Methods, apparatus, controllers and products for controlling power transmission units

By adjusting the duty cycle of the switch in the PTU, the high-voltage battery energy is transferred to the output capacitor and then to the input capacitor, solving the problem of low SCS pre-charging efficiency and achieving efficient and low-cost SCS charging.

CN123074281APending Publication Date: 2026-11-10ROBERT BOSCH GMBH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510604460.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-09
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

In the prior art, the pre-charging efficiency of the stack contactor switch (SCS) of the fuel cell system is low, and the efficiency is even lower and the charging time is longer when using low-voltage batteries, resulting in greater energy loss.

Method used

By adjusting the duty cycle of multiple switches in the PTU, these switches are iteratively opened and closed, transferring electrical energy from the high-voltage battery to the output capacitor, and then to the input capacitor to charge the SCS.

Benefits of technology

This improves the charging efficiency of SCS, reduces charging costs, shortens charging time, and avoids the cost of increasing hardware circuitry.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123074281A_ABST
    Figure CN123074281A_ABST
Patent Text Reader

Abstract

Embodiments of this disclosure relate to methods, apparatus, controllers, and program products for controlling a power transmission unit (PTU). The method includes receiving a request to charge the voltage of an input capacitor in the PTU, connected in parallel with a stack contactor switch (SCS), to a target voltage. The method further includes determining, based on the target voltage, the duty cycle of at least two switches in a set of switches in the PTU. The method also includes controlling, based on the duty cycle, at least two switches to charge the input capacitor to the target voltage. In this manner, the SCS can be charged using the high-voltage battery of the fuel cell system, improving charging efficiency and reducing charging costs compared to charging the SCS using a low-voltage battery.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of this disclosure generally relate to the field of intelligent driving of vehicles, and in particular to methods, apparatus, controllers and program products for controlling a power transmission unit (PTU). Background Technology

[0002] For fuel cell systems, the power transfer unit (PTU) is typically used to transfer electrical energy from the fuel cell power system (e.g., the fuel cell stack) to the power battery (e.g., a high-voltage (HV) battery). A PTU typically includes components such as a DC-DC converter, control unit, sensors, capacitors, resistors, stack contactor switches (SCS), and communication interfaces. The DC-DC converter typically includes multiple switches (e.g., metal-oxide-semiconductor field-effect transistors, MOSFETs). MOSFETs control current flow through their gate voltage and are characterized by high input impedance, low power consumption, and high reliability. Summary of the Invention

[0003] In general, the various example embodiments of this disclosure provide technical solutions for controlling the PTU.

[0004] In a first aspect, a method for controlling a power supply unit (PTU) is provided. The method includes receiving a request to charge the voltage of an input capacitor in the PTU, connected in parallel with an input switch (SCS), to a target voltage. The method further includes determining, based on the target voltage, the duty cycle of at least two switches in a set of switches in the PTU. The method also includes controlling, based on the duty cycle, at least two switches to charge the voltage of the input capacitor to the target voltage.

[0005] In a second aspect, an apparatus for controlling a power supply unit (PTU) is provided. The apparatus includes a receiving module configured to receive a request to charge the voltage of an input capacitor in the PTU, connected in parallel with an input switch (SCS), to a target voltage. The apparatus also includes a determining module configured to determine, based on the target voltage, the duty cycle of at least two switches in a set of switches in the PTU. The apparatus further includes a control module configured to control at least two switches, based on the duty cycle, to charge the voltage of the input capacitor to the target voltage.

[0006] In a third aspect, a controller is provided. The controller includes a processor; and a memory coupled to the processor and having instructions stored thereon, which, when executed by the processor, cause the controller to perform the method according to the first aspect.

[0007] In a fourth aspect, a vehicle is provided. The vehicle includes a controller as described in the third aspect.

[0008] In a fifth aspect, a computer-readable medium is provided. The computer-readable medium includes instructions stored thereon that, when executed by a processor, cause the processor to perform the method described in the first aspect.

[0009] In a sixth aspect, a program product is provided. The program product includes a computer program that, when executed, implements the method according to the first aspect.

[0010] It should be understood that this summary is not intended to identify key or essential features of the embodiments of this disclosure, nor is it intended to limit the scope of this disclosure. Other features of this disclosure will become readily apparent from the following description. Attached Figure Description

[0011] The above and other objects, features, and advantages of this disclosure will become more apparent from the accompanying drawings, which illustrate several exemplary embodiments disclosed herein by way of example and without limitation.

