A method and system for controlling drainage in cable trenches

By acquiring the water accumulation status and regional correlation of the drainage area in the cable trench, the migration path and direction are determined. Combined with the moisture risk of cable joints, a dynamically adjusted drainage control strategy is formulated, which solves the problem that the water migration pattern and moisture risk are not fully considered in the existing technology, and improves the accuracy and efficiency of drainage control.

CN123067210APending Publication Date: 2026-11-10CPI HENAN POWER LTD CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611227746.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-13
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing cable trench drainage control methods do not fully consider the water migration patterns between different drainage areas and the risk of moisture damage to cable joints. This results in untimely identification of objects affected by water accumulation, unreasonable selection of drainage areas, and an inability to dynamically adjust control strategies, leading to ineffective equipment operation or failure to prioritize the protection of joints with high risk of moisture damage.

Method used

By acquiring information on the water accumulation status and regional relationships of multiple drainage areas within the cable trench, the migration path and direction of the accumulated water can be determined. Combined with the moisture risk of cable joints, a dynamically adjusted drainage control strategy can be formulated, including the target drainage area and equipment operation mode.

Benefits of technology

It improves the accuracy of water migration direction judgment and the comprehensiveness of cable joint moisture risk assessment, optimizes the targeting of drainage control and equipment operating efficiency, and reduces problems such as unreasonable drainage location and control lag.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123067210A_ABST
    Figure CN123067210A_ABST
Patent Text Reader

Abstract

This invention relates to the field of power facility drainage control technology, and discloses a method and system for cable trench drainage control. The method determines the migration path and direction of accumulated water based on the water accumulation status information and regional relationships of multiple drainage areas; determines the moisture risk and target cable joints based on the joint status information of cable joints; determines the target drainage area and the operating mode of the drainage equipment based on the migration path, migration direction, and moisture risk of the target cable joints; controls the operation of the drainage equipment; and updates the migration path and migration direction based on the water accumulation status information after drainage. This invention can implement drainage control by combining water migration patterns and cable joint moisture risk, and can dynamically adjust based on the drainage effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of power facility operation monitoring and drainage control technology, specifically relating to a cable trench drainage control method and system. Background Technology

[0002] Cable trenches are used for laying power cables and installing cable joints. Due to factors such as rainwater infiltration, groundwater backflow, drainage pipe backflow, or localized leakage within the trench, water may accumulate inside. This accumulated water migrates along the bottom of the trench, through connecting openings, or along different sections, potentially reaching the cable joints directly. It can also increase humidity within the trench and cause condensation on the cable joint surfaces, thereby increasing the risk of moisture damage to the cable joint insulation and operational failures.

[0003] Existing cable trench drainage control typically involves installing water level sensors in sump pits or localized low-lying areas. The corresponding drainage equipment is activated when the water level reaches a threshold and deactivated when the water level drops to a stop threshold. This control method primarily determines the start / stop status of the drainage equipment based on the current water level at a single monitoring location, failing to adequately analyze the temporal relationships of water accumulation changes in different drainage areas, nor does it consider regional connectivity, elevation, and barrier relationships to determine the migration path and direction of water between different drainage areas. Therefore, a low local water level does not necessarily mean that water will not continue to migrate in. Controlling based solely on local water levels easily leads to a mismatch between the drainage location and the actual migration direction of the water.

[0004] Furthermore, the location, surrounding water conditions, ambient temperature and humidity, joint surface temperature, and insulation condition of different cable joints vary, resulting in different moisture risks. Existing control methods typically do not consider the risks of water proximity, condensation, and insulation moisture absorption in drainage decisions, making it difficult to prioritize the protection of cable joints with higher moisture risks. Additionally, after drainage equipment is operational, water migration patterns may change due to water level drops, changes in flow direction, or localized water redistribution. Using fixed drainage sequences or operating parameters fails to dynamically adjust drainage control strategies based on actual drainage results, potentially leading to delayed drainage, ineffective operation of drainage equipment, or failure to prioritize the protection of cable joints with high moisture risks. Summary of the Invention

[0005] The technical problem to be solved by this invention is: addressing the issue that existing cable trench drainage control mainly relies on directly starting and stopping drainage equipment based on local water levels, without fully considering the water migration patterns between different drainage areas and the moisture risk of different cable joints, resulting in untimely identification of water-affected objects, unreasonable selection of drainage areas, failure to prioritize protection of cable joints with high moisture risk, and the inability to dynamically adjust drainage control strategies according to actual drainage effects. This invention provides a cable trench drainage control method and system.

[0006] To solve the above-mentioned technical problems, the present invention provides a cable trench drainage control method, comprising: This invention is implemented as follows: a cable trench drainage control method, comprising: Obtain water accumulation status information of multiple drainage areas in the cable trench, and determine the migration path and migration direction of water between the multiple drainage areas based on the water accumulation status information and the regional correlation between the multiple drainage areas; Obtain the joint status information of the cable joint, determine the moisture risk of each cable joint based on the joint status information, and identify the cable joint whose moisture risk meets the preset risk conditions as the target cable joint. The joint status information includes the water accumulation status of the adjacent area, the humidity of the joint environment, the temperature of the joint environment, the surface temperature of the joint, and the leakage current of the cable sheath. Based on the migration path, the migration direction, and the moisture risk of the target cable joint, a drainage control strategy is determined. The drainage control strategy includes the target drainage area and the operation mode of the drainage equipment corresponding to the target drainage area. The drainage equipment is controlled to operate according to the drainage control strategy, and the migration path and migration direction are updated based on the water accumulation status information after drainage.

[0007] Preferably, the water accumulation status information includes water level information and water level change information corresponding to each drainage area, and also includes at least one of flow rate information, water accumulation range information, and water accumulation change rate; The regional relationships include regional connectivity relationships, and also include at least one of regional location relationships, regional elevation relationships, and regional barrier relationships; The migration path and the migration direction constitute a water accumulation migration relationship, which also includes at least one of migration intensity and migration probability.

[0008] Preferably, determining the migration path and direction of water between multiple drainage areas based on the water accumulation status information and the regional correlation between multiple drainage areas includes: Based on the water accumulation status information of each drainage area, extract the water accumulation status response features of each drainage area. The water accumulation status response features include at least two of the following: water accumulation change time, water accumulation change rate, water accumulation change amplitude, and water accumulation change trend. Candidate migration directions are determined based on the temporal relationship between the response characteristics of water accumulation status in different drainage areas; The candidate migration directions are filtered based on the regional relationships. The migration path and the migration direction are determined based on the connection relationships between the selected candidate migration directions.

