Tower top hanger mounting device and mounting method thereof
By pre-assembling the base at the top of the tower and utilizing the design of positioning piles and locking mechanisms, the installation difficulties and safety risks caused by the swaying of the side beams were solved, achieving stable installation of the tower top hanger and simplifying operation.
Patent Information
- Application Number
- CN202511630391.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-10
- Publication Date
- 2026-02-13
- Estimated Expiration
- 2045-11-10
AI Technical Summary
During the installation of the tower top gantry, the side beams are prone to swaying after being hoisted to the side of the tower top, which makes the installation operation difficult and poses a safety risk.
The design employs a combination of positioning piles, base, positioning mechanism, foundation, and locking mechanism. By pre-assembling the base at the top of the tower and forming a chute using positioning piles, the base is hoisted and inserted into the chute. The positioning mechanism and the gravity of the foundation drive the locking mechanism to lock the base, thus achieving stable installation.
It simplifies the installation process, reduces the operational risks for workers, and improves the stability and safety of the installation.
Smart Images

Figure CN121066071B_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of tower top hanger installation, in particular to a tower top hanger installation device and an installation method thereof. BACKGROUND
[0002] In long-span cable-stayed bridge engineering, as the main force component, the cable is exposed to complex environment (such as wind and rain erosion, salt spray corrosion and alternating load) for a long time, and the reliability of its protection system is directly related to the safety and service life of the bridge structure. The traditional metal sheath is prone to corrosion and fracture, and ordinary plastic materials have poor weather resistance and weak anti-aging ability. Therefore, the industry widely uses high-density polyethylene (HDPE) pipe as the outer protective barrier of the cable. Currently, the installation of HDPE pipe for long-span cable-stayed bridge cables usually uses the main tower construction tower crane for hoisting.
[0003] A kind of assembly type hanger device and installation method for irregular main tower top are disclosed in Chinese patent application file with publication number CN118498230A, including base plate, stand, diagonal brace, suspension beam and suspension beam, the base plate is installed on the embedded steel plate of tower top, one end of the stand and diagonal brace is respectively installed on the side of base plate away from embedded steel plate, the other end of diagonal brace is fixed to one side of stand, the top of stand is provided with suspension beam, the suspension beam is arranged on one side of stand, the bottom of suspension beam is provided with several lifting lugs four, the lifting lug four is installed with pulley, the bottom of one end of suspension beam close to stand is provided with winch below.
[0004] In use, the pre-embedded steel plate is pre-embedded when the main tower top concrete is poured, the suspension beam and the auxiliary component two are connected by bolts, the hoist is installed in the auxiliary component two, the suspension beam is provided with the lifting lug three and the lifting lug four on both sides, the pulley and the lifting lug four are connected by a pin shaft, the safety pin is installed on the pin shaft, the flange plate one is welded with the stiffener plate and is sleeved on the stand column, then the sleeve pipe, the auxiliary component one, the lifting lug one and the flange plate two are welded, the sleeve pipe is sleeved on the stand column, the stand column is welded with the base plate, the base plate is connected with the pre-embedded steel plate by bolts, the suspension beam is inserted into the top of the stand column, one lifting lug two of the suspension beam is connected with the lifting lug one of the sleeve pipe by a hand-operated hoist, the other lifting lug two of the suspension beam is connected with the lifting lug three of the suspension beam by a hand-operated hoist, the suspension beam, the auxiliary component two, the sleeve pipe, the auxiliary component one and the hoist are lifted to a set height by the hand-operated hoist, the flange plate one and the stiffener plate are moved to the bottom of the flange plate two, the stiffener plate is welded with the stand column, the channel steel diagonal brace is welded with the base plate and the stand column, the horizontal direction of the suspension beam is adjusted by rotating the sleeve pipe, the pin is inserted into the insertion hole of the flange plate one and the flange plate two after adjustment, the position of the pulley in the lifting lug four group is determined, and the pulley is rotatably connected in the selected lifting lug four by the pin shaft and the safety pin, so that the overall installation is completed, and the rope of the hoist is hung on the HDPE pipe after passing through the pulley, so that the HDPE pipe can be hoisted.
[0005] However, the above patent application file still has the following deficiencies: when the lifting frame is fixedly installed on the top of the tower, the side beam in the lifting frame usually needs to be hoisted to the side of the top of the tower first, and then fixed on the side of the top of the tower by the workers to form a base supporting the lifting frame, however, after the side beam is hoisted to the side of the top of the tower, the side beam is easy to shake under the action of inertia, resulting in that the installation operation of the side beam is difficult to implement, and the operation of the workers has a certain danger. SUMMARY
[0006] The present application provides a tower top lifting frame installation device and installation method, which aims to solve the problem in the related art that the side beam is hoisted to the side of the top of the tower, and the side beam is easy to shake under the action of inertia, resulting in that the installation operation of the side beam is difficult to implement, and the operation of the workers has a certain danger.
