Methods, systems and media for predicting suspended solids plumes during continuous deep-sea mining operations

By extracting a cyclic transient velocity kernel and bridging it with cubic Hermite interpolation to form a continuous cyclic velocity kernel, the problem of high computational cost in the simulation of suspended plumes in deep-sea mining vehicles is solved. This enables efficient prediction of the impact range of suspended plumes while preserving wake characteristics, and provides support for environmental impact assessment in deep-sea mining.

CN123069993APending Publication Date: 2026-11-10OCEAN UNIV OF CHINA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611576260.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-13
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing methods for simulating suspended plumes struggle to efficiently predict the engineering scale of suspended plumes in deep-sea mining under conditions of continuous movement and multi-track operations, while preserving the unsteady wake characteristics of mining vehicles. In particular, there is a trade-off between computational cost and preservation of transient wake characteristics.

Method used

By extracting a recyclable transient velocity core after the unsteady wake of the mining vehicle enters the quasi-mature stage, and bridging it with cubic Hermite interpolation as a continuous recyclable velocity core, combined with path synthesis and multi-stage suspended matter transport solutions in the Earth-fixed coordinate system, the periodic reuse of flow field information is realized, reducing computational costs.

Benefits of technology

While retaining the main unsteady wake characteristics such as vortex shedding and lateral oscillation, it significantly reduces the computational cost of simulating suspended plumes in long-term multi-track continuous operations, ensures the physical correctness of wake phase continuity, and outputs the influence range and quantitative indicators of suspended plumes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123069993A_ABST
    Figure CN123069993A_ABST
Patent Text Reader

Abstract

This application relates to the field of numerical simulation technology for environmental impacts in deep-sea mining. It proposes a method, system, and medium for predicting suspended plumes during continuous deep-sea mining vehicle operations. A three-dimensional transient hydrodynamic model of the mining vehicle is established in a vehicle-fixed coordinate system to obtain a three-dimensional transient flow field sequence. The wake is pre-maturely assessed to determine the pre-mature period. Within the pre-mature period, transient velocity kernels are selected based on a comprehensive score and bridged using cubic Hermite interpolation to form a continuous circulating velocity kernel. Based on the instantaneous position and heading angle of the mining vehicle, the continuous circulating velocity kernel is mapped to ground-fixed coordinates and cyclically called along the operation path to synthesize a full-path unsteady flow field. The multi-scale transport equations for suspended matter are solved on the synthesized flow field to obtain the spatiotemporal distribution of concentration and determine the plume's influence range. This application avoids full-path dynamic mesh calculations while preserving the characteristics of the unsteady wake, significantly reducing computational costs. It is suitable for environmental impact assessments, monitoring scheme deployment, and operational parameter comparison in deep-sea mining.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of numerical simulation technology of environmental impact in deep-sea mining, and in particular to methods, systems and media for predicting suspended plumes during continuous operation of deep-sea mining vehicles. Background Technology

[0002] With the development of new energy, energy storage, and high-end equipment industries, the long-term stable supply of key metal resources such as nickel, cobalt, copper, and manganese has attracted widespread attention. The deep seabed contains abundant mineral resources, especially polymetallic nodules and cobalt-rich iron-manganese crusts, which have significant resource potential. However, nodule extraction requires mining vehicles to continuously travel on the seabed, disturbing surface sediments. This not only directly alters seabed morphology, sediment structure, and benthic habitats but also creates suspended plumes. Studies have shown that deep-sea seabed disturbance leads to a decline in benthic abundance and diversity, and some ecological impacts can persist for decades. Surveys conducted in disturbed areas have found that simulated mining-induced seabed physical disturbances and benthic community changes were still identifiable 26 years later, indicating the slow recovery of deep-sea ecosystems. Therefore, accurately predicting suspended plumes generated by continuous mining vehicle operations is crucial for determining the scope of environmental impact, developing monitoring plans, and conducting ecological risk assessments.

[0003] Unlike fixed discharge outlets or fixed construction scenarios, environmental impact prediction in deep-sea mining has unique characteristics: First, mining vehicles move continuously along planned paths, and the source location, direction, and speed all change during operations, with plumes from adjacent tracks potentially overlapping. Second, suspended solids release stems from the combined effects of sediment disturbance, flow around the source, wake turbulence, and particle settling, rather than being an independent emission from a given flow field. Third, near-field strong shear processes need to be integrated with advection diffusion processes on a scale of hundreds of meters. Furthermore, the difficulty in acquiring field data in the deep sea further increases the uncertainty of predictions. These characteristics dictate that traditional fixed-source prediction methods cannot be simply applied to environmental impact assessments of deep-sea mining.

[0004] Existing methods for simulating suspended plumes mainly fall into three categories. The first category is the far-field advection-diffusion-sedimentation model, which equates mining disturbances to point, line, or area sources, predicting concentration and sedimentation range based on background velocity, diffusion coefficient, and settling velocity. This type of model is suitable for large-scale calculations, but its reliability depends on particle transport parameters and near-field initial conditions, and it struggles to reflect the actual shape of the mining vehicle and the impact of three-dimensional transient wakes on particle transport. The second category is near-field computational fluid dynamics (CFD) models, which can analyze the flow around the mining vehicle and the wake structure, but their computational domain is limited and computational costs are high, making it difficult to directly cover engineering-scale plumes formed by continuous operations. Furthermore, steady-state or time-averaged wake fields weaken eddy shedding and velocity fluctuations, and a single instantaneous flow field cannot represent the complete wake evolution process, thus failing to accurately characterize the impact of unsteady wakes on particle transport. The third category is methods that couple computational fluid dynamics with regional transport models, attempting to address scale differences through nesting or unidirectional transfer. However, the high computational cost of high-resolution three-dimensional transient simulations limits their direct application under continuous movement and engineering-scale conditions.

[0005] The three types of methods mentioned above face the following core contradictions: First, the contradiction between preserving the transient characteristics of the wake and computational cost. High-fidelity transient simulation is too expensive, while order reduction simplification will lose key physical processes such as vortex shedding and lateral oscillation. Second, the contradiction between single-point or short-time simulation and continuous long-path operation. Mining vehicles move continuously along the planned path, and the source position, direction, and velocity change in real time. Existing methods are difficult to cover the entire path while preserving the continuity of the wake phase. Third, the contradiction between high-resolution near-field analysis and far-field engineering-scale simulation. The near-field strong shearing process and the advection diffusion process on the scale of hundreds of meters are separated in space and time. Existing research lacks a flow field transfer method that takes into account both transient characteristics and computational efficiency between near-field and far-field models.

[0006] Therefore, how to solve the above contradictions while preserving the unsteady wake characteristics of mining vehicles (such as vortex shedding, lateral oscillation, and phase continuity) and efficiently achieve engineering-scale prediction of suspended plumes in deep-sea mining under continuous movement and multi-track operation conditions has become a problem to be solved. Summary of the Invention

[0007] This application provides a method, system, and medium for predicting suspended plumes during continuous deep-sea mining vehicle operations. Its main purpose is to solve the problem of avoiding full-path dynamic mesh calculation and significantly reducing the simulation calculation cost of suspended plumes during long-term multi-track continuous operations while preserving the unsteady wake characteristics of the mining vehicle.

