A compartmentalized steel-concrete composite bridge tower and its construction method

The design of compartmentalized steel-concrete composite bridge towers solves the problems of corrosion in reinforced concrete bridge towers and wind-induced vibration in pure steel bridge towers, achieving efficient irregular shapes and improved structural stability, simplifying the construction process and reducing costs.

CN123064087APending Publication Date: 2026-11-10GUANGDONG PROVINCE COMM PLANNING & DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611147869.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-30
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing cable-stayed bridges and suspension bridges mostly use reinforced concrete structures for their towers, which suffer from structural cracks, corrosion, and limited design options. Pure steel towers are costly and prone to wind-induced vibration, and it is difficult to achieve irregular shapes.

Method used

The bridge tower adopts a compartmentalized steel-concrete composite structure, which combines inner and outer double-layer steel plate sandwich structure with concrete, and horizontal and vertical stiffening ribs form a grid skeleton. The design of the steel bar holes is convenient and adaptable to various bridge tower structures, so as to achieve the coordinated stress of steel and concrete.

Benefits of technology

It improves the overall seismic, bending, and fatigue resistance of the bridge towers, simplifies the construction process, reduces project costs, enhances structural stability and load-bearing capacity, and adapts to the needs of different bridge types.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123064087A_ABST
    Figure CN123064087A_ABST
Patent Text Reader

Abstract

This invention discloses a compartmentalized steel-concrete composite bridge tower and its construction method. The tower is formed by splicing multiple compartmentalized steel-concrete composite tower columns end-to-end along its height. Each tower column includes an outer wall panel, an inner wall panel, compartment panels, horizontal stiffening ribs, vertical stiffening ribs, transverse reinforcement, vertical reinforcement, and concrete. The outer wall panel is coaxially positioned outside the inner wall panel and encloses a cavity. Multiple compartment panels are arranged within the cavity, dividing it into several independent compartments. Concrete is poured into each compartment to form a steel-concrete co-supporting system. Horizontal stiffening ribs are spaced apart within each compartment. Vertical stiffening ribs are fixed to the outer wall panel, inner wall panel, and compartment panels, forming a grid framework with interlaced horizontal and vertical stiffening ribs. First reinforcement holes are provided in the horizontal stiffening ribs for inserting vertical reinforcement, and second reinforcement holes are provided in the vertical stiffening ribs for inserting transverse reinforcement. This invention balances structural stiffness, allows for factory prefabrication and assembly, effectively improving the defects of concrete bridge towers being prone to cracking and steel bridge towers experiencing wind-induced instability. It is suitable for cable-stayed bridges and suspension bridges.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of bridge engineering technology, and more specifically, relates to a compartmentalized steel-concrete composite bridge tower and its construction method. Background Technology

[0002] With the rapid advancement of highway infrastructure construction in China, cable-stayed bridges have become widely used. Cable-stayed bridges and suspension bridges, as typical cable-stayed bridge systems, possess the advantage of ultra-long spans, making them the preferred bridge type for projects crossing rivers and valleys. The core load-bearing components of a cable-stayed bridge include the stay cables, towers, and main girder; the main load-bearing components of a suspension bridge are the main cables, suspenders, towers, anchorages, and main girder. Among these, the towers are the key vertical support components for both types of bridges, and the stay cables and main cables are anchored to the towers. Besides bearing the main vertical and horizontal loads, the towers also serve as the core element of the overall bridge aesthetic, exhibiting a rich variety of design forms.

[0003] In the current engineering field, cable-stayed bridges and suspension bridges mostly use reinforced concrete structures for their towers. Concrete bridge towers are prone to structural cracks after long-term service, and the corrosion resistance of the concrete itself and internal reinforcing steel is subject to stringent requirements. Bridges in harsh corrosive environments often require stainless steel reinforcement, significantly increasing project costs. For irregularly shaped landscape bridge towers, concrete structure construction presents significant limitations; constrained by standardized formwork, it is difficult to create novel and uniquely shaped towers.

[0004] While pure steel bridge towers can flexibly achieve various special and irregular shapes, their application is significantly limited. On the one hand, the cost of steel is relatively high, significantly increasing project investment; on the other hand, long-span cable-stayed bridges experience significant wind-induced effects, and the low damping ratio of steel towers makes them highly susceptible to wind-induced vibrations such as vortex-induced vibration and galloping. Furthermore, the relatively weak cross-sectional stiffness of steel towers makes them particularly vulnerable to buckling and overall instability. Simultaneously, steel towers need to transmit enormous internal forces, requiring substantial thickness of the tower's steel plates, which places extremely high demands on the quality of steel structure processing and welding. Summary of the Invention

[0005] To address the aforementioned deficiencies or improvement needs of existing technologies, this invention provides a compartmentalized steel-concrete composite bridge tower and its construction method. The compartmentalized steel-concrete composite bridge tower is vertically spliced ​​from multiple tower sections. Each tower section uses inner and outer double-layer steel plates to enclose a cavity. A compartmentalized plate within the cavity separates independent compartments, which are then filled with concrete. Flow holes are provided in the compartmentalized plates to allow the concrete to bleed together, ensuring the integrity of the concrete structure. Horizontal stiffening ribs are arranged within the compartments, and vertical stiffening ribs are fixed to the inner and outer wall plates and the compartmentalized plates. These intersect to form a grid framework, enhancing overall rigidity. The stiffening ribs have reinforcing bar holes for horizontal and vertical reinforcing bars, with various hole shapes facilitating rebar installation. The height of a single tower section ranges from 4500mm to 6000mm, making it suitable for transport and hoisting.

