Concrete prefabricated quick connecting piece

By using a plug-in and insert threaded connection method on precast concrete pipe piles, combined with a snap-fit ​​component, the problem of existing connection methods being affected by the construction environment is solved, achieving a fast and stable connection effect.

CN120967929APending Publication Date: 2025-11-18RUGAO ZHONGCHENG PIPE PILE MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511385559.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-09-26
Publication Date
2025-11-18

AI Technical Summary

Technical Problem

The existing connection methods for precast concrete pipe piles have problems such as welding connections being greatly affected by the construction environment, being cumbersome and time-consuming. In particular, the quality of welding connections is difficult to guarantee in rainy or low-temperature environments, while flange bolt connections require manual tightening one by one, which affects the construction progress.

Method used

The threaded connection method using plug-in and sleeve is achieved by setting internal and external threads in the installation hole of the pipe pile. The relative movement of the plug-in and sleeve enables quick connection, and the connection stability is enhanced by a snap-fit ​​component, including a snap-fit ​​structure with a tapered part and a spring.

Benefits of technology

It enables a quick and easy connection process, improves construction progress, maintains stability in different construction environments, and reduces manual operation time and site limitations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120967929A_ABST
    Figure CN120967929A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of constructional engineering, and particularly discloses a concrete prefabricated quick connecting piece which is used for solving the obvious defects of an existing prefabricated pipe pile connecting mode that welding connection or flange plate bolt connection is mostly adopted in traditional connection, field operation of a professional welder is needed for welding connection, and the cost is low. The influence of construction environment is large (for example, welding quality is difficult to guarantee in rainy days and low-temperature environments), and the construction progress is seriously restricted due to the fact that cooling needs to be waited after welding; flange plate bolt connection needs to manually tighten bolts one by one, operation is tedious, and consumed time is long; the female connector assembly comprises a first mounting hole formed in one end of a first pipe pile, a first connecting sleeve mounted in the first mounting hole and an inserting piece mounted in the first connecting sleeve, an existing prefabricated pipe pile connecting mode is replaced, and the female connector assembly has the advantages of being easy to operate, saving time and labor and the like; and the method is not limited by construction sites and construction environments, and the construction progress is greatly accelerated.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of building engineering, and in particular to a concrete prefabricated quick connector. BACKGROUND

[0002] In the current building engineering, the concrete prefabricated pipe pile is widely used in foundation treatment engineering due to its high strength, short construction period, low cost and other advantages. However, the existing prefabricated pipe pile connection method still has obvious defects: the traditional connection mostly adopts welding connection or flange bolt connection, the welding connection needs professional welder to operate on site, is greatly affected by the construction environment (such as the welding quality is difficult to guarantee in rainy days or low temperature environment), and needs to wait for cooling after welding, which seriously restricts the construction progress; the flange bolt connection needs to tighten the bolts one by one manually, which is tedious and time-consuming.

[0003] In view of the above technical defects, a solution is proposed, which drives the plug-in and the plug-in sleeve to move in opposite directions, and when the plug-in is inserted into the plug-in sleeve, the connection and fixation of the first pipe pile and the second pipe pile are completed, replacing the existing prefabricated pipe pile connection method, which has the advantages of simple operation, time and labor saving, and is not limited by the construction site and the construction environment, greatly improving the construction progress. SUMMARY

[0004] The purpose of the present application is to provide a concrete prefabricated quick connector to solve the above-mentioned problems.

[0005] The purpose of the present application can be realized by the following technical scheme: a concrete prefabricated quick connector, comprising:

[0006] The female connector assembly comprises a first installation hole opened at one end of the first pipe pile, a first connecting sleeve installed inside the first installation hole, and a plug-in installed inside the first connecting sleeve.

[0007] The male connector assembly comprises a second installation hole opened at one end of the second pipe pile, a second connecting sleeve installed inside the second installation hole, and a plug-in sleeve installed inside the second connecting sleeve.

[0008] Preferably, the first connecting sleeve inner wall is provided with a first inner thread, the plug-in outer wall is provided with a first outer thread, and the plug-in is threadedly connected inside the first connecting sleeve by matching the first outer thread with the first inner thread.

[0009] Preferably, the second connecting sleeve inner wall is provided with a second inner thread, the plug-in sleeve outer wall is provided with a second outer thread, and the plug-in sleeve is threadedly connected inside the second connecting sleeve by matching the second outer thread with the second inner thread.

[0010] Preferably, the snap assembly comprises a taper movably arranged inside the second connecting sleeve, a snap strip fixed to the inner wall of the taper, and a snap groove arranged on the outer wall of the insert.

