Methods, devices, equipment, media, and programs for adaptive reclosing in distribution networks
By utilizing the secondary voltage drop information and multi-harmonic current injection at the IIDG grid connection point in the distribution network, the nature of the fault can be identified, solving the problems of reclosing delay and blind reclosing in the distribution network, thus improving power supply reliability and equipment safety.
Patent Information
- Application Number
- CN202510651811.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-20
- Publication Date
- 2026-11-10
AI Technical Summary
The high proportion of IIDG access in the distribution network leads to difficulties in setting reclosing delay, long power outage time, inability to accurately identify the nature of the fault, resulting in blind reclosing, which affects the reliability of power supply and equipment safety.
Based on the secondary drop information of the IIDG grid connection point voltage in the fault area, auxiliary arc extinction control is initiated, multi-harmonic current is injected and phase information is calculated to identify whether the fault is permanent or transient, and control the recloser to lock or reclose, so as to realize the controllable access of the IIDG.
It significantly reduces the downtime of transient faults, avoids blind overlap, improves control performance, ensures equipment safety, and is applicable to a wide range of scenarios.
Smart Images

Figure CN123073641A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of power technology, and in particular to a method, apparatus, equipment, medium and program product for adaptive reclosing in power distribution networks. Background Technology
[0002] As a critical link in the power system that directly faces users, the reliability of power supply in the distribution network is of paramount importance. Automatic reclosing is an important means to improve the reliability of the power supply system.
[0003] In related technologies, adaptive reclosing research is mostly geared towards high-voltage transmission lines, and can be divided into single-phase adaptive reclosing and three-phase adaptive reclosing according to the fault type. Among them, three-phase adaptive reclosing mainly uses the residual electrical characteristics in the line after tripping and the discharge characteristics of the line capacitance and shunt reactor to identify the fault nature. If it is determined to be a transient fault that has been cleared, reclosing is accelerated; if it is a permanent fault, it is blocked.
[0004] However, in related technologies, distribution networks have low voltage levels, short feeders, and weak phase-to-phase coupling. Furthermore, three-phase reclosing in distribution networks does not distinguish between fault types, limiting its applicability. Additionally, after a fault occurs in a distribution line, reclosing operates after approximately 1 second. In distribution networks with a high proportion of IIDG (Inverter Interfaced Distributed Generators) integration, if the IIDG has low-voltage ride-through capability, the anti-islanding protection's operating time can exceed 300 seconds, further extending the reclosing waiting time and severely impacting power supply reliability. Moreover, three-phase adaptive reclosing requires external excitation to achieve fault type identification, making it difficult to promote and resulting in low identification accuracy, necessitating improvement. Summary of the Invention
[0005] This application provides a method, device, equipment, medium, and program product for adaptive reclosing in power distribution networks to solve problems such as difficulty in setting delay, long power outage time, inability to accurately identify the nature of faults leading to blind reclosing, secondary impact on electrical equipment, endangering equipment safety, and limited applicable scenarios in related technologies.
[0006] The first aspect of this application provides an adaptive reclosing method for a distribution network, comprising the following steps: after a fault occurs in a distribution network with a high proportion of IIDGs connected, based on the secondary drop information of the IIDG grid connection point voltage within a preset time in the fault area, IIDG auxiliary arc extinguishing control is initiated to extinguish the arc at the fault point; when the arc at the fault point is completely extinguished, a corresponding preset multi-harmonic current is injected into the distribution network, and the phase information of the multi-harmonic response voltage at the fault point is calculated; based on the phase information, it is identified whether the fault is a permanent fault or a transient fault, wherein, if the fault is a permanent fault, the recloser is controlled to be locked, and the IIDG is controlled to disconnect from the distribution network; otherwise, the recloser is controlled to reclose, and the IIDG is controlled to reconnect to the distribution network.
[0007] Optionally, in one embodiment of this application, before obtaining the secondary voltage drop information of the IIDG grid connection point voltage within a preset time period based on the fault area, the method further includes: obtaining the start time of the IIDG switching to LVRT (Low Voltage Ride Through) control and the first voltage amplitude corresponding to the IIDG grid connection point voltage under the LVRT control; based on the start time, obtaining the first stage protection information of the three-stage protection of the distribution network, and based on the first stage protection information, determining the second voltage amplitude corresponding to the IIDG grid connection point voltage of the distribution network under the first stage protection; obtaining the second stage protection information of the three-stage protection, and based on the second stage protection information, determining the third voltage amplitude corresponding to the IIDG grid connection point voltage of the distribution network under the second stage protection; and obtaining the secondary voltage drop information based on the first voltage amplitude, the second voltage amplitude, and the third voltage amplitude.
[0008] Optionally, in one embodiment of this application, obtaining the secondary drop information based on the first voltage amplitude, the second voltage amplitude, and the third voltage amplitude includes: determining whether the second voltage amplitude is less than the first voltage amplitude, or whether the third voltage amplitude is less than the first voltage amplitude; if the second voltage amplitude is less than the first voltage amplitude, or the third voltage amplitude is less than the first voltage amplitude, then determining that the IIDG has experienced a secondary drop, and obtaining the secondary drop information; if the second voltage amplitude is greater than or equal to the first voltage amplitude, and the third voltage amplitude is greater than or equal to the first voltage amplitude, then determining that the IIDG does not experience a secondary drop.
[0009] Optionally, in one embodiment of this application, identifying whether the fault is a permanent fault or a transient fault based on the phase information includes: obtaining voltage phase information corresponding to different harmonics between different phases of the distribution network based on the phase information and the fault point; determining the trend of voltage phase variation with harmonic frequency based on the voltage phase information; and using the trend of variation to identify whether the fault is a permanent fault or a transient fault.
[0010] Optionally, in one embodiment of this application, the step of using the change trend to identify whether the fault is a permanent fault or a transient fault includes: determining whether the change trend is less than or equal to a preset threshold; if the change trend is less than or equal to the preset threshold, then identifying the fault as a permanent fault; if the change trend is greater than the preset threshold, then identifying the fault as a transient fault.
[0011] A second aspect of this application provides a distribution network adaptive reclosing device, comprising: a starting module, configured to, after a fault occurs in a distribution network with a high proportion of IIDGs connected, initiate IIDG auxiliary arc extinguishing control based on secondary drop information of the IIDG grid connection point voltage within a preset time in the fault area, so as to extinguish the arc at the fault point; an injection module, configured to, when the arc at the fault point is completely extinguished, inject a corresponding preset multi-harmonic current into the distribution network, and calculate the phase information of the multi-harmonic response voltage at the fault point; and an identification module, configured to, based on the phase information, identify whether the fault is a permanent fault or a transient fault, wherein, if the fault is a permanent fault, the recloser is controlled to lock out, and the IIDG is controlled to disconnect from the distribution network; otherwise, the recloser is controlled to reclose, and the IIDG is controlled to reconnect to the distribution network.
