of the field survey data review, and sends a construction data review request and the contract signing request to the EPC business module after the verification passes;

[0028] The EPC business module receives the construction data review request and sends a construction data preliminary review request to the EPC management module;

[0029] The EPC management module receives the construction data preliminary review request and the construction data preliminary review result, verifies the construction data preliminary review result, and sends the construction data review request to the online review module after the verification passes.

[0030] A household photovoltaic power station construction quality supervision system of the present invention is used to implement the above-mentioned household photovoltaic power station construction quality supervision method, and the system includes:

[0031] The EPC management module is used to receive settlement requests and send preliminary review requests for settlement orders to the purchase price calculation module;

[0032] The purchase price calculation module is configured to receive the settlement statement preliminary review request and the settlement statement preliminary review result, verify the settlement statement preliminary review result, and send a settlement statement review request to the asset evaluation and review module after the verification passes;

[0033] The asset evaluation and review module is configured to receive the settlement statement review request and the settlement statement review result, verify the settlement statement review result, and send a price confirmation request to the EPC management module after the verification passes;

[0034] The EPC management module is also used to receive the price confirmation request and the settlement order price confirmation result, verify the settlement order price confirmation result, and after the verification is passed, generate the details of the current batch of settlement orders; the construction quality of the current batch of power stations meets the standards.

[0035] Furthermore,

[0036] Also includes:

[0037] The EPC business module is used to receive contract signing requests and send contract document review requests to the online review module;

[0038] The online review module is used to receive the contract information review request and the contract information review result, verify the contract information review result, and send the settlement request to the EPC management module after the verification is passed.

[0039] Furthermore,

[0040] Also includes:

[0041] The EPC management module is configured to receive a site acceptance request and send a site acceptance document review request to the site acceptance module;

[0042] The on-site acceptance module is configured to receive the on-site acceptance document review request and the on-site acceptance document review result, verify the on-site acceptance document review result, and send the settlement request to the EPC management module after the verification passes.

[0043] Furthermore,

[0044] Also includes:

[0045] The online review module is used to receive a construction data review request, a construction data review result, and a result on the necessity of on-site acceptance, and verify the construction data review result. After the verification is passed, the necessity of on-site acceptance is verified to obtain a verification result. If the verification result is that on-site acceptance is required, an on-site acceptance request is sent to the EPC management module; if the verification result is that on-site acceptance is not required, the settlement request is sent to the EPC management module.

[0046] Furthermore,

[0047] Also includes:

[0048] The online review module is used to receive the review results of the field investigation data, verify the review results of the field investigation data, and after the verification is passed, send a construction data review request and the contract signing request to the EPC business module.

[0049] Furthermore,

[0050] Also includes:

[0051] The online review module is used to receive the results of the field survey data review, verify the results of the field survey data review, and send a construction data review request and the contract signing request to the EPC business module after the verification passes;

[0052] The EPC business module is configured to receive the construction data review request and send a construction data preliminary review request to the EPC management module;

[0053] The EPC management module is used to receive the construction data preliminary review request and the construction data preliminary review result, verify the construction data preliminary review result, and after the verification is passed, send the construction data review request to the online review module.

[0054] A computer-readable storage medium of the present invention stores a program or instruction. When the program or instruction is run on a computer, the computer executes the aforementioned household photovoltaic power station construction quality supervision method.

[0055] An electronic device of the present invention includes a processor coupled to a memory; the processor is used to read and execute a computer program stored in the memory to implement the aforementioned household photovoltaic power station construction quality supervision method.

[0056] Compared with the prior art, the present invention has the following beneficial effects:

[0057] By setting up online review modules and on-site acceptance modules, the supervision of survey and design, construction and grid connection, user signing, on-site acceptance and other links can be strengthened, and the quality of power station construction can be guaranteed.

[0058] By setting up the acquisition price accounting module and the asset valuation review module, the transparency and compliance of the settlement and acquisition links can be ensured.

[0059] Through the information exchange and mutual collaboration of the EPC business module, EPC management module, online audit module, on-site acceptance module, purchase price accounting module and asset appraisal audit module, the quality and progress of the power plant construction process can be effectively supervised, that is, the quality and progress of the power plant construction throughout its life cycle can be effectively supervised. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0061] Figure 1 This is a flow chart of the quality supervision method for household photovoltaic power station construction of the present invention;

[0062] Figure 2 This is a schematic diagram of the structure of the household photovoltaic power station construction quality supervision system of the present invention;

[0063] Figure 3 Schematic diagram of the structure of the electronic device of the present invention.

