Low-voltage power outage incident handling methods, devices, computer equipment, and storage media

By analyzing smart meter signals and judging business-related characteristics, the judgment threshold is dynamically adjusted to automatically handle power outage events in low-voltage distribution networks. This solves the problems of perception lag and insufficient accuracy in traditional methods, and achieves efficient and accurate power outage handling.

CN123073746APending Publication Date: 2026-11-10SHENZHEN POWER SUPPLY BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611265597.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-20
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Traditional methods for handling power outages in low-voltage distribution networks rely on manual sensing and investigation, resulting in delayed sensing and rough assessment of the affected area, making it difficult to meet the needs for rapid and accurate handling.

Method used

By acquiring the status signals, electrical sampling signals, and meter location topology signals of smart meters, and combining the signal missing ratio and power grid operation data, the judgment threshold is dynamically adjusted to distinguish between types such as main switch tripping, branch switch tripping, and single-household power outages. Based on business-related characteristics, the cause of the power outage is determined, and power outage events are handled automatically.

Benefits of technology

It reduced the workload of manual on-site inspections, improved the accuracy and efficiency of power outage type determination, reduced duplicate order creation, and lowered the workload of dispatchers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123073746A_ABST
    Figure CN123073746A_ABST
Patent Text Reader

Abstract

This application relates to a method, apparatus, computer equipment, and storage medium for handling low-voltage power outage events. It includes: acquiring the power grid operation signals corresponding to the respective low-voltage distribution areas sent by each low-voltage main gateway; determining the signal loss ratio for the corresponding low-voltage distribution area based on the status signals of each smart meter, and determining the current power outage type for the corresponding low-voltage distribution area based on the relationship between the signal loss ratio and a current judgment threshold, combined with electrical sampling signals and meter location topology signals; wherein the current judgment threshold is determined based on an initial threshold and the corresponding low-voltage distribution area's area weight, load weight, and line aging weight at the current time; determining the degree of correlation between the business correlation characteristics corresponding to the current power outage event and the power grid business data, and determining the cause of the current power outage event based on the degree of correlation; and handling the current power outage event based on the cause. This can improve the efficiency and accuracy of handling low-voltage power outage events.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of fault handling technology for low-voltage distribution networks in power systems, and in particular to a method, apparatus, computer equipment, and storage medium for handling low-voltage power outage events. Background Technology

[0002] With the development of smart grid technology, terminal equipment such as smart meters with communication capabilities have been gradually deployed on the low-voltage distribution network side. These devices can periodically transmit operation signals and electrical quantity data, providing a foundation for proactive detection of low-voltage power outages.

[0003] Traditional methods mainly rely on user reports to trigger power outage handling procedures, with customer service recording the reports and manually dispatching orders, and repair personnel going to the site to troubleshoot the fault point step by step.

[0004] However, this method has problems such as delayed perception, rough assessment of the power outage range, and reliance on human experience for fault location, making it difficult to meet the needs of low-voltage distribution networks for rapid and accurate handling of power outage events. Summary of the Invention

[0005] Therefore, it is necessary to provide a method, apparatus, computer equipment, and storage medium for handling low-voltage power outages that can improve the efficiency and accuracy of handling such incidents, in response to the aforementioned technical problems.

[0006] Firstly, this application provides a method for handling low-voltage power outage events, including:

[0007] Acquire the grid operation signals corresponding to the low-voltage distribution areas sent by each low-voltage main gateway; the grid operation signals include the status signals, electrical sampling signals and meter location topology signals of each smart meter;

[0008] Based on the status signals of each smart meter, the signal loss ratio of the corresponding low-voltage distribution area is determined. Based on the relationship between the signal loss ratio and the current judgment threshold, combined with the electrical sampling signal and the meter location topology signal, the current power outage type of the corresponding low-voltage distribution area is determined. The current judgment threshold is determined based on the initial threshold and the area weight, load weight and line aging weight of the corresponding low-voltage distribution area at the current time.

[0009] Determine the degree of correlation between the business correlation characteristics corresponding to the current power outage event and the power grid business data, and determine the cause of the current power outage event based on the relationship between the degree of correlation and the judgment threshold corresponding to the current power outage type;

[0010] Based on the cause of the power outage, take appropriate measures to address the current power outage situation.

[0011] In one embodiment, the current determination threshold includes a main switch tripping determination threshold and a branch switch tripping determination threshold; correspondingly, based on the relationship between the signal loss ratio and the current determination threshold, combined with the electrical sampling signal and the meter location topology signal, the current power outage type of the corresponding low-voltage distribution area is determined, including:

[0012] When the signal missing ratio exceeds the main switch tripping judgment threshold, the electrical sampling signal has the characteristics of voltage drop across the entire domain and / or three-phase power loss, and the meter location topology signal represents a global power outage, the current power outage type of the corresponding low-voltage distribution area is determined to be the main switch tripping type.

[0013] If the signal loss ratio exceeds the branch switch tripping threshold but does not exceed the main switch tripping threshold, the electrical sampling signal shows local power outage characteristics, and the meter location topology signal indicates a local power outage, then the current power outage type of the corresponding low-voltage distribution area is determined to be the branch switch tripping type.

[0014] In one embodiment, the method further includes:

[0015] If the signal loss ratio does not exceed the branch switch tripping judgment threshold, the meter location topology signal indicates that a single meter is offline, and the electrical sampling signal corresponding to the offline meter is abnormal, the current power outage type of the corresponding low-voltage distribution area is determined to be a single-household power outage type.

[0016] In one embodiment, the service association features include transformer area topology matching features, time deviation features, and operation coverage features; the power grid service data includes transformer area location information, event occurrence time, and operation scope information. Accordingly, determining the degree of association between the service association features corresponding to the current power outage event and the power grid service data includes:

[0017] The topology matching score is determined based on the matching between the transformer area topology matching features and the transformer area location information; the time matching score is determined based on the matching between the time deviation features and the event occurrence time; and the operation coverage score is determined based on the matching between the operation coverage features and the operation range information.

[0018] Based on the weight coefficients corresponding to the current power outage type, the topology matching score, time matching score, and operation coverage score are weighted and summed to obtain the degree of correlation between the business association features corresponding to the current power outage event and the power grid business data.

[0019] In one embodiment, the cause of the current power outage event is determined based on the relationship between the correlation degree and the determination threshold corresponding to the current power outage type, including:

[0020] If the correlation exceeds the corresponding judgment threshold, it is determined that the current power outage event is caused by an external power grid business event;

[0021] If the correlation does not exceed the corresponding judgment threshold, it is determined that the current power outage event is caused by a line fault or equipment fault within the corresponding low-voltage distribution area.

[0022] In one embodiment, the current power outage event is handled in conjunction with the cause of the power outage, including:

[0023] Merge the current power outage event with related power outage events; related power outage events are historical power outage events that occurred within a preset historical time period, and the outage cause of the related power outage event is the same as the outage cause of the current power outage event;

[0024] Based on the merged power outage events, the content of the power outage handling work orders for related power outage events is updated, so that the current power outage event can be handled based on the updated power outage handling work orders.