[0006] To achieve the above objectives, according to one aspect of the present invention, a compartmented steel-concrete composite bridge tower is provided, which is composed of multiple compartmented steel-concrete composite tower columns spliced ​​end-to-end along the height direction. Each compartmented steel-concrete composite tower column 1 includes an outer wall panel, an inner wall panel, a compartmentalized plate, horizontal stiffening ribs, vertical stiffening ribs, transverse reinforcing bars, vertical reinforcing bars, and concrete; wherein, The outer wall panel is coaxially arranged on the outside of the inner wall panel, and the two enclose each other to form a sandwich cavity. Multiple partition plates are fixedly installed between the outer wall panel and the inner wall panel. The partition plates divide the sandwich cavity into multiple independent compartments. Each compartment is filled with concrete, and the whole structure constitutes a steel-concrete composite load-bearing system that works together to bear loads. Each compartment has several horizontal stiffening ribs fixedly installed at intervals along its height direction. The inner sidewall of the outer wall panel and the outer sidewall of the inner wall panel are fixedly connected with multiple vertical stiffening ribs perpendicular to the horizontal stiffening ribs. Multiple vertical stiffening ribs perpendicular to the horizontal stiffening ribs are symmetrically fixedly connected to both sides of the compartment panel. The horizontal stiffening rib has a first reinforcing bar hole, and a vertical reinforcing bar is inserted inside the first reinforcing bar hole. The vertical stiffening rib has a second reinforcing bar hole, and a horizontal reinforcing bar is inserted inside the second reinforcing bar hole.

[0007] Furthermore, the outer wall panel includes two first horizontal plates and two first vertical plates. The two first horizontal plates are arranged in parallel to each other, and the two first vertical plates are respectively fixed to the two ends of the two first horizontal plates. The two first horizontal plates and the two first vertical plates together form a closed outer wall profile of the tower body.

[0008] Furthermore, the inner wall panel includes two second horizontal plates, two second vertical plates, and an inclined plate. The two second horizontal plates are arranged parallel to each other. Both ends of the second horizontal plates are fixedly fitted with inclined plates that are inclined towards the inside of the tower. The inner ends of the two inclined plates at the same end are fixedly connected to a second vertical plate. The second horizontal plate is parallel to the first horizontal plate, and the second vertical plate is parallel to the first vertical plate. The two second horizontal plates, the two second vertical plates, and the inclined plate together form a closed inner wall cavity of the tower.

[0009] Furthermore, the inner walls of the first horizontal plate and the first vertical plate are fixedly connected with a number of weld studs at equal intervals, and the inner walls of the second horizontal plate, the second vertical plate and the inclined plate are fixedly connected with a number of weld studs at equal intervals.

[0010] Furthermore, the horizontal stiffening rib has a through hole, through which the vertical stiffening rib passes.

[0011] Furthermore, the first and second reinforcing bar holes can be any one of closed type, open type, or open folded type.

[0012] Furthermore, when the bridge tower is used in cable-stayed bridge applications, a steel anchor box is provided on the inner side of the inner wall panel. The anchor plates on both sides of the steel anchor box are aligned with the partition plates, and the partition plates at the force transmission positions corresponding to the anchor plates are designed with a thickened structure.

[0013] Furthermore, when the bridge tower adopts a hybrid structure of upper and lower splicing, a concrete tower column is set at the lower part of the bridge tower, and a compartmentalized steel-concrete composite tower column is set at the upper part. In the joint area of ​​the two tower columns, the vertical reinforcing steel bars configured inside the concrete tower column extend upward from the top of the concrete tower column and extend into the interlayer cavity between the outer wall panel and the inner wall panel of the compartmentalized steel-concrete composite tower column.

[0014] Furthermore, when the bridge tower adopts a hybrid structure of upper and lower splicing, the lower part of the bridge tower is provided with a compartmentalized steel-concrete composite tower column, and the upper part is provided with a steel tower column. The connection between the compartmentalized steel-concrete composite tower column and the steel tower column is achieved by one of two force transmission structures. The first structure is to arrange a pressure plate at the joint position of the two tower columns. The second structure is to extend the vertical stiffening ribs inside the compartmentalized steel-concrete composite tower column upward into the cavity of the steel tower column and rigidly fix them to the inner wall of the steel tower column.