[0008] To achieve the above objectives, this application provides a method for predicting suspended debris plumes during continuous deep-sea mining vehicle operations, comprising: S1. Obtain the three-dimensional geometric model of the mining vehicle, as well as the seabed and incoming flow conditions. Establish a three-dimensional transient hydrodynamic model containing the mining vehicle in the vehicle-fixed coordinate system. Simulate the flow around the mining vehicle and the formation process of the unsteady wake by moving the seabed and incoming flow relative to the mining vehicle, and obtain the three-dimensional transient flow field sequence of the wake flow field evolution over time.

[0009] S2. Based on the three-dimensional transient flow field sequence, the wake flow field is pre-maturely determined to identify the pre-mature wake period when the wake enters the pre-mature stage.

[0010] S3. During the quasi-mature wake period, candidate transient sequences are traversed, and a comprehensive score is given based on the matching degree of the flow field values ​​at the beginning and end of the candidate transient sequences and the matching degree of the time derivatives at the beginning and end, to select transient velocity cores that can be cyclically connected; between the end of the transient velocity core and the starting point of the next cycle, a bridging segment is constructed using cubic Hermite interpolation, and the transient velocity core and the bridging segment are spliced ​​together to form a continuous cyclic velocity core.

[0011] S4. Based on the instantaneous position and heading angle of the mining vehicle, the continuous cyclic velocity core is rotated and translated from the vehicle-fixed coordinate system to the ground-fixed coordinate system, and cyclically called along the working path of the mining vehicle to synthesize the unsteady flow field of the entire path.

[0012] S5. On the synthesized unsteady flow field along the entire path, solve the convection-diffusion-sedimentation transport equations for multiple particle sizes of suspended matter to obtain the spatiotemporal distribution of the suspended matter plume concentration, and determine the influence range of the suspended matter plume based on a preset concentration threshold.

[0013] In a preferred embodiment, the step of determining the quasi-mature wake period based on the three-dimensional transient flow field sequence includes: S201, calculating the root mean square of the lateral pulsation force of the mining vehicle within a preset time window, comparing the relative changes in adjacent windows, and determining whether the overall force fluctuation of the mining vehicle has entered a bounded state; S202, setting velocity probes at different distances downstream of the mining vehicle, calculating the normalized spectral power after linearly detrending the lateral velocity of the probes, and extracting the dominant frequency; S203, using the Q criterion to identify the coherent vortex structure in the wake, and statistically analyzing the wake length, isosurface area, and its coefficient of variation; S204, when the lateral force of the mining vehicle enters a bounded state, the dominant frequencies of the probes at each location fall within the same preset frequency band, and the statistical indicators of the Q criterion structure meet the stability threshold, the wake is determined to have entered a quasi-mature stage, and the quasi-mature wake period is determined.

[0014] In a preferred embodiment, the step of comprehensively scoring the candidate transient sequence based on the matching degree of the flow field values ​​at the beginning and end and the matching degree of the time derivatives at the beginning and end to select the transient velocity kernel that can be cyclically connected includes: for each candidate transient sequence, calculating the normalized error of the flow field values ​​at the beginning and end as a first index, calculating the normalized error of the time derivatives at the beginning and end as a second index, and weighted summing the first index and the second index to obtain a comprehensive score; traversing the candidate start time and candidate duration, and determining the candidate transient sequence with the smallest comprehensive score and whose frequency corresponding to the candidate sequence duration falls within a preset dominant frequency band as the transient velocity kernel.

[0015] In a preferred embodiment, the step of constructing a bridging segment using cubic Hermite interpolation and splicing the transient velocity kernel with the bridging segment to form a continuous cyclic velocity kernel includes: setting a bridging duration, introducing normalized time coordinates, using the flow field value and its first time derivative at the starting point of the bridging segment and the flow field value and its first time derivative at the ending point of the bridging segment as boundary conditions, and using cubic Hermite basis functions to interpolate the flow field variables within the bridging segment so that the flow field value and first time derivative of the spliced ​​cyclic velocity kernel at the bridging point are continuous; the bridging segment and the transient velocity kernel together constitute a complete cycle, and after construction, it is verified whether the cycle frequency of the complete cycle falls within the dominant frequency band identified by the wake probe. If it does not meet the requirement, the candidate start time or candidate duration is adjusted and the candidate transient sequence is re-selected.

[0016] In a preferred embodiment, the cyclic calling along the working path of the mining vehicle includes: advancing the phase clock of the continuous cyclic speed core with the relative flow speed between the mining vehicle and the seawater, so that the speed core intensity and phase advancement speed change synchronously with the speed of the mining vehicle; when the mining vehicle turns and decelerates, the speed core intensity and phase advancement speed are reduced synchronously; during the start-up phase of the mining vehicle, a directly calculated transient development core is used and smoothly transitioned to the continuous cyclic speed core; during the turning phase, the continuous cyclic speed core is curved and mapped along the recent historical path of the mining vehicle.

[0017] In a preferred embodiment, obtaining the three-dimensional transient flow field sequence of the wake flow field evolution over time includes: taking the median of the lateral velocities of each height layer in the upstream region of the mining vehicle at the same time to obtain a reference velocity profile that varies with height, which serves as a reference field; subtracting the reference field from the three-dimensional transient flow field to obtain a velocity increment field; the continuous circulating velocity core is the hydrodynamic increment field caused by the mining vehicle, which does not include the background flow.

[0018] In a preferred embodiment, solving the convection-diffusion-sedimentation transport equation for multiple particle sizes of suspended matter includes: solving the suspended matter separately for three particle sizes: fine, medium, and coarse. The fine particle size corresponds to particles with a diameter less than 10 μm, the medium particle size corresponds to particles with a diameter between 10 and 63 μm, and the coarse particle size corresponds to particles with a diameter greater than 63 μm. Each particle size has a different settling velocity. The suspended matter source term is a moving source term that moves with the mining vehicle, and the source strength changes linearly with the speed of the mining vehicle.

[0019] In a preferred embodiment, the method further includes: based on the concentration spatiotemporal distribution, using a preset percentage of the peak value of the entire process as the concentration threshold, calculating the affected area, the maximum horizontal extension distance from the mining disturbance zone, and the maximum vertical affected height, and outputting the cumulative affected area formed by the multi-track operation.

[0020] To address the aforementioned issues, this application also provides a system for predicting suspended plumes during continuous deep-sea mining vehicle operations. The system includes a hydrodynamic simulation module, used to establish a three-dimensional transient hydrodynamic model containing the mining vehicle in a vehicle-fixed coordinate system. The module simulates the flow around the mining vehicle and the unsteady wake by moving the seabed and the incoming flow relative to the mining vehicle, and outputs a three-dimensional transient flow field sequence of the wake flow field evolution over time.

[0021] The semi-mature determination module is used to determine the semi-mature stage of the wake flow field based on the lateral force of the mining vehicle, the wake probe spectrum and the Q criterion structural index, and to determine the semi-mature wake period when the wake enters the semi-mature stage.

