Calculation method for allowable drainage volume based on tunnel passing under ecologically sensitive areas

By continuously monitoring and lag correlation analysis, the ecological critical groundwater level drawdown was identified and the ecological allowable drainage was inverted, which solved the problem of lag in the response of groundwater level and root zone soil moisture during tunnel construction and realized dynamic regulation of ecologically sensitive areas.

CN122926381BActive Publication Date: 2026-11-17HUNAN INSTITUTE OF ENGINEERING
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611408782.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-09-11
Publication Date
2026-11-17
Estimated Expiration
2046-09-11

AI Technical Summary

Technical Problem

Existing technologies have failed to effectively identify the lag process of changes in tunnel drainage volume in response to groundwater levels and root zone soil moisture in ecologically sensitive areas during tunnel construction. They also lack direct ecological response indicators and dynamic control methods, making it difficult to accurately assess the impact on vegetation moisture conditions.

Method used

By continuously monitoring tunnel drainage, groundwater level, and root zone soil moisture content, and employing two-stage lag correlation analysis and continuous piecewise regression models, the ecological critical groundwater level drawdown is automatically identified and the ecological allowable drainage is inverted, thus establishing a dynamic regulation strategy.

Benefits of technology

It significantly improves the reliability of the relationship between drainage volume, groundwater level and root zone moisture, provides direct constraint indicators and dynamic control means for ecological response, and enhances the reliability of decision-making during construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122926381B_ABST
    Figure CN122926381B_ABST
Patent Text Reader

Abstract

This invention discloses a method for calculating allowable drainage volume for tunnels passing under ecologically sensitive areas, involving the interdisciplinary fields of tunnel engineering and ecohydrology. The method includes: acquiring and preprocessing data, while marking periods of heavy rainfall; identifying drainage-groundwater response lags and groundwater-root zone moisture response lags through hysteresis correlation analysis; aligning the time axis based on the time-lag corrected data and constructing a modeling sample set; identifying the ecologically critical groundwater level drawdown using a continuous piecewise regression model; inverting the ecologically allowable drainage volume through a regression model of drainage volume and drawdown; validating the model using independent validation samples and evaluating threshold stability using Bootstrap resampling; and finally, formulating a graded engineering control strategy based on the response path. This invention realizes the transformation from ecological impact identification to quantitative drainage control in tunnel construction, providing a basis for groundwater protection and drainage management during tunnel construction in ecologically sensitive areas.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the interdisciplinary fields of tunnel engineering and ecohydrology, and in particular to a method for calculating the allowable drainage volume based on tunnels passing under ecologically sensitive areas. Background Technology

[0002] As infrastructure projects such as railways and highways continue to extend into mountainous and ecologically sensitive areas, the conflict between tunnel construction and the protection of groundwater and surface ecology is becoming increasingly prominent. Tunnel excavation alters the surrounding rock structure and natural groundwater flow conditions, creating new groundwater drainage channels through joints, fracture zones, fault zones, and construction disturbance areas. This leads to increased drainage within the tunnel and a drop in the surrounding groundwater level. In ecologically sensitive areas such as forest parks, a continuous decline in the groundwater level may further weaken capillary recharge, affecting shallow soil moisture and the availability of water in the root zone of vegetation. Therefore, groundwater control in tunnel construction has gradually shifted from simply ensuring construction safety to the coordinated protection of both engineering safety and the ecological environment.

[0003] To address groundwater disturbance caused by tunnel construction, existing studies have conducted in-depth analyses of factors such as surrounding rock moisture migration, spatiotemporal variations of tunnel water inrush, and regional groundwater system responses. For example, Lai Hongpeng et al. studied the migration patterns of surrounding rock moisture during the construction of water-rich loess tunnels; Li Jin et al. and Duan Tianyu et al. revealed the connection between tunnel construction and regional hydrological processes from the perspectives of the spatiotemporal evolution of tunnel water inrush and karst groundwater systems, respectively. At the engineering practice level, to reduce the impact of excessive drainage on the groundwater environment, the concept of tunnel drainage has gradually evolved from "complete drainage" to "combined blocking and drainage, with limited discharge." Ji Luling et al. proposed drainage valves for limited drainage tunnels and related design methods, while Zhang et al. studied the issue of limited groundwater discharge from strata with different weathering degrees. These findings provide an important foundation for tunnel groundwater control; however, overall, the control objectives remain primarily focused on surrounding rock stability and structural safety, and the moisture conditions in the root zone of vegetation have not yet been incorporated as an independent constraint indicator into the drainage control system.

[0004] For ecologically sensitive areas, whether tunnel drainage will have a substantial impact on surface vegetation hinges on the hydraulic connection between groundwater, soil, and the root zone. Existing research indicates that groundwater level fluctuations and vadose zone moisture changes exhibit distinct phased characteristics and can influence vegetation moisture conditions; furthermore, root water absorption regulates soil moisture migration and storage. Therefore, compared to indirect indicators such as the normalized difference in vegetation index (NDPI) and chlorophyll content, root zone soil moisture content more directly reflects the process of groundwater disturbance being transferred to available water conditions for vegetation. However, current research, when considering the ecological impact on vegetation, often uses vegetation indices or preset groundwater control levels as the basis for judgment, lacking direct identification of the critical response characteristics of root zone soil moisture as groundwater levels decline.

[0005] In summary, existing technologies still have the following shortcomings: First, changes in tunnel drainage, groundwater level response, and root zone soil moisture response occur at different time scales. Existing methods mostly perform synchronous analysis, which makes it difficult to truly reflect the lag process of construction drainage disturbance being transmitted step by step from the groundwater system to the root zone moisture. Second, existing studies on groundwater control in ecologically sensitive areas are mostly based on preset water levels or empirical values. They fail to automatically identify the critical groundwater level at which root zone soil moisture changes from gradual to sudden changes based on time lag correction and continuous on-site monitoring data. They also fail to further invert this critical condition into drainage control indicators that can be directly applied on the construction side. Third, most existing methods only provide a single fixed threshold and do not quantitatively evaluate the uncertainty of threshold identification under limited monitoring sample conditions, making it difficult to guide dynamic control during construction. Summary of the Invention

[0006] To address the problems of existing technologies, this invention provides a method for calculating the allowable drainage volume of tunnels passing under ecologically sensitive areas. Through continuous monitoring and hysteresis response analysis, it automatically identifies the ecological critical groundwater level drawdown and inversely calculates the ecological allowable drainage volume, providing a basis for groundwater protection and drainage management during tunnel construction in ecologically sensitive areas.

[0007] To solve the above-mentioned technical problems, the technical solution proposed by this invention is as follows:

[0008] A method for calculating the allowable drainage volume of a tunnel passing under an ecologically sensitive area includes the following steps:

[0009] Step S1: Deploy a monitoring system to acquire data on tunnel drainage, groundwater level drawdown, root zone soil moisture content, and rainfall.

