Fixing support for maintenance and management of energy-saving air conditioner

By designing buffer and temperature control components and using air-conditioning water for temperature regulation and atomization discharge, the problem of insufficient installation stability of existing air-conditioning fixed brackets is solved, the effective use of air-conditioning water and automatic control of the frame temperature are achieved, and the installation stability and service life are improved.

CN120667770APending Publication Date: 2025-09-19NANJING SHENGYA INFORMATION TECHNOLOGY CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202510900958.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-07-01
Publication Date
2025-09-19

AI Technical Summary

Technical Problem

Existing air conditioner fixing brackets cannot use the discharged water to adjust the temperature of the brackets, resulting in insufficient installation stability.

Method used

An energy-saving air-conditioning maintenance and management fixed bracket is designed. Through the combination of a buffer component, a temperature control component and an infusion component, air-conditioning water is used for temperature regulation and atomization discharge. The bracket includes the thermal insulation gasket, heat-conducting tube, telescopic rod, piston cylinder in the buffer component and the heat-conducting plate and memory metal regulating plate in the temperature control component, thereby realizing automatic regulation of the frame temperature and effective utilization of air-conditioning water.

Benefits of technology

It realizes the effective collection and utilization of air-conditioning drainage, automatically adjusts the frame temperature, avoids wall soaking, and improves installation stability and service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120667770A_ABST
    Figure CN120667770A_ABST
Patent Text Reader

Abstract

The invention discloses an energy-saving air conditioner maintenance and management fixing support, and belongs to the technical field of energy-saving air conditioner supports, the energy-saving air conditioner maintenance and management fixing support comprises two support bodies fixedly mounted on the outer side of a wall through bolts, the upper ends of the support bodies are movably connected with mounting plates, and the mounting plates are fixedly connected with an energy-saving air conditioner outdoor unit through bolts; a buffering assembly is connected between the frame body and the mounting plates, a temperature adjusting assembly used for conducting heat is arranged on the outer side of the buffering assembly, the frame body is of a hollow structure, a heat exchange pipe is fixedly connected to the inner side of the frame body, a connecting piece is connected between the two mounting plates in an inserted mode, and a spraying assembly used for reducing air conditioner water dripping is further installed on the frame body. The energy-saving air conditioner maintenance and management fixing support can effectively collect and utilize drained water of an air conditioner, automatic regulation and control over the temperature of the support body are achieved, the situation that the installation stability is reduced and the service life is prolonged due to the fact that the temperature change of the support body is large is avoided, atomized discharge of air conditioner water can be achieved, and a wall is prevented from being wetted and damaged for a long time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of energy-saving air-conditioning brackets, in particular to an energy-saving air-conditioning maintenance and management fixing bracket. Background Art

[0002] Energy-saving air conditioners are generally composed of indoor and outdoor units. Since the outdoor unit needs to be placed outside the outdoor wall, a fixed bracket is required to facilitate the maintenance and management of the air conditioner.

