Large bag packaging machine and packaging method and application thereof
By combining a PLC controller and photoelectric switches, the problem of filling error in large bag packaging machines was solved, achieving precise filling results.
Patent Information
- Application Number
- CN202610144721.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-02-02
- Publication Date
- 2026-04-14
AI Technical Summary
Existing large bag packaging machines have errors during the filling process and cannot achieve precise control.
By employing a PLC controller combined with multiple photoelectric switches and cylinders, and through the cooperation of a re-inspection belt and a long-distance conveyor belt, precise filling is achieved.
It enables precise filling of large bag packaging machines, reduces errors, and ensures the accuracy of material measurement.
Smart Images

Figure CN121849422A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to packaging equipment for paste resins in the chemical industry, and in particular to a large bag packaging machine, its packaging method, and its application. Background Technology
[0002] In existing large bag packaging machines, according to the content disclosed in publication number CN105836169A, although a feeding mechanism 20, a lifting mechanism 30, a telescopic pipe 4, and a weighing sensor 50 are also set up accordingly, the single-filling method inevitably results in errors or inaccuracies. Summary of the Invention
[0003] The purpose of this invention is to provide a large bag packaging machine, packaging method, and application that enables precise filling in practice, all capable of achieving precise control.
[0004] The present invention adopts the following technical solution: A large bag packaging machine includes a crossbeam mounted on a support or wall, a buffer hopper, a weighing hopper, a vibrating platform, and a conveyor belt. A replenishment hopper is located on one side of the weighing hopper, and an electrically controlled unloading valve is installed at the outlet end of the replenishment hopper. The weighing hopper is positioned on a first lifting frame via a first weighing sensor. The first lifting frame is placed on a second platform. A large bag hook device is located below the second platform. A vibrating platform cart is located below the large bag hook device, and a conveyor belt is located below the vibrating platform cart. A re-inspection belt is located in the forward direction of the conveyor belt, and the replenishment hopper is located above the re-inspection belt. Photoelectric switches are installed on both the conveyor belt and the re-inspection belt, and the photoelectric switches are connected to a PLC controller.
[0005] Preferred solution for large bag packaging machines: The second platform is equipped with a second cylinder, which is supported by a first lifting frame. The supporting frame is equipped with a weighing hopper via a first weighing sensor. A second lifting frame is located below the first lifting frame. The piston rod of the first cylinder installed on the first lifting frame is connected to the second lifting frame. The second lifting frame is connected to a third lifting frame via two third cylinders. The third lifting frame is equipped with a large bag hook device. The weighing hopper is mounted on the first lifting frame via a weighing hopper fixing pipe at its lower part. The upper and lower parts of the weighing hopper fixing pipe are respectively fitted with telescopic guide tubes.
[0006] The weighing hopper is connected to the weighing hopper protective pipe via a flexible connection. The weighing hopper protective pipe is fitted over the feed valve at the lower end of the buffer hopper. The buffer hopper is mounted on a horizontal support connected to a vertical support via a buffer hopper pad. The vertical support is mounted on the hopper support base frame, which is mounted on a third platform. A top frame is connected above the vertical support, and a vibrating screen is mounted on the top frame. A butterfly valve and a rubber flexible joint are mounted on the vibrating screen.
[0007] The buffer hopper is equipped with a first scraper sight glass and a first tuning fork level gauge. A weighing hopper is located below the buffer hopper. A buffer hopper short section is installed on the lower cone of the buffer hopper. The buffer hopper short section is connected to the feeding pipe through a dust valve. The feeding pipe is connected to the feeding hopper located below it. The feeding hopper is equipped with a second tuning fork level gauge and a second scraper sight glass.
[0008] The replenishment hopper is mounted on the second platform. A stepper motor and a discharge valve are installed at the lower end of the replenishment hopper. A buffer hopper transition joint is installed below the discharge valve. A re-inspection belt is installed directly below the buffer hopper transition joint. The re-inspection belt is equipped with a second photoelectric switch, which is connected to the PLC controller.
