A reservoir scheduling decision-making method and system based on multi-factor situation indicators

By constructing a multi-factor situation indicator system, the problem of insufficient quantitative assessment of the situation in reservoir scheduling was solved, enabling real-time perception and dynamic adjustment of scheduling strategies, and improving the efficiency and robustness of scheduling decisions.

CN123070631APending Publication Date: 2026-11-10GUIZHOU INST OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611517402.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-28
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing reservoir scheduling methods lack the ability to quantitatively assess the system's operational status and make dynamic adaptive decisions, making it difficult to achieve real-time scheduling strategy adjustments and multi-objective optimization.

Method used

A multi-factor situation indicator system is constructed, including the water storage pressure index (SPI), supply and demand trend indicators, and water level fluctuation indicators. Combined with collaborative decision-making rules, it enables real-time quantitative perception and dynamic adaptation of scheduling decisions.

Benefits of technology

It realizes real-time quantitative perception and dynamic adaptive adjustment of the reservoir scheduling system, improves the efficiency and robustness of scheduling decisions, and reduces reliance on human experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123070631A_ABST
    Figure CN123070631A_ABST
Patent Text Reader

Abstract

This invention discloses a reservoir scheduling decision-making method and system based on multi-factor situation indicators, applied in the field of reservoir scheduling technology. The method includes the following steps: constructing a basic reservoir scheduling data system and a multi-factor situation indicator system; determining scheduling decisions based on preset collaborative decision-making rules; judging whether the indicators are functioning correctly based on preset thresholds; determining the target water storage capacity according to the scheduling decision and preset mapping rules, determining the target outflow capacity by combining the current water storage capacity, inflow, and water loss, and converting the target outflow capacity into gate opening commands or generator output commands, outputting them to the reservoir scheduling control system. This invention achieves real-time quantitative perception, trend analysis, and adaptive decision response of the reservoir scheduling system's operational status, improving the efficiency of multi-objective scheduling decisions and robustness to forecast uncertainties.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of reservoir scheduling technology, and more specifically to a reservoir scheduling decision-making method and system based on multi-factor situation indicators. Background Technology

[0002] Reservoir scheduling is a core aspect of water resource management. Its essence lies in optimizing multiple objectives, including water supply, power generation, and ecological balance, through water storage and release decisions under conditions of fluctuating inflow and demand. Currently, reservoir scheduling primarily employs the following technical methods: 1. Conventional Dispatch Chart Method: This method involves statistically drawing dispatch lines (such as normal water level lines, water supply restriction lines, dead water level lines, etc.) based on historical runoff data, dividing the reservoir operation into several zones, each corresponding to different dispatch rules. This method uses static zoning to address dynamic changes, making it difficult to adapt to uncertainties in inflow, and lacks foresight and dynamic response capabilities. 2. Scheduling function method: This method establishes a functional relationship between outflow and variables such as initial water level and inflow during a given period. However, it is essentially a linear or simplified nonlinear mapping and has limited ability to characterize the highly nonlinear and nonstationary nature of hydrological processes. 3. Deterministic optimization scheduling methods: Represented by dynamic programming, this method divides the scheduling period into several stages and recursively solves for the optimal trajectory with water balance as a constraint. This method faces the curse of dimensionality; the computational load increases exponentially with the number of reservoirs or the discretization precision. Furthermore, the optimization results are highly sensitive to the accuracy of runoff forecasts; forecasting errors will cause the scheduling scheme to fail. 4. Intelligent optimization algorithm methods: Scheduling is based on algorithms such as genetic algorithm, particle swarm optimization, and reinforcement learning. These methods have certain advantages in solving multi-objective optimization problems, but they still have obvious shortcomings in the situational awareness and dynamic response of scheduling decisions: there is a lack of a real-time quantitative evaluation mechanism for the system's operating status, and the adjustment of scheduling rules often lags behind changes in the system's state, making it difficult to achieve a closed loop of state awareness, trend analysis, and decision response. In summary, existing technologies lack quantitative assessment methods for the operational status of reservoir scheduling systems, making it impossible to determine in real time whether the system is in a water pressure zone, a balanced operation zone, or a water supply shortage zone. Scheduling rules lack dynamic adaptive capabilities, making it difficult to adjust strategies in advance based on changes in the inflow-outflow relationship. Furthermore, the trade-offs between multiple objectives (water supply, power generation, and ecology) lack quantifiable decision-making basis, and scheduling decisions rely heavily on human experience, resulting in a high degree of subjectivity. Therefore, providing a reservoir scheduling decision-making method and system based on multi-factor status indicators is a problem that urgently needs to be solved by those skilled in the art. Summary of the Invention