[0022] The velocity kernel extraction module is used to filter transient velocity kernels within the quasi-mature wake period based on the comprehensive score of the flow field values ​​at the beginning and end of the candidate transient sequence and the time derivatives at the beginning and end, and to splice the transient velocity kernels into a continuous cyclic velocity kernel using a cubic Hermite interpolation bridging segment.

[0023] The path synthesis module is used to rotate and translate the continuous cyclic velocity core from the vehicle-fixed coordinate system to the ground-fixed coordinate system based on the instantaneous position and heading angle of the mining vehicle, and cyclically call it along the operation path to synthesize the unsteady flow field of the entire path.

[0024] The transport solution module is used to solve the convection-diffusion-sedimentation transport equations for multiple particle sizes of suspended matter in the synthesized unsteady flow field along the entire path, and output the spatiotemporal distribution of the suspended matter plume concentration.

[0025] The impact assessment module is used to determine the impact range of the suspended matter plume based on a preset concentration threshold and output the cumulative impact area formed by multi-track operations.

[0026] Compared with the prior art, this application has the following beneficial effects: 1. After the unsteady wake of the mining vehicle enters the quasi-mature stage, this application extracts the cyclic transient velocity core and splices three Hermite bridging segments into a continuous cyclic velocity core. While retaining the main unsteady wake characteristics such as vortex shedding and lateral oscillation, it realizes the periodic reuse of flow field information, thereby avoiding full-path dynamic mesh calculation and significantly reducing the computational cost of simulating suspended plumes in long-term, multi-track continuous operations.

[0027] 2. This application uses the joint scoring of the flow field values ​​at the beginning and end and the time derivatives at the beginning and end to screen the transient velocity kernel, and uses cubic Hermite interpolation to ensure the continuity of the flow field values ​​and the first time derivative at the bridging point, thereby eliminating non-physical abrupt changes caused by cyclic splicing and avoiding non-physical pulses in subsequent material transport calculations.

[0028] 3. This application ensures the physical correctness of the wake phase continuation under mobile source conditions by processing the phase clock to advance with the relative flow velocity, the velocity kernel strength and phase to decrease synchronously during turning and deceleration, the smooth transition between the transient development kernel and the mature kernel during the start-up phase, and the bending mapping along the recent historical path during the turning phase.

[0029] 4. This application, through path synthesis and multi-level suspended matter transport solution in the geo-fixed coordinate system, can characterize the spatial superposition and cumulative influence area of ​​new and old plumes in multi-track operations, and output quantitative indicators such as influence area, maximum horizontal extension distance from mining disturbance zone, and maximum vertical influence height, providing support for deep-sea mining environmental impact assessment, monitoring scheme layout, and mining operation parameter comparison. Attached Figure Description

[0030] Figure 1 This is a schematic diagram of the computing domain and mesh configuration provided in an embodiment of this application; wherein, (a) is a schematic diagram of the computing domain and mesh encryption level; and (b) is a schematic diagram of the actual mesh section and surface of the mining vehicle in the near field. Figure 2 This is a schematic diagram of the transient evolution process of the near-bottom wake velocity increment of a mining vehicle according to an embodiment of this application; wherein, (a) is the start-up stage at 5 s, (b) is the wake development stage at 120 s, (c) is the late wake development stage at 300 s, (d) is the start time of the transient velocity core at 580 s, (e) is the middle time of the transient velocity core at 608 s, and (f) is the end time of the transient velocity core at 636 s; Figure 3This is a schematic diagram of the transient evolution process of the vertical vorticity near the bottom of a mining vehicle according to an embodiment of this application; wherein, (a) is the start-up stage at t=5s; (b) is the wake development stage at t=120s; (c) is the late wake development stage at t=300s; (d) is the start time of the transient velocity core at t=580s; (e) is the middle time of the transient velocity core at t=608s; and (f) is the end time of the transient velocity core at t=636s. Figure 4 This is a schematic diagram of a comprehensive assessment framework for the wake maturity zone provided in an embodiment of this application; wherein, (a) is the change process of the instantaneous lateral force of the mining vehicle within 300~700s; (b) is the normalized spectral power of the velocity probes at 10m, 20m and 40m downstream of the mining vehicle within 600~700s; (c) is the change of wake length and isosurface area characterized by weak Q isosurface over time; (d) is the comparison results of the lateral force root mean square adjacent window change rate, lateral force dominant frequency adjacent window change rate, weak Q wake length variation coefficient and weak Q isosurface area variation coefficient with the corresponding judgment threshold; Figure 5 This is a schematic diagram of a complete cyclic period search and splicing process provided in an embodiment of this application; wherein, (a) is the search result of the phase matching candidate window; (b) is the cubic Hermite bridging process representing the matching of the point field value and the first time derivative; and (c) is the construction and splicing process of the complete cyclic velocity kernel. Figure 6 This is a schematic diagram of the temporal variation process of the velocity field distribution of a mining path under geodetic coordinates according to an embodiment of this application; wherein, (a) is the transient velocity core of the first straight track at t=200s; (b) is the transient velocity core of the first turning stage at t=500s; (c) is the transient velocity core of the third straight track at t=1200s; (d) is the transient velocity core of the fifth straight track at t=2500s; (e) is the transient velocity core of the seventh turning stage at t=4000s; and (f) is the transient velocity core of the tenth straight track at t=5600s. Figure 7 This is a schematic diagram illustrating the temporal variation of suspended matter concentration distribution under a ground-fixed coordinate mining path according to an embodiment of this application; wherein, (a) is the near-bottom suspended matter plume of the first straight track at t=200s; (b) is the near-bottom suspended matter plume of the first turning stage at t=500s; (c) is the near-bottom suspended matter plume of the third straight track at t=1200s; (d) is the near-bottom suspended matter plume of the fifth straight track at t=2500s; (e) is the near-bottom suspended matter plume of the seventh turning stage at t=4000s; and (f) is the near-bottom suspended matter plume of the tenth straight track at t=5600s. Figure 8This is a schematic diagram of the temporal variation of the vertical distribution of suspended plumes on a mining path according to an embodiment of this application. (a) is the vertical projection of the suspended plume on the first straight track at t=200s; (b) is the vertical projection of the suspended plume during the first turning stage at t=500s; (c) is the vertical projection of the suspended plume on the third straight track at t=1200s; (d) is the vertical projection of the suspended plume on the fifth straight track at t=2500s; (e) is the vertical projection of the suspended plume during the seventh turning stage at t=4000s; and (f) is the vertical projection of the suspended plume on the tenth straight track at t=5600s. Detailed Implementation

[0031] It should be understood that the specific embodiments described herein are merely illustrative of this application and are not intended to limit this application.

[0032] This application provides a method for predicting suspended plumes during continuous deep-sea mining vehicle operations. The method is executed by at least one of several electronic devices, including servers and terminals, capable of computational fluid dynamics numerical simulations and suspended debris transport calculations.

[0033] It should be noted that the specific values ​​of mining vehicle speed, background flow velocity, grid scale, source strength, particle size ratio, and time length recorded in this embodiment are all specific examples of implementing this application and do not constitute a limitation on this application; those skilled in the art can adjust the above parameters according to actual working conditions, and all such adjustments fall within the protection scope of this application.

[0034] Reference Figures 1 to 8 As shown in the embodiments of this application, the method for predicting suspended plumes in continuous deep-sea mining vehicle operations includes steps S1 to S5, and the specific implementation methods of each step are as follows.

