A method and device for prefabricated construction positioning of green building exterior wall insulation

By establishing an external wall insulation positioning model with a panel position control layer, a thermal break anchoring control layer, and a thickness compensation control layer, the problem of positioning deviation in the prefabricated construction of green building external wall insulation was solved, and efficient and precise installation and thickness control of the insulation board were achieved.

CN123064310APending Publication Date: 2026-11-10XINJIANG FUTAI CONSTR (GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611241342.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-17
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

In the prefabricated construction of exterior wall insulation for green buildings, existing technologies make it difficult to achieve the positioning of insulation board edges, joints, anchoring positions, and insulation layer thickness under the same construction positioning benchmark, resulting in the accumulation of installation positioning deviations.

Method used

An external wall insulation positioning model was established, which included a panel position control layer, a thermal break anchorage control layer, and a thickness compensation control layer. Positioning was performed collaboratively on a movable positioning mother frame by panel edge positioning arms, thermal break guide seats, and thickness stoppers, and panel edge coordinates, panel joint coordinates, thermal break anchorage coordinates, and gasket thickness grades were unified.

Benefits of technology

It reduces installation positioning deviations caused by anchor position adjustments and differences in base surface flatness, improves construction consistency and adaptability, reduces cumulative deviations in panel joints and thickness deviations, and enhances the continuity of the insulation layer and anchor reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123064310A_ABST
    Figure CN123064310A_ABST
Patent Text Reader

Abstract

This invention relates to the field of building energy-saving exterior wall insulation construction technology, and discloses a method and device for positioning prefabricated exterior wall insulation in green buildings. The method acquires building energy-saving insulation design information, three-dimensional control points of the exterior wall, opening boundaries, corner boundaries, expansion joint boundaries, embedded component positions, and prefabricated insulation board specifications. It establishes an exterior wall insulation positioning model including a board position control layer, a thermal break anchoring control layer, and a thickness compensation control layer. It generates the board edge coordinates, board joint coordinates, no-anchoring zone, thermal break anchoring coordinates, gasket thickness grade, and positioning stop position of the insulation board positioning unit. The method also achieves board edge positioning, thermal break anchoring guidance, and thickness stop positioning of the prefabricated insulation board through a movable positioning frame.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building energy-saving exterior wall insulation construction technology, and in particular to a prefabricated construction positioning method and device for green building exterior wall insulation. Background Technology

[0002] Building energy-saving exterior wall insulation systems typically involve installing prefabricated insulation boards, integrated insulation and decorative boards, or composite insulation boards on the outer side of the building's exterior wall base to form an insulation layer for the exterior wall envelope. This type of construction generally requires arranging the boards according to the exterior wall dimensions, door and window opening locations, wall corner locations, and insulation board specifications. The installation positions of anchors, connectors, or framing components must be determined on the exterior wall base, and then the insulation boards are fixed to the exterior wall base using anchoring, dry hanging, bonding, or combination connection methods.

[0003] In the prior art, there are already dedicated installation structures and methods for external wall insulation panels. For example, CN107663949A discloses a dedicated installation structure and method for external wall insulation panels, which uses anchor plates to position the vertical keel. The anchor plate includes a flat plate and a guide plate, with the guide plate forming a groove structure for vertical adjustment and positioning of the vertical keel. During construction, on-site measurements are first taken, and a measured building elevation drawing is drawn. Based on the measured building elevation drawing, the panels are arranged, and then an anchor plate drawing and a vertical keel drawing are drawn to locate the expansion bolt positions. Subsequently, lines are drawn, holes are drilled, anchor plates are positioned, and the external wall insulation panels are installed. This type of solution can be used for positioning and fixing in the assembly and installation of external wall insulation panels.

[0004] However, in the prefabricated construction of green building exterior wall insulation, the exterior wall base typically faces various construction constraints, such as opening boundaries, corner boundaries, expansion joint boundaries, the location of embedded components, and differences in the flatness of the base surface. Existing exterior wall insulation board installation methods often rely on layout diagrams, anchor plate diagrams, or keel positioning lines as the primary construction basis. The position of the board edge, the position of the board joint, the anchoring position, and the control of the insulation layer thickness are usually determined separately in different construction stages. When the anchoring position is close to the edge of an opening, a corner, an expansion joint, the position of the board joint, or the position of an embedded component, the anchoring hole position may need to be adjusted on-site. After the anchoring hole position is adjusted, the insulation layer thickness control benchmark at the corresponding position may also change, thus affecting the subsequent board edge positioning, board joint continuity, and the installation benchmark of adjacent insulation boards.

[0005] Furthermore, in current construction processes, flatness, verticality, or joint width are typically checked after each individual insulation board is installed. The results of these checks are mostly used for localized corrections at the current installation location, making it difficult to establish continuous constraints on the initial positioning benchmarks of adjacent, uninstalled insulation boards. As insulation boards are continuously installed along the same row or column, deviations in the edge of individual insulation boards, joints, and anchoring positions can be transmitted between adjacent units, leading to cumulative deviations in the local thickness of the external wall insulation layer, joint positions, and anchoring arrangements.

[0006] Therefore, how to ensure that the positioning of the insulation board edges, the positioning of the board joints, the adjustment of the anchoring position, and the control of the insulation layer thickness are all carried out under the same construction positioning benchmark in the prefabricated construction of energy-saving exterior wall insulation, and reduce the installation positioning deviation caused by the adjustment of the anchoring position and the difference in the flatness of the base surface, has become a technical problem that needs to be solved in this field. Summary of the Invention

[0007] To overcome the aforementioned technical deficiencies, the present invention aims to provide a method and device for positioning prefabricated exterior wall insulation in green buildings. This invention establishes an exterior wall insulation positioning model comprising a panel position control layer, a thermal break anchoring control layer, and a thickness compensation control layer. It uniformly maps panel edge coordinates, panel joint coordinates, no-anchor zones, thermal break anchoring coordinates, gasket thickness grades, and positioning stop positions to a movable positioning frame. Furthermore, it utilizes panel edge positioning arms, thermal break guide seats, and thickness stop components to collaboratively perform positioning at the corresponding exterior wall base layer, thereby resolving the inconsistencies in panel edge positioning, panel joint positioning, anchoring position adjustment, and insulation layer thickness control benchmarks in the prior art.

[0008] This invention discloses a prefabricated construction positioning method for green building exterior wall insulation, comprising:

[0009] Obtain building energy-saving insulation design information for green building exterior walls, three-dimensional control points of exterior walls, opening boundaries, corner boundaries, expansion joint boundaries, embedded component locations and prefabricated insulation board specifications, and establish an exterior wall insulation positioning model including board position control layer, thermal break anchoring control layer and thickness compensation control layer;

[0010] In the board position control layer, generate insulation board positioning units and the board edge coordinates and board seam coordinates of each insulation board positioning unit;

[0011] In the anchorage control layer of the broken bridge, the opening boundary, corner boundary, expansion joint boundary, slab joint coordinates and the position of the embedded components are combined into a no-anchorage zone, and the broken bridge anchorage coordinates are generated outside the no-anchorage zone.

[0012] In the thickness compensation control layer, the gasket thickness level and positioning stop position corresponding to the thermal break anchorage coordinates are generated based on the distance measurement value of the outer wall base layer, and the positioning stop position is output to the movable positioning mother frame.

[0013] The movable positioning frame, equipped with a panel edge positioning arm, a thermal break guide seat, and a thickness stop, is fixed at the outer wall base level corresponding to the current insulation board positioning unit. The panel edge coordinates are defined by the panel edge positioning arm, the thermal break guide seat is defined by the thermal break anchoring coordinates, and the thickness stop is defined by the positioning stop position.

[0014] The prefabricated insulation board is placed into the movable positioning mother frame, and the insulation anchor with heat insulation pad is installed through the thermal break guide seat. The movable positioning mother frame is then removed and transferred to the next insulation board positioning unit.

[0015] Preferably, establishing an external wall insulation positioning model includes: using the intersection of the floor elevation line and the external wall structural axis as the model origin, assigning a unit number to each insulation board positioning unit, and associating the board edge coordinates, board joint coordinates, thermal break anchorage coordinates, gasket thickness grade, and positioning stop position under the same unit number.

[0016] Preferably, in the board position control layer, a unit adjacency relationship is established, the coordinates of the adjacent board edges of the installed insulation board positioning unit are set as the starting constraint coordinates of the uninstalled insulation board positioning unit, and multiple insulation board positioning units located in the same row or column are configured as the same coordinate transfer group.

[0017] Preferably, the fixed movable positioning mother frame includes: decomposing the plate edge coordinates into horizontal plate edge coordinates and vertical plate edge coordinates; setting temporary fixing holes outside the broken bridge anchorage coordinates; fixing the temporary fixing seat to the temporary fixing holes; installing the horizontal reference beam and the vertical reference beam on the temporary fixing seat; and making the horizontal reference beam and the vertical reference beam correspond to the horizontal plate edge coordinates and the vertical plate edge coordinates of the current insulation board positioning unit, respectively.