[0007] The tower top hanger mounting device of the present application comprises a tower top, two positioning piles, a base, a positioning mechanism, a base plate, a hanger and a locking mechanism. The two positioning piles are mounted on the tower top and form two sliding grooves with the tower top. The base can be assembled and fixed in advance before being hoisted, and can be inserted into the two sliding grooves when being hoisted. The positioning mechanism is connected to the tower top and can position and guide the base plate when the base plate is hoisted onto the base, and can press the positioning mechanism. The locking mechanism is installed in the positioning pile and can be driven by the positioning mechanism when the positioning mechanism is pressed to lock the base.
[0008] The base is assembled and fixed in advance before the hanger is installed, and two positioning piles are cast on the tower top to form two sliding grooves between the two positioning piles and the tower top. When the hanger is installed, the base is hoisted onto the tower top by the hoisting device and inserted into the two sliding grooves, and then the positioning mechanism and the base plate are hoisted onto the tower top by the hoisting device in sequence. The base plate is positioned and guided by the positioning mechanism when being hoisted, so that the base plate is fixed and installed after being in contact with the base, and the base plate presses the positioning mechanism by its own gravity to drive the locking mechanism to lock the base. Finally, the hanger is hoisted onto the base plate and fixed and installed to complete the installation of the entire hanger. The base is assembled and fixed in advance and hoisted and inserted into the two sliding grooves by the hoisting device, and the base is fixed by the locking mechanism, so that the installation operation is simple and the danger of the operator is reduced.
[0009] Preferably, the positioning pile is provided with a limiting slot.
[0010] The effect is that the limiting slot on the two positioning piles can limit the positioning mechanism.
[0011] Preferably, the positioning pile is provided with a through slot.
[0012] The effect is that the through slot on the positioning pile can limit the hoisted base plate.
[0013] Preferably, the base comprises a bottom beam, a side beam, a bearing frame and a connecting piece. The bottom beam and the bearing frame are both provided with two, the two bottom beams can be respectively inserted into the two sliding grooves, the rear end of the sliding groove is closed, the side beam is provided with two groups, the number of each group of side beams is two, the two groups of side beams are respectively connected to the two bottom beams, the two bearing frames are connected between the two groups of side beams, and the connecting piece is installed between the two bearing frames.
[0014] Its effect lies in: when assembling and fixing the base, first weld two groups of side beams on two bottom beams, then weld two bearing frames between the two groups of side beams to form the base, then fix the connecting piece between the two bearing frames through bolts and nuts, when hoisting the base to the top of the tower, first connect the hoisting device with the connecting piece, then hoist the base to the top of the tower through the hoisting device and insert it into the two grooves, after hoisting, remove the connecting piece from the two bearing frames, so as to facilitate the subsequent installation of the positioning mechanism.
[0015] Preferably, the positioning mechanism comprises an elastic expansion part, a support, a bracket, a positioning part, a mounting cylinder, a positioning piece and an elastic part, the elastic expansion part is connected to the top of the tower top, the support is connected to the elastic expansion part, the two ends of the support are respectively limitedly and slidably connected in the two limiting grooves, the bracket is provided with two, the two brackets are respectively connected to the top of the support, and the two brackets are respectively limitedly and slidably connected in the limiting grooves on the two positioning piles, the positioning part is provided with two groups, the two groups of positioning parts are respectively connected to the top of the two brackets, the mounting cylinder is connected to the top of the support, the positioning piece is inserted into the mounting cylinder, and the positioning piece is fixed with the mounting cylinder through bolts and nuts.
[0016] Preferably, the number of each group of the positioning part is two, the two positioning parts of the same group are arranged in front of and behind, and are arranged in V shape, the lower half of the positioning piece is in U shape, and the upper half of the positioning piece is in V shape.
[0017] Its effect lies in: when hoisting the base to the base, the two groups of positioning parts can be positioned and guided in the front and back directions, the upper half of the positioning part in V shape can be positioned and guided in the left and right directions, when the base extends into the lower half of the positioning part in U shape, the lower half of the positioning part in U shape can be limited in the left and right directions, so as to realize the guiding and positioning of the base, so as to facilitate the installation of the base.
[0018] Preferably, the support comprises a horizontal plate and an extrusion part, the extrusion part is in inverted U shape, the extrusion part is provided with two, the two extrusion parts are respectively connected to the left and right ends of the horizontal plate, the two extrusion parts are respectively inserted into the limiting grooves on the two positioning piles, and the two extrusion parts are respectively provided with arc faces.
[0019] Preferably, the locking mechanism is provided with two, the locking mechanism comprises a moving part, a connecting part, an elastic piece and a locking part, the moving part is slidably connected in the positioning pile, the connecting part is connected to one side of the moving part close to the bottom beam, the locking part is connected to the connecting part, the bottom beam is provided with a locking groove, the locking part can be inserted into the locking groove on the bottom beam, the elastic piece is connected between the moving part and the locking part, and the moving part is provided with an inclined surface.
