A wastewater treatment device and a wastewater treatment method for processing traditional Chinese medicine.
By introducing a bar screen unit and a flow guiding unit into the wastewater treatment equipment, the diversion and stratified conveying of particles with a high interception rate is achieved, solving the problem of insufficient particle content in the aerobic and anaerobic processes in the existing technology and improving the wastewater treatment efficiency.
Patent Information
- Application Number
- CN202611552332.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-09
- Publication Date
- 2026-11-10
AI Technical Summary
Existing wastewater treatment equipment, even with high screen interception rates, struggles to effectively reduce particle content in aerobic and anaerobic processes, resulting in insufficient treatment efficiency.
Design a wastewater treatment device including a bar screen, an aerobic tank, and an anaerobic tank. By combining bar screen units and flow guiding units, a constant bar screen is formed using rotatable baffles. Combined with multi-chamber diversion and heating vibration, particle separation and conveying are achieved, thereby increasing the particle content in the aerobic and anaerobic tanks.
While ensuring a high interception rate, the efficiency of wastewater treatment has been improved. By using particle diversion and stratified transportation, the biomass of aerobic and anaerobic processes has been enhanced, thereby improving the overall treatment effect.
Smart Images

Figure CN123062022A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of wastewater treatment technology, specifically a wastewater treatment device and a wastewater treatment method for processing traditional Chinese medicine. Background Technology
[0002] In wastewater treatment, screens first intercept particles to reduce the difficulty of subsequent treatment processes. The particle interception rate of a screen is related to the size of the screen openings. The amount of aerobic particles in the aerobic process and the amount of anaerobic particles in the anaerobic process significantly affect the individual and overall treatment efficiency. Particles determine not only solid-liquid separation and biomass retention by quantity, but also degradation rate, shock resistance, and tolerance to toxic substances by particle mass. A higher screen interception rate results in less total particulate solids entering the biological treatment stage, thus reducing the content of aerobic and anaerobic particles in both the aerobic and anaerobic processes. Summary of the Invention
[0003] In view of the above situation and to overcome the defects of the prior art, the embodiments of this application aim to provide a wastewater treatment device and a wastewater treatment method for processing traditional Chinese medicine, which, while ensuring the bar screen interception rate, increases the content of aerobic and anaerobic particles in the aerobic and anaerobic processes to improve wastewater treatment efficiency.
[0004] To achieve the above objectives, a wastewater treatment device includes at least a screen tank, an aerobic tank, and an anaerobic tank, wherein the aerobic tank and the anaerobic tank are connected in parallel or in series downstream of the screen tank, and further includes: A pipeline system is installed inside the grit chamber and extends into the aerobic and anaerobic tanks, wherein the pipeline system forms a connection between at least three ends of the grit chamber, the aerobic tank, and the anaerobic tank; Multiple grid units are configured inside the grid pool and oriented towards the direction of water flow impact. Each grid unit includes a baffle that can rotate relative to the grid pool. A grid gap is formed between the baffles, and the minimum gap of the grid gap remains consistent during the rotation of the baffles. A flow guiding unit is disposed downstream of the grid unit. An opening is provided on the side of the flow guiding unit that communicates with the grid unit so that at least part of the water flow can enter the interior of the flow guiding unit from the grid unit. The flow guiding unit includes a box body, and a first chamber, a second chamber, and a third chamber are provided inside the box body along the water flow channel. The stop bar has at least one impact surface along its axial direction, and the planes containing the impact surfaces of at least two of the stop bars are parallel.
[0005] In one or more embodiments of this application, the grille unit is configured with a drive mechanism connected to the stop bar, and drives the stop bar to rotate between a first intercept position and a first avoidance position. When the stop bar switches between the first intercept position and the first avoidance position, the grille extension path is offset. A grid frame is provided on the outside of the stop bar, and at least part of both ends of the stop bar are inserted into the inside of the grid frame, and the stop bar can rotate relative to the grid frame.
[0006] In one or more embodiments of this application, the bar screen pool is divided into an upper layer and a lower layer, the bar screen unit is disposed in the upper layer and extends to the lower layer, the lower layer is provided with a flushing channel, and the flushing channel connects the upper layer and the lower layer; A guide rod is provided on the outside of the grid frame, which controls the up and down movement of the grid frame. When the grid frame moves downward, the stop rod disengages from the drive mechanism. A scraper is provided on the outside of the grid frame. The scraper moves with the grid frame so that it can contact and scrape off residual particles on the impact surface.