[0012] Figure 1 The illustration shows a schematic diagram of an example fuel cell system that can implement various embodiments of the present disclosure;

[0013] Figure 2 The illustration shows a schematic diagram of an example structure of a PTU according to some embodiments of the present disclosure;

[0014] Figure 3 The illustration shows a schematic diagram of the control flow of a proportional-integral (PI) controller performing pre-charge according to some embodiments of the present disclosure;

[0015] Figure 4 The illustration shows a schematic diagram of the control flow of a PI controller performing current control according to some embodiments of the present disclosure;

[0016] Figure 5 The illustration shows a flowchart of a method for controlling a PTU according to some embodiments of the present disclosure;

[0017] Figure 6 The illustration shows a flowchart of an apparatus for controlling a PTU according to some embodiments of the present disclosure; and

[0018] Figure 7 A schematic block diagram of an example controller implementing some embodiments of the present disclosure is shown.

[0019] In all the accompanying drawings, the same or similar reference numerals denote the same or similar elements. Detailed Implementation

[0020] Embodiments of this disclosure will now be described in more detail with reference to the accompanying drawings. While some embodiments of this disclosure are shown in the drawings, it should be understood that this disclosure can be implemented in various forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided to provide a more thorough and complete understanding of this disclosure. It should be understood that the accompanying drawings and embodiments of this disclosure are for illustrative purposes only and are not intended to limit the scope of protection of this disclosure. The embodiments of this disclosure described below with reference to the accompanying drawings are for illustrative purposes only.

[0021] As described above, the power transfer unit (PTU) is positioned between the fuel cell stack and the high-voltage battery (also known as the power battery) to transfer electrical energy from the fuel cell power system to the high-voltage battery. The PTU typically includes a stack contactor switch (SCS). The SCS can be configured to be closed or open as needed. When the SCS changes from open to closed, the large voltage difference across it can potentially generate an electric arc (spark), affecting safety. Therefore, the SCS can be pre-charged to reduce the voltage difference, thus preventing arcing when it closes.

[0022] Traditionally, pre-charging of SCS (Supercharged Combustion Sealing System) is performed using low-voltage batteries (typically 12V or 24V). Since pre-charging an SCS typically requires bringing its terminals to a voltage close to that of a high-voltage battery, using low-voltage batteries for pre-charging is inefficient, time-consuming, and results in significant energy loss. Improving the efficiency of SCS pre-charging is a challenge.

[0023] In view of this, to address at least one of the aforementioned drawbacks, embodiments of this disclosure provide a scheme for controlling a PTU. This scheme adjusts the duty cycles of multiple switches(s) in the PTU, causing these switches(s) to iteratively open and close, thereby transferring electrical energy from the high-voltage battery to the output capacitor of the PTU, and then transferring the energy from the output capacitor to the input capacitor of the PTU to charge the SCS. Thus, this scheme achieves the purpose of pre-charging the SCS using a high-voltage battery. Therefore, compared to charging the SCS using a low-voltage battery, it improves charging efficiency and reduces charging costs.

[0024] Figure 1 The illustration shows a schematic diagram of an example fuel cell system 100 that may implement various embodiments of the present disclosure. The example fuel cell system 100 is merely illustrative and is not intended to imply any limitation on the scope or functionality of the embodiments of the present disclosure described herein.

[0025] like Figure 1As shown, the example fuel cell system 100 may include a fuel cell stack 101. The fuel cell stack 101 may include an anode 102, a membrane electrode assembly (MEA) 103, and a cathode 104. In the fuel cell stack 101, hydrogen in the anode 102 and oxygen in the cathode 104 can undergo an electrochemical reaction at the MEA 103 to generate electrical energy, which is then used to power a load via a power transfer unit (PTU) 105. For example, the PTU may include a DC-DC converter, and the fuel cell stack 101 may be connected to a high-voltage battery 120, which then powers the load. In the fuel cell stack 101, a potential difference is generated between the anode 102 and the cathode 104 during the electrochemical reaction; this potential difference is the output voltage of the fuel cell stack 101. In embodiments of this disclosure, the fuel cell system 100 may include multiple subsystems, such as a hydrogen system (which can provide hydrogen), a cathode system (which can provide humid air), a thermal system (which can control the temperature of the stack), and an electrical system (which can obtain current from the stack).

[0026] In some example embodiments, the fuel cell system 100 may include a hydrogen injector 106, a water separator 107, a hydrogen circulation pump 108, a drain valve 109, an exhaust valve 110, and a tail exhaust valve 113. The hydrogen injector 106 supplies hydrogen from the hydrogen storage system to the anode 102 of the fuel cell stack 101, and the hydrogen injector 106 controls the pressure and flow rate of the hydrogen. The water separator 107 separates the liquid water discharged from the anode 102. The hydrogen circulation pump 108 circulates unreacted hydrogen from the outlet of the anode 102 to the inlet of the anode 102. The drain valve 109 discharges the liquid water separated by the water separator 107. The exhaust valve 110 discharges impurity gases (such as nitrogen) when the proportion of impurity gases in the anode 102 becomes high. Both the liquid water discharged by the drain valve 109 and the gas discharged by the exhaust valve 110 can be discharged from the fuel cell system through the tail exhaust valve 113.

