Methods, devices, equipment and storage media for predicting the jacking force of ultra-long pipe jacking

By segmenting and dynamically correcting the ultra-long pipe jacking construction process, identifying the contact state around the pipe and changes in mud properties, the problem of inaccurate jacking force prediction was solved, achieving more refined jacking force prediction and improving the safety and efficiency of the construction process.

CN123069952APending Publication Date: 2026-11-10CCCC FOURTH HARBOR ENG INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611182295.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-05
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing methods for predicting jacking force in ultra-long pipe jacking construction cannot accurately reflect the changes in actual contact state and dynamic changes in mud properties at different locations along the jacking route, resulting in inaccurate jacking force prediction results.

Method used

By segmenting the jacking line, identifying the pipe contact state of each calculation section, adopting the corresponding unit area friction calculation model, and combining it with mud performance attenuation parameters for dynamic correction, the jacking force prediction results are calculated.

Benefits of technology

It improves the accuracy and reliability of jacking force prediction, and can better reflect the changes in friction during the jacking process, providing reliable data for the selection of construction equipment and safety control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123069952A_ABST
    Figure CN123069952A_ABST
Patent Text Reader

Abstract

This invention provides a method, apparatus, equipment, and storage medium for predicting the jacking force of ultra-long pipe jacking. By segmenting the jacking route to be predicted and combining the corresponding geological parameters, grouting construction parameters, and construction status parameters for each calculation section, the actual contact state between the outer wall of the jacking pipe section and the surrounding medium is identified, which can adapt to the changes in contact conditions in different areas during the construction of ultra-long pipe jacking. Furthermore, based on different contact states, the corresponding unit area friction resistance calculation model is invoked, and the friction resistance is dynamically corrected by combining mud performance attenuation parameters and mud filling parameters, so that the calculated equivalent unit area friction resistance is more consistent with the actual construction conditions. By accumulating the pipe-circumferential friction resistance and the frontal resistance of each calculation section, a refined prediction of the jacking force of ultra-long pipe jacking is achieved, improving the accuracy and reliability of the jacking force prediction results and providing an effective basis for optimizing pipe jacking construction parameters, selecting equipment, and controlling safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of underground engineering construction technology, and in particular to a method, device, equipment and storage medium for predicting the jacking force of ultra-long pipe jacking. Background Technology

[0002] Pipe jacking is a trenchless underground pipeline laying technology characterized by minimal impact on the surface environment, high construction efficiency, and applicability to complex urban underground space construction. With the continuous development of long-distance, large-diameter pipe jacking projects, ultra-long pipe jacking is increasingly being applied to water supply and drainage, integrated utility tunnels, river crossings, and underground transportation facilities. During ultra-long-distance jacking, the pipe jacking machine and pipe sections need to overcome the face resistance generated by the soil at the excavation face and the peripheral friction between the outer wall of the pipe section and the surrounding strata. The peripheral friction typically accumulates with increasing jacking distance, becoming a crucial factor affecting the selection of jacking equipment, construction safety control, and construction efficiency.

[0003] Existing methods for predicting jacking force in ultra-long pipe jacking construction are typically based on theoretical calculation models, estimating jacking resistance according to parameters such as pipe length, pipe diameter, earth pressure, and friction coefficient. However, in actual construction, the outer wall of the pipe section does not always maintain a single contact state with the surrounding strata. Influenced by factors such as strata properties, grouting effect, pipe posture deviation, and changes in annular gaps, the outer wall of the pipe section may have multiple contact states with the surrounding medium, including direct pipe-soil contact, partial pipe-soil-slurry contact, and pipe-slurry-encased contact. The friction formation mechanism and friction level under different contact states vary significantly. Existing methods usually employ fixed friction parameters or homogenization processing, which makes it difficult to accurately reflect the impact of changes in the actual contact state at different locations along the jacking route on the jacking force.

[0004] Meanwhile, during long-distance jacking, the thixotropic drilling mud in the annular gap is affected by factors such as jacking disturbance, groundwater infiltration, changes in material properties, and time effects. This causes dynamic changes in the mud's drag-reduction properties and filling state, resulting in deviations between the actual pipe-circumferential frictional resistance and the initial calculation results. Existing jacking force prediction methods typically do not fully consider the attenuation effect of mud properties during construction and are difficult to dynamically correct for frictional resistance based on the mud filling state in different areas, thus reducing the accuracy of jacking force prediction results for ultra-long pipe jacking.

[0005] In summary, the problems existing in the current technology urgently need to be solved. Summary of the Invention

[0006] This invention provides a method, apparatus, equipment, and storage medium for predicting the jacking force of ultra-long pipe jacking, in order to overcome the deficiencies in the prior art, realize the refined prediction of the jacking force of ultra-long pipe jacking, and improve the accuracy and reliability of the jacking force prediction results.

[0007] This invention provides a method for predicting the jacking force of ultra-long pipe jacking, comprising: Obtain pipeline structure parameters, geological parameters, grouting parameters, and construction status parameters during the construction of ultra-long pipe jacking projects; Based on the pipeline structure parameters, the stratum parameters, and the construction monitoring requirements, the predicted jacking route is segmented to obtain multiple calculation sections; For each calculation section, the pipe-circumferential contact state between the outer wall of the jacking pipe section and the surrounding medium is identified based on the corresponding construction state parameters, grouting construction parameters and formation parameters, so as to obtain the pipe-circumferential contact state information corresponding to each calculation section. Based on the pre-established unit area friction resistance calculation model corresponding to different pipe contact states, the corresponding unit area friction resistance calculation model is called according to the pipe contact state information corresponding to each calculation section to determine the unit area friction resistance of each calculation section. Based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section, the corresponding unit area frictional resistance is dynamically corrected to obtain the equivalent unit area frictional resistance corresponding to each calculation section. The pipe circumferential frictional resistance of each calculation section is determined based on the equivalent unit area frictional resistance of each calculation section. Combined with the pipe jacking frontal resistance, the jacking force of each calculation section is accumulated to obtain the jacking force prediction result during the construction of ultra-long pipe jacking.

[0008] According to the present invention, a method for predicting the jacking force of ultra-long pipe jacking is provided. The step of segmenting the predicted jacking route into multiple calculation sections based on the pipe structure parameters, the geological parameters, and construction monitoring requirements specifically includes: Based on the geological distribution information corresponding to the jacking route to be predicted, the geological change section is determined; Based on the construction monitoring requirements, determine the data acquisition interval corresponding to the jacking status monitoring data; The pipe section length information is determined based on the pipe structure parameters; Based on at least one of the geological change zone, the data acquisition interval, and the pipe section length information, determine the segment length corresponding to the jacking line to be predicted; The jacking line to be predicted is divided according to the segment length to obtain multiple continuous calculation segments.

[0009] According to the method for predicting the jacking force of ultra-long pipe jacking provided by the present invention, the step of identifying the pipe-circumferential contact state between the outer wall of the pipe section and the surrounding medium based on the corresponding construction state parameters, grouting construction parameters, and formation parameters for each calculation section, and obtaining the pipe-circumferential contact state information corresponding to each calculation section, specifically includes: Obtain the grouting pressure parameters, grouting volume parameters, pipeline attitude parameters, jacking displacement parameters, and formation permeability parameters corresponding to each calculation section; Based on the grouting pressure parameters, the grouting volume parameters, and the formation permeability parameters, determine the mud filling state parameters for the corresponding calculation section; Based on the pipeline attitude parameters and the annular gap parameters of the corresponding calculation section, the gap distribution state between the outer wall of the pipe section and the surrounding medium is determined; Based on the mud filling state parameters and the gap distribution state, the pipe circumferential contact state corresponding to each calculation section is classified to obtain the corresponding pipe circumferential contact state information. The pipe-peripheral contact status information includes at least one of the following: direct pipe-soil contact status, partial pipe-soil-mud contact status, and pipe-mud-wrapped contact status.