[0012] Optionally, in one embodiment of this application, it further includes: a first acquisition module, configured to acquire, before the secondary voltage drop information of the IIDG grid connection point voltage within a preset time period based on the IIDG grid connection point voltage within the fault area, the start time of the IIDG switching to LVRT control and the first voltage amplitude corresponding to the IIDG grid connection point voltage under the LVRT control; a second acquisition module, configured to acquire, based on the start time, the first stage protection information of the three-stage protection of the distribution network, and based on the first stage protection information, determine the second voltage amplitude corresponding to the IIDG grid connection point voltage of the distribution network under the first stage protection; a third acquisition module, configured to acquire, based on the second stage protection information of the three-stage protection, determine the third voltage amplitude corresponding to the IIDG grid connection point voltage of the distribution network under the second stage protection; and a generation module, configured to obtain the secondary voltage drop information based on the first voltage amplitude, the second voltage amplitude, and the third voltage amplitude.
[0013] Optionally, in one embodiment of this application, the generation module includes: a judgment unit, configured to judge whether the second voltage amplitude is less than the first voltage amplitude, or whether the third voltage amplitude is less than the first voltage amplitude; a first judgment unit, configured to determine that the IIDG has a secondary drop when the second voltage amplitude is less than the first voltage amplitude, or the third voltage amplitude is less than the first voltage amplitude, and to obtain the secondary drop information; and a second judgment unit, configured to determine that the IIDG does not have a secondary drop when the second voltage amplitude is greater than or equal to the first voltage amplitude, and the third voltage amplitude is greater than or equal to the first voltage amplitude.
[0014] Optionally, in one embodiment of this application, the identification module includes: an acquisition unit, configured to acquire voltage phase information corresponding to different harmonics between different phases of the distribution network based on the phase information and the fault point; a determination unit, configured to determine the trend of voltage phase change with harmonic frequency based on the voltage phase information; and an identification unit, configured to identify whether the fault is a permanent fault or a transient fault using the trend of change.
[0015] Optionally, in one embodiment of this application, the identification unit includes: a judgment subunit, configured to determine whether the change trend is less than or equal to a preset threshold; a first identification subunit, configured to identify the fault as a permanent fault when the change trend is less than or equal to the preset threshold; and a second identification subunit, configured to identify the fault as a transient fault when the change trend is greater than the preset threshold.
[0016] A third aspect of this application provides an electronic device, including: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the adaptive reclosing method for distribution networks as described in the above embodiments.
[0017] A fourth aspect of this application provides a computer-readable storage medium storing a computer program that, when executed by a processor, implements the above-described adaptive reclosing method for power distribution networks.
[0018] A fifth aspect of this application provides a computer program product, including a computer program that, when executed, implements the above-described adaptive reclosing method for power distribution networks.
[0019] This application embodiment can initiate IIDG auxiliary arc extinction control after a fault occurs in a distribution network with a high proportion of IIDGs connected to the grid. Based on the secondary drop information of the IIDG grid connection point voltage within a certain time period in the fault area, the control is activated. Then, when the arc at the fault point is completely extinguished, a certain amount of multi-harmonic current is injected, and the phase information of the multi-harmonic response voltage is calculated to identify whether the fault is permanent or transient. If the fault is permanent, the recloser is locked, and the IIDG is disconnected from the grid; otherwise, the recloser recloses, and the IIDG is reconnected. This achieves stable, controllable, and active injection of IIDG multi-harmonic current without the need for additional harmonic current injection equipment. It also achieves IIDG power frequency / different frequency decoupling control, improving control performance. It can actively identify the nature of distribution network faults, significantly shortening the power outage time for transient faults, avoiding blind reclosing, and eliminating the need for communication. Therefore, it solves the problems of related technologies, such as difficulty in delay setting, long power outage time, inability to accurately identify the nature of faults leading to blind reclosing, secondary impact on electrical equipment, endangering equipment safety, and limited applicability.
[0020] Additional aspects and advantages of this application will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of this application. Attached Figure Description
[0021] The above and / or additional aspects and advantages of this application will become apparent and readily understood from the following description of the embodiments taken in conjunction with the accompanying drawings, wherein:
[0022] Figure 1 This is a flowchart of an adaptive reclosing method for a distribution network provided according to an embodiment of this application;
[0023] Figure 2 This is a schematic diagram illustrating the working principle of a digital frequency divider according to an embodiment of this application;
[0024] Figure 3 This is a schematic diagram of the multi-harmonic response voltage phase characteristics provided according to an embodiment of this application;
[0025] Figure 4 This is a schematic diagram of the IIDG control timing according to an embodiment of this application;
[0026] Figure 5(a) is a logic diagram of control startup provided according to an embodiment of this application;
[0027] Figure 5(b) is an enlarged schematic diagram of the LVRT operating current in a control startup logic diagram according to an embodiment of this application;
[0028] Figure 6 This is a topology diagram illustrating an application scenario according to an embodiment of this application;
[0029] Figure 7 A flowchart illustrating the working principle of an adaptive reclosing method for distribution networks according to an embodiment of this application;
[0030] Figure 8(a) is a schematic diagram of the simulation effect provided according to an embodiment of this application;
[0031] Figure 8(b) is a partially enlarged schematic diagram of the simulation effect provided according to an embodiment of this application;
[0032] Figure 8(c) is a schematic diagram of the simulation effect of circuit breaker reclosing according to an embodiment of this application;
[0033] Figure 9 This is a block diagram of a distribution network adaptive reclosing device provided according to an embodiment of this application;
[0034] Figure 10 This is a schematic diagram of the structure of an electronic device provided according to an embodiment of this application. Detailed Implementation
[0035] The embodiments of this application are described in detail below. Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain this application, and should not be construed as limiting this application.
