A roof cutting pressure relief and constant resistance support collaborative design method and system
By identifying key areas and targets for stress regulation through reverse analysis, and by collaboratively designing parameters for roof cutting and constant resistance support, the problem of mismatch between pressure relief and support in existing technologies has been solved, and systematic control of the stability of the surrounding rock in the roadway has been achieved.
Patent Information
- Application Number
- CN202610250770.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-03-03
- Publication Date
- 2026-06-23
AI Technical Summary
In existing technologies, the lack of systematic linkage between roof cutting and pressure relief and roadway support measures leads to a mismatch between the pressure relief range and the support strength, making it impossible to effectively control the stability of the surrounding rock in the roadway.
By using reverse analysis to identify key areas and targets for stress control, we can collaboratively design parameters for top cutting and pressure relief and constant resistance support, establish spatiotemporal coordination, and achieve systematic coupling of top cutting and pressure relief and constant resistance support by monitoring and optimizing the parameters.
This achieves an inherent match between the pressure relief range and the support strength, improving the reliability and adaptability of roadway surrounding rock control and ensuring that the stability of the roadway surrounding rock is closer to the optimal control target.
Smart Images

Figure CN122263386A_ABST
