Method and apparatus for determining effective payload capacity of a unit based on a two-layer iterative architecture

By employing a two-layer iterative architecture approach, combining the outer layer truncated string method and the inner layer time-series Monte Carlo simulation, the problem of insufficient accuracy and efficiency in calculating the effective load capacity of generator units in existing technologies is solved, achieving efficient and accurate load capacity assessment.

CN123073710APending Publication Date: 2026-11-10FUJIAN ELECTRIC POWER TRADING CENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611194249.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-07
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing technologies struggle to balance computational accuracy, convergence efficiency, and the elimination of analytical derivative calculations when determining the effective load capacity of generating units. This is especially true in complex power systems where the computational process is complex and its applicability is limited.

Method used

A two-layer iterative architecture is adopted, in which the equivalent load increment is updated by using the truncated sine method in the outer layer iteration and the time-series Monte Carlo simulation is performed in the inner layer iteration, thus constructing a closed-loop iterative system, avoiding analytical derivative solving, and improving computational accuracy and efficiency.

Benefits of technology

While preserving the accuracy of time-series Monte Carlo assessment, the search efficiency for payload capacity is improved, balancing computational accuracy and convergence efficiency, and reducing the difficulty of solving complex power systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123073710A_ABST
    Figure CN123073710A_ABST
Patent Text Reader

Abstract

The application discloses a kind of based on double-layer iteration architecture unit payload capacity determination method and device.Method includes: obtaining the reference load loss expectation of the power system without the unit to be measured;Determine the corresponding reliability residual of the power system containing the unit to be measured under at least two equivalent load increments initial value;Rely on double-layer iteration architecture to carry out double-layer iteration operation, the adjacent two times equivalent load increments and corresponding reliability residual are based on outer layer iteration, and the secant method is used to update next time equivalent load increment;Inner layer iteration carries out time sequence Monte Carlo simulation to the updated equivalent load increment, determines and updates corresponding reliability residual;Double-layer iteration operation is repeated until the updated reliability residual meets preset convergence condition, and the corresponding equivalent load increment when meeting preset convergence condition is determined as the effective payload capacity of the unit to be measured.The method does not need to solve function analytical derivative, fully considers system random operation characteristics, and gives consideration to solving efficiency and calculation accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of power system unit capacity assessment technology, specifically to a method and apparatus for determining the effective load capacity of units based on a two-layer iterative architecture. Background Technology

[0002] In capacity market and power system capacity adequacy assessment, the effective load capacity of a generating unit can characterize the additional load capacity that the system can bear after the unit under test is connected, while maintaining the original reliability level of the power system. Therefore, it can be used as an important indicator to measure the unit's confidence capacity and reliability contribution.

[0003] Existing methods for determining the effective load capacity of generating units mainly include non-iterative approximation methods and iterative search methods. Non-iterative approximation methods typically estimate the effective load capacity directly based on simplified mathematical models. Although the calculation speed is relatively fast, it is difficult to fully reflect random unit outages, load time-series fluctuations, and changes in system capacity adequacy, resulting in limited calculation accuracy. Iterative search methods can solve based on the principle of equal reliability, and although the accuracy is relatively high, the common bisection method has a slow convergence speed and requires multiple reliability simulations. Newton's method or similar methods usually rely on the derivative information of the objective function. In the reliability assessment of complex power systems combined with time-series Monte Carlo simulations, the expected load loss is usually obtained by random sampling statistics, making it difficult to obtain stable and accurate analytical derivatives, leading to complex calculation processes or limited applicability.

[0004] Therefore, existing methods still face challenges in balancing computational accuracy, convergence efficiency, and the elimination of the need for analytical derivative calculations when determining the effective load capacity of nuclear power units awaiting testing. Summary of the Invention

[0005] This application addresses the problems existing in the prior art by providing a method and apparatus for determining the effective load capacity of a generator unit based on a two-layer iterative architecture.

[0006] To achieve the above objectives, the technical solution adopted in this application is as follows: The first aspect of this application provides a method for determining the effective load capacity of a power system based on a two-layer iterative architecture, comprising: obtaining a baseline load shedding expectation of a power system excluding the unit under test; determining the load shedding expectation of the power system including the unit under test under at least two initial values ​​of equivalent load increments, and determining the corresponding reliability residuals based on the difference between each load shedding expectation and the baseline load shedding expectation; using each initial value of equivalent load increment and the corresponding reliability residual as initial iteration data, performing a two-layer iterative operation through a pre-constructed two-layer iterative architecture; wherein the two-layer iterative architecture includes an outer layer iteration and an inner layer iteration; the outer layer iteration updates the next equivalent load increment using the truncated sine method based on two adjacent equivalent load increments and the corresponding reliability residuals; the inner layer iteration performs a time-series Monte Carlo simulation of the power system including the unit under test based on the next equivalent load increment, determines the corresponding load shedding expectation, and updates the corresponding reliability residuals; repeating the two-layer iterative operation until the updated reliability residuals meet a preset convergence condition, and determining the equivalent load increment corresponding to meeting the preset convergence condition as the effective load capacity of the unit under test.