[0015] According to a second aspect of the present invention, a construction method for a compartmented steel-concrete composite bridge tower is provided, which is implemented using the aforementioned compartmented steel-concrete composite bridge tower, and includes the following steps: S100: According to the design drawings, the outer wall panel, inner wall panel, compartment plate, horizontal stiffening rib, vertical stiffening rib and welding stud are prefabricated in the factory. Welding studs are welded and fixed on the surface of the outer wall panel and inner wall panel. The compartment plate is fixed between the outer wall panel and inner wall panel. Horizontal stiffening ribs are fixed inside each compartment. Vertical stiffening ribs are fixed on the surface of the outer wall panel, inner wall panel and compartment plate. Then, the horizontal steel bars are passed through the second steel bar holes of the vertical stiffening ribs and assembled into a single-section compartment-type steel-concrete composite tower column. S200: The prefabricated sections of the compartmentalized steel-concrete composite tower column are transported to the construction site. The tower column sections are hoisted, aligned and spliced ​​in sequence using hoisting equipment. Adjacent compartmentalized steel-concrete composite tower column sections are connected by full-section welding. The butt joints of adjacent vertical stiffening ribs are reinforced by interlocking welding. S300: The vertical steel bars are installed by passing them through the first steel bar hole of the horizontal stiffening rib. The vertical steel bars of adjacent compartment-type steel-concrete composite tower columns are connected by mechanical connection or tapered sleeve joint. S400: High-performance self-compacting shrinkage-compensating concrete is poured into each independent compartment using a layered symmetrical pouring process. The height difference between the concrete pouring in each compartment is controlled to be no more than 500mm. Vibration is used to ensure that the concrete is densely filled. After the concrete has initially set, the fullness and density of the concrete are tested by a combination of ultrasonic and manual tapping methods to identify and eliminate construction defects such as internal voids and gaps.

[0016] In summary, compared with the prior art, the above-described technical solutions conceived by this invention can achieve the following beneficial effects: 1. The present invention provides a compartmentalized steel-concrete composite bridge tower, wherein the outer wall panel is coaxially arranged on the outside of the inner wall panel to form a double-layer steel plate sandwich layer. The compartmentalized plate in the sandwich layer divides the independent compartments and fills them with concrete. The steel plate and concrete constrain each other and cooperate in bearing the force. The horizontal stiffening ribs and the vertical stiffening ribs interweave to form a complete grid skeleton, which supports and constrains the outer wall panel, the inner wall panel and the compartmentalized plate in all directions, evenly distributes the vertical load, wind load and concrete lateral pressure, effectively prevents the steel plate from buckling and instability and the concrete from cracking. The steel and concrete are firmly bonded together and are not prone to interface peeling. The overall seismic resistance, bending resistance and fatigue resistance are greatly improved.

[0017] 2. The present invention provides a compartmentalized steel-concrete composite bridge tower, wherein concrete flow holes are opened along the height of the compartment plate, and the concrete of each compartment flows and merges with each other during the pouring process, eliminating the concrete layer interface, and the concrete in the interlayer forms a complete whole. The steel shell and concrete are tightly bonded, and the steel and concrete work together to bear the load, avoiding stress concentration caused by each compartment being subjected to force alone, and greatly improving the overall load-bearing capacity and structural stability of the tower column.

[0018] 3. The present invention provides a compartmentalized steel-concrete composite bridge tower, wherein closed-type, open-type, and open-faceted rebar holes are provided on the horizontal and vertical stiffening ribs. The open-type rebar holes can directly insert the rebar laterally without long-distance threading and alignment, reducing the difficulty of high-altitude rebar construction. The rebar can be pre-assembled in the factory or installed on site, and the process is flexible and adjustable. The rebar connection adopts mechanical joints to ensure continuous and reliable force transmission of the rebar skeleton.

[0019] 4. This invention provides a compartmentalized steel-concrete composite bridge tower, adaptable to two hybrid bridge tower structures. When the lower concrete tower column is paired with the upper steel-concrete tower column, the pre-reserved reinforcing bars in the concrete tower column extend into the interlayer for anchoring. When the lower steel-concrete tower column is paired with the upper steel tower column, two methods can be used: bearing plate pressure or vertical stiffening rib extension rigid connection. Both connection methods provide clear force transmission paths, continuous stiffness of the joint section, and no slippage or separation defects, meeting the construction requirements of different structural forms of long-span cable-stayed bridges.

[0020] 5. The present invention provides a compartmentalized steel-concrete composite bridge tower in which the outer wall panel, inner wall panel, various stiffening ribs, and reinforcing bars can all be prefabricated in the factory, replacing the on-site formwork and rigid frame erection process, achieving a combination of permanent and temporary structures. At the same time, the vertical reinforcing bars can be pre-installed in the factory, significantly reducing on-site high-altitude reinforcing bar insertion work, simplifying the on-site construction process, shortening the overall construction period, reducing safety hazards of high-altitude operations, and controlling the height of a single tower column to be between 4500mm and 6000mm, adapting to transportation and hoisting conditions, and reducing on-site splicing welds.