[0009] The two clamping plates in the large bag hook device are installed on the third lifting frame by connecting rod bolts and sleeves fitted on the connecting rod bolts. A lifting rod is installed on the lower right part of the clamping plate. A U-shaped opening is provided at the upper end of the lifting rod. A through hole is provided in the U-shaped opening. A mounting plate is provided on one side of the push rod and mounted on the clamping plate. A hook release cylinder is mounted on the mounting plate. The piston rod of the hook release cylinder is hinged to the aforementioned through hole through the push rod. The extended end of the push rod is correspondingly set to the U-shaped opening. A U-shaped fork is installed on one side of the lifting rod, and a hook is installed inside the U-shaped fork. One end of the hook is connected to the lower end of the lifting rod. An extension end of an arc plate is installed above the extended end of the hook. The fixed end of the arc plate is connected to the aforementioned two clamping plates.
[0010] One end of connecting rod one in the large bag hook device is connected to connecting seat one mounted on the third lifting frame. The middle part of connecting rod one is connected to one end of connecting rod three via connecting rod two. The other end of connecting rod three is hinged to one end of connecting rod four and one end of connecting rod five respectively. Connecting rod five has an arc-shaped rod structure. The other end of connecting rod five is connected to connecting rod six. The other end of connecting rod six is hinged to the discharge pipe. One end of connecting rod one is connected to one end of connecting rod nine. The free end of connecting rod nine is equipped with a chuck two. The other end of connecting rod four is connected to the middle of connecting rod seven, and the two ends of connecting rod seven are connected to one end of connecting rod eight and connecting seat two, respectively; the piston rod of bag-holding cylinder is mounted on connecting rod seven, and the cylinder body of bag-holding cylinder is hinged to connecting seat three, which is mounted on the third lifting frame; the free end of connecting rod eight is equipped with pawl one; the connecting rod structure on the other side is the same but arranged in the opposite direction, and pawl one and pawl one on the other side are connected by a first arc-shaped clamping plate, the curvature of the first arc-shaped clamping plate being adapted to the curvature of the discharge pipe; The second chuck and the second chuck on the other side are connected by a second arc-shaped clamp. The arc of the second arc-shaped clamp is the same as that of the first arc-shaped clamp and is adapted to the arc of the discharge pipe.
[0011] A long-distance conveyor belt is provided on one side of the inspection belt in the forward direction; a third photoelectric switch is provided on the long-distance conveyor belt; a second weighing sensor is installed below the inspection belt; the vibration platform trolley is placed on the guide rails on both sides of the conveyor belt in the running direction via guide wheels on both sides; a linkage mechanism is provided at the bottom of the vibration platform trolley, the linkage mechanism is connected to the push-out cylinder; chains are installed on both sides of the vibration platform trolley, one end of each chain is connected to the vibration platform trolley, and the other end of the chain is connected to the base frame via pulleys.
[0012] A packaging method for a large bag packaging machine, the technical solution of which is: controlled by a PLC controller, the process is carried out according to the following steps: S1: The release cylinder returns to its original position. The piston rod and push rod of the release cylinder pull together, and the boom rotates counterclockwise along the clamp. After the large bag is hung, the operator presses the start button, and the release cylinder returns to its original position. The operator hangs the bag's hook on the hook hand, and the blower blows air into the large bag through the first telescopic guide tube, the weighing hopper fixing pipe, and the second telescopic guide tube. The blower blows air for 20 seconds to open the large bag. After the blower blows open the large bag and stops supplying air, the bag-holding cylinder extends into position and clamps the bag opening onto the weighing hopper discharge pipe. S2: The piston rod of the trolley cylinder extends, pushing the vibrating cart under the large bag. After completion, the third cylinder reaches the extension position, the large bag falls onto the vibrating platform cart, and the first butterfly valve at the bottom of the weighing hopper opens to start loading. S3: The dust collector is turned on after a 1-second delay, the vibration motor starts to vibrate after a 2-second delay, the vibration motor stops after a 1-second delay when the feeding is completed, the dust collector stops running 0.5 seconds after the vibration stops, and the second cylinder rises. S4: The piston rod of the trolley cylinder returns to its original position; the piston rod of the first cylinder extends to the extended position, and then the large packaging bag is placed on the conveyor belt. The bag holding cylinder extends to the extended position to loosen the bag opening. The hook release cylinder extends to the extended position, and the large bag is released from the hook device. The third cylinder drives the third lifting frame to return to its original position, and the bag release is completed. S5: The large bag is conveyed forward by the conveyor belt to the re-inspection belt; the missing quality part is compensated by controlling the stepper motor at the bottom of the replenishment hopper and the unloading valve; S6: When the second weighing sensor shows that the weight has been reached, the unloading valve closes and the material supply stops; the large bag is conveyed forward from the inspection belt to the long-distance conveyor belt. When one end of the large bag is conveyed to the long-distance conveyor belt in the forward direction, the long-distance conveyor belt stops running due to the action of the third photoelectric switch. S7: Wait for the forklift to transport the precisely filled large bags away.
