A method for visualizing railway tunnel models based on BIM and Unreal Engine

By combining BIM and Unreal Engine, a high-precision 3D railway tunnel model was constructed and interactive functions were implemented, which solved the shortcomings of traditional technical disclosure methods, improved construction efficiency and accuracy, and reduced construction errors.

CN123069481APending Publication Date: 2026-11-10THE 3RD ENG CO LTD OF CHINA RAILWAY 18TH BUREAU GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611264517.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-20
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Traditional two-dimensional drawings and text descriptions are insufficient to clearly present the complex three-dimensional spatial structure of railway tunnels, resulting in long interpretation times and numerous misunderstandings for construction personnel, thus affecting construction efficiency and accuracy.

Method used

A 3D railway tunnel model was constructed using BIM technology and a visualization system was developed using Unreal Engine (UE5), including model conversion, optimization, interactive function design, and remote cloud rendering. Key information was extracted using Bentley software, the model was exported using Datasmith format, and interactive functions and construction simulation were implemented through UE5's blueprint scripting system.

Benefits of technology

It improved the intuitiveness and accuracy of construction briefings, reduced construction errors and rework costs, and enhanced the informatization level of project management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123069481A_ABST
    Figure CN123069481A_ABST
Patent Text Reader

Abstract

This invention discloses a railway tunnel model visualization method based on BIM and Unreal Engine, belonging to the technical field of railway tunnel model visualization methods. The method includes the following steps: Model construction: Using Bentley software and BIM technology, key information is extracted from tunnel structure design drawings, and multi-disciplinary data is integrated to create a 3D railway tunnel model; the model is converted, refined in detail, and lightweighted before exporting with set export parameters; A visualization system is created in UE5, specifically including the following steps: Creating a project workspace; Importing the exported model into UE5 and building a scene; Optimizing, adjusting, and designing the built model scene and implementing interactive functions; Conducting construction simulation and briefing; Packaging and publishing: The visualization system is packaged and output, uploaded to the 3Dcat platform, and online display parameters are configured, enabling remote cloud rendering and online viewing. This invention can improve the efficiency of construction personnel's understanding of engineering structures and construction processes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the technical field of railway tunnel model visualization methods, specifically to a railway tunnel model visualization method based on BIM and Unreal Engine. Background Technology

[0002] In railway tunnel construction, technical briefings are a crucial step in ensuring the smooth progress of the project. Traditional two-dimensional drawings and textual descriptions are insufficient to clearly present complex three-dimensional spatial structures and constructions, requiring construction workers to spend a significant amount of time and effort interpreting the drawings and imagining the actual spatial relationships. Summary of the Invention

[0003] The technical problem to be solved by this invention is to provide a visualization method for railway tunnel models based on BIM and Unreal Engine, so as to overcome the shortcomings of traditional technical briefing methods, improve the efficiency of construction personnel's understanding of engineering structures and construction processes, and enhance the convenience and accuracy of information acquisition.

[0004] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is as follows.

[0005] A method for visualizing railway tunnel models based on BIM and Unreal Engine includes the following steps: S1. Model Building: Based on Bentley software, BIM technology is used to extract key information from tunnel structure design drawings and integrate multi-disciplinary data to create a three-dimensional railway tunnel model; S2. After converting, refining, and lightweighting the model, set the export parameters and export it. S3. Create a visualization system in UE5, which includes the following steps: S31. Create a project workspace; S32. Import the exported model into UE5 and build the UE5 scene; S33. Optimize and adjust the constructed model scene, and design and implement interactive functions; S34. Conduct construction simulation and briefing; S4. Packaging and Deployment: Package and output the visualization system, upload it to the 3Dcat platform and configure the online display parameters, and realize remote cloud rendering and online viewing.

[0006] Preferably, the key information in step S1 includes the geometric dimensions, positional relationships, material parameters, and construction process requirements of various components.

[0007] Preferably, in step S2, the model is converted to: setting the correct conversion parameters, including coordinate system, unit scale and material texture mapping method; The lightweighting process of the model in step S2 specifically includes: Simplify geometric figures: Rationally control the number of faces and geometric complexity of geometric figures; Material optimization: Merge identical materials and convert Bentley format materials to physically based rendering materials supported by UE5; In step S2, the model is exported in Datasmith format by component type and material layer, ensuring that the export unit is consistent and the model metadata is preserved.

[0008] Preferably, step S31 specifically involves: creating a workspace for the 3D visualization project in UE5, planning the folder structure, and establishing independent folders for storing various types of files.

[0009] Preferably, in step S32, the model is imported into UE5 using the Datasmith format.

