An aquaculture platform based on the jacket of an offshore wind power converter station and its construction method

By installing aquaculture tanks inside the jacket structure of offshore wind power converter stations and connecting them using electromagnetic adsorption devices, the problems of idle jacket structure resources and inconvenient disassembly and assembly of aquaculture tanks have been solved, enabling efficient and safe aquaculture operations.

CN123100539APending Publication Date: 2026-11-17POWERCHINA FUJIAN ELECTRIC POWER SURVEY & DESIGN INST CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611276692.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Offshore wind power converter stations suffer from idle resources and wasted space. Furthermore, existing aquaculture tanks are difficult to disassemble after installation, and cleaning and replacement require underwater operations by divers, which is inefficient and risky.

Method used

An electromagnetic adsorption device is used to connect the aquaculture tank to the jacket of the offshore wind power converter station. The aquaculture tank is set up in the inner cavity of the jacket. The aquaculture tank is quickly installed and disassembled by the magnetic attraction of the electromagnet. It is combined with a double-layer tank structure and an automated feeding system.

Benefits of technology

This has enabled the structural integration of offshore wind power converter stations and aquaculture, improved the utilization rate of marine space, simplified the maintenance and replacement process of aquaculture tanks, improved operational efficiency and safety, and reduced operating costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123100539A_ABST
    Figure CN123100539A_ABST
Patent Text Reader

Abstract

This invention discloses an aquaculture platform based on the jacket of an offshore wind power converter station and its construction method, belonging to the field of offshore wind power and aquaculture technology. The aquaculture platform includes a converter station jacket, an electromagnetic adsorption device, and aquaculture cages. The converter station jacket has an inner cavity, and the aquaculture cages are connected to the converter station jacket via the electromagnetic adsorption device and housed within the inner cavity. This invention achieves rapid assembly and disassembly of the aquaculture cages and converter station jacket through electromagnetic adsorption, enables continuous aquaculture operations using net cages, and integrates convenient fish harvesting and ecological restoration functions, effectively solving the problems of idle space on the converter station jacket and inconvenient assembly and disassembly of aquaculture facilities.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the fields of offshore wind power and aquaculture technology, and in particular to an aquaculture platform based on the jacket of an offshore wind power converter station and its construction method. Background Technology

[0002] As the core hub of a wind farm, the offshore converter station is a massive platform, but for a long time it has only served the functions of power collection and AC / DC conversion. Its huge supporting foundation and platform space are used for a single function, resulting in significant resource idleness and space waste. This has prevented the converter station platform, a high-cost marine engineering facility, from fully realizing its spatial and structural value.

[0003] Currently, the integration of offshore wind power and aquaculture mainly relies on the wind turbine jacket foundation, with aquaculture tanks fixed to the foundation using mechanical means such as mooring ropes and clamps. There are no aquaculture platforms based on converter station jackets yet. Furthermore, existing connection methods are all mechanical fixation, making it difficult to disassemble the aquaculture tanks after installation. Cleaning, replacement, and fish harvesting operations require underwater diver operations, resulting in low efficiency and high risk. Summary of the Invention

[0004] The technical problem to be solved by the present invention is to provide an aquaculture platform based on the jacket of an offshore wind power converter station and its construction method, so as to realize the integration of the converter station and aquaculture equipment, while facilitating the rapid assembly and disassembly of the aquaculture tank and the jacket.

[0005] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is: an aquaculture platform based on the jacket of an offshore wind power converter station, comprising: The converter station jacket is equipped with an internal cavity; An electromagnetic adsorption device is connected to the converter station jacket structure; The breeding box is connected to the guide frame via the electromagnetic adsorption device and is located in the inner cavity.

[0006] Furthermore, it also includes a mooring pad, which is connected to the converter station jacket, and the electromagnetic adsorption device includes an electromagnet integrated on the mooring pad. The aquaculture box is fixed to the mooring pad by the magnetic attraction of the electromagnet.

[0007] Furthermore, the mooring pad includes an upper part and a lower part, the electromagnet is integrated into the upper part, and the lower part is connected to the converter station jacket.

[0008] Furthermore, the lower part is larger than the upper part.

[0009] Furthermore, the aquaculture box is a net cage, comprising an outer box and an inner box. The outer box is connected to the converter station guide frame via the electromagnetic adsorption device, and the inner box is located inside the outer box.