[0013] An application of a large bag packaging machine, used for packaging large bags of resin paste or other granular or powdery materials.
[0014] Compared with the prior art, the present invention, which adopts the above technical solution, achieves precise filling and metering by controlling the replenishment error of the replenishment bin after the conveyor belt arrives at the designated location and the photoelectric switch provides feedback signal. Attached Figure Description
[0015] Figure 1 This is a schematic diagram of the structure of the present invention.
[0016] Figure 2 This is a schematic diagram of the structure of the large bag hook device of the present invention.
[0017] Figure 3 yes Figure 2 View A in the diagram.
[0018] Figure 4 yes Figure 3 View B in the diagram.
[0019] Figure 5 yes Figure 2 The C-direction view in the image.
[0020] Figure 6 This is a structural schematic diagram of a vibration platform vehicle. Detailed Implementation
[0021] For a specific structure of a large bag packaging machine, see the example below. Figure 1-6The structure shown in the diagram includes: 1. Vibrating screen; 2. Top frame; 3. First tuning fork level gauge; 4. First rotary level gauge; 5. Buffer silo; 6. Buffer silo pad; 7. Silo support frame; 8. Servo valve. 9. Feed chute; 10. Third platform; 11. Flexible connection; 12. Weighing hopper; 13. First weighing sensor; 14. Support frame; 15. First butterfly valve; 16. First cylinder; 17. Telescopic guide tube; 18. First lifting frame; 19. Second cylinder; 20. Cylinder head gasket; 21. Second platform; 22. Second lifting frame; 23. Third cylinder; 24. Weighing hopper fixing pipe. 25. Large bag hook device, 26. Vibrating platform trolley, 27. Push-out cylinder, 28. Vibrating platform guide rail, 29. Large bag, 30. Weighing hopper discharge pipe, 31. Third lifting frame, 32. Conveyor belt, 33. Second weighing sensor, 34. Re-inspection belt, 35. Long-distance conveyor belt, 36. Third photoelectric switch, 37. Buffer hopper filter flexible joint, 38. Discharge valve, 39. Stepper motor, 40. Second tuning fork level gauge, 41. Second scraper test mirror, 42. Replenishment hopper, 43. Replenishment pipe, 44. Dust valve, 45. Buffer hopper short section, 46. First rotary level gauge, 47. Rubber flexible joint, 48. Second butterfly valve, 49. Breathing valve, 50. First photoelectric switch, 51.
[0022] This embodiment is applied to filling paste resin and mainly consists of a buffer hopper 5, a weighing hopper 12, a replenishing hopper 42, a conveyor belt 32, a first weighing sensor 13, a second weighing sensor 33, a re-inspection belt 34, and a long-distance conveyor belt 35.
[0023] like Figure 1 The specific structure or location shown is as follows: the buffer silo 5 is placed on the third platform 10 (the third floor of the actual factory area) via the silo support frame 7. A vibrating screen 1 is installed above the buffer silo 5 via the top frame 2. A butterfly valve 48 connected to the material (paste resin) conveying pipeline is installed on the vibrating screen 1. A breather valve 49 is installed on the top of the buffer silo 5. The number of breather valves 49 is set according to the diameter of the buffer silo 5. In this embodiment, four evenly distributed breather valves 49 are used.
[0024] The buffer hopper 5 is equipped with a first scraper sight glass 4, a first tuning fork level gauge 3, and a first rotary level gauge. The first tuning fork level gauge 3 and the first rotary level gauge 4 are both at the same horizontal height and mounted on the outer wall of the buffer hopper 5, spaced 45 degrees apart. The first scraper sight glass 46 is used to easily observe the material supply inside the buffer hopper. The first scraper sight glass 46 and the first tuning fork level gauge 3 are mounted on the outer wall of the buffer hopper 5 at a 90-degree angle.
[0025] Below the buffer hopper 5 is a weighing hopper 12. The lower cone of the buffer hopper 5 is equipped with a buffer hopper section 45. The buffer hopper section 45 is connected to the feeding pipe 43 through a dust valve 44. The feeding pipe 43 is connected to the feeding hopper 42 located below it. The feeding hopper 42 is equipped with a second tuning fork level gauge 40 and a second scraper test mirror 41.
