Method and system for calculating split-phase line loss of metering box based on intelligent measurement switch

By identifying the phase of a single-phase energy meter through an intelligent measurement switch, dynamically adjusting the calculation cycle, and using slip calculation method and anomaly level classification, the system solves the problems of insufficient accuracy and single response in traditional metering box line loss calculation, and realizes refined line loss management of low-voltage distribution networks.

CN121432002AActive Publication Date: 2026-01-30TSINGDA SMART SCI &TECH LTD BEIJING
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202511638176.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-11-10
Publication Date
2026-01-30
Estimated Expiration
2045-11-10

AI Technical Summary

Technical Problem

Traditional metering box line loss calculation methods suffer from insufficient accuracy of phase line loss, ambiguous phase attribution of single-phase energy meters, large data anomaly interference, fixed calculation cycle lacking adaptability, and single anomaly judgment response, making it difficult to meet the refined requirements of low-voltage distribution network metering box line loss management.

Method used

The system uses an intelligent measurement switch to search for the energy meter type via RS485 bus, identifies the phase of the single-phase energy meter, caches the energy data, dynamically adjusts the calculation cycle using the slip calculation method, and combines voltage characteristic comparison and data anomaly correction to classify line loss anomaly levels and report them differently, thus realizing phase-by-phase line loss calculation.

Benefits of technology

Accurately identify the phase of a single-phase energy meter, eliminate abnormal data, dynamically adjust the calculation cycle, reduce line loss calculation errors, improve the pertinence of operation and maintenance response, provide clear traceability clues, shorten fault handling time, and reduce operation and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121432002A_ABST
    Figure CN121432002A_ABST
Patent Text Reader

Abstract

The invention discloses a method and system for calculating split-phase line loss of a metering box based on an intelligent measurement switch, and the method comprises the steps: searching meters through an RS485 bus after the intelligent measurement switch is powered on, and recognizing the types of single-phase and three-phase electric energy meters in the metering box; acquiring voltage data of the single-phase meter, determining an access phase through stability verification, and caching split-phase power supply and subordinate electric energy meter data for the three-phase meter at an initial moment; after correcting the abnormal data of the electric energy, performing phase-splitting classification summation on the data of the electric energy meter according to phase affiliation; dynamically setting a calculation period according to split-phase load fluctuation, and independently calculating a three-phase line loss rate by adopting a slip method when a monitoring time point meets a condition; and comparing the line loss rate with a preset parameter, dividing three levels of abnormities, and reporting the abnormities in a differentiated manner, and realizing abnormities traceability through electric energy proportion analysis and equipment real-time state monitoring. The method improves the calculation precision of the split-phase line loss, balances the calculation efficiency and resource consumption, optimizes the operation and maintenance response efficiency, and is suitable for the fine management of the line loss of the low-voltage distribution network metering box.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The application relates to the technical field of intelligent measurement switches, in particular to a method and system for calculating phase line loss of a metering box based on an intelligent measurement switch. BACKGROUND

[0002] In the operation process of a low-voltage power distribution network, a metering box is a core unit for electric energy metering and power distribution, and line loss (i.e. the difference between the power supply energy at the metering box inlet and the metered energy of all electric energy meters under the metering box) is a key indicator for reflecting the operation efficiency of the power distribution network, checking metering abnormalities and electricity stealing behaviors. The traditional metering box line loss calculation method has the following technical pain points, which cannot meet the fine operation and maintenance requirements:

[0003] 1. Insufficient calculation accuracy of phase line loss: The traditional method calculates the overall line loss in the unit of a transformer area, and does not realize the disassembly of phase (A, B, C) line loss. Since single-phase loads (such as residential electricity) in the low-voltage distribution network often exist in three-phase unbalanced access conditions, the overall line loss data cannot locate the loss abnormalities of specific phases, making it difficult for operation and maintenance personnel to accurately troubleshoot faults.

[0004] 2. Ambiguity of phase attribution of single-phase electric energy meters: Single-phase electric energy meters and three-phase electric energy meters are often mixed in the metering box, and there is a lack of effective identification means for the phase access information (access to A, B, or C) of single-phase electric energy meters. If only relying on manual records or experience, phase classification errors and line loss omission may occur, leading to deviation in the summation of phase electric energy and further causing distortion of the line loss calculation results.

[0005] 3. Data abnormality interference calculation results: Electric energy meters may experience data jumps (such as sudden increase / decrease in a short period of time) or stagnation due to communication interference, hardware failure, and other factors during operation. The traditional method does not effectively correct such abnormal data, which directly participates in the calculation of phase summation, further amplifying the line loss error.

[0006] 4. Lack of adaptability of fixed calculation period: The traditional line loss calculation period is mostly a fixed value (such as 1 hour / 1 day), without considering the impact of load fluctuations. During peak electricity consumption periods (such as residential morning peak and industrial production periods), load fluctuations are severe, and fixed long periods may cause line loss abnormalities to be discovered late. During low electricity consumption periods (such as late at night), the load is stable, and fixed short periods result in data redundancy and waste of computing power.

[0007] 5. Single abnormality determination and response mechanism: The traditional method only determines abnormalities by whether the line loss rate exceeds a fixed threshold, without distinguishing the severity of abnormalities, and the alarm mode is unified as real-time reporting, which causes the main station system to face a large amount of invalid alarm information, reducing the operation and maintenance response efficiency. At the same time, there is a lack of abnormality tracing capability, and operation and maintenance personnel need to check all electric energy meters in the metering box one by one, which is time-consuming and labor-intensive.

[0008] To address the aforementioned issues, existing technologies have not yet proposed an integrated phase-by-phase line loss calculation scheme that comprehensively considers accurate phase identification, data anomaly correction, dynamic periodic calculation, hierarchical alarms, and fault tracing. Therefore, there is an urgent need to design a method and system for calculating phase-by-phase line losses in metering boxes based on intelligent measuring switches, in order to solve the problem of insufficient precision in low-voltage distribution network metering box line loss management. Summary of the Invention

[0009] The technical problem to be solved by this invention is to provide a method and system for calculating phase line loss of metering boxes based on intelligent measuring switches, so as to solve the problems of insufficient phase line loss accuracy, ambiguous phase assignment of single-phase energy meters, large data anomaly interference, fixed calculation cycle lack of adaptability and single anomaly judgment response in traditional metering box line loss calculation, and meet the needs of refined operation and maintenance of line loss of metering boxes in low-voltage distribution networks.