[0010] Furthermore, the electromagnetic adsorption device is equipped with a lifting ring, and the inner box is equipped with a steel wire mesh rope, with the inner box connected to the lifting ring via the steel wire mesh rope.

[0011] Furthermore, it also includes an upper module of the converter station, the bottom surface of which is provided with a feeding device, and the upper module of the converter station is electrically connected to the electromagnetic adsorption device and the feeding device.

[0012] Furthermore, it also includes a fishing net and a winch. The fishing net is located inside the aquaculture tank and has a counterweight at its bottom. The winch is located on the upper module of the converter station, and the fishing net is connected to the winch via a mooring rope.

[0013] Furthermore, the inner cavity includes an upper inner cavity and a lower inner cavity, the aquaculture box is located in the upper inner cavity, and the lower inner cavity is equipped with an artificial reef.

[0014] A construction method for an aquaculture platform based on the jacket of an offshore wind power converter station includes the following steps: S1. Provide a converter station jacket, which is equipped with an electromagnetic adsorption device. Use a barge to transport the converter station jacket to the sea, set up a pile stabilization platform, drive steel pipe piles, and then install, level, and grout the converter station jacket to fix it to the seabed. S2. The breeding box is hoisted and placed inside the inner cavity, and the breeding box is connected to the converter station guide frame through an electromagnetic adsorption device.

[0015] The beneficial effects of this invention are as follows: by setting up aquaculture tanks in the inner cavity of the converter station jacket, the idle space inside the converter station jacket is effectively utilized, realizing the structural integration of offshore wind power converter stations and aquaculture, and improving the utilization rate of sea area space; at the same time, the aquaculture tanks are connected to the converter station jacket through an electromagnetic adsorption device, which, compared with traditional mechanical fixing methods such as mooring ropes and clamps, enables rapid installation and disassembly of aquaculture tanks, simplifies the maintenance, replacement and fish harvesting process of aquaculture tanks, avoids divers working underwater for a long time, and significantly improves operational efficiency and safety. Attached Figure Description

[0016] Figure 1 This is a perspective view of an aquaculture platform based on the jacket of an offshore wind power converter station according to the present invention; Figure 2 This is a partial perspective view of an aquaculture platform based on the jacket of an offshore wind power converter station according to the present invention; Figure 3 for Figure 2 Enlarged view of the image labeled A; Figure 4 This is a schematic diagram of the fish-collecting structure in this invention; Label Explanation: 1. Converter station jacket; 11. Inner cavity; 111. Upper inner cavity; 112. Lower inner cavity; 2. Electromagnetic adsorption device; 21. Electromagnet; 22. Lifting ring; 3. Aquaculture box; 31. Outer box; 32. Inner box; 4. Mooring pad; 41. Upper part; 42. Lower part; 5. Converter station upper module; 6. Fishing net; 7. Winch; 8. Artificial reef. Detailed Implementation

[0017] To explain the technical content, objectives, and effects of this invention in detail, the following description is provided in conjunction with the embodiments and accompanying drawings. This invention effectively utilizes the unused space inside the converter station jacket by installing aquaculture tanks within the inner cavity of the jacket, achieving structural integration of offshore wind power converter stations and aquaculture, and improving the utilization rate of marine space. The aquaculture tanks are connected to the converter station jacket via an electromagnetic adsorption device, which, compared to traditional mechanical fixing methods, allows for rapid assembly and disassembly of the tanks, simplifying maintenance, replacement, and fish harvesting processes. It also eliminates the need for divers to work underwater for extended periods, effectively improving operational efficiency and safety.

[0018] This invention brings significant economic benefits. On the construction side, by directly integrating aquaculture cages into the inner cavity of the converter station's jacket, the aquaculture facilities share the same supporting foundation with the converter station, saving the enormous cost of constructing a separate foundation structure for the aquaculture platform. The vast sea area within the converter station's jacket allows for large-scale and intensive aquaculture, reducing fixed costs, improving production efficiency, and increasing profitability. Simultaneously, the DC power output from the converter station can directly supply aquaculture equipment such as electromagnetic adsorption devices and feed dispensing devices, eliminating the need for laying separate submarine cables or deploying independent power generation systems. On the operation and maintenance side, the aquaculture platform can share maintenance vessels, personnel, and communication systems with the converter station, further reducing operating costs.