[0010] According to the method for predicting the jacking force of ultra-long pipe jacking provided by the present invention, the step of classifying the pipe circumferential contact state corresponding to each calculation section based on the mud filling state parameters and the gap distribution state specifically includes: When the mud filling state parameter is less than the preset first filling threshold, the pipe periphery contact state of the corresponding calculation section is determined to be the pipe-soil direct contact state. When the mud filling state parameter is greater than or equal to the preset second filling threshold, the pipe periphery contact state of the corresponding calculation section is determined to be the pipe mud wrapping contact state. When the mud filling state parameter is between the first filling threshold and the second filling threshold, the pipe periphery contact state of the corresponding calculation section is determined to be the pipe-soil mud partial contact state.

[0011] According to the method for predicting the jacking force of ultra-long pipe jacking provided by the present invention, the step of determining the unit area friction resistance of each calculation section by calling the corresponding unit area friction resistance calculation model based on the pre-established unit area friction resistance calculation model corresponding to different pipe circumferential contact states and according to the pipe circumferential contact state information of each calculation section specifically includes: A unit area frictional resistance calculation model is pre-established corresponding to different pipe contact states. The unit area frictional resistance calculation model includes at least a first frictional resistance calculation model corresponding to the direct pipe-soil contact state, a second frictional resistance calculation model corresponding to the pipe-soil mud partial contact state, and a third frictional resistance calculation model corresponding to the pipe-mud wrapped contact state. Based on the pipe contact state information corresponding to each calculation section, the corresponding target frictional resistance calculation model is matched in the unit area frictional resistance calculation model. Obtain the calculation parameters corresponding to the target friction calculation model, wherein the calculation parameters include at least one of formation parameters, pipeline structure parameters, jacking parameters, and mud parameters; The calculation parameters are input into the corresponding target friction resistance calculation model to calculate the unit area friction resistance corresponding to each calculation section.

[0012] According to the method for predicting the jacking force of ultra-long pipe jacking provided by the present invention, the step of dynamically correcting the corresponding unit area frictional resistance based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section to obtain the equivalent unit area frictional resistance corresponding to each calculation section specifically includes: Obtain the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section. The mud performance attenuation parameters are used to characterize the changes in drag reduction performance of mud during jacking due to thixotropic degradation, leakage loss and consolidation changes. The mud filling parameters are used to characterize the degree of mud filling in the annular gap between the outer wall of the pipe section and the formation. Based on the mud performance attenuation parameters, the mud action parameters in the unit area friction calculation model are corrected to obtain the corrected mud drag reduction action parameters. Based on the mud filling parameters, the ratio of the interaction between the pipe-soil contact area and the pipe-mud contact area in the corresponding calculation section is adjusted; Based on the corrected mud drag reduction parameters and the adjusted action ratio, the unit area frictional resistance is corrected to obtain the equivalent unit area frictional resistance corresponding to each calculation section.

[0013] According to the present invention, a method for predicting the jacking force of ultra-long pipe jacking is provided. The step of determining the pipe circumferential frictional resistance of each calculation section based on the equivalent unit area frictional resistance corresponding to each calculation section, and then summing the jacking force of each calculation section in conjunction with the pipe jacking face resistance to obtain the predicted jacking force result during the construction of ultra-long pipe jacking, specifically includes: Based on the equivalent unit area frictional resistance, pipe outer diameter parameters, and length parameters of each calculation section, determine the pipe circumferential frictional resistance corresponding to each calculation section. Obtain the frontal resistance acting on the tunnel face during pipe jacking construction; Based on the pipe circumferential friction and the frontal resistance corresponding to each calculation section, the resistance parameters corresponding to each calculation section are accumulated to obtain the jacking force prediction result corresponding to the current jacking length.

[0014] The present invention also provides a device for predicting the jacking force of ultra-long pipe jacking, comprising: The parameter acquisition module is used to acquire pipeline structure parameters, stratum parameters, grouting construction parameters, and construction status parameters during the construction of ultra-long pipe jacking. The line segmentation module is used to segment the predicted jacking line according to the pipeline structure parameters, the stratum parameters and construction monitoring requirements, and obtain multiple calculation sections. The status recognition module is used to identify the pipe-circumferential contact status between the outer wall of the jacking pipe section and the surrounding medium for each calculation section based on the corresponding construction status parameters, grouting construction parameters and formation parameters, and to obtain the pipe-circumferential contact status information corresponding to each calculation section. The first calculation module is used to determine the unit area friction resistance of each calculation section by calling the corresponding unit area friction resistance calculation model based on the pre-established unit area friction resistance calculation model corresponding to different pipe contact states and the pipe contact state information corresponding to each calculation section. The second calculation module is used to dynamically correct the corresponding unit area frictional resistance based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section, so as to obtain the equivalent unit area frictional resistance corresponding to each calculation section. The jacking force prediction module is used to determine the pipe circumferential friction resistance of each calculation section based on the equivalent unit area friction resistance corresponding to each calculation section, and to accumulate the jacking force of each calculation section in combination with the pipe jacking frontal resistance to obtain the jacking force prediction result during the construction of ultra-long pipe jacking.

[0015] The present invention also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the ultra-long pipe jacking force prediction method as described above.

[0016] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the ultra-long pipe jacking force prediction method as described above.

[0017] The present invention also provides a computer program product, including a computer program that, when executed by a processor, implements the ultra-long pipe jacking force prediction method as described above.

[0018] The present invention provides a method, apparatus, equipment, and storage medium for predicting the jacking force of ultra-long pipe jacking. By acquiring pipeline structure parameters, geological parameters, grouting construction parameters, and construction status parameters during the construction process of ultra-long pipe jacking, and by segmenting the jacking route to be predicted according to the pipeline structure parameters, geological parameters, and construction monitoring requirements, the long-distance jacking process is divided into multiple calculation segments with independent calculation characteristics. This enables the jacking force prediction to adapt to changes in geological conditions and construction status in different regions, thereby improving the precision of the jacking force calculation.

[0019] Furthermore, this application identifies the contact state between the outer wall of the jacking pipe section and the surrounding medium based on construction status parameters, grouting construction parameters, and formation parameters for each calculation section, and obtains the corresponding contact state information. This can distinguish the actual contact relationship between the pipe section and the formation and mud in different areas, and avoid the prediction deviation caused by using a single friction state for overall calculation in the prior art.

[0020] Furthermore, this application uses a pre-established unit area friction resistance calculation model corresponding to different pipe contact states. Based on the pipe contact state information corresponding to each calculation section, it calls the matching unit area friction resistance calculation model to realize differentiated friction resistance calculation for different contact states. This enables the unit area friction resistance calculation to reflect the actual pipe force mechanism and improves the accuracy of friction resistance calculation.