[0010] Step S2: Preprocess the monitoring data, remove abnormal data and mark the periods of heavy rainfall disturbance;

[0011] Step S3: Identify the drainage-groundwater response time lag and the groundwater-root zone moisture response time lag through hysteresis correlation analysis.

[0012] Step S4: Based on the identified two-level time delay, the monitoring data is aligned with the time axis to construct the first paired sample set of drainage volume and groundwater level drawdown, and the second paired sample set of groundwater level drawdown and root zone water content. After removing samples from periods of heavy rainfall disturbance, the samples are divided into fitting samples and validation samples in chronological order.

[0013] Step S5: Using the groundwater level drawdown and root zone soil moisture content data from the fitted sample, a continuous piecewise regression model is used to identify the ecological critical groundwater level drawdown.

[0014] The continuous piecewise regression model takes the following form:

[0015]

[0016] in, This refers to the volumetric water content of the root zone soil. To lower the groundwater level; The turning point to be identified; For intercept parameters; for ≤ The slope reflects the slow rate of change of water content in the pre-critical root zone as the water level drops. for Compared to ≤ The slope change; parameter estimation is performed using the least squares method for a given candidate , respectively in ≤ and Perform linear regression on the two segments and calculate the overall sum of squared residuals. A grid search is performed within the range of values ​​to select the candidate value that minimizes the sum of squared residuals. The optimal estimate;

[0017] Step S6: Establish a regression model using the drainage volume and groundwater level drawdown data from the fitted sample. Substitute the data obtained in step S5 into this model to retrieve the ecologically permissible drainage volume. The regression model is a linear regression model. ,in This refers to the tunnel's drainage volume. To lower the groundwater level, The regression slope, For the regression intercept; Substitute the values ​​into the regression model to solve for the corresponding displacement: , This refers to the ecologically permissible discharge volume.

[0018] A further improvement to the above technical solution is as follows:

[0019] Preferably, after obtaining the ecologically permissible drainage volume, the method further includes using independent validation samples to validate the model, evaluating the stability of the model using the Bootstrap resampling method, and providing confidence intervals; integrating time-delay parameters, ecological critical water levels, and permissible drainage volume to form a graded engineering control strategy.

[0020] Preferably, the method for obtaining the groundwater level drawdown in step S1 is as follows: multiple groundwater observation points are set up in ecologically sensitive areas, and the drawdown is calculated. Each observation point is at Groundwater level drawdown at any given time:

[0021]

[0022] in, The first under stable conditions before construction Groundwater level elevation at each observation point During the construction process Time of the first The groundwater level elevation at each observation point is used; the average drawdown at multiple effective observation points is used to characterize the overall degree of groundwater disturbance.

[0023] Preferably, the data preprocessing in step S2 specifically includes the following sub-steps: (1) taking the stable monitoring period before the face enters the ecologically sensitive section as the baseline period and calculating the baseline values ​​of each observation index; (2) removing equipment failure or abnormal data and using linear interpolation of adjacent time periods to fill in short-term missing data; (3) setting a heavy rainfall screening threshold and marking the period of heavy rainfall disturbance.

[0024] Preferably, the identification method for the drainage-groundwater response time lag in step S3 is as follows: Pearson correlation analysis is performed on the tunnel drainage volume and the groundwater level drawdown under different lag days, and the correlation coefficient is:

[0025]

[0026] in, for and lag groundwater level drawdown The Pearson correlation coefficient between them; It is a time lag variable; This represents the tunnel's average daily drainage volume. For Pearson correlation coefficient operators; for The depth of groundwater level at any given time; It is a time variable;

[0027] The lag time is the main response time lag of drainage to groundwater:

[0028]

[0029] in, The response time delay for tunnel drainage to transmit changes in groundwater level. To return the independent variable that maximizes the objective function. The value of .

[0030] Preferably, the specific method for aligning the time axis in step S4 is as follows: [The text abruptly ends here, likely due to an incomplete sentence or missing information.] and lag Subsequent groundwater level drawdown Alignment to form the first paired sample set Groundwater level drawdown sequence and lag Root zone water content Alignment to form a second paired sample set The unified time correspondence is as follows: → → ;in This represents the tunnel's average daily drainage volume. for The depth of groundwater level at any given time. for The root zone soil volumetric water content at a given time. for The root zone soil volumetric water content at a given time. The response time lag of groundwater level changes to soil moisture transfer in the root zone.

[0031] Preferably, the continuous piecewise regression model in step S5 is in the following form:

[0032]

[0033] in, This refers to the volumetric water content of the root zone soil. To lower the groundwater level; The turning point to be identified; For intercept parameters; for ≤ The slope reflects the slow rate of change of water content in the pre-critical root zone as the water level drops. for Compared to ≤ The slope change; parameter estimation is performed using the least squares method for a given candidate , respectively in ≤ and Perform linear regression on the two segments and calculate the overall sum of squared residuals. A grid search is performed within the range of values ​​to select the candidate value that minimizes the sum of squared residuals. The optimal estimate.

[0034] Preferably, the regression model in step S6 is a linear regression model: ,in This refers to the tunnel's drainage volume. To lower the groundwater level, The regression slope, For the regression intercept; Substitute into the equation to solve for the corresponding water displacement: , This refers to the ecologically permissible discharge volume.

[0035] Preferably, the model validation using independent validation samples employs a hold-out validation method, calculating the coefficient of determination for both the drainage-groundwater linear model and the groundwater-root zone water piecewise model. Root mean square error and mean absolute error Three evaluation metrics; the specific operation of the Bootstrap resampling method is as follows: perform 1000 resampling cycles with replacement on the fitted samples, with each resampling cycle performed independently. Identification and The inversion was performed, and the results of multiple calculations were recorded. The 2.5% and 97.5% quantiles were used to construct 95% confidence intervals.

[0036] Preferably, the hierarchical engineering control strategy is as follows: the three core variables after time delay correction are plotted as a comprehensive response path diagram for intuitive display. → →θ's step-by-step transmission characteristics, and formulate a hierarchical control strategy based on this path; when the discharge volume is lower than And the groundwater level drawdown is significantly less than When the discharge volume is within a safe range, maintain routine monitoring; when the short-term peak discharge volume exceeds... However, if the groundwater level has not yet continued to decline, it is important to strengthen water level monitoring and not judge the ecological impact solely based on a single day's peak value; when the drainage volume is consistently higher than [a certain value], [further measures should be taken]. And the groundwater level drawdown is gradually approaching When the soil moisture content in the root zone shows a continuous downward trend, it is considered a warning zone, and measures such as grouting to block water or optimizing drainage paths are taken. When the soil moisture content in the root zone shows a continuous downward trend, it is upgraded to a protection zone, and the drainage intensity is reduced and the monitoring frequency is increased.