[0010] To solve the above-mentioned technical problems, embodiments of the present invention provide the following technical solution: a method for calculating phase-by-phase line loss of a metering box based on an intelligent measuring switch, comprising the following steps: Step 1: After the measuring switch is powered on, a meter search operation is performed via RS485 bus to obtain the types of all energy meters in the metering box. The energy meter types are divided into single-phase energy meters and three-phase energy meters. Step 2: For single-phase energy meters, the measuring switch collects and buffers the voltage data of the single-phase energy meter. After a preset time of data accumulation and analysis, it identifies and determines the grid phase connected to each single-phase energy meter. For three-phase energy meters, at the first time point T1, the measuring switch buffers the phase power supply energy data provided by its own metering module, denoted as... , , Simultaneously, collect and cache the energy data of all subordinate energy meters; Step 3: Correct any anomalies in the energy data of single-phase and three-phase energy meters, and perform phase-by-phase classification and summation calculations on the energy data of all energy meters to obtain the phase-by-phase summation data of the energy meters at time T1, which are denoted as follows: , , ; Step 4: At the nth time point Tn, cache the phase power supply energy data of the measuring switch itself again. , , And recalculate and cache the total phase-by-phase energy data of the energy meter. , , When n>2, the phase line loss rate calculation is started, the calculation period is set to a dynamic adaptive calculation period, and the slip calculation method is used to calculate the line loss rates of phases A, B, and C respectively. Step 5: Compare the calculated line loss rate of each phase with the preset anomaly judgment parameters, filter out the abnormal line loss data that exceeds the preset range, and report the abnormal line loss status result to the main station system.

[0011] Preferably, the step of identifying and determining the grid phase to which each of the single-phase energy meters is connected specifically involves: Step 2.1: The measuring switch synchronously collects voltage data for each single-phase energy meter for 5 consecutive power grid cycles, and at the same time collects the voltage phase reference signal of its own three phases A, B, and C. The voltage phase reference signal includes the phase start time and the voltage peak time. The voltage data at least covers the voltage effective value, the voltage zero crossing time, and the voltage waveform distortion rate. Step 2.2: Calculate the time difference between the zero-crossing point of the voltage of each single-phase energy meter and the zero-crossing points of the voltages of phases A, B, and C of the measuring switch, and denot them as Δt_A, Δt_B, and Δt_C, respectively. If the absolute value of Δt_A is ≤ 0.3ms, it is preliminarily determined that the single-phase energy meter is connected to phase A; similarly, if the absolute value of Δt_B is ≤ 0.3ms, it is preliminarily determined that the single-phase energy meter is connected to phase B; if the absolute value of Δt_C is ≤ 0.3ms, it is preliminarily determined that the single-phase energy meter is connected to phase C. Step 2.3: For single-phase energy meters with preliminary phase determination, continuously collect voltage waveform distortion rate data within 3 minutes. If all voltage waveform distortion rate data within 3 minutes are ≤3%, the phase determination result of the single-phase energy meter is confirmed. If the voltage waveform distortion rate is >3% at any moment, the voltage data in that time period is discarded, and steps 2.1-2.2 are repeated until a stable phase determination result is obtained.

[0012] Preferably, the step of correcting abnormal energy data for single-phase and three-phase energy meters specifically includes: Step 3.1: Single-phase meter anomaly determination. Calculate the rate of change of the single-phase energy meter's energy data for three consecutive times using the formula ηsingle = (Esingle after - Esingle before) / Esingle before × 100%. If the absolute value of the rate of change is > 20%, mark the current data as trend abnormal data. Step 3.2: Three-phase meter phase determination. For the independent electrical energy data of phases A, B, and C of the three-phase energy meter, calculate the change rate of each phase according to the formula η phase = (after phase E - before phase E) / before phase E × 100%. If the absolute value of the change rate of any phase is > 20%, mark the data of that phase as abnormal. Step 3.3: Data correction and verification. Abnormal data of single-phase meters are corrected by taking the average of valid data in the same period of the past 30 days; abnormal data of each phase of three-phase meters are corrected by taking the average of valid data of the corresponding phase in the past 30 days, and the deviation of the total of the three phases after correction from the original total data is ≤5%.

[0013] Preferably, the step of classifying and summing the energy data of all energy meters by phase to obtain the phase-specific total energy data of the energy meters at time T1 is specifically as follows: A-phase total data:

[0014] B-phase total data:

[0015] C-phase total data:

[0016] in, This represents the corrected energy data of the i-th single-phase energy meter in the A-phase set at time T1, where m is the number of single-phase energy meters in the A-phase set. This represents the corrected phase A energy data of the j-th three-phase energy meter in phase A set at time T1, where k is the total number of three-phase energy meters in the metering box. This represents the corrected energy data of the i-th single-phase energy meter in the B-phase set at time T1, where w is the number of single-phase energy meters in the B-phase set. This represents the corrected B-phase energy data of the j-th three-phase energy meter within the B-phase set at time T1. This represents the corrected energy data of the i-th single-phase energy meter in the C-phase set at time T1, where p is the number of single-phase energy meters in the C-phase set. This represents the corrected C-phase energy data of the j-th three-phase energy meter within the C-phase set at time T1; and all data involved in the summation must undergo the energy data anomaly correction in step 3, and uncorrected data must not be included in the summation calculation.

[0017] Preferably, the method for determining the dynamic adaptive calculation period includes the following steps: Step 4.1: The measuring switch calculates the phase load fluctuation coefficients of phases A, B, and C from time T1 to time Tn-1. The phase load fluctuation coefficient is calculated as follows: (maximum power supply energy of a phase - minimum power supply energy of that phase) / average power supply energy of that phase × 100%. The average power supply energy of a phase is calculated as the sum of the power supply energy of all sampling points of that phase during the statistical period / the number of sampling points. Step 4.2: Determine the current calculation period based on the statistically obtained three-phase load fluctuation coefficients: If the maximum value of the three-phase load fluctuation coefficient is greater than 20%, then the current calculation period will be set to 20 minutes. If the maximum value of the three-phase load fluctuation coefficient is between 10% and 20%, then the current calculation period is set to 25 minutes. If the maximum value of the three-phase load fluctuation coefficient is ≤10%, then the current calculation period is set to 35 minutes. Step 4.3: After every 3 calculation cycles, repeat steps 4.1-4.2 to update the calculation cycle for the next round.

[0018] Preferably, the line loss rates of phases A, B, and C are calculated using the slip calculation method, specifically using the following mathematical formula: Line loss rates of phases A, B, and C at time Tn , , They are respectively:

[0019]

[0020]

[0021] in, , , The measurement switch's phase-by-phase power supply energy data at the time point of the calculation cycle preceding time Tn; , , This is the total energy data of the electricity meter for each phase corresponding to the previous time point; and the calculation process of the line loss rate for each phase is completely independent of the load data and metering data of the other two phases.