[0018] Preferably, the composite anchor-free zone includes: extending the opening boundary, corner boundary, expansion joint boundary, and slab joint coordinates outward to form boundary anchor-free zones, extending the pre-embedded component positions outward to form component anchor-free blocks, and combining the boundary anchor-free zones and component anchor-free blocks into an anchor-free zone.

[0019] Preferably, generating the anchorage coordinates of the broken bridge includes: generating candidate anchorage points within the insulation board positioning unit; when a candidate anchorage point is located outside the no-anchorage zone, determining the candidate anchorage point as the anchorage coordinates of the broken bridge; when a candidate anchorage point is located within the no-anchorage zone, translating the candidate anchorage point along a first avoidance direction parallel to the joint line corresponding to the joint coordinates to a first correction point; when the first correction point is located outside the no-anchorage zone and the correction path from the candidate anchorage point to the first correction point does not cross the joint line corresponding to the joint coordinates, determining the first correction point as the anchorage coordinates of the broken bridge; when the first correction point is located within the no-anchorage zone, or when the correction path from the candidate anchorage point to the first correction point crosses the joint line corresponding to the joint coordinates, translating the first correction point along a second avoidance direction perpendicular to the adjacent joint to a second correction point, and determining the second correction point, located outside the no-anchorage zone and whose correction path from the first correction point to the second correction point does not cross the joint line corresponding to the joint coordinates, as the anchorage coordinates of the broken bridge.

[0020] Preferably, when a candidate anchor point is translated to a first correction point or a second correction point, the distance measurement value of the outer wall base layer corresponding to the anchor coordinate of the broken bridge is reread in the thickness compensation control layer, and the gasket thickness grade and positioning stop position are updated according to the reread distance measurement value of the outer wall base layer.

[0021] Preferably, based on the distribution of the no-anchor zone within the insulation board positioning unit, the insulation board positioning unit is divided into standard positioning units, opening edge positioning units, corner positioning units, and expansion joint positioning units, and corresponding board edge positioning references and the number of broken bridge anchorage coordinates are configured for different types of insulation board positioning units.

[0022] Preferably, the opening edge positioning unit is equipped with an opening reverse snap positioning frame, the corner positioning unit is equipped with a corner synchronous positioning frame, and the expansion joint positioning unit is equipped with a double-sided joint width limiting frame, and the opening reverse snap positioning frame, the corner synchronous positioning frame or the double-sided joint width limiting frame are detachably connected to the movable positioning mother frame.

[0023] Preferably, after the prefabricated insulation board is anchored, the measured edge coordinates and joint coordinates of the anchored prefabricated insulation board are collected, the measured edge coordinates and joint coordinates are written into the board position control layer, and the measured edge coordinates and joint coordinates are used as the boundary inputs of the positioning units of adjacent unconstructed insulation boards.

[0024] Preferably, when the offset direction of the measured board edge coordinate relative to the corresponding board edge coordinate is consistent with the offset direction of the measured board joint coordinate relative to the corresponding board joint coordinate, and this consistent offset occurs continuously in at least two installed insulation board positioning units in the same coordinate transfer group, the coordinate transfer group correction is triggered.

[0025] Preferably, after triggering the coordinate transfer group correction, the plate edge coordinates, plate joint coordinates, broken bridge anchorage coordinates, and positioning stop positions of the unconstructed insulation board positioning units in the coordinate transfer group are synchronously corrected, and the synchronously corrected broken bridge anchorage coordinates are re-overlapped and checked with the prohibited anchorage area.

[0026] Preferably, before fixing the movable positioning mother frame to the outer wall base surface corresponding to the current insulation board positioning unit, a positioning process package for the current insulation board positioning unit is generated. The positioning process package includes the unit number, board edge coordinates, board joint coordinates, thermal break anchor coordinates, gasket thickness grade, positioning stop position, board edge positioning arm locking position, thermal break guide seat locking position, and thickness stop locking position.

[0027] Preferably, according to the positioning process package, the plate edge positioning arm is locked in the plate edge positioning arm locking position, the thermal break guide seat is locked in the thermal break guide seat locking position, the thickness stop is locked in the thickness stop locking position, and after the prefabricated insulation board is anchored, the current locking state of the movable positioning mother frame is matched with the positioning process package of the next insulation board positioning unit.

[0028] In view of this, the present invention also provides a green building exterior wall insulation prefabricated construction positioning device, including a positioning data processing unit, a movable positioning mother frame, a plate edge positioning arm, a thermal break guide seat, a thickness stop, a heat insulation pad and a heat insulation anchor.

[0029] The positioning data processing unit is used to generate a positioning process package, which includes the unit number, plate edge coordinates, plate joint coordinates, broken bridge anchorage coordinates, gasket thickness grade, positioning stop position, plate edge positioning arm locking position, broken bridge guide seat locking position, and thickness stop component locking position.

[0030] The movable positioning mother frame includes a temporary fixing seat, a horizontal reference beam, a vertical reference beam, and a sliding locking seat. The horizontal reference beam and the vertical reference beam are detachably installed on the temporary fixing seat, and the sliding locking seat is installed on the horizontal reference beam or the vertical reference beam.

[0031] The sliding locking seat is equipped with a locking mark, which corresponds to the locking position of the plate edge positioning arm, the locking position of the broken bridge guide seat, and the locking position of the thickness stop piece, respectively.

[0032] The plate edge positioning arm, the broken bridge guide seat, and the thickness stop are respectively installed on the movable positioning mother frame via sliding locking seats;

[0033] The thermal break guide seat is provided with a guide hole and a heat insulation gasket positioning cavity, and the guide hole and the heat insulation gasket positioning cavity are coaxially arranged;

[0034] The thickness stop component is provided with a stepped stop surface corresponding to different gasket thickness grades;

[0035] The heat insulation gasket is placed in the heat insulation gasket positioning cavity, and the heat insulation anchor passes through the guide hole and the heat insulation gasket.

[0036] Compared with existing technologies, the above technical solution has the following advantages:

[0037] 1. This invention establishes an external wall insulation positioning model including a panel position control layer, a thermal break anchoring control layer, and a thickness compensation control layer. It associates the panel edge coordinates, panel joint coordinates, thermal break anchoring coordinates, gasket thickness grade, and positioning stop position of the prefabricated insulation panel with the same insulation panel positioning unit. This enables panel edge positioning, panel joint positioning, anchoring positioning, and insulation layer thickness control in building energy-saving external wall insulation construction to be performed under the same construction positioning benchmark, reducing the inconsistency of positioning benchmarks caused by separate layout and adjustment in different construction stages in existing construction.

[0038] 2. This invention combines the opening boundary, corner boundary, expansion joint boundary, slab joint coordinates, and embedded component position into a no-anchor zone, and generates the broken bridge anchoring coordinates outside the no-anchor zone, so that the installation position of the thermal insulation anchor can avoid the opening edge, wall corner, expansion joint, slab joint, and embedded component influence area before construction, reducing the need to adjust the anchoring hole position after drilling on site.

[0039] 3. When a candidate anchoring point falls into a no-anchoring zone, the present invention corrects the anchoring position according to a first avoidance direction parallel to the adjacent plate joint and a second avoidance direction perpendicular to the adjacent plate joint, and restricts the correction path from crossing the plate joint line. Thus, anchoring avoidance can be completed while maintaining the integrity of the insulation board positioning unit boundary, reducing the impact of anchoring position adjustment on the continuity of the plate joint and the installation reference of adjacent insulation boards.

[0040] 4. After the anchorage coordinates of the broken bridge are corrected, the present invention rereads the distance measurement value of the outer wall base surface at the corrected anchorage coordinates of the broken bridge, and simultaneously updates the shim thickness grade and the positioning stop position, so that the thickness compensation data after the anchorage position adjustment corresponds to the actual anchorage position, avoiding the insulation layer thickness deviation caused by using the thickness compensation data at the original candidate anchorage point after the anchorage coordinates change.

[0041] 5. The present invention uses a movable positioning mother frame to support the plate edge positioning arm, the thermal break guide seat and the thickness stop, so that the plate edge positioning, thermal break anchoring guidance and insulation layer thickness stop can be completed on the same movable tooling; after the movable positioning mother frame completes the construction of the current insulation board positioning unit, it can be transferred to the next insulation board positioning unit for reuse, thereby reducing repeated layout and repeated on-site adjustments.

[0042] 6. This invention outputs unit number, board edge coordinates, board joint coordinates, thermal break anchorage coordinates, gasket thickness grade, positioning stop position, and locking position of three types of actuators through the positioning process package. This enables construction personnel to call up complete construction positioning information according to a single insulation board positioning unit, and converts the data in the external wall insulation positioning model into the actual locking position on the movable positioning mother frame, thereby improving the consistency of on-site execution.