[0003] In view of this, the present invention provides a reservoir scheduling decision-making method and system based on multi-factor situation indicators, which overcomes the shortcomings of existing reservoir scheduling methods in lacking quantitative assessment of system operation status and dynamic adaptive decision-making capabilities, and realizes real-time quantitative perception, trend analysis and adaptive decision response of the scheduling system operation status.

[0004] To achieve the above objectives, the present invention provides the following technical solution: A reservoir scheduling decision-making method based on multi-factor situation indicators includes the following steps: S1. Construct a basic data system for reservoir scheduling, including: water level-storage capacity relationship curves, water level-discharge capacity relationship curves, historical inflow sequence, water demand processes of various departments, and characteristic water levels of the reservoirs; S2. Construct a multi-factor situation indicator system, including: water storage pressure index (SPI), supply and demand trend indicators, and water level fluctuation indicators; S3. Based on the combination of the situation range of the water storage pressure index SPI, the trend signal of the supply and demand trend index, and the water level position determined by the water level fluctuation index, the scheduling decision is determined based on the preset collaborative decision-making rules. S4. When the water inflow forecast error is less than the preset threshold, all indicator signals are effective normally; when the water inflow forecast error reaches or exceeds the preset threshold, the confidence level of the indicator signals is reduced, and the system switches to manual intervention mode or conservative scheduling mode. S5. Determine the target water storage volume based on the scheduling decision and the preset mapping rules, determine the target outflow volume based on the current water storage volume, inflow volume and water loss, and convert the target outflow volume into gate opening command or unit output command, and output it to the reservoir scheduling control system.

[0005] Optionally, the water storage pressure index (SPI) is obtained based on the ratio of the increase in water storage to the decrease in water storage during the statistical period. ; ; In the formula, This is the ratio of the increase in water storage to the decrease in water storage during the statistical period. To increase the number of days for water storage, To reduce the number of days for water storage, , This represents the corresponding confidence weighting coefficient.

[0006] Optionally, the supply and demand trend indicators can be constructed as follows: Define the supply-demand gap In the formula, For inbound flow, To meet comprehensive water demand, For evaporation and leakage losses, Indicates time; Define trend lines In the formula, This represents the short-run supply-demand difference as a mean. This represents the long-term average of the supply-demand gap. Define signal lines In the formula, m is the signal line smoothing period; The decision rule is: when the trend line Upward signal line When the trend line indicates a positive supply and demand trend; when the trend line... Underpass signal line When this occurs, it indicates a deterioration in the supply and demand trend.

[0007] Optionally, the water level fluctuation index can be constructed as follows: Define the centerline of the water level In the formula, The moving average period is... for The water level at that moment; Define the upper rail of the water level ; Define the lower water level rail ; In the formula, is the standard deviation of the water level series, and k is the coefficient; Introducing physical constraints: ≤Normal water level ≥Dead water level; The decision-making rules are as follows: if the water level touches or exceeds the upper rail, it indicates that the water level is too high and water release should be increased; if the water level touches or exceeds the lower rail, it indicates that the water level is too low and water release should be controlled; if the water level is within the rail, it will be operated according to the regular scheduling rules.

[0008] Optional features include constructing moving average trend indicators and exponentially weighted moving average indicators: Moving average trend indicator: Calculate moving averages for different periods for inflow or reservoir water level to identify the trend of abundant or scarce water. The decision rules are as follows: when the short-term moving average crosses above the long-term moving average, the water inflow trend is positive, and water storage should be increased; when the short-term moving average crosses below the long-term moving average, the water inflow trend is negative, and water release should be controlled; short-term > medium-term > long-term, water inflow is abundant; short-term < medium-term < long-term, water inflow is insufficient. Exponentially weighted moving average indicator: It assigns high weight to recent inflow or water level, enabling the indicator to respond more quickly to short-term changes in runoff; the decision-making rules are the same as those for moving average trend indicators.