[0037] The method for calculating the allowable drainage volume based on tunnels passing under ecologically sensitive areas provided by this invention has the following advantages compared with existing technologies:

[0038] (1) The method for calculating the allowable drainage volume based on tunnels passing under ecologically sensitive areas in this invention introduces a two-stage lag correlation analysis (drainage → groundwater response time lag). Groundwater → Root Zone Moisture Response Time Lag This study quantitatively identified the time effect of tunnel construction drainage disturbance being transmitted step by step from the groundwater system to the root zone of vegetation. Based on time delay correction, it established a true causal relationship between variables, overcoming the shortcomings of traditional synchronous analysis in reflecting the asynchronous response of multiple processes. This significantly improved the reliability of identifying the relationship between drainage volume, groundwater level and root zone moisture.

[0039] (2) The method for calculating the allowable drainage volume based on tunnels passing under ecologically sensitive areas in this invention uses the soil moisture content in the root zone as a direct constraint indicator of ecological response, and uses a continuous piecewise regression model to automatically identify the ecological critical groundwater level drawdown where the root zone moisture changes from a gradual change to a sudden change as the groundwater level drops. Furthermore, the ecological threshold is inverted into an ecologically permissible drainage volume that can be directly monitored and controlled on the construction side using a drainage-groundwater regression model. A complete technical chain of ecological response identification → quantitative control of construction drainage has been established, filling the gap in the existing tunnel drainage control system that lacks vegetation root zone water constraint indicators.

[0040] (3) The method for calculating the allowable drainage volume based on tunnels passing under ecologically sensitive areas in this invention uses a validation sample to evaluate the model's predictive ability, and simultaneously introduces the Bootstrap resampling method to identify... and The stability test was conducted with 1000 resampling cycles and a 95% confidence interval was given. This solved the problem of difficulty in quantitatively evaluating the uncertainty of threshold identification results under limited monitoring sample conditions. It provides a more reasonable parameter reference range for dynamic control during construction and enhances the operability and decision reliability of the method in actual engineering. Attached Figure Description

[0041] Figure 1 This is a response curve of the entire process of construction drainage, groundwater, and root zone moisture in the experimental verification.

[0042] Figure 2 The diagram shows the response distribution of drainage volume, groundwater drawdown and root zone soil moisture content at different construction stages during the experimental verification. (a) represents drainage disturbance, (b) represents groundwater response, and (c) represents root zone moisture response.

[0043] Figure 3 The figure shows the results of the lag correlation analysis in the experimental verification; (a) is the curve of the lag correlation coefficient between drainage and groundwater level drawdown as a function of lag time, and (b) is the curve of the lag correlation coefficient between groundwater level drawdown and root zone soil moisture content as a function of lag time.

[0044] Figure 4 This is to verify the piecewise response fitting results of groundwater drawdown and root zone soil moisture content in the experiment, as well as the ecological critical drawdown identification map.

[0045] Figure 5 This is a diagram to verify the linear response relationship between drainage volume and groundwater level drawdown in the experiment, as well as the identification map of ecologically permissible drainage volume.

[0046] Figure 6 This is a comparison chart of the total drainage volume during the construction process and the ecologically permissible drainage volume in the experimental verification.

[0047] Figure 7 The diagram shows the results of the experimental verification; (a) is the drainage-groundwater model, and (b) is the groundwater-root zone moisture model.

[0048] Figure 8 The Bootstrap resampling distribution and confidence interval plots are shown in the experimental verification, where (a) is the ecological critical groundwater level drawdown and (b) is the ecological allowable drainage.

[0049] Figure 9 This is a comprehensive response path diagram of drainage volume, groundwater level drawdown, and root zone water content after time delay correction, used for experimental verification. Detailed Implementation

[0050] The following provides a detailed description of specific embodiments of the present invention. It should be understood that the specific embodiments described herein are for illustrative and explanatory purposes only and are not intended to limit the scope of the invention.

[0051] The present invention provides a method for calculating the allowable drainage volume of tunnels passing under ecologically sensitive areas. Based on the stepwise response mechanism of tunnel construction drainage-groundwater-root zone moisture, it proposes a general calculation process for allowable drainage volume, which can be widely applied to the construction drainage control of various tunnels passing under ecologically sensitive areas such as forest parks, nature reserves, and water conservation areas.

[0052] Specifically, the following steps are included:

[0053] Step S1: Deployment of the monitoring system and data acquisition.

[0054] This step establishes a field monitoring system covering the entire chain of engineering disturbance, hydrological response, and ecological response, and obtains four core data types: tunnel drainage, groundwater level drawdown, root zone soil moisture content, and rainfall recharge, providing a raw data foundation for subsequent time-delay analysis and threshold identification.

[0055] During the construction of the tunnel passing under an ecologically sensitive area, monitoring equipment was deployed from the tunnel engineering side, the hydrogeological side, and the ecological side.

[0056] S1-1, Tunnel drainage monitoring.

[0057] Drainage metering sections are set up at the beginning and end of the ecologically sensitive area, and flow meters or weir metering devices are installed to continuously record the daily water volume flowing through each section.

[0058] Set time The tunnel drainage volume within the corresponding statistical period is:

[0059] (1)

[0060] In the formula, for The average daily drainage volume of the tunnel at that time, i.e., the effective drainage volume; For statistical period Actual water discharge volume; For statistical time intervals, It is a time variable. In this invention... Take 1 day, therefore That is, the first The average daily drainage volume, in units of Considering the significant diurnal response characteristics of groundwater and soil moisture changes, a correction is made using drainage intensity per unit length.

[0061] For tunnels with a relatively concentrated construction area and small variations in section length, the following can be directly adopted: Characterizes drainage disturbance. If the section length changes significantly during construction, further correction can be made using drainage intensity per unit length.

[0062] (2)

[0063] In the formula, The drainage intensity per unit length; This represents the tunnel's average daily drainage volume. This refers to the length of the construction section that provides significant drainage at the corresponding stage. For cases where the length of the construction section varies significantly, the following can be used: Alternative Further analysis will be conducted; this article will continue with... Let's take an example to illustrate.

[0064] S1-2, Groundwater level monitoring.

[0065] Groundwater level is a key intermediate variable connecting tunnel construction drainage and the surface ecological environment. When the tunnel discharge exceeds the natural recharge capacity of groundwater, the groundwater reserves near the tunnel gradually decrease, forming a localized drawdown zone centered on the tunnel. The degree of this change can be characterized by the groundwater level drawdown.

[0066] The first stable state before construction The groundwater level elevation at each observation point is: During the construction process Time of the first The water level elevation at each groundwater observation point is: The groundwater level drawdown is defined as follows:

[0067] (3)

[0068] in, for Time of the first Drawdown at groundwater observation points This indicates that the groundwater level has dropped relative to before construction.