[0026] The replenishing hopper 42 is mounted on the second platform 21. A stepper motor 39 and a discharge valve 38 are mounted at the lower end of the replenishing hopper 42. A buffer hopper transition joint 37 is mounted below the discharge valve 38. A re-inspection belt 34 is set directly below the buffer hopper transition joint 37. A second photoelectric switch 51 is set on the re-inspection belt 34. The second photoelectric switch 51 is connected to the PLC controller.
[0027] The weighing hopper 12 is connected to the weighing hopper protective pipe via a flexible connection 11. The weighing hopper protective pipe is fitted onto the outside of the feed valve 8 at the lower end of the buffer hopper 5. The buffer hopper 5 is mounted on a horizontal support connected to a vertical support via a buffer hopper pad 6. The vertical support is mounted on a hopper support base frame 7, which is mounted on a third platform 10. A top frame 2 is connected above the vertical support. A vibrating screen 1 is mounted on the top frame 2. A butterfly valve 48 and a rubber flexible joint 47 are mounted on the vibrating screen 1.
[0028] The second platform 21 is equipped with a second cylinder 19 via a cylinder head gasket 20. The second cylinder 19 is equipped with a support frame 14 via a first lifting frame 18. The support frame 14 is equipped with a weighing hopper 12 via a first weighing sensor 13. A second lifting frame 22 is provided below the first lifting frame 18. The piston rod of the first cylinder 16 installed on the first lifting frame 18 is connected to the second lifting frame 22. The second lifting frame 22 is connected to the third lifting frame 31 via two third cylinders 23 (placed on the front and rear sides of the weighing hopper fixing pipe, respectively). The third lifting frame 31 is equipped with a large bag hook device 25.
[0029] The weighing hopper 12 is mounted on the first lifting frame 18 via the weighing hopper fixing pipe 24 at its lower part. The upper and lower parts of the weighing hopper fixing pipe 24 are respectively fitted with telescopic guide pipes 17.
[0030] The stroke of the first cylinder 16 is greater than the stroke of the third cylinder 23, and the stroke of the third cylinder 23 is greater than the stroke of the second cylinder 19.
[0031] The second platform 21 is provided with a through square hole, the diameter of which is larger than the maximum diameter of the two support frames 14 in the lifting frame structure.
[0032] The first cylinder 16, the second cylinder 19 and the third cylinder 23 are each set to two; the maximum diameter of the two evenly distributed second cylinders 19 is greater than the maximum diameter of the two evenly distributed first cylinders 16; the maximum diameter of the two evenly distributed first cylinders 16 is greater than the maximum diameter of the two evenly distributed third cylinders 23.
[0033] The two clamping plates 2502 in the large bag hook device 25 are mounted on the third lifting frame 31 by connecting rod bolts 2501 and sleeves 2526 fitted on the connecting rod bolts 2501. A lifting rod 2503 is installed on the lower right part of the clamping plate 2502. A U-shaped opening 2503-1 is provided at the upper end of the lifting rod 2503. A through hole 2503-2 is provided on the U-shaped opening 2503-1. A mounting plate is provided on one side of the push rod 2506 and mounted on the clamping plate 2502. A hook release cylinder 2509 is mounted on the mounting plate. A push rod 2506 is installed at the piston rod extension end of the hook release cylinder 2509. One end of the push rod 2506 is hinged to the through hole 2503-2 on the U-shaped opening 2503-1 by a pin.
[0034] A U-shaped fork 2510 is installed on one side of the boom 2503, and a hook 2508 is installed inside the U-shaped fork 2510; one end of the hook 2508 is connected to the lower end of the boom 2503, and an extension end of an arc plate is provided above the extension end of the hook, and the fixed end of the arc plate is connected to the aforementioned two clamping plates.
[0035] The hook device is evenly distributed in four parts, which are respectively set at the four corners of the third lifting frame 31.
[0036] The two clamping plates 2502 are arranged symmetrically, and each clamping plate has a chamfered structure 2507 at the part away from the hanging rod.
[0037] The hook 2508 is a rod-shaped structure consisting of three segments: a front straight segment 2508-1, an inclined segment 2508-2, and a rear straight segment 2508-3. The front straight segment 2508-1 and the rear straight segment 2508-3 are parallel. The height of the inclined segment 2508-2 at the connection end with the front straight segment 2508-1 is greater than the height of the inclined segment 2508-2 at the connection end with the rear straight segment 2508-3. The rear straight segment 2508-3 is connected to the lower end of the lifting rod 2503.