[0007] In one possible implementation, obtaining the baseline load shedding expectation of the power system without the generator under test includes: performing a time-series Monte Carlo simulation on the power system without the generator under test to obtain the baseline load shedding expectation.

[0008] In one possible implementation, determining the expected load shedding of the power system containing the generator under test under at least two initial values ​​of equivalent load increments includes: superimposing each initial value of equivalent load increments onto the time-series load of the power system containing the generator under test, and performing time-series Monte Carlo simulations respectively to obtain the expected load shedding corresponding to each initial value of equivalent load increments.

[0009] In one possible implementation, the outer iteration updates the next equivalent load increment based on two adjacent equivalent load increments and the corresponding reliability residuals using the truncated sine method, including: determining the difference quotient based on the ratio of the difference between two adjacent equivalent load increments to the difference between two adjacent reliability residuals; and correcting the current equivalent load increment based on the difference quotient to obtain the next equivalent load increment.

[0010] In one possible implementation, the update formula for the next equivalent load increment includes: ; ; ; in, For the first k+ One equivalent load increment, For the first k Subequivalent load increment For the firstk One equivalent load increment, For the first k Secondary reliability residuals For the first k 1st reliability residual, For the first k , k The difference between the first and second equivalent load increments and the first k , k The ratio of the differences between the first-order reliability residuals, i.e., the difference quotient. k The sequence number; For the first k Secondary load loss expectation, For the first k Expected load loss in one cycle The baseline is the expected load shedding.

[0011] In one possible implementation, the inner iteration performs a time-series Monte Carlo simulation of the power system containing the units under test based on the next equivalent load increment to determine the corresponding load loss expectation. This includes: time-series sampling of the operating and outage states of the units in the power system containing the units under test; determining the available system capacity for each simulation period based on the sampled unit states; determining load loss events based on the comparison between the available system capacity and the system load after superimposing the next equivalent load increment; and statistically analyzing the load loss events to obtain the corresponding load loss expectation.

[0012] In one possible implementation, the updated reliability residual is determined based on the difference between the expected load shedding corresponding to the next equivalent load increment and the baseline expected load shedding; the update formula includes: ;in, For the updated number k+ 1st reliability residual, For the first k+ Expected load loss in one cycle The baseline is the expected load shedding.

[0013] In one possible implementation, time-series sampling of the operating and outage states of the units in the power system containing the units under test is performed, including: modeling each unit as a two-state Markov model that switches between operating and outage states based on the failure rate and repair rate of each unit, and determining the operating state of each unit in each simulation period by random number sampling.

[0014] In one possible implementation, the preset convergence conditions include: the absolute value of the updated reliability residual is less than or equal to a preset residual threshold; or, the difference between two adjacent equivalent load increments is less than or equal to a preset increment threshold.

[0015] In one possible implementation, the unit under test is a nuclear power unit.

[0016] A second aspect of this application provides a unit effective load capacity determination device based on a two-layer iterative architecture, comprising: a benchmark acquisition module for acquiring a benchmark unload expectation of a power system excluding the unit under test; an initial residual determination module for determining the unload expectation of the power system including the unit under test under at least two initial values ​​of equivalent load increments, and determining the corresponding reliability residual based on the difference between each unload expectation and the benchmark unload expectation; and a two-layer iteration module for performing two-layer iterations using each initial value of equivalent load increment and the corresponding reliability residual as initial iteration data through a pre-constructed two-layer iterative architecture. The calculation involves a two-layer iterative architecture, comprising an outer layer iteration and an inner layer iteration. The outer layer iteration updates the next equivalent load increment using the truncated sine method based on two adjacent equivalent load increments and their corresponding reliability residuals. The inner layer iteration performs a time-series Monte Carlo simulation on the power system containing the unit under test based on the next equivalent load increment, determines the corresponding load loss expectation, and updates the corresponding reliability residual. The load capacity determination module is used to repeat the two-layer iterative calculation until the updated reliability residual meets the preset convergence condition, and determines the equivalent load increment corresponding to meeting the preset convergence condition as the effective load capacity of the unit under test.

[0017] This application also provides an electronic device, comprising: a memory for storing at least one instruction; and a processor for invoking the instruction stored in the memory to execute the unit payload capacity determination method based on a two-layer iterative architecture in the first aspect and any possible implementation thereof.

[0018] This application also provides a computer-readable storage medium storing at least one executable instruction, which is loaded and executed by a processor to implement the unit payload capacity determination method based on a two-layer iterative architecture in the first aspect and any possible implementation of the first aspect.

[0019] This application also provides a computer program product, which includes: computer program code, which, when executed by a computer, causes the computer to perform the unit payload capacity determination method based on a two-layer iterative architecture in the first aspect and any possible implementation of the first aspect.

