An energy distribution method for an intelligent portable energy storage device
By identifying and scheduling short-term high-power events in portable energy storage devices, and combining battery and path capabilities, the output matching problem caused by load uncertainty is solved, enabling reasonable allocation of load demand and resource utilization.
Patent Information
- Application Number
- CN202611594114.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-15
- Publication Date
- 2026-11-10
AI Technical Summary
Existing portable energy storage devices struggle to accurately match subsequent short-term high power demands when faced with temporary and uncertain loads, leading to inverter current limiting, bus voltage drops, or protection activation. Furthermore, the long-term retention of peak margin results in idle output capacity.
By identifying candidate short-term high-power events at the output port, and combining battery status and power conversion path capabilities, the system can reserve output capacity for future short-term high-power demands, provide assurance when the event occurs, and allow the system to rejoin normal load sharing after the event is resolved.
Dynamically matching the output capacity of energy storage devices reduces the risk of start-up failure and overload, minimizes idle output capacity, and achieves a reasonable allocation of load demand.
Smart Images

Figure CN123073231A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of intelligent portable energy storage devices, and particularly relates to an energy distribution method and system for intelligent portable energy storage devices. Background Technology
[0002] Portable energy storage devices typically integrate battery packs, battery management units, inverter units, DC-DC converters, and multiple AC, DC, and charging output ports. They can simultaneously power various electrical devices in scenarios such as outdoor work, home emergency response, mobile offices, construction sites, and vehicle-mounted power replenishment. When distributing energy, existing portable energy storage devices usually determine the power available to each load based on the battery's state of charge, the current total output power, the allowable output capacity of each output path, and a preset port control sequence. When the total load approaches the continuous output capacity or reaches the protection boundary, they maintain overall operation by limiting the power of some ports, temporarily suspending the connection of new loads, or implementing overload protection. This control method primarily reflects the current load status. It can meet basic power supply needs for loads with relatively stable power changes, such as lighting equipment, laptops, and charging devices. However, the actual loads of portable energy storage devices are typically highly temporary and uncertain. For example, the power output of refrigerator compressors, water pumps, power tools, air compressors, and other equipment with motors or periodic operating mechanisms may be significantly lower during stable operation than during short-term startup or periodic operation. Furthermore, short-term high-power events of the same load often recur during subsequent operation, with time intervals between events, and are also subject to time drift due to actual operating conditions. If the energy storage device still treats all currently unused output capacity as allocable power for ordinary loads, the connection of new loads or the increase in power of existing loads may prematurely occupy the power space required for the next short-term operation of the original periodic load. When the short-term event actually occurs, even if the device still has a significant amount of remaining power, insufficient short-term output capacity of the entire device or the short-term carrying capacity of the power conversion path at the target port may lead to inverter current limiting, bus voltage drop, interruption of the startup process, or protection activation. If a long-term fixed peak margin is maintained, the limited output capacity of portable energy storage will remain idle for most of the operating time without short-term events. At the same time, the short-term output capacity that portable energy storage can undertake is also affected by the current state of charge, battery temperature, minimum single-cell voltage, current total output load, current load of the power conversion path, and the continuous process that needs to be maintained for short-term high power. The actual power that the same device can reserve for future events is different under different operating conditions. It is difficult to accurately correspond to the actual carrying capacity when an event occurs by reserving power directly based on the rated peak power of the product.
[0003] Therefore, the practical engineering problems that existing energy allocation methods need to further address are: how to form subsequent short-term power demands with time characteristics from the port power behavior that has already occurred, and how to match these demands with the short-term output capacity that the device can actually undertake when the event is approaching; how to make the reserved power that has already undertaken subsequent power supply tasks exit the free allocation range of ordinary loads within an appropriate time, and re-participate in allocation after the corresponding event ends or the expected occurrence period fails, so that the power use of the current ordinary loads and the subsequent short-term high power demands can be coordinated within the output capacity range of the same portable energy storage system. Summary of the Invention
[0004] The purpose of this invention is to propose an energy distribution method and system for an intelligent portable energy storage device to solve the above-mentioned problems.
[0005] To achieve the above objectives, a first aspect of the present invention provides an energy distribution method for an intelligent portable energy storage device, the method comprising the following steps: S1. Obtain the actual output power of each output port according to a pre-set fixed sampling period and establish a recent continuous power record. Based on the increase and duration of the highest actual output power recorded in the recent continuous power record and the reference power of the stable operation period before the event, identify candidate short-term high-power events of the same output port to form power events to be guaranteed. The power events to be guaranteed include output port identifier, expected occurrence time range, guaranteed power, and guaranteed duration. S2. Based on the power event to be guaranteed, and in conjunction with the current state of charge, battery temperature, minimum single-cell voltage, current total output power, and the current output power of the power conversion path where the target port is located, confirm the actual guaranteeable power of the current power event to be guaranteed, so as to form a guaranteeable event result; the guaranteeable event result includes the corresponding output port, the expected occurrence time range, the actual guaranteeable power, and the corresponding guarantee duration; S3. Based on the guaranteed event result and combined with the preset reservation control preparation period, determine the time when the power reservation status begins to take effect, so as to generate the power reservation status associated with the corresponding output port, and switch the reservation stage at the end of the corresponding expected occurrence time range. S4. In each power control cycle, read the corresponding power reservation status, combine the continuous output limit and the short-term total output limit corresponding to the guaranteed duration to determine the free and allocable power that the ordinary load can currently use, execute the actual power control of each output port, and after the reservation is released, the corresponding power is re-included in the ordinary load allocation.
[0006] Furthermore, the identification of candidate short-time high-power events at the same output port specifically includes: The continuous power records of the same output port are processed in the order of sampling time. When the actual output power in multiple consecutive sampling periods is within the pre-calibrated normal fluctuation range and is continuously maintained to reach the preset sampling number, the corresponding continuous record is determined as a stable operating segment, and the average value of each sampled power in the corresponding stable operating segment is taken as the steady-state reference power. Continue reading subsequent power records. When the increase in actual output power relative to the steady-state reference power reaches the preset minimum effective change condition and is continuously maintained at the preset number of samples, the sampling position that first meets the condition is determined as the start position of the candidate short-term high-power event. When the output power re-enters the normal fluctuation range and is continuously maintained at the preset number of samples, the last effective sampling position before returning to the stable state is determined as the end position of the event. The duration of an event is determined by continuous sampling records between the start and end positions, and the highest value is obtained from all actual output power records during the event as the candidate event peak power. The difference between the peak power and the steady-state reference power is used as the additional power demand for the corresponding candidate short-term high-power event.