[0010] Preferably, the optimization and adjustment of the constructed model scene in step S33 specifically includes: Geometry optimization: For the geometry of the model, unnecessary details and hidden faces are removed, and complex structures are simplified to reduce the number of polygons, while retaining key structural features; Material and texture adjustments: Adjust material parameters to match the actual material characteristics of the tunnel, and compress texture images to a reasonable resolution.

[0011] Preferably, in step S33, the following interactive functions are designed and implemented using UE5's blueprint visualization scripting system: Information Query: When you click on different parts of the model or specific buttons on the interface, an information panel will pop up, displaying the relevant attribute information of that part; Accessibility features: Supports zooming, marking, and screenshot operations; Scene roaming control: Write blueprint scripts to control scene roaming, calculate the character's new position and orientation based on the user's input movement commands to control the character's movement and update the camera view in the scene; The logic for displaying and hiding the information panel is as follows: Based on the user's query request, the corresponding attribute information is retrieved from the model and populated into the information panel for display. Animation playback control: Enables playback control of construction process animations and train operation animations; Interactive feedback: Supports user annotation and commenting.

[0012] Preferably, step S3 further includes: S35. System testing and optimization, specifically including the following: Verify the ease of use of the user interface and the accuracy of the interactive functions. Test the animation playback effect and the system's compatibility across different operating systems and display devices; Based on the test results, optimize model performance, adjust lighting effects, and blueprint script logic.

[0013] Preferably, step S4, which involves packaging the visualization system into an .exe file, uploading it to the 3Dcat platform, and configuring the online display parameters, includes the following steps: M1. Check the integrity of the packaged file; M2. Run the local .exe file to simulate user operation scenarios and verify the stability of the function; Upload the M3 packaged .exe file to the 3D model to the 3Dcat platform; M4. Set the initial display state and interactive function parameters of the model; the initial display state includes the default viewpoint, zoom level, and scene lighting effects; the interactive function parameters include the information pop-up style and scene roaming speed.

[0014] Preferably, in step S4, a link is generated using 3Dcat, and a page URL and data interface are provided to integrate the visualization system with the tunnel specialization system, enabling remote cloud rendering to support online viewing on web pages and mobile devices.

[0015] The technological advancements achieved by this invention are as follows, thanks to the adoption of the above technical solutions.

[0016] This invention achieves high-precision 3D visualization of railway tunnel models by combining BIM technology and Unreal Engine, improving the intuitiveness, efficiency and accuracy of construction briefings, reducing construction errors and rework costs, and enhancing the informatization level of project management. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the technical path of the present invention; Figure 2 This is a flowchart of the present invention. Detailed Implementation

[0018] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.

[0019] A method for visualizing railway tunnel models based on BIM and Unreal Engine, combining... Figures 1 to 2 As shown, it includes the following steps: S1. Model building.

[0020] In this step, Bentley software is used for model building. Specifically, based on Bentley software and BIM technology, key information is extracted from the tunnel structure design drawings and multi-disciplinary data is integrated to create a 3D railway tunnel model. Key information includes the geometric dimensions, positional relationships, material parameters, and construction process requirements of various components accurately extracted from the drawings. This key information serves as data support for modeling and 3D technical briefings, ensuring consistency between the model and the design drawings.

[0021] 3D railway tunnel models can display complex engineering nodes and component connection methods in various ways, such as magnification, rotation, and sectioning. For example, in steel structure engineering, 3D visualization can provide detailed information on the connection nodes between steel beams and columns, including bolt installation locations and welding requirements, allowing construction personnel to clearly understand the key points and avoiding misunderstandings caused by the limited information in 2D drawings. Furthermore, integrating data from multiple professional fields involved in engineering construction, such as architecture, structure, water supply and drainage, and electrical systems, with the model facilitates information retrieval. For instance, in a hospital construction project, information such as the building's spatial layout, the installation locations of medical equipment (electrical and water supply interface information, etc.), and the structural beam-column system can be integrated, allowing construction personnel to obtain comprehensive engineering information from a single model, thus improving information retrieval efficiency.

[0022] S2. After transforming and lightweighting the model, set the export parameters and export it.

[0023] After completing the basic structural modeling, the model is transformed. During the transformation process, pay attention to setting the correct transformation parameters, such as coordinate system (ensure it is consistent with the UE5 world coordinate system, usually the right-hand coordinate system), unit scale (keep it consistent with the original model to avoid model size errors), and material texture mapping method (try to retain the original model's material properties and texture coordinate information as much as possible).

