Technical Problem

Existing machine tool bed materials suffer from problems such as complex manufacturing processes, high costs, poor precision, susceptibility to cracking, and poor vibration damping, making it difficult to meet the demands of high-precision machining.

Method used

Mineral raw materials are processed through crushing, screening, drying, mixing and molding, and mineral beds are prepared using vibration compaction and pressure compaction platforms to form mineral raw materials of various specifications and integrally molded.

Benefits of technology

It improves production efficiency and product precision, reduces costs, avoids defects such as cracking and deformation, and meets the needs of high-precision processing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122323567B_ABST
    Figure CN122323567B_ABST
Patent Text Reader

Abstract

The present application relates to the field of machine tool bed, discloses a kind of mineral bed body production equipment and production method, including first feeding system, crushing screening system, second feeding system, batching mixing system, forming system;Crushing screening system includes crusher, vibrating screening machine, several sets of edge removing dryer;Batching mixing system includes heating temperature control device, resin mixer, mixing stirrer;Forming system includes forming die and vibrating compaction platform;The discharge end of first feeding system is arranged above the crusher and is connected with the feed end of the crusher, and the discharge end of the edge removing dryer is connected with the feed end of the second feeding system;The feed end of second feeding system discharge end and heating temperature control device is connected;The discharge end of mixing stirrer and the feed end of forming die are connected;Forming die is detachably fixedly installed on vibrating compaction platform, compared with prior art, the bed body is integrally formed using mineral raw material, with the advantages of high production efficiency, high product precision and low cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of machine tool beds, specifically to a production equipment and method for a mineral bed. Background Technology

[0002] In CNC machining centers, the machine bed serves as the foundation, housing all components such as the column, slide, and rotary table. Therefore, the bed's structure directly impacts the overall stability and operational accuracy of the machine tool, thus affecting its machining precision. Currently, most machine tool beds on the market are made of cast iron. However, using cast iron for machine tool beds presents several drawbacks: complex manufacturing processes, expensive molds, long production cycles, poor product precision, large machining allowances, poor surface quality, poor vibration damping, high thermal expansion coefficient, and significant pollution. Consequently, some machine tool beds are made of concrete. In recent years, the Chinese machinery manufacturing industry has placed higher demands on the static and dynamic performance of machine tools, rendering traditional machine tool structural materials inadequate. Furthermore, the high manufacturing cost of metal materials exacerbates these issues. Currently, the most common problems with using resin concrete as machine tool foundation components are cracking and fracture, affecting the machine tool's machinability; low product strength and brittleness, making it prone to breakage under heavy impacts; and deformation in the high-temperature and high-humidity environments of southern regions. Summary of the Invention

[0003] To address the shortcomings of existing technologies, this invention provides a production equipment and method for mineral bed production, which has the advantages of high production efficiency, high product precision, and low cost.

[0004] To achieve the above objectives, the present invention provides the following technical solution: A mineral bed production equipment includes a first feeding system, a crushing and screening system, a second feeding system, a batching and mixing system, and a molding system. The crushing and screening system includes a crusher, a vibrating screen, and several sets of de-edge drying machines. The batching and mixing system includes a heating and temperature control device, a resin mixer, and a mixing mixer. The molding system includes a molding die and a vibrating compaction platform. The discharge end of the first feeding system is located above the crusher and connected to the crusher's feed end. The feed end of the vibrating screen is located below the crusher and connected to the crusher's feed end. The discharge end is connected; the number of discharge ends below the vibrating screen is the same as the number of the de-edge dryer and is respectively connected to the feed end of the de-edge dryer; the discharge end of the de-edge dryer is connected to the feed end of the second feeding system; the discharge end of the second feeding system is connected to the feed end of the heating and temperature control device; the discharge end of the heating and temperature control device and the discharge end of the resin mixer are respectively connected to the feed end of the mixing mixer; the discharge end of the mixing mixer is connected to the feed end of the molding die; the molding die is detachably and fixedly installed on the vibrating compaction platform.

[0005] Furthermore, the first feeding system includes a first storage bin, a first conveyor belt, an iron separator, and an elevator; the first conveyor belt is disposed below the discharge end of the first storage bin; the iron separator is disposed above the first conveyor belt between the first storage bin and the elevator; the first conveyor belt is connected to the feed end below the elevator; the discharge end above the elevator is connected to the feed end of the crusher.

[0006] Furthermore, the upper end of the elevator is inclined with a guide channel; the lower end of the guide channel is connected to the feed end of the crusher.