[0007] Furthermore, after executing the candidate short-time high-power events at the same output port, a repeatability check is performed on the candidate short-time high-power events, specifically as follows: Using the most recently occurring candidate short-term high-power event as the current comparison benchmark, other recent candidate short-term high-power events are compared one by one. When the newly added power demand falls within the allowable difference range set around the current comparison benchmark, and its duration also falls within the corresponding allowable difference range, the current candidate short-term high-power event is recorded as a similar valid event. When the number of similar valid events reaches a preset number, the highest valid new power demand is selected as the guaranteed power, and the longer duration is selected from the valid duration of normal recurrence as the guaranteed duration.
[0008] Furthermore, the expected time range of the power event to be guaranteed is determined in the following manner: The actual occurrence interval between adjacent events is obtained according to the occurrence order of the similar valid events, and the shorter and longer valid intervals are obtained from the intervals of the most recent adjacent valid events. Using the actual start time of the most recent valid event as the time reference, the time corresponding to the shorter valid interval is determined as the front boundary of the expected occurrence time range, and the time corresponding to the longer valid interval is determined as the back boundary of the expected occurrence time range. In combination with a fixed sampling period, a time margin matching the sampling dispersion is reserved for the two boundaries.
[0009] Furthermore, the confirmation of the actual guaranteeable power of the current power event to be guaranteed specifically includes: Based on the current state of charge, battery temperature and minimum single cell voltage, query the total short-term output capacity of the whole machine corresponding to the guarantee level, and subtract the current total output power and the recent power fluctuation occupancy to obtain the short-term power space of the whole machine. The actual power conversion path is determined based on the corresponding output port of the event to be protected, and the short-time power space on the path side is obtained by subtracting the current actual output power of the path from the short-time output capacity allowed by the corresponding path. The lowest of the short-time power space on the whole machine side and the short-time power space on the path side is taken as the short-time power available for the event. Then, the minimum of the short-time power available for the event and the guaranteed power is taken as the actual guaranteed power.
[0010] Furthermore, the total permissible short-time output capability of the entire machine and the permissible short-time output capability of each channel are obtained through product calibration data, and the calibration method is as follows: Within different states of charge and temperature ranges, external loads are applied in stages according to different short-term duration levels. The highest total external output that can fully maintain the corresponding continuous process and is within the product design operating boundary is recorded as the calibrated short-term total output capability under the corresponding state range and duration level. When the guaranteed duration is between two duration levels, the longer level that can fully cover the guaranteed duration is adopted.
[0011] Furthermore, the step of determining the moment when the power reservation status takes effect based on the guaranteed event outcome and a pre-set reservation control preparation period is as follows: The moment when the power reservation state begins to take effect is obtained by subtracting the reservation control preparation period from the front boundary of the expected occurrence time range; the reservation control preparation period is determined by the longer normal response time required for each output control unit to complete power limiting, branch holding or branch disconnection and enter stable control state after the main controller issues the power constraint command, and at least one control cycle is reserved as state switching margin. When the current time reaches the start time, a corresponding reservation record is generated, and the corresponding output port, reservation power, expected occurrence time range and guarantee duration are written, and the current reservation stage is set to reservation effective; the reservation power is taken as the actual guaranteeable power in the reservation effective and event occupancy stages.
[0012] Furthermore, the step of switching the reservation phase at the end of the corresponding expected occurrence time range includes: Once the current time enters the expected occurrence time range, the actual output power of the corresponding output port is continuously read. When the port continuously experiences a power increase that matches the repeated short-term high-power events and reaches the effective change condition and continuous sampling condition, the sampling time when the conditions are first met is recorded as the actual start time of the event, and the current reservation stage is changed from reservation effective to event occupation. During event occupancy, the reserved power remains at the actual guaranteed power. When the current event has covered the guaranteed duration, and the actual power of the corresponding port has returned to the normal fluctuation range corresponding to the stable operating level before the event and has been continuously maintained at the preset sampling number, the current reservation stage is converted to reservation cancellation; when the event starts near the end of the expected occurrence time range, the reservation status continues until the guaranteed duration is fully covered and the event is confirmed to have ended. For reservation records where the corresponding event has not occurred by the end of the expected occurrence time range, the reservation will be directly converted to a cancellation when the boundary of the expected occurrence time range is reached. After the reservation is cancelled, the current reservation power will be set to zero.
[0013] Furthermore, the determination of the freely allocable power currently available to a normal load by combining the continuous output limit and the short-term total output limit corresponding to the guaranteed duration includes: Read the maximum continuous output that the device is allowed to maintain for a long time under the current operating state, as well as the maximum short-term total output determined based on the current state of charge, battery temperature, minimum single-cell voltage, and the duration of this protection. The freely distributable power is determined according to the following formula: ; in, This refers to the freely distributable power that can be used by ordinary loads during the current control cycle. This represents the upper limit of the continuous output that the device is allowed to maintain for an extended period under the current operating conditions. This represents the short-term total output limit that matches the guaranteed duration of the current scheduled event. The current reserved power; Summarize the power actually used by the current ordinary load and compare it with the free allocable power; when the actual power used by the ordinary load is lower than the free allocable power, the remaining part between the two is taken as the ordinary load power that can be increased in the current control cycle.
[0014] Furthermore, the execution of actual power control for each output port, and the redistribution of the corresponding power to normal load distribution after the reservation is lifted, includes: When the reservation phase is converted to event-occupied, the corresponding output port recorded in the reservation status is allowed to use the current reserved power. The stable operating power of the corresponding port before the event occurs is still included in the actual power of the normal load. After the event occurs, the increase in power relative to the original stable operating level will be given priority to the reserved power. If the actual new demand of the event exceeds the current reserved power, the free power space that has not yet been actually occupied by the normal load will be used, provided that the current short-term total output limit is met. When the reserved power and the immediate idle power are still insufficient to cover the actual demand of the event, the actual output of the corresponding port will be limited according to the current short-term output boundary. When the reservation phase is converted to reservation cancellation, the current reserved power becomes zero. In the next control cycle, the free allocable power is re-determined, and the short-term output space reserved for events awaiting protection re-participates in normal load distribution. For adjustable ports that are restricted but still maintain power requests, their allowed output is increased again according to the product's established power recovery control sequence. For output branches that are in a waiting-to-be-connected state, they are allowed to be connected after the current free power meets the access conditions.