[0027] Water separator 107 separates liquid water discharged from anode 102. Hydrogen circulation pump 108 promotes the recirculation of unconsumed hydrogen within anode 102 and guides it from the anode outlet back to its inlet. Drain valve 109 functions to discharge the liquid water separated by water separator 107. Exhaust valve 110 discharges impurity gases (such as nitrogen) when the concentration in anode 102 becomes high. The liquid water discharged by drain valve 109 and the gas discharged by exhaust valve 110 can then be discharged from fuel cell system 100 through tail exhaust valve 113. Fuel cell system 100 may also include air compressor 111 and back pressure valve 112. Air compressor 111 is used to pressurize air to supply air to cathode 104 of fuel cell stack 101. Back pressure valve 112 is used to regulate the gas pressure within cathode 104 and discharge post-reaction exhaust gases (mainly nitrogen) from cathode 104. The gas discharged from the back pressure valve 112 can be discharged from the fuel cell system through the tail exhaust valve 113.

[0028] It should be understood that the fuel cell system 100 is merely an example of an embodiment of this disclosure and does not limit the technical solutions provided by this disclosure. The fuel cell system 100 may also include more or fewer components.

[0029] Figure 2 The illustration shows a schematic diagram of an example structure of a PTU 200 according to some embodiments of the present disclosure. For example... Figure 2 As shown, to more clearly illustrate the function of the PTU, Figure 2 Also shown are components that are not part of PTU 200 but are connected to PTU 200, such as stack 202 and high-voltage battery 250.

[0030] It is worth noting that, for the purpose of a more focused approach, Figure 2 Some components within the PTU that are not directly related to the technology disclosed herein have also been omitted, such as insulation monitoring and detection (IMD), electrochemical impedance spectroscopy (EIS), electromagnetic compatibility (EMC) components, and circuit boards (PCBA). Figure 2 Focusing only on components relevant to this disclosure, such as the 2-phrase interleaved buck / boost module 204 and SCS206.

[0031] like Figure 1As shown, the 2-phase interleaved buck / boost module 204 may include eight MOSFETs (also known as switches). Examples include MOSFETs 212 and 214, MOSFETs 222 and 224, MOSFETs 232 and 234, and MOSFETs 242 and 244. MOSFETs 212 and 214 are also referred to as the first group of MOSFETs. MOSFETs 222 and 224 are also referred to as the second group of MOSFETs. MOSFETs 232 and 234 are also referred to as the third group of MOSFETs. MOSFETs 242 and 244 are also referred to as the fourth group of MOSFETs.

[0032] The first and third groups of MOSFETs can be connected via inductors to form the first phase of a 2-phase interleaved buck / boost module. The second and fourth groups of MOSFETs can also be connected via inductors to form the second phase of the same module. Therefore, the four MOSFETs in the first phase (212, 214, 232, 234) can be referred to as the first switching set, and the four MOSFETs in the second phase (222, 224, 242, 244) can be referred to as the second switching set. It is important to note that these designations are for descriptive convenience only and do not constitute a limitation.

[0033] The first and second groups of MOSFETs are connected in parallel with the input capacitor 208, and the third and fourth groups of MOSFETs are connected in parallel with the output capacitor 210. Each MOSFET can be turned on and off with a set duty cycle to connect and disconnect the required circuits, and the on and off times of the circuits can be controlled to achieve buck or boost voltage. For example, the output voltage of the stack 202 can be input to the PTU as an input voltage, and the output voltage of the PTU can be input to the high-voltage battery. Through different control methods (e.g., power module 5, PM5), the PTU can realize functions such as pre-charging, current control (including buck mode, buck-boost mode, and boost mode), and active discharge.

[0034] The purpose of the pre-charge function is to reduce the voltage difference across the SCS, thereby preventing arcing when the SCS is closed. For example, charging the SCS can be achieved by increasing the input-side voltage (e.g., storing electrical energy in the input capacitor 208). When the PTU receives a pre-charge request from the fuel cell control unit (FCCU), the PTU can utilize a PI controller. The PI controller's calculations can, for example, adjust the duty cycles of MOSFETs 224 and 242.