[0020] Its effect lies in: the base drives the support downward by extruding the positioning mechanism by its own gravity, when the support moves downward, the arc surface on the extruding part extrudes the inclined surface on the moving part, so that the moving part drives the connecting part and the locking part to move towards the direction of approaching the bottom beam, so that the locking part is inserted into the locking groove on the bottom beam, thereby locking the bottom beam, and the elastic member is compressed.
[0021] Preferably, the hanging piece comprises a working platform and a winch, the winch is connected to the working platform, and the working platform is connected to the base.
[0022] The application further provides a tower top hanging bracket installation method, which comprises the following steps:
[0023] S1: two positioning piles are arranged on the tower top, and two sliding grooves are formed between the two positioning piles and the tower top;
[0024] S2: the base is assembled and fixed before the hanging bracket is installed;
[0025] S3: the base is hoisted to the tower top, and the base is inserted into the two sliding grooves;
[0026] S4: the positioning mechanism is installed on the tower top;
[0027] S5: the base is hoisted to the base, and the base can extrude the positioning mechanism by the positioning mechanism;
[0028] S6: the extruded positioning mechanism drives the locking mechanism, so that the locking mechanism locks the base;
[0029] S7: the hanging piece is hoisted to the base.
[0030] Beneficial effects: two positioning piles are poured on the tower top, so that two sliding grooves are formed between the two positioning piles and the tower top, and the base is assembled and fixed, when the hanging bracket is installed, the base is hoisted to the tower top by the hoisting device, and the base is inserted into the two sliding grooves, then the positioning mechanism and the base are hoisted to the tower top by the hoisting device in sequence, the base is positioned and guided by the positioning mechanism when hoisted, so that the base is fixed and installed by the bolt and the nut after being in contact with the base, and the base extrudes the positioning mechanism by its own gravity, so that the positioning mechanism drives the locking mechanism to lock the base, finally the hanging piece is hoisted to the base and fixed and installed by the bolt and the nut, thereby completing the installation of the entire hanging bracket, the base is assembled and fixed before hoisting, and the base is hoisted and inserted into the two sliding grooves by the hoisting device, and the base is fixed by the locking mechanism, so that the installation operation is simple and the danger of the operator is reduced.
[0031] The beneficial effects of the application are:
[0032] 1. Two positioning piles are poured on the top of the tower to form two sliding grooves between the positioning piles and the top of the tower. The base is then assembled and fixed. During the installation of the hanger, the base is first hoisted to the top of the tower using a hoisting device and inserted into the two sliding grooves. Then, the positioning mechanism and the base are hoisted to the top of the tower in sequence using the hoisting device. During the hoisting of the base, the positioning mechanism is used to position and guide it so that the base is fixed in place with the base using bolts and nuts. The base uses its own weight to compress the positioning mechanism, causing the positioning mechanism to drive the locking mechanism to lock the base. Finally, the hanger is hoisted onto the base and fixed in place with bolts and nuts, thus completing the installation of the entire hanger. By assembling and fixing the base before hoisting, and then hoisting the base into the two sliding grooves using a hoisting device and fixing the base with a locking mechanism, the installation operation is simple and reduces the danger to workers.
[0033] 2. When disassembling the hanger, first remove the bolts and nuts between the hanger and the base, and then remove the hanger. Next, remove the bolts and nuts connecting the base and the pedestal. Then, use the lifting device to lift the base so that the base is separated from the pedestal. After the base is removed from the pedestal, the base no longer presses against the positioning mechanism. At this time, under the action of the elastic expansion joint, the support can be pushed upward so that the pressing part on the support no longer presses against the locking mechanism. The locking mechanism resets under the elastic force of its own elastic element and no longer locks the bottom beam. At this time, the positioning mechanism and the pedestal can be removed from the top of the tower in sequence using the lifting device. The installation and disassembly steps are simple and save time and effort. Attached Figure Description
[0034] Figure 1 This is a schematic diagram of the main structure of the present invention.
[0035] Figure 2 This is a schematic diagram of the main structure of the tower top, positioning pile and base of the present invention.
[0036] Figure 3 This is a three-dimensional structural diagram of the tower top, positioning pile, and base of the present invention.
[0037] Figure 4 This is a three-dimensional structural diagram of the base and positioning mechanism of the present invention.
[0038] Figure 5 This is a three-dimensional structural diagram of the base, positioning mechanism, and substrate of the present invention.
[0039] Figure 6 This is a front view cross-sectional structural diagram of the base and positioning mechanism of the present invention.
[0040] Figure 7 This is a front view cross-sectional structural diagram of the base, positioning mechanism, substrate, and locking mechanism of the present invention.
[0041] Figure 8 is a perspective view of the positioning mechanism and the base of the present application.
[0042] Figure 9 is a top view of the base and the locking mechanism of the present application.
[0043] Figure 10 is a perspective view of the positioning mechanism and the hanger of the present application.