[0009] Preferably, the candidate migration direction is determined based on the temporal relationship between the water accumulation state response characteristics corresponding to different drainage areas, including: Determine the response time for changes in water accumulation status in adjacent drainage areas; Based on the sequential relationship of the response times of the adjacent drainage areas, the candidate migration directions between the adjacent drainage areas are determined; The migration intensity corresponding to the candidate migration direction is determined based on the response time difference, water accumulation rate, and water accumulation amplitude between the adjacent drainage areas.

[0010] Preferably, determining the moisture risk of each cable joint based on the joint status information includes: The risk of water accumulation near the cable joint is determined based on the water accumulation status of the adjacent area. The dew point temperature is determined based on the ambient humidity and ambient temperature of the joint, and the condensation risk is determined based on the difference between the dew point temperature and the surface temperature of the joint. The risk of insulation moisture absorption is determined based on the leakage current of the cable sheath. The moisture risk of the cable joint is determined based on the risks of water accumulation, condensation, and insulation moisture.

[0011] Preferably, determining the risk of insulation moisture based on the cable sheath leakage current includes: Obtain historical cable sheath leakage current under different operating loads and environmental conditions; Based on the historical cable sheath leakage current, establish the correspondence between operating load, environmental conditions and leakage current reference value; Obtain the current operating load and the current environmental status, and determine the leakage current reference value corresponding to the current operating load and the current environmental status according to the correspondence; The risk of insulation moisture is determined based on the deviation between the current cable sheath leakage current and the reference leakage current value.

[0012] Preferably, a drainage control strategy is determined based on the migration path, the migration direction, and the moisture risk of the target cable joint, including: Based on the migration path and the migration direction, multiple candidate drainage areas that have a water accumulation migration relationship with the target cable joint are identified; Determine the degree of influence of each candidate drainage area on the migration of the target cable joint; Based on the migration impact of each candidate drainage area and the moisture risk of the target cable joint, the drainage control priority of each candidate drainage area is determined. The target drainage area is determined based on the drainage control priority, and the operation mode of the drainage equipment corresponding to the target drainage area is determined to generate the drainage control strategy. The operation mode of the drainage equipment includes at least one of the following: the start-up and shutdown sequence of the drainage equipment, the running time, and the drainage power.

[0013] Preferably, determining the migration influence of each candidate drainage area on the target cable joint includes: Determine the migration intensity between the candidate drainage area and the drainage area where the target cable joint is located; The migration distance from the candidate drainage area to the drainage area where the target cable joint is located is determined based on the migration path; The migration impact degree is determined based on the water accumulation status of the candidate drainage area, the migration intensity, and the migration distance; The migration influence increases with the degree of water accumulation in the candidate drainage area and the migration intensity, and decreases with the migration distance.

[0014] Preferably, updating the migration path and the migration direction based on the water accumulation status information after drainage includes: Obtain information on water accumulation status after the drainage equipment has been operated; Based on the water accumulation status information before and after the operation of the drainage equipment, determine the change in water accumulation status for each drainage area; If the change in the water accumulation status meets the preset update conditions, the migration path and migration direction between the multiple drainage areas are redefined. Based on the updated migration path and migration direction, the migration impact degree corresponding to each candidate drainage area is re-determined; If the drainage control priority corresponding to the updated migration impact changes, the operation mode of the target drainage area or the drainage equipment shall be adjusted.

[0015] The present invention also provides a cable trench drainage control system, comprising: Multiple water level sensors are installed in multiple drainage areas of the cable trench; An ambient humidity sensor and an ambient temperature sensor are located near the cable connector; A connector temperature sensor is disposed on the surface of the cable connector; A leakage current sensor is installed on the grounding lead of the cable sheath corresponding to the cable joint; Multiple drainage devices are connected to their respective drainage areas; The controller includes a processor and a memory connected to the processor. The processor is electrically connected to the water level sensor, the ambient humidity sensor, the ambient temperature sensor, the connector temperature sensor, the leakage current sensor, and the drainage device, respectively. The memory stores a computer program, and when the processor executes the computer program, it implements the cable trench drainage control method according to any one of claims 1-9.

[0016] Compared with the prior art, the present invention has at least the following beneficial effects: Identifying candidate migration directions based on the response characteristics and temporal relationships of water accumulation in different drainage areas can reflect the dynamic process of water migration from earlier responding areas to later responding areas, improving the accuracy of migration direction determination. Utilizing regional correlations to filter candidate migration directions can eliminate those that do not conform to regional connectivity, elevation, or obstruction relationships, improving the consistency and reliability of migration paths with the actual structure of the cable trench.

[0017] By comprehensively considering the water accumulation status of the adjacent area, the humidity of the joint environment, the temperature of the joint environment, the surface temperature of the joint, and the leakage current of the cable sheath, the risks of water accumulation proximity, condensation, and insulation moisture absorption are determined, improving the comprehensiveness of the cable joint moisture absorption risk assessment. The drainage control priority is determined by combining the water migration patterns, migration impact, and the moisture absorption risk of the target cable joint, ensuring that limited drainage resources are prioritized for blocking or mitigating water migration towards cable joints with high moisture absorption risk.

[0018] The migration path, migration direction, migration impact, and drainage control priority are updated based on changes in the water accumulation status after drainage, enabling the drainage control strategy to adapt to changes in the actual water distribution and migration status during the drainage process. This reduces unreasonable drainage locations, control lags, and ineffective operation of drainage equipment caused by starting and stopping drainage equipment solely based on single-point water levels, thereby improving the targeting of cable trench drainage control and equipment operating efficiency. Attached Figure Description

[0019] Figure 1 This is a flowchart illustrating the overall process of the cable trench drainage control method of the present invention.

[0020] Figure 2 This is a flowchart illustrating the determination of the migration path and migration direction in this invention.

[0021] Figure 3 This is a flowchart illustrating the determination of the moisture risk of cable joints according to the present invention.

[0022] Figure 4 This is a flowchart illustrating the generation process of the drainage control strategy of the present invention.

[0023] Figure 5 This is a flowchart illustrating the feedback update process of the drainage control strategy of this invention.

[0024] Figure 6 This is a schematic diagram of the cable trench drainage control system of the present invention.

[0025] Figure 7 This is a schematic diagram illustrating the relationship between multiple drainage areas and water migration in this invention.