[0020] Compared with the prior art, this application has the following advantages: This application pre-constructs a two-layer iterative architecture comprising outer and inner iterations, using at least two initial values ​​of equivalent load increments and their corresponding reliability residuals as initial iteration data. This transforms the solution for effective load capacity into an iterative root-finding process where the reliability residual approaches zero, achieving closed-loop computation. The outer iteration employs the truncated sine method, relying on two adjacent equivalent load increments and their corresponding reliability residuals to calculate the next equivalent load increment. By approximating the objective function's changing trend using the difference quotient, it avoids the need to obtain the analytical derivative of the load shedding expectation function, thus circumventing the Newton method's dependence on derivative information and reducing the difficulty of modeling and solving complex power system reliability problems. The inner iteration takes the equivalent load increment output from the outer iteration as input, targeting... By conducting time-series Monte Carlo simulations of power systems including the units under test and solving for the corresponding reliability residuals, the system can fully account for the impact of unit operation and shutdown states, system available capacity, and load fluctuations on the expected load loss under given equivalent load increments, thereby improving the characterization of the system's stochastic operating characteristics in the evaluation results. This leads to the establishment of a closed-loop iterative system with an outer layer updating the equivalent load increment and an inner layer evaluating the reliability residuals. When the reliability residuals meet the preset convergence conditions, the corresponding equivalent load increment is taken as the effective load capacity of the unit under test. This can improve the search efficiency of the equivalent load increment while preserving the accuracy of time-series Monte Carlo evaluation, and balance the computational accuracy and convergence efficiency of the effective load capacity solution. Attached Figure Description

[0021] Figure 1 This is a flowchart illustrating a method for determining the effective load capacity of a generator unit based on a two-layer iterative architecture, according to an embodiment of this application. Figure 2 This is a structural block diagram of a unit effective load capacity determination device based on a two-layer iterative architecture, according to an embodiment of this application. Detailed Implementation

[0022] The present application will now be further described with reference to the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solutions of the present application and should not be construed as limiting the scope of protection of the present application. It should be noted that the following detailed descriptions are exemplary and intended to provide further explanation of the present application.

[0023] The acquisition, transmission, storage, use, and processing of data in this application comply with relevant national laws and regulations. In the embodiments of this application, certain existing industry solutions such as software, components, and models may be mentioned. These should be considered exemplary, intended only to illustrate the feasibility of implementing the technical solution of this application, and do not imply that the applicant has already used or necessarily used such solutions.

[0024] All terms used in this application have the same meaning as understood by one of ordinary skill in the art to which this application pertains, unless otherwise specifically defined. It should also be understood that terms defined in general dictionaries should be interpreted as having meanings consistent with their meanings in the context of the relevant art, and not as idealized or highly formalized, unless expressly defined herein.

[0025] For ease of understanding, the technical terms appearing in the embodiments of this application are explained in advance. Unless otherwise specified, the following definitions apply throughout the entire specification.

[0026] Confidence Credit (CC): This is a core benchmark indicator for quantifying the true contribution of generating units to the reliability of the power system. Its economic essence is: under the constraints of a given system reliability standard, the absolute reliable capacity that a certain type of power source can actually provide equivalently.

[0027] Equivalent Firm Capacity (EFC): refers to the ideal unit capacity that the power source under test can equivalently replace, with an availability of 100%, while maintaining the established reliability level of the system.

[0028] Equivalent Conventional Unit Capacity (ECUC): refers to the capacity of a standard conventional thermal power unit with a specific unplanned outage rate that can be equivalently replaced by a newly connected unit, under the constraint of maintaining system reliability without deterioration.

[0029] Guaranteed Capacity (GC): refers to the minimum effective power that a unit can stably output within a specific confidence interval by statistically inferring from actual operating samples during typical peak load periods.

[0030] Effective Load Carrying Capacity (ELCC): A load-side indicator that refers to the maximum additional load increment that the system can safely bear due to the introduction of the unit under test, while maintaining the original system reliability baseline unchanged.

[0031] Loss of Load Expectation (LOLE): A measure of the probability that the power generation capacity of a power system will be insufficient to meet load demand within a specific time period.

[0032] The assessment of unit confidence capacity is mainly carried out from the generation side and the load side. The core quantitative indicators include equivalent certain capacity (EFC), equivalent conventional unit capacity (ECUC), guaranteed output capacity (GC), and effective load capacity (ELCC). Among them, effective load capacity (ELCC), as a system-level load-side probabilistic evaluation indicator, can accurately quantify the improvement benefits of unit access on system capacity adequacy and objectively reflect the value of reliability support.

[0033] Example 1; This application provides a method for determining the effective load capacity of a generating unit based on a two-layer iterative architecture. For example... Figure 1 As shown, the method may include the following steps S11 to S14.

[0034] Step S11: Obtain the baseline load shedding expectation of the power system excluding the generator under test.

[0035] In this embodiment, load shedding expectation is used as a power system reliability evaluation index. Load shedding expectation can represent the expected duration of a load shedding event due to insufficient available generation capacity to meet load demand within a preset statistical period. For ease of explanation, the load shedding expectation corresponding to the power system without the tested unit is denoted as the baseline load shedding expectation, and the load shedding expectation corresponding to the power system with the tested unit and the equivalent load increment is denoted as the current load shedding expectation.