[0009] Optionally, it also includes constructing water level location indicators: The position of the current water level in the recent fluctuation range is determined by the relative position of the current water level within the range of the highest and lowest water levels in a set period. It is composed of a fast line K, a slow line D, and a sensitive line J. The decision-making rules are as follows: when the values ​​of K, D, and J are all greater than 75, the water level is at a recent high level, and water release should be increased; when the values ​​of K, D, and J are all less than 25, the water level is at a recent low level, and water release should be controlled; when the values ​​of K, D, and J are between 25 and 75, normal scheduling should be implemented; when the D line turns from bottom to top, the water level rises, and when the D line turns from top to bottom, the water level falls; 50 is the equilibrium reference line.

[0010] Optionally, this also includes constructing water kinetic energy indicators: Define water kinetic energy index ; In the formula, for The amount of water discharged or discarded at any given time; When the water level rises ; When the water level drops ; When the water level remains unchanged ; The decision-making rule is as follows: When the water level changes in the same direction as the water level, the water storage and release are supported by available capacity, and the trend is healthy. When the water level deviates from the actual water volume, the water level change lacks support from the actual water volume and may reverse.

[0011] Optional, the preset collaborative decision-making rules are as follows: When the water storage pressure index (SPI) is greater than 75, it is in the high water storage pressure zone, and the water level is near the upper rail. Water release is the basic principle of water release. When the trend signal is a deteriorating trend, water release is increased. When the trend signal is a positive trend, water release is moderately increased. When the water storage pressure index (SPI) is less than 25, it is in the low water storage pressure zone, and the water level is near the lower rail. The scheduling principle is to store water or control the release of water. When the trend signal is a deteriorating trend, the release of water should be strictly controlled. When the trend signal is a positive trend, the water storage should be increased. When the water storage pressure index (SPI) is between 25 and 75, it is in the equilibrium zone. Normal water supply is the basic principle of water management. When the trend signal is positive, normal water supply and moderate water storage are implemented. When the trend signal is negative, normal water supply and moderate control are implemented.

[0012] Optionally, the target outbound flow is as follows: ; In the formula, For the target outbound flow, For inbound flow, For evaporation and leakage losses, This is the current water storage level. For the target water storage capacity, This represents the length of the time period.

[0013] A reservoir scheduling decision-making system based on multi-factor situation indicators, applying the aforementioned reservoir scheduling decision-making method based on multi-factor situation indicators, includes: The data acquisition module is used to acquire the water level-storage capacity relationship curve, water level-discharge capacity relationship curve, historical inflow sequence, water demand process of various departments, and characteristic water level of the target reservoir. The indicator calculation module, connected to the data acquisition module, is used to calculate the water storage pressure index (SPI), supply and demand trend index, and water level fluctuation index. The collaborative decision-making module, connected to the indicator calculation module, determines the scheduling decision based on a combination of three factors: the situation range of the water storage pressure index SPI, the trend signal of the supply and demand trend indicator, and the water level position determined by the water level fluctuation indicator, according to the preset collaborative decision-making rules. The robust processing module, connected to the collaborative decision-making module, determines whether the indicator signal is functioning correctly based on the relationship between the water inflow forecast error and the preset threshold. The instruction generation module, connected to the robust processing module, determines the target water storage volume based on the scheduling decision, calculates the target outflow, and outputs it as a gate opening instruction or a unit output instruction.

[0014] As can be seen from the above technical solution, compared with the prior art, the present invention provides a reservoir scheduling decision-making method and system based on multi-factor situation indicators, which has the following beneficial effects: 1. This invention realizes real-time quantitative perception of the operation status of the reservoir scheduling system. Through three types of status indicators, namely the water storage pressure index (SPI), supply and demand trend, and water level fluctuation, the status of water storage pressure, supply and demand trend, and water level anomaly, which originally relied on manual experience for judgment, are transformed into quantifiable numerical indicators, providing an objective data basis for scheduling decisions. 2. The system realizes dynamic adaptive adjustment of the scheduling strategy. Unlike the static partitioning of the traditional scheduling diagram, the indicator system of this invention is dynamically updated with the change of the water inflow-water consumption relationship. It can issue scheduling signals in a timely manner when the system state changes, realizing a closed loop of state perception, trend analysis, and decision response. 3. Improved decision-making efficiency for multi-objective scheduling: By using a multi-indicator collaborative judgment matrix, constraints on multiple objectives such as water supply, power generation, and ecology are incorporated into a unified decision-making framework, reducing the number of manual calculations and repeated comparisons, and improving the efficiency of generating scheduling schemes. 4. Enhanced the robustness of scheduling decisions to forecast uncertainties. Through the confidence interval gate mechanism, it automatically switches to conservative mode when forecast accuracy is insufficient, avoiding scheduling errors caused by forecast deviations. Attached Figure Description

[0015] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.