[0035] As an example, when MOSFETs 224 and 242 are turned on, a circuit can be formed connecting the high-voltage battery's energy to the output capacitor 210. This allows the voltage across the output capacitor 210 to be increased, and energy to be stored in the output capacitor 210. When MOSFETs 224 and 242 are turned off, a circuit can be formed connecting the output capacitor 210 to the input capacitor 208. This allows the energy stored in the output capacitor 210 to be transferred to the input capacitor 208. Thus, the high-voltage battery can be used to precharge the SCS. It is worth noting that the duty cycles of MOSFETs 224 and 242 can be determined based on the target voltage. Furthermore, the PTU can also determine which MOSFETs need to be used to perform the precharging task based on its specific PTU structure (e.g., different from PTU 200), and it is not necessarily... Figure 2 The MOSFET224 and MOSFET242 are shown.

[0036] Without high-voltage pre-charging, a low-voltage battery must be used to pre-charge the SCS, which increases the associated hardware circuitry and thus costs. Using the method disclosed herein, no additional hardware circuitry is required, saving costs. Furthermore, by utilizing a high-voltage battery to charge the SCS, charging efficiency is improved, charging time is reduced, and the pre-charging process is completed more quickly.

[0037] In some embodiments, the PTU can also perform current control. The purpose of current control is to switch to buck mode if the voltage of the high-voltage battery is greater than the PTU's output voltage. For example, the duty cycles of MOSFETs 212 and 222 will be calculated by the current control controller, while the duty cycles of other MOSFETs are fixed. If the voltage of the high-voltage battery is close to the PTU's output voltage, the current control will switch to boost or buck / boost mode. The duty cycles of MOSFETs 234 and 244 will be calculated by the current control controller, while the duty cycles of other MOSFETs are fixed.

[0038] In some embodiments, the PTU can also perform active discharge. When the PTU receives a discharge request from the FCCU, for example, a request for the voltage on the PTU's output side (e.g., the high-voltage battery) to drop below 60V (or other threshold voltage) within 5 seconds. Conventional active discharge methods involve closing a relay to connect the high-voltage battery to an active discharge circuit, dissipating electrical energy in the active discharge circuit. Therefore, the introduction of the active discharge circuit increases cost. The method provided in this disclosure also enables the PTU 200 to perform active discharge using MOSFETs 232 and 234, 242, and 244. The electrical energy to be released can be dissipated through the switching losses of these MOSFETs, thereby eliminating the need for an active discharge circuit and reducing cost.

[0039] In some embodiments, the PTU can set the duty cycle of MOSFETs 212, 222, 232, and 242 to 1, the duty cycle of MOSFETs 214 and 224 to 0, and the duty cycle of MOSFETs 234 and 244 to a small value (i.e., frequently turning the MOSFETs on and off with a duty cycle duration (e.g., 40 microseconds)). In this way, by simultaneously turning off MOSFETs 232 and 234 and simultaneously turning off MOSFETs 242 and 244, the energy of the high-voltage battery can be dissipated in the switching losses of the MOSFETs. Switching losses refer to the energy loss generated by the MOSFET during the switching process (from on to off or from off to on), which is an inherent characteristic of MOSFETs. With this design, the active discharge circuit can be replaced using the MOSFETs of the PTU, thus saving on the manufacturing cost of the PTU.

[0040] Furthermore, the method disclosed herein can also utilize the PTU's MOSFETs to discharge the SCS, with a principle similar to that described above for high-voltage batteries. As an example, the PTU can set the duty cycles of MOSFETs 212, 222, 232, and 242 to 1, the duty cycles of MOSFETs 214 and 224 to 0, and the duty cycles of MOSFETs 234 and 244 to a smaller value to frequently turn the MOSFETs on and off. Thus, by simultaneously closing MOSFETs 232 and 234, and simultaneously closing MOSFETs 242 and 244, the energy of the output capacitor 210 can be dissipated in the switching losses of MOSFETs 234 and 244. Similarly, by simultaneously closing MOSFETs 212 and 234, and simultaneously closing MOSFETs 222 and 244, the energy of the input capacitor 208 can be dissipated in the switching losses of MOSFETs 234 and 244. Therefore, compared to conventional methods, the solution disclosed herein also provides the function of discharging the SCS, improving vehicle safety without increasing hardware costs.

[0041] Figure 3 The diagram illustrates a control flow 300 of a PI controller performing pre-charging according to some embodiments of the present disclosure. The PI controller can be a logical concept implemented using a control unit in a PTU, or it can be implemented using software, etc. The PTU can receive a request including a target charging voltage 302 from the FCCU. The PTU can acquire the current actual voltage 304 of the SCS using a sensor or otherwise. The PTU can use a comparator 306 to determine the error 308 between the target charging voltage 302 and the current actual voltage 304.

[0042] The PI controller 310 can calculate, based on error 308, which MOSFETs are used for pre-charging and their corresponding duty cycles. For example, the PI controller 310 determines the duty cycle 312 of MOSFET 224 and MOSFET 242 (for simplicity, this is used to uniformly represent the duty cycle of MOSFET 224 and / or MOSFET 242). Thus, the PTU can pre-charge the SCS by adjusting the opening and closing of MOSFETs 224 and 242 with duty cycle 312 to increase the input-side voltage.