[0003] The prior art (publication number: CN118912592A, Chinese patent publication date: 2024-11-08) discloses a high-altitude installation bracket for an air-conditioning outdoor unit. In order to solve the safety hazards and the problem of a large amount of water flow rushing downward in the form of a beam when the air-conditioning outdoor unit is installed at high altitude, two pull ropes are arranged in the outer box. When the outer box is installed, the pull ropes first pass through the main beam arm, and finally the pull ropes are pulled to transport the outer box to the main beam arm to complete the fixation, thereby avoiding the installation personnel from manually carrying the outer box and causing it to fall. The top of the pull rope cannot pass through the main beam arm due to a knot, which also avoids the outer box from falling. At the same time, when the outer box is installed, the water collected by the water collecting chamber will be discharged along the pull rope, and the water flow will be dispersed through the limiting base to avoid the water flow beam from flowing downward, reducing the impact damage to pedestrians below, and achieving the effect of easy high-altitude installation and prevention of water flow beam discharge; The prior art (publication number: CN110925898A, Chinese patent publication date: 2020-03-27) discloses an air-conditioning outdoor unit fixing bracket that is easy to install, which solves the problem that the existing air-conditioning outdoor unit fixing bracket generally adopts triangular iron to weld into left and right mounting brackets, which need to be installed separately when installed at high altitude, making the installation very dangerous and inconvenient. The bracket comprises a telescopic plate, wall fixing plates are welded on both sides of the outside of the telescopic plate, a fixing assembly is fixed to the outside of the wall fixing plate, and a vibration damping assembly is fixed to the top of the fixing assembly. The fixing assembly includes a first screw hole, a second screw hole, a baffle, a first bolt, a U-shaped block, a flat support plate, a rotating shaft, a support plate and a second bolt; the present invention has a simple structure and is easy to operate. The use of the fixing assembly allows the installer to safely and quickly install the fixing bracket on the wall, and the use of the buffer assembly can effectively prevent the fixing bracket and the air-conditioning outdoor unit from resonating, thereby reducing noise and extending the service life of the fixing bracket; Although the existing air conditioning bracket can achieve decentralized drainage, it still discharges water in the form of water droplets, causing the wall to be soaked. Moreover, it is impossible to use the discharged water to adjust the temperature of the bracket to further improve the installation stability of the bracket, and there are certain usage defects. Summary of the Invention

[0004] The purpose of the present invention is to provide an energy-saving air conditioner maintenance and management fixing bracket to solve the problem raised in the above background technology that the air conditioner fixing bracket on the market cannot use the discharged water to adjust the temperature of the bracket to further improve the installation stability of the bracket.

[0005] To achieve the above-mentioned object, the present invention provides the following technical solution: an energy-saving air conditioner maintenance and management fixed bracket, comprising two frames fixedly mounted on the outside of a wall by bolts, the upper ends of the frames being movably connected to a mounting plate, and the mounting plate being fixedly connected to the outdoor unit of the energy-saving air conditioner by bolts; A buffer assembly is connected between the frame and the mounting plate, and a temperature control assembly for conducting heat is provided on the outside of the buffer assembly. The frame is a hollow structure, and a heat exchange tube is fixedly connected to the inner side of the frame. A connector is inserted between the two mounting plates, and the outer sides of the connector are respectively fixedly connected to the first collection box and the second collection box, and the first collection box is connected to the air-conditioning drain pipe. A movable lever is elastically rotatably installed on the outer side of the frame, and an infusion assembly is also fixedly installed on the outer side of the frame, and the frame is driven by the movable lever. A spray assembly for reducing water dripping from the air conditioner is also installed on the frame.

[0006] Preferably, the buffer assembly includes a thermal insulation gasket evenly fixedly installed on the upper end of the frame, and a heat-conducting tube is fixedly installed on the upper end of the thermal insulation gasket, and a telescopic rod is installed on the inner side of the heat-conducting tube for lifting and lowering. At the same time, the telescopic rod is fixedly installed below the mounting plate, and a spring is fixedly connected between the telescopic rod and the heat-conducting tube.

[0007] Preferably, the space between the frame and the heat exchange tube is filled with paraffin phase change material, and the inside of the heat exchange tube is filled with air-conditioning water.

[0008] Preferably, the end of the movable lever close to the rotating shaft is fixedly connected to the mounting plate via a flexible pad, and the mounting plate pushes the movable lever to rotate elastically when the air conditioner vibrates.

[0009] Preferably, the infusion assembly includes a piston cylinder fixedly mounted on the frame, and the inner side of the piston cylinder is slidingly connected with a piston plate, and the upper end of the piston plate is fixedly connected to a guide rod, and at the same time, the upper end of the guide rod slides through the upper end of the piston cylinder, and the guide rod and the movable lever are fixedly connected to a first pull rope at one end away from the rotating shaft. During the rotation of the movable lever, the piston plate is pulled to slide on the inside of the piston cylinder by the first pull rope, and a spring is fixedly connected between the upper inner wall of the piston cylinder and the upper end of the piston plate.