[0036] The following description, with reference to the accompanying drawings, describes the adaptive reclosing method, apparatus, equipment, medium, and program product for distribution networks according to embodiments of this application. Addressing the problems mentioned in the background art, such as difficulties in delay setting, long power outage times, inability to accurately identify the nature of faults leading to blind reclosing, causing secondary impacts on electrical equipment, endangering equipment safety, and limiting applicability, this application provides an adaptive reclosing method for distribution networks. In this method, after a fault occurs in a distribution network with a high proportion of IIDG connections, based on the secondary voltage drop information of the IIDG grid connection point voltage within a certain time period in the fault area, IIDG auxiliary arc extinction control is initiated. Then, after the arc at the fault point is completely extinguished, a certain amount of multi-harmonic current is injected. The system calculates the phase information of the multi-harmonic response voltage to identify whether a fault is permanent or transient. If the fault is permanent, the recloser is blocked, and the IIDG (Integrated Discharge Generator) is disconnected from the grid; otherwise, the recloser recloses, and the IIDG reconnects. This achieves stable, controllable, and active injection of multi-harmonic current into the IIDG, eliminating the need for additional harmonic current injection equipment. It also enables decoupling control of the IIDG between power frequency and different frequencies, improving control performance. Furthermore, it actively identifies the nature of distribution network faults, significantly shortens outage time for transient faults, avoids blind reclosing, and eliminates the need for communication. This solves the problems of related technologies, such as difficulty in delay setting, long outage times, inaccurate fault identification leading to blind reclosing, secondary impacts on electrical equipment, jeopardizing equipment safety, and limited applicability.
[0037] Specifically, Figure 1 This is a flowchart of an adaptive reclosing method for a distribution network provided according to an embodiment of this application.
[0038] like Figure 1 As shown, the adaptive reclosing method for distribution networks includes the following steps:
[0039] In step S101, after a fault occurs in a distribution network with a high proportion of IIDG access, IIDG auxiliary arc extinguishing control is initiated based on the secondary drop information of the IIDG grid connection point voltage within a preset time in the fault area, so as to extinguish the arc at the fault point.
[0040] It is understandable that, in the embodiments of this application, the penetration rate of IIDGs in distribution networks is increasing, and traditional radial distribution networks are gradually evolving into active distribution network forms. It is becoming possible to flexibly utilize existing IIDGs in the system as special signal injection sources to assist in fault identification, or as excitation sources to achieve fault identification. Furthermore, the flexible and controllable characteristics of IIDGs change the passive state after a distribution network trip, enabling active injection of detection signals without modifying feeder switches or adding additional equipment.
[0041] Furthermore, it should be noted that in this embodiment, if the IIDG continuously supplies short-circuit current to the fault point after a distribution network fault occurs, the arc at the fault point will be difficult to extinguish. In addition, related studies have shown that when the short-circuit current flowing through the fault point exceeds 15A, the arc at the fault point cannot extinguish itself. Therefore, this embodiment can use the secondary voltage drop information of the IIDG grid connection point within a certain time period as a feature to design the starting basis for the IIDG-assisted arc extinguishing control. The "certain time period" can be set by those skilled in the art according to actual conditions, and this application does not impose specific limitations.
[0042] As one possible implementation method, in the embodiments of this application, after a fault occurs in a distribution network with a high proportion of IIDG access, the IIDG auxiliary arc extinguishing control can be activated based on the secondary drop information of the IIDG grid connection point voltage within a certain period of time in the fault area, thereby completely extinguishing the arc at the fault point.
[0043] For example, in the embodiments of this application, after a fault occurs in a distribution network with a high proportion of IIDG access, the IIDG auxiliary arc extinction control can be activated based on the secondary drop information of the IIDG grid connection point voltage within a certain period of time. After the IIDG auxiliary arc extinction control is activated, a delay of 0.5s (or other times, this application does not impose specific restrictions) is made to ensure that the arc at the fault point is completely extinguished.
[0044] In step S102, when the arc at the fault point is completely extinguished, a corresponding preset multi-harmonic current is injected into the distribution network, and the phase information of the multi-harmonic response voltage at the fault point is calculated.
[0045] In some embodiments, this application can inject a certain amount of multiharmonic current into the distribution network when the arc at the fault point is completely extinguished, and then calculate the phase information of the multiharmonic response voltage at the fault point. The specific multiharmonic current can be set by those skilled in the art according to actual conditions, and this application does not impose any particular limitation.
[0046] For example, in the embodiments of this application, when the arc at the fault point is completely extinguished, the IIDG additional multiharmonic current injection control can be started and lasted for 0.1s, and the phase information of the multiharmonic response voltage at the fault point after the multiharmonic current injection can be obtained by FFT (Fast Fourier Transform).
[0047] Furthermore, in this embodiment, the additional multi-harmonic current injection control of the IIDG can be as follows: First, when the distribution network system is operating normally, in order to meet power quality requirements, the total harmonic distortion rate of the IIDG output current should be less than 5% during normal operation. Therefore, this embodiment can design a start-up criterion so that the harmonic injection control only starts when a fault is identified. Second, by referring to the power frequency current inner loop control and changing the reference angular velocity of the coordinate system of the Park inverse transform, the active injection of harmonic current signals is achieved. Finally, to avoid mutual interference between power frequency and heterofrequency current control, this embodiment can design a digital frequency divider based on feedforward control, the schematic diagram of which is shown below. Figure 2 As shown, this achieves decoupling control between power frequency and other frequencies.
[0048] In step S103, based on phase information, it is identified whether the fault is a permanent fault or a transient fault. If the fault is a permanent fault, the recloser is controlled to be blocked and the IIDG is controlled to disconnect from the distribution network; otherwise, the recloser is controlled to be reclosed and the IIDG is controlled to reconnect to the distribution network.
[0049] In actual implementation, the embodiments of this application can identify whether the fault is permanent or transient based on phase information. If the fault is permanent, the feeder recloser is blocked, and multi-harmonic current injection continues for a period of time, such as 0.1s. This application does not impose specific restrictions on this period of time, after which the IIDG actively disconnects from the grid. If the fault is transient, the feeder recloser is immediately reclosed, and the IIDG resumes grid-connected operation.
[0050] In this embodiment of the application, the method for identifying whether a fault is permanent or transient can be as follows: analyze the phase characteristics of the multiharmonic response voltage generated at the fault point by the multiharmonic current injected by the IIDG. If the phase characteristics satisfy the condition that "the phase of each harmonic voltage increases with the frequency", then the fault is determined to be transient; if not, then the fault is determined to be permanent.
[0051] The content of the feeder recloser blocking can be as follows: After the feeder trips, the fault point voltage is the voltage measured by the PT (Potential Transformer) on the line side of the circuit breaker. Therefore, after the PT collects the response voltage and obtains the corresponding phase information, the fault can be identified by combining the phase information through local calculation. If the fault is a permanent fault, the recloser will be blocked.
[0052] The reclosing of the feeder recloser can be as follows: After the feeder trips, the fault point voltage is the voltage measured by the PT on the line side of the circuit breaker. Therefore, after the PT collects the response voltage and obtains the corresponding phase information, the fault can be identified by combining the phase information with local calculation. If the fault is a transient fault, the recloser will reclose immediately.