[0043] Figure 4 The figure illustrates a schematic diagram of the control flow 400 of a PI controller performing current control according to some embodiments of the present disclosure. Figure 4In the control flow 400, there are two control loops. The outer loop can represent the battery pack current PI controller 410, and the inner loop can represent the phase current PI controller 420. For example, the calculation results of the PI controller's control of the inner loop can be assigned to the respective duty cycles of MOSFET 212, MOSFET 214, MOSFET 222, MOSFET 224, MOSFET 232, MOSFET 234, MOSFET 242, and MOSFET 244 according to different operating modes (buck mode, buck-boost mode, boost mode) and products (buck-boost system PTU or boost system PTU).

[0044] The PTU can receive a request for a target current 402 for the fuel cell stack, and acquire the current actual current 404 of the fuel cell stack (e.g., via a sensor or otherwise). The PTU can use comparator 406 to determine the error 408 between the target current 402 and the current actual current 404. The PI controller 410 can calculate the duty cycle and control the MOSFET based on the duty cycle to acquire the current actual phase current 414 (e.g., via a sensor or otherwise), and calculate the target phase current 412. The phase current can be understood as the average current over one cycle (e.g., the duration of the duty cycle). The PTU can use comparator 416 to determine the error 418 between the target phase current 412 and the actual phase current 414. The PI controller 420 can calculate a value 422 based on the error 418, which can correspond to a value to be used in a buck-boost system or a boost system.

[0045] In some embodiments, the value 422 can be named ratDTot. For a buck-buck-boost-boost (BTU-BTU-Boost) system, if ratDTot is less than 0.98, the PTU is in buck mode. In this case, the duty cycle of MOSFET 212 can be set to ratDTot, and the duty cycle of MOSFET 234 can be set to 0. MOSFET 214 can be used for synchronous rectification in buck mode. If ratDTot is between 0.98 and 1.1, the PTU is in buck-boost mode. RatDTot will be allocated to MOSFET 212 and MOSFET 234. MOSFET 232 can be used for synchronous rectification in buck-boost mode. If ratDTot exceeds 1.1, the PTU is in boost mode. RatDTot can be allocated to MOSFET 212 and MOSFET 234. MOSFET 232 can be used for synchronous rectification in boost mode.

[0046] MOSFETs 232 and 242 can be used for synchronous rectification. It is understood that PI controllers 410 and 420, and comparators 406 and 416, are used for descriptive convenience only; in practice, these can be the same components. The specific MOSFETs used and their duty cycles will be determined based on the specific PTU; the above is merely a non-limiting illustrative example.

[0047] refer to Figure 5 The illustration shows a flowchart of an example method 500 for controlling a PTU according to some embodiments of the present disclosure. Method 500 can be executed by the PTU, implemented in software, or implemented on a distributed system, cloud computing resources, etc. At 502, a request is received to charge the voltage of an input capacitor connected in parallel with the SCS in the PTU to a target voltage. At 504, based on the target voltage, the duty cycle of at least two switches in the switch set in the PTU is determined. At 506, based on the duty cycle, at least two switches are controlled to charge the voltage of the input capacitor to the target voltage. By implementing method 500, it is possible to precharge the SCS using a high-voltage battery. Therefore, compared to charging the SCS using a low-voltage battery, not only is charging efficiency improved, but charging costs are also reduced.

[0048] refer to Figure 6 The illustration shows a block diagram of an example apparatus 600 for controlling a PTU according to some embodiments of the present disclosure. Apparatus 600 includes a receiving module 602 configured to receive a request to charge the voltage of an input capacitor in the PTU, connected in parallel with the SCS, to a target voltage. Apparatus 600 also includes a determining module 604 configured to determine, based on the target voltage, the duty cycle of at least two switches in a set of switches in the PTU. Apparatus 600 also includes a control module 606 configured to control at least two switches to charge the voltage of the input capacitor to the target voltage based on the duty cycle.

[0049] In some embodiments, the control module 606 may also be configured to control at least two switches based on the duty cycle to transfer electrical energy from the high-voltage battery of the fuel cell system to the output capacitor; and to connect a module configured to connect at least two switches based on the duty cycle to transfer electrical energy from the output capacitor to the input capacitor of the PTU.

[0050] In some embodiments, the output capacitor is connected in parallel with a high-voltage battery. The PTU includes a first set of switches and a second set of switches. The first set of switches and the second set of switches are out of phase. At least two switches belong to the first set of switches, or at least two switches belong to the second set of switches.