[0064] Description of reference numerals:

[0065] 201-Online review module, 202-EPC business module, 203-EPC management module, 204-On-site acceptance module, 205-Purchase price calculation module, 206-Asset evaluation review module, 301-Processor, 302-Memory. DETAILED DESCRIPTION

[0066] To make the objectives, technical solutions, and advantages of the embodiments of the present invention more clear, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts shall fall within the scope of protection of the present invention.

[0067] Figure 1 1 is a flow chart of a method for quality supervision of household photovoltaic power station construction provided by an embodiment of the present invention. In one embodiment, the method specifically includes the following steps:

[0068] S101: The online review module receives the results of the field investigation data review, verifies the results of the field investigation data review, and after passing the verification, sends a construction data review request and a contract signing request to the EPC business module.

[0069] S101 - 1 : The EPC business module (ie, the “general contractor business module”, the same below) receives a request for resubmission of the survey data sent by the EPC management module (ie, the “general contractor management module”, the same below).

[0070] S101-2: The EPC salesperson (i.e., "general contractor salesperson," the same below) creates new field survey data and uploads the data to the EPC business module; or the EPC salesperson resubmits a request to modify the field survey data based on the field survey data and uploads the data to the EPC business module.

[0071] S101-3: The EPC business module receives the survey data submitted by the EPC salesperson and sends a request for preliminary review of the survey data to the EPC management module. The request for preliminary review of the survey data includes the survey data.

[0072] S101 - 4 : The EPC management module receives the request for preliminary review of the field survey data sent by the EPC business module and the request for re-preliminary review of the field survey data sent by the online review module.

[0073] S101-5: The EPC administrator (i.e., "general contractor administrator," the same below) conducts a preliminary review of the field investigation data and uploads the preliminary review results to the EPC management module.

[0074] S101-6: The EPC management module receives the preliminary review results of the survey data and verifies whether the preliminary review results of the survey data are passed. If passed, a survey data review request is sent to the online review module and S101-7 is executed; if not passed, a survey data resubmission request is sent to the EPC business module and S101-1 is executed.

[0075] S101-7: The online review module receives the survey data review request sent by the EPC management module. The survey data review request includes the survey data.

[0076] S101-8: The online audit specialist reviews the field investigation materials and uploads the review results to the online audit module.

[0077] S101-9: The online review module receives the results of the field survey data review and verifies whether the results are passed. If passed, a construction data review request and a contract signing request are sent to the EPC business module and S102 is executed; if not passed, a field survey data re-examination request is sent to the EPC management module and S101-4 is executed.

[0078] S102: The EPC business module receives the construction data review request and sends a construction data preliminary review request to the EPC management module.

[0079] S102-1: The EPC business module receives the construction data review request sent by the online review module and the construction data resubmission request sent by the EPC management module.

[0080] S102-2: The EPC salesperson creates new construction data based on the construction data review request and uploads the construction data to the EPC business module; or modifies the construction data based on the resubmission request of the construction data and uploads the construction data to the EPC business module.

[0081] S102-3: The EPC business module receives the construction data submitted by the EPC salesperson and sends a construction data preliminary review request to the EPC management module. The construction data preliminary review request includes the construction data.

[0082] S103: The EPC management module receives the construction data preliminary review request and the construction data preliminary review result, verifies the construction data preliminary review result, and sends a construction data review request to the online review module after the verification passes.

[0083] S103-1: The EPC management module receives the construction data preliminary review request sent by the EPC business module and the construction data re-preliminary review request sent by the online review module.

[0084] S103-2: The EPC administrator conducts a preliminary review of the construction data and uploads the preliminary review results to the EPC management module.

[0085] S103-3: The EPC management module receives the preliminary review results of the construction data and verifies whether the preliminary review results of the construction data are passed. If passed, a construction data review request is sent to the online review module and S104 is executed; if not passed, a construction data resubmission request is sent to the EPC business module and S102-1 is executed.

[0086] S104: The online review module receives the construction data review request, the construction data review results and the necessity result of on-site acceptance, verifies the construction data review results, and after the verification is passed, verifies the necessity result of on-site acceptance to obtain the verification result. If the verification result is that on-site acceptance is required, an on-site acceptance request is sent to the EPC management module; if the verification result is that on-site acceptance is not required, a settlement request is sent to the EPC management module.