[0053] Optionally, in one embodiment of this application, identifying whether a fault is a permanent fault or a transient fault based on phase information includes: obtaining voltage phase information corresponding to different harmonics between different phases of the distribution network based on phase information and the fault point; determining the trend of voltage phase variation with harmonic frequency based on voltage phase information; and using the trend of variation to identify whether the fault is a permanent fault or a transient fault.
[0054] In some embodiments, the present application embodiments can obtain voltage phase information corresponding to different harmonics between different phases of the distribution network based on phase information and fault point, and then determine the trend of voltage phase change with harmonic frequency, thereby identifying whether the fault is a permanent fault or a transient fault.
[0055] For example, in this embodiment of the application, with the IIDG initiating multi-harmonic current injection, taking the AB phase-to-phase voltage as an example, the voltage measured by the PT can be, but is not limited to, expressed as:
[0056]
[0057] in, These represent the additional harmonic currents injected by IIDG into the A, B, and C phases of the system, respectively. They represent The fault point AB phase-to-phase response voltage under excitation, where ω represents the signal frequency, Z eqAB This represents the equivalent impedance of the system when viewed from the AB port towards the line side.
[0058] Substituting Z = R + jX into equation (1) and separating the real and imaginary parts, we can obtain the corresponding real and imaginary parts, whose expressions can be, but are not limited to, as follows:
[0059]
[0060] Where R represents the system-side equivalent resistance, X represents the system-side equivalent reactance, and R f This indicates the transition resistance at the fault point.
[0061] Then tanθ eqAB It can be calculated using the corresponding real and imaginary parts, and its expression can be, but is not limited to, as follows:
[0062]
[0063] Where ρ=R f / R is the ratio of the transition resistance to the equivalent resistance on the system side, tanθ=X / R is the line impedance angle, θ eqAB This indicates the voltage phase at the fault point.
[0064] Similarly, we can obtain Its expression can be, but is not limited to, as:
[0065]
[0066] in, The meanings of the variables are similar to those in equation (1).
[0067] Therefore, the embodiment of this application can obtain the trend of voltage phase variation with harmonic frequency, as shown in the schematic diagram below. Figure 3 As shown, in the case of a permanent fault, the phenomenon that "the phase of each harmonic voltage increases with increasing frequency" is not satisfied. In this embodiment, the phase difference relationship of the response voltage at each frequency can be defined as shown in equation (5), which can be, but is not limited to, as follows:
[0068]
[0069] in, These represent the i-th harmonic voltages between phases AB, BC, and CA, respectively.
[0070] Furthermore, the embodiments of this application are combined with Figure 3 Analysis yields K AB K BC and K CA It can be, but is not limited to:
[0071]
[0072] Among them, K AB K BC K CA These are intermediate variables used to construct the fault nature criterion, and have no practical significance.
[0073] Furthermore, in the embodiments of this application, K is... add =∏(K AB *K BC *K CA ), where K add It is represented as the trend of voltage phase change with harmonic frequency, used to determine the nature of the fault, thereby identifying whether the fault is permanent or transient.
[0074] Optionally, in one embodiment of this application, identifying whether a fault is a permanent fault or a transient fault using a trend of change includes: determining whether the trend of change is less than or equal to a preset threshold; if the trend of change is less than or equal to the preset threshold, then identifying the fault as a permanent fault; if the trend of change is greater than the preset threshold, then identifying the fault as a transient fault.
[0075] In some embodiments, the present application identifies a fault as a permanent fault when the trend of change is less than or equal to a certain threshold, and identifies a fault as a transient fault when the trend of change is greater than a certain threshold. The certain threshold can be set by those skilled in the art according to actual circumstances, and the present application does not impose specific limitations on it.
[0076] For example, in an embodiment of this application, a certain threshold can be set to 0, resulting in the following expression, which may be, but is not limited to, the following:
[0077]
[0078] Additionally, it should be noted that in some extreme cases, the transition resistance R in the embodiments of this application is... f When = 0, FFT cannot obtain the phase of the fault phase-to-phase voltage. Furthermore, its phase Δθ can be considered as... ABi =0,K add =0.
[0079] Furthermore, in some embodiments, if K... add If the value is ≤0, the fault is identified as a permanent fault. In this case, the recloser is locked out, and after the IIDG performs multi-harmonic injection, the fault point voltage has not yet recovered, so it is directly disconnected from the grid.
[0080] In some embodiments of this application, if K add If the value is >0, the fault is identified as a transient fault. In this case, the recloser immediately recloses. After the IIDG performs multi-harmonic injection, the fault point voltage recovers as the recloser recloses, so the IIDG switches back to normal grid-connected operation.
[0081] Optionally, in one embodiment of this application, before obtaining the secondary voltage drop information of the IIDG grid connection point voltage within a preset time period based on the fault area, the method further includes: obtaining the start time of the IIDG switching to LVRT control and the first voltage amplitude corresponding to the IIDG grid connection point voltage under LVRT control; based on the start time, obtaining the first stage protection information in the three-stage protection of the distribution network, and based on the first stage protection information, determining the second voltage amplitude corresponding to the IIDG grid connection point voltage under the first stage protection of the distribution network; obtaining the second stage protection information in the three-stage protection, and based on the second stage protection information, determining the third voltage amplitude corresponding to the IIDG grid connection point voltage under the second stage protection of the distribution network; and obtaining the secondary voltage drop information based on the first voltage amplitude, the second voltage amplitude, and the third voltage amplitude.
[0082] It is understood that in this embodiment of the application, after a phase-to-phase fault occurs in the distribution network, the IIDG switches to LVRT control and provides reactive power support to the system based on the voltage drop depth at the grid connection point. As can be seen from the characteristics of phase-to-phase faults, the grid-side voltage support does not completely disappear before the protection system operates; therefore, the voltage amplitude at the grid connection point will not be lower than the rated voltage U. N 30%. After the protection action, since the grid-side voltage support is completely lost, and in most cases the fault point has not extinguished the arc and the fault still exists, the voltage of the IIDG grid connection point in the fault area will drop twice, while the IIDG outside the area will quickly recover to the rated voltage and exit LVRT.
[0083] Therefore, in this embodiment, the starting time for switching the IIDG to LVRT control can be set to t0, and the first voltage amplitude U corresponding to the IIDG grid connection point voltage at this time can be recorded. PCCf Considering that approximately 0.2 seconds elapse from the occurrence of the fault to the tripping of a protection circuit breaker, the second voltage amplitude U' corresponding to the IIDG grid connection point voltage is recorded at time t0+0.2s. PCC , if U' PCC PCCf If the fault occurs, the IIDG switches to HOLD mode (i.e., it checks for a secondary voltage drop at the grid connection point due to a trip). Considering that the fault point may be outside the first-stage protection's operating zone, it is also necessary to further determine whether the second-stage protection has operated.