[0051] In some embodiments, the apparatus 600 may further include an acquisition module configured to acquire a target current for the fuel cell stack from a fuel cell stack controller; a first determination module configured to determine, based on the target current, a first duty cycle of at least one switch in a first set of switches of the PTU and a second duty cycle of at least one switch in a second set of switches; and a first control module configured to control the PTU such that the current of the stack reaches the target current based on the first duty cycle and the second duty cycle.

[0052] In some embodiments, the first control module may further include a disconnect and connect module configured to disconnect and connect at least one switch in the first switch set and at least one switch in the second switch set based on a first duty cycle and a second duty cycle to distribute a first current of the first switch set and a second current of the second switch set, wherein the sum of the first current and the second current is equal to the target current.

[0053] In some embodiments, the apparatus 600 may further include a first response module configured to control the PTU in boost mode in response to a current voltage of the fuel cell stack being less than the output voltage of the fuel cell stack and the difference between the current voltage and the output voltage being outside a predetermined range; a second response module configured to control the PTU in buck-boost mode in response to the difference between the current voltage and the output voltage being within a predetermined range; and a third response module configured to control the PTU in buck mode in response to a current voltage being greater than the output voltage and the difference between the current voltage and the output voltage being outside a predetermined range.

[0054] In some embodiments, the device 600 may further include a first receiving module configured to receive a request to discharge the high-voltage battery of the fuel cell system; a second control module configured to control a plurality of switches in a first set of switches and a plurality of switches in a second set of switches to form a first circuit; and a second disconnect and connect module configured to iteratively disconnect and connect the first circuit at a predetermined frequency to discharge the high-voltage battery by consuming electrical energy of the high-voltage battery on a plurality of switches in the first circuit until the voltage of the high-voltage battery is reduced to a threshold voltage.

[0055] In some embodiments, the device 600 may further include a third control module configured to control a plurality of switches in a first set of switches and a plurality of switches in a second set of switches to form a second circuit; and a third disconnect and connect module configured to iteratively disconnect and connect the second circuit at a predetermined frequency to discharge the SCS by consuming the electrical energy of the SCS on a plurality of switches in the second circuit until the voltage of the input capacitor is reduced to a threshold voltage.

[0056] In some embodiments, the first circuit is connected to the output capacitor of the PTU, and the second circuit is connected to the input capacitor of the PTU.

[0057] By implementing Figure 6 Similarly, in the example embodiment, it is possible to pre-charge the SCS using a high-voltage battery. Therefore, compared to charging the SCS using a low-voltage battery, both charging efficiency and charging cost can be improved.

[0058] refer to Figure 7 The diagram illustrates a block diagram of a controller 700 according to some embodiments of the present disclosure. As shown, the controller 700 includes a central processing unit (CPU) 701, which can perform various appropriate actions and processes based on computer program instructions stored in read-only memory (ROM) 702 or loaded from storage units into random access memory (RAM) 703. RAM 703 also stores various programs and data required to operate the controller 700. The CPU 701, ROM 702, and RAM 703 are interconnected via a bus 704, and an input / output (I / O) interface 705 is also connected to the bus 704. Non-limiting examples of the controller 700 may include a PTU, a control unit within the PTU, and / or an FCCU.

[0059] Each of the above processes and procedures, such as method 500, can be executed by processing unit 701. For example, in some embodiments, method 500 can be implemented as a computer software program contained in a computer-readable medium, such as a storage unit. In some embodiments, the computer-readable medium is a non-transient computer-readable medium. In some embodiments, the computer program can be partially or wholly loaded and / or installed into controller 700 via ROM 702 and / or communication unit. When the computer program is loaded into RAM 703 and executed by CPU 701, one or more steps of method 500 described above are implemented. Alternatively, in other embodiments, CPU 701 can also be configured in any suitable manner to implement the above processes / methods.

[0060] This disclosure may be a method, apparatus, system, and / or program product. A program product may include a computer-readable storage medium having computer-readable program instructions loaded thereon for performing various aspects of this disclosure.

[0061] Computer-readable storage media can be tangible devices capable of retaining and storing instructions for use by an instruction execution apparatus. Computer-readable storage media can be, for example, but not limited to, electronic storage devices, magnetic storage devices, optical storage devices, electromagnetic storage devices, semiconductor storage devices, or any suitable combination thereof. More specific examples (not an exhaustive list) of computer-readable storage media include: portable computer disks, hard disks, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), static random access memory (SRAM), portable compact disc read-only memory (CD-ROM), digital versatile optical disc (DVD), memory sticks, floppy disks, mechanical encoding devices (e.g., punched cards or raised structures in recesses where instructions are recorded), and any suitable combination thereof. The computer-readable storage media used herein should not be construed as transient signals themselves, such as radio waves or other freely propagating electromagnetic waves, electromagnetic waves propagating through waveguides or other transmission media (e.g., light pulses through fiber optic cables), or electrical signals transmitted through wires.