[0015] The beneficial technical effects of the present invention are at least as follows: This invention utilizes recurring short-term power variations observed during recent operation of each output port to determine potential short-term high-power demands and their expected durations. Based on the duration of these demands, combined with the battery's operating status near the event, the current overall output, and the short-term load capacity of the power conversion path containing the target port, the invention determines the actual support capability that the device can provide for that specific event. Furthermore, it establishes a time-related relationship between the confirmed power capacity and the corresponding output port and the expected duration, creating a clear reservation status for this output capacity during the event's approach. This also redefines the output range currently usable by ordinary loads. When the corresponding short-term high-power event actually occurs, the reserved power space is used to support the actual short-term output of the target port. Once the event concludes or the expected duration ends, the reservation is lifted, and the device rejoins the power allocation for ordinary loads. By continuously linking the formation of subsequent short-term power demand, the determination of current guaranteed capacity, power reservation with time boundaries, and actual port power control, this invention can dynamically distinguish between the output capacity that has already undertaken subsequent tasks and the output capacity that can be freely used at present, based on the current actual load status of portable energy storage. This reduces the risk of start-up failure and overload caused by ordinary loads occupying the power space required for short-term events in advance, while also reducing the idle output capacity caused by long-term fixed retention of peak power. This allows limited battery and power conversion capabilities to be more rationally and practically allocated between continuous loads and repetitive short-term high-power loads. Attached Figure Description
[0016] The present invention will be further described with reference to the accompanying drawings, but the embodiments in the drawings do not constitute any limitation on the present invention. For those skilled in the art, other drawings can be obtained based on the following drawings without creative effort.
[0017] Figure 1 This is a flowchart illustrating an energy distribution method for an intelligent portable energy storage device according to an embodiment of the present invention. Detailed Implementation
[0018] Embodiments of the present invention are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.
[0019] like Figure 1 As shown in the figure, an embodiment of the present invention provides an energy distribution method for an intelligent portable energy storage device, the method comprising: S1. Obtain the actual output power of each output port according to a pre-set fixed sampling period and establish a recent continuous power record. Based on the increase and duration of the highest actual output power recorded in the recent continuous power record and the reference power of the stable operation period before the event, identify candidate short-term high-power events of the same output port to form power events to be guaranteed. The power events to be guaranteed include the output port identifier, the expected occurrence time range, the guaranteed power, and the guaranteed duration.
[0020] Specifically, the main controller of the portable energy storage device acquires the actual output power of each output port according to a pre-set fixed sampling period and establishes a recent continuous power record for each output port. For AC output ports, the voltage and current detection values at the same sampling moment are obtained from the existing output voltage and current detection channels of the inverter unit. The output voltage is obtained by an isolated voltage sampling circuit, and the output current is obtained by a Hall current sensor, a current sampling resistor, or a current detection circuit configured in the inverter unit. The sampled signals are conditioned and then enter the inverter controller or main controller, which determines the actual output power of the AC output port based on the voltage and current detection values at the same moment. For DC output ports, the detection results are obtained from the output voltage and current detection channels of the corresponding DC-DC converter unit, and then the DC-DC converter unit or the main controller determines the actual output power of the port. For charging output ports that support power negotiation, the actual output power detected by the port control chip or the DC-DC converter unit is used as the recorded value. Each record includes the output port identifier, sampling time, and corresponding actual output power. Each output port has an independent cyclic recording area. New sampled data is written in chronological order, and the earliest record is overwritten after the storage length is reached, ensuring that the main controller can always obtain the recent continuous power change process of each port. The values for power records, power differences, power comparisons, and power limits mentioned in this specification all use the same power caliber from the external output side of the portable energy storage device. Unless otherwise specified in the embodiments, the unit is watts. For example, when the device has multiple AC output ports and multiple DC output ports, each physical output port corresponds to a set of independent recent power records, and subsequent event judgments are performed continuously along the time sequence of the same port.
[0021] Furthermore, the main controller processes continuous power records from the same output port from earliest to latest sampling time, first determining the stable operating segment before the occurrence of a candidate short-term high-power event. When the actual output power within multiple consecutive sampling periods is within the pre-calibrated normal fluctuation range and continuously reaches the preset sampling number, this continuous record is defined as the stable operating segment, and the average level of each sampled power within the stable operating segment is taken as the steady-state reference power used for subsequent event judgment. The normal fluctuation range and the continuous sampling number required for stable operation are determined during the product development stage based on the output detection error and the actual power changes during multiple runs of a typical stable load, and are fixed in the control program. Subsequently, subsequent power records for this port are read. When the increase in actual output power relative to the steady-state reference power reaches the pre-set minimum effective change condition and continuously reaches the preset sampling number, the sampling position that first meets the condition is determined as the start position of the candidate short-term high-power event. After the event begins, subsequent records are continuously read. When the output power re-enters the normal fluctuation range corresponding to the steady-state reference power and continuously reaches the preset sampling number, the last effective sampling position before returning to a stable state is determined as the end position of the event. The duration of an event is determined by the time covered by continuous sampling records between the start and end positions, and the highest value among all actual output power records during the event is taken as the candidate event peak power. The stable operating state before the event occurs at the same port is used as the judgment benchmark, so that external loads with different power levels can determine short-term power changes according to their own actual operating states.
[0022] Furthermore, the power required for subsequent protection during candidate short-term high-power events is the additional power demand during the event period. This is calculated based on the difference operation in basic mathematics and the power increment relationship represented by "power after change minus the baseline power before change" during electrical operation. This application specifically applies this basic relationship to strip away the steady-state load already continuously borne by the portable energy storage device before the event occurred, extracting only the additional output demand added during the short-term event. The calculation relationship is as follows: ; in, This represents the additional power demand of the current candidate short-term high-power event relative to the stable operating state before the event occurred. Its value is obtained by subtracting the peak power of the current candidate event from the corresponding steady-state reference power. This indicates the highest actual output power recorded between the start and end positions of the current candidate event, which is directly obtained from the continuous power sampling records of this output port; This represents the steady-state reference power during the stable operation period before the current candidate event occurred, determined by the average level of the sampled power within that stable operation period. All three variables mentioned above represent power quantities under the same port and power caliber; therefore, the dimensions are consistent before and after the difference calculation. Taking an actual operation process of an AC output port as an example, the power obtained from continuous stable operation records before the event occurred... It was 200, and then detected during a short period of increase. If it is 950, then according to the above relationship, we get The value is 750; this 750 corresponds to the increased output demand of the event relative to the original stable load, and therefore serves as the data for subsequent repetitive evaluation as a candidate event. By processing other candidate events on the same port in the same way, the increased power demand and duration of each event can be obtained.