[0022] Preferably, the abnormal line loss status result is specifically as follows: Level 1 anomaly: Phase loss rate > 1.2 times the preset upper limit of anomalies, is judged as a serious anomaly; Level 2 anomaly: Phase loss rate > preset anomaly upper limit and ≤ 1.2 times the preset anomaly upper limit, is judged as moderate anomaly; Level 3 anomaly: If the phase loss rate is less than 0.8 times the preset lower limit of anomalies, it is judged as a data anomaly; Perform differentiated reporting operations based on different anomaly levels: If it is determined to be a Level 1 anomaly: the measuring switch sends an emergency alarm message to the main station system through the communication module within ≤10 seconds, and at the same time triggers the local audible and visual alarm device of the measuring switch; If the fault is determined to be a Level 2 anomaly: the measurement switch will recalculate the line loss rate of the phase after a 5-minute delay. If the recalculation result is still a Level 2 anomaly, a normal alarm message will be sent to the main station system. If the abnormality is determined to be Level 3, the measurement switch stores the abnormal line loss data in the local cache module. At a fixed time each day, all Level 3 abnormal data are aggregated and a data verification reminder message is sent to the main station system.

[0023] Preferably, it also includes auxiliary methods for tracing the source of abnormal phase line losses, specifically: Step 6.1: When a phase is determined to have abnormal line loss, the measuring switch extracts the energy data of all single-phase energy meters under that phase and the energy data of the corresponding phase of the three-phase energy meters, and calculates the energy percentage of each energy meter. The energy percentage is calculated as follows: (energy data of a single energy meter / total energy data of all energy meters in that phase) × 100%. Step 6.2: Compare the current energy percentage of each energy meter in this phase with the average energy percentage of the same period in the past 7 days, and calculate the percentage deviation value. The percentage deviation value = |current percentage - average percentage|. If the percentage deviation value of a certain energy meter is >8%, then mark the energy meter as a suspicious energy meter. Step 6.3: The measuring switch collects real-time operating data of the suspected energy meter through the RS485 bus, including real-time current data and real-time voltage data, and determines whether there is a situation where the real-time current is greater than 1.1 times the rated current of the energy meter or the real-time voltage is less than 0.9 times the rated voltage of the energy meter. If either of the above situations exists, an abnormality tracing clue containing the device number of the energy meter and the abnormal operating characteristics is recorded. Step 6.4: The measurement switch packages the abnormality tracing clues, abnormal line loss data of the phase, and abnormality level information together and reports them to the main station system.

[0024] This invention also proposes a system for calculating phase-by-phase line loss of a metering box based on a smart measuring switch, used to implement the above-mentioned method for calculating phase-by-phase line loss of a metering box based on a smart measuring switch. The system includes a smart measuring switch, an energy meter cluster, and a master station system, wherein the smart measuring switch is communicatively connected to the energy meter cluster and the master station system. The intelligent measurement switch includes an RS485 communication module, a 4G / 5G module, a metering acquisition module, a data caching module, a local alarm module, a phase recognition module, a line loss calculation module, an anomaly handling module, and a source tracing auxiliary module. The RS485 communication module is used to establish bidirectional communication with the electricity meter cluster, perform meter search operations to obtain the electricity meter type, and collect the electricity energy data, voltage data, and current data of the electricity meter. The 4G / 5G module establishes a communication connection with the main station system to report abnormal line loss data, alarm information, and tracing clues; The metering and acquisition module is used to collect the A, B, and C phase power supply energy data of the intelligent metering switch itself. , , The data acquisition frequency is synchronized with the data acquisition frequency of the electricity meter; The data caching module is used to store the electricity meter type information, the collected voltage data, energy data, current data, as well as the calculated phase line loss rate data and abnormal data; The local alarm module includes LED indicators and a buzzer, which are used to trigger an audible and visual alarm when the level is determined to be a level one anomaly. The phase identification module is used for phase identification of electricity meters and outputs the phase assignment result for each electricity meter. The line loss calculation module is used to calculate the line loss rate using the slip method. The anomaly handling module is used to classify anomalies into different levels and perform differentiated reporting operations, generating alarm information and handling suggestions; The source tracing auxiliary module is used to assist in tracing the source of abnormal phase line loss and generate clues for tracing the source of the abnormality. The electricity meter cluster includes at least one single-phase electricity meter and / or at least one three-phase electricity meter. Both the single-phase electricity meter and the three-phase electricity meter support the RS485 communication protocol and upload electricity data, voltage data and current data to the smart metering switch. The main station system includes a data receiving module, an archive management module, an alarm handling module, an operation and maintenance suggestion module, and a data storage module; The data receiving module is used to receive various data and information reported by the intelligent measuring switch; The file management module is used to store basic file information for metering boxes, smart metering switches, and electricity meter clusters. The alarm processing module is used to classify, display, and prioritize received alarm information. The operation and maintenance suggestion module is used to generate anomaly handling suggestions by associating historical data; The data storage module is used for long-term storage of phase line loss data, alarm information, and traceability clues.

[0025] The beneficial effects of the above-described technical solution of the present invention are as follows: 1. This invention determines the grid phase affiliation of each single-phase energy meter by comparing voltage characteristics and verifying stability, avoiding interference from phase misjudgment on phase data; at the same time, it performs anomaly detection and correction on energy data, eliminates abnormal data and ensures data consistency, and then completes the summation of phase data and independent line loss rate calculation according to phase affiliation, which can accurately locate the loss anomaly of specific phases and provide a reliable basis for the refined management of line loss in low-voltage distribution networks.

[0026] 2. This invention dynamically adjusts the line loss calculation cycle according to the load fluctuation of each phase, which can capture line loss changes in a timely manner during periods of active load change and reduce invalid data processing during periods of stable load. At the same time, it adopts the slip calculation method to calculate the line loss rate by the difference between adjacent period data, which effectively reduces the random error that may exist in a single data acquisition. Combined with the previous data preprocessing process, it further ensures the reliability of the line loss calculation results and avoids interference from invalid data.

[0027] 3. This invention classifies abnormal line losses into different levels and implements differentiated reporting strategies for different levels, improving the targeting of operation and maintenance response. When an abnormal line loss occurs, suspicious equipment is identified by analyzing the changes in the proportion of electricity energy in the subordinate electricity meters. Further investigation is conducted by combining the real-time operating status of the equipment, providing operation and maintenance personnel with clear clues for tracing the source, avoiding blind investigation, significantly shortening the fault handling time, and reducing the manpower and time costs of distribution network operation and maintenance. Attached Figure Description

[0028] Figure 1 This is a flowchart of the method for calculating phase line loss of a metering box based on an intelligent measuring switch according to the present invention. Figure 2 This is a system architecture block diagram of the present invention for calculating phase line loss of a metering box based on an intelligent measuring switch; Figure 3 This is a block diagram of the intelligent measurement switch components of the system for calculating phase line loss of a metering box based on an intelligent measurement switch, as described in this invention. Figure 4 This is a block diagram of the main station system for calculating phase line loss of a metering box based on an intelligent measuring switch, according to the present invention. Detailed Implementation

[0029] To make the technical problems, technical solutions and advantages of the present invention clearer, a detailed description will be given below in conjunction with the accompanying drawings and specific embodiments.