[0035] S1. Obtain the three-dimensional geometric model of the mining vehicle, as well as the seabed and incoming flow conditions. Establish a three-dimensional transient hydrodynamic model containing the mining vehicle in the vehicle-fixed coordinate system. Simulate the flow around the mining vehicle and the formation process of the unsteady wake by moving the seabed and incoming flow relative to the mining vehicle, and obtain the three-dimensional transient flow field sequence of the wake flow field evolution over time.

[0036] In the embodiments of this application, see Figure 1A three-dimensional transient incompressible flow model of a mining vehicle was established using a three-dimensional transient incompressible flow solver based on the finite volume method. The calculation employed a vehicle-fixed coordinate system, with the mining vehicle remaining stationary while the seabed and incoming flow moved at relative velocities, thus avoiding the high computational cost associated with dynamic meshing across the entire computational domain. The incompressible fluid was required to satisfy mass conservation. The transient Reynolds-averaged (URANS) momentum equations included time-averaged velocity, corrected pressure, seawater density, kinematic viscosity, and turbulent kinematic viscosity terms. Turbulence was modeled using the SST k-ω model, with the turbulent kinetic energy generation term, strain rate tensor modulus, and cross-diffusion term of the SST model introduced in standard form. In numerical discretization, the pressure-velocity coupling was performed using the PIMPLE algorithm with transient corrections in the PISO mode. The time term used a second-order backward scheme, the velocity convection term used a bounded linear upwind scheme, the convection terms for turbulent kinetic energy k and specific dissipation rate ω used a first-order upwind scheme, and the diffusion term used a corrected Gaussian linear scheme. The time step was automatically adjusted based on the Courant number.

[0037] The continuity equation used in this embodiment is:

[0038] The transient Reynolds-mean momentum equation is:

[0039] The turbulent flow is modeled using the SST k-ω model, with the transport equations for turbulent kinetic energy k and specific dissipation rate ω as follows:

[0040]

[0041] in, The average speed is the time-averaged speed. To correct for pressure, ρ is the density of seawater, and ν is the kinematic viscosity. For turbulent kinematic viscosity, The term represents the turbulent kinetic energy generation, and S represents the strain rate tensor magnitude. For the cross-diffusion term of the SST model, α, β , These are model constants.

[0042] In this embodiment, the mining vehicle travels at a speed of 0.6 m / s, the background current velocity is 0.05 m / s, and the direction of the background current is the same as the direction of the mining vehicle's travel. In the vehicle-fixed coordinate system, the seabed velocity is −0.60 m / s, and the inlet relative flow velocity is −0.55 m / s. The mining vehicle surface adopts a no-slip boundary, the outlet pressure is set to zero, and the velocity adopts an inlet-outlet boundary condition. To avoid abrupt changes in the initial velocity, the inlet and seabed velocities smoothly increase to the target value within 0–5 s.

[0043] In terms of mesh configuration, this embodiment adopts a combination of Cartesian hexahedral mesh, local densification, and vehicle body-fitted cutting mesh: the far-field base mesh is a regular hexahedron with a scale of approximately 0.69m; the first-level densification area has a scale of approximately 0.345m; the second-level near-vehicle area has a scale of approximately 0.173m; the area near the vehicle body surface is cut and fitted using the cutting mesh method to form non-orthogonal hexahedral and polyhedral elements, with a total mesh count of approximately 750,000.

[0044] S2. Based on the three-dimensional transient flow field sequence, the wake flow field is pre-maturely determined to identify the pre-mature wake period when the wake enters the pre-mature stage.

[0045] In the embodiments of this application, see Figure 4 To avoid subjectively selecting the velocity core based solely on flow field images, this embodiment uses three types of indicators—the lateral force of the mining vehicle, the wake probe spectrum, and the three-dimensional Q criterion structure—to jointly determine the maturity of the wake.

[0046] (1) Lateral force index of mining vehicle: Calculate the root mean square of the lateral pulsation force within a 100s window and compare the relative changes in adjacent windows to determine whether the overall force fluctuation of the mining vehicle has entered a bounded state. When the relative change of the root mean square of the lateral force in adjacent windows is ≤10%, the force fluctuation of the mining vehicle is considered to have entered a bounded state.

[0047] The root mean square of the lateral pulsation force of the mining vehicle within the preset time window is:

[0048] in, Let be the lateral force at the nth sampling time. The mean lateral force within the window, where N is the number of sampling points; The relative changes between adjacent windows are as follows:

[0049] in, , These are the root mean square of the lateral forces of two adjacent windows, respectively.

[0050] (2) Wake probe spectrum index: Near-bottom velocity probes were set at 10m, 20m and 40m downstream of the mining vehicle. The transverse velocity of the probes within 600-700s was linearly detrended, and the normalized spectral power was calculated using sine-cosine least squares scanning to extract the dominant frequency of each probe. When the dominant frequency of each probe falls within the same preset frequency band, it indicates that its response belongs to the same low-frequency wake process, rather than an isolated local random pulsation, that is, the wake has a consistent periodicity in the spatial dimension. In this embodiment, the dominant frequencies of each probe are approximately 0.0141Hz, 0.0159Hz and 0.0177Hz, respectively, all falling within the preset frequency band of 0.014-0.018Hz; the frequencies of the 10m and 20m probes are closer (with a difference of about 12%), while the frequency of the 40m probe is slightly higher, which may be related to its location in the fully developed wake region and the merging of vortex structures, but the three are still of the same order of magnitude and within the same frequency band.

[0051] After linearly detrending the probe's lateral velocity, a sine-cosine least squares scan fit was performed:

[0052] spectral power :

[0053] Normalized spectral power for:

[0054] in, The pulsating velocity is obtained by linearly destylating the probe's lateral velocity. Sampling time, For scanning frequency, and respectively scan frequency The corresponding amplitudes of the sine and cosine components.

[0055] In this embodiment, 751 equally spaced scanning frequency points are set within the frequency range of 0.005 to 0.08 Hz, with an interval of 0.0001 Hz between adjacent scanning frequency points. The least squares method is used to determine the frequency for each scanning frequency. and .

[0056] (3) Q-criterion structural indices: The coherent vortex structure is identified using the Q-criterion, where Q is the combination of the rotation rate tensor and the strain rate tensor. The wake length, isosurface area, and the proportion of the area reaching the outlet are statistically analyzed using the weak Q-isosurface, and the coefficient of variation (the ratio of the standard deviation to the mean) is used to characterize the structural stability. In this embodiment, the coefficients of variation for the wake length and surface area during the quasi-mature period are approximately 6.1% and 8.2%, respectively, which meet the statistical stability requirements.

[0057] The Q criterion is defined as follows:

[0058] Where Ω is the rotation rate tensor, S is the strain rate tensor, and ||·|| is the tensor norm; The coefficient of variation is defined as: Where σ is the standard deviation and μ is the mean.

[0059] The joint engineering criterion used in this embodiment is:

[0060] in, The rate of change of the probe's dominant frequency. , Here, are the coefficients of variation for the wake length and the Q-isosurface area, respectively. The proportion of the wake area reaching the exit of the computational domain.