[0021] Furthermore, this application dynamically corrects the frictional resistance per unit area based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section. This can take into account the impact of mud thixotropic degradation, leakage loss, and changes in filling degree on the friction reduction effect during the jacking process, making the obtained equivalent frictional resistance per unit area more consistent with the actual construction conditions, thereby reducing the jacking force prediction error caused by ignoring changes in mud state.

[0022] Furthermore, this application determines the pipe circumferential frictional resistance based on the equivalent unit area frictional resistance corresponding to each calculation section, and accumulates the jacking force of each calculation section in combination with the pipe jacking frontal resistance to obtain the jacking force prediction result during the construction of ultra-long pipe jacking. This realizes the overall jacking force prediction based on the segmented calculation results, which can more accurately reflect the variation law of jacking force with jacking distance and construction status during the construction of ultra-long pipe jacking, and provide more reliable data basis for jacking equipment configuration, construction parameter adjustment and construction safety control. Attached Figure Description

[0023] To more clearly illustrate the technical solutions in this invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.

[0024] Figure 1 This is a flowchart illustrating the method for predicting the jacking force of ultra-long pipe jacking provided by the present invention; Figure 2 This is a schematic diagram of the structure of the ultra-long pipe jacking force prediction device provided by the present invention; Figure 3 This is a schematic diagram of the structure of the electronic device provided by the present invention. Detailed Implementation

[0025] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without creative effort are within the scope of protection of this invention.

[0026] To address the problems in existing technologies, this invention proposes a method for predicting the jacking force of ultra-long pipe jacking, thereby achieving refined prediction of the jacking force and improving the accuracy and reliability of the prediction results. The method for predicting the jacking force of ultra-long pipe jacking is described below, as follows: Figure 1 As shown, including but not limited to the following steps: Step 110: Obtain pipeline structure parameters, geological parameters, grouting construction parameters, and construction status parameters during the ultra-long pipe jacking construction process.

[0027] In step 110, when predicting the jacking force in ultra-long pipe jacking construction, basic data related to the pipe jacking construction process are first obtained as the data basis for subsequent jacking force calculation.

[0028] The pipeline structure parameters are used to characterize the structural features of the pipeline to be constructed, such as parameters reflecting the pipeline size, structural form, and construction layout; the stratum parameters are used to characterize the geological environment around the jacking route; the grouting construction parameters are used to characterize the construction state corresponding to the annular gap grouting process during the pipe jacking construction; and the construction state parameters are used to characterize the dynamic changes during the actual pipe jacking process.

[0029] In practical applications, the above parameters can be obtained from construction design data, geological survey data, grouting construction records, and on-site monitoring equipment. By acquiring these multiple types of parameters, the jacking force prediction process can comprehensively consider pipeline structure, geological environment, grouting status, and changes in the construction process, thereby improving the data integrity of subsequent jacking force calculations.

[0030] Step 120: Based on the pipeline structure parameters, the stratum parameters, and the construction monitoring requirements, the predicted jacking route is segmented to obtain multiple calculation sections.

[0031] In step 120, since ultra-long pipe jacking construction lines usually have a long jacking distance, the geological conditions, construction status and stress around the pipe may vary along the line. Therefore, it is necessary to segment the predicted jacking line.

[0032] Specifically, based on the obtained pipeline structure parameters, stratum parameters, and construction monitoring requirements, the entire jacking line to be predicted is divided into regions, and the continuous jacking line is divided into multiple calculation sections, so that each calculation section corresponds to the construction status and stress characteristics within a certain range.

[0033] By converting the overall jacking path into multiple local calculation sections, the jacking force parameters can be calculated separately for different locations, avoiding the problem of ignoring local differences due to the use of overall average parameters, and providing a calculation basis for subsequent friction analysis based on the calculation sections.

[0034] Step 130: For each calculation section, based on the corresponding construction state parameters, grouting construction parameters, and formation parameters, identify the pipe-circumferential contact state between the outer wall of the jacking pipe section and the surrounding medium, and obtain the pipe-circumferential contact state information corresponding to each calculation section.

[0035] In step 130, since the interaction between the outer wall of the pipe section and the surrounding medium during the pipe jacking construction process is affected by the geological conditions, grouting status and changes in the construction process, the contact state around the pipe may vary at different locations.

[0036] Therefore, for each calculation section, based on the corresponding construction state parameters, grouting construction parameters, and formation parameters, the interaction between the outer wall of the jacking pipe section and the surrounding medium is analyzed to determine the pipe-circumferential contact state corresponding to the current calculation section and generate the corresponding pipe-circumferential contact state information.

[0037] The pipe contact status information is used to characterize the actual interaction between the outer wall of the pipe section and the surrounding medium in the current calculation section, so as to select an appropriate friction resistance calculation method and improve the matching degree between the friction resistance calculation results per unit area and the actual construction state.

[0038] Step 140: Based on the pre-established unit area friction resistance calculation model corresponding to different pipe contact states, call the corresponding unit area friction resistance calculation model according to the pipe contact state information corresponding to each calculation section, and determine the unit area friction resistance corresponding to each calculation section.

[0039] In step 140, a unit area friction resistance calculation model is pre-established to describe the friction resistance characteristics under different pipe circumferential contact states.

[0040] After obtaining the pipe contact state information corresponding to each calculation section, a calculation model matching the current calculation section is selected from the pre-established unit area friction resistance calculation model based on the pipe contact state information, and the unit area friction resistance of the current calculation section is calculated based on the corresponding calculation model.

[0041] By adopting corresponding unit area friction resistance calculation models for different pipe contact states, the errors caused by using a single friction parameter in the traditional jacking force prediction process can be avoided, and the unit area friction resistance calculation results can more accurately reflect the stress situation of the pipe section under actual construction conditions.

[0042] Step 150: Based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section, dynamically correct the corresponding unit area frictional resistance to obtain the equivalent unit area frictional resistance for each calculation section.

[0043] In step 150, considering that the mud injected between the outer wall of the pipe section and the stratum during the construction of ultra-long pipe jacking will change in performance as the jacking process progresses, and its drag reduction effect is not constant, it is necessary to dynamically correct the frictional resistance per unit area.

[0044] Specifically, the calculated unit area frictional resistance is corrected based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section, so that the corrected unit area frictional resistance can reflect the actual effect of the mud in the current calculation section.

[0045] By introducing factors related to changes in mud state and dynamically adjusting the frictional resistance per unit area, calculation deviations caused by changes in mud action during construction can be reduced, thereby improving the accuracy of jacking force prediction results.

[0046] Step 160: Determine the pipe circumferential friction resistance of each calculation section based on the equivalent unit area friction resistance corresponding to each calculation section, and accumulate the jacking force of each calculation section in combination with the pipe jacking frontal resistance to obtain the jacking force prediction result during the ultra-long pipe jacking construction process.

[0047] In step 160, the pipe circumferential frictional resistance corresponding to each calculation section is calculated based on the equivalent unit area frictional resistance corresponding to each calculation section. Furthermore, the resistance parameters corresponding to each calculation section are comprehensively calculated by combining the face resistance generated at the tunneling face during the pipe jacking construction.

[0048] Specifically, the pipe circumferential friction resistance corresponding to each calculation section is accumulated, and combined with the pipe jacking frontal resistance, to obtain the total jacking force that needs to be overcome under the current jacking state, thereby obtaining the jacking force prediction result in the construction process of ultra-long pipe jacking.