[0038] The front straight section 2508-1, the inclined section 2508-2, and the rear straight section 2508-3 of the hook have the same diameter.
[0039] The spatial width of the two opposing surfaces of the U-shaped fork 2510 is greater than the width of the boom; the two outer surfaces of the U-shaped fork 2510 are respectively fixed to two clamping plates. The distance between the bottom end of the U-shaped fork 2510 and the bottom surface of the second platform 21 is greater than the distance between the bottom end of the boom 2503 and the bottom surface of the second platform 21, and it is necessary to ensure that there is no interference when the boom rotates more than 30 degrees, and also to ensure that the length of the hook 2508 does not disengage from the U-shaped fork 2510 or get stuck during the rotation and return process.
[0040] One end of connecting rod 2511 on one side of the large bag hook device 25 is connected to connecting seat 2522 mounted on the third lifting frame 31. The middle part of connecting rod 2511 is connected to one end of connecting rod 3513 via connecting rod 2512. The other end of connecting rod 3513 is hinged to one end of connecting rod 4514 and one end of connecting rod 5515. Connecting rod 5515 has an arc-shaped rod structure. The other end of connecting rod 5515 is connected to connecting rod 6516. The other end of connecting rod 6516 is connected to the weighing hopper discharge pipe 30. The connecting rod is hinged, with one end of connecting rod 1 2511 connected to one end of connecting rod 9 2519. The free end of connecting rod 9 2519 is equipped with pawl 2 2521. The other end of connecting rod 4 2514 is connected to the middle of connecting rod 7 2517. The two ends of connecting rod 7 2517 are respectively connected to one end of connecting rod 8 2518 and connecting seat 2 2523. The piston rod of bag-holding cylinder 2524 is mounted on connecting rod 7 2517. The cylinder body of bag-holding cylinder 2524 is hinged to connecting seat 3 2525. Connecting seat 3 2525 is mounted on the third lifting frame 31. The free end of connecting rod 8 2518 is equipped with pawl 1 2520.
[0041] The connecting rod structure on the other side is the same but arranged in the opposite direction; see appendix. Figure 5 The specific structure shown is as follows: the first claw 2520 and the other claw are connected by the first arc-shaped clamp 2527. The arc of the first arc-shaped clamp 2527 is adapted to the arc of the discharge pipe 30. It is used to clamp the bag supply opening on the left side of the large bag.
[0042] The second clamp 2521 and the second clamp on the other side are connected by the second arc-shaped clamp 2528. The arc of the second arc-shaped clamp 2528 is the same as that of the first arc-shaped clamp 2527 and is adapted to the arc of the discharge pipe 30. It is used to clamp the bag supply opening on the right side of the large bag 29. The first arc-shaped clamp 2527 and the second arc-shaped clamp 2528 work together to clamp the bag supply opening of the large bag 29 on the outer wall of the discharge pipe 30.
[0043] A long-distance conveyor belt 35 is provided on one side of the inspection belt 34 in the forward direction; a third photoelectric switch 36 is provided on the long-distance conveyor belt 35; a second weighing sensor 33 is provided below the inspection belt 34; the vibrating platform trolley 26 is placed on the guide rails 28 on both sides of the conveyor belt 32 in the running direction via guide wheels 2701 on both sides; a linkage mechanism is provided at the bottom of the vibrating platform trolley 26, which is connected to the piston rod of the ejection cylinder 27; drag chain structures are provided on both sides of the vibrating platform trolley 26 to hold gas pipelines and prevent gas pipeline entanglement due to the return and extension of the cylinder. The vibrating platform trolley 26 vibrates during the filling process through a vibrating motor mounted on its side.
[0044] The packaging method in this embodiment is illustrated using a 29-pack of 1 ton of paste resin as an example. It is controlled by a PLC controller and proceeds as follows: S1: The piston rod of the unhooking cylinder 2509 returns to its original position. Under the combined pulling action of the piston rod of the unhooking cylinder 2509 and the push rod 2506, the lifting rod 2503 rotates counterclockwise along the clamping plate 2502 by about 30 degrees or more. After the large bag 29 is hung, the operator presses the start button, and the unhooking cylinder returns to its original position. The operator hangs the hanging ears of the large bag 29 on the hook handle 2508. The blower blows air into the large bag 29 through the first telescopic guide tube 17, the weighing hopper fixing pipe 24 and the second telescopic guide tube 37. The blower blows air for 20 seconds to open the large bag 29. After the blower (placed on the second platform) blows open the large bag 29 and stops supplying air, the bag-holding cylinder 2524 extends into position and clamps the bag opening of the large bag 29 onto the weighing hopper discharge pipe 1201.