[0043] 7. This invention collects the measured coordinates of the panel edge and the panel joint after the prefabricated insulation board is anchored, and uses this measured data as the boundary input for the positioning units of adjacent un-constructed insulation boards. When consecutive offsets occur in the same direction within the same coordinate transfer group, the panel edge coordinates, panel joint coordinates, broken bridge anchorage coordinates, and positioning stop positions of the positioning units of un-constructed insulation boards are synchronously corrected, thereby reducing the accumulation of positioning errors during continuous paving.

[0044] 8. This invention configures corresponding board edge positioning references and execution structures for standard positioning units, opening edge positioning units, corner positioning units, and expansion joint positioning units, so that prefabricated insulation boards can be positioned according to corresponding construction constraints on flat walls, opening edges, wall corners, and both sides of expansion joints, which is beneficial to improving the construction adaptability of building energy-saving exterior wall insulation systems on complex exterior wall facades.

[0045] 9. This invention uses the guide hole of the thermal break guide seat and the positioning cavity of the thermal insulation gasket to coaxially guide the installation of the thermal insulation anchor with the thermal insulation gasket, so that the thermal insulation gasket can be stably arranged on the installation channel of the thermal insulation anchor. This helps to reduce the thermal bridging effect at the anchoring connection position and meets the requirements for anchoring reliability and insulation continuity in the construction of building energy-saving exterior wall insulation.

[0046] 10. Through comparative testing, under the same base treatment, the same construction personnel, the same batch of boards, and the same climatic conditions, compared with the construction method based on measured building elevation drawings, board layout drawings, anchor plate drawings, and keel positioning lines, the cumulative deviation of board joints within a 10m length range of the present invention was reduced from 8.4mm to 2.6mm, the number of on-site adjustments per 100 anchor holes was reduced from 13 to 4, and the maximum deviation of insulation layer thickness was reduced from 5.1mm to 2.0mm. This demonstrates that the present invention can improve positioning consistency and reduce construction deviations in the prefabricated construction of energy-saving exterior wall insulation. Attached Figure Description

[0047] Figure 1 This is a flowchart illustrating the prefabricated construction positioning method for green building exterior wall insulation in one embodiment of this application.

[0048] Figure 2 This is a schematic diagram showing the correspondence between the external wall insulation positioning model and the movable positioning mother frame in one embodiment of this application.

[0049] Figure 3 This is a schematic diagram illustrating the principles of anchorage avoidance, plate joint coordinates, and feedback correction in one embodiment of this application.

[0050] Figure 4 This is a schematic diagram illustrating the fit between an insulating anchor with a heat-insulating pad and a thickness stop in one embodiment of this application.

[0051] Figure 5 This is a graph showing the cumulative deviation detection results of the board seam within a 10m range in one embodiment of this application.

[0052] Figure 6 This is a graph showing the detection results of the insulation layer thickness deviation in one embodiment of this application.

[0053] Explanation of reference numerals in the attached figures:

[0054] External wall insulation positioning model 100, panel position control layer 110, thermal break anchoring control layer 120, thickness compensation control layer 130, movable positioning mother frame 200, panel edge positioning arm 210, thermal break guide seat 220, guide hole 221, thermal insulation gasket positioning cavity 222, thickness stop 230, sliding locking seat 240, locking mark part 241, prefabricated insulation board 300, external wall base layer 400, insulation board positioning unit 500, anchor-prohibited zone 600, candidate anchoring point 610, first correction point 620, second correction point 630, positioning process package 700. Detailed Implementation

[0055] The following is combined Figures 1 to 6 This paper describes a method for positioning prefabricated exterior wall insulation in green buildings. This embodiment is applied to the construction of energy-saving exterior wall insulation, specifically belonging to the construction positioning technology for the insulation layer of energy-saving exterior wall envelope structures. It is particularly suitable for the continuous laying, anchoring, and thickness positioning control of prefabricated insulation boards 300 in green building exterior walls. The prefabricated insulation board 300 can be a rock wool composite insulation board, an integrated insulation and decoration board, an inorganic composite insulation board, or other exterior wall insulation materials that meet the building's energy-saving design requirements; the exterior wall base layer 400 can be a concrete base layer, a masonry plaster base layer, or an exterior wall base layer with embedded components.

[0056] like Figure 1As shown, before construction, the following information must be obtained: building energy-saving insulation design information for the green building's exterior walls, three-dimensional control points of the exterior walls, opening boundaries, corner boundaries, expansion joint boundaries, locations of embedded components, and specifications of prefabricated insulation boards. Building energy-saving insulation design information includes the design thickness of the insulation layer, thermal conductivity requirements of the insulation boards, design requirements for the heat transfer coefficient of the exterior walls, requirements for the arrangement of insulation anchors, and requirements for insulation board joints. Three-dimensional control points of the exterior walls can be collected using a total station, laser rangefinder, or 3D scanning equipment, or imported from construction surveying and layout data. Opening boundaries include the upper, lower, and side boundaries of door and window openings; corner boundaries include the boundaries of external and internal corners; expansion joint boundaries include the boundary lines on both sides of expansion joints, settlement joints, or seismic joints; locations of embedded components include embedded sleeves, embedded parts, pipeline fixing components, areas affected by structural reinforcement, or other locations where insulation anchors are not suitable.

[0057] Based on the above data, an external wall insulation positioning model 100 is established. The external wall insulation positioning model 100 includes a panel position control layer 110, a thermal break anchoring control layer 120, and a thickness compensation control layer 130. The panel position control layer 110 is used to determine the insulation panel positioning unit 500, panel edge coordinates, and panel joint coordinates; the thermal break anchoring control layer 120 is used to determine the no-anchor zone 600 and thermal break anchoring coordinates; the thickness compensation control layer 130 is used to determine the gasket thickness grade and positioning stop position based on the distance measurement value of the external wall base surface. The three control layers correspond to the same building facade in the same external wall insulation positioning model 100, enabling panel edge positioning, panel joint positioning, thermal break anchoring positioning, and thickness stop positioning to be performed correspondingly under the same construction positioning benchmark.

[0058] In one implementation, the intersection of the floor elevation line and the external wall structural axis is used as the model origin, and a unit number is assigned to each insulation board positioning unit 500. The unit number can be formed by combining floor, row, and column numbers; for example, the insulation board positioning unit 500 in the 2nd row and 5th column of the 3rd floor can be configured as "3-2-5". Under the same unit number, the board edge coordinates, board joint coordinates, thermal break anchorage coordinates, gasket thickness grade, and positioning stop position are associated respectively. This association method allows construction personnel to access complete positioning information for a single insulation board positioning unit 500, avoiding the need for board edge positioning information, anchorage positioning information, and thickness compensation information to originate from different drawings or different construction stages.

[0059] In the panel positioning control layer 110, the building's exterior wall facade is divided into multiple insulation board positioning units 500. Each insulation board positioning unit 500 corresponds to one prefabricated insulation board 300 or one prefabricated insulation board 300 after cutting. The panel edge coordinates include the top, bottom, left, and right coordinates of the current prefabricated insulation board 300; the panel joint coordinates include the horizontal and vertical joint coordinates between two adjacent prefabricated insulation boards 300. During continuous construction, the panel positioning control layer 110 also establishes unit adjacency relationships, setting the adjacent panel edge coordinates of the already constructed insulation board positioning units 500 as the starting constraint coordinates of the unconstructed insulation board positioning units 500, and configuring multiple insulation board positioning units 500 located in the same row or column as the same coordinate transfer group. The coordinate transfer group is used to record the boundary transfer relationships between prefabricated insulation boards 300 continuously installed in the same direction.

[0060] In this embodiment, the seam coordinates include the seam centerline coordinates and the coordinates of the two side boundaries of the seam. When determining whether the correction path crosses the seam line corresponding to the seam coordinates, the straight line corresponding to the seam centerline coordinates is taken as the seam line. For the case where the designed seam width is 10mm, when the coordinates of the two side boundaries of the seam are 3600mm and 3610mm respectively, the seam centerline coordinate is 3605mm, and the straight line passing through the 3605mm position is taken as the seam line crossed by the correction path for judgment.

[0061] In this embodiment, the exterior wall facade is defined by a horizontal direction as the first coordinate direction and a vertical direction as the second coordinate direction. A standard prefabricated insulation board 300 is selected as the current insulation board positioning unit 500. This standard prefabricated insulation board 300 has a length of 1200mm, a height of 600mm, and a designed joint width of 10mm. The model origin is located at the intersection of the current floor elevation line and the exterior wall structure axis. If the lower left corner coordinate of the current insulation board positioning unit 500 is (2400mm, 1200mm), then the left edge coordinate of the insulation board positioning unit 500 is 2400mm, the right edge coordinate is 3600mm, the bottom edge coordinate is 1200mm, and the top edge coordinate is 1800mm. If another prefabricated insulation board 300 is installed adjacent to the right side of the insulation board positioning unit 500, the right side joint coordinate can be set to the joint area between 3600mm and 3610mm, and the left side starting constraint coordinate of the adjacent right side insulation board positioning unit 500 can be set to 3610mm.