[0036] In one possible implementation, obtaining the baseline load shedding expectation of the power system without the unit under test includes: performing a time-series Monte Carlo simulation on the power system without the unit under test to obtain the baseline load shedding expectation. Specifically, this involves obtaining parameters such as the original time-series load of the power system, the rated capacity of the original units, the failure rate, the repair rate, and the simulation period; performing a time-series Monte Carlo simulation on the power system without connecting the unit under test, statistically analyzing the load shedding events of the system in multiple simulation years or multiple simulation periods, and calculating the baseline load shedding expectation. .

[0037] Step S12: Determine the expected load loss of the power system containing the unit under test under at least two initial values ​​of equivalent load increments, and determine the corresponding reliability residuals based on the difference between each expected load loss and the baseline expected load loss.

[0038] In this embodiment, the reliability residual is the difference between the expected load loss of the power system including the generator under test under the corresponding equivalent load increment and the baseline expected load loss of the power system without the generator under test. That is, if the equivalent load increment is... The baseline load shedding expectation is The power system including the unit under test has an equivalent load increment The expected load loss is Then the reliability residual can be expressed as: ; when When the value approaches zero, it means that after adding the equivalent load increment, the reliability of the power system including the unit under test is basically restored to the baseline reliability level when the unit under test is not included. Therefore, the equivalent load increment can be used as the effective load capacity of the unit under test.

[0039] In one possible implementation, determining the expected load shedding of the power system containing the generator under test under at least two initial values ​​of equivalent load increments includes: superimposing each initial value of equivalent load increments onto the system load of the power system containing the generator under test, and performing time-series Monte Carlo simulations respectively to obtain the expected load shedding corresponding to each initial value of equivalent load increment. Specifically, at least two initial values ​​of equivalent load increments are preset, for example... and In a power system containing the generator under test, initial values ​​of each equivalent load increment are superimposed, and time-series Monte Carlo simulations are performed on the power system under each initial value of the equivalent load increment to obtain the corresponding expected load shedding. and .

[0040] Then, based on the difference between each expected load loss and the baseline expected load loss, the corresponding reliability residual is determined. and This results in at least two sets of "equivalent load increment - reliability residual" data, which serve as the initial input for the iteration.

[0041] Step S13: Using the initial values ​​of each equivalent load increment and the corresponding reliability residual as the initial iteration data, perform a two-layer iterative operation through a pre-constructed two-layer iterative architecture.

[0042] The two-layer iterative architecture includes an outer layer iteration and an inner layer iteration. The outer layer iteration updates the next equivalent load increment using the truncated sine method based on two adjacent equivalent load increments and their corresponding reliability residuals. The inner layer iteration performs a time-series Monte Carlo simulation on the power system containing the units under test based on the next equivalent load increment, determines the corresponding load loss expectation, and updates the corresponding reliability residuals. In other words, the outer layer iteration is used to update the equivalent load increment using the truncated sine method, and the inner layer iteration is used to evaluate the reliability residuals under that equivalent load increment using time-series Monte Carlo simulation.

[0043] In one possible implementation, the outer iteration updates the next equivalent load increment based on two adjacent equivalent load increments and the corresponding reliability residuals using the truncated sine method, including: determining the difference quotient based on the ratio of the difference between two adjacent equivalent load increments to the difference between two adjacent reliability residuals; and correcting the current equivalent load increment based on the difference quotient to obtain the next equivalent load increment.

[0044] Therefore, the outer iteration does not need to obtain the analytical derivative of the reliability residual function. Instead, it uses the results of two adjacent iterations to approximate the trend of the reliability residual changing with the equivalent load increment, thereby obtaining a new equivalent load increment.

[0045] In one possible implementation, the inner iteration performs a time-series Monte Carlo simulation of the power system containing the units under test based on the next equivalent load increment to determine the corresponding load loss expectation. This includes: time-series sampling of the operating and outage states of the units in the power system containing the units under test; determining the available system capacity for each simulation period based on the sampled unit states; determining load loss events based on the comparison between the available system capacity and the system load after superimposing the next equivalent load increment; and statistically analyzing the load loss events to obtain the corresponding load loss expectation.

[0046] In one possible implementation, the updated reliability residual is determined based on the difference between the expected load loss corresponding to the next equivalent load increment and the baseline expected load loss.

[0047] In one possible implementation, time-series sampling of the operating and outage states of the units in the power system containing the units under test is performed, including: modeling each unit as a two-state Markov model that switches between operating and outage states based on the failure rate and repair rate of each unit, and determining the operating state of each unit in each simulation period by random number sampling.

[0048] The following explains the mathematical and logical implementation details of the two-layer iterative architecture: (1) Outer iterative model based on the truncated chord method; The outer iterative model is essentially a problem of finding the root of the nonlinear equation that restores the system's reliability to the initial baseline after expansion.

