Cross-shaped core tube design method suitable for super high-rise building

By using a cross-shaped core tube design, combined with parametric simulation and BIM software, the layout of elevator lobbies and auxiliary function rooms is optimized, solving the problems of low space utilization and low circulation efficiency in super high-rise buildings, and achieving higher space utilization efficiency and energy-saving effects.

CN121859401APending Publication Date: 2026-04-14ARCHITECTURAL DESIGN & RES INST OF SOUTH CHINA UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511871185.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-12-12
Publication Date
2026-04-14

AI Technical Summary

Technical Problem

In super high-rise buildings, the traditional parallel core tube design has problems such as difficulty in adapting to the depth requirements of standard office floors, low space utilization, unreasonable functional division, low traffic flow efficiency, and waste of building area, resulting in increased resources and energy consumption and failing to meet the needs of energy conservation and carbon reduction.

Method used

The design adopts a cross-shaped core tube approach, and optimizes the layout of elevator halls, corridors and auxiliary functions through parametric simulation and BIM software collaborative modeling. This achieves a coordinated layout of traffic and auxiliary spaces, and multi-disciplinary collaborative design optimizes construction drawings and operation scheduling, thereby improving space utilization efficiency and circulation balance.

Benefits of technology

By using a cross-shaped core tube design, the core tube traffic area can be saved by 10㎡ per floor, the floor plan utilization rate can be increased by 2%-5%, the circulation length can be shortened by 25%-30%, the waste of building area can be reduced, the floor plan balance and operational efficiency can be improved, and energy consumption can be reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121859401A_ABST
    Figure CN121859401A_ABST
Patent Text Reader

Abstract

The invention discloses a cross-shaped core tube design method suitable for a super high-rise building, belongs to the field of building design, and aims to solve the problems that due to lack of intensive layout, the building area is wasted, and the use amount of building materials and operation energy consumption are increased. A building system, a structure system, an electromechanical system, an elevator system and other systems are subjected to coupling optimization design, and the plane service capacity of the core tube is improved; by adopting the crossed arrangement of the cross-shaped elevator halls, the traffic area of the core tube can be saved by about 10m < 2 > on each floor, and the use space of more than 500m < 2 > is totally saved according to 50 floors; waste of building area is reduced, and the plane utilization rate can be increased to 78%-80% and is increased by about 2%-5% compared with traditional parallel arrangement; by adopting the cross-shaped elevator hall arrangement scheme, the uniformity of the plane can be obviously improved, the problem of plane detour is avoided, and the streamline distance from the core tube to each shop under the same plane layout can be shortened by about 25-30% compared with a parallel arrangement scheme.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a cross-shaped core tube design method, and more particularly to a cross-shaped core tube design method applicable to super high-rise buildings. Background Technology

[0002] As large-scale centralized buildings in urban core areas, the space utilization efficiency of supertall buildings is crucial to controlling resource and energy consumption. However, due to the highly complex and specialized technical systems of supertall buildings, the low degree of coordination among various professional elements has become a key technical bottleneck affecting space efficiency design. As a service hub integrating transportation, evacuation, equipment, and services, the design quality of the core tube directly affects the building's space efficiency, functional organization rationality, and energy consumption level. Currently, many supertall buildings adopt a parallel layout of core tubes, which still has many problems:

[0003] (1) Difficult to adapt to the depth requirements of standard office floors

[0004] The traditional parallel layout of the core tube, under the rigid requirements that each floor of a Grade A office building must have an area of ​​2,000 square meters and an office depth of no less than 12.5 meters, compresses the core tube size and cannot meet the requirements for integrated pipeline layout.

[0005] (2) Low space utilization

[0006] The parallel arrangement of elevator hall traffic spaces unfolds linearly, while the auxiliary spaces are relatively scattered. The lack of coordination between elevators and auxiliary functional areas leads to space fragmentation and an inability to effectively share auxiliary spaces (such as restrooms and equipment shafts), thus reducing the efficiency of floor plan utilization.

[0007] (3) The functional division is unreasonable.

[0008] In parallel layouts, functions such as elevator access, evacuation, and restrooms are often isolated and lack a mechanism for multi-use. They cannot be dynamically adjusted according to elevator zoning strategies, resulting in poor spatial flexibility.