[0026] Figure label: 100. Cable trench drainage control system; 110. Water level sensor; 120. Ambient humidity sensor; 130. Ambient temperature sensor; 140. Joint temperature sensor; 150. Leakage current sensor; 160. Drainage equipment; 170. Controller; 171. Processor; 172. Memory; 200. Cable trench; 210. Drainage area; 220. Cable joint. Detailed Implementation

[0027] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.

[0028] like Figure 6 As shown, the cable trench drainage control system 100 includes multiple water level sensors 110, an ambient humidity sensor 120, an ambient temperature sensor 130, a joint temperature sensor 140, a leakage current sensor 150, multiple drainage devices 160, and a controller 170.

[0029] The cable trench 200 is pre-divided into multiple drainage zones 210 based on the location of the cable joints 220, the water collection point, the location of the drainage equipment 160, the trench's interconnectivity, and elevation changes. A drainage zone 210 can be a section of the trench between two adjacent barrier components, or an area bounded by a collection well, a low-lying point, or the effective drainage range of the drainage equipment 160. For longer, continuous trench sections, multiple drainage zones 210 can be divided based on the water level monitoring coverage distance. Each drainage zone 210 is assigned a unique zone identifier.

[0030] Multiple water level sensors 110 are respectively installed in multiple drainage areas 210. One water level sensor 110 can be installed in one drainage area 210, or multiple water level sensors 110 can be installed along the possible flow direction of the accumulated water. The water level sensors 110 send the collected water level information, its corresponding area identifier, and the acquisition time to the processor 171. In addition to water level information and water level change information, the water accumulation status information may also include at least one of the following: flow rate information, water accumulation range information, and water accumulation change rate. Flow rate information can be obtained by a flow monitoring device installed at the area connection point; water accumulation range information can be obtained by detection points or image acquisition devices arranged at different heights along the ditch wall; the water accumulation change rate can be calculated by the processor 171 based on continuous water level information.

[0031] An ambient humidity sensor 120 and an ambient temperature sensor 130 are disposed near the cable connector 220 to acquire the ambient humidity and ambient temperature of the connector, respectively. The "nearby" location can be a position at a preset distance from the cable connector 220 that reflects the air conditions surrounding the cable connector 220. A connector temperature sensor 140 is attached to or fixed to the surface of the cable connector 230 to acquire the surface temperature of the connector.

[0032] A leakage current sensor 150 is installed on the cable sheath grounding lead corresponding to the cable joint 220 to acquire the cable sheath leakage current. The leakage current sensor 150 can be a through-hole current sensor to detect the cable sheath leakage current without changing the original connection state of the cable sheath grounding lead.

[0033] Multiple drainage devices 160 are connected to corresponding drainage areas 210. The drainage devices 160 can be installed at water collection points within the drainage area 210, or connected to the corresponding drainage area 210 via inlet pipes. The outlet of each drainage device 160 is connected to a drainage pipe outside the cable trench 200. Each drainage device 160 has a corresponding device identifier and area identifier, and can perform start-up, stop, runtime adjustment, or drainage power adjustment according to control commands output by the controller 170.

[0034] The controller 170 includes a processor 171 and a memory 172 connected to the processor 171. The processor 171 is electrically connected to a water level sensor 110, an ambient humidity sensor 120, an ambient temperature sensor 130, a connector temperature sensor 140, a leakage current sensor 150, and a drainage device 160. The electrical connections include wired electrical connections formed through signal lines, fieldbuses, or communication interfaces.

[0035] The memory 172 is used to store computer programs, area identifiers of each drainage area 210, connector identifiers of each cable connector 220, area association relationships, correspondence between sensors and areas or cable connectors 220, correspondence between drainage equipment 160 and drainage area 210, historical water accumulation status information, historical cable sheath leakage current, leakage current reference value, and intermediate data generated during the control process.

[0036] The regional relationships can be stored in memory 172 in the form of a regional relationship table or a regional relationship diagram. When using a regional relationship diagram, each drainage area 210 corresponds to a node, and the regional connectivity between adjacent drainage areas 210 corresponds to the edges between nodes. Each edge can also record at least one of the regional location relationship, regional elevation relationship, and regional barrier relationship. The regional barrier relationship is used to indicate whether there are closed partitions, fireproof barriers, closed gates, or other structures that prevent the migration of accumulated water between adjacent drainage areas 210.

[0037] The processor 171 receives data from each sensor according to a preset sampling period and writes it into the corresponding data sequence based on the sensor identifier, area identifier, connector identifier, and acquisition time carried in the data. When the processor 171 executes the computer program in the memory 172, it sequentially completes the following steps: extraction of water accumulation state response features, generation of candidate migration directions, screening of regional correlations, generation of migration paths and migration directions, determination of three types of moisture risks, determination of target cable connectors, determination of migration impact, determination of drainage control priority, output of drainage control commands, and update of drainage results feedback.

[0038] This application also provides a method for controlling drainage in cable trenches, such as... Figure 1 As shown, Figure 1 The overall flowchart of the cable trench drainage control method of the present invention includes: S100: Obtain water accumulation status information of multiple drainage areas 210 within the cable trench 200, and determine the migration path and direction of water accumulation between the multiple drainage areas 210 based on the water accumulation status information and the regional correlation between the multiple drainage areas 210.

[0039] The processor 171 arranges the data output by each water level sensor 110 according to the acquisition time, forming a water level information sequence corresponding to each drainage area 210. The processor 171 can perform outlier removal and smoothing on the water level information sequence, and determine the water level change information and water accumulation rate based on the water level difference between adjacent sampling times.

[0040] like Figure 2 As shown, the process of determining the migration path and migration direction includes S110 to S140.

[0041] S110, based on the water accumulation status information corresponding to each drainage area, extract the water accumulation status response features corresponding to each drainage area. The water accumulation status response features include at least two of the following: water accumulation change time, water accumulation change rate, water accumulation change amplitude, and water accumulation change trend.

[0042] The processor 171 extracts water accumulation status response features from the water accumulation status information of each drainage area 210. The water accumulation status response features include at least two of the following: water accumulation change time, water accumulation change rate, water accumulation change magnitude, and water accumulation change trend.

[0043] The moment of water level change can be determined as the moment when the change in water level relative to the reference water level first reaches a preset change threshold. To avoid misjudgment caused by instantaneous fluctuations, the processor 171 can also require the water level change to maintain the same direction of change over multiple consecutive sampling periods.

[0044] The rate of change in water level can be determined by the ratio of the change in water level information within a preset time window to the length of the time window. The magnitude of the change in water level can be determined by the difference between the current water level and the baseline water level before the change began. The trend of the change in water level can be determined as an upward trend, a stable trend, or a downward trend based on the fitted slope of the water level information within the preset time window.