[0069] For multiple groundwater monitoring points deployed within the same ecologically sensitive area, the dynamic response of groundwater at each point can be analyzed separately; when characterizing the overall degree of groundwater disturbance, the average drawdown of a typical monitoring point or multiple effective monitoring points is used.

[0070] (4)

[0071] in, for The arithmetic mean of the drawdown at multiple groundwater observation points at any given time is used to characterize the overall degree of groundwater disturbance. To effectively increase the number of underwater observation points, Groundwater observation points are numbered. Groundwater levels are affected by both rainfall and seasonal variations; therefore, all level fluctuations cannot be directly attributed to tunnel construction. Concurrent rainfall data is used as supplementary information to mark significant rainfall recharge phases. Monitoring periods with no strong rainfall interference or similar rainfall conditions are used in the drainage-groundwater response analysis. Rainfall is only controlled as a natural background factor and is not a core variable in the response model of this invention.

[0072] Through the above treatment, the groundwater level drawdown was reduced. It can serve as a core hydrological response indicator in the process of tunnel drainage disturbance being transmitted to the forest ecosystem.

[0073] It should be noted that rainfall, as a natural recharge factor, has its impact controlled through threshold screening in step S2. When establishing the master response model of drainage-groundwater-root zone moisture, the model input uses construction drainage disturbance as the main variable, with rainfall serving only as background discrimination information. The prediction dispersion observed during the experimental verification phase can be partly attributed to the residual effects of the natural recharge process. This reflects the objective reality that ecological responses are influenced by multiple factors and does not affect the universality and applicability of the proposed method framework. That is, samples from periods of heavy rainfall are excluded from the core response relationship fitting, but can still be retained as background reference information in the comprehensive judgment of practical engineering applications.

[0074] S1-3, root zone soil moisture monitoring.

[0075] Vegetation responses to groundwater changes typically do not occur directly, but rather through alterations in rhizosphere soil moisture conditions. Compared to vegetation indicators such as NDVI, chlorophyll content, and sap flow, rhizosphere soil moisture content more directly reflects vegetation's available water conditions and is less affected by vegetation type and remote sensing scale effects. Therefore, rhizosphere soil volumetric moisture content is used as the primary ecological response variable.

[0076] The representative root zone depth was determined based on the root system distribution characteristics of dominant vegetation. Soil volumetric water content was continuously monitored at the same location and depth, and recorded as follows: ,express The volumetric water content of the root zone soil at any given time.

[0077] Considering the differences in initial soil conditions at different monitoring points, when comparing different locations, the relative change rate of soil moisture in the root zone is further defined:

[0078] (5)

[0079] in, for The relative change rate of soil moisture in the root zone at any given time for At any given time, the volumetric water content of the root zone soil. The average soil moisture content in the root zone before construction disturbance. This indicates a loss of root zone moisture relative to the initial state. This invention still uses the actual soil moisture content. As the main analytical indicator.

[0080] When the impact of tunnel drainage is relatively weak, soil pore water storage, rainfall infiltration, and shallow water redistribution can buffer the impact of groundwater decline to some extent, thus the root zone water content may remain relatively stable. However, when groundwater continues to decline and exceeds a certain level, the replenishment of shallow soil moisture by groundwater weakens, and the root zone water content may decrease more significantly. Therefore, it is speculated that there may be a critical response characteristic between groundwater drawdown and root zone soil water content, which forms the basis for subsequent identification of ecological safety thresholds.

[0081] S1-4, Rainfall monitoring.

[0082] Daily rainfall is obtained using on-site rain gauges or nearby weather stations as background information on natural hydrological replenishment, primarily to help distinguish between construction drainage disturbances and natural fluctuations.

[0083] Step S2: Data preprocessing and marking of periods of heavy rainfall.

[0084] To eliminate interference from non-construction factors such as equipment malfunctions, missing data, and heavy rainfall on the monitoring sequence, this ensures that the samples entering subsequent analysis can accurately reflect the groundwater and root zone moisture response caused by construction drainage, thereby improving the accuracy of threshold identification.

[0085] Specifically, it includes the following sub-steps:

[0086] (1) The stable monitoring period before the working face enters the ecologically sensitive section is taken as the baseline period, and the baseline values ​​of each observation index are calculated (e.g., ).

[0087] (2) Remove equipment failure or obviously abnormal data; use linear interpolation of adjacent time periods to complete short-term missing data; do not include data segments with long continuous missing time periods in subsequent analysis.

[0088] (3) Set a heavy rainfall screening threshold. The cumulative rainfall over three consecutive days is used as the discrimination index. When the cumulative rainfall over three consecutive days exceeds the preset threshold (the specific value can be set according to the climate conditions of the project location, such as a fixed value in the range of 30-50 mm), the corresponding time period is marked as a heavy rainfall disturbance period and removed from the subsequent time-delay response master fitting and ecological threshold identification samples to reduce the interference of natural replenishment on the identification of construction drainage response.

[0089] Step S3: Identification of the time-delay response of drainage-groundwater-root zone moisture.

[0090] This step addresses the asynchrony between changes in tunnel drainage, groundwater level response, and root zone soil moisture response. Since groundwater seepage through the surrounding rock takes time, and the propagation of moisture from the groundwater level to the vadose zone and root zone also requires time, direct synchronous analysis would severely underestimate the actual correlation between variables. This step uses lag correlation analysis to quantitatively identify the time lags of the two-level responses, providing a basis for subsequent time lag correction.

[0091] S3-1, Identification of drainage-groundwater response time delay.

[0092] For tunnel drainage Groundwater level drawdown under different lag days Perform Pearson correlation analysis and define the correlation coefficient:

[0093] (6)

[0094] in, For drainage volume and lag groundwater level drawdown The Pearson correlation coefficient between them; As a time lag variable, its value range is set according to the engineering hydrogeological conditions, usually ranging from 0 to 30 days, with a step size of 1 day; This represents the tunnel's average daily drainage volume. For Pearson correlation coefficient operators, for The depth of groundwater level at any given time.

[0095] Calculate each in sequence The correlation coefficient is given below. When the correlation coefficient reaches its maximum value, the corresponding lag time is the main response lag of the drainage-groundwater system.

[0096] (7)

[0097] in, The response time delay for tunnel drainage to transmit changes in groundwater level. To return the independent variable that maximizes the objective function. The value of , It is a time lag variable.

[0098] This leads to the time correspondence: ,Right now Changes in water displacement over time, after The most significant drop-in response was observed at the groundwater observation point.

[0099] S3-2, Identification of groundwater-root zone moisture response time lag.

[0100] Groundwater level drawdown sequence and root zone soil moisture content sequence under different lag days Correlation analysis was performed. Since an increase in groundwater drawdown typically corresponds to a decrease in root zone water content, and the two are predominantly negatively correlated, the response time lag was determined by the lag time corresponding to the largest absolute value of the negative correlation coefficient (i.e., the smallest correlation coefficient).