[0087] S104-1: The online review module receives the construction data review request sent by the EPC management module. The construction data review request includes the construction data.

[0088] S104-2: The online audit specialist reviews the construction data and confirms whether on-site acceptance is required, and uploads the construction data review results and the necessity of on-site acceptance to the online audit module.

[0089] S104-3: The online review module receives the construction data review results and the on-site acceptance necessity results, and verifies whether the construction data review results are passed. If not, a request for re-review of the construction data is sent to the EPC management module, and S103-1 is executed; if passed, the on-site acceptance necessity result is verified to see whether on-site acceptance is required. If on-site acceptance is required, an on-site acceptance request is sent to the EPC management module, and S105 is executed; if on-site acceptance is not required, a settlement request is sent to the EPC management module, and S109 is executed.

[0090] S105: The EPC management module receives the on-site acceptance request and sends an on-site acceptance document review request to the on-site acceptance module.

[0091] S105-1: The EPC management module receives the on-site acceptance request sent by the online review module and the acceptance document resubmission request sent by the on-site acceptance module.

[0092] S105-2: The EPC administrator creates a new on-site acceptance document based on the on-site acceptance request and uploads the on-site acceptance document to the EPC management module; or the EPC administrator modifies the on-site acceptance document based on the resubmitted acceptance request and uploads the on-site acceptance document to the EPC management module.

[0093] S105-3: The EPC management module receives the on-site acceptance data submitted by the EPC administrator and sends a request for reviewing the on-site acceptance data to the on-site acceptance module. The request for reviewing the on-site acceptance data includes the on-site acceptance data.

[0094] S106: The on-site acceptance module receives the on-site acceptance document review request and the on-site acceptance document review result, verifies the on-site acceptance document review result, and sends a settlement request to the EPC management module after the verification passes.

[0095] S106-1: The on-site acceptance module receives the on-site acceptance document review request sent by the EPC management module.

[0096] S106-2: The on-site acceptance specialist reviews the on-site acceptance documents and uploads the review results to the on-site acceptance module.

[0097] S106-3: The on-site acceptance module receives the on-site acceptance document review result and verifies whether the on-site acceptance document review result is passed. If passed, a settlement request is sent to the EPC management module and S109 is executed; if not passed, a request for resubmission of the acceptance document is sent to the EPC management module and S105-1 is executed.

[0098] S107: The EPC business module receives the contract signing request and sends a contract information review request to the online review module.

[0099] S107-1: The EPC business module receives the contract signing request and the contract document resubmission request sent by the online review module.

[0100] S107-2: The EPC salesperson signs the electronic contract with the client based on the contract signing request and submits the contract information to the EPC business module. Alternatively, the EPC salesperson resubmits the contract information and re-signs the electronic contract with the client based on the contract information and submits the contract information to the EPC business module. Electronic contracts can be signed online or offline.

[0101] S107-3: The EPC business module receives the contract information submitted by the EPC salesperson and sends a contract information review request to the online review module. The contract information review request includes the contract information.

[0102] S108: The online review module receives the contract data review request and the contract data review result, verifies the contract data review result, and sends a settlement request to the EPC management module after the verification passes.

[0103] S108-1: The online review module receives the contract information review request sent by the EPC business module.

[0104] S108-2: The online audit specialist reviews the contract information and uploads the audit results to the online audit module.

[0105] S108-3: The online review module receives the contract document review result and verifies whether the contract document review result is passed. If passed, a settlement request is sent to the EPC management module and S109 is executed; if not, a contract document resubmission request is sent to the EPC business module and S107-1 is executed.

[0106] S109: The EPC management module receives the settlement request and sends a settlement order preliminary review request to the purchase price calculation module.

[0107] S109-1: The EPC management module receives the settlement request sent by the online review module, the settlement request sent by the on-site acceptance module, and the settlement statement resubmission request sent by the purchase price calculation module.

[0108] S109-2: The EPC administrator selects power plants to be settled in batches according to the settlement request, generates a settlement statement, and submits the settlement statement to the EPC management module; or the EPC administrator re-selects power plants to be settled in batches according to the settlement statement resubmission request, generates a settlement statement, and submits the settlement statement to the EPC management module.