[0045] S120, determine the candidate migration direction based on the temporal relationship between the water accumulation state response characteristics of different drainage areas.

[0046] Specifically, this includes steps S121 to S123.

[0047] S121, determine the response time of water accumulation changes in adjacent drainage areas 210.

[0048] The processor 171 reads the adjacent drainage areas 210 with regional connectivity from the regional relationship graph, and obtains the time of water accumulation change of the adjacent drainage areas 210 as the response time.

[0049] S122, determine the candidate migration direction based on the sequential relationship of the response times of adjacent drainage areas 210.

[0050] When the response time of the first drainage area is earlier than that of the second drainage area, and the water accumulation trends of the two areas correspond to each other, the direction from the first drainage area to the second drainage area will be determined as the candidate migration direction.

[0051] S123, based on the response time difference, water accumulation rate and water accumulation amplitude between adjacent drainage areas 210, determine the migration intensity corresponding to the candidate migration direction.

[0052] In one implementation, the processor 171 normalizes the response time difference, the rate of change of water accumulation, and the magnitude of change of water accumulation, respectively. The migration strength of the candidate migration direction can be determined by the following formula:

[0053] Among them, M ij Δt represents the migration intensity from the i-th drainage area to the j-th drainage area. ij This represents the response time difference between the two drainage zones 210; v j Δh represents the rate of change of water accumulation in the post-response drainage area. j Indicates the magnitude of water accumulation change in the subsequent drainage area; F t F v and F h Let a, b, c, and d represent the normalization functions respectively; a1, a2, and a3 are weights, and the sum of the three is 1.

[0054] Among them, F t It can be set as a function that decreases as the response time difference increases, so that two drainage areas 210 with closer response times have a higher degree of migration correlation. Each weight can be determined based on historical water accumulation migration data, or it can be preset according to the structural characteristics of the cable trench 200.

[0055] Migration probability can be determined by the ratio of the number of times the same candidate migration direction appears in historical flooding events to the total number of corresponding flooding events, or it can be obtained by mapping migration intensity.

[0056] S130, the candidate migration directions are filtered according to the regional association relationship.

[0057] The processor 171 reads the region connectivity relationship from the memory 172 and deletes candidate migration directions that do not have an actual connection channel between the two drainage regions 210.

[0058] For adjacent drainage areas 210 with regional elevation relationships, in the absence of a forced water conveyance structure, candidate migration directions that clearly do not conform to the achievable water flow conditions can be deleted. For adjacent drainage areas 210 with regional barrier relationships, if the barrier structure is in a closed state, candidate migration directions that cross the barrier structure are deleted; if the barrier structure has water passage holes or is in an open state, candidate migration directions that meet the water passage conditions are retained.

[0059] The regional location relationship is used to verify whether the two drainage areas 210 connected by the candidate migration direction are spatially adjacent or indirectly connected through an intermediate drainage area 210. This allows for the elimination of unreasonable candidate migration directions formed solely by synchronous rainfall, sensor fluctuations, or simultaneous water accumulation in non-adjacent areas.

[0060] S140, determine the migration path and the migration direction based on the connection relationship between the selected candidate migration directions.

[0061] The processor 171 uses the selected candidate migration directions as directed edges and forms a water accumulation migration relationship graph according to the connection relationship between different candidate migration directions.

[0062] The migration path is a directed path from the starting drainage area through one or more drainage areas 210 to the target drainage area in the water migration relationship diagram. The migration direction is the direction of water flow between adjacent drainage areas 210 in the migration path.

[0063] like Figure 7 As shown, when the response time of the first drainage area is earlier than that of the second drainage area, the response time of the second drainage area is earlier than that of the third drainage area, and the first drainage area and the second drainage area, as well as the second drainage area and the third drainage area, satisfy the regional association relationship, the migration path from the first drainage area through the second drainage area to the third drainage area can be determined. The migration directions are, in order, from the first drainage area to the second drainage area and from the second drainage area to the third drainage area.

[0064] The migration path and migration direction constitute the water accumulation migration relationship. The water accumulation migration relationship may also include at least one of the migration intensity and migration probability corresponding to each migration direction.

[0065] S200, obtain the joint status information of the cable joint, determine the moisture risk of each cable joint based on the joint status information, and determine the cable joint whose moisture risk meets the preset risk conditions as the target cable joint. The joint status information includes the water accumulation status of the adjacent area, the humidity of the joint environment, the temperature of the joint environment, the surface temperature of the joint, and the leakage current of the cable sheath.

[0066] The processor 171 obtains the joint status information of the cable joint 220 based on the spatial correspondence between the cable joint 220 and the drainage area 210. The joint status information includes the water accumulation status of the adjacent area, the humidity of the joint environment, the ambient temperature of the joint, the surface temperature of the joint, and the leakage current of the cable sheath.

[0067] The water accumulation status in the adjacent area can be the water accumulation status of the drainage area 210 where the cable connector 220 is located, or it can include the water accumulation status of adjacent drainage areas 210 that are directly connected to the drainage area 210 where the cable connector 220 is located and into which water may migrate. The processor 171 queries the drainage area 210 where the cable connector 220 is located based on the connector identifier, and then obtains the water accumulation status of the adjacent area from the data sequence of the corresponding water level sensor 110.

[0068] like Figure 3 As shown, Figure 3 This is a schematic diagram of step S200 provided in an embodiment of the present invention.

[0069] S210, determine the risk of water accumulation near the cable joint based on the water accumulation status of the adjacent area.

[0070] The processor 171 determines the risk of water accumulation based on the water accumulation status of the adjacent area. The water accumulation status of the adjacent area may include the current water level of the adjacent area, the rate of water accumulation change, the extent of water accumulation, and the elevation difference or spatial distance between the water accumulation and the cable joint 220.

[0071] In one implementation, a first water level threshold and a second water level threshold higher than the first water level threshold are preset. When the current water level in the adjacent area is lower than the first water level threshold, the risk of approaching floodwater is in the low-risk range; when the current water level in the adjacent area is between the first and second water level thresholds, the risk of approaching floodwater is determined based on the current water level and the rate of change of floodwater; when the current water level in the adjacent area reaches or exceeds the second water level threshold, the risk of approaching floodwater is in the high-risk range.

[0072] When the migration path points to the drainage area 210 where the cable joint 220 is located, the processor 171 can also increase the risk of water accumulation near the cable joint 220 based on the migration intensity or migration probability. Thus, the risk of water accumulation can be identified in advance based on the water migration relationship before the water reaches the vicinity of the cable joint 220.