[0025] In one embodiment, the method further includes:

[0026] In the absence of any associated power outage events, a power outage handling work order is created based on the power outage type and cause of the current power outage event, and the current power outage event is handled based on the newly created power outage handling work order.

[0027] Secondly, this application also provides a low-voltage power outage incident handling device, comprising:

[0028] The acquisition module is used to acquire the power grid operation signals corresponding to the low-voltage distribution areas sent by each low-voltage main gateway; the power grid operation signals include the status signals, electrical sampling signals and meter location topology signals of each smart meter;

[0029] The first determining module is used to determine the signal missing ratio of the corresponding low-voltage distribution area based on the status signals of each smart meter, and to determine the current power outage type of the corresponding low-voltage distribution area based on the relationship between the signal missing ratio and the current judgment threshold, combined with the electrical sampling signal and the meter location topology signal; wherein, the current judgment threshold is determined based on the initial threshold and the area weight, load weight and line aging weight of the corresponding low-voltage distribution area at the current time.

[0030] The second determining module is used to determine the degree of correlation between the business correlation characteristics corresponding to the current power outage event and the power grid business data, and to determine the cause of the current power outage event based on the relationship between the degree of correlation and the judgment threshold corresponding to the current power outage type.

[0031] The handling module is used to handle the current power outage event based on the cause of the power outage.

[0032] Thirdly, this application also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to perform the following steps:

[0033] Acquire the grid operation signals corresponding to the low-voltage distribution areas sent by each low-voltage main gateway; the grid operation signals include the status signals, electrical sampling signals and meter location topology signals of each smart meter;

[0034] Based on the status signals of each smart meter, the signal loss ratio of the corresponding low-voltage distribution area is determined. Based on the relationship between the signal loss ratio and the current judgment threshold, combined with the electrical sampling signal and the meter location topology signal, the current power outage type of the corresponding low-voltage distribution area is determined. The current judgment threshold is determined based on the initial threshold and the area weight, load weight and line aging weight of the corresponding low-voltage distribution area at the current time.

[0035] Determine the degree of correlation between the business correlation characteristics corresponding to the current power outage event and the power grid business data, and determine the cause of the current power outage event based on the relationship between the degree of correlation and the judgment threshold corresponding to the current power outage type;

[0036] Based on the cause of the power outage, take appropriate measures to address the current power outage situation.

[0037] Fourthly, this application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, performs the following steps:

[0038] Acquire the grid operation signals corresponding to the low-voltage distribution areas sent by each low-voltage main gateway; the grid operation signals include the status signals, electrical sampling signals and meter location topology signals of each smart meter;

[0039] Based on the status signals of each smart meter, the signal loss ratio of the corresponding low-voltage distribution area is determined. Based on the relationship between the signal loss ratio and the current judgment threshold, combined with the electrical sampling signal and the meter location topology signal, the current power outage type of the corresponding low-voltage distribution area is determined. The current judgment threshold is determined based on the initial threshold and the area weight, load weight and line aging weight of the corresponding low-voltage distribution area at the current time.

[0040] Determine the degree of correlation between the business correlation characteristics corresponding to the current power outage event and the power grid business data, and determine the cause of the current power outage event based on the relationship between the degree of correlation and the judgment threshold corresponding to the current power outage type;

[0041] Based on the cause of the power outage, take appropriate measures to address the current power outage situation.

[0042] Fifthly, this application also provides a computer program product, including a computer program that, when executed by a processor, performs the following steps:

[0043] Acquire the grid operation signals corresponding to the low-voltage distribution areas sent by each low-voltage main gateway; the grid operation signals include the status signals, electrical sampling signals and meter location topology signals of each smart meter;

[0044] Based on the status signals of each smart meter, the signal loss ratio of the corresponding low-voltage distribution area is determined. Based on the relationship between the signal loss ratio and the current judgment threshold, combined with the electrical sampling signal and the meter location topology signal, the current power outage type of the corresponding low-voltage distribution area is determined. The current judgment threshold is determined based on the initial threshold and the area weight, load weight and line aging weight of the corresponding low-voltage distribution area at the current time.

[0045] Determine the degree of correlation between the business correlation characteristics corresponding to the current power outage event and the power grid business data, and determine the cause of the current power outage event based on the relationship between the degree of correlation and the judgment threshold corresponding to the current power outage type;

[0046] Based on the cause of the power outage, take appropriate measures to address the current power outage situation.

[0047] The aforementioned low-voltage power outage event handling methods, devices, computer equipment, and storage media acquire meter status, electrical sampling, and topology-related grid operation signals reported by the low-voltage main gateway through a server. They dynamically adjust judgment thresholds based on factors such as transformer area, load, and line aging. Then, based on signal loss ratios, electrical characteristics, and topological relationships, they differentiate between different outage types, such as main switch tripping, branch switch tripping, and single-household outages. Compared to related technologies that rely on maintenance personnel conducting on-site layer-by-layer verification and investigation, this outage type determination process reduces the workload of manual on-site investigation and improves the accuracy of outage type determination. By correlating and comparing outage events with various grid business data, the actual cause of the outage is determined based on the degree of correlation. The current outage event is then handled based on the cause, reducing duplicate work orders for the same outage cause and alleviating the workload of dispatchers verifying data across systems. In summary, the above process improves the accuracy and efficiency of outage type determination and reduces the inefficiency of outage event handling caused by duplicate work orders. Attached Figure Description

[0048] To more clearly illustrate the technical solutions in the embodiments of this application or related technologies, the drawings used in the description of the embodiments of this application or related technologies will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0049] Figure 1 This is an application environment diagram of a low-voltage power outage event handling method in one embodiment;

[0050] Figure 2 This is a flowchart illustrating a low-voltage power outage event handling method in one embodiment;

[0051] Figure 3 This is a flowchart illustrating the steps for determining the degree of association in one embodiment;

[0052] Figure 4 This is a flowchart illustrating the current power outage event handling steps in one embodiment;

[0053] Figure 5 This is a flowchart illustrating a low-voltage power outage event handling method in another embodiment;

[0054] Figure 6 This is a structural block diagram of a low-voltage power outage event handling device in one embodiment;

[0055] Figure 7 This is an internal structural diagram of a computer device in one embodiment. Detailed Implementation

[0056] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.

[0057] It should be noted that the terms "first," "second," etc., used in this application can be used to describe various elements, but these elements are not limited by these terms. These terms are only used to distinguish the first element from the second element. The terms "comprising" and "having," and any variations thereof, used in this application, are intended to cover non-exclusive inclusion. The term "multiple" used in this application refers to two or more. The term "and / or" used in this application refers to one of the embodiments, or any combination of multiple embodiments.

[0058] The low-voltage power outage event handling method provided in this application embodiment can be applied to, for example... Figure 1 In the application environment shown, server 102 has a communication connection with at least one low-voltage distribution area (the first low-voltage distribution area 104 and the second low-voltage distribution area 106 are used as examples in the figure). This means that server 102 has a communication connection with the distribution terminal deployed in the corresponding low-voltage distribution area. Each low-voltage distribution area has one distribution terminal and one low-voltage main gateway. At least two branch gateways are connected to the low-voltage main gateway, and at least two smart meters are connected to each branch gateway.