[0062] like Figure 2As shown, before fixing the movable positioning mother frame 200, the board edge coordinates are decomposed into horizontal board edge coordinates and vertical board edge coordinates. The horizontal board edge coordinates correspond to the upper or lower edge of the current insulation board positioning unit 500, and the vertical board edge coordinates correspond to the left or right side of the current insulation board positioning unit 500. Temporary fixing holes are set outside the thermal break anchoring coordinates. The temporary fixing seat is fixed in the temporary fixing hole, and then the horizontal reference beam and the vertical reference beam are installed in the temporary fixing seat, so that the horizontal reference beam and the vertical reference beam correspond to the horizontal board edge coordinates and the vertical board edge coordinates of the current insulation board positioning unit 500, respectively. The temporary fixing holes do not occupy the installation position of the subsequent insulation anchors, avoiding interference between the temporary fixing of the movable positioning mother frame 200 and the thermal break anchoring installation. After the current prefabricated insulation board 300 is anchored, the movable positioning mother frame 200 is removed from the temporary fixing seat and transferred to the next insulation board positioning unit 500.

[0063] In the anchorage control layer 120 of the broken bridge, the boundaries of the opening, corners, expansion joints, and slab joints are first extended outwards to form boundary anchorage-prohibited zones, and the positions of the embedded components are extended outwards to form component anchorage-prohibited blocks. Then, the boundary anchorage-prohibited zones and component anchorage-prohibited blocks are combined to form the anchorage-prohibited zone 600. The outward expansion direction of the boundary anchorage-prohibited zones can be determined along the normal direction of the corresponding boundaries, and the outward expansion width can be determined based on the installation radius of the insulation anchor, the allowable deviation of the anchor hole construction, and the edge safety distance. The aforementioned installation radius of the insulation anchor, allowable deviation of the anchor hole construction, and edge safety distance can be derived from the product dimensions of the insulation anchor, the allowable deviation of construction quality acceptance, and the safety distance requirements for external wall insulation construction. The scope of the component anchorage-prohibited blocks can cover the projected boundary of the embedded components and the installation channel of the insulation anchor, avoiding interference between the insulation anchor and the embedded components, pipelines, or structural reinforcement. The installation radius of the insulation anchor is the radius required for the installation channel of the insulation anchor.

[0064] In one implementation, the outward expansion width of the boundary anchorage is determined according to formula (1):

[0065]

[0066] in, This indicates the outward width of the boundary anchorage restriction zone, in mm. This indicates the installation radius of the thermal insulation anchor, in mm. This indicates the allowable deviation for anchor hole construction, in mm; This indicates the edge safety distance, in mm.

[0067] For example, if the installation radius of the thermal insulation anchor is 5mm, the allowable deviation for anchor hole construction is 8mm, and the edge safety distance is 25mm, then the outward expansion width of the boundary anchor-free zone is:

[0068]

[0069] During actual layout, the outward expansion width of the boundary anchorage restriction zone can be rounded to 40mm to match the on-site layout scale. If encountering opening boundaries, corner boundaries, or expansion joint boundaries, the zone should be expanded 40mm outward along the corresponding boundary into the current insulation board positioning unit 500 to form the boundary anchorage restriction zone.

[0070] In one embodiment, the unilateral outward expansion width of the anchor block is determined according to formula (2):

[0071]

[0072] in, This indicates the single-sided outward expansion width of the anchor block of the component, in mm; This indicates the installation radius of the thermal insulation anchor, in mm. This indicates the allowable deviation for anchor hole construction, in mm; The safe distance between components is expressed in mm. The installation radius of the thermal insulation anchor and the allowable deviation of the anchor hole construction in Equations (1) and (2) represent the same technical parameter.

[0073] If the projected width of the embedded component is 50mm, the installation radius of the thermal insulation anchor is 5mm, the allowable deviation for anchor hole construction is 8mm, and the safety distance of the component is 20mm, then the single-sided outward expansion width of the anchor block of the component is:

[0074]

[0075] The total width of the anchor block in this direction is determined according to formula (3):

[0076]

[0077] in, This indicates the total width of the anchor block in this direction, in mm; This indicates the projected width of the embedded component, in mm. This indicates the single-sided outward expansion width of the anchor block of the component, in mm.

[0078] Substituting the above values, the total width of the anchor block in this direction is:

[0079]

[0080] Therefore, areas near the location of the pre-embedded components that are not suitable for anchoring can be included in the no-anchoring zone 600 before construction.

[0081] When generating the anchorage coordinates of the broken bridge, candidate anchorage points 610 are generated within the insulation board positioning unit 500. The candidate anchorage points 610 can be initially arranged according to the corner, edge, and center areas of the prefabricated insulation board 300. When a candidate anchorage point 610 is outside the no-anchorage zone 600, it is determined as the anchorage coordinates of the broken bridge. When a candidate anchorage point 610 is within the no-anchorage zone 600, it is translated to a first correction point 620 along a first avoidance direction parallel to the adjacent board joint. When the first correction point 620 is outside the no-anchorage zone 600, and the correction path from the candidate anchorage point 610 to the first correction point 620 does not cross the board joint line corresponding to the board joint coordinates, the first correction point 620 is determined as the anchorage coordinates of the broken bridge. When the first correction point 620 is still within the no-anchorage zone 600, or when the correction path from the candidate anchorage point 610 to the first correction point 620 crosses the joint line corresponding to the joint coordinate, the first correction point 620 is translated to the second correction point 630 along a second avoidance direction perpendicular to the adjacent joint. The second correction point 630, which is located outside the no-anchorage zone 600 and whose correction path from the first correction point 620 to the second correction point 630 does not cross the joint line corresponding to the joint coordinate, is determined as the anchorage coordinate of the broken bridge. If the second correction point 630 still does not meet the above conditions, the candidate anchorage point 610 can be regenerated within the same insulation board positioning unit 500. The regenerated candidate anchorage point 610 avoids the adjacent area of ​​the original no-anchorage zone and re-enters the above judgment process.

[0082] In one embodiment, the coordinates of the first correction point 620 are determined according to equations (4) and (5):

[0083]

[0084]

[0085] in, This represents the horizontal coordinate of the first correction point 620, in mm. This represents the vertical coordinate of the first correction point 620, in mm. This indicates the lateral coordinate of candidate anchor point 610, in mm; This indicates the vertical coordinate of candidate anchor point 610, in mm; This represents the unit component of the first avoidance direction in the lateral direction; This represents the unit component of the first avoidance direction in the vertical direction; This indicates the first avoidance translation distance, in mm.

[0086] The coordinates of the second correction point 630 are determined according to equations (6) and (7):

[0087]

[0088]

[0089] in, This indicates the horizontal coordinate of the second correction point 630, in mm; This indicates the vertical coordinate of the second correction point 630, in mm; This represents the horizontal coordinate of the first correction point 620, in mm. This represents the vertical coordinate of the first correction point 620, in mm. This represents the unit component of the second avoidance direction in the lateral direction; This represents the unit component of the second avoidance direction in the vertical direction; This indicates the second avoidance translation distance, in mm.

[0090] For example, the coordinates of the current candidate anchor point 610 are (3550mm, 1500mm), the coordinates of the right side plate seam line are 3605mm, and the boundary anchorage restriction zone near the right side plate seam line is from 3565mm to 3645mm. Although the candidate anchor point 610 does not fall within the boundary anchorage restriction zone near the right side plate seam line, it is located within the component anchorage restriction block formed by the embedded component, therefore, avoidance correction is required. If the first avoidance direction is vertically upward, then the unit component of the first avoidance direction in the horizontal direction is 0, and the unit component of the first avoidance direction in the vertical direction is 1; if the first avoidance translation distance is 60mm, then the coordinates of the first correction point 620 are:

[0091]

[0092]

[0093] The coordinates of the first correction point 620 are (3550mm, 1560mm). If the first correction point 620 is still within the anchor block of the component, then continue to translate along the second avoidance direction. If the second avoidance direction is horizontal to the left, then the unit component of the second avoidance direction in the horizontal direction is -1, and the unit component of the second avoidance direction in the vertical direction is 0; if the second avoidance translation distance is 80mm, then the coordinates of the second correction point 630 are:

[0094]

[0095]

[0096] That is, the coordinates of the second correction point 630 are (3470mm, 1560mm). Since the correction path from the first correction point 620 to the second correction point 630 does not cross the right side plate seam line, and the second correction point 630 is located outside the anchorage prohibition zone 600, the second correction point 630 is determined as the anchorage coordinate of the broken bridge.