[0021] 6. The present invention provides a compartmentalized steel-concrete composite bridge tower in which concrete is poured symmetrically in layers during construction, and the pouring height difference is strictly controlled to avoid unilateral load torsion and deformation of the steel shell. After the initial setting of the concrete, the density is tested by ultrasonic combined with tapping method, which can promptly detect voids and gaps, ensure that the concrete is fully filled, and effectively bonded to the steel shell. It has excellent crack resistance and fatigue resistance in long-term use. Attached Figure Description

[0022] Figure 1 This is a three-dimensional structural schematic diagram of a compartmentalized steel-concrete composite bridge tower according to an embodiment of the present invention; Figure 2 for Figure 1 Enlarged view of a portion of point A in the middle; Figure 3 This is a schematic cross-section of a compartmentalized steel-concrete composite bridge tower according to an embodiment of the present invention. Figure 1 ; Figure 4 This is a schematic cross-section of a compartmentalized steel-concrete composite bridge tower according to an embodiment of the present invention. Figure 2 ; Figure 5 This is a schematic cross-section of a compartmentalized steel-concrete composite bridge tower according to an embodiment of the present invention. Figure 3 ; Figure 6 This is a schematic elevation view of a compartmentalized steel-concrete composite bridge tower according to an embodiment of the present invention; Figure 7 This is a schematic diagram of the steel reinforcement hole structure of the horizontal and vertical stiffening ribs of a compartmentalized steel-concrete composite bridge tower according to an embodiment of the present invention. Figure 8 This is a schematic diagram of the installation at the steel anchor box of a compartmentalized steel-concrete composite bridge tower according to an embodiment of the present invention; Figure 9 This is a schematic diagram of the junction between the compartmented steel-concrete composite tower column and the concrete tower column in an embodiment of the present invention. Figure 10 This is a schematic diagram of the junction between the compartmentalized steel-concrete composite tower column and the steel tower column in an embodiment of the present invention.

[0023] In all the accompanying drawings, the same reference numerals denote the same technical features, specifically: 1-compartmental steel-concrete composite tower column, 2-outer wall panel, 201-first horizontal plate, 202-first vertical plate, 3-inner wall panel, 301-second horizontal plate, 302-second vertical plate, 303-sloping plate, 4-compartmental plate, 5-horizontal stiffening rib, 6-vertical stiffening rib, 7-welded stud, 8-transverse reinforcement, 9-vertical reinforcement, 10-concrete, 11-anchor plate, 12-concrete tower column, 13-steel tower column. Detailed Implementation

[0024] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention. Furthermore, the technical features involved in the various embodiments of this invention described below can be combined with each other as long as they do not conflict with each other.

[0025] Example 1 like Figure 1-10 As shown, this embodiment of the invention provides a compartmentalized steel-concrete composite bridge tower, which is formed by splicing multiple compartmentalized steel-concrete composite tower columns 1 end to end along the height direction. Each compartmentalized steel-concrete composite tower column 1 includes an outer wall panel 2, an inner wall panel 3, a compartmentalized panel 4, and concrete 10. The outer wall panel 2 includes two first horizontal plates 201 and two first vertical plates 202. The two first horizontal plates 201 are arranged parallel to each other, and the two first vertical plates 202 are respectively fixed to the two ends of the two first horizontal plates 201. The two first horizontal plates 201 and the two first vertical plates 202 together form a closed outer wall outline of the tower. The inner wall panel 3 is arranged inside the outer wall panel 2, and includes two second horizontal plates 301, two second vertical plates 302, and an inclined plate 303. The two second horizontal plates 301 are arranged parallel to each other. Both ends of the second horizontal plates 301 are fixedly fitted with inclined plates 303 that are inclined inward towards the tower. The inner ends of the two inclined plates 303 at the same end are fixedly connected to the second vertical plates 302. The second horizontal plates 301 are parallel to the first horizontal plate 201, and the second vertical plates 302 are parallel to the first vertical plate 202. The two second horizontal plates 301, the two second vertical plates 302, and the inclined plate 303 together form a closed inner wall cavity of the tower. Several partition plates 4 are fixed between the first horizontal plate 201 and the second horizontal plate 201, and between the first vertical plate 202 and the second vertical plate 302. The partition plates 4 divide the interlayer space between the outer wall panel 2 and the inner wall panel 3 into several independent compartments. The compartments are filled with concrete 10 to form an integral steel-concrete composite load-bearing system. The rectangular structure of the outer wall panel 2, combined with the irregular cavity structure of the inclined plate 303 of the inner wall panel 3, can adapt to various bridge tower shapes, especially irregular tower designs, making it widely applicable. Multiple partition plates 4 form independent compartments, providing continuous confinement to the internal concrete 10, significantly improving the overall load-bearing capacity and deformation ductility of the tower column, resulting in excellent seismic performance. The overall steel shell composed of the outer wall panel 2, inner wall panel 3, and partition plates 4 can also serve as a construction formwork and rigid frame, achieving a combination of permanent and temporary structures, effectively simplifying construction procedures, shortening the construction period, and reducing project costs. Simultaneously, the built-in inclined plate 303 optimizes the force transmission path of the cross-section, reduces stress concentration at structural corners, and improves the overall structural stability and durability.