[0007] Furthermore, a vacuum cleaner is connected to the feed end and discharge end of the elevator; the feed end of the vacuum cleaner is respectively connected to the lower feed end and the upper discharge end of the elevator.

[0008] Furthermore, the vibrating screen is provided with a return port on its side; the feed end of the dust collector is also connected to the feed end of the vibrating screen and the return port respectively.

[0009] Furthermore, the discharge end of the vacuum cleaner is connected to the second feeding system.

[0010] Furthermore, the second feeding system includes a plurality of second storage bins and a second conveyor belt; the feeding ends of the plurality of second storage bins are respectively connected to the discharge end of the de-edge dryer and the discharge end of the dust collector; the second conveyor belt is disposed below the discharge end of the second storage bin; the second conveyor belt is connected to the heating and temperature control device.

[0011] Furthermore, the mixing system also includes a glue mixing device, the discharge end of which is connected to the feed end of the resin mixer.

[0012] Furthermore, the molding system also includes a pressure compaction platform and an insulation chamber, and the molding die can be detachably installed in the pressure compaction platform or the insulation chamber.

[0013] A method for producing a mineral bed, utilizing the aforementioned mineral bed production equipment, includes the following steps: S01, mineral raw materials are placed into the first storage bin; the first conveyor belt transports the mineral raw materials falling from the discharge end of the first storage bin to the feed end of the elevator; the iron remover removes magnetic impurities from the mineral raw materials during the conveying process of the first conveyor belt. S02, the elevator lifts the mineral raw materials to a height and sends them into the crusher, and the dust collector extracts the mineral raw material dust generated at the feed end and discharge end of the elevator; S03, after being crushed by the crusher, the mineral raw materials fall into the vibrating screen and are screened into different sizes; the dust collector extracts the dust from the mineral raw materials from the feed end and return port of the vibrating screen. S04, mineral raw materials of different sizes screened by the vibrating screener are sent to different de-edged and dryer for de-edged and dryer; S05, the de-edging and drying machine delivers the de-edged and dried mineral raw materials of different specifications, and the vacuum cleaner delivers the extracted mineral powder to different second storage bins. The second storage bins and the vacuum cleaner deliver the mineral raw materials and mineral powder of different specifications in proportion. The second conveyor belt delivers the mineral raw materials and powder delivered from the discharge end of the different second storage bins to the heating and temperature control device for heating. S06, the resin mixing device sends the resin raw material to the resin mixing system and mixes it evenly to form resin; the heating and temperature control device and the resin mixer send the mineral raw material and resin into the mixing mixer and mix to form mixed raw material. S07, the mixed raw materials are injected into the molding die while the molding die is vibrated and compacted on the vibrating compaction platform; after the vibration compaction is completed, the molding die is installed on the pressure compaction platform for pressure vibration compaction to remove air bubbles from the mixed raw materials; S08, the forming mold is sent to the heat preservation chamber for heat preservation. After the heat preservation is completed, the mold is demolded to obtain the mineral bed.

[0014] By adopting the above-described technical solution of the present invention, at least the following beneficial effects are achieved: In use, the mineral raw materials are first transported to the crushing and screening system through the first feeding system. After being crushed by the crusher and screened by the vibrating screener, they are divided into several different specifications. The mineral raw materials of several different specifications are then dried by the de-edge drying machine, which can obtain multiple mineral raw materials of different specifications at one time. This facilitates the subsequent molding of mineral beds from the mineral raw materials and improves the production efficiency of mineral beds.

[0015] The second feeding system can simultaneously transport mineral raw materials of different specifications and mineral powder extracted by the vacuum cleaner to the heating and temperature control device for heating through multiple second storage bins. Preferably, by controlling the size of the discharge end opening of the second storage bin or the opening and closing time of the discharge end opening, mineral raw materials of different specifications can be directly mixed in the correct proportion, further improving the production efficiency of the mineral bed.

[0016] The vibration compaction platform and the pressure compaction platform can compact the mineral raw materials in the molding die, avoid defects such as cavitation and cracks, and improve the quality of the product.

[0017] Compared with the prior art, the present invention uses a mineral bed production equipment and method to integrally form the bed from mineral raw materials, which has the advantages of high production efficiency, high product precision and low cost. Attached Figure Description

[0018] Figure 1 This is an overall structural diagram of a mineral bed production equipment according to the present invention; Figure 2 This is a structural diagram of the crushing and screening system in this invention; Figure 3 This is a structural diagram of the ingredient mixing system in this invention; Figure 4 This is a schematic diagram of the pressurized compaction platform and the heat preservation chamber in this invention.

