Design method for non-equidistant cross-section of ultra-high drainage channel at bend to prevent debris flow

By using a non-equidistant elevation design method and the principle of centrifugal force to optimize the bottom elevation of the drainage channel, the problems of high cost and poor terrain adaptability of ultra-high protection for debris flow bends are solved, achieving a high-efficiency and low-cost bend protection effect.

CN123069486APending Publication Date: 2026-11-10NORTHWEST UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610996251.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-06
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing technologies for debris flow protection at bends are costly and have poor terrain adaptability, making it difficult to effectively counteract the superelevation effect at bends. This leads to frequent overflow and overtopping accidents, affecting the protection effect.

Method used

A non-equidistant elevation design method is adopted. By controlling the cross-section division, calculating the superelevation value of the curve based on the principle of centrifugal force mechanics, and adjusting the elevation at the bottom of the drainage channel, the lining elevation design is optimized by combining the safety factor and flow velocity changes, forming a continuous and smooth drainage channel structure.

Benefits of technology

It precisely counteracts the hyperbolic effect of curves, reduces engineering costs, and improves protection. It is suitable for various terrains and debris flow types, ensuring the stability and safety of debris flow.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123069486A_ABST
    Figure CN123069486A_ABST
Patent Text Reader

Abstract

This invention discloses a method for designing the non-uniform elevation of the bottom cross-section of a debris flow bend superelevation channel: Step 1, control cross-section division: determine the center angle of the bend in the channel and divide the bend into at least 3 control cross-sections; Step 2, bend superelevation calculation: calculate the difference in mud depth Δh between the concave and convex banks of each control cross-section using the bend superelevation calculation formula; Step 3, bottom elevation adjustment: select a safety factor; determine the bottom elevation of the control cross-section using one of two adjustment methods: a) adjust the concave bank separately; b) adjust both the concave and convex banks; Step 4, elevation adjustment adaptation: if the average flow velocity change of each control cross-section is ≤10%, adjust using a unified height adjustment value; otherwise, calculate and adjust Δh separately for each control cross-section; Step 5, continuous lining design. The method of this invention can accurately offset the bend superelevation effect, and has strong terrain adaptability and low engineering cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of debris flow engineering prevention and control technology, specifically to a method for designing the non-equal elevation of the bottom cross section of an ultra-high drainage channel in a debris flow bend, applicable to the bend structure design of natural debris flow channels or artificial debris flow drainage channels. Background Technology

[0002] Debris flows are a frequent and serious geological disaster in mountainous areas of my country, posing a significant threat to people's lives and property and regional economic development. The need for debris flow engineering prevention and control is becoming increasingly urgent. In the collaborative prevention and control technology system of debris flows involving "stabilization, interception, and drainage," drainage technology is a key prevention and control measure for areas with sufficient debris supply. Its core is to safely divert debris flows to protected areas through natural channels or artificial drainage trenches.

[0003] However, due to limitations imposed by topographical conditions and geological structures, the planar path of the drainage channel cannot remain straight throughout, making bends a weak point in the drainage system. When debris flows through bends, centrifugal force causes superelevation: the water level on the concave bank rises significantly, while the water level on the convex bank remains relatively low. The extent of superelevation is directly related to parameters such as debris flow velocity, bend radius of curvature, and drainage channel width. Once the water level on the concave bank exceeds the top elevation of the retaining wall, an overflow accident will occur. The overflowing debris flow will cause erosion, burial, and impact damage to villages, public facilities, and farmland along the riverbank, severely affecting the protective effect.

[0004] Existing technical solutions for addressing excessively high water levels in debris flow bends mainly fall into two categories: one is to increase the height of retaining walls, thereby raising the upper limit of the retaining wall's protection to cope with excessively high water levels. However, this solution will significantly increase the consumption of engineering materials, construction difficulty, and construction costs, and is also greatly limited by terrain and foundation bearing capacity. The other is to optimize the curvature of the bend, thereby reducing the centrifugal force by increasing the radius of curvature. However, this solution is extremely constrained by terrain conditions, and it is difficult to make significant adjustments to most mountain bends, thus limiting its applicability.