[0109] S109-3: The EPC management module receives the settlement statement submitted by the EPC administrator and sends a settlement statement preliminary review request to the purchase price calculation module. The settlement statement preliminary review request includes the settlement statement.

[0110] S110: The purchase price accounting module receives the settlement statement preliminary review request and the settlement statement preliminary review result, verifies the settlement statement preliminary review result, and sends a settlement statement review request to the asset appraisal review module after the verification passes.

[0111] S110-1: The purchase price calculation module receives the settlement statement preliminary review request sent by the EPC management module and the settlement statement re-preliminary review request sent by the asset appraisal review module.

[0112] S110-2: The purchase price calculation specialist reviews, verifies and modifies the power plant unit price on the settlement sheet, and uploads the preliminary review results of the settlement sheet to the purchase price calculation module.

[0113] S110-3: The purchase price accounting module receives the preliminary review result of the settlement statement and verifies whether the preliminary review result of the settlement statement is passed. If passed, a settlement statement review request is sent to the asset appraisal review module and S111 is executed; if not passed, a settlement statement resubmission request is sent to the EPC management module and S109-1 is executed.

[0114] S111: The asset appraisal review module receives the settlement statement review request and the settlement statement review result, verifies the settlement statement review result, and sends a price confirmation request to the EPC management module after the verification passes.

[0115] S111-1: The asset valuation review module receives the settlement statement review request sent by the purchase price accounting module and the settlement statement re-review request sent by the EPC management module.

[0116] S111-2: The asset appraisal and audit specialist compares the settlement statement assessment report with the power plant cost and uploads the settlement statement review results to the asset appraisal and audit module.

[0117] S111-3: The asset appraisal review module receives the settlement statement review result and verifies whether the settlement statement review result is passed. If passed, it sends a price confirmation request to the EPC management module and executes S112; if not passed, it sends a settlement statement re-review request to the purchase price accounting module and executes S110-1.

[0118] S112: The EPC management module receives the price confirmation request and the settlement order price confirmation result, verifies the settlement order price confirmation result, and generates the details of the current batch of settlement orders after the verification passes; the construction quality of the current batch of power stations meets the standards.

[0119] S112-1: The EPC management module receives a price confirmation request sent by the asset evaluation and review module.

[0120] S112-2: The EPC administrator confirms the price of the settlement order and uploads the settlement order price confirmation result to the EPC management module.

[0121] S112-3: The EPC management module receives the settlement order price confirmation result and verifies whether the settlement order price confirmation result is passed. If passed, the details of the current batch of settlement orders are generated; if not passed, a settlement order re-review request is sent to the asset appraisal review module and S111-1 is executed.

[0122] After review and confirmation of the aforementioned process nodes, it can be determined that the construction quality of the current batch of power stations meets the standards.

[0123] The embodiment of the present invention also provides a household photovoltaic power station construction quality supervision system, such as Figure 2 As shown, including:

[0124] 1. Online review module 201, used for:

[0125] 1) Receive the request for review of the survey materials.

[0126] 2) Receive the results of the site survey data review and verify whether the results are passed. If passed, send a construction data review request and contract signing request to the EPC business module; if not, send a site survey data re-examination request to the EPC management module.

[0127] 3) Receive requests for review of construction materials.

[0128] 4) Receive the construction data review results and the on-site acceptance necessity results, verify whether the construction data review results are passed, if not, send a construction data re-review request to the EPC management module; if passed, verify whether the on-site acceptance necessity results are that on-site acceptance is required, if on-site acceptance is required, send an on-site acceptance request to the EPC management module; if on-site acceptance is not required, send a settlement request to the EPC management module; if not passed, send a construction data re-review request to the EPC management module.

[0129] 5) Receive contract document review requests.

[0130] 6) Receive the contract data review results and verify whether the contract data review results are passed. If passed, send a settlement request to the EPC management module; if not, send a contract data resubmission request to the EPC business module.

[0131] 2. EPC business module 202, used for:

[0132] 1) Receive the survey data and resubmit the request.

[0133] 2) Receive the survey data and send a preliminary review request for the survey data to the EPC management module.

[0134] 3) Receive construction data review requests.

[0135] 4) Receive construction data and resubmit request.

[0136] 5) Receive construction data and send a request for preliminary review of construction data to the EPC management module.

[0137] 6) Receive contract signing request.

[0138] 7) Receive contract information and resubmit request.