[0059] Specifically, server 102 acquires the grid operation signals corresponding to the low-voltage distribution areas sent by each low-voltage main gateway; the grid operation signals include the status signals, electrical sampling signals, and meter location topology signals of each smart meter; server 102 determines the signal missing ratio corresponding to the corresponding low-voltage distribution area based on the status signals of each smart meter, and determines the current power outage type of the corresponding low-voltage distribution area based on the relationship between the signal missing ratio and the current judgment threshold, combined with the electrical sampling signals and meter location topology signals; wherein, the current judgment threshold is determined based on the initial threshold and the area weight, load weight, and line aging weight corresponding to the corresponding low-voltage distribution area at the current time; server 102 determines the degree of correlation between the business correlation characteristics corresponding to the current power outage event and the grid business data, and determines the cause of the current power outage event based on the relationship between the degree of correlation and the judgment threshold corresponding to the current power outage type; server 102 handles the current power outage event based on the cause of the power outage.

[0060] In one exemplary embodiment, such as Figure 2 As shown, a method for handling low-voltage power outage events is provided, which can be applied to... Figure 1 Taking server 102 as an example, the explanation includes the following steps:

[0061] S210: Obtain the power grid operation signal corresponding to the low-voltage distribution area sent by each low-voltage main gateway.

[0062] The power grid operation signals include the status signals of each smart meter, electrical sampling signals, and meter location topology signals. The status of a smart meter can be used to characterize the online / offline status of a single meter, momentary power loss, heartbeat interruption, and communication failure. The electrical sampling signals can be the real-time three-phase voltage, real-time current, instantaneous power, and voltage and current time-series sampled values ​​of the meter. The meter location topology signals can be used to characterize the hierarchical relationship of the main switch, branch gateways, and smart meters in the distribution area, the meter's Geographic Information System (GIS) coordinates, and the phase sequence distribution of the lines.

[0063] In one optional implementation, the server can obtain the power grid operation signals corresponding to the low-voltage distribution areas sent by each low-voltage main gateway through periodic polling of a message queue. For example, the server continuously receives the smart meter operation signals sent by each low-voltage main gateway to the corresponding low-voltage distribution area through a dual-channel approach of message queue or periodic polling, and transmits these signals to the program backend.

[0064] Optionally, the received power grid operation signals include at least one of four types of messages: heartbeat messages, smart meter periodic sampling data messages, power outage signs at distribution transformer terminals, and meter user information. Specifically, the heartbeat message carries the transformer substation number and gateway operating status, corresponding to the smart meter status signal; the periodic sampling data message carries the smart meter number, current value, voltage value, and signal timestamp, corresponding to the electrical sampling signal; simultaneously, the topology data such as transformer substation level, meter GIS coordinates, and line phase sequence issued by the gateway are received, i.e., the meter location topology signal.

[0065] In some embodiments, to avoid misjudgments caused by equipment malfunctions or data packet loss, the server can maintain a terminal signal status table for each distribution area as an independent unit, recording the gateway's online status, the latest signal reporting time of each smart meter, and the power outage flag of the distribution transformer terminal. Simultaneously, it can calculate the voltage change rate in real time based on the collected voltage and current time-series data, and mark a sharp drop characteristic when the voltage drops by more than 50% within 1 second and the current returns to zero, and mark an undervoltage characteristic when the voltage gradually returns to zero.

[0066] In order to detect power outages as early as possible, the server can determine that the corresponding gateway signal is lost if it detects that each low-voltage main gateway has not uploaded a normal heartbeat message for three consecutive cycles, complete the collection of all power grid operation signals, and automatically trigger the power outage type determination process.

[0067] S220: Based on the status signals of each smart meter, determine the signal loss ratio of the corresponding low-voltage distribution area, and determine the current power outage type of the corresponding low-voltage distribution area according to the relationship between the signal loss ratio and the current judgment threshold, combined with the electrical sampling signal and the meter location topology signal.

[0068] The current judgment threshold is determined based on the initial threshold and the corresponding low-voltage distribution area's area weight, load weight, and line aging weight at the current moment. The initial threshold, area weight, load weight, and line aging weight can all be determined based on manual experience or through extensive experiments; this application does not impose any restrictions on these.

[0069] For example, the current judgment threshold can be determined based on the following formula:

[0070] Thr=BaseThr×(1+α×AreaWeight+β×LoadWeight+γ×LineWeight);

[0071] In the formula, α, β, and γ are the preset weight coefficients that maintenance personnel can configure according to the grid; AreaWeight is the area coefficient, which is +0.15 for urban village transformer areas and -0.1 for purely residential transformer areas; LoadWeight is the load coefficient, which is +0.1 for heavy load transformer areas and -0.08 for light load transformer areas; LineWeight is the line aging coefficient, which is +0.12 for old lines and -0.05 for newly built lines.

[0072] In one optional implementation, the current determination threshold includes a main switch tripping determination threshold and a branch switch tripping determination threshold. Accordingly, if the signal missing ratio exceeds the main switch tripping determination threshold, the electrical sampling signal exhibits global voltage drop characteristics and / or three-phase power loss characteristics, and the meter location topology signal indicates a global power outage, the current power outage type of the corresponding low-voltage distribution area can be determined as a main switch tripping type. If the signal missing ratio exceeds the branch switch tripping determination threshold but does not exceed the main switch tripping determination threshold, the electrical sampling signal exhibits partial power outage characteristics, and the meter location topology signal indicates a partial power outage, the current power outage type of the corresponding low-voltage distribution area can be determined as a branch switch tripping type.

[0073] For example, the current judgment threshold can be used to determine the main switch tripping judgment threshold and the branch switch tripping. Optionally, the main switch tripping judgment logic can be executed first: when the distribution area metering IoT gateway has three consecutive cycles of abnormal heartbeat messages, the distribution transformer terminal reports no power outage signal, and the signal missing ratio exceeds the main switch tripping judgment threshold, the electrical sampling signal has a global steep drop and three-phase uniform voltage drop characteristics, and the meter location topology signal indicates that all meters in the distribution area are under global power outage, the current power outage type of the corresponding low-voltage distribution area is determined to be the main switch tripping type. If the above two conditions are not met, the branch switch tripping judgment logic is entered: the signal missing ratio exceeds the branch switch tripping judgment threshold but does not exceed the main switch tripping judgment threshold, the distribution area gateway has three consecutive cycles of abnormal heartbeats, the distribution transformer terminal has no power outage flag, and at the same time, a spatial topology clustering algorithm is executed based on the meter GIS coordinates and the distribution area topology signal, the offline meters are spatially continuous and concentrated, the electrical sampling has local voltage drop characteristics, and the meter location topology signal indicates a local power outage in the branch range, then the power outage type is determined to be the branch switch tripping type.