[0007] In one or more embodiments of this application, the first chamber includes: A first buffer plate is inclinedly disposed inside the box, and an opening is provided on one side of the first buffer plate; The first guide plate is located below the first buffer plate; The first guide plate is provided with a middle channel and a side channel, and the depth of the middle channel is less than the depth of the side channel. The opening is opened towards the first guide plate and is located at the upper part of the middle channel, so that the water flow falls into the middle channel from the opening and generates a lateral flow.
[0008] In one or more embodiments of this application, the second chamber includes: The second buffer plate is disposed inside the housing; The second guide plate is disposed on the lower side of the second buffer plate, and a blocking element is disposed on the side of the second guide plate facing the second buffer plate; A molded block is disposed on the upper part of the second buffer plate and welded to the second buffer plate; The barrier is attached to the outer wall of the second guide plate and is configured as a weir structure. The flow channel at the second buffer plate narrows at the block and forms turbulence at the rear of the block.
[0009] In one or more embodiments of this application, a cavity is provided inside the housing, a slide is disposed inside the cavity, an electromagnet is provided at the sliding end of the slide, and the blocking member is made of magnetic material, so that the slide can drive the blocking member to change position through the electromagnet.
[0010] In one or more embodiments of this application, the third chamber includes: The third buffer plate is disposed inside the box; The third guide plate is disposed inside the box body, and a heating unit is disposed at the bottom of the third guide plate. The heating unit is attached to the outer wall of the third guide plate and embedded in the third guide plate, so that the water flow forms an upward thermal convection on the third guide plate. A vibrating plate is disposed on the upper side of the third guide plate. The vibrating plate, the third guide plate, and the heating unit are disposed vertically and vertically respectively. The third guide plate is disposed at an angle inside the housing.
[0011] In one or more embodiments of this application, a first partition and a second partition are provided inside the first cavity. Both the first partition and the second partition are slidably installed inside the first cavity, and both the first partition and the second partition are inclined.
[0012] In one or more embodiments of this application, the piping system includes a connector and a recovery pipe. The connector is disposed on the outside of the housing and connected to the housing. The recovery pipe is connected to the connector via a pipe fitting, so that the recovery pipe can communicate with the second chamber and the third chamber through the connector. The first and second recycling boxes are provided on the side of the recycling pipe away from the connector. The first and second recycling boxes are connected to the recycling pipe, and each of the first and second recycling boxes is equipped with a pump assembly. The outlet end of the pump assembly is provided with a supply pipe, which extends to the aerobic tank and the anaerobic tank respectively.
[0013] A wastewater treatment method for processing traditional Chinese medicine includes the following steps: The wastewater to be treated is introduced into the bar screen tank; The grid gaps formed by the baffles in the grid unit that can rotate relative to the grid pool are used to intercept fibrous materials and large solids in the wastewater. The grid gaps remain consistent along the baffle axis at the minimum gap during the rotation of the baffle. At least a portion of the water flow enters the tank through the opening on one side that connects the grid unit and the flow guiding unit; The water entering the tank flows sequentially through the first chamber, the second chamber, and the third chamber. In the first chamber, the coarser fibers are initially separated; in the second chamber, the dense anaerobic particles are enriched; and in the third chamber, the aerobic particles are floated or stratified. Through a pipeline system installed in the grit chamber and extending to the aerobic and anaerobic tanks, the stratified or enriched particles in the second and third chambers are transported to the anaerobic and aerobic tanks respectively to supplement and increase the particulate biomass in each biological segment.
[0014] Compared with the prior art, the beneficial effects of the present invention are: 1. This application can improve the efficiency of wastewater treatment in aerobic and anaerobic processes while ensuring a high interception rate of the screen. After the particles are intercepted by the screen, the particles are diverted and the aerobic and anaerobic particles are transported to the aerobic tank and anaerobic tank according to the needs of the aerobic and anaerobic processes to improve the treatment efficiency.
[0015] 2. The system uses a grid for interception, a three-chamber diversion system, adjustable interceptor for enrichment, and heating and vibration to differentiate particles. This system can recover fibers, anaerobic particles, and aerobic particles while maintaining the biomass and treatment efficiency of the anaerobic and aerobic sections. Attached Figure Description
[0016] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used together with the embodiments of the invention to explain the invention and do not constitute a limitation thereof.