[0026] Furthermore, the inner walls of the first horizontal plate 201 and the first vertical plate 202 are fixedly connected with a plurality of weld studs 7 at equal intervals, and the inner walls of the second horizontal plate 301, the second vertical plate 302, and the inclined plate 303 are fixedly connected with a plurality of weld studs 7 at equal intervals. By arranging weld studs 7 throughout the inner side of each inner and outer wall plate, the interfacial bonding strength and anti-slip ability between the steel plate and the concrete 10 can be significantly improved, effectively preventing the steel-concrete interface from becoming detached and relatively slipping, ensuring that the steel structure and concrete work together to bear the load, and significantly improving the overall stiffness, load-bearing capacity, and durability of the composite bridge tower.

[0027] Furthermore, the partition plate 4 is provided with concrete flow holes spaced apart along its own height direction. When pouring concrete 10, the concrete inside each independent partition can flow and merge with each other through the flow holes, eliminating the problem of concrete layering at the interface of each partition, making the concrete inside the entire tower column integrated, improving the overall synergistic stress performance of the concrete, effectively enhancing the combined effect of the steel shell and concrete, and avoiding the defect of uneven stress caused by independent stress in each partition.

[0028] Furthermore, each compartment is fixedly provided with several horizontal stiffening ribs 5 at intervals along its height direction. The horizontal stiffening ribs 5 extend laterally through the interior of the compartment, forming a lateral constraint support for the outer wall panels 2, inner wall panels 3 and compartment panels 4 on both sides. This can suppress local buckling deformation of the steel plate under pressure, reduce the amount of additional stiffening steel, and improve the overall structural economy.

[0029] Furthermore, multiple vertical stiffening ribs 6 perpendicular to the horizontal stiffening ribs 5 are fixedly connected to the inner sidewalls of the first horizontal plate 201 and the first vertical plate 202. Similarly, multiple vertical stiffening ribs 6 perpendicular to the horizontal stiffening ribs 5 are fixedly connected to the inner sidewalls of the second horizontal plate 301, the second vertical plate 302, and the inclined plate 303. Multiple vertical stiffening ribs 6 perpendicular to the horizontal stiffening ribs 5 are symmetrically fixedly connected to the two sidewalls of the partition plate 4. The vertical stiffening ribs 6 and the horizontal stiffening ribs 5 are arranged orthogonally to form a grid stiffening system, constraining each steel panel vertically and horizontally, effectively reducing the risk of local instability in the outer wall plate 2, inner wall plate 3, and partition plate 4. This eliminates the need for additional auxiliary stiffening components, saving steel. Simultaneously, the grid stiffening structure can cooperate with the welded studs 7 to further strengthen the embedding effect between the steel plate and the concrete 10, improving the synergistic stress-bearing effect of the steel-concrete composite structure.

[0030] Furthermore, the horizontal stiffening rib 5 has through holes, and the vertical stiffening rib 6 passes through the through holes. The horizontal stiffening rib 5 and the vertical stiffening rib 6 interlock to form an integrated grid stiffening frame, eliminating the need for segmented welding and splicing, simplifying the prefabrication process of steel components, improving the overall structural integrity and bending stiffness of the overall stiffening system, better constraining the outer wall panel 2, inner wall panel 3, and partition plate 4, and preventing local bulging and instability of the steel plates.

[0031] Furthermore, a first reinforcing bar hole is provided on the horizontal stiffening rib 5, and a vertical reinforcing bar 9 is inserted inside the first reinforcing bar hole; a second reinforcing bar hole is provided on the vertical stiffening rib 6, and a horizontal reinforcing bar 8 is inserted inside the second reinforcing bar hole. By providing the first reinforcing bar hole and the second reinforcing bar hole respectively on the horizontal stiffening rib 5 and the vertical stiffening rib 6, the vertical reinforcing bar 9 and the horizontal reinforcing bar 8 can be interlaced. The reinforcing bars and the concrete filling the holes form a concrete tenon and pin bearing structure, which effectively strengthens the embedded connection performance between the stiffening rib, the steel panel and the core concrete, restricts the relative slippage of the steel-concrete interface, further ensures the overall coordinated stress of the steel structure and the concrete, and significantly improves the overall integrity, load-bearing stability and crack resistance of the tower column.

[0032] Furthermore, the first and second rebar holes can be any one of closed, open, or open-faceted types. Multiple rebar hole types can flexibly adapt to the on-site rebar insertion requirements. Open and open-faceted rebar holes do not require insertion from the rebar end; during construction, the horizontal rebar 8 and vertical rebar 9 can be directly inserted from the hole opening, significantly improving the ease of horizontal and vertical rebar insertion, reducing the difficulty of on-site rebar alignment and threading, and shortening the rebar binding operation time. Simultaneously, the open-faceted rebar hole reinforces the opening stiffness through the folded edge, compensating for the local strength weakening of the stiffening ribs caused by the opening. All types of rebar holes can ensure that the rebar and the concrete inside the hole form a dowel-like concrete tenon, balancing construction operability and the synergistic stress performance of steel and concrete.