[0073] S220 determines the dew point temperature based on the ambient humidity and ambient temperature of the joint, and determines the condensation risk based on the difference between the dew point temperature and the surface temperature of the joint.

[0074] The processor 171 determines the dew point temperature based on the ambient humidity and temperature of the joint, and determines the condensation risk based on the difference between the dew point temperature and the surface temperature of the joint.

[0075] In one implementation, processor 171 uses a dew point calculation model to determine the dew point temperature:

[0076] Where RH represents the ambient humidity of the joint, T e Indicates the ambient temperature of the connector, T d This represents the dew point temperature, and b and c are model parameters corresponding to the temperature range.

[0077] Processor 171 calculates the difference between the dew point temperature and the joint surface temperature. When the joint surface temperature is higher than the dew point temperature and the difference is large, the risk of condensation is low; when the joint surface temperature is close to the dew point temperature, the risk of condensation increases; when the joint surface temperature is not higher than the dew point temperature, the cable joint 220 is determined to have a high risk of condensation.

[0078] To avoid misjudgment caused by instantaneous temperature changes, the processor 171 can determine the condensation risk based on the temperature difference over multiple consecutive sampling periods, or correct the condensation risk based on the duration of the temperature difference reaching the corresponding risk range.

[0079] S230, determine the risk of insulation moisture based on the leakage current of the cable sheath.

[0080] S230 includes S231 to S234.

[0081] S231, obtain the historical cable sheath leakage current under different operating loads and environmental conditions.

[0082] The operating load can be divided into multiple load ranges based on the load current, load rate, or power of the cable circuit. The environmental condition can be divided into multiple environmental condition ranges based on at least one of the following: joint ambient humidity, joint ambient temperature, and water accumulation in the adjacent area. The processor 171 associates and saves the historical cable sheath leakage current under normal insulation conditions with the corresponding operating load, environmental condition, and acquisition time.

[0083] S232, Based on the historical cable sheath leakage current, establish the correspondence between operating load, environmental conditions and leakage current reference value.

[0084] Processor 171 statistically analyzes historical cable sheath leakage currents within the same operating load range and environmental condition range. After removing abnormal data, the median, mean, or preset quantile can be determined as the corresponding leakage current reference value. A reference relationship table is formed by multiple operating load ranges, multiple environmental condition ranges, and their corresponding leakage current reference values.

[0085] S233, obtain the current operating load and the current environmental state, and determine the leakage current reference value corresponding to the current operating load and the current environmental state according to the correspondence.

[0086] The processor 171 queries the reference relationship table based on the load interval where the current operating load is located and the environmental state interval where the current environmental state is located. When the current operating load or the current environmental state is located between adjacent intervals, it can interpolate based on the leakage current reference values ​​corresponding to the adjacent intervals to obtain the leakage current reference value corresponding to the current operating load and the current environmental state.

[0087] S234, determine the insulation moisture risk based on the deviation between the current cable sheath leakage current and the leakage current reference value.

[0088] The deviation can be the difference between the current cable sheath leakage current and the leakage current reference value, or it can be the ratio of the difference to the leakage current reference value. The processor 171 determines the insulation moisture risk based on the correspondence between the deviation and a preset deviation range. The larger the deviation, the higher the insulation moisture risk.

[0089] The processor 171 may also require the deviation to remain above a preset deviation threshold for multiple consecutive sampling periods in order to reduce the impact of load transients or detection noise on the risk of insulation moisture.

[0090] S240, determine the moisture risk of the cable joint based on the risk of water accumulation, the risk of condensation, and the risk of insulation moisture.

[0091] The processor 171 determines the moisture risk of the cable joint 220 based on the risks of water accumulation, condensation, and insulation moisture.

[0092] In one implementation, the three types of risks are normalized to the same risk range, and a weighted average method is used to determine the risk of moisture absorption:

[0093] Where R represents the risk of moisture, R w Indicates that the water level is approaching a risk, R c Indicates the risk of condensation, R i The values ​​represent the risk of insulation moisture, with w1, w2, and w3 being the corresponding weights, and the sum of the three is 1.

[0094] The weighted result can also be corrected based on the maximum value among the three types of risks, so that when any single risk reaches the severe risk range, the corresponding cable joint 220 can be promptly identified as the target cable joint.

[0095] The preset risk conditions may include at least one of the following: the moisture risk reaches a preset risk threshold, the moisture risk is within a preset ranking range of all cable joints 220, or the increase in moisture risk within a preset time reaches a preset increment threshold. The processor 171 determines the cable joints 220 whose moisture risk meets the preset risk conditions as target cable joints.

[0096] S300, based on the migration path, the migration direction and the moisture risk of the target cable joint, a drainage control strategy is determined, the drainage control strategy including the target drainage area and the operation mode of the drainage equipment corresponding to the target drainage area.

[0097] Processor 171 determines a drainage control strategy based on the migration path, migration direction, and the risk of moisture absorption at the target cable joint. For example... Figure 4 As shown, the process of generating the drainage control strategy includes S310 to S340.

[0098] S310, based on the migration path and the migration direction, determine multiple candidate drainage areas that have a water accumulation migration relationship with the target cable joint.

[0099] The processor 171 takes the drainage area where the target cable connector is located as the target connector area, and performs a reverse query in the water migration relationship graph to find all drainage areas 210 that can reach the target connector area along the migration path.

[0100] Drainage areas 210 that have a water migration relationship with the target cable joint are identified as candidate drainage areas. Candidate drainage areas may include the target joint area itself, or one or more drainage areas 210 located upstream of the migration path and where water can migrate towards the target joint area.

[0101] S320, determine the migration influence of each of the candidate drainage areas on the target cable joint. S320 includes S321 to S323.

[0102] S321, determine the migration intensity between the candidate drainage area and the drainage area where the target cable joint is located.

[0103] When the candidate drainage area and the target joint area are directly adjacent, the migration intensity corresponding to the candidate migration direction between them can be used. When there are multiple intermediate drainage areas 210 between them, the migration intensity from the candidate drainage area to the target joint area can be determined based on the product, minimum value, or weighted result of the migration intensity of each segment in the migration path.

[0104] S322, determine the migration distance from the candidate drainage area to the drainage area where the target cable joint is located based on the migration path.

[0105] The migration distance can be the sum of the actual channel lengths between each drainage zone 210 in the migration path, or it can be the number of connecting segments within the migration path. When multiple migration paths exist, the effective migration path with the shortest migration distance can be selected, or the overall migration distance can be determined by combining the migration probabilities corresponding to each migration path.