[0084] The time difference between the first-stage protection and the second-stage protection is approximately δt≈0.5s. Therefore, if U' PCC ≥U PCCf Then, IIDG should also record the third voltage amplitude U″ corresponding to the IIDG grid connection point voltage at time t0+δt+0.2s=t0+0.7s. PCC , if U″ PCC PCCf If the fault occurs, the IIDG switches to HOLD mode (i.e., it checks for a secondary voltage drop at the grid connection point due to a trip), otherwise the IIDG maintains LVRT until disconnected from the grid. Finally, considering that it takes about 0.5 seconds for the fault point to completely extinguish the arc, E NS It should be held at 1 for 0.5 seconds before being reset to zero. Specifically, let E... NS If the enable signal for IIDG control switching is given, then:
[0085]
[0086] In some embodiments, the present application embodiments can obtain secondary voltage drop information based on the start time of the IIDG switching to LVRT control, the first voltage amplitude corresponding to the IIDG grid connection point voltage under LVRT control, the second voltage amplitude corresponding to the IIDG grid connection point voltage under first-stage protection of the distribution network, and the third voltage amplitude corresponding to the IIDG grid connection point voltage under second-stage protection of the distribution network.
[0087] Among them, such as Figure 4 As shown in the embodiment of this application, the fault occurrence time can be set as t = 0s, and the timing start of the recloser can be set as ts. According to the specific configuration of the protection, under a protection operation, ts ≈ 0.2s, and the time for the fault point to be completely extinguished is about ts + 0.5s. After the arc at the fault point is completely extinguished, IIDG injects a multi-harmonic current with a duration of Δt = 0.1s and identifies the fault in the distribution network. In the case of a permanent fault, the recloser is blocked, and in the case of a transient fault, the recloser is reclosed.
[0088] Furthermore, in this embodiment of the application, under two-stage protection operation, ts = δt + 0.2s, where δt ≈ 0.5s is the protection level difference. The time for the arc at the fault point to be completely extinguished is approximately ts + 0.5s. After the arc at the fault point is completely extinguished, the IIDG switches to HOLD mode according to the control logic and holds for 0.5s before initiating multi-harmonic current injection. The injection lasts for Δt = 0.1s, and the fault in the distribution network is identified. If the fault is permanent, the recloser is blocked; if the fault is transient, the recloser recloses.
[0089] In some embodiments, the GFL-IIDG can achieve grid connection through the power frequency dual-loop control of the converter during normal operation. When the grid connection point voltage is lower than 0.9 times the rated voltage, the outer loop is locked, the LVRT control intervenes, and the inner current loop command value is directly given according to the voltage drop depth at the grid connection point, so the IIDG exhibits controlled current source characteristics. Further, the embodiments of this application refer to the power frequency current inner loop control and design a multi-harmonic current inner loop control. The overall control block diagram of the IIDG is shown in Figures 5(a) and 5(b). The carrier signals output by the power frequency controller and the heterofrequency controller are superimposed and modulated by PWM (Pulse Width Modulation) to generate a switch on / off signal, thereby achieving the control objective. The specific requirements of the LVRT can be implemented with reference to national standards, and this application does not impose specific limitations.
[0090] Furthermore, as can be seen from the circuit principles in the embodiments of this application, Figure 6 When a permanent fault occurs at point F1 and protection 1 trips, the voltage measured by the PT on the line side of the circuit breaker is the voltage at the fault point. Phase information of each harmonic voltage can be obtained through FFT without communication.
[0091] Optionally, in one embodiment of this application, obtaining secondary drop information based on a first voltage amplitude, a second voltage amplitude, and a third voltage amplitude includes: determining whether the second voltage amplitude is less than the first voltage amplitude, or whether the third voltage amplitude is less than the first voltage amplitude; if the second voltage amplitude is less than the first voltage amplitude, or the third voltage amplitude is less than the first voltage amplitude, then determining that the IIDG has experienced a secondary drop, and obtaining secondary drop information; if the second voltage amplitude is greater than or equal to the first voltage amplitude, and the third voltage amplitude is greater than or equal to the first voltage amplitude, then determining that the IIDG does not experience a secondary drop.
[0092] In some embodiments, this application embodiment can determine whether the second voltage amplitude is less than the first voltage amplitude, or whether the third voltage amplitude is less than the first voltage amplitude; and when the second voltage amplitude is less than the first voltage amplitude, or the third voltage amplitude is less than the first voltage amplitude, it is determined that the IIDG has a secondary drop, and secondary drop information is obtained; when the second voltage amplitude is greater than or equal to the first voltage amplitude, and the third voltage amplitude is greater than or equal to the first voltage amplitude, it is determined that the IIDG does not have a secondary drop.
[0093] The adaptive reclosing method for distribution networks proposed in this application will be described below with reference to a specific embodiment.
[0094] in, Figure 7 This is a flowchart illustrating the working principle of the adaptive reclosing method for distribution networks proposed in one embodiment of this application.
[0095] Step S701: Begin.
[0096] Step S702: Protection Startup.
[0097] Step S703: Protection section trips.
[0098] In this embodiment, it can determine whether a protection segment has tripped, and if it has tripped, execute step S705; if it has not tripped, execute step S704.
[0099] Step S704: Protection stage two trips.
[0100] In this embodiment, it can determine whether the second protection stage has tripped, and if it has tripped, execute step S705.
[0101] Step S705: AR starts timing.
[0102] Step S706: Voltage drop.
[0103] Step S707: E NS =1.
[0104] In this embodiment of the application, the enable signal E for IIDG control switching can be determined. NS If the value is equal to 1, proceed to step S708 to switch the IIDG to LVRT mode; otherwise, proceed to step S709 to start the IIDG auxiliary arc extinction control.
[0105] Step S708: LVRT mode.
[0106] Step S709: Assist in arc extinguishing.
[0107] Step S710: Wait for the arc at the fault point to be completely extinguished.
[0108] Step S711: Multi-harmonic injection control start-up.
[0109] Step S712: K add ≤0.
[0110] In this application embodiment, K can be determined. add If the value is less than or equal to 0, proceed to step S715; otherwise, proceed to step S713.
[0111] Step S713: Transient fault.
[0112] Step S714: Overlap.
[0113] In this embodiment, when the fault is identified as a transient fault, the recloser can be locked out, and the IIDG can be disconnected from the distribution network.
[0114] Step S715: Permanent failure.
[0115] Step S716: Locking.
[0116] Step S717: IIDG off the network.