[0049] Objective function construction: Set the baseline unload expectation as... After the unit under test is connected, the system's power outage risk becomes a function of the equivalent load increment. Define the reliability residual function. for: Formula 1: ; In the formula, For the initial time-series load of the system, For equivalent load increment, This represents the initial total available installed capacity of the system. For the rated installed capacity of nuclear power, The expected load shedding corresponding to the equivalent load increment can also be abbreviated as The goal of the outer model is to solve the nonlinear equations. .

[0050] Iterative formula for the truncated chord method: due to the inclusion of Monte Carlo sampling Since the function cannot be expressed with an analytical derivative, this model introduces the method of truncating the sine, using the difference quotient of the lines connecting two points to construct the deviation correction function instead of the derivative. Let the first... k The equivalent load increment for the next iteration is The deviation correction formula based on the system reliability residual is: Formula 2: ; in, For the first k+ One equivalent load increment, For the first k Subequivalent load increment For the first k One equivalent load increment, For the first k Secondary reliability residuals For the first k 1st reliability residual, For the first k , k The difference between the first and second equivalent load increments and the first k , k The ratio of the differences between the first-order reliability residuals, i.e., the difference quotient. k This is the sequence number.

[0051] in, , , For the first k Secondary load loss expectation, For the first k Expected load loss in one cycle The baseline is the expected load shedding.

[0052] During calculation, a minimum allowable error threshold is set, which is the preset residual threshold. .when When the iteration converges, at this point... This is the effective load capacity (ELCC) of the nuclear power unit in question.

[0053] (2) Inner iterative model based on temporal Monte Carlo simulation; The inner iterative model is responsible for applying a given equivalent load increment. Under these conditions, the actual power shortage risk of the system, including random outage events, is calculated by time-series sampling of the system state.

[0054] Unit operating state timing sampling: In reliability assessment, the unit is abstracted into a two-state Markov model of "up" and "down". Utilizing a sequence of operations... Uniformly distributed random numbers For the unit i Trouble-free uptime TTF With fault repair time TTR Perform time-series sampling: Formula 3: ; Formula 4: ; In the formula: For the unit i Trouble-free uptime; For the unit i The fault repair time; For the unit i The failure rate; For the unit i The repair rate.

[0055] System sufficiency supply and demand matching: within a given simulation period t Within, the total available power generation capacity of the entire grid It equals the sum of the products of the status of each unit and its rated capacity.

[0056] Formula 5: ; In the formula, For a given simulation period t Within the network, the total actual available power generation capacity, also known as the system's available capacity; N This represents the total number of generator sets included in the system. For the first i Rated installed capacity of the generator set; For the first i The generator set is t The running state variables at any given time. (1 indicates available, 0 indicates out of service). Units in operation participate in the calculation of system available capacity, while units in out of service do not participate in the calculation of system available capacity.

[0057] Construct a system power shortage status indication function When the available capacity is insufficient to cover the total load demand of the expanded system, an offload event is triggered. Formula 6: ; In the formula, For the system in t The power shortage status indication function at any given time: a value of 1 indicates insufficient available capacity, triggering a load shedding event; a value of 0 indicates that the system supply and demand are balanced or that power is sufficient. For the reference system in t Initial time-series load demand at any given moment; For the outer model in the first k The equivalent load increment in the next iteration calculation. That is, if the available system capacity is less than the system load after adding the equivalent load increment, then a load loss event is determined to have occurred during that simulation period; if the available system capacity is greater than or equal to the system load after adding the equivalent load increment, then a load loss event is determined to have occurred during that simulation period.

[0058] System reliability index calculation: The total number of system load loss hours within a single simulation year is... The time series integration (or discrete summation) is performed. To eliminate the statistical variance introduced by random sampling, the total number of years in the Monte Carlo simulation is set to 1. M (generally M ≥1000). The expected load shedding value of the inner model's final output. The formula is: Formula 7: ; In the formula, Indicates the first m Within the simulated year, the first t The hourly load loss indicator is set to 1 if load loss occurs and 0 if no load loss occurs. m This refers to the simulation year number in the time-series Monte Carlo simulation. t This refers to the hourly time sequence number within the year.

[0059] The calculation result will be directly used as... The variables are fed back to the outer iterative model, which then uses the latest two adjacent sets of "equivalent load increment - reliability residual" data as input to continue updating the equivalent load increment using the truncated sine method. This forms a closed-loop iterative process of "outer layer updating equivalent load increment, inner layer evaluating reliability residual, and inner layer feeding back results to the outer layer".

[0060] Step S14: Repeat the double-layer iterative operation until the updated reliability residual meets the preset convergence condition, and determine the equivalent load increment corresponding to the preset convergence condition as the effective load capacity of the unit under test.

[0061] In this embodiment, payload capacity is used to characterize the additional load capacity that the power system is allowed to bear after the unit under test is connected, while maintaining the original reliability level of the power system. The unit under test can be a nuclear power unit or other generator units that require capacity reliability assessment.