[0045] S2: The piston rod of the trolley cylinder 27 extends, pushing the vibrating platform trolley 26 under the large bag 29. After completion, the third cylinder 23 reaches the extension position, the large bag 29 falls onto the vibrating platform trolley 26, and the first butterfly valve 15 at the bottom of the weighing hopper 12 opens to start loading. Specific loading actions: When the rotary button in the control cabinet is in the feeding state, when the first tuning fork level gauge 3 is in the no-material signal state, when the first rotary level gauge is in the no-material signal state, and when the dust valve 44 is in the feedback closed state, the vibrating motor starts for 2 seconds, and then the butterfly valve 48 opens to send the paste resin in the conveying pipeline into the buffer hopper 5. When the first tuning fork level gauge 3 or the first rotary level gauge shows a material signal, feeding stops. After the butterfly valve 48 closes, the vibrating motor stops after a 1-second delay. When the first tuning fork level gauge 3 or the rotary level gauge has a signal, when the first weighing sensor 13 sends a no-material signal to the weighing hopper 12, the rotary button is in the feeding state, the first butterfly valve 15 is in the closed state, and the servo valve 8 is opened to the maximum position. The first weighing sensor 13 shows that when the weight reaches 850 kg, the servo valve 8 is closed to 60%; when it reaches 900 kg, the servo valve 8 is closed to 40%; when it reaches 950 kg, the servo valve 8 is closed to 20%; and when it reaches 1000 kg, the servo valve 8 is completely closed.
[0046] S3: The dust collector is turned on after a 1-second delay. After a 2-second delay, the vibrating motor starts to vibrate. The first weighing sensor 13 sends a 1-ton completion signal, the servo motor turns off, and the first butterfly valve 15 opens to start feeding the large bag. The vibrating motor vibrates 2 seconds after opening. After feeding is completed, the backflushing solenoid valve blows air for 5 seconds. After the air blowing is completed (backflushing is used to clean the floating material on the tank to ensure the accuracy of the next filling), the first butterfly valve 15 closes, waiting for the next filling.
[0047] After feeding is completed, the vibration motor stops after a 1-second delay. After the vibration stops, the dust removal stops 0.5 seconds later, and the second cylinder 19 rises.
[0048] S4: The piston rod of the trolley cylinder 27 returns to its original position; the piston rod of the first cylinder 16 extends to the extended position, and the large bag 29 is placed on the conveyor belt 32. The bag holding cylinder 2524 extends to the extended position, and the opening of the large bag 29 is released. The hook release cylinder 2509 extends to the extended position, and the large bag 29 is released from the hook device. The third cylinder 23 drives the third lifting frame 31 to return to its original position, and the bag release is completed.
[0049] S5: After the bag is removed, when the first photoelectric switch receives a signal, the large bag is conveyed forward by the conveyor belt 32 to the inspection belt 34. When the inspection belt 34 stops conveying, the data is transmitted to the PLC. When the weight is less than 1 ton (usually due to the weight of the large bag itself, the actual weight of the filled resin may be inaccurate), a prompt for replenishment is made. The buffer hopper transition soft connector 37 connected to the bottom of the unloading valve 38 is manually placed into the bag opening. After placement, the replenishment start / stop button is pressed, and the stepper motor 39 starts to drive the star unloading valve 38 to rotate. When the second weighing sensor 33 shows that the weight has reached 1 ton, the stepper motor 39 stops rotating, and the star unloading valve 38 closes, stopping the feeding.
[0050] S6: After the material replenishment is completed, the worker presses the stop button again to stop the material supply. At this time, the large bag is conveyed forward from the inspection belt 34 to the long-distance conveyor belt 35. When one end of the large bag is conveyed to the long-distance conveyor belt 35, the drive motor of the long-distance conveyor belt 35 stops rotating when the third photoelectric switch 36 (the third photoelectric switch 36 controls the contactor, and when the contactor is disconnected, the drive motor of the long-distance conveyor belt 35 stops rotating) sends a signal, and the long-distance conveyor belt 35 stops running.