[0049] By linking the local frictional changes during the jacking process of ultra-long pipe jacking with the overall jacking force requirement through the above method, jacking force prediction based on segmented calculation and dynamic correction is realized, providing data support for jacking control and construction parameter adjustment during ultra-long pipe jacking construction.

[0050] As a further optional embodiment, the step of segmenting the predicted jacking route into multiple calculation sections based on the pipeline structure parameters, the geological parameters, and construction monitoring requirements specifically includes: Based on the geological distribution information corresponding to the jacking route to be predicted, the geological change section is determined; Based on the construction monitoring requirements, determine the data acquisition interval corresponding to the jacking status monitoring data; The pipe section length information is determined based on the pipe structure parameters; Based on at least one of the geological change zone, the data acquisition interval, and the pipe section length information, determine the segment length corresponding to the jacking line to be predicted; The jacking line to be predicted is divided according to the segment length to obtain multiple continuous calculation segments.

[0051] In this embodiment, in order to improve the accuracy of the stress state analysis of different construction sections during the prediction of ultra-long pipe jacking force, it is necessary to reasonably divide the jacking line to be predicted into multiple calculation sections with relatively independent calculation characteristics based on the geological conditions along the jacking line, construction monitoring requirements, and pipeline structural characteristics.

[0052] Specifically, the geological survey data, stratigraphic distribution data, and geological change information of the construction area corresponding to the jacking route to be predicted are first obtained. Based on the changes in soil type, soil layer thickness, groundwater conditions, and stratigraphic mechanical parameters at different locations, areas with significant stratigraphic differences in the jacking route are identified, and the route range with the same or similar stratigraphic characteristics is divided into corresponding stratigraphic sections.

[0053] Furthermore, based on the monitoring requirements for the jacking status during the construction of ultra-long pipe jacking, a data acquisition interval is determined for collecting construction monitoring data such as jacking force, advancing displacement, and grouting status. This ensures that subsequent calculations can be performed based on continuous and effective construction status data for jacking force analysis. The data acquisition interval can be set according to the data sampling capability of the construction monitoring equipment, the accuracy requirements of construction control, and the status changes during the jacking process.

[0054] Furthermore, the pipe section length information corresponding to the predicted jacking route is determined based on the pipeline structure parameters, so that the divided calculation sections can match the actual pipe jacking construction structural units, avoiding the neglect of local stress changes due to excessively large section division scale, or the increase in calculation complexity due to excessively small section division scale.

[0055] After determining the geological variation zones, data acquisition intervals, and pipe segment lengths, the segment lengths corresponding to the predicted jacking route are determined based on at least one of the aforementioned parameters. The predicted jacking route is then continuously divided along the jacking direction according to these segment lengths, resulting in multiple calculation segments. Each calculation segment corresponds to a continuous jacking route and has corresponding geological conditions, structural parameters, and construction status parameters. This provides a foundation for subsequent identification of pipe contact status, calculation of unit area frictional resistance, and prediction of jacking force for different calculation segments. Through this segmentation process, the jacking force prediction process can fully consider geological variations and differences in construction status within ultra-long pipe jacking routes, improving the matching degree between the jacking force calculation results and the actual construction process.

[0056] As a further optional embodiment, the step of identifying the pipe-circumferential contact state between the outer wall of the jacking pipe section and the surrounding medium based on the corresponding construction state parameters, grouting construction parameters, and formation parameters for each calculation section, and obtaining the pipe-circumferential contact state information corresponding to each calculation section, specifically includes: Obtain the grouting pressure parameters, grouting volume parameters, pipeline attitude parameters, jacking displacement parameters, and formation permeability parameters corresponding to each calculation section; Based on the grouting pressure parameters, the grouting volume parameters, and the formation permeability parameters, determine the mud filling state parameters for the corresponding calculation section; Based on the pipeline attitude parameters and the annular gap parameters of the corresponding calculation section, the gap distribution state between the outer wall of the pipe section and the surrounding medium is determined; Based on the mud filling state parameters and the gap distribution state, the pipe circumferential contact state corresponding to each calculation section is classified to obtain the corresponding pipe circumferential contact state information. The pipe-peripheral contact status information includes at least one of the following: direct pipe-soil contact status, partial pipe-soil-mud contact status, and pipe-mud-wrapped contact status.

[0057] In this embodiment, in order to accurately characterize the actual contact relationship between the outer wall of the pipe section and the surrounding medium during the construction of ultra-long pipe jacking, it is necessary to combine multiple source parameters such as grouting status, pipe posture changes and geological conditions during the construction process to identify the pipe circumferential contact state corresponding to different calculation sections, so as to provide a calculation basis that matches the actual working conditions for subsequent calculation of unit area friction resistance.

[0058] Specifically, the construction status parameters, grouting construction parameters, and formation parameters corresponding to each calculation section are first obtained. The grouting construction parameters include grouting pressure and grouting volume parameters; the construction status parameters include pipe attitude and jacking displacement parameters; and the formation parameters include formation permeability parameters. By collecting these parameters, the actual conditions of annular gap formation, slurry transportation, and slurry diffusion and permeation during pipe jacking construction can be reflected.

[0059] Furthermore, based on the grouting pressure parameters, grouting volume parameters, and formation permeability parameters corresponding to each calculation section, the filling condition of the grout in the annular gap between the outer wall of the jacking pipe section and the formation is analyzed to determine the grout filling state parameters for the corresponding calculation section. Among these parameters, the grouting pressure parameter characterizes the transport capacity of the grout when entering the annular gap, the grouting volume parameter characterizes the actual injected grout volume, and the formation permeability parameter characterizes the degree of grout diffusion and loss to the surrounding formation. By combining these parameters, the variation in the degree of grout filling within different calculation sections can be obtained.

[0060] Furthermore, based on the pipe attitude parameters and annular gap parameters corresponding to each calculation section, the gap distribution between the outer wall of the pipe section and the surrounding medium is determined. The pipe attitude parameters reflect the attitude changes of the pipe section during pipe jacking construction, such as offset and deflection, while the annular gap parameters characterize the theoretically formed gap size between the outer wall of the pipe section and the ground. By analyzing the influence of pipe attitude changes on the spatial distribution of the annular gap, the actual gap state between the outer wall of the pipe section and the surrounding medium at different locations can be determined.

[0061] Furthermore, based on the mud filling state parameters and the gap distribution state, the pipe-circumferential contact state corresponding to each calculation section is classified and identified. When the mud fails to effectively fill the annular gap between the outer wall of the pipe section and the stratum, the corresponding calculation section is determined to be in direct pipe-soil contact state; when the mud only forms a filling in a partial area and contacts both the outer wall of the pipe section and the stratum, the corresponding calculation section is determined to be in partial pipe-soil-mud contact state; when the mud fully fills the annular gap and forms a continuous lubricating layer around the outer wall of the pipe section, the corresponding calculation section is determined to be in pipe-mud-wrapped contact state.

[0062] The above method enables dynamic identification of the pipe circumferential contact state in different calculation sections based on the actual construction status during ultra-long pipe jacking construction. This allows for the differentiation of frictional characteristics under different contact conditions during jacking force prediction, avoiding calculation deviations caused by using a single contact assumption and improving the accuracy of ultra-long pipe jacking force prediction results.