[0019] Please refer to Figures 1 to 3 An aquaculture platform based on the jacket of an offshore wind power converter station includes: Converter station jacket 1, which has an inner cavity 11; Electromagnetic adsorption device 2 is connected to converter station jacket frame 1; The breeding box 3 is connected to the guide tube frame 1 via the electromagnetic adsorption device 2 and is located inside the inner cavity 11.

[0020] Specifically, the converter station jacket 1 consists of main legs arranged vertically and horizontal supports connecting adjacent main legs. The main legs and horizontal supports enclose an inner cavity 11. Each main leg also serves as a support frame for the breeding box 3. When the electromagnetic adsorption device 2 is powered on, it generates magnetic force to attract and fix the breeding box 3.

[0021] As can be seen from the above description, the beneficial effects of the present invention are as follows: by setting the aquaculture box 3 in the inner cavity 11 of the converter station jacket 1 and connecting the aquaculture box 3 with the converter station jacket 1 through the electromagnetic adsorption device 2, the structural integration of offshore wind power converter station and aquaculture can be realized by utilizing the idle space inside the converter station jacket 1, and the aquaculture box 3 can be quickly installed and disassembled through electromagnetic adsorption.

[0022] Please refer to Figure 3 In some embodiments, the device also includes a mooring pad 4, which is connected to the converter station jacket 1. The electromagnetic adsorption device 2 includes an electromagnet 21, which is integrated on the mooring pad 4. The aquaculture box 3 is fixed to the mooring pad 4 by the magnetic adsorption of the electromagnet 21.

[0023] Specifically, the outer frame of the breeding box 3 is a steel structure that can be attracted and fixed by electromagnet 21.

[0024] As described above, by integrating the electromagnet 21 onto the converter station jacket 1 via the mooring pad 4, the aquaculture tank 3 is fixed to the mooring pad 4 by the magnetic attraction of the electromagnet 21. This enables rapid connection and disconnection between the aquaculture tank 3 and the converter station jacket 1, eliminating the need for underwater mooring operations by divers and improving installation and dismantling efficiency.

[0025] Please refer to Figure 3 In some embodiments, the mooring pad 4 includes an upper part 41 and a lower part 42, with an electromagnet 21 integrated into the upper part 41 and the lower part 42 connected to the converter station jacket 1.

[0026] Specifically, the lower part 42 is a support area, which is welded to the main leg and cross brace of the converter station jacket 1, so that the electromagnet 21 is not directly subjected to force, which is beneficial to protecting the structure of the electromagnet 21.

[0027] As described above, the electromagnet 21 is integrated into the upper part 41 of the mooring pad 4, and the lower part 42 is connected to the converter station jacket 1, so that the electromagnet 21 is indirectly connected to the converter station jacket 1 through the mooring pad 4. The mooring pad 4 provides support for the breeding tank 3, avoids the electromagnet 21 from being directly subjected to force, and extends the service life of the electromagnet 21.

[0028] Please refer to Figure 3 In some embodiments, the lower part 42 is larger than the upper part 41.

[0029] Specifically, the protruding part of the lower part 42 forms a guide groove to guide the installation of the breeding box 3, so that the breeding box 3 can be quickly aligned to the installation position.

[0030] As described above, the lower part 42 of the mooring pad 4 is larger than the upper part 41. The protruding part of the lower part 42 forms a guiding structure, which can guide the installation of the breeding box 3 and facilitate the rapid alignment of the breeding box 3.

[0031] Please refer to Figures 1 to 3 In some embodiments, the breeding box 3 is a net cage, including an outer box 31 and an inner box 32. The outer box 31 is connected to the converter station guide frame 1 through an electromagnetic adsorption device 2, and the inner box 32 is located inside the outer box 31.

[0032] Specifically, the outer casing 31 has a segmented structure, including side nets and bottom nets. The side nets are attached to the mooring pads 4 by electromagnets 21, and the bottom nets are permanently fixed and directly fixed to the cross braces of the converter station jacket 1. The inner casing 32 is an integral mesh cover, which is smaller than the outer casing 31.