[0044] Reference signs:
[0045] 1, tower top; 2, positioning pile; 21, sliding groove; 22, limiting groove; 23, through groove; 3, base; 31, bottom beam; 32, side beam; 33, bearing frame; 34, connecting piece; 4, positioning mechanism; 41, elastic extension part; 42, supporting piece; 421, transverse plate; 422, extrusion part; 423, arc surface; 43, bracket; 44, positioning part; 45, mounting cylinder; 46, positioning piece; 47, elastic part; 5, base; 51, cross beam; 52, longitudinal beam; 6, hanger; 61, working platform; 62, winch; 7, locking mechanism; 71, moving part; 72, connecting part; 73, elastic piece; 74, locking part; 75, inclined surface. DETAILED DESCRIPTION
[0046] The embodiments of the present application are described in detail below, examples of which are shown in the accompanying drawings. The embodiments described below by referring to the drawings are exemplary, and are intended to explain the present application, and cannot be understood as a limitation of the present application.
[0047] As Figures 1 to 10 shown, the tower top hanger mounting device of the present application comprises a tower top 1, a positioning pile 2, a base 3, a positioning mechanism 4, a base 5, a hanger 6 and a locking mechanism 7. The positioning pile 2 and the base 3 are both mounted on the tower top 1, and the base 3 can be positioned by the positioning pile 2, so as to facilitate the installation of the base 3. The positioning mechanism 4 is mounted on the tower top 1. The base 3 is connected with the base 5, and the base 5 can be supported by the positioning pile 2. When the base 5 is hoisted onto the base 3, the base 5 can be positioned by the positioning mechanism 4, so as to enable the base 5 to be quickly installed on the base 3, save the operation time of the staff, and reduce the work difficulty of installing the base 5 on the base 3. The hanger 6 is connected to the base 5, and large-span cable-stayed bridge work can be carried out by the hanger 6. The locking mechanism 7 is connected to the positioning pile 2, and the base 3 can be locked on the positioning pile 2 by the locking mechanism 7, so as to enhance the stability of the base 3 after installation.
[0048] When the hanger is installed, first, the positioning pile 2 is pre-installed on the tower top 1, then the base 3 is hoisted and inserted into the positioning pile 2, then the positioning mechanism 4 is hoisted onto the tower top 1, then the base 5 is hoisted onto the positioning mechanism 4, the base 5 is positioned by the positioning mechanism 4, and the base 5 is fixed on the base 3, after the base 5 is hoisted onto the positioning mechanism 4, the positioning mechanism 4 can be pressed down by the gravity of the base 5 itself, so that the positioning mechanism 4 drives the locking mechanism 7, and the base 3 is locked on the positioning pile 2 by the locking mechanism 7, finally, the hanger 6 is hoisted and fixed on the base 3, and the installation of the whole hanger is completed, and then the HDPE pipe is hoisted by the hanger 6, and the hoisting of the HDPE pipe is realized.
[0049] As shown in Figures 1 to 3 , the positioning pile 2 is provided with two, and the two positioning piles 2 are respectively arranged on the left and right sides of the top of the tower top 1, the positioning pile 2 is poured by concrete, and the steel bars connected in the tower top 1 are embedded in the concrete to enhance the overall structural strength of the positioning pile 2, the two positioning piles 2 and the tower top 1 are provided with sliding grooves 21, the base 3 can be inserted into the two sliding grooves 21, so as to realize the installation of the base 3, the rear end of the sliding groove 21 is closed, the base 3 inserted into the sliding groove 21 can be positioned and blocked by the sliding groove 21 with the closed rear end, the top of the positioning pile 2 is provided with a limiting groove 22, the positioning mechanism 4 can be limited and guided by the limiting groove 22, so as to facilitate the positioning of the base 5 by the positioning mechanism 4, and the top of the positioning pile 2 is provided with a through groove 23, the base 5 can be limited by the through groove 23.
[0050] Continue to refer to Figures 1 to 3 , the base 3 includes a bottom beam 31, a side beam 32, a bearing frame 33 and a connecting piece 34, the bottom beam 31 and the bearing frame 33 are both provided with two, the side beam 32 is provided with two groups, the number of each group of side beams 32 is provided with two, the two groups of side beams 32 are respectively connected on the two bottom beams 31, the two bearing frames 33 are connected between the two groups of side beams 32, and the connecting piece 34 is connected between the two bearing frames 33 by bolts and nuts, so as to facilitate the hoisting device to hoist the base 3 to the tower top 1.
[0051] Before hoisting, first, the two groups of side beams 32 are respectively welded on the two bottom beams 31, then the two bearing frames 33 are welded between the two groups of side beams 32 to form the base 3, after the base 3 is hoisted onto the tower top 1 and inserted into the two sliding grooves 21, wait for the locking of the base 3 by the locking mechanism 7, without the need for staff to fix the base 3 additionally, the installation operation is simple to implement, and the safety of the staff is guaranteed, when the base 3 is hoisted onto the tower top 1, first, the hoisting device is connected with the connecting piece 34, then the base 3 is hoisted onto the tower top 1 and inserted into the two sliding grooves 21 by the hoisting device, after hoisting is completed, the connecting piece 34 is removed from the two bearing frames 33, so as to facilitate the subsequent installation of the positioning mechanism 4.
