Pipe pile extending device of sand pile ship

Through the sand pile ship pile extension device, the coordinated cooperation of the ship deck, support frame, winch and other components is solved to solve the problem that the existing sand pile ship cannot complete the pile pipe extension at specific height-restricted locations, realize the stable extension of the pile pipe, and improve construction efficiency and safety.

CN120819097APending Publication Date: 2025-10-21NANTONG XINFU EQUIPMENT INSTALLATION CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511110229.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-08-08
Publication Date
2025-10-21

AI Technical Summary

Technical Problem

Existing sand pile ships are unable to complete the construction of pile pipes with lengths exceeding the existing length at specific height-restricted locations, and there are construction limitations.

Method used

A sand pile barge pipe extension device was designed, which includes a ship deck, a support frame, a winch, a pulley, a vibratory hammer, a widening platform, a hydraulic mechanical clamping arm, and an extension pipe. Through the coordinated cooperation of these components, the pile pipe can be stably lifted, vibrated and sunk, and reliably connected to the extension pipe to complete the pipe pile extension operation.

Benefits of technology

The stable extension of the pile pipe is achieved, the construction efficiency and safety are improved, and the operation quality and safety of the sand pile ship are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120819097A_ABST
    Figure CN120819097A_ABST
Patent Text Reader

Abstract

The sand pile ship tubular pile extending device comprises a ship deck surface, a supporting frame is fixedly welded to one side of the ship deck surface, and a winch is fixedly installed on the side, away from the supporting frame, of the ship deck surface; the pulley is fixedly installed on the top of the supporting frame, and a lifting steel wire rope of the winch bypasses the pulley; the top of the vibratory hammer is fixedly connected with one end of a hoisting steel wire rope of the winch after bypassing the pulley; the top of the pile pipe is fixedly connected with the bottom of the vibratory hammer through a flange and a connecting bolt; the widening platform is fixedly welded to the side, close to the supporting frame, of the deck face of the ship, and a fixing frame is fixedly welded to the widening platform; the top and the bottom of the outer side face of the fixing frame are both provided with the hydraulic mechanical holding arms. According to the sand pile ship pipe pile extending device, the whole structure is installed on the deck face of a ship, stable lifting, vibration sinking and reliable connection with a lengthened pipe of a pile pipe are achieved, pipe pile extending operation is efficiently completed, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of sand pile ships, in particular to a pipe pile extension device for sand pile ships. Background Art

[0002] Engineering vessels can pump materials such as gravel and sand into the seabed or riverbed for the construction of breakwaters, docks, bridges and other buildings. The working principle of a sand pile ship is to use the vibration of a vibratory hammer to drive the pile pipe into the soil, and then pump gravel and other materials into the pile pipe to form a sand pile.

[0003] Existing sand pile boats can only drive sand piles within the length of the pipe piles, and cannot meet the construction requirements of pile pipes exceeding the existing pipe pile length at specific height-restricted locations. This has certain limitations.

[0004] Therefore, it is necessary to provide a new sand pile ship pipe pile extension device to solve the above technical problems. Summary of the Invention

[0005] In order to solve the above technical problems, the present invention provides a pipe pile extension device for a sand pile ship.

[0006] The sand pile ship pipe pile extension device provided by the present invention comprises:

[0007] A ship deck, wherein a support frame is fixedly welded to one side of the ship deck, and a winch is fixedly installed on a side of the ship deck away from the support frame;

[0008] A pulley, the pulley being fixedly mounted on the top of the support frame, and the hoisting wire rope of the winch passing around the pulley;

[0009] A vibrating hammer, the top of which is fixedly connected to one end of the hoisting wire rope of the winch after it passes around the pulley;

[0010] A pile pipe, the top of which is fixedly connected to the bottom of the vibratory hammer via a flange and connecting bolts;

[0011] A widening platform, the widening platform is fixedly welded to a side of the ship deck surface close to the support frame, and a fixing frame is fixedly welded to the widening platform;

[0012] Hydraulic mechanical clamping arms, the top and bottom of the outer side of the fixing frame are provided with hydraulic mechanical clamping arms;

[0013] An extension pipe is provided between the two hydraulic mechanical clamping arms.

[0014] Preferably, the hydraulic mechanical clamping arm includes a first support tube, a first oil cylinder, a mounting plate, a support plate, a second support tube, a second oil cylinder, a sliding head and a clamp. The first support tube is fixedly welded on the fixed frame, the first oil cylinder is fixedly installed in the first support tube, the piston rod of the first oil cylinder is fixedly connected to the mounting plate, two symmetrically arranged second support tubes are fixedly arranged on the mounting plate, the two second support tubes are fixedly installed in the two second oil cylinders, the piston rods of the two second oil cylinders are fixedly connected to the sliding head, two symmetrically arranged clamps are hinged on the support plate, the two clamps are provided with sliding grooves, and the sliding head is slidably connected to the sliding grooves.

[0015] Preferably, a mounting platform is fixedly provided on the top of the chuck.