[0024] After conversion, the model undergoes detail enhancement and weight reduction. Detail enhancement improves the model's precision and realism, while weight reduction prevents excessive model data from impacting software performance, ensuring smooth operation while maintaining high accuracy. Specifically, weight reduction includes simplifying geometry and optimizing materials. Simplifying geometry involves controlling the face count and complexity of geometric shapes. Material optimization involves merging identical materials and converting Bentley format materials to Physically Based Rendering (PBR) materials supported by UE5.

[0025] During the model export phase, it is essential to ensure that the export units are consistent and that the models are exported in layers according to component type and material. Datasmith format (exported via the Bentley plugin) should be used first, with FBX and OBJ formats as alternatives. Metadata such as model hierarchy, materials, and attributes should be retained for subsequent interactive queries.

[0026] S3. Create a visualization system.

[0027] Creating a visualization system using UE5 software involves the following steps: S31. Create a project workspace.

[0028] In UE5, create a dedicated workspace for 3D visualization projects, and rationally plan the folder structure based on the handover content and team collaboration needs. Establish separate folders for storing model files, material and texture resources, blueprint scripts, scene and level files, and final release files, ensuring clear file categorization and easy searching and management.

[0029] S32. Import the exported model into UE5 and build the UE5 scene.

[0030] Specifically, the model is imported into UE5 using the Datasmith format.

[0031] S33. Optimize and adjust the constructed model scene, and design and implement interactive functions.

[0032] Specifically, for the imported model, the constructed model scene is optimized and adjusted according to the performance requirements and real-time rendering characteristics of UE5, including: Geometry optimization: For the model's geometry, unnecessary details and hidden faces are removed, and complex model structures are simplified (e.g., the minute bumps and depressions in tunnel linings are reasonably simplified to reduce the number of model faces without affecting visual effects) to reduce the polygon count and improve rendering efficiency. However, during the simplification process, it is important to retain key structural features and details to ensure the model's realism and accuracy.

[0033] Material and texture adjustments: Check whether parameters such as reflectivity, roughness, and metallicity of the materials match the actual material characteristics of the tunnel (e.g., concrete lining should have low reflectivity and roughness, while metal components such as rails should have high metallicity). Adjust any parameters that do not match the actual material characteristics of the tunnel. Compress and optimize texture images, and adjust the texture resolution to an appropriate level (ensuring clear display while avoiding excessive memory consumption due to high resolution). Ensure that the materials and textures present good visual effects during real-time rendering without placing an excessive burden on performance, allowing the model to run and be displayed smoothly in UE5.

[0034] In this step, the following interactive functions will be designed and implemented using UE5's Blueprint Visual Scripting System: Information Query: When a user clicks on different parts of the model or specific buttons on the interface, a detailed information panel will pop up, displaying the relevant attribute information of that part (such as structural materials, construction technology, maintenance records, etc.). Accessibility features: Supports zooming, marking, and screenshotting, enriching the interactive experience and improving the practicality and functionality of the visualization system. Specifically, the zoom function allows users to view model details; the marking function allows users to mark important locations or problem areas in the scene; and the screenshotting function allows users to easily save scenes of interest.

[0035] Scene roaming control: Write blueprint scripts to control scene roaming, calculate the character's new position and orientation based on the user's input movement commands, thereby controlling the character's movement and updating the camera view in the scene; The logic for displaying and hiding the information panel is as follows: Based on the user's query request, the corresponding attribute information is retrieved from the model and populated into the information panel for display. Animation playback control: Enables playback control of construction process animations and train operation animations.

[0036] Interactive feedback: Supports user annotation and commenting.

[0037] In summary, UE5's Blueprint visualization scripting system transforms planned interaction logic into actual functional implementation. By creating Blueprint classes and connecting various nodes, the logical flow of interactive functions is constructed. For example, a Blueprint function is created to handle mouse click events. Within this function, it checks if the click location is within the valid area of ​​the model; if so, it triggers the corresponding information query or operation response.

[0038] S34. Conduct construction simulation and briefing.

[0039] This step determines the content of the briefing and collects the briefing materials.

[0040] S35. System Testing and Optimization.

[0041] A comprehensive test was conducted on all functions of the visualization system, including the following: Verify the ease of use of the user interface and the accuracy of the interactive functions, such as whether clicking on a part of the model can accurately bring up the corresponding information panel, whether the scene roaming control is smooth, and whether the viewpoint switching is fast and accurate.

[0042] Test animation playback effects, such as verifying whether construction process animations and train operation animations play normally, whether the animation content matches the actual construction and operation processes, and whether the animation effects achieve the expected realism and smoothness. Test the system's compatibility on different operating systems (such as Windows, Mac OS, etc.) and display devices (such as ordinary monitors, high-definition large screens, VR devices, etc., if supported) to ensure the stability and consistency of system functions and provide users with a reliable user experience.