[0139] 8) Receive contract information and send a contract information review request to the online review module.

[0140] 3. EPC management module 203, used to:

[0141] 1) Receive the request for preliminary review of the survey materials.

[0142] 2) Receive the request for re-examination of the survey data.

[0143] 3) Receive the preliminary review results of the survey data and verify whether the preliminary review results of the survey data are passed. If passed, send a survey data review request to the online review module; if not passed, send a survey data resubmission request to the EPC business module.

[0144] 4) Receive request for preliminary review of construction materials.

[0145] 5) Receive the request for re-examination of construction materials.

[0146] 6) Receive the preliminary review results of the construction data and verify whether the preliminary review results of the construction data are passed. If passed, send a construction data review request to the online review module; if not passed, send a construction data resubmission request to the EPC business module.

[0147] 7) Receive on-site acceptance requests.

[0148] 8) Receive acceptance materials and resubmit the request.

[0149] 9) Receive on-site acceptance data and send a request for on-site acceptance data review to the on-site acceptance module.

[0150] 10) Receive settlement request.

[0151] 11) Receive settlement statement resubmission request.

[0152] 12) Receive the settlement statement and send a request for preliminary review of the settlement statement to the purchase price calculation module.

[0153] 13) Receive price confirmation request.

[0154] 14) Receive the settlement order price confirmation result and verify whether the settlement order price confirmation result is passed. If passed, generate the details of the current batch of settlement orders; if not, send a settlement order re-review request to the asset appraisal review module.

[0155] 4. On-site acceptance module 204, used to:

[0156] 1) Receive on-site acceptance document review requests.

[0157] 2) Receive the on-site acceptance document review results, verify whether the on-site acceptance document review results are passed, if passed, send a settlement request to the EPC management module; if not, send a resubmission request for the acceptance document to the EPC management module.

[0158] 5. Purchase price calculation module 205, used to:

[0159] 1) Receive the request for preliminary review of the settlement statement.

[0160] 2) Receive the request for re-examination of the settlement statement.

[0161] 3) Receive the preliminary review results of the settlement statement and verify whether the preliminary review results of the settlement statement are passed. If passed, send a settlement statement review request to the asset appraisal review module; if not passed, send a settlement statement resubmission request to the EPC management module.

[0162] 6. Asset evaluation and review module 206, used to:

[0163] 1) Receive settlement statement review request.

[0164] 2) Receive the request for re-review of the settlement statement.

[0165] 3) Receive the settlement statement review result and verify whether the settlement statement review result is passed. If passed, send a price confirmation request to the EPC management module; if not, send a settlement statement re-review request to the purchase price accounting module.

[0166] An embodiment of the present invention also provides a computer-readable storage medium storing a program or instruction. When the program or instruction is executed on a computer, the computer executes the household photovoltaic power station construction quality supervision method as described in the above method embodiment.

[0167] like Figure 3 As shown, an embodiment of the present invention also provides an electronic device, including: a processor 301, the processor 301 is coupled to a memory 302, and the processor 301 is used to read and execute a computer program stored in the memory 302 to implement the household photovoltaic power station construction quality supervision method as described in the above method embodiment.

[0168] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein; and these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for supervising the construction quality of household photovoltaic power stations, characterized in that: include: The EPC management module receives the settlement request and sends a request for preliminary review of the settlement order to the purchase price calculation module; The purchase price calculation module receives the settlement statement preliminary review request and the settlement statement preliminary review result, verifies the settlement statement preliminary review result, and sends a settlement statement review request to the asset evaluation and review module after passing the verification; The asset evaluation and review module receives the settlement statement review request and the settlement statement review result, verifies the settlement statement review result, and sends a price confirmation request to the EPC management module after the verification passes; The EPC management module receives the price confirmation request and the settlement order price confirmation result, verifies the settlement order price confirmation result, and generates details of the current batch of settlement orders after the verification passes; The construction quality of the current batch of power stations meets the standards.

2. The method according to claim 1, characterized in that Before the EPC management module receives the settlement request, it includes: The EPC business module receives the contract signing request and sends a contract document review request to the online review module; The online review module receives the contract information review request and the contract information review result, verifies the contract information review result, and sends the settlement request to the EPC management module after the verification passes.