[0016] Figure 1 This is a flowchart of the reservoir scheduling decision-making method based on multi-factor situation indicators of the present invention; Figure 2 This is a schematic diagram of the preset collaborative decision-making rules of the present invention; Figure 3 This is a schematic diagram of the reservoir scheduling decision system based on multi-factor situation indicators of the present invention. Detailed Implementation

[0017] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0018] This invention discloses a reservoir scheduling decision-making method based on multi-factor situation indicators, such as... Figure 1 As shown, it includes the following steps: S1. Construct a basic data system for reservoir scheduling, including: water level-storage capacity relationship curves, water level-discharge capacity relationship curves, historical inflow sequence, water demand processes of various departments, and characteristic water levels of the reservoirs; S2. Construct a multi-factor situation indicator system, including: water storage pressure index (SPI), supply and demand trend indicators, and water level fluctuation indicators; S3. Based on the combination of the situation range of the water storage pressure index SPI, the trend signal of the supply and demand trend index, and the water level position determined by the water level fluctuation index, the scheduling decision is determined based on the preset collaborative decision-making rules. S4. When the water inflow forecast error is less than the preset threshold, all indicator signals are effective normally; when the water inflow forecast error reaches or exceeds the preset threshold, the confidence level of the indicator signals is reduced, and the system switches to manual intervention mode or conservative scheduling mode. S5. Determine the target water storage volume based on the scheduling decision and the preset mapping rules, determine the target outflow volume based on the current water storage volume, inflow volume and water loss, and convert the target outflow volume into gate opening command or unit output command, and output it to the reservoir scheduling control system.

[0019] Furthermore, the water storage pressure index (SPI) is obtained based on the ratio of the increase in water storage to the decrease in water storage during the statistical period. ; ; In the formula, This is the ratio of the increase in water storage to the decrease in water storage during the statistical period. To increase the number of days for water storage, To reduce the number of days for water storage, , This represents the corresponding confidence weighting coefficient.

[0020] Furthermore, the specific construction of supply and demand trend indicators is as follows: Define the supply-demand gap In the formula, For inbound flow, To meet comprehensive water demand, For evaporation and leakage losses, Indicates time; Define trend lines In the formula, This represents the short-run supply-demand difference as a mean. This represents the long-term average of the supply-demand gap. Define signal lines In the formula, m is the signal line smoothing period; The decision rule is: when the trend line Upward signal line When the trend line indicates a positive supply and demand trend; when the trend line... Underpass signal line When this occurs, it indicates a deterioration in the supply and demand trend.

[0021] Furthermore, the water level fluctuation index is constructed as follows: Define the centerline of the water level In the formula, The moving average period is... for The water level at that moment; Define the upper rail of the water level ; Define the lower water level rail ; In the formula, is the standard deviation of the water level series, and k is the coefficient; Introducing physical constraints: ≤Normal water level ≥Dead water level; The decision-making rules are as follows: if the water level touches or exceeds the upper rail, it indicates that the water level is too high and water release should be increased; if the water level touches or exceeds the lower rail, it indicates that the water level is too low and water release should be controlled; if the water level is within the rail, it will be operated according to the regular scheduling rules.

[0022] Furthermore, this also includes constructing moving average trend indicators and exponentially weighted moving average indicators: Moving average trend indicator: Calculate moving averages for different periods for inflow or reservoir water level to identify the trend of abundant or scarce water. The decision rules are as follows: when the short-term moving average crosses above the long-term moving average, the water inflow trend is positive, and water storage should be increased; when the short-term moving average crosses below the long-term moving average, the water inflow trend is negative, and water release should be controlled; short-term > medium-term > long-term, water inflow is abundant; short-term < medium-term < long-term, water inflow is insufficient. Exponentially weighted moving average indicator: It assigns high weight to recent inflow or water level, enabling the indicator to respond more quickly to short-term changes in runoff; the decision-making rules are the same as those for moving average trend indicators.