[0030] like Figure 1 As shown, this invention proposes a method for calculating phase-by-phase line loss of a metering box based on an intelligent measuring switch, comprising the following steps: Step 1: After the measuring switch is powered on, the meter search operation is performed through the RS485 bus to obtain the types of all energy meters in the metering box. The energy meter types are divided into single-phase energy meters and three-phase energy meters. Step 2: For single-phase energy meters, the measuring switch collects and buffers the voltage data of the single-phase energy meter. After a preset time of data accumulation and analysis, it identifies and determines the grid phase connected to each single-phase energy meter. For three-phase energy meters, at the first time point T1, the measuring switch buffers the phase power supply energy data provided by its own metering module, denoted as... , , Simultaneously, collect and cache the energy data of all subordinate energy meters; Step 3: Correct any anomalies in the energy data of single-phase and three-phase energy meters, and perform phase-by-phase classification and summation calculations on the energy data of all energy meters to obtain the phase-by-phase summation data of the energy meters at time T1, which are denoted as follows: , , ; Step 4: At the nth time point Tn, cache the phase power supply energy data of the measuring switch itself again. , , And recalculate and cache the total phase-by-phase energy data of the energy meter. , , When n>2, the phase line loss rate calculation is started, the calculation period is set to a dynamic adaptive calculation period, and the slip calculation method is used to calculate the line loss rates of phases A, B, and C respectively. Step 5: Compare the calculated line loss rate of each phase with the preset anomaly judgment parameters, filter out the abnormal line loss data that exceeds the preset range, and report the abnormal line loss status result to the main station system.

[0031] In this embodiment, the grid phase to which each single-phase energy meter is connected is identified and determined, specifically as follows: Step 2.1: The measuring switch synchronously acquires voltage data for each single-phase energy meter for five consecutive grid cycles, and simultaneously acquires the voltage phase reference signals for its own A, B, and C phases. The voltage phase reference signals include the phase start time and voltage peak time. The voltage data must at least cover the effective voltage value, the voltage zero-crossing point, and the voltage waveform distortion rate. This step is designed based on the periodicity and consistency of the grid voltage characteristics. Acquiring voltage data for five consecutive grid cycles reduces the random error of a single acquisition through the statistical analysis of multi-cycle data; simultaneously acquiring the voltage phase reference signals for the measuring switch's own three phases establishes a reference coordinate system for subsequent single-phase meter phase determination. The effective voltage value reflects the stability of the voltage amplitude, the voltage zero-crossing point is a critical time node for phase synchronization determination, and the voltage waveform distortion rate reflects the purity of the voltage signal.

[0032] Step 2.2: Calculate the time difference between the zero-crossing point of the voltage of each single-phase energy meter and the zero-crossing points of the voltages of phases A, B, and C of the measuring switch, denoted as Δt_A, Δt_B, and Δt_C respectively. If the absolute value of Δt_A is ≤ 0.3ms, it is preliminarily determined that the single-phase energy meter is connected to phase A; similarly, if the absolute value of Δt_B is ≤ 0.3ms, it is preliminarily determined that the single-phase energy meter is connected to phase B; and if the absolute value of Δt_C is ≤ 0.3ms, it is preliminarily determined that the single-phase energy meter is connected to phase C. In a power system, the zero-crossing points of voltage signals of the same phase are highly synchronized in time. Therefore, when the absolute value of the time difference between the zero-crossing point of the voltage of a single-phase energy meter and the zero-crossing point of a certain phase (A / B / C) of the measuring switch is ≤ 0.3ms, they can be considered to belong to the same phase. This time difference threshold-based determination method does not require complex circuit topology testing. It can quickly complete the preliminary phase classification of a single-phase meter through precise measurement in the time dimension, balancing determination efficiency and preliminary accuracy.

[0033] Step 2.3: For single-phase energy meters with preliminary phase determination, continuously collect voltage waveform distortion rate data for 3 minutes. If the voltage waveform distortion rate of all data within 3 minutes is ≤3%, the phase determination result of the single-phase energy meter is confirmed. If the voltage waveform distortion rate is >3% at any moment, the voltage data for that period is discarded, and steps 2.1-2.2 are repeated until a stable phase determination result is obtained. This step ensures the reliability of the phase determination result through the stability verification of the voltage waveform distortion rate. The voltage waveform distortion rate reflects the degree of contamination of the voltage signal by factors such as harmonics and interference. When the distortion rate is ≤3%, it indicates that the voltage signal is in a stable and pure state, and the preliminary phase determination result based on the time difference has high reliability. If the distortion rate is >3%, the voltage signal has serious interference, which will cause deviation in the time difference determination. Therefore, the data for that period needs to be discarded and the determination process needs to be repeated.

[0034] In this embodiment, the steps for correcting abnormal energy data of single-phase and three-phase energy meters specifically include: Step 3.1: Single-phase meter anomaly determination. Calculate the rate of change of energy data for three consecutive times using the formula ηsingle = (Esingle after - Esingle before) / Esingle before × 100%. If the absolute value of the rate of change is > 20%, mark the current data as abnormal trend data. Under normal power consumption scenarios, the rate of change of energy will not show drastic changes. By calculating the rate of change three times consecutively and setting a 20% threshold, data jumps in single-phase meters caused by communication interference or hardware failure can be identified.

[0035] Step 3.2: Phase-by-phase determination of three-phase energy meters. For the independent energy data of phases A, B, and C of the three-phase energy meter, the change rate of each phase is calculated according to the formula η phase = (E phase after - E phase before) / E phase before × 100%. If the absolute value of the change rate of any phase is greater than 20%, the data of that phase is marked as abnormal. The metering of each phase of the three-phase energy meter is independent. The change rate is calculated for each phase and a 20% threshold is set. This can accurately locate the abnormal data of a certain phase (such as a phase module failure) and avoid misjudgment of the whole meter data due to the abnormality of one phase, thus ensuring the accuracy of single-phase data in the phase-by-phase line loss calculation.

[0036] Step 3.3: Data Correction and Verification. For single-phase meters, abnormal data is corrected using the average of valid data from the same period over the past 30 days. For three-phase meters, abnormal data for each phase is corrected using the average of valid data from the corresponding phase over the past 30 days, and the deviation of the corrected total of the three phases from the original total data is ≤5%. Historical data from the same period show similarities in electricity consumption behavior, and correcting abnormal data in this way can restore reasonable values. At the same time, limiting the deviation of the total three-phase data to ≤5% avoids excessive correction of single-phase data from disrupting the overall consistency of the three-phase data.