[0023] Furthermore, the main controller continues to process recently extracted candidate short-term high-power events from the same output port, and determines events with stable repetitive characteristics based on the new power demand, duration, and timing of the event. Using the most recently occurring candidate event as the current comparison benchmark, other recent candidate events are compared one by one. When the new power demand falls within the allowable difference range set around the current comparison benchmark, and the duration also falls within the corresponding allowable difference range, the candidate event is recorded as a similar valid event. The allowable difference range is predetermined based on the power detection error and the normal discrete range formed by multiple whole-machine tests during typical startup processes. The preset number of similar valid events required is determined and solidified during the whole-machine commissioning phase based on the product's recent record length, periodic load misidentification control requirements, and timely pre-response. As the number of similar valid events reaches the preset number, the main controller treats these events as recently recurring short-term high-power behaviors from the same output port, selecting the highest valid new power demand as the guaranteed power, and selecting the longer duration from the normally recurring valid duration as the guaranteed duration. For example, if a port recently receives three similar valid events with new power demands of 710, 740, and 750 respectively, and their durations are all within a similar range, then 750 is taken as the current guaranteed power, and the longer normal duration of the three valid events is taken as the guaranteed duration. The higher valid demand that has actually occurred recently is used to ensure that the resulting guaranteed power can cover the short-term demand level that has actually occurred at the port recently. Records where candidate events deviate significantly from the allowable difference range are retained as independent operation records, and corresponding repetitive behavior judgments are re-formed when similar events occur again.
[0024] Furthermore, after determining the guaranteed power and guaranteed duration, the main controller obtains the actual occurrence intervals between adjacent events according to the order of occurrence of similar valid events, and uses the most recent valid occurrence intervals to determine the expected occurrence time range of the next event. Specifically, it obtains the shorter and longer valid intervals from the intervals of recent adjacent valid events, uses the actual start time of the most recent valid event as the time reference, determines the time corresponding to the shorter valid interval as the front boundary of the expected occurrence time range, and determines the time corresponding to the longer valid interval as the back boundary of the expected occurrence time range, and retains a time margin matching the sampling dispersion for the two boundaries in combination with a fixed sampling period. For example, if the occurrence intervals between recent similar valid events on the same port are successively close to eighteen, nineteen, and twenty reference time periods, then taking the most recent valid event as the starting point, the time after nearly eighteen reference time periods is taken as the front part of the expected occurrence range of the next event, and the time after nearly twenty reference time periods is taken as the back part of the expected occurrence range, thus forming a future event interval with time width. For refrigeration equipment, circulating pumps, and loads with cyclical operating characteristics, changes in their operating conditions can cause normal drift between adjacent start-up times. Using the most recent actual interval to form a time range can allow subsequent power reservations to cover this operational drift.
[0025] Finally, the main controller combines the output port identifier of the repeated valid event, the expected occurrence time range, the guaranteed power, and the guaranteed duration to form the power event to be guaranteed; when a new similar valid event is subsequently generated at the output port, the new event is added to the recent valid event record and the above content is updated according to the same rules.
[0026] S2. Based on the power event to be guaranteed, and in conjunction with the current state of charge, battery temperature, minimum single-cell voltage, current total output power, and the current output power of the power conversion path where the target port is located, confirm the actual guaranteeable power of the current power event to be guaranteed, so as to form a guaranteeable event result; the guaranteeable event result includes the corresponding output port, the expected occurrence time range, the actual guaranteeable power, and the corresponding guarantee duration.
[0027] Specifically, the main controller receives the power-to-be-guaranteed event generated in step one and reads the corresponding output port, expected occurrence time range, guaranteed power, and guaranteed duration. The expected occurrence time range is used to determine the time position at which the guarantee capability assessment needs to be completed. The corresponding output port is used to determine the inverter path or DC-DC converter path through which the power to be guaranteed actually passes. The guaranteed duration is used to select a short-term output capability boundary that matches the duration of the event. The guaranteed power is used to limit the actual increase in output demand required for this event.
[0028] Furthermore, during the product commissioning phase, a pre-determined pre-control preparation period is established. This period, determined after the main controller issues a power constraint command, represents a relatively long normal response time required for the various output control units supported by the device to complete power limiting, branch holding, or branch disconnection and enter a stable control state. At least one control cycle is reserved as a state switching margin. The main controller completes the assurance capability assessment before the expected occurrence time range's boundary arrives, ensuring that the assurance event result is formed earlier than the time corresponding to "subtracting the pre-control preparation period from the expected occurrence time range's boundary," thus ensuring sufficient pre-control preparation time even after obtaining the actual assurance power in step three.
[0029] When entering the capability judgment phase, the main controller reads the current state of charge, battery temperature, and individual cell voltage detection results provided by the battery management unit in the same control cycle. The battery temperature is the highest detection value among all effective temperature detection locations, and the individual cell voltage is the lowest detection value among all effective individual cell voltage detection results. At the same time, it reads the actual output power of each working output port and sums them to obtain the current total output power. Then, based on the corresponding output port of the event to be guaranteed, it queries the preset correspondence between the port and the power conversion path formed by the product hardware connection relationship and the port configuration table, and sums the actual power of each output port that has passed through the power conversion path to obtain the output power that the path has currently undertaken.