[0005] Therefore, there is an urgent need to develop an optimized design method for drainage channel bends based on mechanical principles, with precise design, simple construction, and controllable cost. Through structural innovation, the ultra-high effect of bends can be precisely offset, effectively preventing overflow and roof-overflow accidents without significantly increasing engineering costs, and improving the stability and safety of debris flow drainage systems. This is also a technical problem that urgently needs to be solved in the field of debris flow prevention and control engineering. Summary of the Invention

[0006] To address the shortcomings of existing technologies, such as high engineering costs, poor terrain adaptability, and limited effectiveness in offsetting excessive height, this invention provides a method for designing the non-equielable cross-section of the bottom section of a drainage channel to prevent excessive height in debris flow bends.

[0007] To achieve the above-mentioned objectives, the technical solution adopted by the present invention is as follows:

[0008] Step 1, control the cross-sectional division Based on the center angle φ of the bend in the guide channel, the bend is divided into several segments at equal angular intervals of (1 / 4-1 / 5)φ, determining at least 3 control cross-sections. The maximum distance between adjacent control cross-sections must be ≤10m to ensure that the control cross-sections fully cover the entire bend, guaranteeing the continuity of subsequent elevation adjustments. For example, when φ=30°, dividing at 7.5° (1 / 4φ) intervals yields 4 interval segments and 5 control cross-sections (including the bend's start and end points). For bends with special angles, the number of control cross-sections can be appropriately adjusted while meeting the equal angular interval principle and maximum spacing requirements to ensure design accuracy.

[0009] Step 2, Calculation of curve superelevation Based on the principles of centrifugal force mechanics, a formula for calculating the superelevation of curves is established to accurately calculate the difference in mud depth Δh between the concave and convex banks of each control cross section. The formula is as follows: Δh = K v² B / (g R) Explanation of parameters in the formula: Δh: Superelevation of a bend (m), which is the natural height difference between the concave and convex banks of the debris flow when the debris flow passes through a bend. K: Correction factor, used to correct for the influence of solid particles in debris flow and the difference in fluid viscosity. It is determined according to the type of debris flow: 1.2~1.5 for viscous debris flow and 1.0 for dilute debris flow. v: Average flow velocity of debris flow (m / s), which can be obtained through field measurement, physical model test, or calculated using the velocity calculation formula recommended in the "Design Code for Debris Flow Prevention Engineering" (GB 50434-2008); B: Width of the drainage channel (m) is defined as the horizontal distance between the inner walls of the retaining walls on both sides of the drainage channel, which is confirmed by design drawings or on-site measurement; g: Gravitational acceleration (m / s²), taken as the standard value of 9.8 m / s²; R: Radius of curvature of the curve centerline (m), which is the vertical distance from the center of the curve to the centerline of the guide channel, which is accurately extracted through topographic surveys or design drawings.

[0010] Step 3, Adjust the bottom elevation Based on factors such as the geological conditions of the project site, the intensity level of the debris flow, and the importance of the protected target, a safety factor n (ranging from 1.2 to 1.5) is selected. When the debris flow is large in scale and high in risk (e.g., the protected target is a densely populated residential area or an important transportation route), the upper limit of the safety factor is used; when the risk level is low, the lower limit can be used. One of the following two elevation adjustment methods is used to determine the bottom elevation of each control cross-section: Method 1: Adjust the concave bank separately The elevation of the bottom of the concave bank will be reduced by n from the normal design elevation. Δh, the bottom elevation of the convex bank remains unchanged at the normal design elevation. The elevation of the middle part of the cross-section (between the concave and convex banks) transitions with a linear slope i = 1:50~1:100, that is, from the normal elevation of the convex bank to the lowered elevation of the concave bank, the elevation is uniformly and linearly distributed along the width of the cross-section to ensure a smooth elevation change. This method is suitable for scenarios where the width of the drainage channel is small (if R≥5B, the bottom plate of the concave bank is lowered by 0.3-0.6m, which serves as an energy dissipation effect) and the space on the convex bank side is limited.

[0011] Method 2: Bidirectional adjustment of concave and convex banks The elevation of the bottom of the concave bank will be reduced by 0.5n from the normal design elevation. Δh, and simultaneously raise the elevation of the bottom of the convex bank by 0.5n from the normal design elevation. Δh. The elevation of the middle section of the cross-section also transitions along a linear slope i = 1:50 to 1:100, forming a symmetrical elevation adjustment structure. This method can more evenly offset the superelevation effect caused by centrifugal force, and the adjustment range is more gentle. It is suitable for scenarios with a large drainage channel width and sufficient adjustment space on the convex bank side.