[0037] In this embodiment, the energy data of all energy meters are classified and summed by phase to obtain the total energy data of the energy meters at time T1, specifically: A-phase total data:

[0038] B-phase total data:

[0039] C-phase total data:

[0040] in, This represents the corrected energy data of the i-th single-phase energy meter in the A-phase set at time T1, where m is the number of single-phase energy meters in the A-phase set. This represents the corrected phase A energy data of the j-th three-phase energy meter in phase A set at time T1, where k is the total number of three-phase energy meters in the metering box. This represents the corrected energy data of the i-th single-phase energy meter in the B-phase set at time T1, where w is the number of single-phase energy meters in the B-phase set. This represents the corrected B-phase energy data of the j-th three-phase energy meter within the B-phase set at time T1. This represents the corrected energy data of the i-th single-phase energy meter in the C-phase set at time T1, where p is the number of single-phase energy meters in the C-phase set. This represents the corrected C-phase energy data of the j-th three-phase energy meter within the C-phase set at time T1; and all data involved in the summation must undergo the energy data anomaly correction in step 3, and uncorrected data must not be included in the summation calculation.

[0041] In this embodiment, the method for determining the dynamic adaptive calculation period includes the following steps: Step 4.1: The measuring switch statistically analyzes the phase load fluctuation coefficients of phases A, B, and C from time T1 to time Tn-1. The phase load fluctuation coefficient is calculated as follows: (Maximum power supply energy of a phase - Minimum power supply energy of that phase) / Average power supply energy of that phase × 100%. Here, the average power supply energy of a phase is the sum of the power supply energy of all sampling points for that phase during the statistical period / the number of sampling points. The degree of load fluctuation in each phase is quantified by calculating the phase load fluctuation coefficient. In the formula, the difference between the maximum and minimum power supply energy reflects the load fluctuation amplitude. Dividing this by the average power supply energy standardizes the fluctuation amplitude, thus determining whether the load is experiencing severe fluctuations, moderate fluctuations, or stability.

[0042] Step 4.2: Determine the current calculation period based on the statistically obtained three-phase load fluctuation coefficients: If the maximum value of the three-phase load fluctuation coefficient is greater than 20%, then the current calculation period will be set to 20 minutes. If the maximum value of the three-phase load fluctuation coefficient is between 10% and 20%, then the current calculation period is set to 25 minutes. If the maximum value of the three-phase load fluctuation coefficient is ≤10%, then the current calculation period is set to 35 minutes.

[0043] This step dynamically adapts the calculation period based on the degree of load fluctuation. When the load fluctuation is large (coefficient > 20%), a short period of 20 minutes is set to quickly capture changes in line loss; when the fluctuation is moderate (10%-20%), a period of 25 minutes is set to balance accuracy and efficiency; when the fluctuation is small (≤10%), a long period of 35 minutes is set to reduce the collection of invalid data. By setting different periods, the optimal balance between accuracy and efficiency in line loss calculation is achieved.

[0044] Step 4.3: After every 3 calculation cycles, repeat steps 4.1-4.2 to update the calculation cycle for the next round.

[0045] In this embodiment, the slip calculation method is used to calculate the line loss rate of phases A, B, and C respectively. The following mathematical formula is used for the calculation: Line loss rates of phases A, B, and C at time Tn , , They are respectively:

[0046]

[0047]

[0048] in, , , The measurement switch's phase-by-phase power supply energy data at the time point of the calculation cycle preceding time Tn; , , This refers to the total electrical energy data of each phase from the electricity meter at the previous time point; and the calculation process for the line loss rate of each phase is completely independent of the load and metering data of the other two phases. Taking phase A as an example, in the numerator, It is the difference in power supply energy of phase A of the measuring switch within adjacent calculation cycles, representing the change in energy at the input terminal of phase A; This is the energy difference between adjacent cycles of the total energy of phase A in the electricity meter, representing the energy change at the output end of phase A. The difference between the two is the energy change of phase A in that cycle. The denominator is the energy change at the input end, and dividing the two gives the line loss rate of phase A at time Tn. This slip (difference between adjacent cycles) calculation method transforms static energy data into dynamic cycle differences, effectively eliminating random errors in single data acquisition and significantly improving the accuracy of line loss rate calculation.

[0049] In this embodiment, the specific result of the abnormal line loss status is as follows: Level 1 anomaly: Phase loss rate > 1.2 times the preset upper limit of anomalies, is judged as a serious anomaly; Level 2 anomaly: Phase loss rate > preset anomaly upper limit and ≤ 1.2 times the preset anomaly upper limit, is judged as moderate anomaly; Level 3 anomaly: If the phase loss rate is less than 0.8 times the preset lower limit of anomalies, it is judged as a data anomaly; Perform differentiated reporting operations based on different anomaly levels: If it is determined to be a Level 1 anomaly: the measuring switch sends an emergency alarm message to the main station system through the communication module within ≤10 seconds, and at the same time triggers the local audible and visual alarm device of the measuring switch; If the fault is determined to be a Level 2 anomaly: the measurement switch will recalculate the line loss rate of the phase after a 5-minute delay. If the recalculation result is still a Level 2 anomaly, a normal alarm message will be sent to the main station system. If the abnormality is determined to be Level 3, the measurement switch stores the abnormal line loss data in the local cache module. At a fixed time each day, all Level 3 abnormal data are aggregated and a data verification reminder message is sent to the main station system.

[0050] This embodiment also includes assistance in tracing the source of abnormal phase line losses, specifically: Step 6.1: When a phase is determined to have abnormal line loss, the measuring switch extracts the energy data of all single-phase energy meters under that phase and the energy data of the corresponding phase of the three-phase energy meters, and calculates the energy percentage of each energy meter. Energy percentage = (energy data of a single energy meter / total energy data of all energy meters in that phase) × 100%; Step 6.2: Compare the current energy percentage of each energy meter in this phase with the average energy percentage of the same period in the past 7 days, and calculate the percentage deviation value. Percentage deviation value = |current percentage - average percentage|. If the percentage deviation value of a certain energy meter is >8%, then mark the energy meter as a suspicious energy meter. Step 6.3: The measuring switch collects real-time operating data of the suspected energy meter through the RS485 bus, including real-time current data and real-time voltage data, and determines whether there is a situation where the real-time current is greater than 1.1 times the rated current of the energy meter or the real-time voltage is less than 0.9 times the rated voltage of the energy meter. If either of the above situations exists, an abnormality tracing clue containing the device number of the energy meter and the abnormal operating characteristics is recorded. Step 6.4: The measurement switch packages the abnormality tracing clues, abnormal line loss data of the phase, and abnormality level information together and reports them to the main station system.