[0101] (8)

[0102] (9)

[0103] in, Drawdown of groundwater level and lag Root zone moisture content The Pearson correlation coefficient between them For Pearson correlation coefficient operators, for The depth of groundwater level at any given time. for The root zone soil volumetric water content at a given time. The response time lag of groundwater level changes to soil moisture transfer in the root zone.

[0104] This leads to the time correspondence: ,in for The root zone soil volumetric water content at time t; The change in groundwater level over time, after The octopus has the most significant effect on the soil moisture content in the root zone.

[0105] Combining two-level time delays, the unified time correspondence of the three core variables can be expressed as follows:

[0106] (10)

[0107] in, This represents the tunnel's average daily drainage volume. for The depth of groundwater level at any given time. for The root zone soil volumetric water content at a given time. The response time delay for tunnel drainage to transmit changes in groundwater level. The response time lag of groundwater level changes to soil moisture transfer in the root zone.

[0108] This method can reflect the time effect of tunnel drainage disturbance being transmitted step by step from the groundwater system to the root zone of vegetation, without the need to introduce a complex dynamic hydrological model.

[0109] The purpose of time-delay analysis is not to establish a strict causal relationship, but to identify the most representative response time scales between monitoring sequences. Subsequent threshold analyses all use combinations of variables that have undergone time-delay correction to improve the reliability of identifying the relationship between drainage, groundwater level, and root zone moisture.

[0110] Step S4: Time delay correction and modeling sample construction.

[0111] Based on the two-level time delay identified in step S3, the original monitoring data is aligned with the time axis to construct two pairs of samples with real causal time order: drainage volume-groundwater level drawdown and groundwater level drawdown-root zone water content. This prepares a standardized dataset for subsequent regression modeling and threshold identification.

[0112] Specifically:

[0113] (1) The average daily drainage volume of the tunnel and lag Subsequent groundwater level drawdown Alignment to form the first paired sample set .

[0114] (2) Lower the groundwater level and lag Root zone water content Alignment to form a second paired sample set .

[0115] (3) Remove samples marked as periods of heavy rainfall disturbance and data anomalies in step S2.

[0116] (4) The valid samples after the above processing are sorted from earliest to latest response time and divided into fitting samples and validation samples. In order to simulate the engineering application scenario of using early data to predict later response, the first 75% are taken as fitting samples for model parameter estimation; the last 25% are taken as validation samples for subsequent prediction capability evaluation. The validation samples do not participate in any parameter fitting process to ensure the objectivity of the evaluation.

[0117] Step S5: Identification of the ecological critical groundwater level drawdown.

[0118] By establishing a response relationship between groundwater drawdown data after time-lag correction and root zone soil moisture content data, the critical point at which root zone soil moisture changes from a gradual to abrupt change as groundwater level drops is automatically identified. This critical point is the ecological critical groundwater drawdown, which reflects the threshold at which root zone moisture begins to be rapidly lost after groundwater disturbance exceeds the buffering capacity of the soil and natural recharge. It is a core parameter connecting hydrological changes and ecological responses.

[0119] This invention employs a continuous piecewise regression model for critical point identification. The model is as follows:

[0120] (11)

[0121] in, This refers to the volumetric water content of the root zone soil. To lower the groundwater level; The turning point to be identified is the ecological critical groundwater level drawdown. For intercept parameters; For the first paragraph ( ≤ The slope of the slope reflects the slow rate of change of water content in the pre-critical root zone as the water level drops. For the second paragraph ( ) relative to the change in slope of the first segment, if It is a negative value and its absolute value is significantly greater than The absolute value of indicates that the rate of decrease in root zone water content accelerates after exceeding the critical value, meaning that the root zone water is more sensitive to changes in groundwater level.

[0122] Parameter estimation is performed using the least squares method. For a given candidate... , respectively in ≤ and Perform linear regression on the two segments and calculate the overall sum of squared residuals. A grid search is performed within the range of values ​​to select the candidate value that minimizes the sum of squared residuals as the optimal value. The estimated value and search step size can be taken from the monitoring data. The minimum non-zero difference is 1 / 10, or set according to engineering accuracy requirements, such as 0.01m. The physical meaning of this inflection point is: when... At that time, groundwater disturbance is within the buffer range of soil water storage and natural recharge; when At that time, the continuous decline in groundwater led to a weakening of capillary recharge, accelerated water loss in the root zone, and a significant increase in ecological risks.

[0123] Step S6: Ecologically permissible drainage volume inversion.

[0124] Identified ecological critical groundwater level By establishing a quantitative relationship between drainage volume and groundwater level, drainage volume indicators can be directly monitored and controlled on the construction side. This enables a crucial shift from identifying ecological impacts to quantitative control of construction drainage.

[0125] Specifically, the first paired sample set of drainage-groundwater constructed in step S4 is used. Establish the tunnel drainage volume after time delay correction. With groundwater level drawdown A regression model is used when the drainage volume and drawdown show a good linear relationship within the monitoring range. The following linear regression model is employed:

[0126] (12)

[0127] in, This refers to the tunnel's drainage volume. To lower the groundwater level; The regression slope reflects the drawdown caused by a unit volume of drainage. The regression intercept reflects the baseline drawdown offset when there is no drainage (or when the drainage volume approaches zero).

[0128] If the monitoring data exhibits obvious nonlinear characteristics, it can also be fitted using polynomial or logarithmic functions, but this invention prefers the linear form to maintain the interpretability and engineering applicability of the parameters.

[0129] The result obtained in step S5 Substituting into the above regression equation, we can solve for the corresponding drainage volume:

[0130] (13)

[0131] in, Ecologically permissible drainage volume refers to the level of continuous drainage that should be controlled during tunnel construction to avoid significant accelerated loss of root zone moisture caused by a continuous decline in groundwater, given the current geological, hydrological, and vegetation conditions. The time scale can be calculated by continuous The daily moving average drainage volume is used to characterize this, and the cumulative drainage volume within this scale can reflect the continuous impact on the groundwater level. This represents the number of days. In engineering applications, The specific value should be determined comprehensively based on the construction stage, hydrogeological conditions, and monitoring frequency. When prior information is lacking, a value can be prioritized. Equal to drainage-groundwater response time delay (e.g., 4 days in this example) to match the timescale of drainage control with the characteristics of hydrological response.

[0132] Therefore, drainage control during tunnel construction has been expanded from traditional purely engineering safety constraints to eco-hydrological constraints:

[0133] (14)

[0134] in, It reflects the drainage control requirements over a certain time period, rather than the absolute upper limit of instantaneous drainage on a single day. This is not an absolute prohibition value for drainage at a specific instant, but rather an ecological control indicator proposed for continuous drainage over a certain time scale. A short-term drainage peak may not immediately lead to changes in the root zone water environment, but continuously exceeding this threshold may cause groundwater to gradually exceed the ecological critical drawdown. Therefore, in actual construction control, a comprehensive judgment should be made based on the drainage duration and groundwater monitoring results. When an independent duration control threshold is lacking, the drainage-groundwater main response time lag can be used as a reference time scale for judging continuous exceedances, but its specific value still needs to be calibrated based on the on-site groundwater response.