[0106] S323, determine the migration impact degree based on the water accumulation status of the candidate drainage area, the migration intensity, and the migration distance.

[0107] In one implementation, the migration impact is determined using the following formula:

[0108] Among them, I kj P represents the migration influence of the k-th candidate drainage area on the j-th target cable joint; k M represents the water accumulation level of the k-th candidate drainage area; kj D represents the migration intensity from the k-th candidate drainage area to the drainage area where the j-th target cable joint is located; kj λ represents the corresponding migration distance; λ represents the distance correction coefficient.

[0109] Using the above determination method, the migration impact increases with the degree of water accumulation in the candidate drainage area, increases with the migration intensity, and decreases with the migration distance.

[0110] S330, determine the drainage control priority of each candidate drainage area based on the migration impact degree corresponding to each candidate drainage area and the moisture risk of the target cable joint.

[0111] The processor 171 determines the drainage control priority of each candidate drainage area based on the degree of migration impact and the risk of moisture to the target cable joint.

[0112] In one implementation, the migration impact of a candidate drainage area on a target cable joint is combined with the moisture risk of the corresponding target cable joint to obtain the priority evaluation value of the candidate drainage area.

[0113] Among them, Q k I represents the priority evaluation value of the k-th candidate drainage area. kj R represents the migration influence of the candidate drainage area on the j-th target cable joint. j This represents the moisture risk of the j-th target cable joint, and n represents the number of target cable joints that have a water migration relationship with the candidate drainage area.

[0114] The processor 171 ranks the candidate drainage areas from high to low according to their priority evaluation values, thus obtaining the corresponding drainage control priorities. As a result, candidate drainage areas that have a greater migration impact on cable joints with high moisture risk are given higher drainage control priorities.

[0115] S340, determine the target drainage area according to the drainage control priority, determine the operation mode of the drainage equipment corresponding to the target drainage area, and generate the drainage control strategy.

[0116] The processor 171 determines the candidate drainage areas whose drainage control priority is within a preset range as target drainage areas according to the drainage control priority, and queries the drainage equipment 160 corresponding to each target drainage area.

[0117] The operation mode of the drainage equipment includes at least one of the following: the start-up and shutdown sequence, the operating duration, and the drainage power of the drainage equipment 160. The start-up and shutdown sequence can be determined according to the drainage control priority of the target drainage area; the operating duration can be determined according to the water accumulation level of the target drainage area and the drainage capacity of the drainage equipment 160; the drainage power can be determined according to the degree of migration impact, the risk of moisture, and the adjustable power range of the drainage equipment 160.

[0118] When multiple drainage devices 160 corresponding to multiple target drainage areas can operate simultaneously without exceeding the power supply capacity, the processor 171 can control the multiple drainage devices 160 to operate in parallel. When the simultaneous operation of the drainage devices 160 would exceed the power supply capacity, the processor 171 will start the corresponding drainage devices 160 in sequence according to the drainage control priority.

[0119] The processor 171 writes the corresponding contents of the target drainage area, drainage equipment identification, start time, stop condition, running time and drainage power into the drainage control strategy, and outputs start command, stop command or power adjustment command to the corresponding drainage equipment 160.

[0120] S400, control the operation of the drainage equipment according to the drainage control strategy, and update the migration path and the migration direction according to the water accumulation status information after drainage.

[0121] The processor 171 controls the operation of the drainage equipment 160 according to the drainage control strategy and continuously receives the water accumulation status information after drainage collected by the water level sensor 110.

[0122] like Figure 5 As shown, the feedback update process after drainage includes S410 to S450.

[0123] S410: Obtain information on water accumulation status after the drainage equipment has been in operation.

[0124] After the drainage equipment 160 is started, the processor 171 continues to acquire the water accumulation status information of each drainage area 210 according to the preset sampling period. The water accumulation status information after drainage is associated with and saved with the corresponding drainage area identifier, acquisition time, and the operating status of the drainage equipment at that time.

[0125] S420, based on the water accumulation status information before and after the operation of the drainage equipment, determine the change in water accumulation status corresponding to each drainage area.

[0126] The processor 171 uses the water accumulation status information within a preset time window before the drainage equipment 160 starts as the water accumulation status before drainage, and uses the water accumulation status information within a preset time window after the drainage equipment 160 starts running as the water accumulation status after drainage, to determine the change in water accumulation status corresponding to each drainage area 210.

[0127] Changes in water accumulation status can include at least one of the following: changes in water level, changes in the rate of change of water accumulation, changes in the extent of water accumulation, and changes in flow rate. To reduce the impact of short-term fluctuations, the changes in water accumulation status can be determined using the average or median value within the time window before and after drainage, respectively.

[0128] S430, if the change in the water accumulation status meets the preset update conditions, the migration path and migration direction between the multiple drainage areas are re-determined.

[0129] The preset update conditions may include at least one of the following conditions: the water level drop in the target drainage area reaches a preset drop threshold; the water level rise in the non-target drainage area reaches a preset rise threshold; the response time relationship between adjacent drainage areas 210 changes; the change in the rate of water accumulation reaches a preset rate threshold; and the migration intensity corresponding to the current migration direction drops below a preset intensity threshold.

[0130] If the change in water accumulation meets the preset update conditions, the processor 171 re-executes S110 to S140, re-extracts the water accumulation response features, determines the candidate migration direction, filters the candidate migration direction according to the regional correlation, and redetermines the migration path and migration direction between multiple drainage areas 210.

[0131] S440, based on the updated migration path and migration direction, redetermine the migration impact degree corresponding to each of the candidate drainage areas.

[0132] Based on the updated migration path and migration direction, processor 171 redetermines the candidate drainage areas that have a water accumulation migration relationship with the target cable joint, and re-executes S321 to S323 to obtain the migration influence degree corresponding to each candidate drainage area.

[0133] S450, if the drainage control priority corresponding to the updated migration impact changes, adjust the operation mode of the target drainage area or the drainage equipment.

[0134] Processor 171 redetermines the drainage control priority based on the updated migration impact and the moisture risk of the target cable joint, and compares the drainage control priorities before and after the update.

[0135] When the drainage control priority corresponding to the updated migration impact changes, the processor 171 adjusts the operation mode of the target drainage area or drainage equipment. For example, when the migration impact of the original target drainage area on the target cable joint decreases significantly, while the migration impact of another candidate drainage area increases, the drainage power of the drainage equipment 160 corresponding to the original target drainage area can be stopped or reduced, and the drainage power of the drainage equipment 160 corresponding to the other candidate drainage area can be started or increased.