[0023] Furthermore, this also includes constructing water level location indicators: The position of the current water level in the recent fluctuation range is determined by the relative position of the current water level within the range of the highest and lowest water levels in a set period. It is composed of a fast line K, a slow line D, and a sensitive line J. The decision-making rules are as follows: when the values ​​of K, D, and J are all greater than 75, the water level is at a recent high level, and water release should be increased; when the values ​​of K, D, and J are all less than 25, the water level is at a recent low level, and water release should be controlled; when the values ​​of K, D, and J are between 25 and 75, normal scheduling should be implemented; when the D line turns from bottom to top, the water level rises, and when the D line turns from top to bottom, the water level falls; 50 is the equilibrium reference line.

[0024] Furthermore, this also includes constructing water volume kinetic energy indicators: Define water kinetic energy index ; In the formula, for The amount of water discharged or discarded at any given time; When the water level rises ; When the water level drops ; When the water level remains unchanged ; The decision-making rule is as follows: When the water level changes in the same direction as the water level, the water storage and release are supported by available capacity, and the trend is healthy. When the water level deviates from the actual water volume, the water level change lacks support from the actual water volume and may reverse.

[0025] Furthermore, as shown in Table 1 and Figure 2 As shown, the preset collaborative decision-making rules are as follows: When the water storage pressure index (SPI) is greater than 75, it is in the high water storage pressure zone, and the water level is near the upper rail. Water release is the basic principle of water release. When the trend signal is a deteriorating trend, water release is increased. When the trend signal is a positive trend, water release is moderately increased. When the water storage pressure index (SPI) is less than 25, it is in the low water storage pressure zone, and the water level is near the lower rail. The scheduling principle is to store water or control the release of water. When the trend signal is a deteriorating trend, the release of water should be strictly controlled. When the trend signal is a positive trend, the water storage should be increased. When the water storage pressure index (SPI) is between 25 and 75, it is in the equilibrium zone. Normal water supply is the basic principle of water management. When the trend signal is positive, normal water supply and moderate water storage are implemented. When the trend signal is negative, normal water supply and moderate control are implemented.

[0026] Table 1 Preset Collaborative Decision-Making Rules

[0027] In this embodiment, the preset threshold in S4 is 15%.

[0028] Furthermore, the target outbound flow is specifically as follows: ; In the formula, For the target outbound flow, For inbound flow, For evaporation and leakage losses, This is the current water storage level. For the target water storage capacity, This represents the length of the time period.

[0029] In this embodiment of the invention, the target water storage capacity is determined based on scheduling decisions and preset mapping rules. : When the scheduling decision is "increase water release", ; When the scheduling decision is "to moderately increase water release", ; When the dispatching decision is "normal water supply, moderate water storage", ; When the dispatching decision is "normal water supply, moderate control", ; When the scheduling decision is "increase water storage", ; When the dispatching decision is "strictly control water release" (ensuring water supply), ; in, The dead water level corresponds to the reservoir capacity. The values ​​represent the reservoir capacity corresponding to the normal water level. In this embodiment, the coefficients (0.20, 0.35, 0.45, 0.50, 0.60, 0.75) are example values. In actual applications, they can be dynamically adjusted based on factors such as reservoir regulation performance, inflow forecast accuracy, and the urgency of water demand. The core logic is: the more the scheduling decision favors "releasing water," the lower the target water storage capacity; the more the scheduling decision favors "storing water," the higher the target water storage capacity.