[0062] In one possible implementation, the preset convergence conditions include: the absolute value of the updated reliability residual is less than or equal to a preset residual threshold; or, the difference between two adjacent equivalent load increments is less than or equal to a preset increment threshold.

[0063] For example, when | When |≤ε, the two-level iteration is deemed to meet the convergence condition, where ε is a preset residual threshold. If the current reliability residual does not meet the preset convergence condition, the next round of two-level iteration continues; if the current reliability residual meets the preset convergence condition, the iteration is terminated, and the equivalent load increment corresponding to meeting the preset convergence condition is determined as the effective load capacity of the unit under test.

[0064] In one example, a regional power system is selected as the system under test. This system includes multiple existing nuclear power units when the nuclear power unit under test is not present. First, a time-series Monte Carlo simulation with a preset lifespan is performed on the power system excluding the nuclear power unit under test to obtain the baseline expected load shedding. Then, the nuclear power unit under test is connected to the power system, and two initial values ​​for the equivalent load increment are set. The corresponding expected load shedding and reliability residuals are calculated respectively. Using these two sets of data as the initial iteration data for the truncated sine method, the outer iteration obtains a new equivalent load increment according to the truncated sine method, and the inner iteration performs a time-series Monte Carlo simulation under this new equivalent load increment and calculates the new reliability residual. After multiple rounds of feedback iteration, when the absolute value of the reliability residual is less than a preset residual threshold, the current equivalent load increment is output as the effective load capacity of the nuclear power unit under test.

[0065] This embodiment uses the truncated sine method for outer-layer iteration, eliminating the need to obtain the analytical derivative of the load shedding expectation function with respect to the equivalent load increment, thus reducing the solution difficulty in reliability assessment of complex power systems. Simultaneously, the inner-layer iteration employs time-series Monte Carlo simulation, which can account for the impact of random unit outages, repair processes, and load time-series changes on the load shedding expectation. Therefore, this embodiment can improve the search efficiency of effective load capacity while ensuring the accuracy of reliability assessment.

[0066] To facilitate understanding, the above method will be explained in general with specific examples below.

[0067] For example, if a provincial power grid is selected as the measurement object, the benchmark grid does not include the nuclear power unit under test, and the system has a total of 92 existing generator sets; the unit under test is a single nuclear power unit with a rated installed capacity. =1089MW, unit failure rate = 0.3 times / year, repair rate = 18.25 times / year; Monte Carlo simulation set simulation lifespan. M =1000 years, preset residual threshold =0.5MWh / year; Equivalent load increment assignment in the initial iteration of the outer truncated chord method =3000MW =5000MW.

[0068] Step 1: Baseline LOLE calculate; A 1000-year time-series Monte Carlo probability sampling was conducted on a benchmark power grid excluding nuclear power units, using formulas 3 to 7. Through sampling calculations, the expected load shedding of the benchmark system was obtained. =6.4375h / year, and this value is used as the baseline value for the reliability constraint of the entire process.

[0069] Step 2: Model initialization and solution of baseline data under dual initial load conditions; The nuclear power unit under test with a rated capacity of 1089MW and shutdown parameters (λ,μ) was incorporated into the existing simulation system of 92 units; two sets of initial values ​​for equivalent load increments were set: =3000MW =5000MW, respectively substituted into the inner iterative model for step-by-step calculation.

[0070] Start-up and shutdown times of sampling units using the two-state Markov sampling formula: Based on formulas 3 and 4: ; ; , Using uniformly distributed random numbers in the interval [0,1], the operating status of nuclear power plants and existing units is generated year by year and hour by hour. ∈{0,1}; The instantaneous available installed capacity of the entire network, i.e., the available system capacity, is based on formula 5: ; The power shortage determination indicator function uses formula 6: ; Substitute into formula 7: Solve for the expected system load shedding under the two initial conditions respectively: Load increment =3000MWh / year, =24.9213h / year, Reliability residual = =18.4838; Load increment =5000MWh / year, =79.1280h / year Reliability residual = =72.6905; Initial iterative dataset: {[ , ],[ , ]}={[3000.0,18.4838],[5000.0,72.6905]}, which serves as the input data for the first iteration of the truncated string method.

[0071] Step 3: Double-layer iterative successive calculation (outer layer truncated chord + inner layer Monte Carlo nesting); Employing outer truncated chord iteration formula 2: The inner layer is fixed and newly generated. Repeated unit status sampling → available capacity calculation → power shortage judgment → statistical load shedding expectation, output And calculate the residuals Closed-loop backhaul to the outer layer.

[0072] For example, in the 3rd iteration (k=2): Substitution , , , To Formula 2: =2318.0277MWh / year; Inner Monte Carlo simulation =16.7557h / year, residual =10.3182; At this moment | |=10.3182> They did not restrain themselves. The process is continuously iterated, with each round executing the following steps: outer layer updates load increment based on formula 2 → inner layer calculates current load loss expectation based on formulas 3 to 7 → solves reliability residual.