[0009] (4) Traffic flow efficiency is low and the paths are long.

[0010] In super high-rise buildings, elevator usage peaks and pedestrian density fluctuate drastically. If elevator zoning and traffic flow organization are not properly done, it will lead to insufficient uniformity in access to various spaces, which can easily cause congestion and low service efficiency. Moreover, the cost of adjusting related spaces is high.

[0011] (5) Insufficient effective building area leads to material waste.

[0012] The lack of intensive layout leads to a waste of building area, resulting in increased use of building materials and increased energy consumption, which is not conducive to achieving the "dual carbon" strategic goals.

[0013] Therefore, there is an urgent need for a more compact, composite, flexible and efficient core tube design method that can integrate the functions of multiple systems, realize the coupled utilization of traffic and auxiliary spaces, improve the utilization rate of building floor plan, optimize vertical traffic organization, and at the same time meet the development needs of energy conservation, carbon reduction and functional diversity. Summary of the Invention

[0014] The purpose of this invention is to provide a cruciform core tube design method suitable for super high-rise buildings. Through the compact arrangement and streamline optimization of the cruciform core tube, it improves the efficiency of floor plan utilization and shortens the length of traffic flow lines, thereby solving the problems of wasted building area, insufficient floor plan utilization, severe traffic detours, and poor uniformity caused by a lack of compact layout. To achieve the above objectives, the specific solution is as follows:

[0015] A method for designing a cruciform core tube suitable for super high-rise buildings, comprising the following steps:

[0016] S1, Basic Data Collection and Model Building: Obtain the planning control conditions and surrounding environmental parameters of the building site, and establish a parametric building model including the tower volume, podium and urban interface; based on the building height, functional requirements and standard floor area, use parametric simulation methods to simulate pedestrian flow and elevator service range, and determine the number of elevator groups, speed and zone service range.

[0017] S2, Arrange the cross-shaped elevator hall: The elevator groups are initially allocated according to the principle of "cross-shaped" four-way arrangement, and the initial length and width ratio of the cross axis are determined by simulating different combination methods and comparing the simulation through parameter calculation.

[0018] S3, Layout of corridors and auxiliary function rooms: Adjust the length of the cross corridor arm according to the number and distribution ratio of elevator groups, and arrange auxiliary function rooms at the ends and intervals of the corridor to achieve coordinated layout of traffic paths and functional spaces; According to the vertical service zoning of elevators, some redundant elevator groups are eliminated in the high zone of the core tube, and auxiliary function rooms or electromechanical shafts are arranged in the freed space; In the low zone, shuttle elevators and regular elevators are combined, and auxiliary function rooms are arranged in between to achieve spatial balance;

[0019] S4, Independent Partitioning of Immutable Systems: Immutable systems are arranged in the four partitions of the core tube, and independent partitioning is carried out in the cross-shaped partition to maintain vertical correspondence between upper and lower floors and avoid interfering with the main axis of elevator traffic. The number of elevators and partitioning pattern on both sides of the cross-shaped axis in the core tube are adjusted according to actual needs and traffic simulation results. The core tube ratio, corridor length and auxiliary space distribution are iterated repeatedly to make the traffic system and auxiliary functions better coordinate.

[0020] S5, Multi-disciplinary Collaboration and Iterative Optimization: Multi-disciplinary collaborative design of architecture, structure and MEP, coordinating the parameter relationships between the internal space of the core tube and the structural column grid, pipe shaft layout, elevator shaft depth and equipment room dimensions, to achieve spatial coupling and integration of the cross-shaped core tube system;

[0021] S6, Construction Drawing and Operation Optimization: After optimization, a cross-shaped core tube layout pattern for the adapted solution is obtained. Construction drawings are drawn according to the results. During the operation phase, the target floor control system and AI algorithm are used to optimize scheduling to improve transportation efficiency, reduce elevator waiting time, and reduce operating energy consumption.

[0022] Furthermore, in step S2, an elevator hall is set up at the intersection of the cross axes of the core tube, and the elevator halls are uniformly arranged inside the cross axes to form a unified pedestrian gathering and dispersal area; and the elevator groups are arranged in an alternating manner according to the elevator service floors to achieve balanced coverage of longitudinal traffic.