3. The method according to claim 1, characterized in that Before the EPC management module receives the settlement request, the module further includes: The EPC management module receives the on-site acceptance request and sends a request for on-site acceptance data review to the on-site acceptance module; The on-site acceptance module receives the on-site acceptance document review request and the on-site acceptance document review result, verifies the on-site acceptance document review result, and sends the settlement request to the EPC management module after the verification passes.

4. The method according to claim 1, wherein Before the EPC management module receives the settlement request, the module further includes: The online review module receives the construction data review request, the construction data review result and the on-site acceptance necessity result, verifies the construction data review result, and after the verification is passed, verifies the on-site acceptance necessity result to obtain the verification result. If the verification result is that on-site acceptance is required, the on-site acceptance request is sent to the EPC management module; if the verification result is that on-site acceptance is not required, the settlement request is sent to the EPC management module.

5. The method according to claim 2, characterized in that Before the EPC business module receives the contract signing request, it includes: The online review module receives the results of the field investigation data review, verifies the results of the field investigation data review, and after passing the verification, sends a construction data review request and the contract signing request to the EPC business module.

6. The method according to claim 4, characterized in that Before the online review module receives the construction data review request, it includes: The online review module receives the results of the field survey data review, verifies the results of the field survey data review, and sends a construction data review request and the contract signing request to the EPC business module after the verification passes; The EPC business module receives the construction data review request and sends a construction data preliminary review request to the EPC management module; The EPC management module receives the construction data preliminary review request and the construction data preliminary review result, verifies the construction data preliminary review result, and sends the construction data review request to the online review module after the verification passes.

7. A household photovoltaic power station construction quality supervision system, characterized in that: include: The EPC management module is used to receive settlement requests and send preliminary review requests for settlement orders to the purchase price calculation module; The purchase price calculation module is configured to receive the settlement statement preliminary review request and the settlement statement preliminary review result, verify the settlement statement preliminary review result, and send a settlement statement review request to the asset evaluation and review module after the verification passes; The asset evaluation and review module is configured to receive the settlement statement review request and the settlement statement review result, verify the settlement statement review result, and send a price confirmation request to the EPC management module after the verification passes; The EPC management module is also used to receive the price confirmation request and the settlement order price confirmation result, verify the settlement order price confirmation result, and after the verification is passed, generate the details of the current batch of settlement orders; the construction quality of the current batch of power stations meets the standards.

8. The system according to claim 7, characterized in that Also includes: The EPC business module is used to receive contract signing requests and send contract document review requests to the online review module; The online review module is used to receive the contract information review request and the contract information review result, verify the contract information review result, and send the settlement request to the EPC management module after the verification is passed.

9. The system according to claim 7, wherein: Also includes: The EPC management module is configured to receive a site acceptance request and send a site acceptance document review request to the site acceptance module; The on-site acceptance module is configured to receive the on-site acceptance document review request and the on-site acceptance document review result, verify the on-site acceptance document review result, and send the settlement request to the EPC management module after the verification passes.

10. The system according to claim 7, wherein: Also includes: The online review module is used to receive a construction data review request, a construction data review result, and a result on the necessity of on-site acceptance, and verify the construction data review result. After the verification is passed, the necessity of on-site acceptance is verified to obtain a verification result. If the verification result is that on-site acceptance is required, an on-site acceptance request is sent to the EPC management module; if the verification result is that on-site acceptance is not required, the settlement request is sent to the EPC management module.

11. The system according to claim 8, wherein: Also includes: The online review module is used to receive the review results of the field investigation data, verify the review results of the field investigation data, and after the verification is passed, send a construction data review request and the contract signing request to the EPC business module.

12. The system according to claim 10, wherein: Also includes: The online review module is used to receive the results of the field survey data review, verify the results of the field survey data review, and send a construction data review request and the contract signing request to the EPC business module after the verification passes; The EPC business module is configured to receive the construction data review request and send a construction data preliminary review request to the EPC management module; The EPC management module is used to receive the construction data preliminary review request and the construction data preliminary review result, verify the construction data preliminary review result, and after the verification is passed, send the construction data review request to the online review module.

13. A computer-readable storage medium, characterized in that A program or instruction is stored, and when the program or instruction is run on a computer, the computer is caused to execute the household photovoltaic power station construction quality supervision method according to any one of claims 1 to 6.

14. An electronic device, characterized in that: comprising a processor coupled to a memory; The processor is configured to read and execute the computer program stored in the memory to implement the household photovoltaic power station construction quality supervision method according to any one of claims 1 to 6.