[0073] Step 4: Convergence determination; Iterate to k When =6, the outer layer output equivalent load increment =1016.1984MW; Inner layer Monte Carlo simulation calculation yields: Annual reliability residual: = =0.1015, absolute error | |=0.1015< If the convergence criterion is met, the double-layer iterative loop is terminated.

[0074] Step 5: Output of Payload Capacity ELCC Results After iterative convergence, the equivalent load increment output by the outer iterative model is the effective load capacity of the nuclear power unit under test: ELCC = =1016.20MW.

[0075] Example 2; This application also provides a device for determining the effective load capacity of a generator unit based on a two-layer iterative architecture. For example... Figure 2 As shown, the device 100 may include a reference acquisition module 110, an initial residual determination module 120, a two-layer iteration module 130, and a load capacity determination module 140.

[0076] The benchmark acquisition module 110 is used to acquire the benchmark load shedding expectation of the power system excluding the generator under test; the initial residual determination module 120 is used to determine the load shedding expectation of the power system including the generator under test under at least two initial values ​​of equivalent load increments, and to determine the corresponding reliability residuals based on the difference between each load shedding expectation and the benchmark load shedding expectation; the two-layer iteration module 130 is used to perform two-layer iteration calculations using each initial value of equivalent load increment and the corresponding reliability residuals as initial iteration data through a pre-constructed two-layer iteration architecture; wherein, the two-layer iteration architecture includes an outer layer The process involves two iterations: an outer iteration based on two adjacent equivalent load increments and their corresponding reliability residuals, using a truncated sine method to update the next equivalent load increment; an inner iteration based on the next equivalent load increment to perform a time-series Monte Carlo simulation of the power system containing the unit under test, determining the corresponding load loss expectation, and updating the corresponding reliability residual; and a load capacity determination module 140, which repeats the two-layer iterative calculation until the updated reliability residuals meet the preset convergence conditions, and determines the equivalent load increment corresponding to meeting the preset convergence conditions as the effective load capacity of the unit under test.

[0077] For details and benefits of the unit payload capacity determination device based on a two-layer iterative architecture provided in the embodiments of this application, please refer to the above description of the unit payload capacity determination method based on a two-layer iterative architecture, which will not be repeated here.

[0078] Example 3; This application also provides an electronic device, comprising: a memory for storing at least one instruction; and a processor for calling the instruction stored in the memory to execute the unit payload capacity determination method based on a two-layer iterative architecture provided in the above embodiments.

[0079] This application also provides a computer-readable storage medium storing at least one executable instruction, which is loaded and executed by a processor to implement the unit payload capacity determination method based on a two-layer iterative architecture provided in the above embodiments.

[0080] This application also provides a computer program product, which includes computer program code. When the computer program code is run by a computer, it causes the computer to execute the unit payload capacity determination method based on the two-layer iterative architecture provided in the above embodiments.

[0081] Those skilled in the art will understand that embodiments of this application can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0082] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of this application. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart... Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0083] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0084] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.

[0085] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0086] Memory may include non-persistent memory in computer-readable media, such as random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM. Memory is an example of computer-readable media.

[0087] Computer-readable media includes both permanent and non-permanent, removable and non-removable media that can store information using any method or technology. Information can be computer-readable instructions, data structures, modules of programs, or other data. Examples of computer storage media include, but are not limited to, phase-change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technologies, CD-ROM, digital versatile optical disc (DVD) or other optical storage, magnetic tape, magnetic magnetic disk storage or other magnetic storage devices, or any other non-transferable medium that can be used to store information accessible by a computing device. As defined herein, computer-readable media does not include transient computer-readable media, such as modulated data signals and carrier waves.

[0088] It should be noted that the terms "first," "second," and similar terms used in this application do not indicate any order, quantity, or importance, but are merely used to distinguish different parts. Terms such as "including" or "comprising" mean that the element preceding the word covers the element listed after the word, and do not exclude the possibility of covering other elements as well.

[0089] Although the operations are described in a specific order in the accompanying drawings in this application, it should not be construed as requiring these operations to be performed in the specific order or serial order shown, or requiring all of the shown operations to obtain the desired result. In certain environments, multitasking and parallel processing may be advantageous.

[0090] Finally, it should be noted that the above content is only used to illustrate the technical solution of this application, and is not intended to limit the scope of protection of this application. Simple modifications or equivalent substitutions made by those skilled in the art to the technical solution of this application shall not depart from the substance and scope of the technical solution of this application.

Claims

1. A method for determining the effective load capacity of a generating unit based on a two-layer iterative architecture, characterized in that, include: Obtain the baseline expected load shedding of the power system excluding the generator under test; Determine the expected load loss of the power system containing the unit under test under at least two initial values ​​of equivalent load increments, and determine the corresponding reliability residual based on the difference between each expected load loss and the baseline expected load loss; Using the initial values ​​of each equivalent load increment and the corresponding reliability residual as initial iteration data, a two-layer iterative operation is performed through a pre-constructed two-layer iterative architecture. The two-layer iterative architecture includes an outer layer iteration and an inner layer iteration. The outer layer iteration updates the next equivalent load increment using the truncated sine method based on two adjacent equivalent load increments and their corresponding reliability residuals. The inner layer iteration performs a time-series Monte Carlo simulation of the power system containing the unit under test based on the next equivalent load increment, determines the corresponding load loss expectation, and updates the corresponding reliability residual. Repeat the two-level iterative operation until the updated reliability residual meets the preset convergence condition, and determine the equivalent load increment corresponding to the preset convergence condition as the effective load capacity of the unit under test.