[0074] In an alternative implementation, if the signal loss ratio does not exceed the branch switch tripping judgment threshold, the meter location topology signal indicates that a single meter is offline, and the electrical sampling signal corresponding to the offline meter is abnormal, the current power outage type of the corresponding low-voltage distribution area can be determined as a single-household power outage type.

[0075] For example, the server sends active current and voltage detection commands to the offline meter through downlink channels such as High-speed Power Line Communication (HPLC) power line carrier and low-power wireless. If the detection times out without response or the returned voltage is 0 volts, combined with the abnormal electrical sampling signal of the meter, the server determines that the current power outage type of the corresponding low-voltage distribution area is a single-household power outage type.

[0076] It should be noted that, to facilitate subsequent processing of the current power outage event, in some embodiments, the power outage type determination record of the current power outage event can be written into the server's work order database as the data basis for subsequent association matching and dispatch decisions. For example, each determination record contains at least one of the following data fields: a unique event identifier (ID) automatically generated by the system, transformer area number, power outage type (main switch / branch / single household), determination time, number and proportion of smart meters with missing signals, distribution transformer terminal signal status, smart meter recall result (only single household power outage type has a value), and a list of affected users (obtained by looking up the user information table based on the missing signal smart meter number).

[0077] S230, determine the degree of correlation between the business correlation characteristics corresponding to the current power outage event and the power grid business data, and determine the cause of the current power outage event based on the relationship between the degree of correlation and the judgment threshold corresponding to the current power outage type.

[0078] In one optional implementation, a multi-type power grid business database including medium-voltage faults, planned maintenance, marketing metering operations, and customer call repairs can be pre-established. Spatial topology, time synchronization, and user coverage are extracted as three business association features for matching calculations. For each type of power grid business, the scores of the three business association features are calculated separately, and then weighted fusion is performed using fixed weights to obtain the comprehensive correlation between the current power outage event and that type of business. The system configures dedicated judgment thresholds for the three outage types: main switch tripping, branch switch tripping, and single-household power outages. The comprehensive correlation is compared with the judgment threshold corresponding to the current outage type. If the comprehensive correlation is greater than the judgment threshold, the outage is determined to be caused by that type of power grid business. If the comprehensive correlation of all types of businesses is less than the judgment threshold, the outage is determined to be caused by a fault in the distribution network's native equipment.

[0079] In another optional implementation, a two-way time-series sliding window can be set with the power outage assessment time point as the center. Only all power grid business data within the window time range are selected for matching calculation. Two types of business association features, structured address matching and fault text semantics, are extracted uniformly. First, the address similarity score and the text semantic cosine similarity score are calculated separately. Then, the two scores are merged to obtain the comprehensive association degree. The comprehensive association degree is compared with the judgment threshold corresponding to the current power outage type. When the comprehensive association degree is higher than the judgment threshold, the corresponding business is directly locked as the cause of the power outage. When the comprehensive association degree is between the preset middle range and the judgment threshold, the suspected related business is marked and pushed to the dispatcher for manual review. When the comprehensive association degree is lower than the preset middle range, the cause of the power outage is directly determined to be a sudden equipment failure of the line or switch.

[0080] S240, based on the cause of the power outage, handle the current power outage event.

[0081] In one optional implementation, if the cause of the power outage is determined to be a business-related event such as planned maintenance or medium-voltage fault, and the overall correlation exceeds the corresponding determination threshold, the current power outage work order can be automatically marked as not requiring on-site handling, and the work order can be closed directly.

[0082] In another optional implementation, if the cause of the power outage is determined to be a fault in the main switch, branch switch, or individual household equipment, the preset dispatch configuration rules can be read, and the emergency repair work order can be automatically pushed to the corresponding mobile terminal according to the work order level and the location of the emergency repair team.

[0083] To enable dispatchers to intuitively grasp the overall situation of fault handling and track the progress of emergency repairs in real time, some embodiments can render the geographical area of ​​the power outage on a visual map while generating emergency repair work orders, and simultaneously transmit and update the movement trajectory of emergency repair personnel and the progress information of the entire on-site handling process.

[0084] The aforementioned low-voltage power outage handling method obtains meter status, electrical sampling, and topology-related grid operation signals reported by the low-voltage main gateway through a server. It dynamically adjusts the judgment threshold based on the distribution area, load, and line aging. Then, it distinguishes different outage types such as main switch tripping, branch switch tripping, and single-household power outages based on signal loss ratio, electrical characteristics, and topology relationships. Compared to related technologies that rely on maintenance personnel to conduct on-site layer-by-layer verification and investigation, this outage type determination process reduces the workload of manual on-site investigation and improves the accuracy of outage type determination. By correlating and comparing outage events with various grid business data, the actual cause of the outage is determined based on the degree of business correlation. The current outage event is then handled based on the cause, reducing duplicate work orders for the same outage cause and alleviating the workload of dispatchers in verifying data across systems. In summary, the above process improves the accuracy and efficiency of outage type determination and reduces the inefficiency of outage event handling caused by duplicate work orders.

[0085] Based on the technical solutions of the above embodiments, this application also provides an optional embodiment. In this optional embodiment, the service association features include transformer area topology matching features, time deviation features, and operation coverage features, and the power grid service data includes transformer area location information, event occurrence time, and operation scope information. In this case, the process of determining the degree of association between the service association features corresponding to the current power outage event and the power grid service data will be described.

[0086] See Figure 3 The steps for determining the degree of association shown include:

[0087] S310. Determine the topology matching score based on the matching between the topology matching features of the transformer area and the location information of the transformer area.

[0088] Among them, the transformer area topology matching feature is the spatial topology attribute of the transformer area corresponding to the current power outage event, specifically including the transformer area number covered by this power outage, the list of distribution transformer equipment, the branch power supply range, the set of affected users, and the user-level topology relationship. The transformer area location information is the spatial location data brought by various power grid services, specifically including the list of distribution transformers affected by medium-voltage faults, the range of transformer areas covered by work orders, the equipment covered by marketing operations, the transformer areas associated with customer calls, and structured address level information.

[0089] In one optional implementation, differentiated matching rules can be executed according to the power outage type to perform spatial hierarchical comparison between the transformer topology matching features of the power outage event and the transformer location information of the power grid business, and the matching status between the transformer topology matching features and the transformer location information can be determined based on the comparison results.

[0090] For example, the differentiated matching rules for power outage types can be as follows: a main switch tripping event is considered valid if it matches any associated distribution transformer; a branch switch tripping event requires that more than 80% of the power-receiving users under the branch overlap with the users affected by the business; a single-household power outage event is valid only if it is accurately matched with the user's dedicated distribution transformer and dedicated user number.

[0091] To improve the accuracy of matching scores, in some embodiments, a topological matching degree formula can also be used. Calculate the score, where The number of successfully matched transformers / users, To determine the total number of distribution transformers / total number of users corresponding to the event.

[0092] It should be noted that different scores are assigned according to the corresponding rules for marketing operations, customer calls, and address backup scenarios, and the score is set to zero if there is no topological overlap.