[0051] S7: Wait for the forklift to transport the precisely filled large bags away.
[0052] This invention is not limited to the embodiments listed above. Any equivalent content that is substantially the same as the scope of protection of this invention shall be deemed to be within the scope of protection of this invention.
Claims
1. A large bag packaging machine, comprising a crossbeam mounted on a support or wall, a buffer hopper, a weighing hopper, a vibrating platform cart, and a conveyor belt, characterized in that: A replenishment bin is provided on one side of the weighing bin, and an electrically controlled unloading valve is provided at the outlet end of the replenishment bin. The weighing bin is placed on a first lifting frame via a first weighing sensor. The first lifting frame is placed on a second platform. A large bag hook device is provided below the second platform. A vibrating platform cart is provided below the large bag hook device. A conveyor belt is provided below the vibrating platform cart. A re-inspection belt is provided in the forward direction of the conveyor belt. The replenishment bin is provided above the re-inspection belt. Photoelectric switches are provided on the conveyor belt and the re-inspection belt respectively. The photoelectric switches are connected to a PLC controller.
2. The large bag packaging machine according to claim 1, characterized in that: The second platform is equipped with a second cylinder, which is supported by a first lifting frame. The supporting frame is equipped with a weighing hopper via a first weighing sensor. A second lifting frame is located below the first lifting frame. The piston rod of the first cylinder installed on the first lifting frame is connected to the second lifting frame. The second lifting frame is connected to a third lifting frame via two third cylinders. The third lifting frame is equipped with a large bag hook device. The weighing hopper is mounted on the first lifting frame via a weighing hopper fixing pipe at its lower part. The upper and lower parts of the weighing hopper fixing pipe are respectively fitted with telescopic guide tubes.
3. The large bag packaging machine according to claim 1, characterized in that: The weighing hopper is connected to the weighing hopper protective pipe via a flexible connection. The weighing hopper protective pipe is fitted over the feed valve at the lower end of the buffer hopper. The buffer hopper is mounted on a horizontal support connected to a vertical support via a buffer hopper pad. The vertical support is mounted on the hopper support base frame, which is mounted on a third platform. A top frame is connected above the vertical support, and a vibrating screen is mounted on the top frame. A butterfly valve and a rubber flexible joint are mounted on the vibrating screen.
4. The large bag packaging machine according to claim 1, characterized in that: The buffer hopper is equipped with a first scraper sight glass and a first tuning fork level gauge. A weighing hopper is located below the buffer hopper. A buffer hopper short section is installed on the lower cone of the buffer hopper. The buffer hopper short section is connected to the feeding pipe through a dust valve. The feeding pipe is connected to the feeding hopper located below it. The feeding hopper is equipped with a second tuning fork level gauge and a second scraper sight glass.
5. The large bag packaging machine according to claim 1, characterized in that: The replenishment hopper is mounted on the second platform. A stepper motor and a discharge valve are installed at the lower end of the replenishment hopper. A buffer hopper transition joint is installed below the discharge valve. A re-inspection belt is installed directly below the buffer hopper transition joint. The re-inspection belt is equipped with a second photoelectric switch, which is connected to the PLC controller.
6. The large bag packaging machine according to claim 1, characterized in that: The two clamping plates in the large bag hook device are installed on the third lifting frame by connecting rod bolts and sleeves fitted on the connecting rod bolts. A lifting rod is installed on the lower right part of the clamping plate. A U-shaped opening is provided at the upper end of the lifting rod. A through hole is provided in the U-shaped opening. A mounting plate is provided on one side of the push rod and mounted on the clamping plate. A hook release cylinder is mounted on the mounting plate. The piston rod of the hook release cylinder is hinged to the aforementioned through hole through the push rod. The extended end of the push rod is correspondingly set to the U-shaped opening. A U-shaped fork is installed on one side of the lifting rod, and a hook is installed inside the U-shaped fork. One end of the hook is connected to the lower end of the lifting rod. An extension end of an arc plate is installed above the extended end of the hook. The fixed end of the arc plate is connected to the aforementioned two clamping plates.