[0023] Furthermore, in step S3, the auxiliary function rooms include a tea room, a printing area, a restroom, and a power and low voltage electrical room.

[0024] Furthermore, in step S4, the immutable system includes evacuation staircases, air conditioning rooms, and pipe shafts.

[0025] Furthermore, in step S4, the number of elevators and the zoning pattern on both sides of the cross-shaped axis in the core tube are adjusted according to actual needs and traffic simulation results.

[0026] In summary, the present invention has the following advantages over the prior art:

[0027] (1) This design method uses BIM software to collaboratively model the spatial system and electromechanical equipment, and performs coupled optimization design of building, structure, electromechanical, elevator and other systems, thereby improving the planar service capability of the core tube.

[0028] (2) By adopting a cross-shaped elevator hall layout, approximately 10㎡ of core tube traffic area can be saved per floor. Based on 50 floors, a total of more than 500㎡ of usable space can be saved.

[0029] (3) It reduces the waste of building area and can increase the floor plan utilization rate to 78%-80%, which is about 2%-5% higher than the traditional parallel layout.

[0030] (4) The cross-shaped elevator hall layout can significantly improve the uniformity of the floor plan and avoid the problem of detours. Under the same floor plan layout, the flow distance from the core to each shop can be shortened by about 25-30% compared with the parallel layout. Attached Figure Description

[0031] The accompanying drawings, which are included to provide a further understanding of the invention and form part of this invention, illustrate exemplary embodiments of the invention and are used to explain the invention, but do not constitute an undue limitation of the invention. In the drawings:

[0032] Figure 1 A flowchart illustrating the cross-shaped core tube design method for super high-rise buildings provided by this invention;

[0033] Figure 2 A schematic diagram of the zoning plan for super high-rise buildings;

[0034] Figure 3 A schematic diagram showing the arrangement of elevator lobbies on the inside of a cross axis, so that the floor zones served by different elevator groups intersect with each other.

[0035] Figure 4 A schematic diagram showing the layout of functional areas utilizing the space of the high-rise elevator lobby and shuttle elevator hall;

[0036] Figure 5 Layout diagram after some redundant elevator groups are removed from the high-level elevator zone;

[0037] Figure 6 A comparison diagram is provided between the conventional solution and the solution of the present invention. Detailed Implementation

[0038] It should be noted that, unless otherwise specified, the embodiments and features described in the present invention can be combined with each other. The present invention will now be described in detail with reference to the accompanying drawings and embodiments.

[0039] It should be noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the exemplary embodiments of the present invention. As used herein, the singular form may also include the plural form unless the context clearly indicates otherwise. Furthermore, it should be understood that when the terms "comprising" and / or "including" are used in this specification, they indicate the presence of features, steps, operations, devices, components, and / or combinations thereof.

[0040] Unless otherwise specifically stated, the relative arrangement, numerical expressions, and values ​​of the components and steps set forth in these embodiments do not limit the scope of the invention. It should also be understood that, for ease of description, the dimensions of the various parts shown in the drawings are not drawn to actual scale. Techniques, methods, and devices known to those skilled in the art may not be discussed in detail, but where appropriate, such techniques, methods, and devices should be considered part of the specification. In all examples shown and discussed herein, any specific values ​​should be interpreted as merely exemplary and not as limitations. Therefore, other examples of exemplary embodiments may have different values. It should be noted that similar reference numerals and letters in the following figures denote similar items; therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.

[0041] See Figure 1 As shown, this invention provides a cross-shaped core tube design method suitable for super high-rise buildings, including the following steps:

[0042] S1, Basic Data Collection and Model Building: Obtain the planning control conditions and surrounding environmental parameters of the building site, and establish a parametric building model including the tower volume, podium and urban interface; based on the building height, functional requirements and standard floor area, use parametric simulation methods to simulate pedestrian flow and elevator service range, and determine the number of elevator groups, speed and zone service range.

[0043] S2, Arrange the cross-shaped elevator hall: The elevator groups are initially allocated according to the principle of "cross-shaped" four-way arrangement, such as arranging 2-3 elevators in the north-south direction and 2-4 elevators in the east-west direction. The initial length and width ratio of the cross axis are determined by simulating different combination methods.