[0051] like Figure 2As shown, the present invention also proposes a system for calculating the phase line loss of a metering box based on a smart metering switch, which is used to implement the above-mentioned method for calculating the phase line loss of a metering box based on a smart metering switch. The system includes a smart metering switch 101, an energy meter cluster 102, and a master station system 103. The smart metering switch 101 is communicatively connected to the energy meter cluster 102 and the master station system 103.

[0052] like Figure 3 As shown, the intelligent measurement switch includes an RS485 communication module 1011, a 4G / 5G module 1012, a metering acquisition module 1013, a data buffer module 1014, a local alarm module 1015, a phase recognition module 1016, a line loss calculation module 1017, an anomaly handling module 1018, and a traceability auxiliary module 1019. Among them, the phase recognition module 1016, the line loss calculation module 1017, the anomaly handling module 1018, and the traceability auxiliary module 1019 are functional modules of the core processor of the intelligent measurement switch. RS485 communication module 1011 is used to establish bidirectional communication with the electricity meter cluster, perform meter search operations to obtain the electricity meter type, and collect the electricity energy data, voltage data, and current data of the electricity meter. 4G / 5G module 1012 establishes a communication connection with the main station system and reports abnormal line loss data, alarm information, and tracing clues; The metering and acquisition module 1013 is used to collect the A, B, and C phase power supply energy data of the intelligent metering switch itself. , , The data collection frequency is synchronized with the electricity meter data. The data cache module 1014 is used to store the electricity meter type information, the collected voltage data, energy data, current data, as well as the calculated phase line loss rate data and abnormal data; The local alarm module 1015 includes LED indicator lights and a buzzer, which are used to trigger an audible and visual alarm when the level is determined to be a level one abnormality; The phase identification module 1016 is used for phase identification of electricity meters and outputs the phase assignment result of each electricity meter. Line loss calculation module 1017 is used to calculate the line loss rate using the slip method; The anomaly handling module 1018 is used to classify anomalies into different levels and perform differentiated reporting operations, generating alarm information and handling suggestions; The tracing assistance module 1019 is used to assist in tracing the source of abnormal phase line loss and generate abnormal tracing clues.

[0053] The electricity meter cluster 102 includes at least one single-phase electricity meter and / or at least one three-phase electricity meter. Both the single-phase and three-phase electricity meters support the RS485 communication protocol and upload energy data, voltage data, and current data to the smart metering switch 101.

[0054] like Figure 4 As shown, the main station system 103 includes a data receiving module 1031, a file management module 1032, an alarm processing module 1033, an operation and maintenance suggestion module 1034, and a data storage module 1035; The data receiving module 1031 is used to receive various data and information reported by the intelligent measuring switch; The file management module 1032 is used to store basic file information of metering boxes, smart metering switches, and electricity meter clusters; The alarm processing module 1033 is used to classify and display the received alarm information and sort it by priority. The operation and maintenance suggestion module 1034 is used to generate anomaly handling suggestions by associating historical data; The data storage module 1035 is used for long-term storage of phase line loss data, alarm information, and traceability clues.

[0055] In summary, the present invention is based on the following specific principles: The first step is initialization and meter identification. After the smart metering switch is powered on, it performs a meter search operation via the RS485 bus to automatically identify the type of electricity meter in the metering box (single-phase / three-phase). Because single-phase meters require clear phase assignment and three-phase meters require splitting the data for each phase, the processing logic for the two is different. This step is a prerequisite for calculating phase-by-phase line loss.

[0056] Secondly, phase identification and data caching are implemented. For single-phase energy meters, the measuring switch synchronously collects voltage data (including RMS value, zero-crossing time, and waveform distortion rate) for five consecutive grid cycles, while simultaneously collecting its own A / B / C three-phase voltage phase reference signals (phase start and peak time). By calculating the zero-crossing time difference between each phase of the single-phase meter and the measuring switch, if the absolute value of the difference is ≤0.3ms, the phase is initially determined. Then, the voltage waveform distortion rate is monitored for another 3 minutes. The phase is confirmed only when all data are ≤3%, avoiding phase misjudgment caused by interference. For three-phase energy meters, the measuring switch's own phase power supply energy data is directly cached at the first time point T1, while simultaneously collecting and caching the energy data of all energy meters.

[0057] Next comes data anomaly correction and phase-by-phase summation. First, anomaly detection is performed on the energy data: for single-phase meters, the rate of change for three consecutive data points is calculated (ηsingle = (Esingle after - Esingle before) / Esingle before × 100%), and an absolute value > 20% is marked as an anomaly; for three-phase meters, the rate of change is calculated phase-by-phase, and any phase exceeding 20% ​​is marked as an anomaly. Then, the average of valid data from the same period over the past 30 days is used to correct the anomaly data (the total corrected data for all three phases deviates from the original total data by ≤ 5%, ensuring data consistency). Finally, according to the confirmed phase assignment, the corrected data is categorized and summed phase-by-phase to obtain the total energy of phases A, B, and C at time T1, ensuring the accuracy of the data used in line loss calculations.

[0058] Next is the dynamic calculation cycle and line loss rate calculation. The load fluctuation coefficient of each phase from time T1 to Tn-1 is statistically analyzed by the measuring switch: (maximum power supply energy of a certain phase - minimum power supply energy) / average power supply energy × 100%. The calculation cycle is dynamically set according to the fluctuation coefficient: 20 minutes for fluctuation > 20% (quickly capture anomalies), 25 minutes for fluctuation 10%-20% (balance accuracy and efficiency), and 35 minutes for fluctuation ≤ 10% (reduce redundancy). The cycle value is updated every 3 cycles. When n>2, the slip calculation method is used to independently calculate the three-phase line loss rate: the difference in power supply energy of each phase at the measuring switch between time Tn and Tn-1 is used as the base, the sum difference of the phases of the energy meters during the same period is subtracted, and then divided by the power supply energy difference to eliminate random errors in single data and achieve independent and accurate calculation for each phase.

[0059] Finally, there is the anomaly detection, reporting, and tracing. The line loss rate is compared with preset parameters to classify anomalies into three levels: Level 1 (>1.2 times the upper limit, severe anomaly) requires an emergency report within 10 seconds plus a local audible and visual alarm; Level 2 (>1.2 times the upper limit, moderate anomaly) requires a normal report if the anomaly persists after a 5-minute recalculation; Level 3 (<0.8 times the lower limit, data anomaly) requires daily summary verification and reminders. When tracing the source of anomalies, the percentage of electricity energy of the meters under the abnormal phase is first calculated and compared with the percentage of the same period in the past 7 days. A deviation >8% marks a suspicious meter. Then, real-time current (>1.1 times the rated value) and voltage (<0.9 times the rated value) data of the suspicious meters are collected to generate tracing clues. These clues, along with the anomaly data and level, are packaged and reported to the main station to assist maintenance personnel in accurately locating the problem.