[0011] Preferably, the taper is fixed with a spring at one end.

[0012] Preferably, the end of the spring away from the taper is fixed to the inner wall of the second connecting sleeve.

[0013] Advantages of the present application:

[0014] 1. First, the first connecting sleeve is installed and fixed into the first mounting hole of the first pipe pile, and then the insert is threadedly connected to the inside of the first connecting sleeve under the cooperation of the first outer thread and the first inner thread. Similarly, the second connecting sleeve is installed and fixed into the second mounting hole of the second pipe pile, and then the insert sleeve is threadedly connected to the inside of the second connecting sleeve under the cooperation of the second outer thread and the second inner thread. Then, the insert and the insert sleeve are driven to move in opposite directions. When the insert is inserted into the insert sleeve, the connection and fixation of the first pipe pile and the second pipe pile are completed. Compared with the prior art, the present application replaces the connection mode of the existing prefabricated pipe pile, has the advantages of simple operation, time and labor saving, and is not limited by the construction site and the construction environment, thereby greatly improving the construction progress.

[0015] 2. When the insert is inserted into the insert sleeve, the insert will extrude the taper, and the spring will be compressed and contracted. With the deepening of the insert, the snap strip on the inner wall of the taper will be snapped into the snap groove on the outer wall of the insert, thereby completing the locking of the insert. Since the first pipe pile and the second pipe pile are connected and adhered, the first pipe pile and the second pipe pile cannot move in opposite directions. Therefore, only the tensile property of the first pipe pile and the second pipe pile needs to be considered. When the first pipe pile and the second pipe pile are subjected to tension, the insert will drive the taper to move leftward. At this time, the taper will be limited by the second connecting sleeve, so that the second connecting sleeve cannot move leftward, thereby improving the connection stability of the first pipe pile and the second pipe pile. BRIEF DESCRIPTION OF DRAWINGS

[0016] The present application will be further described below with reference to the accompanying drawings;

[0017] Fig. 1 is the overall structure of the present application;

[0018] Fig. 2 is the structure of the female joint assembly in the present application;

[0019] Fig. 3 is the structure of the male joint assembly in the present application.

[0020] Legend: 100, female joint assembly; 101, first pipe pile; 102, first mounting hole; 103, first connecting sleeve; 104, plug-in; 200, male joint assembly; 201, second pipe pile; 202, second mounting hole; 203, second connecting sleeve; 204, plug-in sleeve; 300, clamping assembly; 301, clamping groove; 302, taper; 303, clamping strip; 304, spring. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.

[0022] Embodiment one: the application background of the present application is based on the fact that the existing connection mode of prefabricated pipe piles still has obvious defects: traditional connection mostly adopts welding connection or flange bolt connection, welding connection needs professional welders to operate on site, is greatly affected by construction environment (such as welding quality is difficult to guarantee in rainy days or low temperature environment), and needs to wait for cooling after welding, which seriously restricts the construction progress; flange bolt connection needs manual tightening of bolts one by one, which is tedious and time-consuming, and the technical solution of the present application is to solve how to improve the connection efficiency of prefabricated pipe piles;

[0023] Please refer to Figs. 1-3 The present embodiment is a kind of prefabricated concrete quick connector, including: female joint assembly 100, including first mounting hole 102 opened at one end of first pipe pile 101, first connecting sleeve 103 installed in first mounting hole 102, plug-in 104 installed in first connecting sleeve 103; male joint assembly 200, including second mounting hole 202 opened at one end of second pipe pile 201, second connecting sleeve 203 installed in second mounting hole 202, plug-in sleeve 204 installed in second connecting sleeve 203, first connecting sleeve 103 inner wall is provided with first internal thread, plug-in 104 outer wall is provided with first external thread, plug-in 104 is connected in first connecting sleeve 103 by first external thread matched with first internal thread, second connecting sleeve 203 inner wall is provided with second internal thread, plug-in sleeve 204 outer wall is provided with second external thread, plug-in sleeve 204 is connected in second connecting sleeve 203 by second external thread matched with second internal thread;

[0024] First, the first connecting sleeve 103 is installed and fixed into the first mounting hole 102 of the first pipe pile 101, and then the insert 104 is screwed into the inside of the first connecting sleeve 103 under the cooperation of the first outer thread and the first inner thread. Similarly, the second connecting sleeve 203 is installed and fixed into the second mounting hole 202 of the second pipe pile 201, and then the insert sleeve 204 is screwed into the inside of the second connecting sleeve 203 under the cooperation of the second outer thread and the second inner thread. Then, the insert 104 and the insert sleeve 204 are driven to move in opposite directions. When the insert 104 is inserted into the insert sleeve 204, the connection and fixation of the first pipe pile 101 and the second pipe pile 201 are completed. Compared with the prior art, the present application replaces the connection method of the existing prefabricated pipe pile, has the advantages of simple operation, time and labor saving, and is not limited by the construction site and the construction environment, greatly improving the construction progress.