[0052] As shown in Figures 1 to 6 The positioning mechanism 4 comprises an elastic telescopic part 41, a support piece 42, two supports 43, two sets of positioning parts 44, a mounting cylinder 45, a positioning piece 46 and an elastic part 47. The elastic telescopic part 41 is connected to the top of the tower top 1. The elastic telescopic part 41 is a telescopic rod with a compression spring built-in. The support piece 42 is connected to the top end of the elastic telescopic part 41. The two ends of the support piece 42 are respectively limited to slide and connect into the limiting grooves 22 on the two positioning piles 2. The two supports 43 are arranged in two. The two supports 43 are respectively connected to the two ends of the top of the support piece 42. The two supports 43 are respectively limited to slide and connect into the limiting grooves 22 on the two positioning piles 2. Each set of the positioning parts 44 is arranged in two. The two sets of the positioning parts 44 are respectively connected to the top of the two supports 43. The two positioning parts 44 in the same set are arranged in front of and behind each other and are arranged in a V shape. When the base 5 is hoisted onto the base 3, the two sets of the positioning parts 44 can position and guide the base 5 in the front-to-back direction. The mounting cylinder 45 is connected to the top of the support piece 42. The positioning piece 46 is inserted into the mounting cylinder 45. The positioning piece 46 is fixed with the mounting cylinder 45 through a fixing structure. The fixing structure is composed of a bolt and a nut. The lower half of the positioning piece 46 is in a U shape. The upper half of the positioning piece 46 is arranged in a V shape. The upper half of the positioning piece 46 arranged in a V shape can position and guide the base 5 in the left-to-right direction. The lower half of the positioning piece 46 arranged in a U shape can limit the base 5 in the left-to-right direction. The elastic part 47 is a compression spring. The elastic part 47 is connected between the positioning piece 46 and the mounting cylinder 45 and is used to drive the positioning piece 46 to reset.
[0053] After the base 3 is installed on the tower top 1, the elastic expansion part 41 is first fixedly installed on the top of the tower top 1, then the support 42 is hoisted and moved above the tower top 1 by the hoisting device, and then the support 42 is slowly lowered to be inserted into the limiting groove 22 on the two positioning piles 2, and the two supports 43 are inserted into the limiting grooves 22 on the two positioning piles 2 respectively, then the base 5 is hoisted and moved above the positioning mechanism 4 by the hoisting device, and finally the hoisting device is started to lower the base 5, and in the process of lowering the base 5, the base 5 is limited in the front-rear direction by the two groups of positioning parts 44, and at the same time the base 5 is positioned and guided in the left-right direction by the upper half of the V-shaped positioning part 46, and after the base 5 passes through the upper half of the V-shaped positioning part 46 and enters the lower half of the U-shaped positioning part 46, the base 5 is limited in the left-right direction by the lower half of the U-shaped positioning part 46, so as to be positioned and installed, and after the bottom of the base 5 contacts with the top of the support 43, the base 5 continues to fall, and at this time the support 43 is pressed down by the base 5, so as to drive the positioning part 44, the mounting cylinder 45, the positioning part 46 and the elastic part 47 to move downward, and compress the elastic expansion part 41, until the base 5 is inserted into the through groove 23 on the top of the positioning pile 2, at this time the bottom of the base 5 contacts with the two groups of side beams 32, and then the base 5 is fixed with the two groups of side beams 32 by bolts and nuts, so as to realize the fixation between the base 5 and the base 3, and at the same time the fixing structure between the positioning part 46 and the mounting cylinder 45 is removed, so as to facilitate the subsequent hoisting operation of the hoisting part 6.
[0054] As shown in Figure 1 , Figures 5 to 8 , the base 5 comprises a cross beam 51 and a longitudinal beam 52, the cross beam 51 is provided in two, and the longitudinal beam 52 is provided in three, and the three longitudinal beams 52 are connected between the two cross beams 51, when the base 5 is hoisted to the base 3, the two cross beams 51 of the base 5 can be positioned and guided in the front-rear direction by the two groups of positioning parts 44, and the middle longitudinal beam 52 can be inserted into the positioning part 46, and the middle longitudinal beam 52 is positioned and guided by the positioning part 46, so as to guide and position the whole base 5.
[0055] As shown in Figure 1 , Figures 6 to 9As shown, the support 42 comprises a horizontal plate 421 and two extruded parts 422, the extruded parts 422 are inverted U-shaped, and the two extruded parts 422 are respectively connected to the left and right ends of the horizontal plate 421, and the two extruded parts 422 are respectively inserted into the limiting grooves 22 on the two positioning piles 2. After the support 42 stops moving downward, the two extruded parts 422 can respectively block the two bottom beams 31 on the base 3, so as to enhance the installation strength of the base 3. The two extruded parts 422 are respectively provided with arc surfaces 423, and the locking mechanism 7 is provided with two, which are respectively connected in the two positioning piles 2. When the support 42 moves downward, the arc surfaces 423 on the two extruded parts 422 can respectively push the two locking mechanisms 7, so that the two locking mechanisms 7 lock the two bottom beams 31 on the base 3, so as to enhance the installation strength of the base 3.