[0060] At the system level, the RS485 communication module of the smart metering switch is responsible for data transmission, the metering acquisition module synchronously collects power supply data, and the phase recognition, line loss calculation, anomaly handling, and traceability assistance modules support their respective functions; the energy meter cluster uploads data according to the protocol; the main station system receives data, manages files, sorts alarms, and generates operation and maintenance suggestions.

[0061] The above description represents the preferred embodiments of the present invention. It should be noted that those skilled in the art can make various improvements and modifications without departing from the principles of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.

Claims

1. A method for calculating phase line loss of a metering box based on a smart metering switch, characterized in that, The method comprises the following steps: Step 1, the metering switch is powered on to perform a meter searching operation through the RS485 bus, and the types of all electric energy meters in the metering box are obtained, wherein the electric energy meter types are divided into single-phase electric energy meters and three-phase electric energy meters; Step 2, for single-phase electric energy meter, the measurement switch collects and caches the voltage data of the single-phase electric energy meter, and through data accumulation and analysis for a preset time, identifies and determines the phase of the power grid to which each single-phase electric energy meter is connected; for three-phase electric energy meter, the measurement switch caches the split-phase power supply energy data provided by its own metering module at the first time point T1, denoted as , , ; at the same time, collects and caches the electric energy data of all subordinate electric energy meters; Step 3, the electric energy data of single-phase electric energy meter and three-phase electric energy meter are corrected, and the electric energy data of all electric energy meters are classified and summed up, to obtain the total electric energy data of electric energy meter in T1 time, respectively recorded as , , ; Step 4, at the nth time point Tn, again cache the split-phase power supply energy data of the measurement switch itself 、 、 , and again calculate and cache the split-phase total energy data of the electric energy meter 、 、 ; when n>2, start the split-phase line loss rate calculation, set the calculation period as a dynamic adaptive calculation period, and calculate the line loss rates of A, B, and C three phases respectively by using the slip calculation method; Step 5, comparing the calculated line loss rate of each phase with the preset abnormality determination parameter, screening out abnormal line loss data exceeding the preset range, and reporting the abnormal line loss state result to the master station system.

2. The method for calculating phase line loss of a metering box based on a smart metering switch according to claim 1, wherein, The phase of the power grid to which each single-phase electric energy meter is connected is identified and determined, and specifically: Step 2.1: The metering switch synchronously collects voltage data of each single-phase electric energy meter for 5 consecutive power grid cycles, and simultaneously collects voltage phase reference signals of A, B and C phases of the metering switch, wherein the voltage phase reference signals include a phase starting time point and a voltage peak time point, and the voltage data at least includes a voltage effective value, a voltage zero-crossing time point and a voltage waveform distortion rate; Step 2.2: The time difference between the voltage zero-crossing time point of each single-phase electric energy meter and the voltage zero-crossing time points of A, B and C phases of the metering switch is calculated, and is recorded as Δt_A, Δt_B and Δt_C respectively; if the absolute value of Δt_A is less than or equal to 0.3 ms, it is preliminarily determined that the single-phase electric energy meter is connected to the A phase; similarly, if the absolute value of Δt_B is less than or equal to 0.3 ms, it is preliminarily determined that the single-phase electric energy meter is connected to the B phase; if the absolute value of Δt_C is less than or equal to 0.3 ms, it is preliminarily determined that the single-phase electric energy meter is connected to the C phase; Step 2.3: For the single-phase electric energy meter with a preliminarily determined phase, the voltage waveform distortion rate data within 3 minutes is continuously collected, and if all the voltage waveform distortion rate data within 3 minutes are less than or equal to 3%, the phase determination result of the single-phase electric energy meter is confirmed; if the voltage waveform distortion rate is greater than 3% at any time, the voltage data in the period is excluded, and steps 2.1-2.2 are re-executed until a stable phase determination result is obtained.

3. The method of claim 1, wherein the method further comprises: The electric energy data abnormality correction step for the single-phase electric energy meter and the three-phase electric energy meter specifically comprises: Step 3.1: Single-phase meter abnormality determination, the change rate of the electric energy data of the single-phase electric energy meter is calculated according to the formula ηsingle=(Esingleafter-Esinglebefore) / Esinglebefore*100%, and if the absolute value of the change rate is greater than 20%, the current data is marked as trend abnormal data; Step 3.2: Three-phase meter phase determination, the independent electric energy data of A, B and C phases of the three-phase electric energy meter is calculated according to the formula ηphase=(Ephaseafter-Ephasebefore) / Ephasebefore*100%, and if the absolute value of the change rate of any phase is greater than 20%, the phase data is marked as abnormal; Step 3.3: Data correction verification, the single-phase meter abnormal data is corrected by taking the average of the effective data in the same period within the last 30 days; the abnormal data of each phase of the three-phase meter is corrected by taking the average of the effective data of the corresponding phase within the last 30 days, and the deviation between the sum of the corrected three-phase and the original total data is less than or equal to 5%.

4. The method of claim 1, wherein the method further comprises: The electric energy data of all electric energy meters is classified and summed according to the phase to obtain the total electric energy data of the electric energy meters at T1, and specifically: A-phase separation sum data: ; B-phase phase-splitting summation data: ; C-phase separation sum data: ; Wherein, represents the corrected electric energy data of the i-th single-phase electric energy meter in the A-phase set at T1, and m is the number of single-phase electric energy meters in the A-phase set; represents the corrected A-phase electric energy data of the j-th three-phase electric energy meter in the A-phase set at T1, and k is the total number of three-phase electric energy meters in the metering box; represents the corrected electric energy data of the i-th single-phase electric energy meter in the B-phase set at T1, and w is the number of single-phase electric energy meters in the B-phase set; represents the corrected B-phase electric energy data of the j-th three-phase electric energy meter in the B-phase set at T1; represents the corrected electric energy data of the i-th single-phase electric energy meter in the C-phase set at T1, and p is the number of single-phase electric energy meters in the C-phase set; represents the corrected C-phase electric energy data of the j-th three-phase electric energy meter in the C-phase set at T1; and all the data participating in the summation need to be subjected to the electric energy data anomaly correction in step 3, and the uncorrected data cannot be included in the summation calculation.