[0019] Figure label: First feeding system 1; First storage bin 11; First conveyor belt 12; 13. Iron separator; 14. Hoist; 15. Guide channel; Crushing and screening system 2; Crusher 21; Vibrating screen 22; 23 De-edged dryer; 24 Waste bin; 221 Return port; Second feeding system 3; Second storage bin 31; Second conveyor belt 32; 4. Ingredient mixing system; 41. Heating and temperature control device; 42. Resin mixer; 43. Mixing and stirring machine; 44. Glue mixing device; Molding system 5; Molding mold 51; Vibration compaction platform 52; 53. Pressurized compaction platform; 54. Insulated warehouse; 6. Vacuum cleaner; 61. Exhaust fan; 62. Powder storage silo. Detailed Implementation

[0020] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0021] Please see the appendix Figures 1 to 4 As shown, the present invention provides a production equipment for a mineral bed, including a first feeding system 1, a crushing and screening system 2, a second feeding system 3, a batching and mixing system 4, and a molding system 5; the crushing and screening system 2 includes a crusher 21, a vibrating screen 22, and several sets of de-edge drying machines 23; the batching and mixing system 4 includes a heating and temperature control device 41, a resin mixer 42, and a mixing mixer 43; the molding system 5 includes a molding mold 51 and a vibrating compaction platform 52; the discharge end of the first feeding system 1 is located above the crusher 21 and connected to the feed end of the crusher 21, and the feed end of the vibrating screen 22 is located below the crusher 21 and connected to the feed end of the crusher 21. The discharge end of the crusher 21 is connected; the number of discharge ends below the vibrating screen 22 is the same as the number of discharge ends of the de-edge dryer 23 and is respectively connected to the feed end of the de-edge dryer 23; the discharge end of the de-edge dryer 23 is connected to the feed end of the second feeding system 3; the discharge end of the second feeding system 3 is connected to the feed end of the heating and temperature control device 41; the discharge end of the heating and temperature control device 41 and the discharge end of the resin mixer 42 are respectively connected to the feed end of the mixing mixer 43; the discharge end of the mixing mixer 43 is connected to the feed end of the molding mold 51; the molding mold 51 is detachably and fixedly installed on the vibrating compaction platform 52 by bolts and nuts. In use, the mineral raw materials are first conveyed to the crushing and screening system 2 through the first feeding system 1. After being crushed by the crusher 21 and screened by the vibrating screen 22, they are separated into several different specifications. The mineral raw materials of these different specifications are then dried and de-edged using a de-edgedryer 23, allowing for the simultaneous production of multiple specifications of mineral raw materials. Preferably, the de-edgedryer 23 consists of a drum mill and a three-pass drum dryer. This allows the mineral raw materials to be de-edged while retaining a rough surface, resulting in a stronger bond between the mineral bed and the resin during molding, thus improving product quality. Furthermore, the de-edgedryer 23 is connected to a waste bin 24, which is used to recycle waste generated during grinding, facilitating subsequent reuse and making it more environmentally friendly.

[0022] Preferably, the first feeding system 1 includes a first storage bin 11, a first conveyor belt 12, an iron separator 13, and an elevator 14; the first conveyor belt 12 is disposed below the discharge end of the first storage bin 11; the first conveyor belt 12 is a motor-driven conveyor belt, and the iron separator 13 is disposed above the first conveyor belt 12 between the first storage bin 11 and the elevator 14; the discharge end of the first storage bin 11 may be provided with an openable opening to control the conveying efficiency of the mineral raw materials, and the first conveyor belt 12 is connected to the feed end below the elevator 14; the discharge end above the elevator 14 is connected to the feed end of the crusher 21.

[0023] Preferably, the upper end of the elevator 14 is provided with an inclined guide channel 15; the lower end of the guide channel 15 is connected to the feed end of the crusher 21. Therefore, the mineral raw material can fall into the crusher 21 from the guide channel 15 under the action of gravity.

[0024] Preferably, such as Figure 2 As shown, a dust collector 6 is connected to the feed end and discharge end of the elevator 14; the feed end of the dust collector 6 is connected to the lower feed end and the upper discharge end of the elevator 14, respectively. A return port 221 is provided on the side of the vibrating screen 22; the feed end of the dust collector 6 is also connected to the feed end of the vibrating screen 22 and the return port 221, respectively. The discharge end of the dust collector 6 is connected to the second feeding system 3. A powder storage bin 62 is provided inside the dust collector 6, and the dust collector 6 delivers mineral powder through the discharge end of the powder storage bin 62. The dust collector 6 uses a blower 61 to extract dust generated during the processing of mineral raw materials for reuse, reducing the production cost of the mineral bed.