[0010] Preferably, a drain pipe is fixedly connected between the lower end of the piston cylinder and the heat exchange tube, and a second suction pipe is fixedly connected between the lower end of the piston cylinder and the first collecting box, and a one-way valve structure is installed above both the drain pipe and the second suction pipe. The piston cylinder draws air-conditioning water from the first collecting box through the second suction pipe and transports it to the heat exchange tube through the drain pipe.

[0011] Preferably, the movable tube and the heat exchange tube are elastically rotatably connected and communicated, and an atomizing nozzle is installed on the movable tube.

[0012] Preferably, the temperature control component includes a heat-conducting plate that is lifted and lowered and mounted on the outside of the heat-conducting tube, and each heat-conducting plate is fixedly connected and assembled through an adjustment plate, and an adjustment plate is fixedly connected between the adjustment plate and the top of the frame. At the same time, the adjustment plate is made of memory metal material, and the adjustment plate drives the adjustment plate and the heat-conducting plate to move downward when the temperature is low. After the heat-conducting plate moves downward, it fits into the frame, and the heat-conducting plate conducts the heat generated by the air pressure compression inside the heat-conducting tube.

[0013] Preferably, a second pull rope is fixedly connected to the outer side of the adjustment plate, and the other end of the second pull rope is wrapped around the movable tube, and during the movement of the adjustment plate, the movable tube is pulled by the second pull rope to rotate elastically to adjust the direction of the atomizing nozzle.

[0014] Preferably, fixed grilles made of non-heat-conducting material are evenly provided on the connecting parts, and the fixed grilles are attached to the outside of the wall, and the fixed grilles are located above the second collecting box. At the same time, a first suction pipe is fixedly connected between the second collecting box and the piston cylinder, and a buoyancy ball valve structure is provided at one end of the first suction pipe located on the inner side of the second collecting box, and when the air-conditioning water inside the second collecting box opens the buoyancy ball valve through buoyancy, the piston cylinder extracts the air-conditioning water in the second collecting box through the first suction pipe.

[0015] Compared with the existing technology, the beneficial effects of the present invention are: the energy-saving air-conditioning maintenance and management fixed bracket can effectively collect and utilize air-conditioning drainage, realize automatic control of the rack temperature, avoid large temperature fluctuations of the rack that reduce the installation stability and service life, and can realize atomized discharge of air-conditioning water, avoiding long-term soaking and damage to the wall. The specific contents are as follows; 1. It is equipped with a telescopic rod, a heat-conducting tube, and a heat-insulating gasket. As the air conditioner outdoor unit vibrates during operation, it will drive the mounting plate to vibrate synchronously. At this time, the mounting plate will drive the telescopic rod to move up and down in the heat-conducting tube, thereby compressing the gas inside the heat-conducting tube, and then achieving efficient shock absorption through the elastic force of the spring; 2. A mounting plate, a movable lever, and a piston cylinder are provided. As the mounting plate elastically rises and falls, it can drive the movable lever to perform reciprocating elastic rotation. During the rotation of the movable lever, the guide rod and the piston plate can be pulled by the first pull rope to perform elastic lifting and lowering adjustment in the piston cylinder, so that the piston cylinder can extract the air-conditioning water collected in the first collection box through the second suction pipe and transport the air-conditioning water to the heat exchange tube through the discharge pipe, thereby cooling the phase change material inside the frame and preventing the frame from maintaining a high temperature in hot weather; 3. A movable tube is provided. As the water pressure inside the heat exchange tube increases, the air-conditioning water can be transported through the movable tube and discharged through the atomizing nozzle. In a high-temperature environment, the atomizing nozzle is directed toward the air-conditioning outdoor unit, and the air-conditioning outdoor unit is cooled by the sprayed mist droplets. When the outside temperature is low, the adjustment plate will deform, thereby driving the adjustment plate downward, so that the heat-conducting plate transfers the heat generated by the compressed air inside the heat-conducting cylinder to the frame. At the same time, the adjustment plate will adjust the position of the second pull rope, causing the movable tube to rotate elastically. At this time, the nozzle is directed toward the fixed grille. The sprayed mist droplets act between the fixed grille and the wall, causing the gathered air-conditioning water to freeze, thereby improving the connection stability between the entire frame and the wall. The second collection box can collect the melted ice water and extract it again through the first suction pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the installation structure of the present invention; Figure 2 This is a schematic diagram of the main structure of the present invention; Figure 3 This is a schematic diagram of the connection structure between the frame and the mounting plate of the present invention; Figure 4 This is a schematic cross-sectional view of the frame and mounting plate of the present invention; Figure 5 This is a schematic diagram of the piston cylinder installation structure of the present invention; Figure 6 For the present invention Figure 5 A in the middle is an enlarged structural diagram; Figure 7 This is a schematic diagram of the cross-sectional structure of the piston cylinder of the present invention; Figure 8 It is a schematic diagram of the main structure of the connecting piece of the present invention.