[0012] Step 4, Elevation Adjustment and Adaptation After completing the superelevation calculations for all control cross sections, the average velocity variation within each control cross section of the curve is analyzed: If the average velocity variation at each control cross section is ≤10% (i.e., (maximum average velocity - minimum average velocity) / average velocity ≤0.1), it indicates that the hydrodynamic characteristics of debris flow within the bend are relatively uniform. A uniform height adjustment value (determined according to debris flow type: 0.3-0.6m for dilute or water-debris flow; 0.6-1.0m for transitional debris flow; and 1.0-1.5m for viscous debris flow) can be used to adjust the elevation of all control cross sections, simplifying the design process. If the average flow velocity change is greater than 10%, it indicates that the hydrodynamic characteristics of different cross sections within the bend are significantly different. It is necessary to calculate Δh separately for each control cross section and adjust the elevation separately according to step 3 to ensure that the superelevation effect of each cross section can be accurately offset.

[0013] Step 5, Continuous lining design To ensure smooth debris flow and avoid localized turbulence or sedimentation due to abrupt elevation changes, the lining elevation between adjacent control cross sections transitions with a linear slope i = 1:50 to 1:100. Specifically, the elevations of characteristic points on the preceding control cross section (such as the convex bank endpoint, the midpoint of the cross section, and the concave bank endpoint) change uniformly and linearly with the corresponding characteristic points on the following control cross section, forming a continuous and smooth bottom lining structure for the drainage channel. This ensures that the cross-sectional area of ​​the drainage channel remains unchanged and its flow capacity is not affected.

[0014] Compared with the prior art, the present invention has the following significant advantages: 1) High offsetting accuracy and reliable overflow prevention: This invention constructs an ultra-high value calculation model based on the principle of centrifugal force mechanics, and introduces correction coefficients in combination with actual parameters such as debris flow type and flow velocity. At the same time, it adapts to different risk scenarios through safety factors. The elevation adjustment has sufficient theoretical basis and engineering adaptability, which can accurately offset the ultra-high effect of bends and ensure that the liquid surface is approximately horizontal when the debris flow passes through the bend, fundamentally eliminating the risk of overflow and overtopping. 2) Low project cost and easy construction: There is no need to increase the height of the retaining wall or make significant adjustments to the curve terrain. The protection target can be achieved simply by optimizing the bottom lining elevation of the guide channel. The project modification is small and the construction process is simple, which can significantly reduce material consumption, construction period and construction cost. It is especially suitable for curve modification projects with existing guide channels. 3) Wide range of applications and high flexibility: The elevation adjustment method (adjustment of concave bank alone / adjustment of concave and convex banks) and safety factor can be flexibly selected according to factors such as the width of the drainage channel, the type of debris flow (viscous / loose), and the risk level. It is suitable for the bend design of newly built artificial drainage channels, as well as the bend optimization of natural debris flow channels, and can be adapted to different terrains and engineering scenarios. 4) Good flow stability and high drainage efficiency: The cross-section and longitudinal elevation adopt a linear transition design to ensure that the bottom structure of the drainage channel is continuous and smooth, avoiding problems such as local eddies, siltation or sudden changes in flow velocity during debris flow. At the same time, it does not change the cross-sectional area of ​​the drainage channel, ensuring the flow capacity and long-term stable operation of the drainage system.

[0015] In summary, the method of this invention is based on the principle of centrifugal force mechanics. By accurately calculating the superelevation value of the bend and optimizing the elevation arrangement of the bottom lining of the drainage channel, it achieves precise cancellation of the superelevation effect at the bend, keeping the liquid surface approximately horizontal when the debris flow passes through the bend and avoiding the risk of overflow. Its design process is scientifically controllable and easy to construct, requiring no major modifications to the existing drainage channel structure, significantly reducing engineering costs, and is applicable to various debris flow drainage systems with bends. Attached Figure Description