[0136] When the updated drainage control priority remains unchanged, the processor 171 can maintain the current drainage control strategy and continue to acquire information on the water accumulation status after drainage. This forms a closed-loop drainage control process of "water accumulation status acquisition - migration relationship identification - dampness risk assessment - drainage control strategy generation - drainage execution - drainage result feedback".

[0137] The software implementation process of the cable trench drainage control method disclosed in this invention is as follows.

[0138] The computer programs stored in memory 172 include at least a data receiving program, a regional relationship management program, a water accumulation migration relationship analysis program, a damp risk analysis program, a drainage control strategy generation program, an equipment control program, and a feedback update program.

[0139] The data receiving program receives water level information, joint ambient humidity, joint ambient temperature, joint surface temperature, and cable sheath leakage current according to the sensor identification, and writes them into the corresponding data sequence according to the area identification, joint identification, and acquisition time.

[0140] The regional relationship management program stores regional connectivity relationships, as well as at least one of regional location relationships, regional elevation relationships, and regional barrier relationships, in the form of a regional relationship table or regional relationship diagram.

[0141] The water accumulation migration relationship analysis program extracts at least two of the following from the water accumulation status information: water accumulation change time, water accumulation change rate, water accumulation change magnitude, and water accumulation change trend. Based on the response time sequence of different drainage areas 210, candidate migration directions are generated. Based on the regional correlation, candidate migration directions are filtered, and migration paths and migration directions are generated according to the connection relationship between the filtered candidate migration directions.

[0142] The moisture risk analysis procedure determines the risk of water accumulation based on the water accumulation status of the adjacent area, the risk of condensation based on the humidity, temperature, dew point temperature and surface temperature of the joint, the risk of insulation moisture based on the deviation between the current leakage current of the cable sheath and the leakage current reference value, and then determines the moisture risk based on the three types of risks, and determines the target cable joint according to the preset risk conditions.

[0143] The drainage control strategy generation program queries candidate drainage areas that have a water migration relationship with the target cable joint, calculates the migration impact degree corresponding to the candidate drainage areas, determines the drainage control priority based on the migration impact degree and the moisture risk of the target cable joint, and determines the target drainage area and the operation mode of the drainage equipment.

[0144] The equipment control program generates control commands based on the drainage control strategy, including corresponding information such as equipment identification, start / stop status, running time, and drainage power, and outputs the control commands through the control interface electrically connected to the drainage equipment 160.

[0145] The feedback update program obtains the water accumulation status information after the drainage equipment 160 is running, determines the change in water accumulation status before and after drainage, updates the migration path and migration direction when the change in water accumulation status meets the preset update conditions, re-determines the migration impact and drainage control priority, and adjusts the target drainage area or drainage equipment operation mode when the drainage control priority changes.

[0146] Through the above hardware structure and software implementation process, when the processor 171 executes the computer program in the memory 172, it can fully implement the cable trench drainage control method according to any one of claims 1-9.

[0147] In summary, this invention, by acquiring water accumulation status information from multiple drainage areas, determining the migration path and direction of the accumulated water based on regional correlations, and comprehensively considering the risks of water accumulation, condensation, and insulation moisture absorption at cable joints to determine drainage control strategies, has at least the following beneficial effects: This invention determines candidate migration directions based on the temporal relationship between the response characteristics of water accumulation states corresponding to different drainage areas, and uses at least one of regional connectivity, regional location, regional elevation, and regional barrier relationships to screen candidate migration directions. This can eliminate erroneous judgments caused by synchronous rainfall, sensor fluctuations, or actual regional disconnection, thereby improving the accuracy and reliability of migration path and migration direction identification.

[0148] This invention determines the migration intensity based on the response time difference, water accumulation rate, and water accumulation amplitude of adjacent drainage areas. It can not only determine where the water is migrating to, but also characterize the strength of water migration between different drainage areas, providing more sufficient data for the selection of candidate drainage areas and the determination of drainage control priorities.

[0149] This invention determines the risk of water accumulation based on the water accumulation status of the adjacent area, determines the risk of condensation based on the humidity, temperature, dew point temperature, and surface temperature of the joint, and determines the risk of insulation moisture based on the leakage current of the cable sheath. It can comprehensively assess the moisture risk of cable joints from three aspects: proximity of water accumulation space, condensation on the joint surface, and changes in insulation status, thereby improving the comprehensiveness of moisture risk assessment and facilitating the early identification of cable joints that may be affected by water accumulation or humid environments.

[0150] This invention establishes a correspondence between operating load, environmental conditions, and leakage current benchmark values. By comparing the current cable sheath leakage current with the leakage current benchmark values ​​corresponding to the current operating load and environmental conditions, it can reduce the interference of changes in operating load and environmental conditions on leakage current judgment results and improve the pertinence and reliability of insulation moisture risk judgment.

[0151] This invention determines candidate drainage areas that have a water migration relationship with the target cable joint based on the migration path and migration direction. It also determines the drainage control priority by comprehensively considering the water accumulation status, migration intensity, migration distance of the candidate drainage areas and the moisture risk of the target cable joint. This allows the drainage equipment to be used preferentially in drainage areas that have a greater impact on cable joints with a high risk of moisture, thereby improving the rationality of the selection of target drainage areas and the determination of the operation mode of drainage equipment.

[0152] This invention determines at least one of the following: the start-up and shutdown sequence, operating time, and drainage power of drainage equipment according to drainage control priority. It can allocate drainage capacity based on the actual water accumulation status of different drainage areas and the degree of impact on target cable joints, reducing the mismatch between drainage location and actual water migration direction and the ineffective operation of drainage equipment, thereby improving the utilization efficiency of drainage resources.

[0153] This invention determines the change in water accumulation status based on the water accumulation status information before and after the operation of the drainage equipment, and re-determines the migration path, migration direction, and migration impact when the change in water accumulation status meets the preset update conditions; when the drainage control priority changes, the target drainage area or the operation mode of the drainage equipment is further adjusted, thereby forming a closed-loop drainage control, so that the drainage control strategy can adapt to the dynamic changes in water accumulation distribution and migration patterns during the drainage process, and improve the timeliness and adaptability of cable trench drainage control.

[0154] This invention combines multiple water level sensors, ambient humidity sensors, ambient temperature sensors, joint temperature sensors, leakage current sensors, multiple drainage devices, and a controller to achieve integrated collection of water accumulation status, assessment of cable joint moisture risk, generation of drainage control strategies, control of drainage devices, and feedback and updating of drainage results. This helps reduce the risk of cable joint malfunctions caused by water accumulation, condensation, or insulation moisture, and improves the automation level of cable trench drainage control and cable operation safety.