[0017] In the figure: 1. frame; 2. mounting plate; 3. telescopic rod; 4. heat-conducting tube; 5. thermal insulation gasket; 6. heat exchange tube; 7. connector; 701. fixed grid; 8. first collecting box; 9. second collecting box; 10. movable lever; 11. piston cylinder; 12. piston plate; 13. guide rod; 14. first pull rope; 15. drain pipe; 16. first suction pipe; 17. second suction pipe; 18. movable pipe; 19. heat-conducting plate; 20. adjustment plate; 21. adjustment plate; 22. second pull rope. DETAILED DESCRIPTION

[0018] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0019] Example 1: The existing energy-saving air conditioner maintenance and management fixed bracket is not convenient for effectively collecting and discharging air conditioning water, making it easy for dripping air conditioning water to contaminate the wall. In order to solve this technical problem, this embodiment discloses the following technical content, please refer to Figures 1-6 As shown; an energy-saving air-conditioning maintenance and management fixed bracket, comprising two frames 1 fixedly installed on the outside of the wall by bolts, the upper end of the frame 1 is movably connected with a mounting plate 2, and the mounting plate 2 is fixedly connected to the energy-saving air-conditioning outdoor unit by bolts; a buffer assembly is connected between the frame 1 and the mounting plate 2, the frame 1 is a hollow structure, and the inner side of the frame 1 is fixedly connected with a heat exchange tube 6, a connector 7 is inserted between the two mounting plates 2, and the outer sides of the connector 7 are respectively fixedly connected with a first collecting box 8 and a second collecting box 9, and the first collecting box 8 is connected to the air-conditioning drain pipe, a movable lever 10 is elastically rotatably installed on the outer side of the frame 1, and an infusion assembly is also fixedly installed on the outer side of the frame 1, and the frame 1 is driven by the movable lever 10, and a spray assembly for reducing water dripping from the air conditioner is also installed on the frame 1.

[0020] The buffer assembly includes a thermal insulation gasket 5 evenly fixedly mounted on the upper end of the frame 1, and a heat-conducting tube 4 is fixedly mounted on the upper end of the thermal insulation gasket 5, and a telescopic rod 3 is installed on the inner side of the heat-conducting tube 4 for lifting and lowering. At the same time, the telescopic rod 3 is fixedly mounted below the mounting plate 2, and a spring is fixedly connected between the telescopic rod 3 and the heat-conducting tube 4. Paraffin phase change material is filled between the frame 1 and the heat exchange tube 6, and the inner side of the heat exchange tube 6 is filled with air-conditioning water. The end of the movable lever 10 close to the rotating shaft is fixedly connected to the mounting plate 2 by a flexible pad, and the mounting plate 2 pushes the movable lever 10 to rotate elastically when the air conditioner vibrates.