[0030] and Figure 1 Corresponding to the method described above, this invention also discloses a reservoir scheduling decision system based on multi-factor situation indicators. Applying the aforementioned reservoir scheduling decision method based on multi-factor situation indicators, such as... Figure 3 As shown, it includes: The data acquisition module is used to acquire the water level-storage capacity relationship curve, water level-discharge capacity relationship curve, historical inflow sequence, water demand process of various departments, and characteristic water level of the target reservoir. The indicator calculation module, connected to the data acquisition module, is used to calculate the water storage pressure index (SPI), supply and demand trend index, and water level fluctuation index. The collaborative decision-making module, connected to the indicator calculation module, determines the scheduling decision based on a combination of three factors: the situation range of the water storage pressure index SPI, the trend signal of the supply and demand trend indicator, and the water level position determined by the water level fluctuation indicator, according to the preset collaborative decision-making rules. The robust processing module, connected to the collaborative decision-making module, determines whether the indicator signal is functioning correctly based on the relationship between the water inflow forecast error and the preset threshold. The instruction generation module, connected to the robust processing module, determines the target water storage volume based on the scheduling decision, calculates the target outflow, and outputs it as a gate opening instruction or a unit output instruction.

[0031] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on its differences from other embodiments. Similar or identical parts between embodiments can be referred to interchangeably. For the systems disclosed in the embodiments, since they correspond to the methods disclosed in the embodiments, the descriptions are relatively simple; relevant parts can be referred to the method section.

[0032] Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A reservoir scheduling decision-making method based on multi-factor situation indicators, characterized in that, Includes the following steps: S1. Construct a basic data system for reservoir scheduling, including: water level-storage capacity relationship curves, water level-discharge capacity relationship curves, historical inflow sequence, water demand processes of various departments, and characteristic water levels of the reservoirs; S2. Construct a multi-factor situation indicator system, including: water storage pressure index (SPI), supply and demand trend indicators, and water level fluctuation indicators; S3. Based on the combination of the situation range of the water storage pressure index SPI, the trend signal of the supply and demand trend index, and the water level position determined by the water level fluctuation index, the scheduling decision is determined based on the preset collaborative decision-making rules. S4. When the water inflow forecast error is less than the preset threshold, all indicator signals are effective normally; when the water inflow forecast error reaches or exceeds the preset threshold, the confidence level of the indicator signals is reduced, and the system switches to manual intervention mode or conservative scheduling mode. S5. Determine the target water storage volume based on the scheduling decision and the preset mapping rules, determine the target outflow volume based on the current water storage volume, inflow volume and water loss, and convert the target outflow volume into gate opening command or unit output command, and output it to the reservoir scheduling control system.

2. The reservoir scheduling decision-making method based on multi-factor situation indicators according to claim 1, characterized in that, The water storage pressure index (SPI) is obtained by comparing the increase in water storage with the decrease in water storage during the statistical period. ; ; In the formula, This is the ratio of the increase in water storage to the decrease in water storage during the statistical period. To increase the number of days for water storage, To reduce the number of days for water storage, , This represents the corresponding confidence weighting coefficient.

3. The reservoir scheduling decision-making method based on multi-factor situation indicators according to claim 1, characterized in that, The specific steps for constructing supply and demand trend indicators are as follows: Define the supply-demand gap In the formula, For inbound flow, To meet comprehensive water demand, For evaporation and leakage losses, Indicates time; Define trend lines In the formula, This represents the short-run supply-demand difference as a mean. This represents the long-term average of the supply-demand gap. Define signal lines In the formula, m is the signal line smoothing period; The decision rule is: when the trend line Upward signal line When the trend line indicates a positive supply and demand trend; when the trend line... Underpass signal line When this occurs, it indicates a deterioration in the supply and demand trend.

4. The reservoir scheduling decision-making method based on multi-factor situation indicators according to claim 1, characterized in that, The water level fluctuation index is constructed as follows: Define the centerline of the water level In the formula, The moving average period is... for The water level at that moment; Define the upper rail of the water level ; Define the lower water level rail ; In the formula, is the standard deviation of the water level series, and k is the coefficient; Introducing physical constraints: ≤Normal water level ≥Dead water level; The decision-making rules are as follows: if the water level touches or exceeds the upper rail, it indicates that the water level is too high and water release should be increased; if the water level touches or exceeds the lower rail, it indicates that the water level is too low and water release should be controlled; if the water level is within the rail, it will be operated according to the regular scheduling rules.