[0117] In this embodiment, if the fault is identified as a permanent fault, the recloser can be locked out, and the IIDG can be disconnected from the distribution network.
[0118] Furthermore, embodiments of this application can be built in the xx simulation platform. Figure 6 The model of a medium-voltage distribution network feeder with IIDG access is shown, which verifies the effectiveness of the proposed method.
[0119] In this embodiment, the system base capacity is SB = 1MVA, the base voltage is UB = 10.5kV, and the overhead line parameters are r1 = 0.27Ω / km and x1 = 0.35Ω / km. IIDG1 has a capacity of 1MVA, and IIDG2 has a capacity of 2MVA. After the HOLD mode ends, IIDG2 needs to switch to GFL-IIDG mode to provide voltage and frequency support to the upstream IIDG. The load capacities are 0.4MVA and 0.6MVA, respectively, and the load power factor is 0.9 for both. The fault point F is located at the midpoint of the feeder. The primary and secondary voltages of the IIDG output side step-up transformer are 10kV / 0.69kV, the DC side rated voltage is 1.0kV, the IIDG DC side overvoltage protection threshold is set to 1.2kV, the DC stabilizing capacitor is 1000μF, the filter inductor is 1mH, and the DC voltage corresponding to the photovoltaic power supply's maximum power point (MPP) is 0.83kV. In the simulation, transient faults are assumed to be cleared within 0.2 seconds after the circuit breaker is fully disconnected, while permanent faults are assumed to persist indefinitely. The signal sampling frequency in the simulation is 10kHz.
[0120] The fault type is set as an AB transient phase-to-phase fault, lasting 0.1s, with a transition resistance of 5Ω and a protection measurement point signal sampling rate of 10kHz. The three-phase voltage and three-phase current flowing through the protection are collected at the protection installation location. After the circuit breaker line-side PT collects the multi-harmonic response voltage, the fundamental and harmonic signals are separated using FFT to obtain the line-side voltage phase information. During normal operation, the IIDG uses a dual-loop control system with an outer power loop and an inner current loop. After a fault, additional multi-harmonic current injection control is initiated. The fault point F1 is set at 60% of the feeder length upstream of the IIDG bus.
[0121] After the fault occurred, CB1 tripped first, and IIDG then initiated auxiliary arc extinction control. After the auxiliary arc extinction control timer ended, additional multi-harmonic current injection was initiated, and the recloser initiated fault nature identification, based on the proposed criterion K. add and three-phase voltage asymmetry K asy When a fault is identified as transient, a reclosing command is sent to the circuit breaker after the identification process is completed, and the system resumes power supply. The entire process's electrical quantity information and circuit breaker operating sequence are as follows: Figures 8(a)-8(c) As shown.
[0122] Depend on Figures 8(a)-8(c)As can be seen, in this embodiment, the fault occurs at 0.5s, and the circuit breaker trips at approximately 0.72s (the tripping time is delayed by 0.2s to simulate the mechanical action time of the circuit breaker in a real environment; this application does not impose specific limitations). Subsequently, the IIDG first initiates auxiliary arc-extinguishing control, reduces power output and maintains it for 0.5s to ensure complete arc extinguishing at the fault point. Then, at approximately 1.22s, it initiates multi-harmonic current injection control, outputting the 4th, 5th, and 8th harmonics. Under multi-harmonic current excitation, the line-side PT collects the corresponding 4th, 5th, and 8th AB and BC phase-to-phase harmonic voltage phases θ. AB1 θ AB2 θ AB3 θ BC1 θ BC2 θ BC3 Both decrease as the frequency of the harmonic current decreases, i.e., θ AB3 >θ AB2 >θ AB1 θ BC3 >θ BC2 >θ BC1 Therefore, we can obtain K. add >0. At this point, the recloser identifies the fault as transient and sends a reclosing command to the circuit breaker at approximately 1.33 seconds.
[0123] According to the adaptive reclosing method for distribution networks proposed in this application, after a fault occurs in a distribution network with a high proportion of IIDGs connected, the IIDG auxiliary arc extinguishing control is initiated based on the secondary drop information of the IIDG grid connection point voltage within a certain time period in the fault area. Then, when the arc at the fault point is completely extinguished, a certain amount of multi-harmonic current is injected, and the phase information of the multi-harmonic response voltage is calculated to identify whether the fault is permanent or transient. If the fault is permanent, the recloser is blocked and the IIDG is disconnected from the grid; otherwise, the recloser is reclosed and the IIDG is reconnected. This achieves stable, controllable, and active injection of IIDG multi-harmonic current without the need for additional harmonic current injection equipment. It also achieves IIDG power frequency / different frequency decoupling control, improves control performance, can actively identify the nature of distribution network faults, significantly shortens the power outage time of transient faults, avoids blind reclosing, and has the advantages of no communication required. This solves the problems in related technologies, such as difficulty in delay setting, long power outage time, inability to accurately identify the nature of the fault leading to blind overlap, secondary impact on electrical equipment, endangering equipment safety, and limited application scenarios.
[0124] Next, the adaptive reclosing device for distribution networks proposed according to the embodiments of this application is described with reference to the accompanying drawings.
[0125] Figure 9 This is a block diagram of a distribution network adaptive reclosing device provided according to an embodiment of this application.
[0126] like Figure 9 As shown, the adaptive reclosing device 10 for the power distribution network includes: a startup module 100, an injection module 200, and an identification module 300.
[0127] The startup module 100 is used to start IIDG auxiliary arc extinguishing control to extinguish the arc at the fault point after a fault occurs in a distribution network with a high proportion of IIDG access. This is based on the secondary drop information of the IIDG grid connection point voltage within a preset time in the fault area.
[0128] The injection module 200 is used to inject a corresponding preset multi-harmonic current into the distribution network when the arc at the fault point is completely extinguished, and to calculate the phase information of the multi-harmonic response voltage at the fault point.
[0129] The identification module 300 is used to identify whether the fault is permanent or transient based on phase information. If the fault is permanent, the recloser is locked and the IIDG is disconnected from the distribution network; otherwise, the recloser is reclosed and the IIDG is reconnected to the distribution network.
[0130] Optionally, in one embodiment of this application, it further includes: a first acquisition module, a second acquisition module, a third acquisition module, and a generation module.
[0131] The first acquisition module is used to acquire the start time of the IIDG switching to LVRT control and the first voltage amplitude corresponding to the IIDG grid connection point voltage under LVRT control before the secondary drop information of the IIDG grid connection point voltage within a preset time based on the IIDG grid connection point voltage within the fault area.
[0132] The second acquisition module is used to acquire the protection information of one stage of the three-stage protection of the distribution network based on the start time, and to determine the second voltage amplitude corresponding to the voltage at the IIDG grid connection point under the protection of the first stage of the distribution network.