[0021] The infusion assembly includes a piston cylinder 11 fixedly mounted on the frame 1, and the inner side of the piston cylinder 11 is connected to the piston piece 12 in an interference sliding manner, and the upper end of the piston piece 12 is fixedly connected to a guide rod 13. At the same time, the upper end of the guide rod 13 slides through the upper end of the piston cylinder 11, and the guide rod 13 and the end of the movable lever 10 away from the rotating shaft are fixedly connected to a first pull rope 14. During the rotation of the movable lever 10, the piston piece 12 is pulled to slide inside the piston cylinder 11 by the first pull rope 14, and the upper inner wall of the piston cylinder 11 and the upper end of the piston piece 12 are fixedly connected to the piston cylinder 11. A spring is fixedly connected between the ends, a drain pipe 15 is fixedly connected between the lower end of the piston cylinder 11 and the heat exchange tube 6, and a second suction pipe 17 is fixedly connected between the lower end of the piston cylinder 11 and the first collecting box 8, and a one-way valve structure is installed above the drain pipe 15 and the second suction pipe 17. The piston cylinder 11 draws the air-conditioning water in the first collecting box 8 through the second suction pipe 17, and transports it to the heat exchange tube 6 through the drain pipe 15. The movable tube 18 and the heat exchange tube 6 are elastically rotatably connected and communicated, and an atomizing nozzle is installed on the movable tube 18.

[0022] The frame 1 and the connector 7 are plugged and assembled, and the frame 1 is fixedly installed at a suitable position outside the wall by bolts, and then the air conditioner outdoor unit and the mounting plate 2 are fixedly connected by bolts. As the air conditioner outdoor unit vibrates during operation, it will drive the mounting plate 2 to vibrate synchronously. At this time, the mounting plate 2 will drive the telescopic rod 3 to move up and down in the heat-conducting tube 4, thereby compressing the gas inside the heat-conducting tube 4, and then achieving efficient shock absorption through the elastic force of the spring. As the mounting plate 2 elastically rises and falls, it can drive the movable lever 10 to rotate back and forth elastically. During the rotation of the movable lever 10, The first pull rope 14 pulls the guide rod 13 and the piston plate 12 to elastically adjust the piston cylinder 11, so that the piston cylinder 11 can extract the air-conditioning water collected in the first collection box 8 through the second suction pipe 17, and transport the air-conditioning water to the heat exchange tube 6 through the discharge pipe 15, thereby cooling the phase change material inside the frame 1 and preventing the frame 1 from maintaining a high temperature in hot weather. As the water pressure inside the heat exchange tube 6 increases, the air-conditioning water can be transported through the movable pipe 18 and discharged through the atomizing nozzle, preventing the air-conditioning water from dripping directly onto the wall surface and preventing the wall surface from being damaged by long-term soaking; Example 2: The technical content disclosed in this embodiment is a further improvement based on the above-mentioned Example 1. The existing energy-saving air-conditioning maintenance and management fixed bracket is not convenient for utilizing the recycled air-conditioning water to improve the installation firmness and life of the frame. In order to further solve this technical problem, this embodiment discloses the following technical content, such as Figure 4-Figure 8As shown; a temperature regulating assembly for conducting heat is provided on the outside of the buffer assembly, and the temperature regulating assembly includes a heat conducting sheet 19 which is lifted and sleeved on the outside of the heat conducting tube 4, and each heat conducting sheet 19 is fixedly connected and assembled through an adjusting plate 20, and an adjusting sheet 21 is fixedly connected between the adjusting plate 20 and the top of the frame 1, and the adjusting sheet 21 is made of memory metal material, and the adjusting sheet 21 drives the adjusting plate 20 and the heat conducting sheet 19 to move downward when the temperature is low, and the heat conducting sheet 19 is fitted to the frame 1 after moving downward, and the heat conducting sheet 19 conducts the heat generated by the air pressure compression inside the heat conducting tube 4, and a second pull rope 22 is fixedly connected to the outside of the adjusting plate 20, and the other end of the second pull rope 22 is wound around the movable tube 1 8, and during the movement of the adjustment plate 20, the movable tube 18 is pulled by the second pull rope 22 to elastically rotate to adjust the direction of the atomizing nozzle, and a fixed grille 701 of non-heat-conducting material is evenly arranged on the connecting piece 7, and the fixed grille 701 is attached to the outside of the wall, and the fixed grille 701 is located above the second collecting box 9. At the same time, a first suction pipe 16 is fixedly connected between the second collecting box 9 and the piston cylinder 11. The first suction pipe 16 is located at one end inside the second collecting box 9 and is provided with a buoyancy ball valve structure. When the air-conditioning water inside the second collecting box 9 opens the buoyancy ball valve through buoyancy, the piston cylinder 11 extracts the air-conditioning water in the second collecting box 9 through the first suction pipe 16.