[0135] Ultimately, the established response and threshold recognition process can be summarized as follows:

[0136] (15)

[0137] The first two stages are used to characterize the transfer process of tunnel drainage disturbance to groundwater and root zone moisture. and The response time characteristics are characterized; the latter two steps respectively provide the ecological critical groundwater level drawdown and the ecologically permissible drainage volume. This realizes the transformation from ecological impact identification to quantitative control of construction drainage, providing a methodological basis for groundwater protection and drainage management during tunnel construction in ecologically sensitive areas of forest parks.

[0138] Step S7: Model validation and threshold stability evaluation.

[0139] Validation data, independent of the fitted samples, is used to objectively evaluate the predictive ability of the established model; meanwhile, due to the limited sample size from on-site monitoring, the identified... and Due to potential fluctuations in sample composition, this step uses the Bootstrap resampling method to quantitatively evaluate the stability of the two ecological thresholds and provide their confidence intervals, thus offering a range of uncertainty for engineering decisions.

[0140] S7-1, Verification.

[0141] The validation samples (the last 25% of the data) from step S4 were used to validate both the drainage-groundwater linear model and the groundwater-root zone water segmentation model. The following three commonly used evaluation metrics were calculated:

[0142] Coefficient of determination ,in These are measured values. These are the model's predicted values. This is the average of the measured values;

[0143] Root mean square error ,in To verify the sample size;

[0144] Mean Absolute Error .

[0145] In eco-hydrological prediction, the verification of the order of 0.6 to 0.7 is crucial. This is within an acceptable range, indicating that the model can effectively capture the response trend driven by the controlling factors. The remaining bias mainly comes from natural variability factors not included in the model. The closer the value is to 1, the stronger the model's explanatory power. and The smaller the value, the lower the prediction error.

[0146] It should be noted that the validation coefficient of determination for the groundwater-root zone water segmentation model is... The value was 0.663, lower than that of the drainage-groundwater model. This is mainly because, in addition to being controlled by the groundwater level, root zone soil moisture is also affected by natural processes such as rainfall infiltration, soil water release, and evaporation. These factors are treated as non-construction disturbance background in this invention and therefore are not included in the main model. This verification result demonstrates that the method is effective in identifying the main effects of engineering disturbances, while also reflecting the natural variability of ecological responses. In engineering applications, it is recommended to combine real-time monitoring data for comprehensive judgment.

[0147] S7-2, Bootstrap resampling stability evaluation.

[0148] The Bootstrap method is used to resample the fitted samples 1000 times with replacement. Each resampling operation performs the following independent steps:

[0149] In the refitting step S5 — Continuous piecewise regression model, identify and record ;

[0150] Refitting step S6 — Linear regression model, and inverse record. .

[0151] Record the results of 1000 calculations and The numerical distribution was analyzed, and its 2.5% and 97.5% quantiles were used to construct 95% confidence intervals. A narrower confidence interval indicates that the threshold identification result is less affected by fluctuations in the monitored samples, and thus exhibits higher stability. This confidence interval can provide a more reasonable parameter reference range for dynamic control during construction.

[0152] Step S8: Integrate response path and engineering control strategy.

[0153] The time delay parameters, ecological critical water level, and allowable drainage volume obtained from each step are integrated into a unified engineering control logic, forming a closed-loop technical system from monitoring to identification to inversion to control, guiding the hierarchical regulation at the engineering site.

[0154] The three core variables after time delay correction are plotted as a comprehensive response path diagram, which can visually demonstrate their characteristics. → → Based on the hierarchical transmission characteristics of this path, the following hierarchical control strategy is formulated:

[0155] When the drainage volume is lower than And the groundwater level drawdown is significantly less than At this time, it is within the safe range; routine monitoring should be maintained.

[0156] When the discharge volume is short, the peak value exceeds However, if the groundwater level has not continued to decline, water level monitoring should be strengthened, and the ecological impact should not be judged solely based on the peak value of a single day.

[0157] When the drainage volume continues (exceeds) (sky) higher than And the groundwater level gradually draws down to near When the area falls within the warning zone, timely measures such as grouting to block water and optimizing drainage paths should be taken.

[0158] When the soil moisture content in the root zone shows a continuous downward trend, it should be upgraded to a protected zone, and the drainage intensity should be reduced immediately while the monitoring frequency is increased.

[0159] The distinction between short-term peak values ​​and durations consistently above Qeco is based on the drainage-groundwater response time lag. Quantization boundary: the duration of the overlimit exceeds The condition is determined to be a continuous operating condition; the duration of the over-limit operation does not exceed [the specified limit]. The weather was determined to be a short-term operating condition. The result has been quantitatively calculated in step S3-1 using formulas (6) and (7). This was achieved during the initial stages of tunnel construction. While the calculation is not yet complete, three consecutive days can be temporarily used as the default number of days for determining "continuous". Once confirmed Adjustments will be made to ensure accuracy.

[0160] Experimental verification:

[0161] This section uses a newly constructed railway tunnel passing under an ecologically sensitive section of a forest park as a specific engineering case study, applying the method of this invention to actual monitoring data to verify the feasibility and technical effectiveness of the invention. It should be noted that all specific values ​​in this section are only applicable to this particular engineering condition and do not represent a limitation on the general scope of this invention.

[0162] (I) Project Overview and Monitoring System Setup.

[0163] The tunnel is 5909.34m long with a maximum burial depth of approximately 157m, of which the section passing under the forest park reserve is approximately 1612m long (mileage DK147+744~DK149+356.34). The surrounding rock of the tunnel is mainly Lower Paleozoic metamorphic sandstone, with localized fault fracture zones and densely jointed fissure zones. The proportions of Class III, IV, and V surrounding rock are 73.79%, 18.78%, and 7.43%, respectively. The groundwater type is mainly bedrock fissure water, primarily recharged by atmospheric precipitation, with an average annual rainfall of approximately 1551.8mm.

[0164] Ultrasonic flow meters were installed at both the inlet and outlet to continuously record daily drainage volume. Five groundwater level observation wells (depths ranging from 15 to 30 m) were set up along a typical hydrological cross-section, and automatic water level gauges were installed. Soil moisture sensors were buried at corresponding locations (monitoring depth at the main root distribution layer, approximately 60 cm), and daily rainfall was recorded simultaneously. The continuous monitoring period was from January 1, 2025 to March 31, 2026, resulting in 455 daily-scale monitoring records. The daily drainage volume at the starting cross-section was set as... The daily drainage volume at the endpoint section is The effective drainage volume Calculate using the following formula:

[0165] (16)

[0166] in, It is a time variable.

[0167] (ii) Data preprocessing and sample construction.