[0033] Furthermore, the height of the single-section compartmentalized steel-concrete composite tower column 1 is set to 4500mm to 6000mm. This size range is suitable for the height restrictions of conventional road transportation and the lifting performance of hoisting equipment, while also taking into account the convenience of factory prefabrication and assembly; the moderate segment height can reduce the number of welds for on-site segment splicing, reduce the amount of high-altitude welding work, and at the same time ensure the overall rigidity of the single tower column, avoiding deformation of the steel shell during transportation and hoisting.

[0034] Furthermore, when the bridge tower is used in cable-stayed bridge applications, a steel anchor box is installed on the inner side of the inner wall panel 3. The anchor plates 11 on both sides of the steel anchor box are aligned with the partition plates 4 one-to-one, and the partition plates 4 at the force transmission positions corresponding to the anchor plates are thickened. Aligning the steel anchor box anchor plates with the partition plates 4 and thickening and reinforcing the partition plates 4 in the corresponding areas allows the cable force of the cable stays to be directly and evenly transmitted to the thickened partition plates 4 through the anchor plates. The force transmission path is clear and direct, effectively avoiding stress concentration and local overload in the anchorage area, and significantly improving the overall bearing capacity and fatigue resistance of the tower's anchorage area. At the same time, the aligned structure enables rigid force transmission of the steel structure, and the thickened plates enhance local stiffness. Under the premise of meeting the large-tonnage cable force bearing requirements of cable-stayed bridges, the anchorage reinforcement structure is simplified, the on-site reinforcement construction difficulty is reduced, and the structural reliability and construction convenience are balanced.

[0035] Furthermore, when the bridge tower adopts a hybrid structure of upper and lower splicing, a concrete tower column 12 is set at the lower part of the bridge tower, and a compartmentalized steel-concrete composite tower column 1 is set at the upper part. In the joint area of ​​the two tower columns, the vertical reinforcing bars configured inside the concrete tower column 12 extend upward from the top of the concrete tower column 12 and extend into the interlayer cavity between the outer wall panel 2 and the inner wall panel 3 of the compartmentalized steel-concrete composite tower column 1, thereby completing the anchoring connection between the two tower columns and ensuring that the two tower columns can transfer loads collaboratively. By using the reinforcing bars extending from the concrete tower column 12 to extend into the interlayer of the upper steel-concrete composite tower column, the reinforcing bars can form a reliable anchorage with the concrete 10 filling the interlayer. The force transmission path of the two tower columns is continuous and smooth, avoiding problems such as stress abrupt changes and slippage at the joint surface; there is no need to add additional complex shear keys, bearing plates and other connecting components, simplifying the processing of the joint section and the on-site construction process, reducing construction costs, and at the same time significantly improving the overall stiffness, integrity and seismic performance of the hybrid structure bridge tower.

[0036] Furthermore, when the bridge tower adopts a hybrid structure of upper and lower splicing, a compartmentalized steel-concrete composite tower column 1 is set at the lower part of the bridge tower, and a steel tower column 13 is set at the upper part. The connection between the compartmentalized steel-concrete composite tower column 1 and the steel tower column 13 is achieved by one of two force transmission structures. The first structure is to place a pressure plate at the joint position of the two tower columns. The second structure is to extend the vertical stiffening rib 6 inside the compartmentalized steel-concrete composite tower column 1 upward into the cavity of the steel tower column 13 and rigidly fix it to the inner wall of the steel tower column 13. Both of the above structures can complete the load transfer, structural limitation and overall fixation of the two tower columns. The pressure plate joint scheme can achieve uniform vertical pressure diffusion, stable load bearing, and simple on-site alignment and welding construction. The vertical stiffening rib extension and insertion fixing scheme can form a continuous rigid force transmission skeleton, which takes into account both vertical bearing capacity and horizontal shear force and bending moment transmission capacity. Both connection methods can avoid defects such as separation, slippage, and stress concentration at the interface of the hybrid tower column, without the need for a large number of additional reinforcing components. They are suitable for different tonnage load conditions and take into account both the overall structural reliability and the convenience of on-site assembly and construction.

[0037] Example 2 Combination Figure 1-10 This invention provides a construction method for a compartmented steel-concrete composite bridge tower, which is implemented using the aforementioned compartmented steel-concrete composite bridge tower. The specific steps are as follows: S100: According to the design drawings, the outer wall panel 2, inner wall panel 3, compartment plate 4, horizontal stiffening rib 5, vertical stiffening rib 6 and welding studs 7 are prefabricated in the factory. Welding studs 7 are welded and fixed on the surface of the outer wall panel 2 and inner wall panel 3. The compartment plate 4 is fixed between the outer wall panel 2 and inner wall panel 3. Horizontal stiffening ribs 5 are fixed inside each compartment. Vertical stiffening ribs 6 are fixed on the surface of the outer wall panel 2, inner wall panel 3 and compartment plate 4. Then, the transverse steel bars 8 are passed through the second steel bar holes of the vertical stiffening ribs 6. The single-section compartment-type steel-concrete composite tower column 1 is assembled. S200: The prefabricated sections of the compartmentalized steel-concrete composite tower column 1 are transported to the construction site. The tower columns are hoisted, aligned and spliced ​​in sequence using hoisting equipment. Adjacent sections of the compartmentalized steel-concrete composite tower column 1 are connected by full-section welding. The butt joints of adjacent vertical stiffening ribs 6 are reinforced by interlocking welding. S300: The vertical steel bars 9 are installed by passing them through the first steel bar hole of the horizontal stiffening rib 5. The vertical steel bars 9 of adjacent compartment-type steel-concrete composite tower columns 1 are connected by mechanical connection or tapered sleeve joint. S400: High-performance self-compacting shrinkage-compensating concrete 10 is poured into each independent compartment using a layered symmetrical pouring process. The height difference between the concrete pouring in each compartment is controlled to be no more than 500mm. Vibration is used to ensure that the concrete is filled densely. After the concrete has initially set, the fullness and density of the concrete are tested by a combination of ultrasonic and manual tapping methods. Construction defects such as internal voids and gaps are identified and eliminated.