[0062] The computer-readable program instructions described herein can be downloaded from a computer-readable storage medium to a suitable computing / processing device, or downloaded via a network (e.g., the Internet, a local area network, a wide area network, and / or a wireless network) to an external computer or external storage device. The network may include copper cables, optical fibers, wireless transmission, routers, firewalls, switches, gateway computers, and / or edge servers. A network adapter card or network interface in each computing / processing device receives the computer-readable program instructions from the network and forwards them to a computer-readable storage medium within the suitable computing / processing device.

[0063] Computer-readable program instructions used to perform the operations of this disclosure may be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-dependent instructions, microcode, firmware instructions, status setting data, or source code or object code written in any combination of one or more programming languages, including object-oriented programming languages ​​such as Smalltalk, C++, etc., and conventional procedural programming languages ​​such as the "C" programming language or similar programming languages. The computer-readable program instructions may execute entirely on the user's computer, partially on the user's computer, as a standalone software package, partially on the user's computer, partially on a remote computer, or entirely on a remote computer or server. In the latter case, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet provided by an Internet service provider). In some embodiments, electronic circuitry, including, for example, a programmable logic circuit (PLC), a field-programmable gate array (FPGA), or a programmable logic array (PLA), may be personalized using the status information of the computer-readable program instructions to execute the computer-readable program instructions, thereby implementing various aspects of this disclosure.

[0064] This document describes aspects of the present disclosure with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and program products according to embodiments of the present disclosure. It should be understood that each block in the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer-readable program instructions.

[0065] These computer-readable program instructions may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions / actions specified in the flowchart and / or one or more block diagrams. These computer-readable program instructions may also be stored in a computer-readable storage medium that can instruct a computer, programmable data processing apparatus, and / or other apparatus to operate in a particular manner, such that the computer-readable storage medium in which the instructions are stored includes an article of manufacture comprising instructions for implementing aspects of the functions / actions specified in the flowchart and / or one or more block diagrams.

[0066] Computer-readable program instructions may also be loaded onto a computer, other programmable data processing apparatus or other device to cause a series of operational steps to be performed on the computer, other programmable apparatus or other device, thereby producing a computer-implemented process, such that the instructions executed on the computer, other programmable apparatus or other device implement the functions / actions specified in the flowchart and / or one or more block diagrams.

[0067] Flowcharts and block diagrams illustrate the architecture, functionality, and operation of possible implementations of systems, methods, and program products according to various embodiments of this disclosure. In this regard, each box in a flowchart or block diagram may represent a module, segment, or code portion, including one or more executable instructions for implementing a specified logical function(s). In some alternative implementations, the functions indicated in the boxes may be implemented in a different order than that shown in the figures. For example, two consecutively displayed boxes may actually be executed substantially simultaneously, or sometimes the boxes may be executed in reverse order, depending on the functions involved. It should also be noted that each box in the block diagrams and / or flowchart illustrations, and combinations of boxes in the block diagrams and / or flowchart illustrations, may be implemented by a dedicated hardware system performing the specified function or action, or by a combination of dedicated hardware and computer instructions.

[0068] Furthermore, although the operations are shown in a specific order, they should not be construed as requiring these operations to be performed in the specific order or sequence shown, or requiring all the shown operations to achieve the desired result. In some cases, multitasking and parallel processing may be advantageous. Similarly, while several specific implementation details are included in the foregoing discussion, they should not be construed as limiting the scope of this disclosure, but rather as a description of the features of particular embodiments. Certain features described in the context of different embodiments may also be implemented in combination in a single embodiment. Conversely, the various features described in the context of a single embodiment may also be implemented individually or in any suitable sub-combination in multiple embodiments.

[0069] Those skilled in the art will recognize that, based on the examples described in the embodiments disclosed herein, the units and algorithm steps can be implemented by electronic hardware or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0070] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the detailed working process of the above-described systems, devices, and units can be referred to the corresponding process in the foregoing method embodiments, and will not be repeated here.

[0071] In the several embodiments provided in this application, it should be understood that the disclosed systems, apparatuses, and methods can be implemented in other ways. For example, the described apparatus embodiments are merely examples. For example, the division of units is merely a logical functional division, and may be other divisions in actual implementation. For example, multiple units or components may be combined or integrated into another system, or certain features may be omitted or not performed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed may be implemented through some interface. Indirect coupling or communication connection between devices or units may be implemented in an electronic, mechanical, or other form.

[0072] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units. They may be located in one place or distributed across multiple network units. Some or all of the units may be selected to achieve the purpose of the technical solution of the embodiment according to actual needs.

[0073] In addition, the functional units in the embodiments of this application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit.