[0043] Based on the test results, the identified issues were meticulously recorded and categorized. For performance bottlenecks, corresponding optimization measures were implemented, such as further optimizing the model (reducing unnecessary polygon count and optimizing material texture compression ratio), adjusting lighting and effects settings (reducing shadow precision and particle system count), optimizing Blueprint script logic (removing redundant calculations and operations), and rationally configuring software parameters (adjusting memory allocation strategies and optimizing rendering pipeline settings) to improve system efficiency and smoothness. For issues discovered during functional testing, such as abnormal interactive functions and animation playback errors, repairs were made by checking Blueprint script code, adjusting animation parameters, and fixing model flaws to ensure all functions functioned correctly. Throughout the optimization process, continuous testing was conducted, comparing performance and functional metrics before and after optimization to verify the effectiveness of the optimization measures until system performance reached expected standards, functionality was stable and reliable, and project requirements and user expectations were met.

[0044] S4. Packaging and Release.

[0045] The visualization system is packaged into an .exe file, uploaded to the 3Dcat platform, and configured with online display parameters, enabling remote cloud rendering and online viewing.

[0046] Specifically, uploading to the 3Dcat platform and configuring the online display parameters includes the following steps: M1. Check the integrity of the packaged file.

[0047] Perform a thorough check on the packaged railway tunnel.exe file to ensure that it contains all the necessary resources for the project, including models, materials, textures, animations, and interactive scripts, to avoid issues such as missing models or malfunctions after uploading.

[0048] M2. Run the local .exe file to simulate user operation scenarios and verify the stability of the function.

[0049] Run the local .exe file to simulate various user operation scenarios, such as scene roaming, information querying, and animation playback. Check whether the interactive functions work properly, whether the model display is complete and clear, whether the materials and textures are loaded correctly, and whether the lighting effects meet expectations. Ensure that the file runs stably and is fully functional in the local environment.

[0050] Upload the M3 package .exe file to the 3D model to the 3Dcat platform.

[0051] M4. Set the initial display state and interactive function parameters of the model.

[0052] After the file is successfully uploaded, the initial display state of the model is set according to the characteristics and display requirements of the railway tunnel project. This includes parameters such as default view (selecting a view that can show the entire tunnel and key features, such as a front view of the tunnel entrance or a perspective view along the tunnel centerline), zoom level (setting an appropriate zoom ratio so that the model can be fully displayed in the web page window during initial loading, while also clearly showing key details), and scene lighting effects (adjusting light intensity, color temperature, and shadow type to ensure that the lighting effects inside and outside the tunnel are realistic and natural, highlighting the model's three-dimensionality and layering). These parameters are used to provide the best initial display effect.

[0053] Configure interactive function parameters, enable the model click-to-search function, and set the style and content format of the information pop-up (such as displaying detailed information like model name, structural parameters, construction process, etc., using clear and easy-to-read fonts and layouts) to ensure users can obtain accurate and useful information promptly when clicking on the model. For the scene roaming function, set reasonable movement speeds (different movement speed options such as walking speed and running speed are available based on user operating habits and model scene size to facilitate users' free exploration of the model), rotation sensitivity (adjust the sensitivity of scene rotation when using mouse or touch to avoid an overly sensitive or sluggish operating experience), and scaling limits (set minimum and maximum scaling ratios to prevent users from excessively scaling and causing model distortion or loss of focus) to ensure users can smoothly and naturally perform scene roaming operations on the webpage and interact well with the model.

[0054] In this step, 3Dcat generates links and provides page URLs and data interfaces to integrate the visualization system with the tunnel specialization system, enabling remote cloud rendering to support online viewing on web pages and mobile devices. This allows all project owners to view the project online on web pages and mobile devices.

[0055] In use, this invention constructs a high-precision 3D model using Bentley software, integrating multi-source data from architecture, structure, and electrical systems. UE5 is used for dynamic rendering and interactive functionality design. The resulting executable file is uploaded to the 3Dcat platform, supporting real-time viewing on a web browser and cloud-based collaboration. Furthermore, this method, through 3D stereoscopic display, multi-dimensional information integration, and two-way interactive operation, allows construction personnel to interact with the 3D model via a user interface. This includes selecting different floors, different professional systems, and hiding or showing certain components. Simultaneously, construction personnel can annotate and add comments to the model, providing feedback on their questions and understanding to the technical briefing personnel. The briefing personnel can also adjust the briefing content promptly based on the feedback, significantly improving the accuracy and efficiency of technical briefings, reducing the risk of construction errors, and making it suitable for the digital construction and management of railway tunnels and similar complex projects.