[0038] Furthermore, the installation process of the vertical reinforcing bars 9 can be flexibly adjusted. In the factory prefabrication process of step S100, the layout can be completed in advance after the horizontal reinforcing bars 8 are installed. The vertical reinforcing bars 9 can be directly inserted into the first reinforcing bar hole opened in the horizontal stiffening rib 5 in the factory, and the overall assembly of the horizontal and vertical reinforcing bar skeleton inside a single tower column can be completed in one go. This method greatly reduces the amount of work of inserting reinforcing bars at high altitude on site. On site, only the vertical reinforcing bars 9 of adjacent compartment-type steel-concrete composite tower columns 1 need to be mechanically connected or connected with tapered sleeve joints. Relying on the stable working conditions in the factory, the alignment and threading accuracy of the reinforcing bars are higher, effectively simplifying the on-site construction process and shortening the on-site reinforcing bar operation period.

[0039] Furthermore, if the bridge tower adopts a hybrid structure of a lower concrete tower column 12 and an upper compartmentalized steel-concrete composite tower column 1, during construction, the pre-reserved vertical reinforcing bars at the top of the concrete tower column 12 are extended upwards and inserted into the interlayer cavity between the outer wall panel 2 and the inner wall panel 3 of the upper compartmentalized steel-concrete composite tower column 1. The concrete 10 poured in the interlayer forms a reliable anchorage, realizing the load transfer between the upper and lower tower columns. If the bridge tower adopts a hybrid structure of a lower compartmentalized steel-concrete composite tower column 1 and an upper steel tower column 13, a pressure plate is set in the joint area of ​​the two tower columns to bear the pressure and transfer force, or the vertical stiffening ribs 6 inside the steel-concrete composite tower column are extended upwards and inserted into the cavity of the steel tower column 13, and rigidly welded to the inner wall of the steel tower column 13 to form a complete rigid force transmission system, ensuring that the two tower columns share the load together.

[0040] Those skilled in the art will readily understand that the above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A compartmentalized steel-concrete composite bridge tower, characterized in that, It is constructed by splicing multiple compartmentalized steel-concrete composite tower columns (1) end to end along the height direction. Each compartmentalized steel-concrete composite tower column (1) includes an outer wall panel (2), an inner wall panel (3), a compartmentalized panel (4), horizontal stiffening ribs (5), vertical stiffening ribs (6), transverse reinforcing bars (8), vertical reinforcing bars (9), and concrete (10); among which, The outer wall panel (2) is coaxially arranged on the outside of the inner wall panel (3), and the two enclose each other to form a sandwich cavity. Multiple partition plates (4) are fixedly installed between the outer wall panel (2) and the inner wall panel (3). The partition plates (4) divide the sandwich cavity into multiple independent compartments. Each compartment is filled with concrete (10), and the whole structure constitutes a steel-concrete composite load-bearing system with coordinated load-bearing capacity. Each compartment is fixedly fitted with several horizontal stiffening ribs (5) at intervals along its height direction. The inner sidewall of the outer wall panel (2) and the outer sidewall of the inner wall panel (3) are fixedly connected with a number of vertical stiffening ribs (6) perpendicular to the horizontal stiffening ribs (5). The two sidewalls of the compartment panel (4) are symmetrically fixedly connected with a number of vertical stiffening ribs (6) perpendicular to the horizontal stiffening ribs (5). The horizontal stiffening rib (5) has a first steel bar hole, and a vertical steel bar (9) is inserted inside the first steel bar hole. The vertical stiffening rib (6) has a second steel bar hole, and a horizontal steel bar (8) is inserted inside the second steel bar hole.

2. A compartmentalized steel-concrete composite bridge tower according to claim 1, characterized in that, The outer wall panel (2) includes two first horizontal plates (201) and two first vertical plates (202). The two first horizontal plates (201) are arranged in parallel to each other, and the two first vertical plates (202) are respectively fixed to the two ends of the two first horizontal plates (201). The two first horizontal plates (201) and the two first vertical plates (202) together form a closed outer wall outline of the tower.