[0063] As a further optional embodiment, the step of classifying the pipe contact state corresponding to each calculation section based on the mud filling state parameters and the gap distribution state specifically includes: When the mud filling state parameter is less than the preset first filling threshold, the pipe periphery contact state of the corresponding calculation section is determined to be the pipe-soil direct contact state. When the mud filling state parameter is greater than or equal to the preset second filling threshold, the pipe periphery contact state of the corresponding calculation section is determined to be the pipe mud wrapping contact state. When the mud filling state parameter is between the first filling threshold and the second filling threshold, the pipe periphery contact state of the corresponding calculation section is determined to be the pipe-soil mud partial contact state.

[0064] In this embodiment, in order to accurately classify the contact state of the pipe periphery in different calculation sections, the contact state of the pipe periphery is divided into different types according to the degree of filling of the mud in the annular gap between the outer wall of the pipe section and the formation, so that the subsequent frictional resistance calculation can match the corresponding contact conditions.

[0065] Specifically, the actual filling degree of the mud in the annular gap is characterized by the mud filling state parameters, and a first filling threshold and a second filling threshold are preset. The first filling threshold is used to characterize the critical state in which direct contact is easily formed between the outer wall of the pipe section and the formation when the mud filling degree is low, and the second filling threshold is used to characterize the critical state in which the mud can fully cover the outer wall of the pipe section and form a continuous drag-reducing layer.

[0066] When the mud filling state parameter is less than the preset first filling threshold, it indicates that the mud injection volume in the corresponding calculation section is insufficient, or that the mud cannot be effectively maintained in the annular gap due to factors such as formation seepage and loss, resulting in a large area of ​​direct contact between the outer wall of the pipe section and the surrounding formation. Therefore, the pipe-soil contact state corresponding to this calculation section is determined as the pipe-soil direct contact state.

[0067] When the mud filling state parameter is greater than or equal to the preset second filling threshold, it indicates that the mud in the corresponding calculation section can fully fill the annular gap between the outer wall of the pipe section and the formation, and form a relatively continuous mud isolation layer around the pipe section, so that the outer wall of the pipe section and the formation mainly contact each other through the mud medium. Therefore, the pipe circumferential contact state corresponding to this calculation section is determined as the pipe-mud encapsulated contact state.

[0068] When the mud filling state parameter is between the first filling threshold and the second filling threshold, it indicates that the mud filling degree in the corresponding calculation section is in an intermediate state, with a mud lubrication layer forming in some areas, while some areas still have direct contact between the outer wall of the pipe section and the stratum. Therefore, the pipe periphery contact state corresponding to this calculation section is determined as the pipe-soil mud partial contact state.

[0069] By using the classification method based on the filling threshold described above, the continuously changing mud filling state can be converted into corresponding pipe circumferential contact state information, enabling different calculation sections to match different frictional resistance calculation models according to actual contact conditions, thereby improving the adaptability and accuracy of pipe circumferential frictional resistance calculation during pipe jacking construction.

[0070] As a further optional embodiment, the step of determining the unit area friction resistance corresponding to each calculation segment by calling the corresponding unit area friction resistance calculation model according to the pipe contact state information corresponding to each calculation segment, based on a pre-established unit area friction resistance calculation model corresponding to different pipe contact states, specifically includes: A unit area frictional resistance calculation model is pre-established corresponding to different pipe contact states. The unit area frictional resistance calculation model includes at least a first frictional resistance calculation model corresponding to the direct pipe-soil contact state, a second frictional resistance calculation model corresponding to the pipe-soil mud partial contact state, and a third frictional resistance calculation model corresponding to the pipe-mud wrapped contact state. Based on the pipe contact state information corresponding to each calculation section, the corresponding target frictional resistance calculation model is matched in the unit area frictional resistance calculation model. Obtain the calculation parameters corresponding to the target friction calculation model, wherein the calculation parameters include at least one of formation parameters, pipeline structure parameters, jacking parameters, and mud parameters; The calculation parameters are input into the corresponding target friction resistance calculation model to calculate the unit area friction resistance corresponding to each calculation section.

[0071] In this embodiment, to avoid the problem that using a single frictional resistance calculation method cannot adapt to the changes in different pipe contact conditions during the construction of ultra-long pipe jacking, a unit area frictional resistance calculation model corresponding to different pipe contact states is established in advance, and a matching calculation model is selected according to the actual pipe contact state of each calculation section, thereby realizing differentiated calculation of unit area frictional resistance under different construction conditions.

[0072] Specifically, based on the different contact forms that may exist between the outer wall of the pipe section and the surrounding medium during the construction of ultra-long pipe jacking, calculation models for the unit area frictional resistance corresponding to various pipe-circumferential contact states are established. Among them, a first frictional resistance calculation model is established for the case where the outer wall of the pipe section is in direct contact with the stratum, corresponding to the direct pipe-soil contact state; a second frictional resistance calculation model is established for the case where part of the outer wall of the pipe section is in contact with the slurry medium and part of the outer wall is in direct contact with the stratum, corresponding to the partial pipe-soil-slurry contact state; and a third frictional resistance calculation model is established for the case where the slurry fully fills the annular gap between the outer wall of the pipe section and the stratum, forming a continuous lubricating isolation layer, corresponding to the pipe-slurry wrapped contact state.

[0073] Furthermore, based on the pipe-circumferential contact state information corresponding to each calculation segment, a matching process is performed within a pre-established set of unit area frictional resistance calculation models to determine the target frictional resistance calculation model corresponding to the contact state of the current calculation segment. For example, when the pipe-circumferential contact state corresponding to a certain calculation segment is a direct pipe-soil contact state, the first frictional resistance calculation model is used for calculation; when the corresponding pipe-circumferential contact state is a partial pipe-soil-mud contact state, the second frictional resistance calculation model is used for calculation; and when the corresponding pipe-circumferential contact state is a pipe-mud-wrapped contact state, the third frictional resistance calculation model is used for calculation.

[0074] Furthermore, after determining the target friction resistance calculation model, the corresponding calculation parameters are obtained. These calculation parameters may include at least one of the following: soil parameters, pipeline structure parameters, jacking parameters, and grout parameters. The soil parameters characterize the soil properties and stress conditions within the jacking area; the pipeline structure parameters characterize the pipe section dimensions and structural features; the jacking parameters characterize the advancement status during construction; and the grout parameters characterize the influence of the grouting medium on the friction around the pipe.

[0075] Furthermore, the obtained calculation parameters are input into the corresponding target friction resistance calculation model. The target friction resistance calculation model is used to calculate the unit area friction resistance on the outer wall of the pipe section under different contact states, and the unit area friction resistance corresponding to each calculation section is obtained.

[0076] By using the above method, the corresponding unit area friction resistance calculation model is called according to the actual pipe contact state in different calculation sections. This allows the unit area friction resistance calculation process to adapt to various construction states such as pipe-soil contact, pipe-soil-slurry mixed contact, and pipe-slurry contact. Compared with the traditional calculation method based on a fixed friction coefficient, it can more accurately reflect the actual friction resistance changes during the construction of ultra-long pipe jacking, providing a more reliable data basis for subsequent jacking force prediction.

[0077] As a further optional embodiment, the step of dynamically correcting the corresponding unit area frictional resistance based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation segment, and obtaining the equivalent unit area frictional resistance for each calculation segment, specifically includes: Obtain the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section. The mud performance attenuation parameters are used to characterize the changes in drag reduction performance of mud during jacking due to thixotropic degradation, leakage loss and consolidation changes. The mud filling parameters are used to characterize the degree of mud filling in the annular gap between the outer wall of the pipe section and the formation. Based on the mud performance attenuation parameters, the mud action parameters in the unit area friction calculation model are corrected to obtain the corrected mud drag reduction action parameters. Based on the mud filling parameters, the ratio of the interaction between the pipe-soil contact area and the pipe-mud contact area in the corresponding calculation section is adjusted; Based on the corrected mud drag reduction parameters and the adjusted action ratio, the unit area frictional resistance is corrected to obtain the equivalent unit area frictional resistance corresponding to each calculation section.