[0155] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for controlling drainage in cable trenches, characterized in that, include: Obtain water accumulation status information of multiple drainage areas in the cable trench, and determine the migration path and migration direction of water between the multiple drainage areas based on the water accumulation status information and the regional correlation between the multiple drainage areas; Obtain the joint status information of the cable joint, determine the moisture risk of each cable joint based on the joint status information, and identify the cable joint whose moisture risk meets the preset risk conditions as the target cable joint. The joint status information includes the water accumulation status of the adjacent area, the humidity of the joint environment, the temperature of the joint environment, the surface temperature of the joint, and the leakage current of the cable sheath. Based on the migration path, the migration direction, and the moisture risk of the target cable joint, a drainage control strategy is determined. The drainage control strategy includes the target drainage area and the operation mode of the drainage equipment corresponding to the target drainage area. The drainage equipment is controlled to operate according to the drainage control strategy, and the migration path and migration direction are updated based on the water accumulation status information after drainage.

2. The cable trench drainage control method according to claim 1, characterized in that, The water accumulation status information includes water level information and water level change information corresponding to each drainage area, and also includes at least one of flow rate information, water accumulation range information and water accumulation change rate; The regional relationships include regional connectivity relationships, and also include at least one of regional location relationships, regional elevation relationships, and regional barrier relationships; The migration path and the migration direction constitute a water accumulation migration relationship, which also includes at least one of migration intensity and migration probability.

3. The cable trench drainage control method according to claim 2, characterized in that, The step of determining the migration path and direction of water between multiple drainage areas based on the water accumulation status information and the regional correlation between multiple drainage areas includes: Based on the water accumulation status information of each drainage area, extract the water accumulation status response features of each drainage area. The water accumulation status response features include at least two of the following: water accumulation change time, water accumulation change rate, water accumulation change amplitude, and water accumulation change trend. Candidate migration directions are determined based on the temporal relationship between the response characteristics of water accumulation status in different drainage areas; The candidate migration directions are filtered based on the regional relationships. The migration path and the migration direction are determined based on the connection relationships between the selected candidate migration directions.

4. The cable trench drainage control method according to claim 3, characterized in that, Candidate migration directions are determined based on the temporal relationship between the water accumulation state response characteristics of different drainage areas, including: Determine the response time for changes in water accumulation status in adjacent drainage areas; Based on the sequential relationship of the response times of the adjacent drainage areas, the candidate migration directions between the adjacent drainage areas are determined; The migration intensity corresponding to the candidate migration direction is determined based on the response time difference, water accumulation rate, and water accumulation amplitude between the adjacent drainage areas.

5. The cable trench drainage control method according to claim 1, characterized in that, Determining the moisture risk of each cable joint based on the joint status information includes: The risk of water accumulation near the cable joint is determined based on the water accumulation status of the adjacent area. The dew point temperature is determined based on the ambient humidity and ambient temperature of the joint, and the condensation risk is determined based on the difference between the dew point temperature and the surface temperature of the joint. The risk of insulation moisture absorption is determined based on the leakage current of the cable sheath. The moisture risk of the cable joint is determined based on the risks of water accumulation, condensation, and insulation moisture.

6. The cable trench drainage control method according to claim 5, characterized in that, The determination of insulation moisture risk based on the cable sheath leakage current includes: Obtain historical cable sheath leakage current under different operating loads and environmental conditions; Based on the historical cable sheath leakage current, establish the correspondence between operating load, environmental conditions and leakage current reference value; Obtain the current operating load and the current environmental status, and determine the leakage current reference value corresponding to the current operating load and the current environmental status according to the correspondence; The risk of insulation moisture is determined based on the deviation between the current cable sheath leakage current and the reference leakage current value.

7. The cable trench drainage control method according to claim 1, characterized in that, Based on the migration path, the migration direction, and the moisture risk of the target cable joint, a drainage control strategy is determined, including: Based on the migration path and the migration direction, multiple candidate drainage areas that have a water accumulation migration relationship with the target cable joint are identified; Determine the degree of influence of each candidate drainage area on the migration of the target cable joint; Based on the migration impact of each candidate drainage area and the moisture risk of the target cable joint, the drainage control priority of each candidate drainage area is determined. The target drainage area is determined based on the drainage control priority, and the operation mode of the drainage equipment corresponding to the target drainage area is determined to generate the drainage control strategy. The operation mode of the drainage equipment includes at least one of the following: the start-up and shutdown sequence of the drainage equipment, the running time, and the drainage power.

8. The cable trench drainage control method according to claim 7, characterized in that, Determining the migration impact of each candidate drainage area on the target cable joint includes: Determine the migration intensity between the candidate drainage area and the drainage area where the target cable joint is located; The migration distance from the candidate drainage area to the drainage area where the target cable joint is located is determined based on the migration path; The migration impact degree is determined based on the water accumulation status of the candidate drainage area, the migration intensity, and the migration distance; The migration influence increases with the degree of water accumulation in the candidate drainage area and the migration intensity, and decreases with the migration distance.

9. The cable trench drainage control method according to claim 7, characterized in that, The migration path and migration direction are updated based on the water accumulation status information after drainage, including: Obtain information on water accumulation status after the drainage equipment has been operated; Based on the water accumulation status information before and after the operation of the drainage equipment, determine the change in water accumulation status for each drainage area; If the change in the water accumulation status meets the preset update conditions, the migration path and migration direction between the multiple drainage areas are redefined. Based on the updated migration path and migration direction, the migration impact degree corresponding to each candidate drainage area is re-determined; If the drainage control priority corresponding to the updated migration impact changes, the operation mode of the target drainage area or the drainage equipment shall be adjusted.

10. A cable trench drainage control system, characterized in that, include: Multiple water level sensors are installed in multiple drainage areas of the cable trench; An ambient humidity sensor and an ambient temperature sensor are located near the cable connector; A connector temperature sensor is disposed on the surface of the cable connector; A leakage current sensor is installed on the grounding lead of the cable sheath corresponding to the cable joint; Multiple drainage devices are connected to their respective drainage areas; The controller includes a processor and a memory connected to the processor. The processor is electrically connected to the water level sensor, the ambient humidity sensor, the ambient temperature sensor, the connector temperature sensor, the leakage current sensor, and the drainage device, respectively. The memory stores a computer program, and when the processor executes the computer program, it implements the cable trench drainage control method according to any one of claims 1-9.