2. The method for determining the effective load capacity of a generator unit based on a two-layer iterative architecture according to claim 1, characterized in that, The process of obtaining the baseline load shedding expectation of the power system excluding the generator under test includes: A time-series Monte Carlo simulation was performed on the power system excluding the generator under test to obtain the baseline load shedding expectation.

3. The method for determining the effective load capacity of a generator unit based on a two-layer iterative architecture according to claim 1, characterized in that, Determining the expected load shedding of the power system containing the generator under test under at least two initial values ​​of equivalent load increments includes: The initial values ​​of each equivalent load increment are superimposed onto the time-series load of the power system containing the unit under test, and time-series Monte Carlo simulations are performed respectively to obtain the expected load loss corresponding to each initial value of the equivalent load increment.

4. The method for determining the effective load capacity of a generator unit based on a two-layer iterative architecture according to claim 1, characterized in that, The outer iteration updates the next equivalent load increment based on two adjacent equivalent load increments and the corresponding reliability residuals, using a truncated sine method, including: The difference quotient is determined by the ratio of the difference between two adjacent equivalent load increments to the difference between two adjacent reliability residuals. The current equivalent load increment is corrected based on the difference quotient to obtain the next equivalent load increment.

5. The method for determining the effective load capacity of a generator unit based on a two-layer iterative architecture according to claim 4, characterized in that, The update formula for the next equivalent load increment includes: ; ; ; in, For the first k+ One equivalent load increment, For the first k Subequivalent load increment For the first k One equivalent load increment, For the first k Secondary reliability residuals For the first k 1st reliability residual, For the first k , k The difference between the first and second equivalent load increments and the first k , k The ratio of the differences between the first-order reliability residuals, i.e., the difference quotient. k The sequence number; For the first k Secondary load loss expectation, For the first k Expected load loss in one cycle The baseline is the expected load shedding.

6. The method for determining the effective load capacity of a generator unit based on a two-layer iterative architecture according to claim 1, characterized in that, The inner iteration performs a time-series Monte Carlo simulation of the power system containing the unit under test based on the next equivalent load increment to determine the corresponding load shedding expectation, including: Time-series sampling of the operating and shutdown states of the units in the power system containing the units under test; The available system capacity for each simulation period is determined based on the sampled unit status. The load loss event is determined based on the comparison between the available system capacity and the system load after adding the next equivalent load increment; The corresponding expected load loss is obtained by statistically analyzing the aforementioned load loss events.

7. The method for determining the effective load capacity of a generator unit based on a two-layer iterative architecture according to claim 6, characterized in that, The time-series sampling of the operating and shutdown states of the generating units in the power system containing the units under test includes: Based on the failure rate and repair rate of each unit, each unit is modeled as a two-state Markov model that switches between operating and shutdown states, and the operating state of each unit in each simulation period is determined by random number sampling.

8. The method for determining the effective load capacity of a generator unit based on a two-layer iterative architecture according to claim 1, characterized in that, The preset convergence conditions include: The absolute value of the updated reliability residual is less than or equal to the preset residual threshold; or, The difference between two adjacent equivalent load increments is less than or equal to the preset increment threshold.

9. The method for determining the effective load capacity of a generator unit based on a two-layer iterative architecture according to claim 1, characterized in that, The unit under test is a nuclear power unit.

10. A device for determining the effective load capacity of a generator unit based on a two-layer iterative architecture, characterized in that, include: The baseline acquisition module is used to acquire the baseline load shedding expectation of the power system excluding the generator under test. The initial residual determination module is used to determine the expected load loss of the power system containing the unit under test under at least two initial values ​​of equivalent load increments, and to determine the corresponding reliability residual based on the difference between each expected load loss and the baseline expected load loss. A two-layer iteration module is used to perform two-layer iteration operations using the initial values ​​of each equivalent load increment and the corresponding reliability residual as initial iteration data through a pre-constructed two-layer iteration architecture. The two-layer iteration architecture includes an outer layer iteration and an inner layer iteration. The outer layer iteration updates the next equivalent load increment using a truncated sine method based on two adjacent equivalent load increments and the corresponding reliability residuals. The inner layer iteration performs a time-series Monte Carlo simulation of the power system containing the unit under test based on the next equivalent load increment, determines the corresponding load loss expectation, and updates the corresponding reliability residual. The load capacity determination module is used to repeat the two-level iterative calculation until the updated reliability residual meets the preset convergence condition, and to determine the equivalent load increment corresponding to the preset convergence condition as the effective load capacity of the unit under test.