[0061] Based on the above engineering criteria, this embodiment determines 550–700 s as the candidate interval for a quasi-mature wake.

[0062] S3. During the quasi-mature wake period, candidate transient sequences are traversed, and a comprehensive score is given based on the matching degree of the flow field values ​​at the beginning and end of the candidate transient sequences and the matching degree of the time derivatives at the beginning and end, to select transient velocity cores that can be cyclically connected; between the end of the transient velocity core and the starting point of the next cycle, a bridging segment is constructed using cubic Hermite interpolation, and the transient velocity core and the bridging segment are spliced ​​together to form a continuous cyclic velocity core.

[0063] See Figure 2 and Figure 3 After the mining vehicle starts, a local acceleration zone and a velocity deficit zone first form around the vehicle body, and then the wake gradually extends along the rear of the mining vehicle. After 580s, the wake length and lateral oscillation no longer show continuous growth, but exhibit repetitive unsteady changes, indicating that the flow field has entered the quasi-mature stage. There are obvious vortex shedding and lateral oscillations inside the wake. The structure is different at different times, but the statistical scale is similar, indicating that maturity is not static, but stable unsteady. Therefore, a single steady-state flow field cannot be used to represent the entire mining process.

[0064] See Figure 4Within the candidate region of quasi-mature wakes, determined through joint criteria of lateral force, wake probe spectrum, and three-dimensional Q-criterion structure, transient velocity kernels are extracted. First, three-dimensional velocity and turbulent viscosity fields are extracted from the three-dimensional transient flow field sequence. To eliminate the influence of background flow and near-bottom boundary layer, the median lateral velocity at each height level in the upstream region of the mining vehicle at the same moment is used to obtain a reference velocity profile varying with height. The velocity increment field is obtained by subtracting the reference field from the three-dimensional transient flow field; correspondingly, the turbulent viscosity is also incremented. Therefore, the extracted velocity kernel represents the hydrodynamic increment caused by the mining vehicle, rather than the total velocity field including background flow.

[0065] The velocity increment field is: ; in, The velocity field in the vehicle-fixed coordinate system. The median reference field for the vertical velocity profile in the upstream region of the mining vehicle at the same moment; The turbulent viscosity increment is: ; Secondly, by traversing different start times and durations within the candidate interval, the normalized error of the flow field values ​​at the beginning and end (first index) and the normalized error of the time derivatives at the beginning and end (second index) are calculated for each candidate transient sequence. The comprehensive score is obtained by weighted summation of the two. The smaller the score, the closer the velocity field morphology and trend of the beginning and end of the candidate sequence are, and the more suitable it is for periodic connection.

[0066] The error in the flow field values ​​at the beginning and end is:

[0067] in, , Let be the velocity increment fields at the start and end times of the candidate sequence, respectively, and RMS(·) be the root mean square operator. [·] represents the median of the root mean square of the differences between adjacent time points; Let the first-order time derivative fields of the three-dimensional velocity increment field at the start and end times be respectively... and : , ; The time derivative error at the beginning and end is: ; The overall score is: ; in, The weighting coefficient for the time derivative error is used to adjust the relative impact of the matching degree of the first and last flow field values ​​and the matching degree of the first and last time derivatives on the overall score. Considering that the time derivative is calculated through the difference of the discrete flow field sequence and is sensitive to sampling intervals and local numerical fluctuations, this embodiment uses the error of the first and last flow field values ​​as the main evaluation index and the error of the first and last time derivatives as a continuity penalty term. The default value is 0.35. In other implementations, the value can be adjusted according to the flow field sampling interval, the degree of fluctuation of the time derivative, and the continuity requirements of the cyclic splicing. The value of .

[0068] In this embodiment, a total of 765 candidate time windows were evaluated. Among them, the candidate window with a start time of 580s and a duration of 56s (580~636s) had the lowest comprehensive score J=2.4706, corresponding to =2.2293、 =0.6894, therefore the transient flow field sequence from 580 to 636 s was selected as the transient velocity kernel (original length 56 s).

[0069] See Figure 5 Since the initial and final fields of the transient velocity core extracted from the semi-mature wake are usually not completely consistent, directly connecting the end of the sequence to the starting point of the next cycle may cause abrupt changes in the velocity field and its time rate of change, generating non-physical pulses in subsequent mass transport calculations. Therefore, this embodiment sets a transition period between the end of the original transient sequence and the starting point of the next cycle, using cubic Hermite functions for smooth connection: the flow field and its time derivative at the start and end times of the original sequence are used as boundary conditions, a normalized time coordinate is introduced, and cubic Hermite basis functions are used to interpolate any flow field variable within the bridging segment. After bridging, a complete cycle consists of the original transient sequence and the bridging segment, with the cycle frequency being the reciprocal of the cycle period (the sum of the original sequence duration and the bridging duration).

[0070] Let the bridging duration be Introducing normalized time coordinates (0≤s≤1), any flow field variable within the bridging section is expressed as:

[0071] in, The flow field value at the start of the bridging section (the end field of the previous cycle) is... The flow field value at the end of the bridging segment (the starting field of the next cycle) is used as the first-order time derivative of the flow field values ​​at the beginning and end of the bridging segment, which serves as the boundary derivative condition for Hermite interpolation. For bridging duration;

[0072] The cubic Hermite basis functions are: ; ; ;

[0073] The complete cycle period is The cycle frequency is ,in, The duration of the original transient sequence. This refers to the bridging duration.

[0074] In this embodiment, the original velocity core length (580–636 s) is 56 s, the bridging time is 8 s, and a continuous cyclic velocity core (64 s) is ultimately formed with a cyclic frequency of 0.015625 Hz. This frequency falls within the dominant frequency band of 0.014–0.018 Hz identified by the wake probe, indicating that the spliced ​​cyclic velocity core retains the dominant frequency characteristics of the original wake. The spliced ​​flow field values ​​and first-order time derivative are continuous.

[0075] S4. Based on the instantaneous position and heading angle of the mining vehicle, the continuous cyclic velocity core is rotated and translated from the vehicle-fixed coordinate system to the ground-fixed coordinate system, and cyclically called along the working path of the mining vehicle to synthesize the unsteady flow field of the entire path.

[0076] In the embodiments of this application, see Figure 6 The periodic, continuously circulating velocity core is transformed from vehicle-fixed coordinates to ground-fixed coordinates based on the instantaneous position and heading angle of the mining vehicle, and continuously mapped along the work path. Specifically: the position and heading angle of the mining vehicle are recorded in the ground-fixed coordinate system; any ground-fixed coordinate point is transformed to vehicle-fixed coordinates; the vehicle-fixed coordinate component of the velocity core is rotated to ground-fixed coordinates according to the heading angle; the rotated velocity increment is superimposed with the background flow and multiplied by the relative flow velocity ratio to obtain the total flow velocity. The phase clock of the velocity core advances according to the relative flow velocity between the mining vehicle and the seawater.