[0023] In a high temperature environment, the atomizing nozzle is directed toward the outdoor unit of the air conditioner, and the temperature of the outdoor unit is cooled by the sprayed droplets. When the outside temperature is low, the adjustment plate 21 made of memory metal will deform, thereby driving the adjustment plate 20 to move downward, so that the heat conducting plate 19 transfers the heat generated by the compressed air inside the heat conducting tube 4 to the frame 1. At the same time, the adjustment plate 20 will adjust the position of the second pull rope 22, so that the movable tube 18 rotates elastically. At this time, the nozzle is directed toward the fixed grille 701, and the sprayed droplets act between the fixed grille 701 and the wall, so that the gathered air-conditioning water freezes, thereby improving the connection stability between the frame 1 as a whole and the wall. The second collection box 9 can collect the melted ice water, so that the buoyancy ball valve at the end of the first suction pipe 16 is opened, and the piston cylinder 11 extracts the air-conditioning water through the first suction pipe 16 again.

[0024] The contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0025] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A fixed bracket for maintenance and management of an energy-saving air conditioner, comprising two frames (1) fixedly mounted on the outside of a wall by bolts, wherein the upper ends of the frames (1) are movably connected to a mounting plate (2), and the mounting plate (2) is fixedly connected to an outdoor unit of the energy-saving air conditioner by bolts; It is characterized in that A buffer component is connected between the frame (1) and the mounting plate (2), and a temperature regulating component for conducting heat is provided on the outside of the buffer component. The frame (1) is a hollow structure, and a heat exchange tube (6) is fixedly connected to the inside of the frame (1). A connector (7) is inserted between the two mounting plates (2), and the outsides of the connector (7) are respectively fixedly connected to a first collection box (8) and a second collection box (9), and the first collection box (8) is connected to an air-conditioning drainage pipe. A movable lever (10) is elastically rotatably installed on the outside of the frame (1), and an infusion component is also fixedly installed on the outside of the frame (1), and the frame (1) is driven by the movable lever (10). A spray component for reducing air-conditioning water dripping is also installed on the frame (1).

2. The energy-saving air conditioner maintenance and management fixing bracket according to claim 1, characterized in that: The buffer assembly comprises a heat insulating gasket (5) uniformly fixedly mounted on the upper end of the frame (1), a heat conducting tube (4) fixedly mounted on the upper end of the heat insulating gasket (5), and a telescopic rod (3) is installed on the inner side of the heat conducting tube (4) for lifting, while the telescopic rod (3) is fixedly mounted below the mounting plate (2), and a spring is fixedly connected between the telescopic rod (3) and the heat conducting tube (4).

3. The energy-saving air conditioner maintenance and management fixing bracket according to claim 1, characterized in that: The space between the frame (1) and the heat exchange tube (6) is filled with paraffin phase change material, and the inside of the heat exchange tube (6) is filled with air-conditioning water.