[0093] S320, determine the time matching score based on the matching between the time deviation characteristics and the event occurrence time.

[0094] Among them, the time deviation feature is the time sequence feature consisting of the judgment trigger time of the current power outage event and the fault start and end time; the event occurrence time is the effective time parameter corresponding to various power grid services, including the occurrence time of medium voltage faults, the execution time of work orders, the time of marketing operation plans, and the time of customer call reporting.

[0095] In one optional implementation, the trigger time of the power outage event can be used as a benchmark to calculate the time difference between the power outage timing characteristics and the occurrence time of each business event, and the timing can be determined by combining the corresponding business's preset effective time window. Specifically, the attenuation coefficients for main switch tripping, branch switch tripping, and single-household power outages are 30 minutes, 20 minutes, and 10 minutes, respectively. Marketing operations use a 2-hour time window before and after the outage, and customer calls use a 15-minute time window before and after the outage.

[0096] To improve the accuracy of matching scores, in some embodiments, a time decay formula can also be used. Calculate the time matching score, where, To determine the timing of the power outage event, The time of occurrence of the power grid business event. This is the time decay coefficient. If the time window is exceeded, the score is set to zero. This step ultimately outputs the quantized time matching score.

[0097] S330: Determine the job coverage score based on the matching between job coverage features and job scope information.

[0098] Among them, the operation coverage feature is the scope of affected objects corresponding to the current power outage event, including the scope of distribution transformers, branch areas, and user groups affected by the power outage; the operation scope information is the operation impact, fault impact, and service coverage data corresponding to various power grid services.

[0099] In one optional implementation, the overlap between the covered objects of the power outage event and the operation covered objects of the power grid business can be compared one by one, and differentiated matching standards can be implemented for different business scenarios: the overlap range of users is compared for work order failure scenarios, the operation type and coverage area are compared for marketing operation scenarios, the density of incoming call users and the region are compared for customer call scenarios, and the multi-level address matching accuracy is compared for address fallback scenarios.

[0100] To improve the accuracy of matching scores, in some embodiments, quantitative calculations can be performed separately according to business type: For work order failure scenarios, the overlap ratio between power outage users and users affected by the business is directly used as the median score; for marketing metering operation scenarios, the median score is obtained by combining the weights of operation types, with meter replacement and capacity expansion having a weight of 1.0, overall transformer area renovation having a weight of 0.7, and other marketing operations having a weight of 0.5; for customer call scenarios, a formula is used... Calculate the intermediate score of incoming call density, where, Score based on incoming call density. This refers to the number of calls received in the same area during the same period. The call thresholds for various event types are defined; the call thresholds for the main switch, branch switches, and single-household power outages are 3 households, 2 households, and 1 household, respectively. For the structured address fallback scenario, a single-layer address matching formula is used. Calculate the intermediate score of a single-level address; where, For single-layer address matching scores, Edit the distance for the address text. Cosine similarity of address element semantic vectors These are fixed fusion weight coefficients. A corresponding similarity threshold is used for validity verification.

[0101] It should be noted that the intermediate scores obtained from the above scenarios are validated. If invalid, they are set to 0. The validated values ​​are the job coverage scores. This step finally outputs the determined job coverage scores.

[0102] S340, based on the weight coefficients corresponding to the current power outage type, performs a weighted summation of the topology matching score, time matching score, and operation coverage score to obtain the degree of correlation between the business association features corresponding to the current power outage event and the power grid business data.

[0103] This step performs a weighted fusion calculation based on the topology matching score, time matching score, and job coverage score obtained above, combined with fixed weight coefficients preset for different power outage types and different business scenarios.

[0104] For medium-voltage faults, pre-scheduled work orders, and other work order scenarios, the formula is as follows:

[0105]

[0106] In the formula, Score represents the business association credibility. To preset fixed weight parameters, Score the topology matching. The score is based on the time matching.

[0107] In marketing measurement scenarios, the formula used is:

[0108]

[0109] In the formula, Score represents the job association confidence level. To preset fixed weight parameters, Scoring is based on the matching score of the task scope. For time matching score, Weights for job types.

[0110] For customer call scenarios, the formula is as follows:

[0111]

[0112] In the formula, Score represents the call aggregation correlation degree. To preset fixed weight parameters, Score for address matching. The semantic cosine similarity of the incoming call text. The score is based on the incoming call density.

[0113] In the case of structured address fallback, a multi-level weighted formula is used:

[0114]

[0115] In the formula, The overall address similarity is given by i, where i is the address hierarchy number. The layer weight corresponding to the address of layer i. The single-layer address matching score is the i-th layer; the address levels are, in order, district bureau, street, community / village, building / village group, and household number.

[0116] In the above embodiments, the data is quantified and then fused from multiple dimensions such as space, time sequence, and operation coverage to adapt to different power outage types and heterogeneous power grid services. This can avoid misjudgments from single-dimensional matching, filter out irrelevant business interference, output quantifiable correlation results, reduce reliance on human experience, and thus improve the accuracy and automation level of business correlation analysis of low-voltage power outage events.

[0117] Accordingly, if the correlation exceeds the corresponding judgment threshold, it can be determined that the current power outage event is caused by an external power grid business event; if the correlation does not exceed the corresponding judgment threshold, it can be determined that the current power outage event is caused by a line fault or equipment fault within the corresponding low-voltage distribution area.

[0118] Based on the technical solutions of the above embodiments, this application also provides an optional embodiment. In this optional embodiment, the process of handling the current power outage event in conjunction with the cause of the power outage is further refined.

[0119] See Figure 4 The current power outage incident handling steps shown include:

[0120] S410 merges the current power outage event with related power outage events.

[0121] The associated power outage events are historical power outage events that occurred within a preset historical time period, and the cause of the associated power outage event is the same as the cause of the current power outage event. The preset historical time period can be determined based on manual experience or through extensive experiments, and this application does not impose any limitations on it.

[0122] Specifically, the server obtains the cause of the current power outage event, reads the time parameters of a preset historical period, retrieves all historical power outage events within the preset historical period from the historical power outage event database, and filters out historical power outage events whose causes are consistent with the cause of the current power outage event as associated power outage events. The server then merges the original event data of the current power outage event and associated power outage events, including event number, occurrence time, affected user set, transformer area information, and fault description, to obtain the merged power outage event, thus completing event aggregation.

[0123] S420, based on the merged power outage events, updates the content of the power outage handling work orders for related power outage events, so as to handle the current power outage event based on the updated power outage handling work orders.

[0124] In some embodiments, the server retrieves existing power outage handling work orders corresponding to the associated power outage event, and synchronously updates the event information, affected users, and transformer area data contained in the merged power outage event into the work order content and impact scope fields of the power outage handling work order to form an updated power outage handling work order. The updated power outage handling work order is reused to carry out the handling task of the current power outage event. Subsequently, the work order is sent to the dispatch decision step, which completes the closure or dispatch determination of the work order based on the power restoration status, user characteristics, association identifier, credibility of associated events, and system automatic dispatch configuration.