[0030] Furthermore, portable energy storage devices establish short-time output capability calibration data during product development and overall calibration. During calibration, the same battery pack, power connection structure, and power conversion hardware as the actual product are used. The battery pack is adjusted to different states of charge (SOC) and temperature ranges. The lowest single-cell voltage before loading is recorded within each SOC range, and external loads are applied progressively according to the different short-time duration levels required by the product. For a given duration level, the total external output is increased progressively from a stable output state. Each load level maintains the complete corresponding duration, and the lowest single-cell voltage, battery management unit discharge allowable state, and overall output state are recorded simultaneously during loading. The highest total external output that can completely maintain this duration and remains within the product design operating boundaries is recorded as the calibrated short-time total output capability for the corresponding SOC range and duration level. The inverter path and DC-DC conversion path undergo path loading tests at the same duration level to form the corresponding calibrated path short-time output capability. During operation, the main controller locates the corresponding calibration range based on the current SOC, battery temperature, and lowest single-cell voltage, and selects the duration level that can completely cover the duration given in step one. When the protection duration falls between two duration levels, the longer level that can fully cover the protection duration is adopted. The main controller further reads the upper limit of the overall machine output and the corresponding upper limit of the corresponding path output under the same operating conditions of the current power control system, and compares them with the calibration results respectively. The lower result is used as the overall machine's allowable short-time total output capability and the path's allowable short-time output capability for this capability assessment, so that the short-time capability boundary adopted in step two is consistent with the output boundary adopted in the subsequent actual power control.
[0031] Further, after obtaining the total allowable short-term output capacity of the entire machine, the main controller subtracts the current total output power to obtain the short-term output space of the entire machine that is not yet occupied by actual load. Simultaneously, it reads the total output power records stored over several consecutive sampling periods prior to the capability judgment time, using the positive increase of the highest total output power during the observation period relative to the current total output power at the end of the observation period as the recent power fluctuation occupancy, and continues to subtract this portion of power from the short-term output space of the entire machine. When the result after subtraction is less than zero, the short-term power space available for the current event to be guaranteed on the entire machine side is determined to be zero. Subsequently, based on the actual power conversion path corresponding to the event to be guaranteed, the actual output power currently borne by that path is subtracted from the allowable short-term output capacity of that path; when the result after subtraction is less than zero, the short-term power space that can continue to increase on the path side is determined to be zero. Finally, the short-term power space on the entire machine side and the short-term power space on the path side are compared, and the lower of the two is taken as the short-term power available for the event as described below. This process ensures that the additional power from the event to be protected is constrained by both the overall power supply capacity and the power conversion path of the target port, and explicitly limits all available power entering subsequent comparisons to non-negative values.
[0032] Furthermore, after obtaining the available short-term power for the event, it is matched with the guaranteed power output in step one. The final calculation relationship used in this step is derived from the minimum value operation in mathematics and the upper limit constraint of the electrical system's demand. That is, the power that can actually be reserved for a certain load event cannot exceed the guaranteed power required by the event itself, nor can it exceed the available short-term power for the event that the current power supply path can provide. Based on this, the specific event demand formed in step one is matched with the power capacity after being jointly limited by the overall machine status, recent load fluctuations, and actual output paths in this step, resulting in: ; in, This represents the actual guaranteed power of the current power event to be guaranteed, which is calculated by this formula and written into the guaranteed event result. This refers to the guaranteed power in the power event to be guaranteed formed in step one, which is derived from the additional power demand determined by step one for the recent repeated valid short-term high-power events at the same output port. The available short-time power for this event is obtained as follows: First, based on the current state of charge, battery temperature, minimum single-cell voltage, and guaranteed duration, query the total allowable short-time output capacity of the entire unit. Subtract the current total output power and the recent power fluctuations to obtain the short-time power space on the unit side. Then, determine the actual power conversion path based on the corresponding output port. Subtract the current output power of the path from the allowable short-time output capacity of the path to obtain the short-time power space on the path side. Finally, take the lower of the short-time power space on the unit side and the short-time power space on the path side. , and Both represent the power corresponding to the same event to be protected, and use the same power unit and output side diameter, so the minimum value can be directly compared.
[0033] Understandably, taking the power guarantee event corresponding to a certain AC output port as an example, step one is to determine the event... The value is 750, and the corresponding protection duration is determined. After entering the capability assessment period, the calibration range corresponding to the current state of charge, battery temperature, and lowest single-cell voltage gives the total allowable short-term output capability of the whole machine under this protection duration level as 2,000. The current total output power after summing the actual power of each output port is 1,300, so the initial short-term power space of the whole machine is 700. During the continuous observation period before the capability assessment, the highest total output power reached 1,330, and the current total output power at the end of the observation period is 1,300. Therefore, the recent power fluctuation occupancy is 30, and the short-term power space available for this event on the whole machine side is 670. The short-term output capability allowed by the inverter path where this AC output port is located under the same protection duration level is 1,800, and the actual output power currently undertaken by this inverter path is 1,000. Therefore, the short-term power space that can be further increased on the path side is 800. Comparing 670 and 800, the available short-term power for the event is... Take 670; further... With step one By comparing the above relationships, we can obtain... The result is 670. If the same processing is performed under another operating state... It is 820, and the corresponding step one is... It remains 750, then The value is set at 750, allowing the remaining output capacity exceeding the requirements of this specific event to continue participating in the power allocation of subsequent ordinary loads.
[0034] Furthermore, the main controller combines the corresponding output port and expected occurrence time range input from step one with the actual guaranteed power and the original guaranteed duration obtained in this step to form a guaranteed event result, which serves as the complete input for step three. Specifically, the corresponding output port is used in step three to determine the physical output port corresponding to the reserved power; the expected occurrence time range is used to determine the time boundary for the reserved power to enter the effective state; the actual guaranteed power is used to determine the power level that can be actually included in the reserved state in step three; and the guaranteed duration is used to maintain consistency between this reservation and the short-term event duration requirement identified in step one.
[0035] S3. Based on the guaranteed event result and the preset reservation control preparation period, determine the time when the power reservation status takes effect, so as to generate the power reservation status associated with the corresponding output port, and switch the reservation stage at the end of the corresponding expected occurrence time range.