[0044] As a preferred option, an elevator lobby is set up at the intersection of the cross axes of the core tube, and the elevator lobby is uniformly arranged inside the cross axes to form a unified pedestrian gathering and dispersal area; and the elevator groups are arranged in an alternating manner according to the elevator service floors to achieve balanced coverage of longitudinal traffic.

[0045] S3, Arrangement of corridors and auxiliary function rooms: Adjust the length of the cross corridor arm according to the number and distribution ratio of elevator groups, and arrange auxiliary function rooms at the ends and intervals of the corridor to achieve coordinated layout of traffic paths and functional spaces; According to the vertical service zoning of elevators, some redundant elevator groups are eliminated in the high zone of the core tube, and auxiliary function rooms or electromechanical shafts are arranged in the freed space; In the low zone, shuttle elevators are combined with conventional elevators, and auxiliary function rooms are arranged in between to achieve spatial balance.

[0046] As a preferred option, auxiliary function rooms include a tea room, a printing area, a restroom, and a room for both high-voltage and low-voltage electrical wiring.

[0047] S4, Immutable System Independent Partitioning: Immutable systems are arranged in the four partitions of the core tube, and independent partitioning is carried out in the cross-shaped partition to maintain the vertical correspondence between the upper and lower floors and avoid interfering with the main axis of elevator traffic.

[0048] As a preferred option, immutable systems include evacuation staircases, air conditioning rooms, and utility shafts.

[0049] As an alternative, the number and zoning pattern of elevators on both sides of the cross-shaped axis in the core tube are adjusted according to actual needs and traffic simulation results. For example, there are 3 elevators in the south, 2 in the north, and 2 each in the east and west. The core tube ratio, corridor length and auxiliary space distribution are iterated repeatedly to make the traffic system and auxiliary functions work together.

[0050] S5, Multi-disciplinary Collaboration and Iterative Optimization: Multi-disciplinary collaborative design of architecture, structure and MEP, coordinating the parameter relationships between the internal space of the core tube and the structural column grid, pipe shaft layout, elevator shaft depth and equipment room dimensions, to achieve spatial coupling and integration of the cross-shaped core tube system;

[0051] S6, Construction Drawing and Operation Optimization: After optimization, a cross-shaped core tube layout pattern for the adapted solution is obtained. Construction drawings are drawn according to the results. During the operation phase, the target floor control system and AI algorithm are used to optimize scheduling to improve transportation efficiency, reduce elevator waiting time, and reduce operating energy consumption.

[0052] Example 1:

[0053] The simulation results and partitioning methods based on the above methods are shown in Table 1 and... Figure 2 As shown, this implementation method takes a square-plan super high-rise building with a building height of 300m (approximately 60 floors) and a standard floor area of ​​2000㎡ as an example. Combining BIM technology and parametric simulation tools, it fully presents the entire process of implementing the cross-shaped core tube from model construction to operation optimization. At the same time, through comparison and verification with traditional solutions, it highlights the technical advantages of the design method.

[0054] S1, Basic Data Collection and Model Building: Obtain the planning control conditions and surrounding environmental parameters of the building site, collect the planning control conditions of the building site (including land boundary, plot ratio, building height limit), surrounding urban interface parameters (such as the distance between adjacent buildings, road grade, distribution of pedestrian gathering points), and clarify the building functional requirements (each floor of the office area must meet the Class A office building standard of 2000㎡ area and office depth of not less than 12.5m), and electromechanical equipment parameters (such as elevator load capacity, speed selection range, air conditioning room, and pipe shaft size requirements).

[0055] BIM Parametric Modeling: Using BIM software, construct a parametric model that includes the main tower (60-story office area, 5m high), podium (5-story commercial facilities, 6m high), surrounding urban roads and green spaces; and ensure that the architectural, structural and MEP models can interact collaboratively, and that the dimensions of each component can be adjusted in real time.