[0125] In some embodiments, when there is no associated power outage event, a power outage handling work order corresponding to the current power outage event is constructed based on the power outage type and cause of the current power outage event, so as to handle the current power outage event based on the newly created power outage handling work order.

[0126] Specifically, if the server does not find a matching power outage event after searching, it generates a new power outage handling work order based on the power outage type, cause, transformer area information, and list of affected users of the current power outage event. This power outage handling work order carries all the original information of the current power outage event. The newly created power outage handling work order is sent to the dispatch decision step, which then performs subsequent closed-loop judgments or dispatch outputs.

[0127] The work order dispatching decision is executed by the backend server and is triggered after the power outage event is associated and matched. The core task is to automatically determine whether the work order generated by the event needs to be dispatched to the repair personnel or directly closed based on the power restoration status, user characteristics, association identifiers, and the credibility of the associated event. The specific execution process is as follows:

[0128] (1) Automatic work dispatch function configuration: The backend server reads the configuration items entered by the administrator in the configuration interface. The configuration items include the automatic work dispatch main switch, the automatic work dispatch options configured according to the power outage type, and the automatic work dispatch strategy configured according to the transformer area or grid. Based on the parsed user level, the work orders corresponding to large customers, key customers, and important users are set as high-level work orders. The work order level is set according to the power outage type. The tripping priority of the main switch is greater than that of the branch switch, and the tripping priority of the branch switch is greater than that of a single household power outage. All the above configurations are stored in the system configuration table in the form of key-value pairs. The work dispatch decision module reads the currently effective configuration in real time each time it processes a work order.

[0129] (2) Closed-loop judgment of association identifier and association credibility: The backend server reads the association matching results of the analysis record, judges whether the association identifier exists, and judges whether the credibility of the association event is greater than the specified threshold. When the analysis record has an association identifier and the credibility of the association event is greater than the specified threshold, the work order status is directly set to "closed-loop" and does not enter the subsequent work dispatch process. When there is an association identifier but the credibility of the association event is less than the threshold, it is handed over to the service dispatch personnel for offline judgment before deciding whether to dispatch.

[0130] (3) Quick power restoration automatic closed-loop judgment: For the judgment events that were not filtered in the previous step, the backend server checks the power restoration status of the smart meters; the backend server monitors the signal status of smart meters within the scope of the judgment event in real time. If the smart meters under the transformer area that experienced signal interruption upload the first power restoration time message within the configurable time threshold (default 10 minutes) calculated from the time the work order warning was created, it is determined that the power outage has been self-healed, the work order is marked as "power restored" and the closed loop is directly closed, and the reason for the closed loop is recorded.

[0131] (4) Closed-loop determination of the same user name: For the analysis event that has not yet been closed, the backend server executes the algorithm to determine whether the affected users are the same user name; extracts the usernames of all users from the output list of affected users. If there is only a single user entry, it is determined to be a single user; if there are multiple user entries, compare all usernames. If all usernames are consistent, it is determined to be the same user name; read the urban village identification field in the basic information table of the transformer area. If the urban village identification is negative, the work order is closed directly and the reason for the closure is recorded; if the urban village identification is positive, the work order is dispatched.

[0132] (5) Dispatch output: After filtering through the above steps, the work orders that need to be dispatched are obtained; read the automatic dispatch switch configuration. When automatic dispatch is turned on, the work orders are automatically pushed to the mobile terminals of the emergency repair personnel according to the grid affiliation, emergency repair team schedule, and nearest distance principle; when automatic dispatch is turned off, the work orders enter the dispatcher's waiting queue for dispatch, and are manually dispatched after manual review.

[0133] To achieve full-process visual monitoring of power outage handling work orders, accurately display the scope of power outage impact and repair progress, ensure priority handling of high-priority work orders, and improve the overall handling and control capabilities of power outage events, in some embodiments, after completing the above-mentioned S410 and S420 power outage event merging and power outage handling work order update or creation process, and after completing the automatic closure of the work order or work order determination through the work dispatch decision step, the server starts the visual display and on-site repair execution control process.

[0134] For example, the server aggregates the power outage type and business-related information of the current power outage event, and pushes the latest work order status data, after aggregation processing by S410 and S420, to the front-end visualization platform for page rendering and display. The server then pushes the work orders that need to be dispatched to the mobile repair app of the repair personnel, receives work order acceptance feedback from the on-site personnel, and simultaneously records the on-site attendance and handling behavior of the repair personnel. During the fault repair, the back-end server continuously receives the activity trajectory of the repair personnel, repair process information, and on-site repair photos transmitted back from the mobile app, and updates and synchronizes key handling node data such as estimated arrival time, estimated power restoration time, and actual power restoration time to the front end in real time.

[0135] Based on the technical solutions of the above embodiments, this application also provides an optional embodiment. In this optional embodiment, the low-voltage power outage event handling method provided by this application is described in detail.

[0136] See Figure 5 The low-voltage power outage incident handling methods shown include:

[0137] S510: Obtain the power grid operation signal corresponding to the low-voltage distribution area sent by each low-voltage main gateway.

[0138] Among them, the power grid operation signals include the status signals of each smart meter, electrical sampling signals, and meter location topology signals.

[0139] S520 determines the signal loss ratio of the corresponding low-voltage distribution area based on the status signals of each smart meter, and determines the current power outage type of the corresponding low-voltage distribution area based on the relationship between the signal loss ratio and the current judgment threshold, combined with the electrical sampling signal and the meter location topology signal.

[0140] The current judgment threshold is determined based on the initial threshold and the corresponding low-voltage distribution area's area weight, load weight, and line aging weight at the current moment.

[0141] For example, when the signal loss ratio exceeds the main switch tripping threshold, the electrical sampling signal exhibits a global voltage drop characteristic and / or three-phase power failure characteristic, and the meter location topology signal indicates a global power outage, the current power outage type of the corresponding low-voltage distribution area is determined to be the main switch tripping type; when the signal loss ratio exceeds the branch switch tripping threshold but does not exceed the main switch tripping threshold, the electrical sampling signal exhibits a partial power outage characteristic, and the meter location topology signal indicates a partial power outage, the current power outage type of the corresponding low-voltage distribution area is determined to be the branch switch tripping type; when the signal loss ratio does not exceed the branch switch tripping threshold, the meter location topology signal indicates a single meter is offline, and the electrical sampling signal corresponding to the offline meter is abnormal, the current power outage type of the corresponding low-voltage distribution area is determined to be the single-household power outage type.

[0142] S530: Determine the topology matching score based on the matching between the topology matching features of the transformer area and the location information of the transformer area; determine the time matching score based on the matching between the time deviation features and the time of event occurrence; and determine the operation coverage score based on the matching between the operation coverage features and the operation range information.

[0143] S540, based on the weight coefficients corresponding to the current power outage type, performs a weighted summation of the topology matching score, time matching score, and operation coverage score to obtain the degree of correlation between the business association features corresponding to the current power outage event and the power grid business data.

[0144] S550: Determine the cause of the current power outage event based on the relationship between the correlation degree and the judgment threshold corresponding to the current power outage type.