[0036] Specifically, the main controller receives the guaranteed event result generated in step two and reads the corresponding output port, expected occurrence time range, and actual guaranteed power. And the guaranteed duration. The corresponding output port is used to determine the actual physical port served by this reservation, the estimated occurrence time range is used to determine the effective and waiting boundaries of the reservation status, and the actual guaranteed power. The target power that can be reserved for this event is used to define the process by which the reserved power needs to be maintained after the event actually occurs. During the product commissioning phase, a pre-determined reservation control preparation period is established. This period is determined by the relatively long normal response time required from the issuance of the power constraint command by the main controller to the output control unit supported by the device, from the command's issuance to the completion of the corresponding port power limiting, branch holding, or branch disconnection actions and the attainment of a stable state. Step two has already ensured that the guaranteed event result is formed before the reservation start time. Therefore, after obtaining the guaranteed event result, the main controller subtracts the reservation control preparation period forward from the front boundary of the expected occurrence time range to determine the time when the power reservation state begins to take effect. This relationship originates from the forward preparation relationship of the time interval, meaning that the control action needs to reserve complete execution time before the target event may occur, expressed as: ; in, This indicates the moment when the power reservation status takes effect; This indicates the front boundary of the expected occurrence time range passed in step two, which is derived from the time information determined in step one based on the recent recurring valid event intervals at the same output port. This refers to the pre-determined and fixed reservation control preparation period during the product's overall debugging phase. The above time amounts use the same time unit or the same baseline time period, so they can be directly deducted. For example, if the expected occurrence time range's leading edge is located at the 30th baseline time period, and the corresponding product configuration's reservation control preparation period is 5 baseline time periods, then the reservation status will take effect from the 25th baseline time period, ensuring that step four has a complete set of 5 baseline time periods to convert the reservation into an actual output constraint.
[0037] Furthermore, when the current time arrives At that time, the main controller generates a reservation record corresponding to the result of the guaranteed event and writes it to the corresponding output port and the actual guaranteed power. The system defines the reserved power, the expected time range, and the guaranteed duration, and simultaneously sets the current reservation phase as the reservation effective. From this moment on, the actual guaranteed power... The current reserved power is provided to step four, which then creates a corresponding power space for the event within the actual output power budget. Once the current timeframe enters the expected occurrence time range, the main controller continuously reads the actual output power of the corresponding output port and uses the actual power of that port during its most recent stable operation phase before the event as the judgment benchmark. When the corresponding port continuously experiences a power increase matching the repetitive short-duration high-power events determined in step one (where similar valid events are individuals constituting a repetitive short-duration high-power event, and a repetitive short-duration high-power event is a description of the overall similar valid events reaching a preset number), and meets the valid change conditions and continuous sampling conditions adopted in step one, the sampling time when the conditions are first met is recorded as the actual start time of this event, and the current reservation phase is changed from reservation effective to event occupancy. In the event occupancy state, the reserved power remains the actual guaranteed power. Step four allows the corresponding port to use the previously allocated short-term power space.
[0038] Furthermore, for reservation records already in the event occupancy state, the main controller accumulates the event duration from the actual start time of the event and continuously monitors the actual power of the corresponding port. When the event has covered the guaranteed duration passed in step two, and the actual power of the port re-enters the normal fluctuation range corresponding to the stable operating level before the event and continuously maintains a preset sampling number, the current reservation stage is converted to reservation cancellation. When the event starts near the later boundary of the expected occurrence time range, the reservation state continues until the guaranteed duration is fully covered and the event is confirmed to have ended. For reservation records where the corresponding event has not occurred by the end of the expected occurrence time range, the reservation is directly converted to reservation cancellation when the later boundary of the expected occurrence time range is reached. After reservation cancellation, the current reserved power of the record is set to zero, allowing the corresponding power to re-enter the normal load allocation range in step four.
[0039] This step ultimately outputs the power reservation status, including the corresponding output port, current reserved power, estimated occurrence time range, guaranteed duration, and current reservation stage. The current reserved power is taken as the actual guaranteed power determined in step two during the reservation activation and event occupancy stages. The value is set to zero after the reservation is cancelled; the current reservation stage is used to distinguish between reservation activation, event occupancy, and reservation cancellation.
[0040] S4. In each power control cycle, read the corresponding power reservation status, combine the continuous output limit and the short-term total output limit corresponding to the guaranteed duration to determine the free and allocable power that the ordinary load can currently use, execute the actual power control of each output port, and after the reservation is released, the corresponding power is re-included in the ordinary load allocation.
[0041] Specifically, in each power control cycle, the main controller reads the power reservation status output in step three, including the corresponding output port, current reserved power, expected occurrence time range, guaranteed duration, and current reservation stage, and simultaneously reads the actual output power of each output port and the current power control boundary of the device. The current reserved power is denoted as... (The current reserved power is taken as the actual guaranteed power Pg determined in step two during the reservation effective and event occupancy phases, and is taken as zero after the reservation is cancelled.) Its value is directly taken as the reserved power in the current power reservation state in step three. The main controller obtains the allowed total output upper limit under continuous output conditions based on the current operating results of the battery management unit and the whole machine power control unit, and obtains the short-time total output upper limit corresponding to the current control cycle and the duration of the event based on the same short-time output capability calibration data used in step two, combined with the current state of charge, battery temperature, minimum single cell voltage, and the duration of this guarantee. The above continuous output upper limit and short-time total output upper limit both use the actual output side outside the device as a unified power caliber.
[0042] Furthermore, the power available to ordinary loads must be within the device's current continuous output capacity, and also reserve corresponding short-term output space for already effective scheduled events. Therefore, this step determines the current freely allocable power based on power budget constraints. This relationship stems from the total power constraint of the electrical system and the mathematical principle of taking the minimum value of an interval: ordinary loads are first limited by continuous output capacity, and the sum of ordinary loads and scheduled power must also be within the short-term output capacity corresponding to the duration of the event to be guaranteed. Therefore, we obtain: ; in, This indicates the freely distributable power that can be shared by ordinary loads during the current control cycle; This indicates the maximum continuous output that the device can maintain for an extended period under the current operating conditions, and is given by the existing power control unit based on the current battery and overall device status. This represents the short-term total output limit that matches the guaranteed duration of the current scheduled event in step three. Its acquisition method is consistent with the overall short-term capability boundary of the machine in step two, and is obtained according to the current operating status. This indicates the current reserved power output from step three. All the above power values use the same output-side power specification. This represents the short-term available power space after deducting reservations. During a given control cycle... For 1200, For 2000, When the value is 670, the short-term space after deducting reservations is 1330, therefore Take 1200; if the current short-term total output limit subsequently drops to 1700, then the short-term space after deducting reservations is 1030. The corresponding value is 1030. Thus, what is reserved is the peak space required by future short-term events, while ordinary continuous loads are still constrained by their own continuous output boundaries.