[0097] In the thickness compensation control layer 130, distance measurement is performed on the outer wall base layer 400. The distance measurement value of the outer wall base layer can be obtained through a laser rangefinder, a distance sensor, or a 3D scanning device with distance measurement function. The distance measurement positions include the corner areas of the insulation board positioning unit 500 and the corresponding positions of each thermal break anchorage coordinate. Based on the distance measurement value of the outer wall base layer, the gasket thickness is divided into multiple gasket thickness grades. The positioning stop position is set corresponding to the gasket thickness grade, so that the thickness stop 230 limits the outward position of the prefabricated insulation board 300 relative to the outer wall base layer 400 during construction.

[0098] In one embodiment, the gasket thickness is determined according to formula (8):

[0099]

[0100] in, This indicates the thickness of the gasket, in mm. This indicates the design thickness of the insulation layer, in mm. This indicates the distance measured at the base of the exterior wall, in mm. The design thickness of the insulation layer is the distance from the outer design control surface of the prefabricated insulation board (300mm) to the design reference surface of the base of the exterior wall (400mm). The distance measured at the base of the exterior wall is the distance between the outer design control surface of the prefabricated insulation board (300mm) and the actual base of the exterior wall (400mm).

[0101] For example, if the insulation layer is designed to be 80mm thick, and the distance measured from the outer wall base surface at a certain thermal break anchorage coordinate is 75mm, then the corresponding gasket thickness at that location is:

[0102]

[0103] If the distance measured at the anchorage coordinate of another broken bridge is 72mm from the base surface of the outer wall, then the corresponding shim thickness at that location is:

[0104]

[0105] In one embodiment, the gasket thickness grade can be classified according to the available gasket specifications for construction. A gasket thickness of 0mm to 3mm corresponds to the first gasket thickness grade; a gasket thickness greater than 3mm and less than or equal to 6mm corresponds to the second gasket thickness grade; and a gasket thickness greater than 6mm and less than or equal to 10mm corresponds to the third gasket thickness grade. Corresponding to the above example, a 5mm gasket thickness corresponds to the second gasket thickness grade, and an 8mm gasket thickness corresponds to the third gasket thickness grade. The thickness stop 230 has stepped stop surfaces corresponding to different gasket thickness grades, and the construction personnel select the corresponding stepped stop surface according to the gasket thickness grade in the positioning process package 700.

[0106] When the gasket thickness calculated based on the insulation layer design thickness and the distance measurement value of the outer wall base surface is less than 0mm, it indicates that there may be a local protrusion of the outer wall base surface 400 or a distance value greater than the insulation layer design thickness at the corresponding position. In this case, the gasket thickness at the corresponding position is treated as 0mm, and the extension position of the prefabricated insulation board 300 relative to the outer wall base surface 400 is limited by the thickness stop 230. For example, when the insulation layer design thickness is 80mm and the distance measurement value of the outer wall base surface is 82mm, the gasket thickness obtained according to formula (8) is -2mm. In this case, the gasket thickness is treated as 0mm, and the prefabricated insulation board 300 is positioned by the corresponding stop surface of the thickness stop 230.

[0107] When candidate anchor point 610 is shifted to either the first correction point 620 or the second correction point 630, the distance measurement value of the outer wall base surface corresponding to the anchorage coordinates of the broken bridge is reread in the thickness compensation control layer 130, and the shim thickness grade and positioning stop position are updated according to the reread outer wall base surface distance measurement value. For example, the outer wall base surface distance value at the original candidate anchor point 610 is 75mm, corresponding to a shim thickness of 5mm; after avoidance correction, the outer wall base surface distance value at the second correction point 630 is 72mm, and the corresponding shim thickness becomes 8mm. At this time, the positioning process package 700 updates the shim thickness grade from the second shim thickness grade to the third shim thickness grade, and adjusts the positioning stop position of the thickness stop component 230 to the stepped stop surface corresponding to the third shim thickness grade. In this way, the thickness compensation data at the original candidate anchor point 610 will not be used after the anchorage coordinates are corrected.

[0108] In one implementation, based on the distribution of the anchorage-prohibited zone 600 within the insulation board positioning unit 500, the insulation board positioning unit 500 is divided into standard positioning units, opening edge positioning units, corner positioning units, and expansion joint positioning units. Standard positioning units correspond to the straight areas of the exterior wall away from openings, corners, and expansion joints; opening edge positioning units correspond to the perimeter of door and window openings; corner positioning units correspond to external or internal corner areas; and expansion joint positioning units correspond to the areas on both sides of the expansion joint. Different types of insulation board positioning units 500 are configured with corresponding board edge positioning references and the number of thermal break anchorage coordinates.

[0109] For the opening edge positioning unit, an opening snap-fit ​​positioning frame is configured. The opening snap-fit ​​positioning frame includes an inner snap-fit ​​edge and an outer frame edge. The inner snap-fit ​​edge is used to adhere to or press against the inner base surface of the door / window opening, and the outer frame edge is used to define the position of the prefabricated insulation board 300 edge of the opening edge positioning unit. For the corner positioning unit, a corner synchronous positioning frame is configured. The corner synchronous positioning frame includes a first positioning frame, a second positioning frame, and an angle locking component. The first positioning frame is used to adhere to the first exterior wall surface, the second positioning frame is used to adhere to the second exterior wall surface, and the angle locking component is used to fix the included angle between the first and second positioning frames. For the expansion joint positioning unit, a double-sided joint width limiting frame is configured. The double-sided joint width limiting frame includes a first-side positioning beam, a second-side positioning beam, and a detachable joint width limiting component. The first-side positioning beam and the second-side positioning beam are located on both sides of the expansion joint boundary, and the detachable joint width limiting component is used to limit the spacing between the prefabricated insulation boards 300 on both sides of the expansion joint. The opening reverse positioning frame, the corner synchronous positioning frame, and the double-sided seam width limiting frame can all be detachably connected to the movable positioning mother frame 200, specifically by plug-in, screw-in, or locking connection methods.

[0110] During construction, a positioning process package 700 is generated based on the current insulation board positioning unit 500. Positioning process package 700 includes the unit number, board edge coordinates, board joint coordinates, thermal break anchorage coordinates, gasket thickness grade, positioning stop position, board edge positioning arm locking position, thermal break guide seat locking position, and thickness stop component locking position. Positioning process package 700 can be output to a tablet terminal, construction layout equipment, or positioning data processing unit. After parsing positioning process package 700, the positioning data processing unit outputs the board edge positioning arm locking position, thermal break guide seat locking position, and thickness stop component locking position. Based on positioning process package 700, the board edge positioning arm 210 is locked to the board edge positioning arm locking position, the thermal break guide seat 220 is locked to the thermal break guide seat locking position, and the thickness stop component 230 is locked to the thickness stop component locking position. The edge positioning arm 210 is used to abut against or limit the edge of the assembled insulation board 300, the thermal break guide seat 220 is used to limit the installation direction and position of the insulation anchor, and the thickness stop 230 is used to limit the outward position of the assembled insulation board 300.

[0111] In one embodiment, the positioning data processing unit is disposed on or communicatively connected to the movable positioning mother frame 200. The positioning data processing unit receives the positioning process package 700 of the current insulation board positioning unit 500 and outputs the locking positions of the board edge positioning arm, the thermal break guide seat, and the thickness stop. A sliding locking seat 240 is provided on the movable positioning mother frame 200, which can move and lock along a transverse or vertical reference beam. The sliding locking seat 240 is provided with a locking marking section 241, which includes a board edge locking marking, an anchoring locking marking, and a thickness locking marking. The board edge locking marking corresponds to the locking position of the board edge positioning arm, the anchoring locking marking corresponds to the locking position of the thermal break guide seat, and the thickness locking marking corresponds to the locking position of the thickness stop. During construction, the positioning data processing unit outputs the corresponding locking position according to the positioning process package 700. The construction personnel move the plate edge positioning arm 210, the broken bridge guide seat 220 and the thickness stop 230 to the corresponding locking mark part 241 and lock them.

[0112] like Figure 4 As shown, the thermal break guide seat 220 is provided with a guide hole 221 and a heat insulation gasket positioning cavity 222. The guide hole 221 and the heat insulation gasket positioning cavity 222 are coaxially arranged. The thermal insulation anchor with heat insulation gasket includes the thermal insulation anchor and the heat insulation gasket disposed on the installation channel of the thermal insulation anchor. The heat insulation gasket is pre-set in the heat insulation gasket positioning cavity 222 of the thermal break guide seat 220. After the thermal insulation anchor passes through the guide hole 221 and the heat insulation gasket, it enters the outer wall base layer 400. The heat insulation gasket is located on the heat transfer path between the thermal insulation anchor and the prefabricated insulation board 300. Since the heat insulation gasket is pre-positioned by the thermal break guide seat 220, a thermal insulation connection can be formed at the thermal break anchoring coordinates after the thermal insulation anchor is installed. The thickness stop 230 is provided with stepped stop surfaces corresponding to different gasket thickness grades. Construction personnel select the corresponding stepped stop surface according to the gasket thickness grade in the positioning process package 700, thereby limiting the positioning stop position of the prefabricated insulation board 300.