[0077] Let the position of the mining vehicle in the Earth-fixed coordinate system be... If the heading angle is θ, then the expression for transforming any ground-fixed coordinate point (x, y) to vehicle-fixed coordinates (ξ, η) is: ,

[0078] Vehicle-fixed coordinate components of velocity core The expression for rotating to Earth-fixed coordinates is: ,

[0079] The total flow rate is: ; in, The background flow velocity vector in the Earth-fixed coordinate system. For the heading rotation matrix, Let λ be the velocity kernel increment field in the vehicle-fixed coordinate system, and λ be the relative velocity ratio. The relative velocity ratio is defined as the ratio of the relative velocity between the mining vehicle and the seawater under the current operating condition to the relative velocity between the mining vehicle and the seawater under the reference operating condition, i.e.:

[0080] in, For the speed of the mining vehicle, Let be the unit vector representing the direction of travel of the mining vehicle. U is the projection component of the background flow in the direction of the mining vehicle's travel. ref For reference, the relative velocity between the mining vehicle and the seawater under the working conditions is 0.6 − 0.05 = 0.55 m / s in this embodiment; The projection component of the background flow in the direction of the mining vehicle's travel under the reference working condition is 0.05 m / s in this embodiment.

[0081] The λ value represents the ratio of the current relative velocity to the reference relative velocity, used to adjust the intensity of the continuous circulating velocity core and the phase propulsion speed. When the mining vehicle is traveling in a straight line at the reference operating speed, λ = 1; when the mining vehicle turns and decelerates, λ decreases with the current relative velocity, causing the intensity of the circulating velocity core and the phase propulsion speed to decrease synchronously. During the mining vehicle startup and wake development stages, a time-divided velocity core switching method is adopted: within 0–120 s, the startup and development core formed by time interpolation of the discrete transient flow field obtained by direct calculation is used; within 120–180 s, the startup and development core at 120 s is smoothly weighted and transitioned with the continuous circulating velocity core; after 180 s, the continuous circulating velocity core is used entirely.

[0082] In this embodiment, the mining vehicle travels along a straight section at a speed of 0.6 m / s and passes through a turning section at a speed of 0.3 m / s, continuously operating along 10 mining tracks. The startup and transition phases are handled according to the aforementioned core switching method; after entering the continuous operation phase, the intensity and phase propulsion speed of the continuous circulating speed core are synchronously adjusted according to the current relative flow velocity. When the mining vehicle turns, the continuous circulating speed core is curved and mapped along the recent historical path of the mining vehicle, thereby avoiding the continued use of the wake evolution frequency under the straight-line working condition and avoiding rigid rotation of the entire straight-line wake. Figure 6 As shown, fluid disturbances are mainly distributed behind the mining vehicle and its already traveled path, and the direction of the wake changes with the heading during the turn.

[0083] S5. On the synthesized unsteady flow field along the entire path, solve the convection-diffusion-sedimentation transport equations for multiple particle sizes of suspended matter to obtain the spatiotemporal distribution of the suspended matter plume concentration, and determine the influence range of the suspended matter plume based on a preset concentration threshold.

[0084] In the embodiments of this application, see Figure 7 Based on the synthesized flow field in geostationary coordinates, the convection-diffusion-sedimentation equations for suspended matter are further solved. The suspended matter is solved separately for three particle sizes: fine, medium, and coarse. The transport equations for each particle size include convection, diffusion, sedimentation, and moving source terms. In this embodiment, the total suspended matter source intensity in the straight section is 18 kg / s and varies linearly with the mining vehicle speed; therefore, the source intensity in the turning stage is 9 kg / s. The mass ratios of fine, medium, and coarse particles are 20%, 50%, and 30%, respectively, and each particle size has a different sedimentation velocity. The source term is located 5 m behind the mining vehicle and 1 m above the seabed. The transport grid has a horizontal resolution of 5 m, a vertical resolution of 2 m, and a time step of 2 s.

[0085] No. The convection-diffusion-sedimentation transport equation for particulate matter is:

[0086] in, For the first Particle size suspended solids concentration, For the first Particle size settling velocity, It is a vertical unit vector. For the effective diffusion tensor of suspended matter, For the first Granularity-level moving source item.

[0087] The effective diffusion tensor includes background horizontal diffusion, background vertical diffusion, and turbulent additional diffusion determined by the turbulent kinematic viscosity increment in the velocity kernel.

[0088]

[0089]

[0090] in, and These are the background horizontal diffusion coefficient and background vertical diffusion coefficient of suspended matter, respectively; Add a diffusion coefficient to the turbulence that varies with space and time; This represents the turbulent kinematic viscosity increment corresponding to the continuous cyclic velocity kernel; For turbulent Schmidt number; A preset upper limit for the diffusion coefficient applied to turbulence; This represents a diagonal tensor.

[0091] In this embodiment, the same effective diffusion tensor and background horizontal diffusion coefficient are used for each particle size. =0.08m 2 / s, background vertical diffusion coefficient =0.002 m2 / s, turbulent Schmidt number =0.7, the upper limit of the turbulent additional diffusion coefficient is 0.04 m 2 / s; the transport differences between particle sizes are mainly reflected through different settling velocities.

[0092] The total suspended solids source intensity in the straight section varies linearly with the speed of the mining vehicle:

[0093] in, This is the instantaneous speed of the mining vehicle; when the mining vehicle decelerates to a certain speed while turning... When the velocity is 0.3 m / s, the source strength is 9 kg / s.

[0094] The total suspended solids source strength of 18 kg / s in this embodiment is based on the following: Referring to the measured data from the pre-prototype sea trial of the polymetallic nodule collector, the initial sediment input was approximately 12 ± 3 kg / s; simultaneously, considering the sampling head parameters used in this embodiment (cutting width approximately 2.5 m, disturbance depth 12 cm, travel speed 0.6 m / s, sediment wet density approximately 1600 kg / m³),... 3 (Porosity approximately 0.8) The amount of sediment disturbance calculated from the cutting volume of the sampling head is:

[0095] in, The depth of the acquisition head disturbance. For sediment porosity, Let ρ be the wet density of the sediment, w be the cutting width, and U be the speed of the mining vehicle. Considering that only a portion of the sediment is lifted by the sampling head to form suspended matter (lifting rate approximately 0.3%), the source strength is approximately 18 kg / s. The above lifting rate value is based on test results from similar sampling head flume experiments. The linear relationship between source strength and speed stems from the direct proportionality between the cutting volume of the sampling head and the velocity, i.e., the area of ​​seabed swept per unit time is proportional to the velocity. Therefore, the total amount of disturbed sediment and the amount of lifted suspended matter are both linearly related to the velocity. When the mining vehicle turns and decelerates to 0.3 m / s, the source strength decreases to 9 kg / s according to the same linear relationship.