[0043] Furthermore, the main controller summarizes the power actually used by the current normal load and compares it with the freely allocable power. Comparison is needed when the actual power used by a typical load is lower than the freely available power. At that time, the remaining portion between the two is considered as the allowable increase in normal load power for this control cycle; for charging output ports and DC output ports that support power negotiation or continuous power regulation, the main controller will allow the output range to be directly written to the corresponding port control chip or DC-DC converter unit. After the reservation takes effect, if the existing normal load power is higher than the new one... If the output power is still exceeded after continuous adjustment, the output port with continuous power regulation capability will be reduced first, according to the pre-configured port control sequence of the product. Then, the output branches pre-configured for temporary suspension are disconnected or kept disconnected, thereby forming an actual usable reserved power space within the reservation control preparation period given in step three. For output ports that can obtain power requests through communication, new power requests are only executed when the remaining free power can cover the corresponding request; for loads connected to ordinary AC sockets that cannot report actual power before connection, the access power limit pre-set in the product configuration of the AC branch is used for access judgment. When the current remaining free power can cover the access power limit, the branch is allowed to be put into operation. After being put into operation, the actual detected power of the branch is immediately used to participate in the power allocation of subsequent control cycles. When the remaining free power is insufficient, the branch is kept in a waiting state.
[0044] When the current reservation phase in step three is converted to event occupancy, the main controller allows the corresponding output port recorded in the reservation status to use the current reserved power. The stable operating power of the port before the event is still included in the actual power of the normal load. The increase in power after the event relative to the original stable operating level will be prioritized using the reserved power. For example, if the original stable output of the target port was 200, and the actual output increased to 850 after the event, the new demand is 650. When the current reserved power is 670, this 650 will be covered by the reserved space, and the remaining reserved space will be maintained until the event is confirmed to have ended in step three. If the actual new demand after the event exceeds the current reserved power, then the current power will be used first. Under the premise of total power boundary, further utilize the free power space that has not yet been actually occupied by ordinary loads; when the reserved power and the immediate idle power are still insufficient to cover the actual needs of the event, limit the actual output of the corresponding port according to the current short-term output boundary.
[0045] After step three converts the current reservation stage into reservation cancellation... When the value becomes zero, the main controller re-obtains the value according to the above relationship in the next control cycle. Previously reserved short-term output space for events awaiting protection is re-engaged in normal load distribution. For adjustable ports that were previously restricted but still maintain power requests, their allowable output is increased again according to the product's established power recovery control sequence. For output branches waiting to be put into operation, they are allowed to be put into operation once the current free power meets the access conditions. This step ultimately forms and executes the actual power control results for each output port. For continuously adjustable ports, this is represented by the allowable output value sent to the corresponding inverter unit, DC-DC converter unit, or port control chip; for branch control ports, it is represented by the put-in, hold-out, or disconnected state. This process ultimately translates the power events awaiting protection formed in step one, the actual guaranteeable capacity determined in step two, and the time reservation established in step three into the actual energy distribution actions of the portable energy storage device.
[0046] Those skilled in the art will understand that, for the sake of convenience and brevity, the specific working processes of the systems, devices, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.
[0047] In the embodiments provided in this application, it should be understood that the disclosed systems, apparatuses, and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative; for instance, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection of apparatuses or units may be electrical, mechanical, or other forms.
[0048] If the aforementioned functions are implemented as software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or a portion of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of this application. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.
[0049] Although embodiments of the invention have been shown and described, those skilled in the art will understand that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the claims and their equivalents.
Claims
1. An energy distribution method for an intelligent portable energy storage device, characterized in that, The method includes: S1. Obtain the actual output power of each output port according to a pre-set fixed sampling period and establish a recent continuous power record. Based on the increase and duration of the highest actual output power recorded in the recent continuous power record and the reference power of the stable operation period before the event, identify candidate short-term high-power events of the same output port to form power events to be guaranteed. The power events to be guaranteed include output port identifier, expected occurrence time range, guaranteed power, and guaranteed duration. S2. Based on the power event to be guaranteed, and in conjunction with the current state of charge, battery temperature, minimum single-cell voltage, current total output power, and the current output power of the power conversion path where the target port is located, confirm the actual guaranteeable power of the current power event to be guaranteed, so as to form a guaranteeable event result; the guaranteeable event result includes the corresponding output port, the expected occurrence time range, the actual guaranteeable power, and the corresponding guarantee duration; S3. Based on the guaranteed event result and combined with the preset reservation control preparation period, determine the time when the power reservation status begins to take effect, so as to generate the power reservation status associated with the corresponding output port, and switch the reservation stage at the end of the corresponding expected occurrence time range. S4. In each power control cycle, read the corresponding power reservation status, combine the continuous output limit and the short-term total output limit corresponding to the guaranteed duration to determine the free and allocable power that the ordinary load can currently use, execute the actual power control of each output port, and after the reservation is released, the corresponding power is re-included in the ordinary load allocation.
2. The energy distribution method of an intelligent portable energy storage device according to claim 1, characterized in that, The identification of candidate short-time high-power events at the same output port specifically includes: The continuous power records of the same output port are processed in the order of sampling time. When the actual output power in multiple consecutive sampling periods is within the pre-calibrated normal fluctuation range and is continuously maintained to reach the preset sampling number, the corresponding continuous record is determined as a stable operating segment, and the average value of each sampled power in the corresponding stable operating segment is taken as the steady-state reference power. Continue reading subsequent power records. When the increase in actual output power relative to the steady-state reference power reaches the preset minimum effective change condition and is continuously maintained at the preset number of samples, the sampling position that first meets the condition is determined as the start position of the candidate short-term high-power event. When the output power re-enters the normal fluctuation range and is continuously maintained at the preset number of samples, the last effective sampling position before returning to the stable state is determined as the end position of the event. The duration of an event is determined by continuous sampling records between the start and end positions, and the highest value is obtained from all actual output power records during the event as the candidate event peak power. The difference between the peak power and the steady-state reference power is used as the additional power demand for the corresponding candidate short-term high-power event.
3. The energy distribution method of an intelligent portable energy storage device according to claim 1, characterized in that, After executing the candidate short-time high-power event for the same output port, a repeatability check is performed on the candidate short-time high-power event, specifically as follows: Using the most recently occurring candidate short-term high-power event as the current comparison benchmark, other recent candidate short-term high-power events are compared one by one. When the newly added power demand falls within the allowable difference range set around the current comparison benchmark, and its duration also falls within the corresponding allowable difference range, the current candidate short-term high-power event is recorded as a similar valid event. When the number of similar valid events reaches a preset number, the highest valid new power demand is selected as the guaranteed power, and the longer duration is selected from the valid duration of normal recurrence as the guaranteed duration.