[0145] For example, if the correlation exceeds the corresponding judgment threshold, it is determined that the current power outage event is caused by an external power grid business event; if the correlation does not exceed the corresponding judgment threshold, it is determined that the current power outage event is caused by a line fault or equipment fault within the corresponding low-voltage distribution area.

[0146] S560, based on the cause of the power outage, handles the current power outage event.

[0147] For example, the current power outage event and related power outage events are merged; the related power outage events are historical power outage events that occurred within a preset historical period, and the outage cause of the related power outage events is the same as that of the current power outage event; based on the merged power outage events, the content of the power outage handling work orders for the related power outage events is updated, so that the current power outage event can be handled based on the updated power outage handling work orders. If there are no related power outage events, a power outage handling work order corresponding to the current power outage event is constructed based on the outage type and outage cause of the current power outage event, so that the current power outage event can be handled based on the newly created power outage handling work order.

[0148] It should be understood that although the steps in the flowcharts of the above embodiments are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the above embodiments may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages in other steps. It is understood that the steps in different embodiments can be freely combined as needed, and all non-contradictory solutions formed by such combinations are within the scope of protection of this application.

[0149] Based on the same inventive concept, this application also provides a low-voltage power outage event handling device for implementing the low-voltage power outage event handling method described above. The solution provided by this device is similar to the solution described in the above method. Therefore, the specific limitations of one or more low-voltage power outage event handling device embodiments provided below can be found in the limitations of the low-voltage power outage event handling method above, and will not be repeated here.

[0150] In one exemplary embodiment, such as Figure 6 As shown, a low-voltage power outage event handling device is provided, including: an acquisition module 610, a first determination module 620, a second determination module 630, and a handling module 640, wherein:

[0151] The acquisition module 610 is used to acquire the power grid operation signals corresponding to the low-voltage distribution areas sent by each low-voltage main gateway; the power grid operation signals include the status signals, electrical sampling signals and meter location topology signals of each smart meter;

[0152] The first determining module 620 is used to determine the signal missing ratio of the corresponding low-voltage distribution area based on the status signals of each smart meter, and to determine the current power outage type of the corresponding low-voltage distribution area based on the relationship between the signal missing ratio and the current judgment threshold, combined with the electrical sampling signal and the meter location topology signal; wherein, the current judgment threshold is determined based on the initial threshold and the area weight, load weight and line aging weight of the corresponding low-voltage distribution area at the current time.

[0153] The second determining module 630 is used to determine the degree of correlation between the business correlation characteristics corresponding to the current power outage event and the power grid business data, and to determine the cause of the current power outage event based on the relationship between the degree of correlation and the judgment threshold corresponding to the current power outage type.

[0154] The handling module 640 is used to handle the current power outage event based on the cause of the power outage.

[0155] In one embodiment, the current determination threshold includes a main switch tripping determination threshold and a branch switch tripping determination threshold. Correspondingly, the first determination module 620 includes a first determination unit, used to determine the current power outage type of the corresponding low-voltage distribution area as a main switch tripping type when the signal missing ratio exceeds the main switch tripping determination threshold, the electrical sampling signal has global voltage drop characteristics and / or three-phase power loss characteristics, and the meter location topology signal indicates a global power outage. The second determination unit is used to determine the current power outage type of the corresponding low-voltage distribution area as a branch switch tripping type when the signal missing ratio exceeds the branch switch tripping determination threshold but does not exceed the main switch tripping determination threshold, the electrical sampling signal has local power outage characteristics, and the meter location topology signal indicates a local power outage.

[0156] In one embodiment, the first determining module 620 further includes a third determining unit, used to determine the current power outage type of the corresponding low-voltage distribution area as a single-household power outage type when the signal missing ratio does not exceed the branch switch tripping determination threshold, the meter location topology signal indicates that a single meter is offline, and the electrical sampling signal corresponding to the offline meter is abnormal.

[0157] In one embodiment, the business association features include transformer area topology matching features, time deviation features, and operation coverage features, and the power grid business data includes transformer area location information, event occurrence time, and operation scope information. Correspondingly, the second determining module includes a fourth determining unit, used to determine a topology matching score based on the matching between the transformer area topology matching features and the transformer area location information; determine a time matching score based on the matching between the time deviation features and the event occurrence time; and determine an operation coverage score based on the matching between the operation coverage features and the operation scope information. A fifth determining unit is used to perform a weighted summation of the topology matching score, time matching score, and operation coverage score based on the weighting coefficients corresponding to the current power outage type, to obtain the degree of association between the business association features corresponding to the current power outage event and the power grid business data.

[0158] In one embodiment, the second determining module includes a sixth determining unit, used to determine that the current power outage event is caused by an external power grid business event when the correlation degree exceeds the corresponding determination threshold; and a seventh determining unit, used to determine that the current power outage event is caused by a line fault or equipment fault within the corresponding low-voltage distribution area when the correlation degree does not exceed the corresponding determination threshold.

[0159] In one embodiment, the processing module includes a first processing unit, used to merge the current power outage event with related power outage events; the related power outage events are historical power outage events generated within a preset historical time period, and the outage cause of the related power outage events is the same as the outage cause of the current power outage event; the second processing unit is used to update the content of the power outage processing work order of the related power outage events based on the merged power outage events, so as to process the current power outage event based on the updated power outage processing work order.

[0160] In one embodiment, the handling module further includes a third handling unit, which is used to construct a power outage handling work order corresponding to the current power outage event based on the power outage type and cause of the current power outage event when there is no associated power outage event, so as to handle the current power outage event based on the newly created power outage handling work order.

[0161] Each module in the aforementioned low-voltage power outage incident handling device can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in the processor of a computer device in hardware form or independent of it, or stored in the memory of a computer device in software form, so that the processor can call and execute the corresponding operations of each module.

[0162] In one exemplary embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be as follows: Figure 7As shown, the computer device includes a processor, memory, input / output interfaces, a communication interface, a display unit, and an input device. The processor, memory, and input / output interfaces are connected via a system bus, and the communication interface, display unit, and input device are also connected to the system bus via the input / output interfaces. The processor provides computing and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system and computer programs. The internal memory provides an environment for the operation of the operating system and computer programs stored in the non-volatile storage media. The input / output interfaces are used for exchanging information between the processor and external devices. The communication interface is used for wired or wireless communication with external terminals; wireless communication can be achieved through Wi-Fi, mobile cellular networks, Near Field Communication (NFC), or other technologies. When the computer program is executed by the processor, it implements a method for handling low-voltage power outage events. The display unit is used to form a visually visible image and can be a display screen, a projection device, or a virtual reality imaging device. The display screen can be an LCD screen or an e-ink screen. The input device of the computer device can be a touch layer covering the display screen, or buttons, trackballs, or touchpads set on the casing of the computer device, or external keyboards, touchpads, or mice, etc.

[0163] Those skilled in the art will understand that Figure 7 The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the computer device to which the present application is applied. Specific computer devices may include more or fewer components than those shown in the figure, or combine certain components, or have different component arrangements.