[0168] After preliminary statistical analysis of the raw monitoring data, in order to visually demonstrate the overall changing trends of the three core variables during the monitoring period, a full-process response curve was plotted as follows: Figure 1 As shown. By Figure 1 It is evident that there is a clear sequential relationship between the increase in tunnel drainage, the increase in groundwater level drawdown, and the decrease in root zone water content, preliminarily indicating a response time lag among these three factors. Furthermore, to reflect the statistical differences across different construction stages (base period, approach to the tunnel face, crossing of sensitive sections, post-crossing impacts, and stabilization recovery period), the response distribution for each stage is plotted as follows: Figure 2 As shown in (a) to (c). From Figure 2 As shown in (a) to (c), the statistical distribution of the three variables in different construction stages is significantly different. The drainage volume and drawdown in the crossing and post-crossing impact stages are significantly higher than in other stages, while the root zone moisture content is in the low range.

[0169] Following step S2, the initial groundwater level is calculated using the stabilization period (approximately 60 days) before the tunnel face enters the ecologically sensitive section as the baseline period. and initial root zone water content Fifteen outliers due to equipment malfunction were removed, and short-term missing values ​​were filled using linear interpolation. A cumulative rainfall exceeding 35 mm over three consecutive days was used as the screening criterion, identifying approximately 45 days of heavy rainfall disturbances; the corresponding samples were not included in the master fit analysis.

[0170] Following steps S3 and S4, time lag analysis and sample division were performed on the data. After the above processing, approximately 380 valid paired samples were obtained. The first 75% (approximately 285 groups) were selected as fitted samples in chronological order, and the last 25% (approximately 95 groups) were selected as validation samples.

[0171] (III) Results of time delay response identification.

[0172] Following the lag correlation analysis method in step S3, the time lag correlation coefficients of drainage-groundwater and groundwater-root zone moisture were calculated respectively, and the results are as follows. Figure 3 As shown in (a) and (b). Figure 3 As shown in (a), with the lag time As the number of days increases, the correlation coefficient between drainage volume and groundwater drawdown first increases and then decreases. When the timing is optimal, the correlation coefficient is approximately 0.996, therefore it is determined that... sky. Figure 3 As shown in (b), the absolute value of the negative correlation coefficient between groundwater drawdown and root zone water content is... When the timing is optimal, the correlation coefficient is approximately -0.897, therefore, it is determined... Days. Therefore, the unified time correspondence under the conditions of this project is: .

[0173] (iv) Identification results of the ecological critical groundwater level drawdown.

[0174] Following step S5, using the time-delay corrected... — For the fitted samples, a continuous piecewise regression model was used for least squares fitting, and the results are as follows: Figure 4 As shown, the ecologically critical groundwater level drawdown is identified by minimizing the sum of squared residuals through grid search. .like Figure 4 As shown, the validation determination coefficient of the segmented model in the subsequent hold-out period is... This indicates that the model can reflect the overall trend and critical turning point characteristics of groundwater level decline and root zone moisture changes, but the root zone moisture response still exhibits certain time-varying fluctuations. The fitted parameters are: , , Before and after the critical value, the slopes of the change in root zone water content were -0.0124 and -0.0527, respectively. The absolute value of the latter was about 4.3 times that of the former, indicating that the root zone water sensitivity increased significantly after exceeding the critical value.

[0175] (v) Results of ecologically permissible drainage volume inversion.

[0176] Following step S6, using the time-delay corrected... — Fit the sample, establish a linear regression equation, and the fitting result is as follows: Figure 5 As shown. The fitting yielded... (in , ).Will Substituting into the equation, the ecologically permissible drainage volume is obtained through inversion. .

[0177] To further examine the actual performance of drainage volume relative to this threshold throughout the construction process, the daily drainage volume was compared with... Plotted on the same timeline, such as Figure 6 As shown. By Figure 6 It is evident that more than The period of sustained high drainage is mainly concentrated in the sensitive section crossing and the post-crossing impact stage, which corresponds well with the stage of continuous decline in groundwater level and decrease in root zone water content.

[0178] (vi) Model validation and threshold stability evaluation results.

[0179] Following step S7, hold-out validation was performed on the model using independent validation samples (95 groups), and the comparison between predicted and measured values ​​was performed. Figure 7 As shown in (a) and (b). Figure 7 (a) The validation points for the drainage-groundwater model are closely distributed near the 1:1 line. Figure 7 (b) It shows that although the validation points of the groundwater-root zone moisture model are somewhat discrete, the overall trend is consistent.

[0180] Coefficient of determination on the validation set of the drainage-groundwater linear model , , Validation set of the groundwater-root zone water segmentation model , , The former indicates that the drainage-water level relationship has good predictive stability, while the latter reflects that root zone moisture is affected not only by groundwater level but also by factors such as rainfall infiltration, soil water storage, and recovery process. Although there is some dispersion, it can still capture the overall trend relatively well.

[0181] The result was obtained by resampling 1000 times using Bootstrap. and Frequency distribution as Figure 8 As shown in (a) and (b). The 95% confidence interval is [1.212m, 1.293m]. The 95% confidence interval is [1146.0 m³ / d, 1199.7 m³ / d]. The Bootstrap distributions of both parameters are relatively concentrated, indicating good stability of the recognition results.

[0182] (vii) Engineering application effects.

[0183] The identified time delay parameters and thresholds are applied to actual construction control. Following the tiered strategy in step S8, during the sensitive section crossing and post-crossing impact phases, the continuous drainage volume exceeds... And the duration exceeds In key sections of the area, measures such as enhanced grouting and water plugging, and adjustments to the layout of drainage holes were implemented.

[0184] The three variables—time-delay corrected drainage volume, groundwater drawdown, and root zone water content—are plotted together in the same response space, and the results are as follows: Figure 9 As shown in the figure. This figure visually illustrates... → — The stepwise transmission path: as the drainage volume increases, the drawdown of the groundwater level increases; in Not exceeding Previously, the moisture content in the root zone decreased gradually, but once this critical value was exceeded, the rate of moisture content decrease increased significantly. Based on Figure 9 The response path shown, combined with actual monitoring data, implemented grouting and water-blocking measures during critical high drainage periods. Monitoring indicated that the groundwater level drawdown did not continue to exceed the target. The root zone moisture content remained stable at over 90% of the baseline value, and no obvious signs of vegetation degradation were observed, verifying the effectiveness and practicality of the method proposed in this invention for tunnel drainage control in ecologically sensitive areas.

[0185] The above embodiments are merely preferred examples of the present invention and are not intended to limit the present invention in any way. Although the present invention has been disclosed above with reference to preferred embodiments, it is not intended to limit the present invention. Therefore, any simple modifications, equivalent changes, and alterations made to the above embodiments based on the technical essence of the present invention without departing from the scope of the present invention should fall within the protection scope of the present invention.