[0017] In the attached diagram: Figure 1 This is a schematic diagram of wastewater treatment equipment. Figure 2 This is a schematic diagram of the grating pool used in this application. Figure 1 ; Figure 3 This is a schematic diagram of the grating pool used in this application. Figure 2 ; Figure 4 This is a schematic diagram of the internal structure of the bar screen in this application; Figure 5 This is a schematic diagram of the grille unit and the flow guiding unit of this application; Figure 6 This is a schematic diagram of the grille unit in this application; Figure 7 This is a schematic diagram of the grid frame in this application; Figure 8 This is a schematic diagram of the gate slot in this application; Figure 9 This is a schematic diagram of the scraper in this application; Figure 10 This is a schematic diagram of the flow guiding unit in this application; Figure 11 This is a schematic diagram of the box structure of this application; Figure 12 This is a plan view of the internal structure of the enclosure in this application; Figure 13 This is a schematic diagram of the internal structure of the box in this application; Figure 14 This is a schematic diagram of the first guide vane structure of this application; Figure 15 This is a schematic diagram of the second buffer plate structure of this application; Figure 16 This is a schematic diagram of the third guide plate structure in this application.
[0018] In the diagram: 100, grit chamber; 200, aerobic tank; 300, anaerobic tank; 400, piping system; 10. Grille unit; 20. Flow guide unit; 30. Housing; 40. Drive mechanism; 11. Grille frame; 12. Baffle bar; 13. Grille slot; 14. Impact surface; 15. Flushing channel; 16. Guide bar; 17. Scraper; 21. First chamber; 211. First buffer plate; 212. First guide plate; 213. Intermediate trough; 214. Side trough; 22. Second chamber; 221. Second buffer plate; 222. Second guide plate; 223. Molded block; 224. Barrier component; 225. Slide table; 226. Electromagnet; 23. Third chamber; 231. Third buffer plate; 232. Third guide plate; 233. Heating unit; 234. Vibrating plate; 24. First partition; 25. Second partition; 41. Connector; 42. Recycling pipe; 43. First recycling bin; 44. Second recycling bin; 45. Pump assembly; 46. Supply pipe. Detailed Implementation
[0019] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of the present invention.
[0020] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of this application. The terms “comprising” and “having”, and any variations thereof, are intended to cover non-exclusive inclusion.
[0021] In the description of the embodiments of this application, the technical terms "first," "second," "third," etc., are used only to distinguish different objects and should not be construed as indicating or implying relative importance or implicitly specifying the number, specific order, or primary and secondary relationship of the indicated technical features. In the description of the embodiments of this application, "multiple" means two or more, unless otherwise explicitly defined.
[0022] In this document, the term "embodiment" means that a particular feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a separate or alternative embodiment mutually exclusive with other embodiments. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments.
[0023] In the description of the embodiments of this application, unless otherwise expressly specified and limited, technical terms such as "installation" and "connection" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. For those skilled in the art, the specific meaning of the above terms in the embodiments of this application can be understood according to the specific circumstances.
[0024] This application provides a wastewater treatment device, see the attached embodiment. Figure 1 As shown, it includes at least a bar screen 100, an aerobic tank 200, and an anaerobic tank 300, wherein several treatment processes are provided between the bar screen 100 and the aerobic tank 200 and the anaerobic tank 300. For example, a grit chamber and an equalization tank are also provided between the bar screen 100 and the aerobic tank 200 and the anaerobic tank 300.
[0025] It should be noted that the wastewater treatment equipment provided in this application can be configured underground, installed at a high altitude using a frame, or mounted on the ground. The pool structure described in this application can be constructed by welding steel materials or by casting.
[0026] See Figures 2-3 As shown, a pipeline system 400 is provided between the bar screen 100, the aerobic tank 200, and the anaerobic tank 300. The pipeline system 400 connects the bar screen 100, the aerobic tank 200, and the anaerobic tank 300 at at least three ends. When the pipeline system 400 is connected, the bar screen 100 can deliver particles to the aerobic tank 200 or the anaerobic tank 300.
[0027] See Figures 4-5 As shown, a grid pool 100 is provided with a grid unit 10 and a flow guiding unit 20. The flow guiding unit 20 is located downstream of the grid unit 10 and corresponds to the grid slot 13 of the grid unit 10.
[0028] See Figures 5-9As shown, the grid unit 10 is movably configured with a plurality of rotatable baffles 12 and a drive mechanism 40. The baffles 12 are rotatable and form a grid slit 13 on one side of the baffles 12. The grid slit 13 remains consistent along the axial direction of the baffles 12 at the minimum gap during the rotation of the baffles 12.