[0016] Preferably, the extension tube is fixedly provided with an anti-fall stop block clamped above the chuck, and the anti-fall stop blocks are distributed in a circular array.

[0017] Preferably, flanges are provided at both ends of the extension tube, which can be connected to the pile pipe and the vibratory hammer through connecting bolts.

[0018] Compared with the related art, the sand pile ship pipe pile extension device provided by the present invention has the following beneficial effects:

[0019] The pile extension device provided by the present invention is integrally mounted on the deck of the vessel, enabling stable lifting of the pile pipe, vibratory lowering, and reliable connection with the extension pipe, effectively completing the pile extension operation and improving construction efficiency. A hydraulic clamping arm securely clamps the extension pipe, while an anti-drop stop prevents it from falling, ensuring operational safety. The extension pipe is connected to the pile pipe and vibratory hammer via matching flanges, ensuring easy operation and reliable connection. Furthermore, a mounting platform on top of the chuck facilitates operator access, further enhancing operational convenience and safety, and comprehensively improving the quality and safety of sand pile vessel operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A schematic diagram of the three-dimensional structure of the pipe pile extension device of the sand pile ship provided by the present invention;

[0021] Figure 2 A schematic diagram of the three-dimensional structure of the pipe pile extension device of the sand pile ship provided by the present invention;

[0022] Figure 3 A schematic diagram of the hydraulic mechanical clamping arm and extension tube structure provided by the present invention;

[0023] Figure 4 The present invention provides Figure 2 A in the middle is an enlarged structural diagram;

[0024] Figure 5This is a schematic diagram of the main structure of the sand pile ship pipe pile extension device provided by the present invention.

[0025] Numbers in the figure: 1, ship deck; 2, support frame; 3, winch; 4, pulley; 5, vibratory hammer; 6, pile pipe; 7, widening platform; 8, fixing frame; 9, hydraulic mechanical clamping arm; 10, extension pipe; 11, first support pipe; 12, first oil cylinder; 13, support plate; 14, second support pipe; 15, second oil cylinder; 16, sliding head; 17, clamping head; 18, slideway; 19, mounting platform; 20, anti-fall stop block; 21, mounting plate; 22, DETAILED DESCRIPTION

[0026] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0027] Please refer to Figure 1-Figure 5 ,in, Figure 1 A schematic diagram of the three-dimensional structure of the pipe pile extension device of the sand pile ship provided by the present invention; Figure 2 A schematic diagram of the three-dimensional structure of the pipe pile extension device of the sand pile ship provided by the present invention; Figure 3 A schematic diagram of the hydraulic mechanical clamping arm and extension tube structure provided by the present invention; Figure 4 The present invention provides Figure 2 A in the middle is an enlarged structural diagram; Figure 5 This is a schematic diagram of the main structure of the sand pile ship pipe pile extension device provided by the present invention.

[0028] In the specific implementation process, Figure 1-Figure 5 The pile extension device shown in the figure is used to extend piles during operations on a sand pile barge. The overall structure is mounted on the ship's deck 1. Through the coordinated cooperation of various components, the pile pipe 6 is stably lifted, vibrated and lowered, and securely connected to the extension tube 10, completing the pile extension operation.

[0029] On one side of the ship deck surface 1, a support frame 2 is fixedly installed by welding.

[0030] On the other side of the ship deck 1 away from the support frame 2, the winch 3 is fixedly installed with bolts to ensure the stability of the winch 3 during operation.

[0031] The pulley 4 is fixedly installed on the top of the support frame 2. During installation, ensure that the axis of the pulley 4 is horizontal and can rotate freely to reduce the friction of the winch 3 lifting wire rope when it passes around the pulley 4, ensuring the normal operation of the wire rope.

[0032] After the lifting wire rope of the winch 3 passes around the pulley 4, one end thereof is fixedly connected to the top of the vibrating hammer 5.

[0033] The top of the pile pipe 6 is fixedly connected to the bottom of the vibratory hammer 5 through a flange and connecting bolts. During the connection process, the parallelism and verticality between the flanges must be ensured, and the connecting bolts must be tightened with appropriate torque to ensure that the pile pipe 6 and the vibratory hammer 5 are tightly connected and will not loosen during operation.

[0034] On the side of the ship's deck 1 near the support frame 2, a widening platform 7 is welded and fixed to increase working space and stability. A fixing frame 8 is welded to the widening platform 7, ensuring that the fixing frame 8 is perpendicular to the widening platform 7, providing stable support for the subsequent installation of the hydraulic mechanical clamping arm 9.

[0035] The hydraulic mechanical clasping arm 9 comprises:

[0036] First support tube 11 and first oil cylinder 12: The first support tube 11 is fixed on the fixing frame 8 by welding, ensuring that the first support tube 11 is perpendicular to the fixing frame 8. The first oil cylinder 12 is installed in the first support tube 11 so that the first oil cylinder 12 can be stably extended and retracted.

[0037] Mounting plate 21 connection: The mounting plate 21 is fixedly connected to the piston rod of the first oil cylinder 12 by bolt connection or the like, ensuring that the mounting plate 21 is perpendicular to the piston rod of the first oil cylinder 12 and can accurately transmit the thrust of the first oil cylinder 12.