[0133] The third acquisition module is used to acquire the protection information of the second stage in the three-stage protection, and based on the protection information of the second stage, to determine the third voltage amplitude corresponding to the voltage at the IIDG grid connection point of the distribution network under the protection of the second stage.
[0134] The generation module is used to obtain secondary drop information based on the first voltage amplitude, the second voltage amplitude, and the third voltage amplitude.
[0135] Optionally, in one embodiment of this application, the generation module includes: a judgment unit, a first judgment unit, and a second judgment unit.
[0136] The judgment unit is used to determine whether the second voltage amplitude is less than the first voltage amplitude, or whether the third voltage amplitude is less than the first voltage amplitude.
[0137] The first determination unit is used to determine that the IIDG has experienced a secondary drop when the second voltage amplitude is less than the first voltage amplitude, or the third voltage amplitude is less than the first voltage amplitude, and to obtain secondary drop information.
[0138] The second determination unit is used to determine that there is no secondary drop in the IIDG when the second voltage amplitude is greater than or equal to the first voltage amplitude and the third voltage amplitude is greater than or equal to the first voltage amplitude.
[0139] Optionally, in one embodiment of this application, the identification module 300 includes: an acquisition unit, a determination unit, and an identification unit.
[0140] The acquisition unit is used to acquire voltage phase information corresponding to different harmonics between different phases of the distribution network based on phase information and fault points.
[0141] The determination unit is used to determine the trend of voltage phase variation with harmonic frequency based on voltage phase information.
[0142] The identification unit is used to identify whether a fault is permanent or transient by utilizing the trend of change.
[0143] Optionally, in one embodiment of this application, the identification unit includes: a judgment subunit, a first identification subunit, and a second identification subunit.
[0144] The judgment sub-unit is used to determine whether the trend of change is less than or equal to a preset threshold.
[0145] The first identification subunit is used to identify a fault as a permanent fault when the trend of change is less than or equal to a preset threshold.
[0146] The second identification subunit is used to identify the fault as a transient fault when the changing trend is greater than a preset threshold.
[0147] It should be noted that the foregoing explanation of the adaptive reclosing method embodiment for distribution networks also applies to the adaptive reclosing device for distribution networks in this embodiment, and will not be repeated here.
[0148] According to the distribution network adaptive reclosing device proposed in this application embodiment, after a fault occurs in a distribution network with a high proportion of IIDG access, the device can initiate IIDG auxiliary arc extinction control based on the secondary drop information of the IIDG grid connection point voltage within a certain time period in the fault area. Then, when the arc at the fault point is completely extinguished, a certain amount of multi-harmonic current is injected, and the phase information of the multi-harmonic response voltage is calculated to identify whether the fault is permanent or transient. If the fault is permanent, the recloser is blocked and the IIDG is disconnected from the grid; otherwise, the recloser is reclosed and the IIDG is reconnected. This achieves stable, controllable, and active injection of IIDG multi-harmonic current without the need for additional harmonic current injection equipment. It also achieves IIDG power frequency / different frequency decoupling control, improves control performance, can actively identify the nature of distribution network faults, significantly shortens the power outage time of transient faults, avoids blind reclosing, and has the advantages of no communication required. This solves the problems in related technologies, such as difficulty in delay setting, long power outage time, inability to accurately identify the nature of the fault leading to blind overlap, secondary impact on electrical equipment, endangering equipment safety, and limited application scenarios.
[0149] Figure 10 This is a schematic diagram of the structure of an electronic device provided according to an embodiment of this application. The electronic device may include:
[0150] The memory 1001, the processor 1002, and the computer program stored on the memory 1001 and capable of running on the processor 1002.
[0151] When the processor 1002 executes the program, it implements the adaptive reclosing method for distribution networks provided in the above embodiments.
[0152] Furthermore, electronic devices also include:
[0153] Communication interface 1003 is used for communication between memory 1001 and processor 1002.
[0154] The memory 1001 is used to store computer programs that can run on the processor 1002.
[0155] The memory 1001 may include high-speed RAM memory, and may also include non-volatile memory, such as at least one disk storage device.
[0156] If the memory 1001, processor 1002, and communication interface 1003 are implemented independently, then the communication interface 1003, memory 1001, and processor 1002 can be interconnected via a bus to complete communication between them. The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, or an Extended Industry Standard Architecture (EISA) bus, etc. Buses can be divided into address buses, data buses, control buses, etc. For ease of representation, Figure 10 The bus is represented by a single thick line, but this does not mean that there is only one bus or one type of bus.
[0157] Optionally, in a specific implementation, if the memory 1001, processor 1002, and communication interface 1003 are integrated on a single chip, then the memory 1001, processor 1002, and communication interface 1003 can communicate with each other through an internal interface.
[0158] The processor 1002 may be a central processing unit (CPU), an application specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of this application.
[0159] This application also provides a computer-readable storage medium storing a computer program thereon, which, when executed by a processor, implements the above-described adaptive reclosing method for power distribution networks.
[0160] This application also provides a computer program product, including a computer program that, when executed, implements the above-described adaptive reclosing method for power distribution networks.
[0161] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of this application. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.
[0162] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this application, "N" means at least two, such as two, three, etc., unless otherwise explicitly specified.
[0163] Any process or method described in the flowchart or otherwise herein can be understood as representing a module, segment, or portion of code comprising one or N executable instructions for implementing custom logic functions or processes, and the scope of the preferred embodiments of this application includes additional implementations in which functions may be performed not in the order shown or discussed, including substantially simultaneously or in reverse order depending on the functions involved, as should be understood by those skilled in the art to which embodiments of this application pertain.
[0164] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as a sequenced list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by, or in conjunction with, an instruction execution system, apparatus, or device (such as a computer-based system, a processor-included system, or other system that can fetch and execute instructions from, an instruction execution system, apparatus, or device). For the purposes of this specification, "computer-readable medium" can be any means that can contain, store, communicate, propagate, or transmit programs for use by, or in conjunction with, an instruction execution system, apparatus, or device. More specific examples (a non-exhaustive list) of computer-readable media include: an electrical connection having one or more wires (electronic device), a portable computer disk drive (magnetic device), random access memory (RAM), read-only memory (ROM), erasable and editable read-only memory (EPROM or flash memory), fiber optic devices, and portable optical disc read-only memory (CDROM). Alternatively, the computer-readable medium may be paper or other suitable media on which the program can be printed, since the program can be obtained electronically by optically scanning the paper or other medium, followed by editing, interpreting, or otherwise processing as necessary, and then stored in a computer memory.