[0016] Figure 1 is a schematic diagram of the cross-sectional division of the guide channel bend control in Embodiment 1 of the present invention; Figure 2 is a schematic diagram of the control of cross-sectional elevation adjustment (bidirectional adjustment of concave and convex banks) in Embodiment 1 of the present invention; Figure 3 is a schematic diagram of the control cross-sectional elevation adjustment (concave bank adjustment separately) in Embodiment 2 of the present invention; Figure 4 is a schematic diagram of the longitudinal elevation transition between adjacent control cross sections in Embodiment 2 of the present invention; Figure 5 This is a schematic diagram of the entire cross-section of the curve in Embodiment 2 of the present invention; Figure 6 This is a three-dimensional perspective view of the curve in Embodiment 2 of the present invention; Figure 7 This is a schematic diagram of the numerical simulation results in Embodiment 2 of the present invention. In the diagram: 1. Convex bank; 2. Concave bank; 3-1. First control cross section; 3-2. Second control cross section; 3-3. Third control cross section; 3-4. Fourth control cross section; 3-5. Fifth control cross section; 4. Centerline of the curve; 5. Normal design elevation; 6. Elevation after adjustment of the concave bank; 7. Elevation after adjustment of the convex bank; 8. Linear transition section; R, radius of curvature of the centerline of the curve; B, width of the guide channel; Δh, superelevation of the curve. Detailed Implementation

[0017] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0018] Example 1: Modification of a bend in a manual guide channel (bidirectional adjustment of concave and convex banks) 1. Project Background A bend in an artificial debris flow diversion channel in a mountainous area needs to be modified. The target area for protection of this bend is a densely populated residential area downstream, with a high risk level. The basic engineering parameters are as follows: channel width B = 8m (distance between the inner walls of the retaining walls on both sides), retaining wall height 4m, bend center angle φ = 30°, channel longitudinal slope 12°, and bend centerline curvature radius R = 50m (determined through topographic survey). Based on on-site investigation and testing, the debris flow type in this area is a dilute debris flow, with a design average flow velocity v = 5m / s (calculated using the recommended formula in the "Design Code for Debris Flow Prevention Engineering").

[0019] 2. Design Steps 1) Control cross section division: The center angle of the curve is φ=30°, and it is divided into equal angle intervals of 1 / 4φ=7.5°. A total of 5 control cross sections are set up (including the starting point of the curve, 7.5°, 15°, 22.5°, and 30° ending point). The distance between adjacent control cross sections is ≤10m, covering the entire curve. 2) Calculation of superelevation of curve: Dilute debris flow correction factor K=1.0, gravitational acceleration g=9.8m / s², substituting into the formula Δh=K v² B / (g R), we can calculate Δh = 1.0 × 5² × 8 / (9.8 × 50) = 200 / 490 ≈ 0.408 m; 3) Bottom elevation adjustment: The protected target is a densely populated residential area with a high risk level, so a safety factor of n=1.5 is selected; the drainage channel is relatively wide, so a two-way adjustment method with concave and convex banks is adopted (Method 2): Adjustment amount for concave bank: 0.5×n×Δh=0.5×1.5×0.408≈0.306m (the concave bank is lowered by 0.306m from the normal design elevation); Adjustment amount for the convex bank: 0.5×n×Δh=0.306m (the convex bank is raised by 0.306m from the normal design elevation); The middle part of the cross section transitions with a linear slope of i=1:80 to form a smooth elevation change; 4) Elevation Adjustment Adaptation: Calculations show that the average flow velocity change at each control cross section is 8% (≤10%). A uniform adjustment amount is used to adjust the elevation of all five control cross sections. For a comparison before and after adjustment, please refer to [link to relevant documentation]. Figure 2 ; 5) Continuous lining design: The lining elevation between adjacent control cross sections transitions with a linear slope i=1:80. For example, from the starting section to the 7.5° section, the elevation of the convex bank gradually increases from the normal design value to +0.306m, and the elevation of the concave bank gradually decreases from the normal design value to -0.306m. The intermediate parts transition linearly in sync, forming a continuous and smooth bottom structure.

[0020] 3. Construction effect After the project was completed, on-site monitoring revealed that when the debris flow passed through the bend, the levelness error of the liquid surface was ≤ ±5cm, with no obvious over-height phenomenon. The safe distance between the top of the retaining wall and the liquid surface was maintained at more than 0.8m, completely eliminating the risk of overflow. The debris flow in the drainage channel was smooth, without local turbulence or siltation. The flow capacity met the design requirements, effectively ensuring the safety of the downstream residential area.

[0021] Example 2: Optimization of natural debris flow gully bends (individual adjustment of concave bank) 1. Project Background A natural debris flow channel has a high overflow hazard at its bend, requiring optimized design. The basic engineering parameters are as follows: drainage channel width B = 10m, retaining wall height 5m, bend center angle φ = 40°, bend centerline radius of curvature R = 60m (determined by topographic survey). Investigation revealed that the debris flow type in this area is viscous debris flow, with a design average flow velocity v = 4.5m / s and a safety factor n = 1.4 (high risk level). Due to topographical constraints, there is no space for raising or adjusting the convex bank; therefore, a separate adjustment method for the concave bank is adopted.