[0029] The baffle 12 can be used to intercept particles. The drive mechanism 40 can control the baffle 12 to rotate between a first interception position and a first avoidance position, so that the position of the grid slit 13 is adjusted after interception for a period of time. When the baffle 12 switches between the first interception position and the first avoidance position, the grid slit 13 is offset.
[0030] Understandably, the baffle 12 is provided with at least one impact surface 14 along its axial direction, and the planes containing the impact surfaces 14 of at least two baffles 12 are parallel, that is, the planes containing the impact surfaces 14 of at least two baffles 12 do not intersect. In this way, on the one hand, in two adjacent baffles 12, the impact surface 14 of at least one baffle 12 is arranged facing the direction in which the wastewater flows into the bar screen 100, so as to increase the contact area between the particles in the wastewater and the baffle 12; on the other hand, the impact surfaces 14 between adjacent baffles 12 can be used alternately, and when the baffle 12 rotates, the outer contour shape of the baffles 12 on both sides of the bar screen 13 facing the direction of the wastewater flow can be switched.
[0031] In another embodiment, the impact surface 14 is inclined along the axial direction of the stop rod 12, that is, the plane containing the impact surface 14 intersects the axial direction of the stop rod 12. It should be noted that when the impact surface 14 is inclined, the width of the impact surface 14 corresponding to the stop rod 12 will change, the width of the impact surface 14 on one side of the stop rod 12 will decrease, and the width of the impact surface 14 on the other side of the stop rod 12 will increase.
[0032] In this embodiment, the structural design of the inclined impact surface 14 can be varied. For example, the impact surface 14 may have two inclined directions, the width of the two sides of the impact surface 14 may be greater than the width of the middle, or the width of the two sides of the impact surface 14 may be less than the width of the middle. This embodiment does not impose any restrictions.
[0033] In some feasible embodiments, the grid unit 10 also includes a grid frame 11 detachably installed in the grid pool 100, a stop bar 12 movably embedded inside the grid frame 11 and rotatable relative to the grid frame 11, the two ends of the stop bar 12 being axially inserted into the inner side of the grid frame 11, and a drive mechanism 40 being fixedly installed on the grid pool 100 outside the grid frame 11 and axially connected to the stop bar 12, the drive mechanism 40 driving the stop bar 12 to rotate synchronously.
[0034] Furthermore, multiple grid units 10 are provided, and multiple grid units 10 are arranged in parallel. The grid frame 11 can move up and down relative to the grid pool 100. The upper part of the grid frame 11 is provided with a scraper 17, which is fixedly installed on the outside of the grid frame 11 and can contact the impact surface 14 in the grid unit 10.
[0035] It should be noted that the bar screen 100 is divided into upper and lower layers. The upper layer of the bar screen 100 is used to intercept particles in the wastewater, and the lower layer is used to divert the intercepted particles. When the bar screen unit 10 is in the interception state, it is located in the upper layer of the bar screen 100. When the particles are recycled, the bar screen unit 10 moves to the lower layer of the bar screen 100.
[0036] Furthermore, a flushing channel 15 is provided inside the bar screen 100. The flushing channel 15 connects the upper layer of the bar screen unit 10 and the lower layer of the bar screen unit 10. When the bar screen passes through the flushing channel 15, the wastewater is flushed by the interception and separation side of the bar screen frame 11, so that the particles are carried into the flow guiding unit 20 by the wastewater flow for particle diversion.
[0037] The scraper 17 is detachably mounted on the outside of the grid frame 11 by bolts, and the contact position between the scraper 17 and the stop bar 12 is made of flexible material so that the scraper 17 can deform when it contacts the stop bar 12.
[0038] In some embodiments, the drive mechanism 40 and the stop bar 12 are detachably plugged in. When the stop bar 12 is inserted into the drive mechanism 40, the drive mechanism 40 can drive the stop bar 12 to rotate. When the stop bar 12 is disengaged from the drive mechanism 40, the position of the stop bar 12 is fixed. A guide rod 16 is provided at one end of the grid frame 11. The guide rod 16 is arranged axially along the stop bar 12, and the telescopic end of the guide rod 16 is fixedly installed on the outside of the grid frame 11.