[0113] After the prefabricated insulation board 300 is anchored, the measured coordinates of the board edge and the measured coordinates of the board joint are collected. The measured coordinates of the board edge can be obtained using a straightedge, laser line projector, image measuring equipment, or 3D scanning equipment; the measured coordinates of the board joint can be obtained using a board joint measuring caliper, image recognition equipment, or laser rangefinder. After collection, the measured coordinates of the board edge and the measured coordinates of the board joint are written into the board position control layer 110, and the measured coordinates of the board edge and the measured coordinates of the board joint are used as the boundary inputs of the adjacent unconstructed insulation board positioning units 500.

[0114] In one embodiment, the edge offset and the seam offset are determined according to equations (9) and (10):

[0115]

[0116]

[0117] in, This indicates the offset of the plate edge, in mm. Indicates the measured coordinates of the plate edge, in mm; This indicates the coordinates of the corresponding plate edge, in mm. This indicates the offset of the board joint, in mm. Indicates the measured coordinates of the plate joint, in mm; This indicates the coordinates of the center line of the corresponding board seam, in mm.

[0118] When the offset of the board edge and the offset of the board seam satisfy equation (11), it is determined that the offset direction of the measured board edge coordinate relative to the corresponding board edge coordinate is consistent with the offset direction of the measured board seam coordinate relative to the corresponding board seam centerline coordinate:

[0119]

[0120] When both the board edge offset and the board seam offset are positive or both are negative, it is determined that their offset directions are consistent.

[0121] For example, in the same coordinate transfer group, the corresponding edge coordinate of the first installed insulation board positioning unit 500 is 3600mm, and the measured edge coordinate is 3601.4mm. Then the edge offset is:

[0122]

[0123] The centerline coordinate of the joint of the first installed insulation board positioning unit 500 is 3605mm, and the measured joint coordinate is 3606.2mm. Therefore, the joint offset is:

[0124]

[0125] at this time:

[0126]

[0127] Therefore, it is determined that the offset direction of the edge of the insulation board positioning unit 500 is consistent with the offset direction of the board seam. If the second installed insulation board positioning unit 500 in the same coordinate transfer group also shows the same offset, then the coordinate transfer group correction is triggered.

[0128] After triggering the coordinate transfer group correction, the coordinates of the board edge, board joint, thermal break anchorage, and positioning stop position of the un-constructed insulation board positioning unit 500 in the coordinate transfer group are synchronously corrected, and the synchronously corrected thermal break anchorage coordinates are re-overlapped and checked with the no-anchorage zone 600. If the synchronously corrected thermal break anchorage coordinates fall into the no-anchorage zone 600, the avoidance correction is performed again according to the first avoidance direction and the second avoidance direction, and the distance measurement value of the corresponding external wall base layer is reread after correction to update the gasket thickness grade and positioning stop position.

[0129] After anchoring the current prefabricated insulation board 300, the current locking state of the movable positioning mother frame 200 is matched with the positioning process package 700 of the next insulation board positioning unit 500. When the locking positions of the board edge positioning arm, the thermal break guide seat, and the thickness stop of the next insulation board positioning unit 500 are the same as or only partially different from the current locking state, only the corresponding components are adjusted; when all the locking positions of the next insulation board positioning unit 500 change, the locking of the board edge positioning arm 210, the thermal break guide seat 220, and the thickness stop 230 on the sliding locking seat 240 is released, and they are relocked according to the next positioning process package 700. In this way, the movable positioning mother frame 200 can be used continuously between adjacent insulation board positioning units 500, reducing repeated layout and repeated on-site adjustments.

[0130] To verify the construction positioning effect of this embodiment, a sample section of the same green building's exterior wall insulation was selected for comparative testing. The test sample section was 3.6m high and 12m wide, with a single panel size of 1200mm × 600mm for the prefabricated insulation board 300 and a designed insulation layer thickness of 80mm. The comparative example used the method described in the background art for installing exterior wall insulation boards based on measured building elevation drawings, panel layout drawings, anchor plate drawings, and keel positioning lines; the embodiment used the exterior wall insulation positioning model 100, anchor-free zone 600, thickness compensation control layer 130, and movable positioning mother frame 200 described in this embodiment for construction positioning. The comparative example and the embodiment were conducted under the same base treatment, the same construction personnel, the same batch of boards, and the same climatic conditions. For each method, 60 prefabricated insulation boards 300 were installed, and after construction, the cumulative deviation of board joints, the number of on-site adjustments to anchor hole positions, the insulation layer thickness deviation, and the number of adjustments to adjacent units were tested.

[0131] During inspection, the cumulative deviation of the board joints was measured using a laser line projector and a steel ruler at positions of 0m, 2m, 4m, 6m, 8m, and 10m; the deviation of the insulation layer thickness was measured using a laser rangefinder at 10 inspection points; the number of times the anchor hole positions were adjusted on-site was recorded from the construction records; the number of times adjacent units were readjusted was recorded from the disassembly or relocking of adjacent insulation board positioning units 500. The inspection results are shown in the table below.

[0132] Table 1 Comparison of Test Items

[0133] Test Project Comparative Example This embodiment Cumulative deviation of board joints within a 10m length range 8.4mm 2.6mm Number of on-site adjustments per 100 anchoring holes 13 times 4 times Maximum deviation in insulation layer thickness 5.1mm 2.0mm Number of re-adjustments per 300 adjacent units for every 60 prefabricated insulation panels 8 times 2 times Average positioning time for single-piece prefabricated insulation board 300 185s 122s

[0134] To further illustrate the changes in deviation during the detection process, such as Figure 5 As shown, the cumulative deviation of the board joint was measured at positions of 0m, 2m, 4m, 6m, 8m, and 10m. The cumulative deviations of the board joint in the comparative example at these positions were 0mm, 1.8mm, 3.6mm, 5.5mm, 7.1mm, and 8.4mm, respectively; while the cumulative deviations of the board joint in this embodiment at these positions were 0mm, 0.6mm, 1.1mm, 1.6mm, 2.1mm, and 2.6mm, respectively. The detection curve shows that the cumulative deviation of the board joint in this embodiment was lower than that in the comparative example during continuous installation.

[0135] like Figure 6 As shown, the insulation layer thickness deviation was measured at 10 testing points. The comparative example showed insulation layer thickness deviations of 4.8mm, -3.6mm, 5.1mm, -4.2mm, 3.9mm, -4.7mm, 4.4mm, -3.2mm, 4.9mm, and -4.1mm at the 10 testing points; the embodiment showed insulation layer thickness deviations of 1.6mm, -1.2mm, 2.0mm, -1.5mm, 1.4mm, -1.8mm, 1.7mm, -1.1mm, 1.9mm, and -1.4mm at the 10 testing points. The test curves show that the insulation layer thickness deviation range of this embodiment is smaller than that of the comparative example.

[0136] As can be seen from the above test results, under the same external wall base layer 400 and the same prefabricated insulation board 300, this embodiment uses the external wall insulation positioning model 100 to uniformly associate the board edge coordinates, board joint coordinates, thermal break anchorage coordinates, gasket thickness grade, and positioning stop position. The movable positioning mother frame 200 then converts the above positioning data into on-site execution positions, ensuring that board edge positioning, anchorage avoidance, and insulation layer thickness control are executed correspondingly under the same construction positioning benchmark. Compared with the comparative example, this embodiment can reduce the number of on-site adjustments to anchorage hole positions, reduce cumulative board joint deviation and insulation layer thickness deviation, and reduce the number of re-adjustments between adjacent insulation board positioning units 500. These beneficial effects stem from the coordination between the external wall insulation positioning model 100, the no-anchor zone 600, the thickness compensation control layer 130, and the movable positioning mother frame 200, rather than relying solely on a single construction tool or measurement step.

[0137] This embodiment provides a green building exterior wall insulation prefabricated construction positioning device. This device is used to execute the aforementioned green building exterior wall insulation prefabricated construction positioning method, and is particularly suitable for on-site positioning control of the edge position, joint position, thermal break anchoring position, and insulation layer thickness of the prefabricated insulation board 300 during the construction of the insulation layer of the building's energy-saving exterior wall envelope structure. Since the aforementioned embodiment has already described in detail the exterior wall insulation positioning model 100, board position control layer 110, thermal break anchoring control layer 120, thickness compensation control layer 130, anchorage prohibition zone 600, thermal break anchoring coordinates, gasket thickness grade, positioning stop position, and the generation method of positioning process package 700, this embodiment focuses on describing the structural composition of the construction positioning device and its execution coordination relationship with the positioning process package 700.