4. The energy distribution method of an intelligent portable energy storage device according to claim 3, characterized in that, The expected time range of the power event to be guaranteed is determined in the following way: The actual occurrence interval between adjacent events is obtained according to the occurrence order of the similar valid events, and the shorter and longer valid intervals are obtained from the intervals of the most recent adjacent valid events. Using the actual start time of the most recent valid event as the time reference, the time corresponding to the shorter valid interval is determined as the front boundary of the expected occurrence time range, and the time corresponding to the longer valid interval is determined as the back boundary of the expected occurrence time range. In combination with a fixed sampling period, a time margin matching the sampling dispersion is reserved for the two boundaries.
5. The energy distribution method of an intelligent portable energy storage device according to claim 1, characterized in that, The confirmation of the actual guaranteeable power of the current power event to be guaranteed specifically includes: Based on the current state of charge, battery temperature and minimum single cell voltage, query the total short-term output capacity of the whole machine corresponding to the guarantee level, and subtract the current total output power and the recent power fluctuation occupancy to obtain the short-term power space of the whole machine. The actual power conversion path is determined based on the corresponding output port of the event to be protected, and the short-time power space on the path side is obtained by subtracting the current actual output power of the path from the short-time output capacity allowed by the corresponding path. The lowest of the short-time power space on the whole machine side and the short-time power space on the path side is taken as the short-time power available for the event. Then, the minimum of the short-time power available for the event and the guaranteed power is taken as the actual guaranteed power.
6. The energy distribution method of an intelligent portable energy storage device according to claim 5, characterized in that, The total permissible short-time output capacity of the entire machine and the permissible short-time output capacity of each channel are obtained through product calibration data. The calibration method is as follows: Within different states of charge and temperature ranges, external loads are applied in stages according to different short-term duration levels. The highest total external output that can fully maintain the corresponding continuous process and is within the product design operating boundary is recorded as the calibrated short-term total output capability under the corresponding state range and duration level. When the guaranteed duration is between two duration levels, the longer level that can fully cover the guaranteed duration is adopted.
7. The energy distribution method of an intelligent portable energy storage device according to claim 1, characterized in that, Based on the guaranteed event outcome and in conjunction with a pre-set reservation control preparation period, the time at which the power reservation status begins to take effect is determined, specifically as follows: The moment when the power reservation state begins to take effect is obtained by subtracting the reservation control preparation period from the front boundary of the expected occurrence time range; the reservation control preparation period is determined by the longer normal response time required for each output control unit to complete power limiting, branch holding or branch disconnection and enter stable control state after the main controller issues the power constraint command, and at least one control cycle is reserved as state switching margin. When the current time reaches the start time, a corresponding reservation record is generated, and the corresponding output port, reservation power, expected occurrence time range and guarantee duration are written, and the current reservation stage is set to reservation effective; the reservation power is taken as the actual guaranteeable power in the reservation effective and event occupancy stages.
8. The energy distribution method of an intelligent portable energy storage device according to claim 1, characterized in that, The step of switching the reservation at the end of the corresponding expected occurrence time range includes: Once the current time enters the expected occurrence time range, the actual output power of the corresponding output port is continuously read. When the port continuously experiences a power increase that matches the repeated short-term high-power events and reaches the effective change condition and continuous sampling condition, the sampling time when the conditions are first met is recorded as the actual start time of the event, and the current reservation stage is changed from reservation effective to event occupation. During event occupancy, the reserved power remains at the actual guaranteed power. When the current event has covered the guaranteed duration, and the actual power of the corresponding port has returned to the normal fluctuation range corresponding to the stable operating level before the event and has been continuously maintained at the preset sampling number, the current reservation stage is converted to reservation cancellation; when the event starts near the end of the expected occurrence time range, the reservation status continues until the guaranteed duration is fully covered and the event is confirmed to have ended. For reservation records where the corresponding event has not occurred by the end of the expected occurrence time range, the reservation will be directly converted to a cancellation when the boundary of the expected occurrence time range is reached. After the reservation is cancelled, the current reservation power will be set to zero.
9. The energy distribution method of an intelligent portable energy storage device according to claim 1, characterized in that, The determination of the freely allocable power currently available to a normal load by combining the continuous output limit and the short-term total output limit corresponding to the guaranteed duration includes: Read the maximum continuous output that the device is allowed to maintain for a long time under the current operating state, as well as the maximum short-term total output determined based on the current state of charge, battery temperature, minimum single-cell voltage, and the duration of this protection. The freely distributable power is determined according to the following formula: ; in, This refers to the freely distributable power that can be used by ordinary loads during the current control cycle. This represents the upper limit of the continuous output that the device is allowed to maintain for an extended period under the current operating conditions. This represents the short-term total output limit that matches the guaranteed duration of the current scheduled event. The current reserved power; Summarize the power actually used by the current ordinary load and compare it with the free allocable power; when the actual power used by the ordinary load is lower than the free allocable power, the remaining part between the two is taken as the ordinary load power that can be increased in the current control cycle.
10. The energy distribution method of an intelligent portable energy storage device according to claim 9, characterized in that, The execution of actual power control for each output port, and the redistribution of the corresponding power to normal load distribution after the reservation is lifted, includes: When the reservation phase is converted to event-occupied, the corresponding output port recorded in the reservation status is allowed to use the current reserved power. The stable operating power of the corresponding port before the event occurs is still included in the actual power of the normal load. After the event occurs, the increase in power relative to the original stable operating level will be given priority to the reserved power. If the actual new demand of the event exceeds the current reserved power, the free power space that has not yet been actually occupied by the normal load will be used, provided that the current short-term total output limit is met. When the reserved power and the immediate idle power are still insufficient to cover the actual demand of the event, the actual output of the corresponding port will be limited according to the current short-term output boundary. When the reservation phase is converted to reservation cancellation, the current reserved power becomes zero. In the next control cycle, the free allocable power is re-determined, and the short-term output space reserved for events awaiting protection re-participates in normal load distribution. For adjustable ports that are restricted but still maintain power requests, their allowed output is increased again according to the product's established power recovery control sequence. For output branches that are in a waiting-to-be-connected state, they are allowed to be connected after the current free power meets the access conditions.