[0039] It should be noted that the mounting end of the guide rod 16 is detachably connected to the bar screen 100. The guide rod 16 extends and retracts to push the bar screen frame 11, causing the baffle rod 12 to slide up and down. When the guide rod 16 pushes the bar screen frame 11 downward, the baffle rod 12 disengages from the drive mechanism 40. When the guide rod 16 pushes the bar screen frame 11 upward, the baffle rod 12 can re-engage with the drive mechanism 40, and the drive mechanism 40 drives the baffle rod 12 to rotate to change the position of the impact surface 14.
[0040] The stop lever 12 is configured as an engagement end on the side facing the drive mechanism 40. The stop lever 12 engages with the drive mechanism 40 through the engagement end to transmit power.
[0041] In this embodiment, the structure of the engagement end of the stop lever 12 is not limited, and those skilled in the art can design it themselves. For example, the stop lever 12 and the engagement end are connected by snap-fit, magnetic attraction, or plug-in to realize the function of the drive mechanism 40 driving the stop lever 12 to rotate.
[0042] See Figures 10-16 As shown, in some feasible embodiments, the flow guiding unit 20 is provided with a box 30, and the box 30 is configured with a first chamber 21, a second chamber 22 and a third chamber 23. The first chamber 21, the second chamber 22 and the third chamber 23 are connected in sequence. Wastewater containing particles intercepted by the grid unit 10 passes through the first chamber 21, the second chamber 22 and the third chamber 23 in sequence to achieve the separation of fibers, anaerobic particles and aerobic particles in the wastewater.
[0043] In some embodiments, the first chamber 21 includes a first buffer plate 211 and a first guide plate 212. The first buffer plate 211 is fixedly installed in the first chamber 21, and the first guide plate 212 is located below the first buffer plate 211 and is fixedly connected to the first chamber 21. The first guide plate 212 is disposed on the side of the first chamber 21 away from the side where the first buffer plate 211 is installed.
[0044] The first buffer plate 211 is inclined, and the side of the first buffer plate 211 facing the first guide plate 212 is higher than the side of the first buffer plate 211 facing away from the first guide plate 212. The first guide plate 212 has a middle groove 213 and a side groove 214 on the side facing the first buffer plate 211. The depth of the side groove 214 is greater than the depth of the middle groove 213. Wastewater falls from the first buffer plate 211 into the middle groove 213 and generates lateral diversion, the streamline is bent, and a lateral velocity component is generated.
[0045] Understandably, the first buffer plate 211 has an opening on the side facing the first guide plate 212 to allow wastewater to flow into the intermediate tank 213 through the first guide plate 212. At least one opening is provided to ensure that wastewater can flow accurately into the intermediate tank 213.
[0046] In some embodiments, the second chamber 22 includes a second buffer plate 221, a second guide plate 222, and a block 223. The second buffer plate 221 is located below the first buffer plate 211 and is fixedly installed inside the housing 30. The block 223 is located on both sides of the second buffer plate 221 and is welded to the housing 30 and the second buffer plate 221. The block 223 is at least partially melted and connected to the housing 30 and the second buffer plate 221 so that the flow channel at the second buffer plate 221 narrows at the block 223 and turbulence is formed at the rear of the block 223.
[0047] Understandably, wastewater flows in the first chamber 21 and the second chamber 22 to form flow channels, while the first buffer plate 211, the second buffer plate 221, the first guide plate 212, the second guide plate 222 and the block 223 are used to change the flow state of the wastewater, that is, to achieve the initial separation of particles through the flow of wastewater.
[0048] The second guide plate 222 is located below the first guide plate 212 and is fixed inside the housing 30. The housing 30 has a cavity inside, and the inner wall of the cavity is on the same plane as the bottom surface of the second guide plate 222. A blocking member 224 is provided on the side of the second guide plate 222 away from the cavity, and the blocking member 224 is attached to the outer wall of the second guide plate 222.
[0049] The barrier 224 forms a weir structure in the water flow, enabling the enrichment of anaerobic particles upstream of the barrier 224.
[0050] It should be noted that the blocking member 224 is attached to the surface of the second guide plate 222, and the position of the blocking member 224 will affect the enrichment of particles in the flow field. Therefore, a slide 225 is provided inside the cavity. The slide 225 is detachably installed on the inner wall of the cavity, and the blocking member 224 is made of magnetic material. An electromagnet 226 is provided at the sliding end of the slide 225. The electromagnet 226 and the blocking member 224 are magnetically coupled to realize the adjustment of the position of the blocking member 224.