[0078] In this embodiment, during the construction of ultra-long pipe jacking, as the pipe section continuously advances, the drag-reducing medium in the annular gap formed between the outer wall of the pipe section and the stratum is affected by factors such as jacking time, shearing action, groundwater infiltration, and changes in stratum pressure. This causes dynamic changes in the viscosity, thixotropic properties, and lubrication properties of the slurry. Simultaneously, the slurry within the annular gap may experience localized loss, uneven filling, or consolidation and deposition, resulting in differences in the drag-reducing effect at different locations. Therefore, it is necessary to dynamically correct the unit area frictional resistance calculated based on the initial conditions, considering both the slurry performance degradation state and the actual slurry filling state, to improve the matching degree between the predicted jacking force and the actual construction conditions.

[0079] Specifically, the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section are first obtained. The mud performance attenuation parameters characterize the changes in drag reduction performance of the mud during jacking due to factors such as thixotropic structure failure, continuous shearing, groundwater intrusion, material loss, and consolidation changes. The mud filling parameters characterize the actual degree of mud filling in the annular gap between the outer wall of the jacking pipe section and the formation.

[0080] In one implementation, the mud performance attenuation parameters can be determined based on jacking time, cumulative jacking distance, grouting pressure changes, mud material performance test parameters, and construction monitoring data; the mud filling parameters can be determined based on grouting volume, theoretical annular gap volume, formation grout absorption, and grouting pressure changes, so as to reflect the actual working state of the mud in different calculation sections.

[0081] Furthermore, based on the mud performance degradation parameters, the mud action parameters in the unit area friction resistance calculation model are corrected to obtain the corrected mud drag reduction parameters. Specifically, the mud lubrication coefficient, mud viscosity parameter, or mud drag reduction coefficient are adjusted according to the degree of mud performance degradation, so that the mud action parameters used in the unit area friction resistance calculation can reflect the actual state of mud performance changes during construction.

[0082] Furthermore, based on the mud filling parameters, the ratio of the pipe-soil contact area to the pipe-mud contact area in the corresponding calculation section is adjusted. Specifically, when the mud filling degree is high, a continuous mud isolation layer is formed between the outer wall of the pipe section and the stratum, the proportion of the pipe-mud contact area is high, and the mud drag reduction effect is enhanced; when the mud filling degree is low, some areas may re-form a direct pipe-soil contact state, the proportion of the pipe-soil contact area increases, thereby leading to an increase in the overall unit area frictional resistance.

[0083] Furthermore, based on the corrected mud drag reduction parameters and the adjusted action ratio, the unit area frictional resistance is corrected to obtain the equivalent unit area frictional resistance for each calculation section. By simultaneously considering the attenuation of mud properties during construction and the influence of changes in mud spatial distribution, the obtained equivalent unit area frictional resistance can reflect the actual drag reduction state at different locations during ultra-long pipe jacking construction, providing a more accurate data basis for subsequent pipe circumferential frictional resistance calculation and jacking force prediction.

[0084] The above method can avoid the calculation deviation caused by using only the initial grouting state parameters in the traditional jacking force calculation process, and improve the adaptability to dynamic construction conditions in the jacking force prediction process of ultra-long pipe jacking construction.

[0085] As a further optional embodiment, the step of determining the pipe circumferential frictional resistance of each calculation section based on the equivalent unit area frictional resistance corresponding to each calculation section, and combining it with the pipe jacking face resistance to accumulate the jacking force of each calculation section and obtain the jacking force prediction result during the ultra-long pipe jacking construction process, specifically includes: Based on the equivalent unit area frictional resistance, pipe outer diameter parameters, and length parameters of each calculation section, determine the pipe circumferential frictional resistance corresponding to each calculation section. Obtain the frontal resistance acting on the tunnel face during pipe jacking construction; Based on the pipe circumferential friction and the frontal resistance corresponding to each calculation section, the resistance parameters corresponding to each calculation section are accumulated to obtain the jacking force prediction result corresponding to the current jacking length.

[0086] In this embodiment, after obtaining the equivalent unit area frictional resistance corresponding to each calculation section, the unit area frictional resistance is further converted into the actual pipe circumferential frictional resistance on the outer wall of the pipe section within the corresponding calculation section based on the spatial range of each calculation section and the pipe structure parameters. Combined with the face resistance acting on the cutterhead or tunneling face during the pipe jacking process, the resistance of different jacking sections is comprehensively calculated to obtain the jacking force prediction result corresponding to the current jacking length.

[0087] Specifically, the circumferential frictional resistance corresponding to each calculation section is determined based on the equivalent unit area frictional resistance, the pipe outer diameter parameter, and the length parameter of the corresponding calculation section. The equivalent unit area frictional resistance characterizes the average resistance effect per unit circumferential contact area, the pipe outer diameter parameter determines the circumferential contact dimension of the pipe section's outer wall, and the length parameter determines the pipe wall length involved in the frictional resistance within the corresponding calculation section.

[0088] In one implementation, the circumferential frictional resistance of a given calculation section can be calculated based on the equivalent unit area frictional resistance of each calculation section and the circumferential contact area of ​​that section. The circumferential contact area can be determined based on the pipe outer diameter parameter and the calculation section length parameter, thereby separately characterizing the differences in frictional resistance caused by variations in geological conditions, grouting conditions, and contact conditions within different calculation sections.

[0089] Furthermore, the face resistance acting on the tunneling face during pipe jacking construction is obtained. The face resistance is used to characterize the resistance generated between the front end of the tunneling equipment and the stratum to be excavated during pipe jacking, and its magnitude can be determined based on factors such as the tunneling face area, the physical and mechanical parameters of the stratum, the groundwater pressure, and the construction status parameters.

[0090] Furthermore, based on the pipe friction resistance and the frontal resistance corresponding to each calculation section, the resistance parameters corresponding to each calculation section are accumulated to obtain the predicted jacking force corresponding to the current jacking length. Specifically, the pipe friction resistance corresponding to multiple calculation sections distributed along the jacking line is accumulated segment by segment, and the frontal resistance generated during the jacking process is superimposed to obtain the predicted jacking force required by the jacking equipment at the current jacking distance.

[0091] By dividing the ultra-long pipe jacking construction route into multiple calculation sections and considering the differences in equivalent unit area friction resistance within each section, a refined calculation of pipe circumferential friction resistance under non-uniform geological conditions and dynamic grouting drag reduction conditions is achieved, avoiding the prediction deviations caused by the use of a single average friction resistance parameter in traditional methods. Furthermore, by comprehensively summing the segmented pipe circumferential friction resistance with the face resistance, a more accurate prediction of the jacking force can be obtained, providing data support for jacking equipment selection, construction parameter adjustment, and construction risk control.

[0092] The following describes the ultra-long pipe jacking force prediction device provided by the present invention, such as... Figure 2 As shown, the ultra-long pipe jacking force prediction device described below and the ultra-long pipe jacking force prediction method described above can be referred to in correspondence.