[0074] When a function is implemented as a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solutions in this application, essentially or in parts or portions that contribute to the prior art, can be implemented in the form of a software product. This computer software product is stored in a storage medium and includes several instructions for instructing a computer device (which may be a personal computer, server, network device, etc.) to execute all or part of the steps of the methods described in the embodiments of this application. The aforementioned storage medium includes: USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), disks, optical discs, and any medium capable of storing program code.

[0075] The above description is merely a specific embodiment of this application and is not intended to limit the scope of protection of this application. Any variations or substitutions that are readily conceived by those skilled in the art within the scope of the technology disclosed in this application fall within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

Claims

1. A method (500) for controlling a power transmission unit (PTU), comprising: Receive (502) a request to charge the voltage of the input capacitor (208) in the PTU (200) connected in parallel with the stack contactor switch SCS (206) to the target voltage; Based on the target voltage, determine (504) the duty cycle of at least two switches in the switch set (212, 214, 222, 224, 232, 234, 242, 244) in the PTU; as well as Based on the duty cycle (312), control (506) the at least two switches to charge the voltage of the input capacitor to the target voltage.

2. The method (500) according to claim 1, wherein controlling the at least two switches to charge the voltage of the input capacitor to the target voltage based on the duty cycle comprises: Based on the duty cycle, control the at least two switches to transfer electrical energy from the high-voltage battery of the fuel cell system to the output capacitor (210) of the PTU; as well as Based on the duty cycle, the at least two switches are turned on to transfer the electrical energy from the output capacitor to the input capacitor (208).

3. The method (500) according to claim 2, wherein the output capacitor is connected in parallel with the high-voltage battery.

4. The method (500) according to claim 1, wherein: The PTU includes a first set of switches and a second set of switches; The first set of switches and the second set of switches have different phases; and The at least two switches belong to the first set of switches, or the at least two switches belong to the second set of switches.

5. The method (500) according to claim 1, further comprising: Obtain the target current for the fuel cell stack of the fuel cell system from the fuel cell stack controller; Based on the target current, determine the first duty cycle of at least one switch in the first set of switches of the PTU and the second duty cycle of at least one switch in the second set of switches; as well as Based on the first duty cycle and the second duty cycle, the PTU is controlled so that the current of the fuel cell stack reaches the target current.

6. The method (500) according to claim 5, wherein controlling the PTU based on the first duty cycle and the second duty cycle comprises: Based on the first duty cycle and the second duty cycle, at least one switch in the first switch set and at least one switch in the second switch set are turned on and off to allocate a first current of the first switch set and a second current of the second switch set, wherein the sum of the first current and the second current is equal to the target current.

7. The method (500) according to claim 5, wherein: In response to the current voltage of the fuel cell being less than the output voltage of the fuel cell and the difference between the current voltage and the output voltage being outside a predetermined range, a boost mode is used to control the PTU. In response to the difference between the current voltage and the output voltage being within a predetermined range, the PTU is controlled using a buck-boost mode; and In response to the current voltage being greater than the output voltage and the difference between the current voltage and the output voltage being outside the predetermined range, a buck mode is used to control the PTU.

8. The method (500) according to claim 1, further comprising: Receive a request to discharge the high-voltage battery of the fuel cell system; Controlling multiple switches in a first set of switches and multiple switches in a second set of switches to form a first circuit; and The first circuit is iteratively disconnected and connected at a predetermined frequency to discharge the high-voltage battery by consuming its electrical energy on the plurality of switches in the first circuit until the voltage of the high-voltage battery is reduced to a threshold voltage.

9. The method (500) according to claim 8, further comprising: Control multiple switches in the first switch set and multiple switches in the second switch set to form a second circuit; as well as The second circuit is iteratively switched on and off at a predetermined frequency to discharge the SCS by discharging the SCS through the plurality of switches in the second circuit until the voltage of the input capacitor is reduced to a threshold voltage.

10. The method (500) according to claim 9, wherein the first circuit is connected to the output capacitor of the PTU and the second circuit is connected to the input capacitor of the PTU.

11. A device (600) for controlling a power transmission unit (PTU), comprising: The receiving module (602) is configured to receive a request to charge the voltage of the input capacitor in the PTU, which is connected in parallel with the stack contactor switch SCS, to a target voltage. The determining module (604) is configured to determine the duty cycle of at least two switches in the switch set of the PTU based on the target voltage; as well as The control module (606) is configured to control the at least two switches to charge the voltage of the input capacitor to the target voltage based on the duty cycle.

12. A controller (700), comprising: processor; as well as A memory coupled to the processor and having instructions stored thereon, which, when executed by the processor, cause the controller to perform the method according to any one of claims 1-10.

13. A program product comprising a computer program that, when executed, implements the method according to any one of claims 1-10.