3. A compartmentalized steel-concrete composite bridge tower according to claim 2, characterized in that, The inner wall panel (3) includes two second horizontal plates (301), two second vertical plates (302), and an inclined plate (303). The two second horizontal plates (301) are arranged parallel to each other. Both ends of the second horizontal plate (301) are fixedly fitted with inclined plates (303) that are inclined towards the inside of the tower. The inner ends of the two inclined plates (303) at the same end are fixedly connected with a second vertical plate (302). The second horizontal plate (301) is parallel to the first horizontal plate (201), and the second vertical plate (302) is parallel to the first vertical plate (202). The two second horizontal plates (301), the two second vertical plates (302), and the inclined plate (303) together form a closed inner wall cavity of the tower.

4. A compartmentalized steel-concrete composite bridge tower according to claim 3, characterized in that, The inner walls of the first horizontal plate (201) and the first vertical plate (202) are fixedly connected with a number of welding studs (7) at equal intervals, and the inner walls of the second horizontal plate (301), the second vertical plate (302) and the inclined plate (303) are fixedly connected with a number of welding studs (7) at equal intervals.

5. A compartmentalized steel-concrete composite bridge tower according to claim 1, characterized in that, The horizontal stiffening rib (5) has a through hole, and the vertical stiffening rib (6) passes through the through hole.

6. A compartmentalized steel-concrete composite bridge tower according to claim 1, characterized in that, The first and second reinforcing bar holes can be any one of the following: closed type, open type, or open folded type.

7. A compartmentalized steel-concrete composite bridge tower according to claim 1, characterized in that, When the bridge tower is used in cable-stayed bridge construction, a steel anchor box is provided on the inner side of the inner wall panel (3). The anchor plates (11) on both sides of the steel anchor box are aligned with the partition plate (4) in a one-to-one correspondence. The partition plate (4) at the force transmission position corresponding to the anchor plate is provided with a thickened structure.

8. A compartmentalized steel-concrete composite bridge tower according to claim 1, characterized in that, When the bridge tower adopts a hybrid structure of upper and lower splicing, a concrete tower column (12) is set at the lower part of the bridge tower and a compartmentalized steel-concrete composite tower column (1) is set at the upper part. In the joint area of ​​the two tower columns, the vertical reinforcing steel bars configured inside the concrete tower column (12) extend upward from the top of the concrete tower column (12) and extend into the interlayer cavity between the outer wall panel (2) and the inner wall panel (3) of the compartmentalized steel-concrete composite tower column (1).

9. A compartmentalized steel-concrete composite bridge tower according to claim 1, characterized in that, When the bridge tower adopts a hybrid structure of upper and lower splicing, a compartmentalized steel-concrete composite tower column (1) is set at the lower part of the bridge tower and a steel tower column (13) is set at the upper part. The connection between the compartmentalized steel-concrete composite tower column (1) and the steel tower column (13) is achieved by one of two force transmission structures. The first structure is to set a pressure plate at the joint position of the two tower columns. The second structure is to extend the vertical stiffening rib (6) inside the compartmentalized steel-concrete composite tower column (1) upward into the cavity of the steel tower column (13) and rigidly fix it to the inner wall of the steel tower column (13).

10. A construction method for a compartmentalized steel-concrete composite bridge tower, characterized in that, The application of a compartmentalized steel-concrete composite bridge tower as described in any one of claims 1-9 is characterized by comprising the following steps: S100: According to the design drawings, prefabricate the outer wall panel (2), inner wall panel (3), compartment plate (4), horizontal stiffening rib (5), vertical stiffening rib (6) and welding stud (7) in the factory. Weld the welding stud (7) on the outer wall panel (2) and inner wall panel (3) and fix the compartment plate (4) between the outer wall panel (2) and inner wall panel (3). Fix the horizontal stiffening rib (5) in the compartment and fix the vertical stiffening rib (6) on the outer wall panel (2), inner wall panel (3) and compartment plate (4). Then pass the horizontal steel bar (8) through the second steel bar hole of the vertical stiffening rib (6) and assemble into a single compartment steel-concrete composite tower column (1). S200: The prefabricated sections of the compartmentalized steel-concrete composite tower column (1) are transported to the construction site. The tower columns are hoisted, aligned and spliced ​​in sequence using hoisting equipment. The sections of the adjacent compartmentalized steel-concrete composite tower column (1) are connected by full-section welding. The joints of the adjacent vertical stiffening ribs (6) are reinforced by interlocking welding. S300: The vertical steel bars (9) are inserted into the first steel bar hole of the horizontal stiffening rib (5) to complete the layout. The vertical steel bars (9) of the adjacent compartment-type steel-concrete composite tower column (1) are connected by mechanical connection or tapered sleeve joint. S400: High-performance self-compacting shrinkage-compensating concrete (10) is poured into each independent compartment. The construction process is carried out by layered symmetrical pouring. The height difference of the concrete pouring in each compartment is controlled to be no more than 500mm. The concrete is compacted by vibration. After the concrete has initially set, the fullness and density of the concrete are tested by ultrasonic method combined with manual tapping method. Construction defects such as internal voids and gaps are investigated and eliminated.