[0022] 2. Design Steps 1) Control cross section division: The center angle of the curve is φ=40°, and it is divided into equal angle intervals of 1 / 5φ=8°, with a total of 6 control cross sections. The distance between adjacent control cross sections is ≤10m. 2) Calculation of superelevation value of curve: The correction factor for viscous debris flow is K=1.3. Substituting this into the formula Δh=K v² B / (g R), we can calculate Δh = 1.3 × 4.5² × 10 / (9.8 × 60) = 1.3 × 20.25 × 10 / 588 ≈ 0.448 m; 3) Bottom elevation adjustment: The concave bank is adjusted separately (method one). The elevation adjustment amount of the concave bank = n×Δh=1.4×0.448≈0.627m (the concave bank is reduced by 0.627m based on the normal design elevation). The middle part of the cross section is transitioned with a linear slope i=1:100. 4) Elevation Adjustment Adaptation: Analysis showed that the average flow velocity change at each control cross section was 12% (>10%). Therefore, Δh was calculated separately for each control cross section, resulting in values ​​of 0.432m, 0.448m, 0.455m, 0.442m, and 0.438m, respectively. Correspondingly, the concave bank adjustment amounts were calculated (0.605m, 0.627m, 0.637m, 0.619m, and 0.613m, respectively), and individual elevation adjustments were performed. For a comparison before and after adjustment, please refer to [link to relevant documentation]. Figure 3 ; 5) Continuous Lining Design: The lining elevation between adjacent control cross sections transitions with a linear slope i=1:100 to ensure a smooth and continuous bottom structure. For details on the longitudinal elevation transition between adjacent control cross sections, please refer to [reference needed]. Figure 4 .

[0023] 3. Construction effect Post-construction on-site monitoring showed that the liquid level was basically horizontal when the debris flow passed through the bend, with no excessive overflow; there was no siltation or turbulence in the drainage channel, and the debris flow was stable, verifying the effectiveness and applicability of this design method in natural gully bends and viscous debris flow scenarios.

[0024] 4. Numerical simulation verification analysis A control group and an experimental group were set up for verification analysis. The basic parameters of the control group were as follows: width of the guide groove. B =10m, retaining wall height 5m, the entire cross-section of the curve is as follows Figure 5 As shown. Center angle of the curve. φ =40°, radius of curvature of the centerline of the curve R =60m; the initial design velocity is v =3m / s, initial mud depth is 40m.

[0025] The parameter settings and design of the experimental group serve as the case study for this experiment, and its three-dimensional curve diagram is shown below. Figure 6 As shown.

[0026] Numerical simulation results are as follows Figure 7 The results showed that: Curve evolution experiments on debris flows in bends were conducted using conventional flat-bottomed, contour-elevated drainage channels (control group, black curve) and optimized cross-section drainage channels with non-contour-elevated bottoms (experimental group, red curve). The time-varying mud depth curves of the flow cross-section quantified the control effect of the two structures on the superelevation of debris flows in bends. From the time-history evolution of mud depth, the control group debris flow... t =The flow begins to enter the bend in about 10 seconds, and the mud depth rises sharply and shows obvious oscillation peaks. The peak mud depth can reach 14.8m in a short time. t =15s later, the mud depth increased sharply again, and in the subsequent 60s test period, the mud depth showed a continuous monotonous upward trend, eventually exceeding 32m. The reason for this is that the flat-bottomed drainage channel with equal elevation could not counteract the centrifugal effect brought about by the circulation of the debris flow in the bend. The water flow was continuously obstructed on the outside of the bend, resulting in excessive accumulation and a continuous rise in the mud level. The risk of excessive overflow increased with the duration of the flow. In contrast, the test group using a non-equal elevation cross section showed a lag in the onset of the debris flow. t =15s, after entering the bend, the overall mud depth rise rate slowed down significantly, and there was no sudden peak super-high phenomenon. The mud depth increased slowly throughout the time period, and the mud depth was only about 12.8m at the end of the test, which was more than 60% lower than the final mud depth of the control group.