[0056] With reference to the above Figure 1 , Figures 6 to 9 As shown, the locking mechanism 7 comprises a moving part 71, a connecting part 72, a resilient part 73 and a locking part 74. The moving part 71 is slidingly connected in the positioning pile 2. The connecting part 72 is connected to one side of the moving part 71 close to the bottom beam 31. The locking part 74 is connected to the connecting part 72. The bottom beam 31 is provided with a locking groove. The locking part 74 can be inserted into the locking groove on the bottom beam 31, so as to lock the bottom beam 31. The resilient part 73 is a compression spring, which is connected between the moving part 71 and the locking part 74. The moving part 71 is provided with an inclined surface 75. When the support 42 moves downward, the arc surfaces 423 on the extruded parts 422 can extrude the inclined surface 75 on the moving part 71, so as to move the moving part 71 towards the bottom beam 31, so as to move the connecting part 72 and drive the locking part 74 to be inserted into the locking groove on the bottom beam 31, while extruding the resilient part 73.
[0057] When the support 42 moves downward, the arc surfaces 423 on the extruded parts 422 extrude the inclined surface 75 on the moving part 71, so as to move the moving part 71, the connecting part 72 and the locking part 74 towards the bottom beam 31, so as to insert the locking part 74 into the locking groove on the bottom beam 31, so as to lock the bottom beam 31, while compressing the resilient part 73.
[0058] When the base 5 and the pedestal 3 are disassembled, the bolts and nuts connecting the base 5 and the pedestal 3 are disassembled first, then the base 5 is lifted by the lifting device, so that the base 5 is separated from the pedestal 3, thereby facilitating the disassembly operation between the base 5 and the pedestal 3, and after the base 5 is disassembled from the pedestal 3, the base 5 no longer extrudes the positioning mechanism 4, at this time the supporting piece 42 is pushed upward under the action of the elastic extension part 41, so that the extrusion part 422 on the supporting piece 42 no longer extrudes the locking mechanism 7, the locking mechanism 7 is reset under the elastic force of the elastic piece 73, and no longer locks the bottom beam 31, at this time the positioning mechanism 4 and the pedestal 3 can be disassembled from the tower top 1 in sequence by the lifting device, the installation and disassembly steps are simple, time-saving and labor-saving.
[0059] As shown in Figure 1 and Figure 10 The lifting piece 6 includes a working platform 61 and a winch 62, the winch 62 is connected to the working platform 61, and the working platform 61 is connected to the base 5, so that the working staff can operate the winch 62 through the working platform 61.
[0060] When the lifting piece 6 is installed, the lifting piece 6 is lifted to the upper side of the base 5 by the lifting device and falls, in the process of falling of the working platform 61, the bottom of the working platform 61 first contacts the top of the positioning piece 46, when the working platform 61 continues to fall, the positioning piece 46 is extruded downward by the working platform 61, so that the positioning piece 46 moves downward and the elastic part 47 is compressed, until the bottom of the working platform 61 contacts the top of the base 5, and then the working platform 61 and the base 5 are fixed by the bolts and nuts.
[0061] Working principle:
[0062] The positioning pile 2 is pre-installed on the tower top 1, the positioning pile 2 is made of concrete, and the steel bars connected to the tower top 1 are arranged in the concrete.
[0063] The two groups of side beams 32 are welded on the two bottom beams 31 respectively, then the two bearing frames 33 are connected between the two groups of side beams 32 to form the pedestal 3, and then the connecting piece 34 is connected between the two bearing frames 33 by bolts and nuts.
[0064] The lifting device is connected with the connecting piece 34, and the lifting device is started, the pedestal 3 is lifted to the tower top 1 by the lifting device and inserted into the two sliding grooves 21, and then the connecting piece 34 is dismounted from the two bearing frames 33.
[0065] The elastic expansion part 41 is fixedly installed on the top of the tower top 1, then the supporting part 42 is hoisted and moved above the tower top 1 by the hoisting device, then the supporting part 42 is slowly lowered to be inserted into the limiting grooves 22 on the two positioning piles 2, and the two supports 43 are inserted into the limiting grooves 22 on the two positioning piles 2 respectively, then the base 5 is hoisted and moved above the positioning mechanism 4 by the hoisting device, finally the hoisting device is started to lower the base 5, in the process of lowering the base 5, the base 5 is limited in the front-rear direction by the two groups of positioning parts 44, and the base 5 is positioned and guided in the left-right direction by the upper half of the V-shaped positioning part 46, after the base 5 passes through the upper half of the V-shaped positioning part 46 and enters the lower half of the U-shaped positioning part 46, the base 5 is limited in the left-right direction by the lower half of the U-shaped positioning part 46, so that the base 5 is positioned and installed, after the bottom of the base 5 contacts with the top of the support 43, the base 5 continues to fall, at this time, the support 43 is pressed downward by the base 5, so that the support 43 drives the positioning part 44, the mounting cylinder 45, the positioning part 46 and the elastic part 47 to move downward, and the elastic expansion part 41 is compressed, until the base 5 is inserted into the through groove 23 on the top of the positioning pile 2, at this time, the bottom of the base 5 contacts with the two groups of side beams 32, then the base 5 is fixed with the two groups of side beams 32 by bolts and nuts, so that the base 5 and the base 3 are fixed, and the fixing structure between the positioning part 46 and the mounting cylinder 45 is removed.