Claims

1. A method for calculating the allowable drainage volume based on tunnels passing under ecologically sensitive areas, characterized in that, Includes the following steps: Step S1: Deploy a monitoring system to acquire data on tunnel drainage, groundwater level drawdown, root zone soil moisture content, and rainfall. Step S2: Preprocess the monitoring data, remove abnormal data and mark the periods of heavy rainfall disturbance; Step S3: Identify the drainage-groundwater response time lag and the groundwater-root zone moisture response time lag through hysteresis correlation analysis. Step S4: Based on the identified two-level time delay, the monitoring data is aligned with the time axis to construct the first paired sample set of drainage volume and groundwater level drawdown, and the second paired sample set of groundwater level drawdown and root zone water content. After removing samples from periods of heavy rainfall disturbance, the samples are divided into fitting samples and validation samples in chronological order. Step S5: Using the groundwater level drawdown and root zone soil moisture content data from the fitted sample, a continuous piecewise regression model is used to identify the ecological critical groundwater level drawdown. The continuous piecewise regression model takes the following form: ; in, This refers to the volumetric water content of the root zone soil. To lower the groundwater level; The turning point to be identified; For intercept parameters; for ≤ The slope reflects the slow rate of change of water content in the pre-critical root zone as the water level drops. for Compared to ≤ The slope change; parameter estimation is performed using the least squares method for a given candidate , respectively in ≤ and Perform linear regression on the two segments and calculate the overall sum of squared residuals. A grid search is performed within the range of values ​​to select the candidate value that minimizes the sum of squared residuals. The optimal estimate; Step S6: Establish a regression model using the drainage volume and groundwater level drawdown data from the fitted sample. Substitute the data obtained in step S5 into this model to retrieve the ecologically permissible drainage volume. The regression model is a linear regression model. ,in This refers to the tunnel's drainage volume. To lower the groundwater level, The regression slope, For the regression intercept; Substitute the values ​​into the regression model to solve for the corresponding displacement: , This refers to the ecologically permissible discharge volume.

2. The method for calculating the allowable drainage volume based on a tunnel passing under an ecologically sensitive area as described in claim 1, characterized in that, After obtaining the ecologically permissible discharge volume, the method also includes using independent validation samples to validate the model, evaluating the stability of the model using the Bootstrap resampling method, and providing confidence intervals; integrating time-delay parameters, ecological critical water levels, and permissible discharge volumes to form a graded engineering control strategy.

3. The method for calculating the allowable drainage volume based on a tunnel passing under an ecologically sensitive area according to claim 2, characterized in that, The method for obtaining the groundwater level drawdown in step S1 is as follows: multiple groundwater observation points are set up in ecologically sensitive areas, and the drawdown is calculated. Each observation point is at Groundwater level drawdown at any given time: ; in, The first under stable conditions before construction Groundwater level elevation at each observation point During the construction process Time of the first The groundwater level elevation at each observation point is used; the average drawdown at multiple effective observation points is used to characterize the overall degree of groundwater disturbance.

4. The method for calculating the allowable drainage volume based on a tunnel passing under an ecologically sensitive area according to claim 3, characterized in that, The data preprocessing in step S2 specifically includes the following sub-steps: (1) taking the stable monitoring period before the face enters the ecologically sensitive section as the baseline period and calculating the baseline values ​​of each observation index; (2) removing equipment failure or abnormal data and using linear interpolation of adjacent time periods to fill in short-term missing data; (3) setting a heavy rainfall screening threshold and marking the period of heavy rainfall disturbance.

5. The method for calculating the allowable drainage volume based on a tunnel passing under an ecologically sensitive area according to claim 4, characterized in that, The identification method for the drainage-groundwater response time lag in step S3 is as follows: Pearson correlation analysis is performed on the tunnel drainage volume and the groundwater level drawdown under different lag days, and the correlation coefficient is: ; in, for and lag groundwater level drawdown The Pearson correlation coefficient between them; It is a time lag variable; This represents the tunnel's average daily drainage volume. For Pearson correlation coefficient operators; for The depth of groundwater level at any given time; It is a time variable; The lag time is the main response time lag of drainage to groundwater: ; in, The response time delay for tunnel drainage to transmit changes in groundwater level. To return the independent variable that maximizes the objective function. The value of .

6. The method for calculating the allowable drainage volume based on a tunnel passing under an ecologically sensitive area according to claim 5, characterized in that, The specific method for aligning the time axis in step S4 is as follows: The drainage volume... and lag Subsequent groundwater level drawdown Alignment to form the first paired sample set ; Groundwater level drawdown sequence and lag Post-root zone water content Align to form a second paired sample set The unified time correspondence is as follows: → → ;in This represents the tunnel's average daily drainage volume. for The depth of groundwater level at any given time. for The root zone soil volumetric water content at a given time. for The root zone soil volumetric water content at a given time. The response time lag of groundwater level changes to soil moisture transfer in the root zone.

7. The method for calculating the allowable drainage volume based on a tunnel passing under an ecologically sensitive area as described in claim 6, characterized in that, The model validation using independent validation samples employs a hold-out validation approach, calculating the coefficient of determination for both the drainage-groundwater linear model and the groundwater-root zone moisture piecewise model. Root mean square error and mean absolute error Three evaluation metrics; the specific operation of the Bootstrap resampling method is as follows: perform 1000 resampling cycles with replacement on the fitted samples, with each resampling cycle performed independently. Identification and The inversion was performed, and the results of multiple calculations were recorded. The 2.5% and 97.5% quantiles were used to construct 95% confidence intervals.

8. The method for calculating the allowable drainage volume based on a tunnel passing under an ecologically sensitive area according to claim 7, characterized in that, The hierarchical engineering control strategy is as follows: The three core variables after time delay correction are plotted as a comprehensive response path diagram for intuitive display. → →θ's step-by-step transmission characteristics, and formulate a hierarchical control strategy based on this path; when the discharge volume is lower than And the groundwater level drawdown is significantly less than When the discharge volume is within a safe range, maintain routine monitoring; when the short-term peak discharge volume exceeds... However, if the groundwater level has not yet continued to decline, it is important to strengthen water level monitoring and not judge the ecological impact solely based on a single day's peak value; when the drainage volume is consistently higher than [a certain value], [further measures should be taken]. And the groundwater level drawdown is gradually approaching When the soil moisture content in the root zone shows a continuous downward trend, it is considered a warning zone, and measures such as grouting to block water or optimizing drainage paths are taken. When the soil moisture content in the root zone shows a continuous downward trend, it is upgraded to a protection zone, and the drainage intensity is reduced and the monitoring frequency is increased.

Citation Information

Patent Citations

  • Mountain tunnel waterproof and drainage system displacement control method adapting to ecological water demand

    CN116227722A

  • Tunnel buffering multi-layer waterproof and drainage structure, construction method and construction equipment

    CN120367650A