[0025] Preferably, the second feeding system 3 includes a plurality of second storage bins 31 and a second conveyor belt 32; the feeding ends of the plurality of second storage bins 31 are respectively connected to the discharge ends of the de-edge dryer 23 and the dust collector 6; the second conveyor belt 32 is disposed below the discharge ends of the second storage bins 31; the second conveyor belt 32 is connected to the heating and temperature control device 41. Furthermore, the second feeding system 3 can simultaneously transport mineral raw materials of different specifications and mineral powder extracted by the dust collector 6 to the heating and temperature control device 41 for heating through multiple second storage bins 31. Preferably, by controlling the size of the discharge end opening of the second storage bins 31 or the opening and closing time of the discharge end opening, mineral raw materials of different specifications can be directly mixed in the correct proportions, further improving the production efficiency of the mineral bed.

[0026] Preferably, the mixing system 4 further includes a resin mixing device 44, the discharge end of which is connected to the feed end of the resin mixer 42. The resin mixing device 44 contains resin raw materials, which can be pumped into the resin mixer 42 for mixing using a water pump.

[0027] Preferably, such as Figure 4 As shown, the molding system 5 also includes a pressure compaction platform 53 and an insulation chamber 54. The molding die 51 can be detachably installed in the pressure compaction platform 53 or the insulation chamber 54. The vibration compaction platform 52 and the pressure compaction platform 53 can compact the mineral raw materials in the molding die 51, avoiding defects such as cavitation and cracks, and improving the quality of the product.

[0028] A method for producing a mineral bed, utilizing the aforementioned mineral bed production equipment, includes the following steps: S01, mineral raw materials are placed into the first storage bin 11; the first conveyor belt 12 transports the mineral raw materials falling from the discharge end of the first storage bin 11 to the feed end of the elevator 14; the iron remover 13 removes magnetic impurities from the mineral raw materials during the conveying process of the first conveyor belt 12. S02, the elevator 14 lifts the mineral raw material to a height and sends it into the crusher 21, and the dust collector 6 extracts the mineral raw material dust generated at the feed end and discharge end of the elevator 14. S03, after being crushed by crusher 21, the mineral raw materials fall into vibrating screen 22 and are screened into different sizes; the dust collector 6 extracts the dust from the mineral raw materials from the feed end and return port 221 of the vibrating screen 22. S04, the mineral raw materials of different sizes screened by the vibrating screener 22 are sent into different de-edged and dryer 23 for de-edged and dryer. S05, the de-edging and drying machine 23 delivers the de-edged and dried mineral raw materials of different specifications and the vacuum cleaner 6 delivers the extracted mineral powder to different second storage bins 31. The second storage bins 31 and the vacuum cleaner 6 deliver the mineral raw materials and mineral powder of different specifications in proportion. The second conveyor belt 32 delivers the mineral raw materials and powder delivered from the discharge end of the different second storage bins 31 to the heating and temperature control device 41 for heating. S06, the resin mixing device 44 sends the resin adhesive raw material to the resin mixing system and mixes it evenly to form resin adhesive; the heating and temperature control device 41 and the resin mixer 42 send the mineral raw material and resin adhesive into the mixing mixer 43 and mix to form mixed raw material. S07, the mixed raw materials are injected into the molding mold 51 and the molding mold 51 is vibrated and compacted on the vibration compaction platform 52. After the vibration compaction is completed, the molding mold 51 is installed on the pressure compaction platform 53 for pressure vibration compaction to remove air bubbles in the mixed raw materials. S08, the forming mold 51 is sent to the heat preservation chamber 54 for heat preservation. After the heat preservation is completed, the mold is demolded to obtain the mineral bed.

[0029] Compared with the prior art, the present invention uses a mineral bed production equipment and method to integrally form the bed from mineral raw materials, which has the advantages of high production efficiency, high product precision and low cost.