[0038] Installation of the second support tube 14 and the second oil cylinder 15: Two symmetrical second support tubes 14 are fixed on the mounting plate 21. The two second oil cylinders 15 are fixedly installed in the two second support tubes 14 respectively, ensuring that the axis of the second oil cylinder 15 coincides with the axis of the second support tube 14.

[0039] The sliding head 16 is connected to the clamping head 17: The piston rods of the two second oil cylinders 15 are fixedly connected to the sliding head 16 by welding or bolting. Two symmetrically arranged clamping heads 17 are hinged on the support plate 13 via an articulated axis, ensuring free rotation about the axis. Slide slots 18 are defined in both clamping heads 17, allowing the sliding head 16 to slide within them, thereby enabling the clamping heads 17 to open and close.

[0040] An extension tube 10 is arranged between the two hydraulic mechanical clamping arms 9 , and the outer diameter of the extension tube 10 is adapted to the inner diameter of the clamp 17 so that the clamp 17 can firmly clamp the extension tube 10 .

[0041] A mounting platform 19 is fixedly provided on the top of the clamping head 17 by welding, so that workers can stand conveniently.

[0042] On the extension tube 10, an anti-fall stop block 20 is fixedly set by welding and clamped above the clamp 17. The anti-fall stop block 20 is distributed in a circular array to ensure that when the extension tube 10 is subjected to axial force, the anti-fall stop block 20 can effectively prevent the extension tube 10 from falling off from the clamp 17, thereby improving the safety of the operation.

[0043] Flanges that can be connected to the pile pipe 6 and the vibratory hammer 5 through connecting bolts are provided at both ends of the extension tube 10. The specifications and dimensions of the flanges must match those on the pile pipe 6 and the vibratory hammer 5 so as to achieve reliable connection between the extension tube 10, the pile pipe 6 and the vibratory hammer 5.

[0044] When the pile is lowered to the bottom of the extension pipe 10, the vibrating hammer 5 and the pile pipe 6 are pushed up and the vibrating hammer 5 is driven up and down to the bottom of the extension pipe 10, thereby extending the pile pipe 6.

[0045] The sand pile ship pipe pile extension device of the present invention can efficiently and stably complete the pipe pile extension operation, improve construction efficiency and quality, and ensure the safety of the operation.

[0046] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention description and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. The pile extension device of the sand pile ship is characterized by: include: A ship deck (1), wherein a support frame (2) is fixedly welded to one side of the ship deck (1), and a winch (3) is fixedly installed on the side of the ship deck (1) away from the support frame (2); A pulley (4), wherein the pulley (4) is fixedly mounted on the top of the support frame (2), and the lifting wire rope of the hoist (3) passes around the pulley (4); A vibrating hammer (5), the top of which is fixedly connected to one end of the lifting wire rope of the hoist (3) after it passes around the pulley (4); A pile pipe (6), the top of which is fixedly connected to the bottom of the vibrating hammer (5) via a flange and connecting bolts; A widening platform (7), the widening platform (7) is fixedly welded to a side of the ship deck surface (1) close to the support frame (2), and a fixing frame (8) is fixedly welded to the widening platform (7); A hydraulic mechanical clamping arm (9), wherein the top and bottom of the outer side surface of the fixing frame (8) are both provided with a hydraulic mechanical clamping arm (9); An extension tube (10) is provided between the two hydraulic mechanical clasping arms (9).

2. The pile extension device for a sand pile ship according to claim 1, characterized in that: The hydraulic mechanical clamping arm (9) comprises a first support tube (11), a first oil cylinder (12), a mounting plate (21), a support plate (13), a second support tube (14), a second oil cylinder (15), a sliding head (16) and a clamp (17); the first support tube (11) is fixedly welded on the fixed frame (8); the first oil cylinder (12) is fixedly mounted in the first support tube (11); the piston rod of the first oil cylinder (12) is fixedly connected with the mounting plate (21); two symmetrically arranged second support tubes (14) are fixedly arranged on the mounting plate (21); the two second support tubes (14) are both fixedly mounted with the second oil cylinder (15); the piston rods of the two second oil cylinders (15) are both fixedly connected with the sliding head (16); the support plate (13) is hinged with two symmetrically arranged clamps (17); the two clamps (17) are both provided with a slide groove (18); the sliding head (16) is slidably connected to the slide groove (18).

3. The pile extension device for a sand pile ship according to claim 2, characterized in that: A mounting platform (19) is fixedly provided on the top of the clamp (17).

4. The pile extension device for a sand pile ship according to claim 3, characterized in that: The extension tube (10) is fixedly provided with an anti-fall stop block (20) clamped on the top of the clamp (17), and the anti-fall stop blocks (20) are distributed in a circumferential array.

5. The pile extension device for a sand pile ship according to claim 1, characterized in that: Both ends of the extension pipe (10) are provided with flanges that can be connected to the pile pipe (6) and the vibrating hammer (5) via connecting bolts.