5. The method of claim 1, wherein the method further comprises: The dynamic self-adaptive calculation cycle determination method comprises the following steps: Step 4.1: Measure the switching statistics of the respective phase load fluctuation coefficients of A, B, and C three-phase from time T1 to time Tn-1, wherein the phase load fluctuation coefficient = (the maximum power supply energy of a certain phase - the minimum power supply energy of the phase) / the average power supply energy of the phase x 100%, and the average power supply energy of a certain phase = the sum of power supply energy of all collection points in the statistical period / the number of collection points; Step 4.2: Determine the current calculation period according to the three-phase phase load fluctuation coefficients obtained by statistics: If the maximum value of the three-phase phase load fluctuation coefficients is > 20%, the current calculation period is set to 20 minutes; If the maximum value of the three-phase phase load fluctuation coefficients is between 10% and 20%, the current calculation period is set to 25 minutes; If the maximum value of the three-phase phase load fluctuation coefficients is ≤ 10%, the current calculation period is set to 35 minutes; Step 4.3: After completing 3 calculation periods, re-execute steps 4.1-4.2 to update the calculation period of the next round.

6. The method of claim 1, wherein the method further comprises: The line loss rate of A, B, and C three-phase is calculated by using the slip calculation method, and the following mathematical formula is used for calculation: The A, B, C phase line loss rate of the metering box at Tn moment , , respectively: ; ; ; Wherein, , , is the measured energy supply phase data of the energy meter at the previous calculation cycle time point of the Tn moment; , , is the total energy phase data of the energy meter corresponding to the previous time point; and the line loss rate calculation process of each phase is completely independent of the load data and metering data of the other two phases.

7. The method of claim 1, wherein the method further comprises: The abnormal line loss state result is specifically: First-level abnormality: phase line loss rate > 1.2 times of the preset abnormal upper limit value, judged as serious abnormality; Second-level abnormality: phase line loss rate > preset abnormal upper limit value and ≤ 1.2 times of the preset abnormal upper limit value, judged as moderate abnormality; Third-level abnormality: phase line loss rate < 0.8 times of the preset abnormal lower limit value, judged as data abnormality; According to different abnormal levels, difference reporting operation is performed: If it is judged as first-level abnormality: the measurement switch sends emergency alarm information to the master station system within ≤ 10 seconds through the communication module, and simultaneously triggers the local sound and light alarm device of the measurement switch; If it is judged as second-level abnormality: the measurement switch recalculates the line loss rate of the phase after a delay of 5 minutes, and if the recalculated result is still second-level abnormality, it sends ordinary alarm information to the master station system; If it is judged as third-level abnormality: the measurement switch stores the abnormal line loss data to the local cache module, and summarizes all third-level abnormal data of the day at a fixed time period every day, and sends data checking reminder information to the master station system.

8. The method of claim 1, wherein the method further comprises: It also includes assisting in tracing the phase line loss abnormality, specifically: Step 6.1: When a certain phase is judged as line loss abnormality, the measurement switch extracts the power data of all single-phase electric energy meters under the phase and the power data of the corresponding phase of the three-phase electric energy meter, calculates the power proportion of each electric energy meter, and the power proportion = (the power data of a certain electric energy meter / the total power data of all electric energy meters of the phase) x 100%; Step 6.2: Compare the current power proportion of each electric energy meter of the phase with the average power proportion of the same period in the past 7 days, calculate the proportion deviation value, and the proportion deviation value = |current proportion - average proportion|, if the proportion deviation value of a certain electric energy meter is > 8%, mark the electric energy meter as suspicious. Step 6.3: The measurement switch collects real-time operation data of the suspicious electric energy meter through the RS485 bus, including real-time current data and real-time voltage data, judges whether there is a case that real-time current > 1.1 times of the rated current of the electric energy meter or real-time voltage < 0.9 times of the rated voltage of the electric energy meter, and if any of the above cases exists, records the abnormal traceability clues including the equipment number of the electric energy meter and the abnormal operation characteristics; Step 6.4: The measurement switch packages the abnormal traceability clues together with the abnormal line loss data and abnormal level information of the phase, and reports to the master station system.

9. A system for calculating phase line loss of a metering box based on smart metering switches, characterized in that, The system for implementing the method for calculating the phase line loss of the metering box according to any one of claims 1-8, the system comprising a smart measurement switch, an electric energy meter cluster, and a master station system, wherein the smart measurement switch is in communication connection with the electric energy meter cluster and the master station system; The smart measurement switch comprises an RS485 communication module, a 4G / 5G module, a metering acquisition module, a data caching module, a local alarm module, a phase identification module, a line loss calculation module, an abnormality processing module, and a traceability assistance module; The RS485 communication module is configured to establish bidirectional communication with the electric energy meter cluster, perform a search operation to obtain the type of the electric energy meter, and collect electric energy data, voltage data, and current data of the electric energy meter; The 4G / 5G module is configured to establish communication connection with the master station system, and report abnormal line loss data, alarm information, and traceability clues; The metering collection module is used for collecting A, B and C three-phase separate power supply energy data of the intelligent metering switch itself , , The collection frequency is kept synchronous with the data collection frequency of the electric energy meter. The data caching module is configured to store the type information of the electric energy meter and the collected voltage data, electric energy data, current data, calculated phase line loss rate data, and abnormal data; The local alarm module comprises an LED indicator light and a buzzer, and is configured to trigger sound and light alarms when a first-level abnormality is determined; The phase identification module is configured to identify the phase of the electric energy meter and output the phase attribution result of each electric energy meter; The line loss calculation module is configured to calculate the line loss rate by using the slip method; The abnormality processing module is configured to perform abnormal level division and differentiated reporting operation, and generate alarm information and disposal suggestions; The traceability assistance module is configured to assist in abnormal phase line loss traceability, and generate abnormal traceability clues; The electric energy meter cluster comprises at least one single-phase electric energy meter and / or at least one three-phase electric energy meter, and the single-phase electric energy meter and the three-phase electric energy meter both support the RS485 communication protocol and upload electric energy data, voltage data, and current data to the smart measurement switch; The master station system comprises a data receiving module, an archive management module, an alarm processing module, an operation and maintenance suggestion module, and a data storage module; The data receiving module is configured to receive various data and information reported by the smart measurement switch; The archive management module is configured to store the basic archive information of the metering box, the smart measurement switch, and the electric energy meter cluster; The alarm processing module is configured to classify and display the received alarm information and perform priority sorting; The operation and maintenance suggestion module is configured to generate abnormal disposal suggestions by associating historical data; The data storage module is configured to store the phase line loss data, alarm information, and traceability clues for a long time.

Citation Information

Patent Citations

  • Phase identification method and system for single-phase electric energy meter access measurement switch

    CN119438732A

  • Distributed energy access-oriented intelligent electric meter multi-device collaborative optimization method, device, equipment and medium

    CN120896213A

  • Motor condition and performance analyzer

    US6144924A