[0056] Pedestrian flow simulation boundary conditions: Based on the usage characteristics of office buildings, three key time periods are set: morning peak (8:30-9:30), midday peak (12:00-13:00), and evening peak (18:00-19:00). The pedestrian flow density in each time period is calculated based on an average usable area of ​​10㎡ per person in the office area, that is, the peak pedestrian flow in each floor office area is about 200 people, and the total peak pedestrian flow in the 60 floors of the building is about 12,000 people (excluding equipment floors and transfer floors).

[0057] Elevator zoning and parameter determination: Elevator simulation software such as Elevate or Traction is used to simulate the operating efficiency of different elevator groups, speeds, and zoning schemes, and finally determine the vertical zoning scheme and parameters, as follows:

[0058] Table 1. Elevator Zone Simulation Results

[0059]

[0060] S2, Arrange a cross-shaped elevator lobby: The initial dimensions of the cross axis are determined. Based on the number of elevator zones and the area of ​​the standard floor, elevator groups are allocated according to the "cross-shaped" four-directional arrangement principle. 2-3 elevators are arranged in each of the north and south directions (4 elevators in the low zone are evenly distributed to the north and south directions, 2 in each direction; 6 elevators in the middle and low zones are evenly distributed to the north and south directions, 3 in each direction). 2-4 elevators are arranged in each of the east and west directions (6 elevators in the middle and high zones are evenly distributed to the east and west directions, 3 in each direction; 4 elevators in the shuttle zone and 6 elevators in the high zone are evenly distributed to the east and west directions, 5 in each direction). Different cross axis length and width ratios are simulated through a BIM model (initially, a long axis of 16m and a short axis of 12m were tried, and finally optimized to a long axis of 14m and a short axis of 10m) to ensure that the total area of ​​the elevator lobby is controlled within 80㎡ and that the opening direction of each elevator door is unobstructed.

[0061] As a preferred option, a circular pedestrian gathering and dispersal area (6m in diameter) is set up at the intersection of the cross axes, and all elevator halls are uniformly arranged inside the cross axes (3-5m away from the center of the cross axes). This allows elevator waiting halls in the low, middle-low, middle-high, and high zones to be directly accessed from the gathering and dispersal area, forming a "central radial" pedestrian flow organization, thus avoiding the congestion problem of the traditional parallel layout's unidirectional flow.

[0062] S3, the corridor and auxiliary function rooms are arranged as follows: The auxiliary function rooms include restrooms (8 male restrooms and 10 female restrooms, with a total area of ​​40㎡), tea room (equipped with 2 sinks and 1 water dispenser, with an area of ​​8㎡), electrical and communication rooms (15㎡ each), and printing area (2 printers, with an area of ​​6㎡). According to the frequency of use of each function and the need for convenient access, the restrooms and electrical and communication rooms are located at the end of the cross corridor (away from the elevator hall to reduce the interference of pedestrian flow), while the tea room and printing area are located at intervals in the corridor (one every 20m, close to the entrance of the office area).

[0063] In the high-rise area (floors 46-60), the redundant elevator groups in the low-rise area were eliminated (the original four elevators in the low-rise area only served floors 1-15, and no elevators were needed for floors 46-60). The freed-up space of the four elevator shafts (each with an area of ​​12㎡) was converted into two electromechanical shafts (each with an area of ​​15㎡) and two tea rooms (each with an area of ​​8㎡). In the low-rise area (floors 1-15), the shuttle elevators (serving floors 1-45) and the regular elevators (serving floors 1-15) were arranged adjacent to each other, and the space between them (3m wide and 8m long) was converted into a printing area and a storage room to maximize the utilization of space.

[0064] S4, Independent Zoning of Immutable Systems: The immutable systems include evacuation staircases (2, each with a net width of 1.8m, using smoke-proof stairwells), air conditioning room (1 per floor, with an area of ​​30㎡), and pipe shafts (2 water supply and drainage pipe shafts and 2 fire protection pipe shafts, each with an area of ​​4㎡). They must meet the requirements of vertical correspondence between upper and lower floors (deviation not exceeding 50mm) and not interfering with the main axis of elevator traffic (distance from elevator hall ≥5m).