5. The reservoir scheduling decision-making method based on multi-factor situation indicators according to claim 1, characterized in that, This also includes constructing moving average trend indicators and exponentially weighted moving average indicators: Moving average trend indicator: Calculate moving averages for different periods for inflow or reservoir water level to identify the trend of abundant or scarce water. The decision rules are as follows: when the short-term moving average crosses above the long-term moving average, the water inflow trend is positive, and water storage should be increased; when the short-term moving average crosses below the long-term moving average, the water inflow trend is negative, and water release should be controlled; short-term > medium-term > long-term, water inflow is abundant; short-term < medium-term < long-term, water inflow is insufficient. Exponentially weighted moving average indicator: It assigns high weight to recent inflow or water level, enabling the indicator to respond more quickly to short-term changes in runoff; the decision-making rules are the same as those for moving average trend indicators.

6. The reservoir scheduling decision-making method based on multi-factor situation indicators according to claim 1, characterized in that, This also includes constructing water level location indicators: The position of the current water level in the recent fluctuation range is determined by the relative position of the current water level within the range of the highest and lowest water levels in a set period. This is composed of a fast line K, a slow line D, and a sensitive line J. The decision-making rules are as follows: when the values ​​of K, D, and J are all greater than 75, the water level is at a recent high level, and water release should be increased; when the values ​​of K, D, and J are all less than 25, the water level is at a recent low level, and water release should be controlled; when the values ​​of K, D, and J are between 25 and 75, normal scheduling should be implemented; when the D line turns from bottom to top, the water level rises, and when the D line turns from top to bottom, the water level falls; 50 is the equilibrium reference line.

7. The reservoir scheduling decision-making method based on multi-factor situation indicators according to claim 1, characterized in that, This also includes constructing water volume kinetic energy indicators: Define water kinetic energy index ; In the formula, for The amount of water discharged or discarded at any given time; When the water level rises ; When the water level drops ; When the water level remains unchanged ; The decision-making rule is as follows: When the water level changes in the same direction as the water level, the water storage and release are supported by available capacity, and the trend is healthy. When the water level deviates from the actual water volume, the water level change lacks support from the actual water volume and may reverse.

8. A reservoir scheduling decision-making method based on multi-factor situation indicators according to claim 1, characterized in that, The pre-defined collaborative decision-making rules are as follows: When the water storage pressure index (SPI) is greater than 75, it is in the high water storage pressure zone, and the water level is near the upper rail. Water release is the basic principle of water release. When the trend signal is a deteriorating trend, water release is increased. When the trend signal is a positive trend, water release is moderately increased. When the water storage pressure index (SPI) is less than 25, it is in the low water storage pressure zone, and the water level is near the lower rail. The scheduling principle is to store water or control the release of water. When the trend signal is a deteriorating trend, the release of water should be strictly controlled. When the trend signal is a positive trend, the water storage should be increased. When the water storage pressure index (SPI) is between 25 and 75, it is in the equilibrium zone. Normal water supply is the basic principle of water management. When the trend signal is positive, normal water supply and moderate water storage are implemented. When the trend signal is negative, normal water supply and moderate control are implemented.

9. A reservoir scheduling decision-making method based on multi-factor situation indicators according to claim 1, characterized in that, The target outbound flow is as follows: ; In the formula, For the target outbound flow, For inbound flow, For evaporation and leakage losses, This is the current water storage level. For the target water storage capacity, This represents the length of the time period.

10. A reservoir scheduling decision-making system based on multi-factor situation indicators, characterized in that, The reservoir scheduling decision-making method based on multi-factor situation indicators according to any one of claims 1-9 includes: The data acquisition module is used to acquire the water level-storage capacity relationship curve, water level-discharge capacity relationship curve, historical inflow sequence, water demand process of various departments, and characteristic water level of the target reservoir. The indicator calculation module, connected to the data acquisition module, is used to calculate the water storage pressure index (SPI), supply and demand trend index, and water level fluctuation index. The collaborative decision-making module, connected to the indicator calculation module, determines the scheduling decision based on a combination of three factors: the situation range of the water storage pressure index SPI, the trend signal of the supply and demand trend indicator, and the water level position determined by the water level fluctuation indicator, according to the preset collaborative decision-making rules. The robust processing module, connected to the collaborative decision-making module, determines whether the indicator signal is functioning correctly based on the relationship between the water inflow forecast error and the preset threshold. The instruction generation module, connected to the robust processing module, determines the target water storage volume based on the scheduling decision, calculates the target outflow, and outputs it as a gate opening instruction or a unit output instruction.