[0027] A thorough analysis at the mechanistic level reveals that the non-equielevation cross-section at the bottom of the drainage channel, by differentially arranging the channel bottom elevation along the bend's radial direction, utilizes the gravity component generated by the difference in bottom bed elevation to counteract the centrifugal inertial force of the debris flow bend, suppressing the rise of the outer liquid level induced by circulation, and promoting a near-horizontal mud surface in the bend's cross-section. This fundamentally weakens the superelevation trend of debris flow bends from the hydrodynamic source. In contrast, conventional equal-elevation channel bottoms lack gravity correction, and centrifugal force dominates the cross-sectional velocity redistribution, causing high-velocity surface fluid to converge and accumulate on the outer side of the bend, resulting in a continuous increase in mud depth. The differentiated evolution characteristics of the time-history curves intuitively confirm that the non-equielevation bottom cross-section design can effectively constrain the superelevation development of debris flow liquid levels in bends, significantly reducing the engineering risks of overflow and spillage in the bend section of the drainage channel, and providing reliable experimental basis for the cross-sectional optimization design of debris flow bend drainage projects.

Claims

1. A method for designing the non-equal elevation of the bottom cross-section of a drainage channel to prevent excessive height in debris flow bends, characterized in that, Includes the following steps: Step 1, control cross section division: determine the center angle φ of the guide channel bend, divide the bend at equal angular intervals of (1 / 4-1 / 5)φ to form at least 3 control cross sections, and the maximum distance between adjacent control cross sections is ≤10m to ensure that the control cross sections cover the entire length of the bend. Step 2, Calculation of Superelevation of Curve: The difference in mud depth Δh between the concave and convex banks of each control cross section is calculated using the superelevation calculation formula: Δh = K v² B / (g R); where K is a correction factor, taken as 1.2~1.5 for viscous debris flow and 1.0 for dilute debris flow; v is the average velocity of the debris flow, in m / s; B is the width of the drainage channel, in m, i.e., the horizontal distance between the inner walls of the retaining walls on both sides of the drainage channel; g is the acceleration due to gravity, taken as 9.8 m / s²; R is the radius of curvature of the centerline of the curve, in m; Step 3, bottom elevation adjustment: Select a safety factor n, n=1.2-1.5, take the upper limit when the debris flow is large in scale and high in risk level; The bottom elevation of the control cross section shall be determined using one of the following two adjustment methods: a) Adjustment of the concave bank separately: Reduce the elevation of the bottom of the concave bank by n from the normal design elevation. Δh, the convex bank maintains the normal design elevation, and the middle part of the cross section transitions with a linear slope i=1:50~1:100; b) Two-way adjustment of concave and convex banks: The bottom elevation of the concave bank is lowered by 0.5n from the normal design elevation. Δh, the elevation of the bottom of the convex bank is increased by 0.5n from the normal design elevation. Δh, the middle part of the cross section transitions with a linear slope i = 1:50~1:100; Step 4, Elevation Adjustment Adaptation: If the average flow velocity change of each control cross section within the curve is ≤10%, a uniform height adjustment value is used to adjust the elevation of all control cross sections; if the average flow velocity change is >10%, Δh is calculated separately for each control cross section and adjusted in the manner described in Step 3. Step 5, Continuous lining design: The lining elevation between adjacent control cross sections transitions with a linear slope i=1:50~1:100 to form a continuous and smooth bottom structure of the drainage channel.

2. The method for designing the non-equal elevation of the bottom cross-section of the drainage channel to prevent excessive height in debris flow bends according to claim 1, characterized in that, In step 1, when the center angle φ of the curve is a special angle, the number of control cross sections can be appropriately adjusted on the premise of satisfying the principle of equal angle interval and the maximum distance between adjacent control cross sections ≤ 10m, so as to ensure the continuity and accuracy of the curve elevation adjustment.

3. The method for designing the non-equal elevation of the bottom cross-section of the drainage channel to prevent excessive height in debris flow bends according to claim 1, characterized in that, In step 3, linear transition means that the elevation of the middle part of the cross section is adjusted from the elevation on the convex bank to the elevation on the concave bank, and then the elevation is uniformly and linearly distributed along the width of the cross section without any abrupt changes in elevation.

4. The method for designing the non-equal elevation of the bottom cross-section of the drainage channel to prevent excessive height in debris flow bends according to claim 1, characterized in that, In step 5, the elevation of corresponding points between adjacent control cross sections changes linearly to ensure the continuity and smoothness of the bottom lining structure of the drainage channel, and to avoid local turbulence or siltation during the flow of debris flow.