[0025] Embodiment two: please refer to Figs. 1-3 As shown in the drawings, the present embodiment is a kind of prefabricated concrete fast connecting piece, further comprising clamping assembly 300, clamping assembly 300 includes the taper piece 302 movably arranged in the inside of second connecting sleeve 203, the clamping strip 303 fixed in the inner wall of taper piece 302, the clamping groove 301 opened in the outer wall of insert 104, one end of taper piece 302 is fixed with spring 304, the end of spring 304 away from taper piece 302 is fixed with the inner wall of second connecting sleeve 203;

[0026] When the insert 104 is inserted into the insert sleeve 204, the insert 104 will extrude the taper piece 302, and the spring 304 will be compressed and contracted. With the deepening of the insert 104, the clamping strip 303 on the inner wall of the taper piece 302 will be clamped into the clamping groove 301 on the outer wall of the insert 104, completing the locking of the insert 104. Since the first pipe pile 101 and the second pipe pile 201 are connected and adhered, the first pipe pile 101 and the second pipe pile 201 cannot move in opposite directions, so only the tensile properties of the first pipe pile 101 and the second pipe pile 201 need to be considered. When the first pipe pile 101 and the second pipe pile 201 are subjected to tension, the insert 104 will move left with the taper piece 302, and the taper piece 302 will be limited by the second connecting sleeve 203 at this time, so that the second connecting sleeve 203 cannot move left, thereby improving the connection stability of the first pipe pile 101 and the second pipe pile 201.

[0027] In combination of Embodiment One and Embodiment Two, on one hand, the plug-in 104 and the plug sleeve 204 are driven to move oppositely, and after the plug-in 104 is inserted into the plug sleeve 204, the connection and fixation of the first pipe pile 101 and the second pipe pile 201 are completed, which replaces the existing connection mode of the prefabricated pipe pile, has the advantages of simple operation, time and labor saving, and is not limited by the construction site and the construction environment, and greatly improves the construction progress; on the other hand, when the first pipe pile 101 and the second pipe pile 201 are subjected to tension, the plug-in 104 drives the conical part 302 to move left, and at this time, the conical part 302 is limited by the second connecting sleeve 203, so that the second connecting sleeve 203 cannot move left, thereby improving the connection stability of the first pipe pile 101 and the second pipe pile 201.

[0028] The above is only an example and description of the structure of the present application, and those skilled in the art can make various modifications or supplements or use similar ways to replace the described specific embodiments, as long as they do not deviate from the structure of the present application or exceed the scope defined by the present claims, which shall belong to the protection scope of the present application.

Claims

1. A precast concrete quick connector, characterized in that, include: The female connector assembly (100) includes a first mounting hole (102) opened at one end of the first pipe pile (101), a first connecting sleeve (103) installed inside the first mounting hole (102), and a plug (104) installed inside the first connecting sleeve (103). The male connector assembly (200) includes a second mounting hole (202) opened at one end of the second pipe pile (201), a second connecting sleeve (203) installed inside the second mounting hole (202), and a plug sleeve (204) installed inside the second connecting sleeve (203).

2. The precast concrete quick connector according to claim 1, characterized in that, The inner wall of the first connecting sleeve (103) is provided with a first internal thread, and the outer wall of the plug (104) is provided with a first external thread. The plug (104) is threadedly connected inside the first connecting sleeve (103) by the first external thread and the first internal thread.

3. A precast concrete quick connector according to claim 1, characterized in that, The inner wall of the second connecting sleeve (203) is provided with a second internal thread, and the outer wall of the insert (204) is provided with a second external thread. The insert (204) is threadedly connected inside the second connecting sleeve (203) by the second external thread and the second internal thread.

4. A precast concrete quick connector according to claim 1, characterized in that, It also includes a locking assembly (300), which includes a tapered member (302) movably disposed inside the second connecting sleeve (203), a locking strip (303) fixed to the inner wall of the tapered member (302), and a locking groove (301) formed on the outer wall of the plug (104).

5. A precast concrete quick connector according to claim 4, characterized in that, A spring (304) is fixed to one end of the tapered member (302).

6. A precast concrete quick connector according to claim 5, characterized in that, The end of the spring (304) away from the tapered member (302) is fixed to the inner wall of the second connecting sleeve (203).