[0051] In another embodiment, the second buffer plate 221 consists of two parts: the first part is a plate body with a contraction channel, and the second part is a top plate set on the upper part of the plate body. After the wastewater is guided by the middle channel 213 and the side channel 214 of the first guide plate 212, the wastewater in the middle channel 213 falls into the top plate for diversion, and the wastewater in the side channel 214 enters the contraction channel in the plate body. Part of the wastewater is guided by the block 223.
[0052] In some embodiments, the third chamber 23 is provided with a third buffer plate 231, a third guide plate 232, a heating unit 233 and a vibration plate 234. The third guide plate 232 is fixedly installed inside the housing 30. The third buffer plate 231 is located between the third guide plate 232 and the second guide plate 222. The vibration plate 234 is located on the upper part of the third guide plate 232 and is detachably installed inside the housing 30.
[0053] The vibrating plate 234, the third guide plate 232 and the heating unit 233 are positioned vertically. The heating unit 233 is detachably embedded inside the third guide plate 232 to heat the third guide plate 232, forming an upward thermal convection. The aerobic particles are carried upward by the upflow. The vibrating plate 234 generates periodic acceleration and local shear, which promotes particle size classification and destroys the flocculent agglomeration structure.
[0054] To further facilitate the settling or migration of anaerobic particles towards the wall, the third guide plate 232 is inclined, allowing the anaerobic particles to gather at one location during their movement, thus enabling their separation.
[0055] In some embodiments, a first partition 24 and a second partition 25 are provided inside the housing 30. Both the first partition 24 and the second partition 25 are inclined. Both the first partition 24 and the second partition 25 are slidably installed inside the first chamber 21. The first partition 24 is located on the upper part of the first buffer plate 211, and the second partition 25 is located between the first buffer plate 211 and the first guide plate 212.
[0056] The first partition 24 and the second partition 25 are set after the wastewater enters the tank 30. They can be used to separate some of the coarser fibers. As the fibers accumulate and are impacted by the wastewater, they gradually slide down along the first partition 24 and the second partition 25 and fall out of the tank 30, so that the fibers can be recycled.
[0057] In some embodiments, the piping system 400 includes a connector 41 and a recovery pipe 42. The piping system 400 is installed on the outside of the housing 30 and communicates with the second chamber 22 and the third chamber 23. The recovery pipe 42 is connected to the connector 41 to achieve the separation of anaerobic particles and aerobic particles.
[0058] To improve the recovery rate of anaerobic and aerobic particles, the connector 41 is connected to multiple recovery pipes 42. The connector 41 is angled to facilitate the transition of particles from inside the housing 30 to the recovery pipes 42.
[0059] Understandably, a first recycling box 43 and a second recycling box 44 are provided at the end of the recycling pipe 42, which are used to recycle anaerobic particles and aerobic particles respectively. Pump assemblies 45 can be detachably installed on the outside of the first recycling box 43 and the second recycling box 44. A supply pipe 46 is provided at the outlet end of the pump assembly 45 and connected to the supply pipe 46. The supply pipe 46 extends into the anaerobic tank 300 and the aerobic tank 200 respectively, and supplies anaerobic particles and aerobic particles through the pump assembly 45.
[0060] In some embodiments, the anaerobic tank 300 is equipped with an anaerobic system, and the aerobic tank 200 is equipped with an aerobic system. Under anaerobic conditions, the anaerobic system decomposes organic matter by anaerobic microorganisms, producing gases such as methane and carbon dioxide and enriching high-density particles. Under aerobic conditions, the aerobic system oxidizes organic matter into carbon dioxide and water by aerobic microorganisms.
[0061] This application also provides a wastewater treatment method for processing traditional Chinese medicine, used in the aforementioned wastewater treatment equipment, comprising the following steps: Water is introduced into the bar screen 100, and multiple rotatable baffles 12 form a grid slit 13 through the bar screen unit 10 installed in the bar screen 100, which intercepts fibrous materials and large solids in the water.
[0062] The intercepted particles are washed through the flushing channel 15 in the grid pool 100 and transported to the box 30 of the flow guiding unit 20. Wastewater flows sequentially through the first chamber 21 inside the tank 30, and lateral diversion occurs at the intermediate channel 213 and the side channel 214 formed by the first buffer plate 211 and the first guide plate 212, so that coarser fibers are intercepted or laterally diverted and recycled in the first chamber 21.
[0063] Wastewater treated in the first chamber 21 enters the second chamber 22. The second buffer plate 221 and the block 223 cause local turbulence and narrow the flow channel. An adjustable barrier 224 set on one side of the second guide plate 222 forms a weir structure, and dense anaerobic particles are enriched upstream of the barrier 224.