Claims

1. A method for visualizing railway tunnel models based on BIM and Unreal Engine, characterized in that: Includes the following steps: S1. Model Building: Based on Bentley software, BIM technology is used to extract key information from tunnel structure design drawings and integrate multi-disciplinary data to create a three-dimensional railway tunnel model; S2. After converting, refining, and lightweighting the model, set the export parameters and export it. S3. Create a visualization system in UE5, which includes the following steps: S31. Create a project workspace; S32. Import the exported model into UE5 and build the UE5 scene; S33. Optimize and adjust the constructed model scene, and design and implement interactive functions; S34. Conduct construction simulation and briefing; S4. Packaging and Deployment: Package and output the visualization system, upload it to the 3Dcat platform and configure the online display parameters, and realize remote cloud rendering and online viewing.

2. The method for visualizing railway tunnel models based on BIM and Unreal Engine according to claim 1, characterized in that: The key information in step S1 includes the geometric dimensions, positional relationships, material parameters, and construction process requirements of various components.

3. The method for visualizing railway tunnel models based on BIM and Unreal Engine according to claim 1, characterized in that: In step S2, the model is converted by setting the correct conversion parameters, including coordinate system, unit scale and material texture mapping method; The lightweighting process of the model in step S2 specifically includes: Simplify geometric figures: Rationally control the number of faces and geometric complexity of geometric figures; Material optimization: Merge identical materials and convert Bentley format materials to physically based rendering materials supported by UE5; In step S2, the model is exported in Datasmith format by component type and material layer, ensuring that the export unit is consistent and the model metadata is preserved.

4. The method for visualizing railway tunnel models based on BIM and Unreal Engine according to claim 1, characterized in that: Step S31 specifically involves: creating a workspace for the 3D visualization project in UE5, planning the folder structure, and establishing independent folders for storing various types of files.

5. The method for visualizing railway tunnel models based on BIM and Unreal Engine according to claim 1, characterized in that: In step S32, the model is imported into UE5 using the Datasmith format.

6. The method for visualizing railway tunnel models based on BIM and Unreal Engine according to claim 1, characterized in that: The optimization and adjustment of the constructed model scene in step S33 specifically includes: Geometry optimization: For the geometry of the model, unnecessary details and hidden faces are removed, and complex structures are simplified to reduce the number of polygons, while retaining key structural features; Material and texture adjustments: Adjust material parameters to match the actual material characteristics of the tunnel, and compress texture images to a reasonable resolution.

7. The method for visualizing railway tunnel models based on BIM and Unreal Engine according to claim 1, characterized in that: In step S33, the following interactive functions are designed and implemented using UE5's blueprint visualization scripting system: Information Query: When you click on different parts of the model or specific buttons on the interface, an information panel will pop up, displaying the relevant attribute information of that part; Accessibility features: Supports zooming, marking, and screenshot operations; Scene roaming control: Write blueprint scripts to control scene roaming, calculate the character's new position and orientation based on the user's input movement commands to control the character's movement and update the camera view in the scene; The logic for displaying and hiding the information panel is as follows: Based on the user's query request, the corresponding attribute information is retrieved from the model and populated into the information panel for display. Animation playback control: Enables playback control of construction process animations and train operation animations; Interactive feedback: Supports user annotation and commenting.

8. The method for visualizing railway tunnel models based on BIM and Unreal Engine according to claim 1, characterized in that: Step S3 further includes: S35. System testing and optimization, specifically including the following: Verify the ease of use of the user interface and the accuracy of the interactive functions. Test the animation playback effect and the system's compatibility across different operating systems and display devices; Based on the test results, optimize model performance, adjust lighting effects, and blueprint script logic.

9. The method for visualizing railway tunnel models based on BIM and Unreal Engine according to claim 1, characterized in that: Step S4, which involves packaging the visualization system into an .exe file, uploading it to the 3Dcat platform, and configuring the online display parameters, includes the following steps: M1. Check the integrity of the packaged file; M2. Run the local .exe file to simulate user operation scenarios and verify the stability of the function; Upload the M3 packaged .exe file to the 3D model to the 3Dcat platform; M4. Set the initial display state and interactive function parameters of the model; the initial display state includes the default viewpoint, zoom level, and scene lighting effects; the interactive function parameters include the information pop-up style and scene roaming speed.

10. A method for visualizing railway tunnel models based on BIM and Unreal Engine according to claim 1, characterized in that: In step S4, 3Dcat generates links and provides page URLs and data interfaces to integrate the visualization system with the tunnel specialization system, enabling remote cloud rendering to support online viewing on web pages and mobile devices.