4. The energy-saving air conditioner maintenance and management fixing bracket according to claim 1, characterized in that: The movable lever (10) is fixedly connected to the mounting plate (2) at one end close to the rotating shaft via a flexible pad, and the mounting plate (2) pushes the movable lever (10) to rotate elastically when the air conditioner vibrates.

5. The energy-saving air conditioner maintenance and management fixing bracket according to claim 4, characterized in that: The infusion assembly includes a piston cylinder (11) fixedly mounted on a frame (1), and the inner side of the piston cylinder (11) is connected to a piston plate (12) in an interference sliding manner, and the upper end of the piston plate (12) is fixedly connected to a guide rod (13), and the upper end of the guide rod (13) slides through the upper end of the piston cylinder (11), and the guide rod (13) and the end of the movable lever (10) away from the rotating shaft are fixedly connected to a first pull rope (14), and during the rotation of the movable lever (10), the piston plate (12) is pulled by the first pull rope (14) to slide inside the piston cylinder (11), and a spring is fixedly connected between the inner wall of the upper end of the piston cylinder (11) and the upper end of the piston plate (12).

6. The energy-saving air conditioner maintenance and management fixing bracket according to claim 5, characterized in that: A discharge pipe (15) is fixedly connected between the lower end of the piston cylinder (11) and the heat exchange tube (6), and a second suction pipe (17) is fixedly connected between the lower end of the piston cylinder (11) and the first collection box (8), and a one-way valve structure is installed above both the discharge pipe (15) and the second suction pipe (17). The piston cylinder (11) draws air-conditioning water from the first collection box (8) through the second suction pipe (17) and transports it to the heat exchange tube (6) through the discharge pipe (15).

7. The energy-saving air conditioner maintenance and management fixing bracket according to claim 1, characterized in that: The spray assembly includes a movable tube (18), and the movable tube (18) and the heat exchange tube (6) are elastically rotatably connected and communicated, and an atomizing nozzle is installed on the movable tube (18).

8. The energy-saving air conditioner maintenance and management fixing bracket according to claim 2, characterized in that: The temperature control component includes a heat conducting sheet (19) which is lifted and sleeved on the outside of the heat conducting tube (4), and each heat conducting sheet (19) is fixedly connected and assembled through an adjustment plate (20), and an adjustment sheet (21) is fixedly connected between the adjustment plate (20) and the top of the frame (1), and the adjustment sheet (21) is made of a memory metal material, and the adjustment sheet (21) drives the adjustment plate (20) and the heat conducting sheet (19) to move downward when the temperature is low, and the heat conducting sheet (19) is attached to the frame (1) after moving downward, and the heat conducting sheet (19) conducts the heat generated by the air pressure compression inside the heat conducting tube (4).

9. The energy-saving air conditioner maintenance and management fixing bracket according to claim 8, characterized in that: A second pull rope (22) is fixedly connected to the outer side of the adjustment plate (20), and the other end of the second pull rope (22) is wound around the movable tube (18). When the adjustment plate (20) moves, the movable tube (18) is pulled by the second pull rope (22) to elastically rotate, thereby adjusting the direction of the atomizing nozzle.

10. The energy-saving air conditioner maintenance and management fixing bracket according to claim 1, characterized in that: Fixed grilles (701) made of non-heat-conducting material are evenly arranged on the connecting member (7), and the fixed grilles (701) are attached to the outside of the wall. The fixed grilles (701) are located above the second collection box (9). At the same time, a first suction pipe (16) is fixedly connected between the second collection box (9) and the piston cylinder (11). A buoyancy ball valve structure is provided at one end of the first suction pipe (16) located inside the second collection box (9). When the air-conditioning water inside the second collection box (9) opens the buoyancy ball valve through buoyancy, the piston cylinder (11) extracts the air-conditioning water in the second collection box (9) through the first suction pipe (16).

Citation Information

Patent Citations

  • Easy-to-install air conditioner outdoor unit fixing bracket

    CN110925898A

  • Air conditioner outdoor unit high-altitude installation support

    CN118912592A