[0030] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A production equipment for a mineral bed, characterized in that, The system includes a first feeding system, a crushing and screening system, a second feeding system, a batching and mixing system, and a molding system. The crushing and screening system includes a crusher, a vibrating screen, and several sets of de-edge drying machines. The batching and mixing system includes a heating and temperature control device, a resin mixer, and a mixing mixer. The molding system includes a molding die and a vibrating compaction platform. The discharge end of the first feeding system is located above the crusher and connected to the crusher's feed end. The feed end of the vibrating screen is located below the crusher and connected to the crusher's discharge end. The number of discharge ends at the bottom of the machine is the same as the number of de-edged dryers, and they are respectively connected to the feed ends of the de-edged dryers; the de-edged dryer consists of a drum mill and a three-pass drum dryer, in which mineral raw materials can be de-edged and retain surface roughness; the discharge end of the de-edged dryer is connected to the feed end of the second feeding system; the discharge end of the second feeding system is connected to the feed end of the heating and temperature control device; the discharge end of the heating and temperature control device and the discharge end of the resin mixer are respectively connected to the feed end of the mixing mixer; the discharge end of the mixing mixer and... The forming mold is connected to the feed end; the forming mold is detachably installed on the vibrating compaction platform; the first feeding system includes a first storage bin, a first conveyor belt, an iron separator, and an elevator; the first conveyor belt is located below the discharge end of the first storage bin; the iron separator is located above the first conveyor belt between the first storage bin and the elevator; the first conveyor belt is connected to the feed end below the elevator; the discharge end above the elevator is connected to the feed end of the crusher; a vacuum cleaner is connected to the feed end and discharge end of the elevator; the feed end of the vacuum cleaner is respectively connected to the feed end of the elevator. The elevator has a lower feed end and an upper discharge end; the vibrating screen is provided with a return port on its side; the feed end of the vacuum cleaner is also connected to the feed end and return port of the vibrating screen; the discharge end of the vacuum cleaner is connected to a second feeding system; the second feeding system includes several second storage bins and a second conveyor belt; the feed ends of several second storage bins are respectively connected to the discharge end of the de-edge dryer and the discharge end of the vacuum cleaner; the second conveyor belt is located below the discharge end of the second storage bin; the second conveyor belt is connected to a heating and temperature control device.

2. The production equipment for a mineral bed according to claim 1, characterized in that, The upper end of the elevator is inclined with a guide channel; the lower end of the guide channel is connected to the feed end of the crusher.

3. The production equipment for a mineral bed according to claim 1, characterized in that, The mixing system also includes a glue mixing device, the discharge end of which is connected to the feed end of the resin mixer.

4. The production equipment for a mineral bed according to claim 1, characterized in that, The molding system also includes a pressure compaction platform and an insulation chamber, and the molding die can be detachably installed in the pressure compaction platform or the insulation chamber.

5. A method for producing a mineral bed, utilizing the mineral bed production equipment according to any one of claims 1 to 4, comprising the following steps: S01, mineral raw materials are placed into the first storage bin; the first conveyor belt transports the mineral raw materials falling from the discharge end of the first storage bin to the feed end of the elevator; the iron remover removes magnetic impurities from the mineral raw materials during the conveying process of the first conveyor belt. S02, the elevator lifts the mineral raw materials to a height and sends them into the crusher, and the dust collector extracts the mineral raw material dust generated at the feed end and discharge end of the elevator; S03, after being crushed by the crusher, the mineral raw materials fall into the vibrating screen and are screened into different sizes; the dust collector extracts the dust from the mineral raw materials from the feed end and return port of the vibrating screen. S04, mineral raw materials of different sizes screened by the vibrating screener are sent to different de-edged and dryer for de-edged and dryer; S05, the de-edging and drying machine removes the edges and corners of different specifications of mineral raw materials and the vacuum cleaner extracts the mineral raw material dust to different second storage bins. The second storage bins send out different specifications of mineral raw materials and mineral raw material dust according to the proportion. The second conveyor belt transports the mineral raw materials and mineral raw material dust sent out from the discharge end of different second storage bins to the heating and temperature control device for heating. S06, the resin mixing device sends the resin raw material to the resin mixer and mixes it evenly to form resin; the heating and temperature control device and the resin mixer send the mineral raw material and resin into the mixing mixer and mix to form mixed raw material. S07, the mixed raw materials are injected into the molding die while the molding die is vibrated and compacted on the vibrating compaction platform; after the vibration compaction is completed, the molding die is installed on the pressure compaction platform for pressure vibration compaction to remove air bubbles from the mixed raw materials; S08, the forming mold is sent to the heat preservation chamber for heat preservation. After the heat preservation is completed, the mold is demolded to obtain the mineral bed.

Citation Information

Patent Citations

  • Stone crushing and screening device for engineering construction based on Internet of Things

    CN112024076A

  • Mineral casting lathe bed structure applied to dicing saw and preparation method

    CN120269698A

  • Ecological concrete's production facility

    CN205774140U