[0064] Wastewater treated in the second chamber 22 is introduced into the third chamber 23. In the third chamber 23, the third guide plate 232 or local water is heated to generate upward thermal convection. At the same time, the vibrating plate 234 installed at the top is subjected to periodic vibration, so that aerobic particles are carried by the upward flow and undergo particle size classification and stratification with anaerobic particles.
[0065] The aerobic and anaerobic particles that are layered or enriched in the third chamber 23 and the second chamber 22 are respectively introduced into the corresponding first recovery box 43 and second recovery box 44 through the pipeline system 400, connector 41 and recovery pipe 42 outside the box 30.
[0066] After the anaerobic and aerobic particles recovered from the recycling bin pass quality and activity tests, the anaerobic particles are returned to the anaerobic tank 300 and the aerobic particles are returned to the aerobic tank 200 through the pump assembly 45 and the supply pipe 46, respectively, to supplement and increase the particulate biomass in the anaerobic and aerobic systems.
[0067] Based on online monitoring of flow rate, liquid level, SS / turbidity, recovery tank weight, temperature, VFA and effluent indicators, the system automatically adjusts the position of the barrier 224, the power of the heating unit 233, the frequency / amplitude of the vibrating plate 234 and the interception / avoidance cycle of the grid baffle 12 to maintain particle enrichment efficiency and activate bypass or buffer measures in abnormal operating conditions.
[0068] The above embodiments are merely illustrative of the technical solutions of this application and are not intended to limit it. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features therein. These modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this application, and all should be covered within the scope of this application. In particular, as long as there is no structural conflict, the various technical features mentioned in the embodiments can be combined in any way. This application is not limited to the specific embodiments disclosed herein.
Claims
1. A wastewater treatment device, comprising at least a bar screen (100), an aerobic tank (200), and an anaerobic tank (300), wherein the aerobic tank (200) and the anaerobic tank (300) are connected in parallel or in series downstream of the bar screen (100), characterized in that, Also includes: A pipeline system (400) is installed in the grit chamber (100) and extends to the aerobic tank (200) and the anaerobic tank (300). The pipeline system (400) connects at least three ends of the grit chamber (100), the aerobic tank (200) and the anaerobic tank (300). Multiple grid units (10) are disposed inside the grid pool (100) and oriented toward the direction of water flow impact. Each grid unit (10) includes a baffle (12) that can rotate relative to the grid pool (100). A grid gap (13) is formed between the baffles (12). The minimum gap of the grid gap (13) remains constant during the rotation of the baffles (12). A flow guiding unit (20) is disposed downstream of the grid unit (10). The flow guiding unit (20) is provided with an opening on the side connected to the grid unit (10) so that at least part of the water flow can enter the interior of the flow guiding unit (20) from the grid unit (10). The flow guiding unit (20) includes a box (30). The box (30) is provided with a first chamber (21), a second chamber (22) and a third chamber (23) along the water flow channel inside the box (30). The stop bar (12) is provided with at least one impact surface (14) along its axial direction, and the planes containing the impact surfaces (14) of at least two of the stop bars (12) are parallel.
2. The wastewater treatment equipment according to claim 1, characterized in that: The grille unit (10) is configured with a drive mechanism (40) connected to the baffle (12) and drives the baffle (12) to rotate between the first intercept position and the first avoidance position. When the baffle (12) switches between the first intercept position and the first avoidance position, the extension path of the grille slot (13) is offset. A grid frame (11) is provided on the outside of the stop bar (12), and at least part of both ends of the stop bar (12) are inserted into the inside of the grid frame (11), and the stop bar (12) is rotatable relative to the grid frame (11).
3. The wastewater treatment equipment according to claim 2, characterized in that: The bar screen pool (100) is divided into an upper layer and a lower layer. The bar screen unit (10) is arranged in the upper layer and extends to the lower layer. The lower layer is provided with a flushing channel (15), which connects the upper layer and the lower layer. A guide rod (16) is provided on the outside of the grid frame (11). The guide rod (16) controls the grid frame (11) to move up and down. When the grid frame (11) moves down, the stop rod (12) disengages from the drive mechanism (40). A scraper (17) is provided on the outside of the grid frame (11). The scraper (17) moves with the grid frame (11) so that the scraper (17) can contact and scrape off the residual particles on the impact surface (14).