[0093] A device for predicting the jacking force of ultra-long pipe jacking, comprising: The parameter acquisition module 210 is used to acquire pipeline structure parameters, stratum parameters, grouting construction parameters and construction status parameters during the construction of ultra-long pipe jacking. The line segmentation module 220 is used to segment the predicted jacking line according to the pipeline structure parameters, the stratum parameters and construction monitoring requirements, and obtain multiple calculation sections. The status recognition module 230 is used to identify the pipe-circumferential contact status between the outer wall of the jacking pipe section and the surrounding medium for each calculation section based on the corresponding construction status parameters, grouting construction parameters and formation parameters, and to obtain the pipe-circumferential contact status information corresponding to each calculation section. The first calculation module 240 is used to determine the unit area friction resistance of each calculation section by calling the corresponding unit area friction resistance calculation model based on the pre-established unit area friction resistance calculation model corresponding to different pipe contact states and the pipe contact state information corresponding to each calculation section. The second calculation module 250 is used to dynamically correct the corresponding unit area frictional resistance based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section, so as to obtain the equivalent unit area frictional resistance corresponding to each calculation section. The jacking force prediction module 260 is used to determine the pipe circumferential friction resistance of each calculation section based on the equivalent unit area friction resistance corresponding to each calculation section, and to accumulate the jacking force of each calculation section in combination with the pipe jacking frontal resistance to obtain the jacking force prediction result during the construction of ultra-long pipe jacking.

[0094] Figure 3 An example is a schematic diagram of the physical structure of an electronic device, such as... Figure 3 As shown, the electronic device may include: a processor 310, a communication interface 320, a memory 330, and a communication bus 340, wherein the processor 310, the communication interface 320, and the memory 330 communicate with each other via the communication bus 340. The processor 310 can call logical instructions in the memory 330 to execute a method for predicting the jacking force of ultra-long pipe jacking, which includes: Obtain pipeline structure parameters, geological parameters, grouting parameters, and construction status parameters during the construction of ultra-long pipe jacking projects; Based on the pipeline structure parameters, the stratum parameters, and the construction monitoring requirements, the predicted jacking route is segmented to obtain multiple calculation sections; For each calculation section, the pipe-circumferential contact state between the outer wall of the jacking pipe section and the surrounding medium is identified based on the corresponding construction state parameters, grouting construction parameters and formation parameters, so as to obtain the pipe-circumferential contact state information corresponding to each calculation section. Based on the pre-established unit area friction resistance calculation model corresponding to different pipe contact states, the corresponding unit area friction resistance calculation model is called according to the pipe contact state information corresponding to each calculation section to determine the unit area friction resistance of each calculation section. Based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section, the corresponding unit area frictional resistance is dynamically corrected to obtain the equivalent unit area frictional resistance corresponding to each calculation section. The pipe circumferential frictional resistance of each calculation section is determined based on the equivalent unit area frictional resistance of each calculation section. Combined with the pipe jacking frontal resistance, the jacking force of each calculation section is accumulated to obtain the jacking force prediction result during the construction of ultra-long pipe jacking.

[0095] Furthermore, the logical instructions in the aforementioned memory 330 can be implemented as software functional units and, when sold or used as independent products, can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, essentially, or the part that contributes to the prior art, or a part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of the present invention. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.

[0096] On the other hand, the present invention also provides a computer program product, which includes a computer program that can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer is able to execute the ultra-long pipe jacking force prediction method provided by the above methods, the method including: Obtain pipeline structure parameters, geological parameters, grouting parameters, and construction status parameters during the construction of ultra-long pipe jacking projects; Based on the pipeline structure parameters, the stratum parameters, and the construction monitoring requirements, the predicted jacking route is segmented to obtain multiple calculation sections; For each calculation section, the pipe-circumferential contact state between the outer wall of the jacking pipe section and the surrounding medium is identified based on the corresponding construction state parameters, grouting construction parameters and formation parameters, so as to obtain the pipe-circumferential contact state information corresponding to each calculation section. Based on the pre-established unit area friction resistance calculation model corresponding to different pipe contact states, the corresponding unit area friction resistance calculation model is called according to the pipe contact state information corresponding to each calculation section to determine the unit area friction resistance of each calculation section. Based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section, the corresponding unit area frictional resistance is dynamically corrected to obtain the equivalent unit area frictional resistance corresponding to each calculation section. The pipe circumferential frictional resistance of each calculation section is determined based on the equivalent unit area frictional resistance of each calculation section. Combined with the pipe jacking frontal resistance, the jacking force of each calculation section is accumulated to obtain the jacking force prediction result during the construction of ultra-long pipe jacking.

[0097] In another aspect, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the ultra-long pipe jacking force prediction method provided by the above methods, the method comprising: Obtain pipeline structure parameters, geological parameters, grouting parameters, and construction status parameters during the construction of ultra-long pipe jacking projects; Based on the pipeline structure parameters, the stratum parameters, and the construction monitoring requirements, the predicted jacking route is segmented to obtain multiple calculation sections; For each calculation section, the pipe-circumferential contact state between the outer wall of the jacking pipe section and the surrounding medium is identified based on the corresponding construction state parameters, grouting construction parameters and formation parameters, so as to obtain the pipe-circumferential contact state information corresponding to each calculation section. Based on the pre-established unit area friction resistance calculation model corresponding to different pipe contact states, the corresponding unit area friction resistance calculation model is called according to the pipe contact state information corresponding to each calculation section to determine the unit area friction resistance of each calculation section. Based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section, the corresponding unit area frictional resistance is dynamically corrected to obtain the equivalent unit area frictional resistance corresponding to each calculation section. The pipe circumferential frictional resistance of each calculation section is determined based on the equivalent unit area frictional resistance of each calculation section. Combined with the pipe jacking frontal resistance, the jacking force of each calculation section is accumulated to obtain the jacking force prediction result during the construction of ultra-long pipe jacking.

[0098] The device embodiments described above are merely illustrative. The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs. Those skilled in the art can understand and implement this without any creative effort.

[0099] Through the above description of the embodiments, those skilled in the art can clearly understand that each embodiment can be implemented by means of software plus necessary general-purpose hardware platforms, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solutions, in essence or the part that contributes to the prior art, can be embodied in the form of a software product. This computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, magnetic disk, optical disk, etc., and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute the methods described in the various embodiments or some parts of the embodiments.

[0100] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for predicting the jacking force of ultra-long pipe jacking, characterized in that, include: Obtain pipeline structure parameters, geological parameters, grouting parameters, and construction status parameters during the construction of ultra-long pipe jacking projects; Based on the pipeline structure parameters, the stratum parameters, and the construction monitoring requirements, the predicted jacking route is segmented to obtain multiple calculation sections; For each calculation section, the pipe-circumferential contact state between the outer wall of the jacking pipe section and the surrounding medium is identified based on the corresponding construction state parameters, grouting construction parameters and formation parameters, so as to obtain the pipe-circumferential contact state information corresponding to each calculation section. Based on the pre-established unit area friction resistance calculation model corresponding to different pipe contact states, the corresponding unit area friction resistance calculation model is called according to the pipe contact state information corresponding to each calculation section to determine the unit area friction resistance of each calculation section. Based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section, the corresponding unit area frictional resistance is dynamically corrected to obtain the equivalent unit area frictional resistance corresponding to each calculation section. The pipe circumferential frictional resistance of each calculation section is determined based on the equivalent unit area frictional resistance of each calculation section. Combined with the pipe jacking frontal resistance, the jacking force of each calculation section is accumulated to obtain the jacking force prediction result during the construction of ultra-long pipe jacking.