[0138] like Figure 2 and Figure 4 As shown, the construction positioning device in this embodiment includes a positioning data processing unit, a movable positioning mother frame 200, a panel edge positioning arm 210, a thermal break guide seat 220, a thickness stop 230, a heat insulation pad, and a thermal insulation anchor. The positioning data processing unit is used to receive or generate a positioning process package 700 corresponding to the current thermal insulation board positioning unit 500. The positioning process package 700 includes the unit number, panel edge coordinates, panel joint coordinates, thermal break anchor coordinates, pad thickness grade, positioning stop position, panel edge positioning arm locking position, thermal break guide seat locking position, and thickness stop locking position. The positioning data processing unit can be installed on the movable positioning mother frame 200 or can be communicatively connected to the movable positioning mother frame 200. When the positioning data processing unit is communicatively connected to the movable positioning mother frame 200, the positioning process package 700 can be transmitted to the field execution terminal corresponding to the movable positioning mother frame 200 through wired connection, wireless communication, or construction terminal data import.

[0139] The movable positioning frame 200 serves as the main load-bearing structure of the construction positioning device, forming a temporary construction positioning reference at the current insulation board positioning unit 500. The movable positioning frame 200 includes a temporary fixing seat, a horizontal reference beam, a vertical reference beam, and a sliding locking seat 240. The temporary fixing seat is used to fix the frame at a temporary fixing hole position outside the anchorage coordinates of the broken bridge, ensuring that the fixed position of the movable positioning frame 200 does not occupy the installation position of the insulation anchor. The horizontal and vertical reference beams are detachably installed on the temporary fixing seats. The horizontal reference beam corresponds to the horizontal edge coordinates of the current insulation board positioning unit 500, and the vertical reference beam corresponds to the vertical edge coordinates of the current insulation board positioning unit 500. The horizontal and vertical reference beams can be assembled using plug-in, screw-in, snap-fit, or locking connections to facilitate the disassembly and transfer of the movable positioning frame 200 between different insulation board positioning units 500.

[0140] The sliding locking seat 240 is installed on the transverse or vertical reference beam and can move along the transverse or vertical reference beam. The sliding locking seat 240 is provided with a locking marking section 241, which includes a plate edge locking marking, an anchoring locking marking, and a thickness locking marking. The plate edge locking marking corresponds to the locking position of the plate edge positioning arm in the positioning process package 700, the anchoring locking marking corresponds to the locking position of the broken bridge guide seat in the positioning process package 700, and the thickness locking marking corresponds to the locking position of the thickness stop in the positioning process package 700. During construction, the positioning data processing unit parses the positioning process package 700 and outputs the locking positions of the plate edge positioning arm, the broken bridge guide seat, and the thickness stop. Construction personnel move the sliding locking seat 240 to the corresponding locking marking section 241 and lock the plate edge positioning arm 210, the broken bridge guide seat 220, and the thickness stop 230 in their respective positions.

[0141] The edge positioning arm 210 is mounted on the movable positioning mother frame 200 via a sliding locking seat 240. The edge positioning arm 210 is used to abut or limit the edge of the prefabricated insulation board 300. The edge positioning arm 210 can be configured as a positioning arm that can be telescopically adjusted relative to the transverse or vertical reference beam, or it can be configured as a positioning stop arm with a fixed abutment surface. After locking, the abutment surface of the edge positioning arm 210 corresponds to the edge coordinates in the positioning process package 700, so that the prefabricated insulation board 300 can be positioned according to the edge coordinates when it is placed into the movable positioning mother frame 200. For opening edge positioning units, corner positioning units, or expansion joint positioning units, the edge positioning arm 210 can also be used in conjunction with opening reverse positioning frames, corner synchronous positioning frames, or double-sided joint width limiting frames to limit the edge position of the prefabricated insulation board 300 at special boundaries.

[0142] The thermal break guide seat 220 is installed on the movable positioning mother frame 200 via a sliding locking seat 240. The thermal break guide seat 220 is used to define the installation direction and position of the thermal insulation anchor. The thermal break guide seat 220 is provided with a guide hole 221 and a thermal insulation gasket positioning cavity 222, which are coaxially arranged. The center position of the guide hole 221 corresponds to the thermal break anchor coordinate in the positioning process package 700. The thermal insulation gasket positioning cavity 222 is used to pre-accommodate the thermal insulation gasket. During construction, the thermal insulation gasket is placed in the thermal insulation gasket positioning cavity 222, and then the thermal insulation anchor passes through the guide hole 221, the thermal insulation gasket, and the prefabricated insulation board 300 in sequence before entering the outer wall base layer 400. Since the guide hole 221 and the heat insulation gasket positioning cavity 222 are coaxially arranged, the heat insulation gasket can be held on the installation channel of the thermal insulation anchor, thereby enabling the thermal insulation anchor with heat insulation gasket to be installed at the thermal break bridge anchoring coordinate.

[0143] Thickness stop 230 is installed on the movable positioning mother frame 200 via sliding locking seat 240. Thickness stop 230 is used to limit the overhang position of prefabricated insulation board 300 relative to the outer wall base layer 400. Thickness stop 230 has stepped stop surfaces corresponding to different gasket thickness grades. The positioning data processing unit outputs the locking position of the thickness stop and the position of the stepped stop surface corresponding to the gasket thickness grade according to the gasket thickness grade in the positioning process package 700. After the construction personnel lock the thickness stop 230, the outer control surface of the prefabricated insulation board 300 mates with the corresponding stepped stop surface, thereby controlling the insulation layer thickness according to the positioning stop position. For different positions with gasket thickness grades of the first, second, or third gasket thickness grades, the thickness stop 230 uses different stepped stop surfaces to mate with the prefabricated insulation board 300.

[0144] In one specific application, the construction workers first fix the temporary fixing seat at the corresponding external wall base level 400 of the current insulation board positioning unit 500, and then install the horizontal reference beam and vertical reference beam on the temporary fixing seat. After the positioning data processing unit reads the positioning process package 700 of the current insulation board positioning unit 500, it outputs the locking positions of the board edge positioning arm, the thermal break guide seat, and the thickness stop component. Subsequently, the construction workers lock the board edge positioning arm 210, the thermal break guide seat 220, and the thickness stop component 230 at the corresponding locking mark 241 using the sliding locking seat 240. After completing the above locking, the prefabricated insulation board 300 is placed into the movable positioning mother frame 200, so that the edge of the prefabricated insulation board 300 abuts against the board edge positioning arm 210, and the outer control surface of the prefabricated insulation board 300 corresponds to the stepped stop surface of the thickness stop component 230. Then, the thermal insulation anchor with heat insulation pad is installed through the guide hole 221 of the thermal break guide seat 220, so that the thermal insulation anchor enters the outer wall base layer 400 according to the thermal break anchoring coordinates. After the current prefabricated insulation board 300 is anchored, the connection between the movable positioning mother frame 200 and the temporary fixing seat is released, the movable positioning mother frame 200 is transferred to the next insulation board positioning unit 500, and the board edge positioning arm 210, thermal break guide seat 220 and thickness stop 230 are re-locked according to the positioning process package 700 of the next insulation board positioning unit 500.

[0145] In this embodiment, the movable positioning frame 200 is not a component permanently retained in the external wall insulation layer, but a transferable construction device that provides a temporary positioning reference during construction. After the prefabricated insulation board 300 is anchored, the movable positioning frame 200 can be removed from the external wall base layer 400 corresponding to the current insulation board positioning unit 500 and transferred to the external wall base layer 400 corresponding to the next insulation board positioning unit 500 for reuse. Through the cooperation between the positioning process package 700, the locking mark part 241, the board edge positioning arm 210, the thermal break guide seat 220, and the thickness stop 230, the construction positioning device can convert the board edge coordinates, thermal break anchoring coordinates, and positioning stop position into a structural locking position that can be executed on site, thereby adapting to the aforementioned prefabricated construction positioning method for energy-saving building external wall insulation.

[0146] In another embodiment, the positioning data processing unit may include a data import interface, a display module, and a locking position prompting module. The data import interface is used to import the positioning process package 700 of the current insulation board positioning unit 500. The display module is used to display the unit number, board edge coordinates, board seam coordinates, thermal break anchorage coordinates, gasket thickness grade, and positioning stop position. The locking position prompting module is used to indicate the locking positions of the board edge positioning arm, the thermal break guide seat, and the thickness stop. The locking position prompting module can use digital display, scale indication, light indication, or audio-visual prompting, without affecting the structural fit between the movable positioning mother frame 200, the board edge positioning arm 210, the thermal break guide seat 220, and the thickness stop 230.