7. The large bag packaging machine according to claim 1, characterized in that: One end of connecting rod 1 in the large bag hook device is connected to connecting seat 1 mounted on the third lifting frame. The middle part of connecting rod 1 is connected to one end of connecting rod 3 via connecting rod 2. The other end of connecting rod 3 is hinged to one end of connecting rod 4 and one end of connecting rod 5 respectively. Connecting rod 5 has an arc-shaped rod structure. The other end of connecting rod 5 is connected to connecting rod 6. The other end of connecting rod 6 is hinged to the discharge pipe. One end of connecting rod 1 is connected to one end of connecting rod 9. The free end of connecting rod 9 is equipped with claw 2. The other end of connecting rod 4 is connected to the middle part of connecting rod 7. The two ends of connecting rod 7 are connected to one end of connecting rod 8 and connecting seat 2 respectively. Connecting rod 7 is equipped with the piston rod of the bag-holding cylinder. The cylinder body of the bag-holding cylinder is hinged to connecting seat 3, which is mounted on the third lifting frame. The free end of connecting rod 8 is equipped with claw 1. The connecting rod structure on the other side is the same but in the opposite direction. The first claw and the first claw on the other side are connected by the first arc-shaped clamp, and the curvature of the first arc-shaped clamp is adapted to the curvature of the discharge pipe. The second chuck and the second chuck on the other side are connected by a second arc-shaped clamp. The arc of the second arc-shaped clamp is the same as that of the first arc-shaped clamp and is adapted to the arc of the discharge pipe.
8. The large bag packaging machine according to claim 1, characterized in that: A long-distance conveyor belt is provided on one side of the inspection belt in the forward direction; a third photoelectric switch is provided on the long-distance conveyor belt; a second weighing sensor is installed below the inspection belt; the vibration platform trolley is placed on the guide rails on both sides of the conveyor belt in the running direction via guide wheels on both sides; a linkage mechanism is provided at the bottom of the vibration platform trolley, the linkage mechanism is connected to the push-out cylinder; chains are installed on both sides of the vibration platform trolley, one end of each chain is connected to the vibration platform trolley, and the other end of the chain is connected to the base frame via pulleys.
9. A packaging method for a large bag packaging machine as described in any one of claims 1-8, characterized in that, The PLC controller is used for control, and the following steps are followed: S1: The release cylinder returns to its original position. The piston rod and push rod of the release cylinder pull together, and the boom rotates counterclockwise along the clamp. After the large bag is hung, the operator presses the start button, and the release cylinder returns to its original position. The operator hangs the bag's hook on the hook hand, and the blower blows air into the large bag through the first telescopic guide tube, the weighing hopper fixing pipe, and the second telescopic guide tube. The blower blows air for 20 seconds to open the large bag. After the blower blows open the large bag and stops supplying air, the bag-holding cylinder extends into position and clamps the bag opening onto the weighing hopper discharge pipe. S2: The piston rod of the trolley cylinder extends, pushing the vibrating cart under the large bag. After completion, the third cylinder reaches the extension position, the large bag falls onto the vibrating platform cart, and the first butterfly valve at the bottom of the weighing hopper opens to start loading. S3: The dust collector is turned on after a 1-second delay, the vibration motor starts to vibrate after a 2-second delay, the vibration motor stops after a 1-second delay when the feeding is completed, the dust collector stops running 0.5 seconds after the vibration stops, and the second cylinder rises. S4: The piston rod of the trolley cylinder returns to its original position; the piston rod of the first cylinder extends to the extended position, and then the large packaging bag is placed on the conveyor belt. The bag holding cylinder extends to the extended position to loosen the bag opening. The hook release cylinder extends to the extended position, and the large bag is released from the hook device. The third cylinder drives the third lifting frame to return to its original position, and the bag release is completed. S5: The large bag is conveyed forward by the conveyor belt to the re-inspection belt; the missing quality part is compensated by controlling the stepper motor at the bottom of the replenishment hopper and the unloading valve; S6: When the second weighing sensor shows that the weight has been reached, the unloading valve closes and the material supply stops; the large bag is conveyed forward from the inspection belt to the long-distance conveyor belt. When one end of the large bag is conveyed to the long-distance conveyor belt in the forward direction, the long-distance conveyor belt stops running due to the action of the third photoelectric switch. S7: Wait for the forklift to transport the precisely filled large bags away.
10. An application of the large bag packaging machine as described in any one of claims 1-8, characterized in that, It is used for packaging paste resin in bulk bags or other granular or powdery materials.
Citation Information
Patent Citations
Big bag packing machine for cement
CN105836169A