[0065] One evacuation staircase and one set of pipe shafts are arranged in each of the four quadrants of the core tube (northeast, southeast, northwest and southwest zones divided by the cross axis). The air conditioning room is located in the northwest zone (away from the main lighting surface of the office area to reduce noise impact). Through the collision detection function of the BIM model, it is ensured that there is no spatial conflict between the immutable system and the elevator shaft and auxiliary functions, and that the pipeline route (such as the air conditioning pipeline radiating from the machine room to the surrounding office area) is the shortest.

[0066] S5, Multi-disciplinary Collaboration and Iterative Optimization: With the optimization goals of "floor utilization rate ≥78%, circulation length reduction ≥50%, and average elevator interval time ≤35s", three rounds of iterative adjustments were made: the first round optimized the cross axis ratio (the long axis was shortened from 16m to 14m, increasing the floor utilization rate by 1.2%); the second round adjusted the location of auxiliary function rooms (the restrooms were moved from the middle of the corridor to the end, shortening the circulation length by 8%); the third round optimized the elevator zoning mode (the elevators in the mid-high zones were changed from serving floors 31-45 to floors 30-45, reducing the average interval time by 2.1s), ultimately achieving the optimization goals.

[0067] S6, Construction Drawing and Operation Optimization: After optimization, a cross-shaped core tube layout pattern for the adapted solution is obtained. Construction drawings are drawn according to the results. During the operation phase, the target floor control system and AI algorithm are used to optimize scheduling to improve transportation efficiency, reduce elevator waiting time, and reduce operating energy consumption.

[0068] like Figure 3 As shown, the elevator hall is located inside the cross axis, and the waiting halls of each corresponding elevator zone can be directly accessed from outside the core tube, which allows the floor zones served by different elevator groups to be staggered.

[0069] like Figure 4 As shown, in the lower-level plan, the space of the upper-level elevator lobby and shuttle elevator hall is used to arrange functions such as restrooms.

[0070] like Figure 5 As shown, some redundant elevator groups in the high-level elevator zone are eliminated, and the original low-level elevator and shuttle elevator spaces are used to arrange auxiliary functions such as restrooms, tea rooms, kitchens, and electrical rooms, while maintaining the continuity and flexibility of the office space.

[0071] Comparative Example 1: Implementation Effect Verification (Compared with Traditional Parallel Core Tube)

[0072] A traditional parallel core tube scheme with the same conditions as this embodiment (60 floors, 300m height, 2000㎡ standard floor) was selected as the comparison object. The two schemes maintained the same number of elevators (26 units) and net office area ratio (72%). The following indicators were used for quantitative comparison:

[0073] I. Experimental conditions and comparison objects

[0074] like Figure 6 As shown, two standard floor plans are selected as comparison objects:

[0075] Comparative Example (Traditional Scheme, Left Figure): A parallel core tube layout is adopted, with elevator halls and evacuation staircases distributed linearly in a concentrated manner. A cross-shaped corridor is not used, and the flow is organized by relying on the external corridor. Example (Scheme of the Invention, Right Figure): A cross-shaped core tube design method is adopted, in which elevator halls, evacuation staircases and auxiliary rooms are arranged along the cross axis, and a composite traffic system is formed by the cross axis and the ring corridor.

[0076] The two schemes maintain the following equivalent conditions:

[0077] Standard floor area: approximately 2000 m²;

[0078] The standard floor has 6 elevators, arranged in the same vertical zone.

[0079] Net office area percentage: approximately 72% (after deducting the area of ​​the core and corridors);

[0080] II. Streamline Length Calculation Method

[0081] The center point of the elevator hall in the elevator zone is taken as the starting point of the circulation calculation (denoted as x1), and the center point of each office area entrance is taken as the ending point of the circulation (denoted as y1~y8). The horizontal walking path length from the elevator hall to the entrance of each of the eight typical office areas on the plane (the locations are approximately symmetrically distributed) is measured.

[0082] The length of each streamline is denoted as:

[0083]

[0084] The total streamline length is denoted as:

[0085]

[0086] The longest streamline length is denoted as:

[0087]

[0088] III. Calculation Results

[0089] Table 2 Comparison Results

[0090]

[0091] IV. Results Analysis

[0092] (1) Improved streamline efficiency

[0093] Because the elevator hall opening is unidirectional, the office area needs to go around the circular corridor to reach each space, forming a circular flow.