[0165] It should be understood that the various parts of this application can be implemented using hardware, software, firmware, or a combination thereof. In the above embodiments, the N steps or methods can be implemented using software or firmware stored in memory and executed by a suitable instruction execution system. If implemented in hardware, as in another embodiment, it can be implemented using any one or more of the following techniques known in the art: discrete logic circuits having logic gates for implementing logical functions on data signals, application-specific integrated circuits (ASICs) having suitable combinational logic gates, programmable gate arrays (PGAs), field-programmable gate arrays (FPGAs), etc.
[0166] Those skilled in the art will understand that all or part of the steps of the methods in the above embodiments can be implemented by a program instructing related hardware. The program can be stored in a computer-readable storage medium, and when executed, the program includes one or a combination of the steps of the method embodiments.
[0167] Furthermore, the functional units in the various embodiments of this application can be integrated into a processing module, or each unit can exist physically separately, or two or more units can be integrated into a module. The integrated module can be implemented in hardware or as a software functional module. If the integrated module is implemented as a software functional module and sold or used as an independent product, it can also be stored in a computer-readable storage medium.
[0168] The storage medium mentioned above can be a read-only memory, a disk, or an optical disk, etc. Although embodiments of this application have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting this application. Those skilled in the art can make changes, modifications, substitutions, and variations to the above embodiments within the scope of this application.
Claims
1. A method for adaptive reclosing in a distribution network, characterized in that, Includes the following steps: After a fault occurs in a distribution network with a high proportion of inverter-type distributed generation (IIDG) connected, IIDG auxiliary arc extinction control is initiated based on the secondary drop information of the IIDG grid connection point voltage within a preset time in the fault area, in order to extinguish the arc at the fault point. When the arc at the fault point is completely extinguished, a corresponding preset multiharmonic current is injected into the distribution network, and the phase information of the multiharmonic response voltage at the fault point is calculated. Based on the phase information, it is determined whether the fault is a permanent fault or a transient fault. If the fault is a permanent fault, the recloser is controlled to be locked and the IIDG is controlled to disconnect from the distribution network; otherwise, the recloser is controlled to be reclosed and the IIDG is controlled to reconnect to the distribution network.
2. The method according to claim 1, characterized in that, Before the information on the secondary voltage drop at the IIDG grid connection point within the fault zone within a preset time, it also includes: Obtain the start time of IIDG switching to low voltage ride-through LVRT control and the first voltage amplitude corresponding to the IIDG grid connection point voltage under the LVRT control; Based on the start time, obtain the protection information of one stage of the three-stage protection of the distribution network, and based on the protection information of one stage, determine the second voltage amplitude corresponding to the voltage of the IIDG grid connection point under the protection of one stage of the distribution network; Obtain the protection information of two stages in the three-stage protection, and based on the protection information of the two stages, determine the third voltage amplitude corresponding to the voltage of the IIDG grid connection point under the two-stage protection of the distribution network; The secondary drop information is obtained based on the first voltage amplitude, the second voltage amplitude, and the third voltage amplitude.
3. The method according to claim 2, characterized in that, The process of obtaining the secondary drop information based on the first voltage amplitude, the second voltage amplitude, and the third voltage amplitude includes: Determine whether the second voltage amplitude is less than the first voltage amplitude, or whether the third voltage amplitude is less than the first voltage amplitude; If the second voltage amplitude is less than the first voltage amplitude, or the third voltage amplitude is less than the first voltage amplitude, then it is determined that the IIDG has experienced a secondary drop, and the secondary drop information is obtained. If the second voltage amplitude is greater than or equal to the first voltage amplitude, and the third voltage amplitude is greater than or equal to the first voltage amplitude, then it is determined that the IIDG does not experience a secondary drop.
4. The method according to claim 1, characterized in that, The step of identifying whether the fault is a permanent fault or a transient fault based on the phase information includes: Based on the phase information and the fault point, obtain the voltage phase information corresponding to different harmonics between different phases of the distribution network; Based on the voltage phase information, the trend of voltage phase variation with harmonic frequency is determined; The changing trend is used to identify whether the fault is a permanent fault or a transient fault.
5. The method according to claim 4, characterized in that, The step of identifying whether the fault is a permanent fault or a transient fault using the changing trend includes: Determine whether the trend of change is less than or equal to a preset threshold; If the trend of change is less than or equal to the preset threshold, the fault is identified as a permanent fault. If the trend of change is greater than the preset threshold, the fault is identified as a transient fault.
6. A distribution network adaptive reclosing device, characterized in that, include: The startup module is used to start the IIDG auxiliary arc extinguishing control to extinguish the arc at the fault point after a fault occurs in a distribution network with a high proportion of IIDG access. This is based on the secondary drop information of the IIDG grid connection point voltage within a preset time in the fault area. The injection module is used to inject a corresponding preset multiharmonic current into the power distribution network when the arc at the fault point is completely extinguished, and to calculate the phase information of the multiharmonic response voltage at the fault point. The identification module is used to identify whether the fault is a permanent fault or a transient fault based on the phase information. If the fault is a permanent fault, the recloser is controlled to be locked and the IIDG is controlled to disconnect from the distribution network; otherwise, the recloser is controlled to be reclosed and the IIDG is controlled to reconnect to the distribution network.
7. The apparatus according to claim 6, characterized in that, Also includes: The first acquisition module is used to acquire the start time of IIDG switching to LVRT control and the first voltage amplitude corresponding to the IIDG grid connection point voltage under the LVRT control before the secondary drop information of the IIDG grid connection point voltage within a preset time based on the IIDG grid connection point voltage in the fault area. The second acquisition module is used to acquire the protection information of one stage of the three-stage protection of the distribution network based on the start time, and to determine the second voltage amplitude corresponding to the voltage of the IIDG grid connection point under the protection of the first stage of the distribution network based on the protection information of the first stage. The third acquisition module is used to acquire the protection information of the second stage in the three-stage protection, and based on the protection information of the second stage, determine the third voltage amplitude corresponding to the voltage of the IIDG grid connection point under the protection of the second stage in the distribution network. The generation module is used to obtain the secondary drop information based on the first voltage amplitude, the second voltage amplitude, and the third voltage amplitude.
8. An electronic device, characterized in that, include: A memory, a processor, and a computer program stored in the memory and executable on the processor, the processor executing the program to implement the adaptive reclosing method for a distribution network as described in any one of claims 1-5.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that, The program is executed by the processor to implement the adaptive reclosing method for distribution networks as described in any one of claims 1-5.
10. A computer program product, characterized in that, Includes a computer program, which, when executed, is used to implement the adaptive reclosing method for distribution networks as described in any one of claims 1-5.