4. The wastewater treatment equipment according to claim 1, characterized in that: The first chamber (21) includes: The first buffer plate (211) is inclinedly disposed inside the box (30), and an opening is provided on one side of the first buffer plate (211); The first guide plate (212) is located below the first buffer plate (211); The first guide plate (212) is provided with a middle groove (213) and a side groove (214), and the depth of the middle groove (213) is less than the depth of the side groove (214). The opening is opened towards the first guide plate (212) and the opening is located at the upper part of the middle groove (213) so that the water flow falls into the middle groove (213) from the opening and generates a lateral flow.
5. The wastewater treatment equipment according to claim 1, characterized in that: The second chamber (22) includes: The second buffer plate (221) is disposed inside the housing (30); The second guide plate (222) is disposed on the lower side of the second buffer plate (221), and the second guide plate (222) is provided with a blocking member (224) on the side facing the second buffer plate (221). A molding block (223) is disposed on the upper part of the second buffer plate (221) and welded to the second buffer plate (221); The barrier (224) is attached to the outer wall of the second guide plate (222), and the barrier (224) is configured as a weir structure. After the flow channel at the second buffer plate (221) narrows at the block (223), turbulence is formed at the rear of the block (223).
6. The wastewater treatment equipment according to claim 5, characterized in that: The housing (30) has an internal cavity, and a slide (225) is arranged inside the cavity. An electromagnet (226) is provided at the sliding end of the slide (225), and the blocking member (224) is made of magnetic material, so that the slide (225) can drive the blocking member (224) to change position through the electromagnet (226).
7. The wastewater treatment equipment according to claim 1, characterized in that: The third chamber (23) includes: The third buffer plate (231) is disposed inside the box (30); The third guide plate (232) is disposed inside the box (30), and a heating unit (233) is disposed at the bottom of the third guide plate (232). The heating unit (233) is attached to the outer wall of the third guide plate (232) and embedded in the third guide plate (232) so that the water flow forms an upward thermal convection in the third guide plate (232). A vibrating plate (234) is disposed on the upper side of the third guide plate (232). The vibrating plate (234), the third guide plate (232), and the heating unit (233) are disposed vertically and vertically respectively. The third guide plate (232) is disposed obliquely inside the housing (30).
8. The wastewater treatment equipment according to claim 4, characterized in that: The first chamber (21) is provided with a first partition (24) and a second partition (25). The first partition (24) and the second partition (25) are both slidably installed inside the first chamber (21), and the first partition (24) and the second partition (25) are both inclined.
9. The wastewater treatment equipment according to claim 1, characterized in that: The piping system (400) includes a connector (41) and a recovery pipe (42). The connector (41) is located outside the housing (30) and connected to the housing (30). The recovery pipe (42) is connected to the connector (41) through a pipe fitting so that the recovery pipe (42) can communicate with the second chamber (22) and the third chamber (23) through the connector (41). The first recycling tank (43) and the second recycling tank (44) are provided on the side of the recycling pipe (42) away from the connector (41). The first recycling tank (43) and the second recycling tank (44) are connected to the recycling pipe (42). The first recycling tank (43) and the second recycling tank (44) are both equipped with pump assemblies (45). The outlet end of the pump assembly (45) is provided with a supply pipe (46). The supply pipe (46) extends to the aerobic tank (200) and the anaerobic tank (300) respectively.
10. A wastewater treatment method for processing traditional Chinese medicine, used in the wastewater treatment equipment as described in any one of claims 1-9, characterized in that, Includes the following steps: The wastewater to be treated is introduced into the bar screen (100). The grid gap (13) formed by the baffle (12) in the grid unit (10) that can rotate relative to the grid pool (100) intercepts fibrous materials and large solids in the wastewater. During the rotation of the baffle (12), the minimum gap of the grid gap (13) remains consistent along the axial direction of the baffle (12). At least a portion of the water flows into the tank (30) through the opening on one side of the grid unit (10) that connects to the flow guiding unit (20); The water entering the tank (30) flows sequentially through the first chamber (21), the second chamber (22) and the third chamber (23). In the first chamber (21), the coarser fibers are initially separated. In the second chamber (22), the dense anaerobic particles are enriched. In the third chamber (23), the aerobic particles are floated or stratified. The stratified or enriched particles in the second chamber (22) and the third chamber (23) are transported to the anaerobic tank (300) and the aerobic tank (200) respectively by the pipeline system (400) set in the grid tank (100) and extending to the aerobic tank (200) and the anaerobic tank (300) to supplement and increase the particulate biomass in each biological segment.