[0096] In this embodiment, suspended matter is classified into three particle sizes: fine, medium, and coarse. The particle size distribution criteria are based on the grain size distribution characteristics of sediments in the Clarion-Clipperton (CCZ) mining area: fine particles correspond to cohesive particles with a grain size less than 10 μm; medium particles correspond to silty particles with a grain size between 10 and 63 μm; and coarse particles correspond to sandy particles with a grain size greater than 63 μm. Referring to the statistical results of sediment grain size distribution in the CCZ contract area, the mass ratios of fine, medium, and coarse particles are 20%, 50%, and 30%, respectively, and appropriate adjustments have been made based on the disturbance characteristics of the mining vehicle in this embodiment. The settling velocities of each particle size are determined comprehensively based on the Stokes settling formula and deep-sea sediment still-water settling experimental data: the characteristic grain size of the fine particle size is approximately 5 μm, and the calculated settling velocity is approximately 3.6 × 10⁻⁶. -4 m / s; for medium-sized particles, the characteristic particle size is approximately 30 μm, and the calculated settling velocity is approximately 2.0 × 10⁻⁶ m / s. -3 m / s; the characteristic particle size of the coarse-grained class is approximately 200 μm, and the calculated settling velocity is approximately 8.33 × 10⁻⁶ m / s; -3 m / s. In practical applications, the settling velocity of each particle size can be adjusted according to the measured particle size distribution and particle density of sediments in different mining areas, based on the Stokes formula or static water settling test data.

[0097] The solution results show that, see Figure 7 The suspended solids plume initially develops along a single straight path, deflecting during the turning phase as the mining vehicle's course changes. As the operational track increases, the early plume continues to spread and overlaps with suspended solids generated on subsequent paths. By the 10th track, the plume gradually evolves from a local near-source influence to a cumulative influence area covering multiple tracks. In this embodiment, the maximum suspended solids concentration at the grid points throughout the entire process is approximately 6343.9 mg / L, occurring around 141 seconds into the operation on the first straight path. The peak location is near the release point behind the mining vehicle, representing an instantaneous near-source peak within the moving source grid points. The median concentration across the entire envelope of the mining path centerline is approximately 3280.6 mg / L.

[0098] It should be noted that, in this embodiment, the mining disturbance zone is defined as a strip-shaped area of ​​the seabed directly crushed and disturbed by the mining vehicle, with a width equal to 5m (the width of the mining vehicle), i.e., a range of 2.5m on each side of the path centerline. The maximum horizontal extension distance from the boundary of the mining disturbance zone, as calculated subsequently, refers to the maximum normal distance beyond the boundary of the suspended matter concentration threshold contour line to the boundary of the disturbance zone, i.e., the outward extension distance in the direction perpendicular to the path, rather than the total width relative to the path centerline.

[0099] See Figure 8When the concentration thresholds were set at 10%, 5%, and 1% of the peak value of the entire process, the corresponding concentrations were 634.39 mg / L, 317.19 mg / L, and 63.44 mg / L, respectively, with affected areas of 13,575 m², 15,950 m², and 28,100 m², respectively. The maximum horizontal extension distances from the 5 m wide mining disturbance zone were 6.43 m, 25.92 m, and 145.71 m, respectively, and the maximum vertical impact heights were 4 m, 6 m, and 8 m, respectively. The results showed a clear characteristic of high concentration near the source and low concentration in the far field, and the impact distance increased significantly as the evaluation threshold decreased.

[0100] The method described in this embodiment can be applied to environmental impact assessments of deep-sea mining, monitoring scheme deployment, and comparison of mining operation parameters. For example, keeping other conditions constant, by changing the mining vehicle's speed, path spacing, turning method, background flow intensity, or suspended matter source strength, and using the continuous circulating velocity kernel of this embodiment to resynthesize the full-path flow field and solve the transport equations, the spatiotemporal distribution and impact range of suspended matter plume concentration under different schemes can be quickly obtained. This allows for comparison of the environmental impact under different operation parameters, providing a quantitative basis for mining path planning, operation scheduling, and ecological risk assessment.

[0101] Because this embodiment extracts and reuses velocity kernels during the quasi-mature wake period, a single mining vehicle operation only needs to complete one three-dimensional transient hydrodynamic calculation up to the quasi-mature period (a 700s transient simulation in this embodiment). Subsequently, the flow field synthesis and transport solutions required for multi-track, long-duration operations only involve coordinate transformation and solving scalar transport equations, without needing to repeatedly solve transient equations. In this embodiment, each straight segment of the mining path is 150m long, and each turning segment is 104m long, containing 10 mining paths and 9 turns, with a total path length of 2436m; the straight segment travel speed is 0.6m / s, the turning speed is 0.3m / s, and the total travel time is approximately 5620s. In comparison, the computational cost of the full-path direct simulation method is approximately 200 CPU cores, while the computational cost is reduced to 12.6 CPU cores after adopting the transient velocity kernel proxy method, reducing computational resource consumption by approximately 93.7%. Therefore, this method can efficiently conduct multi-condition comparisons and rapid environmental impact assessments under engineering-scale conditions.

[0102] An embodiment of this application also provides a system for predicting suspended debris plumes during continuous deep-sea mining operations, including a hydrodynamic simulation module, a quasi-maturity determination module, a velocity kernel extraction module, a path synthesis module, a transport solution module, and an impact assessment module. The hydrodynamic simulation module performs step S1, the quasi-maturity determination module performs step S2, the velocity kernel extraction module performs step S3, the path synthesis module performs step S4, and the transport solution module and impact assessment module perform step S5.

[0103] Those skilled in the art will understand that all or part of the steps in the methods of the above embodiments can be implemented by hardware related to program instructions, and the corresponding program can be stored in a computer-readable storage medium. The storage medium mentioned above can be a read-only memory, a disk, or an optical disk, etc.

[0104] In the several embodiments provided in this application, it should be understood that the disclosed methods and systems can be implemented in other ways. For example, the system embodiments described above are merely illustrative; for instance, the division of modules is only a logical functional division, and other division methods may exist in actual implementation. The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical units, i.e., they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs.

[0105] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this application and are not intended to limit it. Although this application has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of this application without departing from the spirit and scope of the technical solutions of this application.

Claims

1. A method for predicting suspended debris plumes during continuous deep-sea mining vehicle operations, characterized in that, The method includes: S1. Obtain the three-dimensional geometric model of the mining vehicle and the conditions of the seabed and incoming flow. Establish a three-dimensional transient hydrodynamic model containing the mining vehicle in the vehicle-fixed coordinate system. Simulate the flow around the mining vehicle and the formation process of the unsteady wake by moving the seabed and the incoming flow relative to the mining vehicle. Obtain the three-dimensional transient flow field sequence of the wake flow field evolution over time. S2. Based on the three-dimensional transient flow field sequence, the wake flow field is pre-maturely determined to identify the pre-mature wake period when the wake enters the pre-mature stage. S3. During the quasi-mature wake period, candidate transient sequences are traversed, and a comprehensive score is given based on the matching degree of the flow field values ​​at the beginning and end of the candidate transient sequences and the matching degree of the time derivatives at the beginning and end, to select transient velocity cores that can be cyclically connected; between the end of the transient velocity core and the starting point of the next cycle, a bridging segment is constructed using cubic Hermite interpolation, and the transient velocity core and the bridging segment are spliced ​​together to form a continuous cyclic velocity core; S4. Based on the instantaneous position and heading angle of the mining vehicle, the continuous cyclic velocity core is rotated and translated from the vehicle-fixed coordinate system to the ground-fixed coordinate system, and cyclically called along the working path of the mining vehicle to synthesize the unsteady flow field of the entire path. S5. On the synthesized unsteady flow field along the entire path, solve the convection-diffusion-sedimentation transport equations for multiple particle sizes of suspended matter to obtain the spatiotemporal distribution of the suspended matter plume concentration, and determine the influence range of the suspended matter plume based on a preset concentration threshold.

