An auxiliary tool applied to segmented hanging of a shielding area and a method of using the same
By designing an auxiliary tooling system that includes a U-shaped tooling body, a steel wire connecting rope, and a shackle, the problem of difficulty in hooking up lifting points in obstructed areas was solved, enabling fast and safe lifting point connection and improving construction efficiency.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- QINGDAO BEIHAI SHIPBUILDING HEAVY IND CO LTD
- Filing Date
- 2025-08-20
- Publication Date
- 2026-07-24
AI Technical Summary
During shipbuilding, it is difficult, time-consuming, and requires a lot of personnel to hook up the lifting points in the obstructed areas, and there are also safety hazards, especially the lifting points on the main deck of the anti-torsion box section of the container ship are difficult to connect effectively.
Design an auxiliary tooling, including a U-shaped tooling body, a steel wire connecting rope, and a shackle. The steel wire connecting rope is fixed to the tooling body by the auxiliary tooling, and then lifted to the lifting point by a crane hook. After connecting the shackle, a quick connection is achieved.
It enables rapid connection between the lifting points in the obstructed area and the crane, reducing manpower requirements, improving work efficiency, and reducing safety hazards.
Smart Images

Figure CN120793086B_ABST