[0066] When the supporting part 42 moves downward, the inclined surface 75 on the moving part 71 is extruded by the arc-shaped surface 423 on the extruding part 422, so that the moving part 71 drives the connecting part 72 and the locking part 74 to move towards the direction of approaching the bottom beam 31, so that the locking part 74 is inserted into the locking groove on the bottom beam 31, thereby locking the bottom beam 31, and the elastic part 73 is compressed.
[0067] The hoisting device hoists the lifting part 6 to above the base 5 and lowers it, in the process of lowering the working platform 61, the bottom of the working platform 61 first contacts with the top of the positioning part 46, when the working platform 61 continues to fall, the positioning part 46 moves downward and the elastic part 47 is compressed by the working platform 61 extruding downward, until the bottom of the working platform 61 contacts with the top of the base 5, then the working platform 61 and the base 5 are fixed by bolts and nuts.
[0068] The worker walks on the working platform 61 and operates the winch 62, the HDPE pipe is hoisted by the winch 62.
[0069] The application also provides a tower top lifting frame installation method, which comprises the following steps:
[0070] S1: two positioning piles 2 are arranged on the tower top 1, and two sliding grooves 21 are formed between the two positioning piles 2 and the tower top 1;
[0071] Specifically, positioning piles 2 are pre-installed on the tower top 1, the positioning piles 2 are made of concrete, and steel bars connected to the tower top 1 are arranged in the concrete, and two sliding grooves 21 are formed between the two positioning piles 2 and the tower top 1;
[0072] S2: Before the hanger is installed, the base 3 is assembled and fixed;
[0073] Specifically, two groups of side beams 32 are welded on two bottom beams 31, respectively, then two bearing frames 33 are connected between the two groups of side beams 32 to form the base 3, and then the connecting piece 34 is connected between the two bearing frames 33 by bolts and nuts;
[0074] S3: Hoist the base 3 to the tower top 1, and insert the base 3 into the two sliding grooves 21;
[0075] Specifically, the hoisting device is connected with the connecting piece 34, and the hoisting device is started, the base 3 is hoisted to the tower top 1 and inserted into the two sliding grooves 21 by the hoisting device, and then the connecting piece 34 is removed from the two bearing frames 33;
[0076] S4: Install the positioning mechanism 4 on the tower top 1;
[0077] Specifically, the elastic extension part 41 is fixedly installed on the top of the tower top 1, then the supporting piece 42 is hoisted and moved above the tower top 1 by the hoisting device, then the supporting piece 42 is slowly lowered, so that the supporting piece 42 is inserted into the limiting groove 22 on the two positioning piles 2, and the two supports 43 are respectively inserted into the limiting grooves 22 on the two positioning piles 2;
[0078] S5: Hoist the base 5 to the base 3, and guide and position it by the positioning mechanism 4, and the base 5 can extrude the positioning mechanism 4;
[0079] Specifically, the base 5 is lifted and moved to the upper side of the positioning mechanism 4 by the lifting device, and finally the base 5 is dropped by starting the lifting device. During the falling of the base 5, the base 5 is limited in the front-rear direction by the two groups of positioning parts 44, and at the same time, the base 5 is positioned and guided in the left-right direction by the upper half of the V-shaped positioning part 46. After the base 5 passes through the upper half of the V-shaped positioning part 46 and enters the lower half of the U-shaped positioning part 46, the base 5 is limited in the left-right direction by the lower half of the U-shaped positioning part 46, so as to position and install the base 5. After the bottom of the base 5 contacts the top of the support 43, the base 5 continues to fall, and at this time, the support 43 is pressed down by the base 5, so as to drive the positioning part 44, the mounting cylinder 45, the positioning part 46 and the elastic part 47 to move downward, and compress the elastic part 41. Until the base 5 is inserted into the through slot 23 at the top of the positioning pile 2, at this time, the bottom of the base 5 contacts the two groups of side beams 32, and then the base 5 and the two groups of side beams 32 are fixed by the bolt and the nut, so as to realize the fixation between the base 5 and the base 3, and at the same time, the fixation structure between the positioning part 46 and the mounting cylinder 45 is removed.
[0080] S6: The positioning mechanism 4 is driven to lock the locking mechanism 7, so as to lock the base 3 by the locking mechanism 7.
[0081] Specifically, when the supporting part 42 moves downward, the inclined surface 75 on the moving part 71 is extruded by the arc surface 423 on the extruding part 422, so as to drive the connecting part 72 and the locking part 74 to move towards the bottom beam 31, so as to insert the locking part 74 into the locking slot on the bottom beam 31, and at the same time, compress the elastic part 73, so as to lock the bottom beam 31.