2. The method for predicting suspended debris plumes during continuous deep-sea mining vehicle operations as described in claim 1, characterized in that, The process of determining the quasi-maturity of the wake flow field based on the three-dimensional transient flow field sequence, and identifying the quasi-mature wake period when the wake enters the quasi-mature stage, includes: S201, calculate the root mean square of the lateral pulsation force of the mining vehicle within the preset time window, compare the relative changes of adjacent windows, and determine whether the overall force fluctuation of the mining vehicle has entered a bounded state. S202, set velocity probes at different distances downstream of the mining vehicle, calculate the normalized spectral power after linearly detrending the lateral velocity of the probes, and extract the dominant frequency. S203 uses the Q criterion to identify coherent vortex structures in the wake and statistically analyzes the wake length, isosurface area and its coefficient of variation. S204, when the lateral force of the mining vehicle enters a bounded state, the dominant frequencies of the probes at each position all fall within the same preset frequency band, and the statistical index of the Q criterion structure meets the stability threshold, it is determined that the wake has entered the quasi-mature stage, and the quasi-mature wake period is determined.

3. The method for predicting suspended debris plumes during continuous deep-sea mining vehicle operations as described in claim 1, characterized in that, The process of comprehensively scoring the matching degree of the flow field values ​​at the beginning and end of the candidate transient sequences and the matching degree of the time derivatives at the beginning and end, and selecting transient velocity kernels that can be cyclically connected, includes: For each candidate transient sequence, the normalized error of the flow field values ​​at the beginning and end is calculated as the first index, and the normalized error of the time derivatives at the beginning and end is calculated as the second index. The first index and the second index are weighted and summed to obtain a comprehensive score. Traverse the candidate start time and candidate duration, and determine the candidate transient sequence with the smallest comprehensive score and the frequency corresponding to the candidate sequence duration that falls within the preset dominant frequency band as the transient velocity kernel.

4. The method for predicting suspended debris plumes during continuous deep-sea mining vehicle operations as described in claim 1, characterized in that, The construction of a bridging segment using cubic Hermite interpolation, and the splicing of the transient velocity kernel with the bridging segment to form a continuous cyclic velocity kernel, includes: The bridging duration is set, and a normalized time coordinate is introduced. The flow field value at the beginning of the bridging segment and its first time derivative, and the flow field value at the end of the bridging segment and its first time derivative are used as boundary conditions. The cubic Hermite basis function is used to interpolate the flow field variables in the bridging segment so that the flow field value and first time derivative of the spliced ​​cyclic velocity kernel at the bridging point are continuous. The bridging segment and the transient velocity core together form a complete loop. After the loop is constructed, it is checked whether the cycle frequency of the complete loop falls within the dominant frequency band identified by the wake probe. If it does not meet the requirement, the candidate start time or candidate duration is adjusted and the candidate transient sequence is re-selected.

5. The method for predicting suspended debris plumes during continuous deep-sea mining vehicle operations as described in claim 1, characterized in that, The cyclical invocation along the working path of the mining vehicle includes: The phase clock of the continuous circulating velocity core is advanced by the relative flow speed between the mining vehicle and the seawater, so that the velocity core intensity and the phase advancement speed change synchronously with the speed of the mining vehicle; when the mining vehicle turns and decelerates, the velocity core intensity and the phase advancement speed are reduced synchronously. During the startup phase of the mining vehicle, a directly calculated transient development kernel is used, and a smooth transition is made to the continuous cyclic speed kernel; during the turning phase, the continuous cyclic speed kernel is curved and mapped along the recent historical path of the mining vehicle.

6. The method for predicting suspended debris plumes during continuous deep-sea mining vehicle operations as described in claim 1, characterized in that, The obtained three-dimensional transient flow field sequence of the wake flow field evolution over time includes: By taking the median of the lateral velocities at each height level in the upstream region of the mining vehicle at the same time, a reference velocity profile varying with height is obtained and used as a reference field. Subtracting the reference field from the three-dimensional transient flow field yields the velocity increment field; the continuous cyclic velocity core is the hydrodynamic increment field caused by the mining vehicle, excluding the background flow.

7. The method for predicting suspended debris plumes during continuous deep-sea mining vehicle operations as described in claim 1, characterized in that, The solution to the convection-diffusion-sedimentation transport equations for multiple particle sizes of suspended matter includes: The suspended matter was solved separately according to three particle sizes: fine, medium, and coarse. The fine particle size corresponds to particles with a diameter of less than 10 μm, the medium particle size corresponds to particles with a diameter between 10 and 63 μm, and the coarse particle size corresponds to particles with a diameter of more than 63 μm. Each particle size has a different settling velocity. The suspended matter source term is a mobile source term that moves with the mining vehicle, and the source strength changes linearly with the speed of the mining vehicle.

8. The method for predicting suspended debris plumes during continuous deep-sea mining vehicle operations as described in claim 1, characterized in that, Also includes: Based on the spatiotemporal distribution of the concentration, a preset percentage of the peak value of the entire process is used as the concentration threshold. The affected area, the maximum horizontal extension distance from the mining disturbance zone, and the maximum vertical impact height are calculated, and the cumulative impact area formed by multi-track operations is output.

9. A system for predicting suspended debris plumes during continuous operation of deep-sea mining vehicles, characterized in that: The deep-sea mining vehicle continuous operation suspended plume prediction system is used to execute the deep-sea mining vehicle continuous operation suspended plume prediction method according to any one of claims 1 to 8, including: The hydrodynamic simulation module is used to establish a three-dimensional transient hydrodynamic model containing the mining car in the vehicle-fixed coordinate system. It simulates the flow around the mining car and the unsteady wake by making the seabed and the incoming flow move relative to the mining car, and outputs a three-dimensional transient flow field sequence of the wake flow field evolution over time. The semi-maturity determination module is used to determine the semi-maturity of the wake flow field based on the lateral force of the mining vehicle, the wake probe spectrum and the Q criterion structural index, and to determine the semi-maturity wake period when the wake enters the semi-maturity stage. The velocity kernel extraction module is used to filter transient velocity kernels based on the comprehensive score of the flow field values ​​at the beginning and end of the candidate transient sequence and the time derivatives at the beginning and end during the quasi-mature wake period, and to splice the transient velocity kernels into a continuous cyclic velocity kernel using a cubic Hermite interpolation bridging segment. The path synthesis module is used to rotate and translate the continuous cyclic velocity core from the vehicle-fixed coordinate system to the ground-fixed coordinate system based on the instantaneous position and heading angle of the mining vehicle, and cyclically call it along the operation path to synthesize the unsteady flow field of the entire path. The transport solution module is used to solve the convection-diffusion-sedimentation transport equations for multiple particle sizes of suspended matter in the synthesized unsteady flow field along the entire path, and output the spatiotemporal distribution of the suspended matter plume concentration. The impact assessment module is used to determine the impact range of the suspended matter plume based on a preset concentration threshold and output the cumulative impact area formed by multi-track operations.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by the processor, it implements the method for predicting suspended plumes during continuous operation of deep-sea mining vehicles as described in any one of claims 1 to 8.