[0164] In one exemplary embodiment, a computer device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the steps in the above-described method embodiments.

[0165] In one embodiment, a computer-readable storage medium is provided having a computer program stored thereon, which, when executed by a processor, implements the steps in the above method embodiments.

[0166] In one embodiment, a computer program product is provided, including a computer program that, when executed by a processor, implements the steps in the above method embodiments.

[0167] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, data stored, data displayed, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of the relevant data must comply with relevant regulations.

[0168] Those skilled in the art will understand that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium. When executed, the computer program can include the processes of the embodiments of the above methods. Any references to memory, databases, or other media used in the embodiments provided in this application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM). The databases involved in the embodiments provided in this application may include at least one type of relational database and non-relational database. Non-relational databases may include, but are not limited to, blockchain-based distributed databases. The processors involved in the embodiments provided in this application may be general-purpose processors, central processing units, graphics processing units, digital signal processors, programmable logic devices, quantum computing-based data processing logic devices, artificial intelligence (AI) processors, etc., and are not limited to these.

[0169] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.

[0170] The above embodiments merely illustrate several implementation methods of this application, and their descriptions are relatively specific and detailed, but they should not be construed as limiting the scope of this application's patent. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this application should be determined by the appended claims.

Claims

1. A method for handling low-voltage power outage incidents, characterized in that, The method is applied to a server, wherein the server has a communication connection with at least one low-voltage distribution area, each low-voltage distribution area is equipped with a distribution terminal and a low-voltage main gateway, and at least two branch gateways are connected to the low-voltage main gateway, and at least two smart meters are connected to each branch gateway; the method includes: Acquire the grid operation signal corresponding to the low-voltage distribution area sent by each of the low-voltage main gateways; the grid operation signal includes the status signal, electrical sampling signal and meter location topology signal of each smart meter; Based on the status signals of each smart meter, the signal loss ratio corresponding to the corresponding low-voltage distribution area is determined. Based on the relationship between the signal loss ratio and the current judgment threshold, combined with the electrical sampling signal and the meter location topology signal, the current power outage type of the corresponding low-voltage distribution area is determined. The current judgment threshold is determined based on the initial threshold and the area weight, load weight and line aging weight of the corresponding low-voltage distribution area at the current time. Determine the degree of correlation between the business association characteristics corresponding to the current power outage event and the power grid business data, and determine the cause of the current power outage event based on the relationship between the degree of correlation and the judgment threshold corresponding to the current power outage type; Based on the stated cause of the power outage, the current power outage event will be handled accordingly.

2. The method according to claim 1, characterized in that, The current judgment threshold includes the main switch tripping judgment threshold and the branch switch tripping judgment threshold; correspondingly, determining the current power outage type of the corresponding low-voltage distribution area based on the relationship between the signal missing ratio and the current judgment threshold, combined with the electrical sampling signal and the meter location topology signal, includes: If the signal missing ratio exceeds the main switch tripping determination threshold, the electrical sampling signal has global voltage drop characteristics and / or three-phase power loss characteristics, and the meter location topology signal represents a global power outage, then the current power outage type of the corresponding low-voltage distribution area is determined to be the main switch tripping type. If the signal missing ratio exceeds the branch switch tripping determination threshold but does not exceed the main switch tripping determination threshold, the electrical sampling signal has local power outage characteristics, and the meter location topology signal represents a local power outage, then the current power outage type of the corresponding low-voltage distribution area is determined to be the branch switch tripping type.

3. The method according to claim 2, characterized in that, The method further includes: If the signal missing ratio does not exceed the branch switch tripping determination threshold, the meter location topology signal indicates that a single meter is offline, and the electrical sampling signal corresponding to the offline meter is abnormal, the current power outage type of the corresponding low-voltage distribution area is determined to be a single-household power outage type.

4. The method according to claim 3, characterized in that, The business association features include transformer area topology matching features, time deviation features, and operation coverage features; the power grid business data includes transformer area location information, event occurrence time, and operation scope information; correspondingly, determining the degree of association between the business association features corresponding to the current power outage event and the power grid business data includes: A topology matching score is determined based on the matching between the transformer area topology matching features and the transformer area location information; a time matching score is determined based on the matching between the time deviation features and the event occurrence time; and a job coverage score is determined based on the matching between the job coverage features and the job range information. Based on the weight coefficients corresponding to the current power outage type, the topology matching score, the time matching score, and the operation coverage score are weighted and summed to obtain the degree of correlation between the business association features corresponding to the current power outage event and the power grid business data.

5. The method according to claim 4, characterized in that, The step of determining the cause of the current power outage event based on the relationship between the correlation degree and the determination threshold corresponding to the current power outage type includes: If the correlation exceeds the corresponding determination threshold, it is determined that the current power outage event is caused by an external power grid service event. If the correlation does not exceed the corresponding determination threshold, it is determined that the current power outage event is caused by a line fault or equipment fault within the corresponding low-voltage distribution area.

6. The method according to any one of claims 1-5, characterized in that, The handling of the current power outage event, based on the stated cause of the power outage, includes: The current power outage event is merged with related power outage events; the related power outage events are historical power outage events that occurred within a preset historical period, and the cause of the power outage in the related power outage events is the same as the cause of the power outage in the current power outage event; Based on the merged power outage events, the content of the power outage handling work orders for the associated power outage events is updated, so that the current power outage event can be handled based on the updated power outage handling work orders.

7. The method according to claim 6, characterized in that, The method further includes: In the absence of the associated power outage event, a power outage handling work order is constructed based on the power outage type and cause of the current power outage event, so as to handle the current power outage event based on the newly created power outage handling work order.

8. A low-voltage power outage incident handling device, characterized in that, The device is configured on a server, which has a communication connection with at least one low-voltage distribution area. Each low-voltage distribution area is equipped with a power distribution terminal and a low-voltage main gateway. At least two branch gateways are connected to the low-voltage main gateway, and at least two smart meters are connected to each branch gateway. The device includes: The acquisition module is used to acquire the power grid operation signal corresponding to the low-voltage distribution area sent by each of the low-voltage main gateways; the power grid operation signal includes the status signal, electrical sampling signal and meter location topology signal of each smart meter; The first determining module is used to determine the signal missing ratio of the corresponding low-voltage distribution area based on the status signals of each smart meter, and to determine the current power outage type of the corresponding low-voltage distribution area based on the relationship between the signal missing ratio and the current determination threshold, combined with the electrical sampling signal and the meter location topology signal; wherein, the current determination threshold is determined based on the initial threshold and the area weight, load weight and line aging weight of the corresponding low-voltage distribution area at the current time; The second determining module is used to determine the degree of correlation between the business association characteristics corresponding to the current power outage event and the power grid business data, and to determine the cause of the current power outage event based on the relationship between the degree of correlation and the judgment threshold corresponding to the current power outage type. The processing module is used to process the current power outage event based on the cause of the power outage.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that, When the processor executes the computer program, it implements the steps of the method according to any one of claims 1-7.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1-7.