[0147] In another embodiment, the sliding locking seat 240 may be equipped with a mechanical locking element, which may be a locking bolt, an eccentric locking element, a snap-locking element, or an elastic positioning pin. The edge positioning arm 210, the thermal break guide seat 220, and the thickness stop 230 are respectively fixed to the sliding locking seat 240 by their respective mechanical locking elements. After locking, the abutment surface of the edge positioning arm 210, the center of the guide hole 221 of the thermal break guide seat 220, and the stepped stop surface of the thickness stop 230 correspond to the edge coordinates, thermal break anchoring coordinates, and positioning stop positions in the positioning process package 700, respectively. The above structure enables the construction positioning device to achieve coordinated execution of edge positioning, thermal break anchoring, and thickness stop positioning without changing the main structure of the prefabricated insulation board 300.

[0148] Through the construction positioning device of this embodiment, the positioning process package 700 generated or received by the positioning data processing unit can be directly converted into the locking position of the three types of actuators on the movable positioning mother frame 200; the thermal break guide seat 220 can constrain the heat insulation gasket and the thermal insulation anchor within the installation channel corresponding to the thermal break anchor coordinate; the thickness stop 230 can limit the outward position of the prefabricated insulation board 300 according to the gasket thickness level; and the board edge positioning arm 210 can limit the board edge position of the prefabricated insulation board 300.

[0149] It should be noted that the embodiments of the present invention have better implementability and are not intended to limit the present invention in any way. Any person skilled in the art may use the above-disclosed technical content to change or modify it into equivalent effective embodiments. However, any modifications or equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention shall still fall within the scope of the technical solution of the present invention.

Claims

1. A prefabricated construction positioning method for green building exterior wall insulation, characterized in that, include: Obtain building energy-saving insulation design information for green building exterior walls, three-dimensional control points of exterior walls, opening boundaries, corner boundaries, expansion joint boundaries, embedded component locations and prefabricated insulation board specifications, and establish an exterior wall insulation positioning model including board position control layer, thermal break anchoring control layer and thickness compensation control layer; In the panel position control layer, insulation board positioning units and the panel edge coordinates and panel seam coordinates of each insulation board positioning unit are generated. In the broken bridge anchorage control layer, the opening boundary, the corner boundary, the expansion joint boundary, the slab joint coordinates and the position of the embedded component are combined into an anchorage-prohibited zone, and the broken bridge anchorage coordinates are generated outside the anchorage-prohibited zone; In the thickness compensation control layer, the gasket thickness level and positioning stop position corresponding to the broken bridge anchorage coordinate are generated based on the distance measurement value of the outer wall base surface, and the positioning stop position is output to the movable positioning mother frame. The movable positioning mother frame, which is equipped with a panel edge positioning arm, a thermal break guide seat, and a thickness stop, is fixed to the outer wall base surface corresponding to the current insulation board positioning unit. The panel edge coordinates are defined by the panel edge positioning arm, the thermal break anchoring coordinates are defined by the thermal break guide seat, and the positioning stop position is defined by the thickness stop. The prefabricated insulation board is placed into the movable positioning mother frame, and the insulation anchor with heat insulation pad is installed through the broken bridge guide seat. The movable positioning mother frame is then removed and transferred to the next insulation board positioning unit.

2. The prefabricated construction positioning method for green building exterior wall insulation according to claim 1, characterized in that, Establishing the external wall insulation positioning model includes: using the intersection of the floor elevation line and the external wall structural axis as the model origin, configuring a unit number for each insulation board positioning unit, and associating the board edge coordinates, board joint coordinates, thermal break anchorage coordinates, gasket thickness grade, and positioning stop position under the same unit number.

3. The prefabricated construction positioning method for green building exterior wall insulation according to claim 2, characterized in that, In the panel position control layer, a unit adjacency relationship is established, the coordinates of the adjacent panel edges of the installed insulation panel positioning unit are set as the starting constraint coordinates of the uninstalled insulation panel positioning unit, and multiple insulation panel positioning units located in the same row or column are configured as the same coordinate transfer group.

4. The prefabricated construction positioning method for green building exterior wall insulation according to claim 1, characterized in that, Fixing the movable positioning mother frame includes: decomposing the plate edge coordinates into horizontal plate edge coordinates and vertical plate edge coordinates; setting temporary fixing holes outside the broken bridge anchorage coordinates; fixing the temporary fixing seat to the temporary fixing holes; installing the horizontal reference beam and the vertical reference beam on the temporary fixing seat; and making the horizontal reference beam and the vertical reference beam correspond to the horizontal plate edge coordinates and vertical plate edge coordinates of the current insulation board positioning unit, respectively.

5. The prefabricated construction positioning method for green building exterior wall insulation according to claim 1, characterized in that, The synthesis of the anchor-free zone includes: expanding the opening boundary, the corner boundary, the expansion joint boundary, and the plate joint coordinates outward to form boundary anchor-free zones, expanding the pre-embedded component positions outward to form component anchor-free blocks, and combining the boundary anchor-free zones and component anchor-free blocks into the anchor-free zone.

6. The prefabricated construction positioning method for green building exterior wall insulation according to claim 5, characterized in that, Generating the anchorage coordinates of the broken bridge includes: generating candidate anchorage points within the insulation board positioning unit; when the candidate anchorage point is outside the no-anchorage zone, determining the candidate anchorage point as the anchorage coordinates of the broken bridge; when the candidate anchorage point is within the no-anchorage zone, translating the candidate anchorage point along a first avoidance direction parallel to the joint line corresponding to the joint coordinates to a first correction point; when the first correction point is outside the no-anchorage zone and the correction path from the candidate anchorage point to the first correction point does not cross the joint line corresponding to the joint coordinates, determining the first correction point as the anchorage coordinates of the broken bridge; when the first correction point is within the no-anchorage zone, or when the correction path from the candidate anchorage point to the first correction point crosses the joint line corresponding to the joint coordinates, translating the first correction point along a second avoidance direction perpendicular to the adjacent joint to a second correction point, and determining the second correction point, which is outside the no-anchorage zone and whose correction path from the first correction point to the second correction point does not cross the joint line corresponding to the joint coordinates, as the anchorage coordinates of the broken bridge.

7. The green building exterior wall insulation prefabricated construction positioning method according to claim 6, characterized in that, When the candidate anchor point is translated to the first correction point or the second correction point, the distance measurement value of the outer wall base surface corresponding to the anchor coordinate of the broken bridge is reread in the thickness compensation control layer, and the gasket thickness level and the positioning stop position are updated according to the reread distance measurement value of the outer wall base surface.

8. The prefabricated construction positioning method for green building exterior wall insulation according to claim 5, characterized in that, Based on the distribution of the anchorage prohibition zone within the insulation board positioning unit, the insulation board positioning unit is divided into standard positioning unit, opening edge positioning unit, corner positioning unit, and expansion joint positioning unit, and corresponding plate edge positioning reference and number of broken bridge anchorage coordinates are configured for different types of insulation board positioning units.

9. The prefabricated construction positioning method for green building exterior wall insulation according to claim 8, characterized in that, The opening edge positioning unit is equipped with an opening reverse snap positioning frame, the corner positioning unit is equipped with a corner synchronous positioning frame, and the expansion joint positioning unit is equipped with a double-sided joint width limiting frame. The opening reverse snap positioning frame, the corner synchronous positioning frame or the double-sided joint width limiting frame are detachably connected to the movable positioning mother frame.

10. A prefabricated construction positioning device for green building exterior wall insulation, characterized in that, Includes a positioning data processing unit, a movable positioning mother frame, a plate-side positioning arm, a thermal break guide seat, a thickness stop, a heat insulation pad, and a heat insulation anchor. The positioning data processing unit is used to generate a positioning process package, which includes a unit number, plate edge coordinates, plate joint coordinates, broken bridge anchorage coordinates, gasket thickness grade, positioning stop position, plate edge positioning arm locking position, broken bridge guide seat locking position, and thickness stop component locking position. The movable positioning mother frame includes a temporary fixing seat, a horizontal reference beam, a vertical reference beam, and a sliding locking seat. The horizontal reference beam and the vertical reference beam are detachably installed on the temporary fixing seat, and the sliding locking seat is installed on the horizontal reference beam or the vertical reference beam. The sliding locking seat is provided with a locking mark, which corresponds to the locking position of the plate edge positioning arm, the locking position of the broken bridge guide seat, and the locking position of the thickness stop. The plate edge positioning arm, the broken bridge guide seat, and the thickness stop are respectively installed on the movable positioning mother frame via the sliding locking seat; The broken bridge guide seat is provided with a guide hole and a heat insulation gasket positioning cavity, and the guide hole and the heat insulation gasket positioning cavity are coaxially arranged; The thickness stop member is provided with a stepped stop surface corresponding to different gasket thickness grades; The heat insulation pad is disposed in the heat insulation pad positioning cavity, and the heat insulation anchor passes through the guide hole and the heat insulation pad.

Citation Information

Patent Citations

  • Installation structure and method special for external-wall insulation boards

    CN107663949A