[0082] S7: The lifting part 6 is lifted to the base 5.
[0083] Specifically, the lifting device lifts the lifting part 6 to the upper side of the base 5 and drops it. During the falling of the working platform 61, the bottom of the working platform 61 first contacts the top of the positioning part 46, and when the working platform 61 continues to fall, the positioning part 46 is extruded downward by the working platform 61, so as to move downward and compress the elastic part 47. Until the bottom of the working platform 61 contacts the top of the base 5, and then the working platform 61 and the base 5 are fixed by the bolt and the nut.
[0084] Although the embodiments of the present application have been shown and described above, it should be understood that the above embodiments are exemplary and should not be construed as limiting the present application, and those skilled in the art can make changes, modifications, replacements and variations to the above embodiments within the scope of the present application.
Claims
1. A tower top hanger installation device, comprising a tower top, characterized in that, It also includes positioning piles, base, positioning mechanism, base, lifting parts and locking mechanism. There are two positioning piles, both of which are installed on the top of the tower and form two sliding grooves between them. The base can be pre-assembled and fixed before being hoisted. When being hoisted, the base can be inserted into the two sliding grooves. The positioning mechanism is connected to the top of the tower. When the base is hoisted onto the base, it can be positioned and guided by the positioning mechanism and squeeze the positioning mechanism. The locking mechanism is installed in the positioning pile. When the positioning mechanism is squeezed, it can drive the locking mechanism to lock the base. The lifting parts are connected to the base. The positioning pile is provided with a limiting groove; the base includes two bottom beams, which can be respectively inserted into two sliding grooves; The positioning mechanism includes an elastic telescopic part, a support member connected to the elastic telescopic part, two brackets, two sets of positioning parts, a mounting cylinder, positioning elements, and an elastic part. The elastic telescopic part is connected to the top of the tower top. The two ends of the support member are respectively limited and slidably connected to two limiting grooves. The two brackets are respectively connected to the top ends of the support member. The two brackets are respectively limited and slidably connected to the limiting grooves on two positioning piles. The two sets of positioning parts are respectively connected to the top of the two brackets. The mounting cylinder is connected to the top of the support member. The positioning elements are inserted into the mounting cylinder and fixed to the mounting cylinder by bolts and nuts. The support includes a horizontal plate and two extrusion sections. The extrusion sections are in the shape of an inverted U. The two extrusion sections are connected to the left and right ends of the horizontal plate, respectively. The two extrusion sections are inserted into the limiting grooves on the two positioning posts, and both extrusion sections are provided with arc-shaped surfaces. The locking mechanism is provided in two parts. The locking mechanism includes a moving part, a connecting part, an elastic element and a locking part that are slidably connected in the positioning pile. The connecting part is connected to the side of the moving part near the bottom beam. The locking part is connected to the connecting part. The bottom beam is provided with a locking groove. The locking part can be inserted into the locking groove on the bottom beam. The elastic element is connected between the moving part and the locking part. The moving part is provided with an inclined surface. When the support moves down, the curved surface on the pressing part presses the inclined surface on the moving part, causing the moving part to drive the connecting part and the locking part to move towards the bottom beam, so that the locking part is inserted into the locking groove on the bottom beam, thereby locking the bottom beam and compressing the elastic element at the same time.
2. The tower top hanger installation device according to claim 1, characterized in that, The positioning stake is provided with a through groove.
3. The tower top hanger installation device according to claim 1, characterized in that, The base also includes side beams, support frames, and connectors. There are two support frames, the rear end of the slide is closed, and there are two sets of side beams, with two side beams in each set. The two sets of side beams are connected to two bottom beams respectively, and the two support frames are connected between the two sets of side beams. The connectors are installed between the two support frames.
4. The tower top hanger installation device according to claim 1, characterized in that, The number of positioning parts in each group is set to two. The two positioning parts in the same group are arranged one after the other in a V-shape. The lower half of the positioning part is U-shaped and the upper half of the positioning part is V-shaped.
5. The tower top hanger installation device according to claim 1, characterized in that, The lifting device includes a working platform and a winch, with the winch connected to the working platform and the working platform connected to the base.
6. A method for installing a tower top hanger, characterized in that, The tower top hanger installation device according to any one of claims 1-5 includes the following steps: S1: Two positioning stakes are set on the top of the tower, and two sliding grooves are formed between the two positioning stakes and the top of the tower; S2: Before installing the hanger, assemble and fix the base; S3: Hoist the base to the top of the tower and insert the base into the two sliding grooves; S4: Install the positioning mechanism at the top of the tower; S5: The base is hoisted onto the base, and simultaneously positioned and guided by the positioning mechanism, while the base can squeeze the positioning mechanism; S6: The squeezed positioning mechanism drives the locking mechanism to lock the base; S7: Hoist the lifting components onto the base.
Citation Information
Patent Citations
Fabricated hanging bracket device for irregular main tower top and mounting method
CN118498230A
Supporting bracket for construction
CN118461453A
Tower top hanging bracket installed at inclined inhaul cable tower end
CN214401419U