2. The method for predicting the jacking force of ultra-long pipe jacking according to claim 1, characterized in that, The step of segmenting the predicted jacking route into multiple calculation sections based on the pipeline structure parameters, the geological parameters, and construction monitoring requirements specifically includes: Based on the geological distribution information corresponding to the jacking route to be predicted, the geological change section is determined; Based on the construction monitoring requirements, determine the data acquisition interval corresponding to the jacking status monitoring data; The pipe section length information is determined based on the pipe structure parameters; Based on at least one of the geological change zone, the data acquisition interval, and the pipe section length information, determine the segment length corresponding to the jacking line to be predicted; The jacking line to be predicted is divided according to the segment length to obtain multiple continuous calculation segments.

3. The method for predicting the jacking force of ultra-long pipe jacking according to claim 1, characterized in that, The step of identifying the pipe-circumferential contact state between the outer wall of the jacking pipe section and the surrounding medium based on the corresponding construction state parameters, grouting construction parameters, and formation parameters for each calculation section, and obtaining the pipe-circumferential contact state information corresponding to each calculation section, specifically includes: Obtain the grouting pressure parameters, grouting volume parameters, pipeline attitude parameters, jacking displacement parameters, and formation permeability parameters corresponding to each calculation section; Based on the grouting pressure parameters, the grouting volume parameters, and the formation permeability parameters, determine the mud filling state parameters for the corresponding calculation section; Based on the pipeline attitude parameters and the annular gap parameters of the corresponding calculation section, the gap distribution state between the outer wall of the pipe section and the surrounding medium is determined; Based on the mud filling state parameters and the gap distribution state, the pipe circumferential contact state corresponding to each calculation section is classified to obtain the corresponding pipe circumferential contact state information. The pipe-peripheral contact status information includes at least one of the following: direct pipe-soil contact status, partial pipe-soil-mud contact status, and pipe-mud-wrapped contact status.

4. The method for predicting the jacking force of ultra-long pipe jacking according to claim 3, characterized in that, The step of classifying the pipe contact state corresponding to each calculation section based on the mud filling state parameters and the gap distribution state specifically includes: When the mud filling state parameter is less than the preset first filling threshold, the pipe periphery contact state of the corresponding calculation section is determined to be the pipe-soil direct contact state. When the mud filling state parameter is greater than or equal to the preset second filling threshold, the pipe periphery contact state of the corresponding calculation section is determined to be the pipe mud wrapping contact state. When the mud filling state parameter is between the first filling threshold and the second filling threshold, the pipe periphery contact state of the corresponding calculation section is determined to be the pipe-soil mud partial contact state.

5. The method for predicting the jacking force of ultra-long pipe jacking according to claim 1, characterized in that, The step of determining the unit area friction resistance for each calculation segment by calling the corresponding unit area friction resistance calculation model based on the pre-established unit area friction resistance calculation model corresponding to different pipe contact states specifically includes: A unit area frictional resistance calculation model is pre-established corresponding to different pipe contact states. The unit area frictional resistance calculation model includes at least a first frictional resistance calculation model corresponding to the direct pipe-soil contact state, a second frictional resistance calculation model corresponding to the pipe-soil mud partial contact state, and a third frictional resistance calculation model corresponding to the pipe-mud wrapped contact state. Based on the pipe contact state information corresponding to each calculation section, the corresponding target frictional resistance calculation model is matched in the unit area frictional resistance calculation model. Obtain the calculation parameters corresponding to the target friction calculation model, wherein the calculation parameters include at least one of formation parameters, pipeline structure parameters, jacking parameters, and mud parameters; The calculation parameters are input into the corresponding target friction resistance calculation model to calculate the unit area friction resistance corresponding to each calculation section.

6. The method for predicting the jacking force of ultra-long pipe jacking according to claim 1, characterized in that, The step of dynamically correcting the corresponding unit area frictional resistance based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation segment, and obtaining the equivalent unit area frictional resistance for each calculation segment, specifically includes: Obtain the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section. The mud performance attenuation parameters are used to characterize the changes in drag reduction performance of mud during jacking due to thixotropic degradation, leakage loss and consolidation changes. The mud filling parameters are used to characterize the degree of mud filling in the annular gap between the outer wall of the pipe section and the formation. Based on the mud performance attenuation parameters, the mud action parameters in the unit area friction calculation model are corrected to obtain the corrected mud drag reduction action parameters. Based on the mud filling parameters, the ratio of the interaction between the pipe-soil contact area and the pipe-mud contact area in the corresponding calculation section is adjusted; Based on the corrected mud drag reduction parameters and the adjusted action ratio, the unit area frictional resistance is corrected to obtain the equivalent unit area frictional resistance corresponding to each calculation section.

7. The method for predicting the jacking force of ultra-long pipe jacking according to claim 1, characterized in that, The step of determining the pipe circumferential frictional resistance of each calculation section based on the equivalent unit area frictional resistance corresponding to each calculation section, and summing the jacking force of each calculation section in combination with the pipe jacking face resistance to obtain the jacking force prediction result during the ultra-long pipe jacking construction process, specifically includes: Based on the equivalent unit area frictional resistance, pipe outer diameter parameters, and length parameters of each calculation section, determine the pipe circumferential frictional resistance corresponding to each calculation section. Obtain the frontal resistance acting on the tunnel face during pipe jacking construction; Based on the pipe circumferential friction and the frontal resistance corresponding to each calculation section, the resistance parameters corresponding to each calculation section are accumulated to obtain the jacking force prediction result corresponding to the current jacking length.

8. A device for predicting the jacking force of ultra-long pipe jacking, characterized in that, include: The parameter acquisition module is used to acquire pipeline structure parameters, stratum parameters, grouting construction parameters, and construction status parameters during the construction of ultra-long pipe jacking. The line segmentation module is used to segment the predicted jacking line according to the pipeline structure parameters, the stratum parameters and construction monitoring requirements, and obtain multiple calculation sections. The status recognition module is used to identify the pipe-circumferential contact status between the outer wall of the jacking pipe section and the surrounding medium for each calculation section based on the corresponding construction status parameters, grouting construction parameters and formation parameters, and to obtain the pipe-circumferential contact status information corresponding to each calculation section. The first calculation module is used to determine the unit area friction resistance of each calculation section by calling the corresponding unit area friction resistance calculation model based on the pre-established unit area friction resistance calculation model corresponding to different pipe contact states and the pipe contact state information corresponding to each calculation section. The second calculation module is used to dynamically correct the corresponding unit area frictional resistance based on the mud performance attenuation parameters and mud filling parameters corresponding to each calculation section, so as to obtain the equivalent unit area frictional resistance corresponding to each calculation section. The jacking force prediction module is used to determine the pipe circumferential friction resistance of each calculation section based on the equivalent unit area friction resistance corresponding to each calculation section, and to accumulate the jacking force of each calculation section in combination with the pipe jacking frontal resistance to obtain the jacking force prediction result during the construction of ultra-long pipe jacking.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the ultra-long pipe jacking force prediction method as described in any one of claims 1 to 7.

10. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by the processor, it implements the ultra-long pipe jacking force prediction method as described in any one of claims 1 to 7.