[0094] The cross-shaped core tube, through the four-way opening elevator hall, combined with the cross axis and the ring corridor composite traffic structure, achieves multi-directional diversion and significantly shortens the walking distance.

[0095] Calculation results show that this method can reduce the total streamline length by 24.4% and the length of the longest streamline by 28.2%.

[0096] (2) Enhanced spatial homogeneity

[0097] In the parallel layout, some office areas need to pass through the main circular corridor, which leads to overlapping traffic flow, local congestion, and reduced corridor utilization efficiency.

[0098] The cross-shaped layout allows each area to independently access the main traffic axis, avoiding traffic flow intersections and improving the balance of arrival times between areas.

[0099] The above are merely preferred embodiments of the present invention and are not intended to limit the present invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A method for designing a cruciform core tube suitable for super high-rise buildings, characterized in that, Including the following steps: S1, Basic Data Collection and Model Building: Obtain the planning control conditions and surrounding environmental parameters of the building site, and establish a parametric building model including the tower volume, podium and urban interface. Based on the building height, functional requirements, and standard floor area, parametric simulation methods are used to simulate passenger flow and elevator service range, and to determine the number of elevator groups, speed, and zone service range. S2, Arrange the cross-shaped elevator hall: The elevator groups are initially allocated according to the principle of "cross-shaped" four-way arrangement, and the initial length and width ratio of the cross axis are determined by simulating different combination methods and comparing the parameters through simulation. S3, Layout of corridors and auxiliary function rooms: Adjust the length of the cross corridor arm according to the number and distribution ratio of elevator groups, and arrange auxiliary function rooms at the ends and intervals of the corridor to achieve coordinated layout of traffic paths and functional spaces; According to the vertical service zoning of elevators, some redundant elevator groups are eliminated in the high zone of the core tube, and auxiliary function rooms or electromechanical shafts are arranged in the freed space; In the low zone, shuttle elevators and regular elevators are combined, and auxiliary function rooms are arranged in between to achieve spatial balance; S4, Independent Partitioning of Immutable Systems: Immutable systems are arranged in the four partitions of the core tube, and independent partitioning is carried out in the cross-shaped partition to maintain vertical correspondence between upper and lower floors and avoid interfering with the main axis of elevator traffic. The number of elevators and partitioning pattern on both sides of the cross-shaped axis in the core tube are adjusted according to actual needs and traffic simulation results. The core tube ratio, corridor length and auxiliary space distribution are iterated repeatedly to make the traffic system and auxiliary functions better coordinated. S5, Multi-disciplinary Collaboration and Iterative Optimization: Multi-disciplinary collaborative design of architecture, structure and MEP, coordinating the parameter relationships between the internal space of the core tube and the structural column grid, pipe shaft layout, elevator shaft depth and equipment room dimensions, to achieve spatial coupling and integration of the cross-shaped core tube system; S6, Construction Drawing and Operation Optimization: After optimization, a cross-shaped core tube layout pattern for the adapted solution is obtained. Construction drawings are drawn according to the results. During the operation phase, the target floor control system and AI algorithm are used to optimize scheduling to improve transportation efficiency, reduce elevator waiting time, and reduce operating energy consumption.

2. The cross-shaped core tube design method for super high-rise buildings according to claim 1, characterized in that, In step S2, an elevator hall is set up at the intersection of the cross axes of the core tube, and the elevator halls are uniformly arranged inside the cross axes to form a unified pedestrian gathering and dispersal area; and the elevator groups are arranged in an alternating manner according to the elevator service floors to achieve balanced coverage of longitudinal traffic.

3. The cross-shaped core tube design method for super high-rise buildings according to claim 1, characterized in that, In step S3, the auxiliary function rooms include a tea room, a printing area, a restroom, and a power and low voltage electrical room.

4. The cross-shaped core tube design method for super high-rise buildings according to claim 1, characterized in that, In step S4, the immutable system includes evacuation staircases, air conditioning rooms, and pipe shafts.

5. The cross-shaped core tube design method for super high-rise buildings according to claim 1, characterized in that, In step S4, the number of elevators and the zoning pattern on both sides of the cross-shaped axis in the core tube are adjusted according to actual needs and traffic simulation results.