[0033] As described above, the breeding box 3 adopts a double-layer structure of an outer box 31 and an inner box 32. The outer box 31 is connected to the converter station guide frame 1 through the electromagnetic adsorption device 2, which can play a protective role and a temporary alternative breeding role. The inner box 32 is located inside the outer box 31 and can be disassembled and replaced separately, realizing the continuity of breeding operations and the convenience of cage maintenance.

[0034] Please refer to Figure 3 In some embodiments, the electromagnetic adsorption device 2 is provided with a lifting ring 22, and the inner box 32 is provided with a wire mesh rope, and the inner box 32 is connected to the lifting ring 22 through the wire mesh rope.

[0035] Specifically, the inner box 32 has shackles on its mesh rope, which can be detachably connected to the lifting ring 22.

[0036] As described above, the inner box 32 is connected to the lifting ring 22 on the electromagnetic adsorption device 2 via a wire mesh rope, thereby achieving a flexible connection between the inner box 32 and the converter station jacket 1. This facilitates the installation and disassembly of the inner box 32 while avoiding damage to the wire mesh caused by a rigid connection.

[0037] Please refer to Figure 1 In some embodiments, the converter station upper module 5 is also included. The bottom surface of the converter station upper module 5 is provided with a feeding device. The converter station upper module 5 is electrically connected to the electromagnetic adsorption device 2 and the feeding device.

[0038] Specifically, the upper module 5 of the converter station is installed on the top of the converter station jacket 1 to supply power to the electromagnetic adsorption device 2 and the feed feeding device.

[0039] As described above, the upper module 5 of the converter station supplies power to the electromagnetic adsorption device 2 and the feeding device, so that the electromagnetic adsorption device 2 maintains its adsorption force. At the same time, the feeding device can automatically feed the fish in the breeding tank 3, realizing energy self-sufficiency and automated breeding operations.

[0040] Please refer to Figure 4 In some embodiments, the system also includes a fishing net 6 and a winch 7. The fishing net 6 is located inside the aquaculture tank 3 and has a counterweight at its bottom. The winch 7 is located on the upper module 5 of the converter station and is connected to the fishing net 6 by a mooring rope.

[0041] As described above, the winch 7 drives the fishing net 6 to rise and fall via the mooring rope. The counterweight at the bottom of the fishing net 6 keeps the net in an unfolded state during the aquaculture process. When harvesting fish, the winch 7 retracts the mooring rope to pull up the fishing net 6, and the fish float to the surface, thus achieving convenient fish harvesting.

[0042] Please refer to Figure 1 In some embodiments, the inner cavity 11 includes an upper inner cavity 111 and a lower inner cavity 112, with the breeding box 3 located in the upper inner cavity 111 and the lower inner cavity 112 equipped with an artificial reef 8.

[0043] As described above, the inner cavity 11 is divided into an upper inner cavity 111 and a lower inner cavity 112 by the cross bracing of the converter station jacket 1. The upper inner cavity 111 is used for aquaculture, and the lower inner cavity 112 is used to set up artificial reefs 8, so as to realize the vertical space layer utilization. The upper layer is used for aquaculture of high economic value fish, and the lower layer is used for ecological restoration and resource enhancement.

[0044] A construction method for an aquaculture platform based on the jacket of an offshore wind power converter station, characterized by the following steps: S1. Provide converter station jacket 1, with an electromagnetic adsorption device 2 pre-installed on the converter station jacket 1; transport the converter station jacket 1 to the sea using a barge, set up a pile stabilization platform, drive steel pipe piles, and then install, level, and grout the converter station jacket 1 to fix it to the seabed. S2. The breeding box 3 is hoisted and placed inside the inner cavity 11, and the breeding box 3 is connected to the converter station guide frame 1 through the electromagnetic adsorption device 2.

[0045] Specifically, in S1, the converter station jacket 1 has its electromagnetic adsorption device 2 pre-installed at the factory. The electromagnetic adsorption device 2 includes an electromagnet 21 and a mooring pad 4. The mooring pad 4 includes an upper part 41 and a lower part 42, with the electromagnet 21 integrated into the upper part 41. After the mooring pad 4 is prefabricated at the factory, its lower part 42 is welded to the main leg and cross brace of the converter station jacket 1, so that the electromagnetic adsorption device 2 is fixed to the converter station jacket 1 at the time of leaving the factory. The installation process of the converter station jacket 1 includes: transporting the converter station jacket 1 with the electromagnetic adsorption device 2 to the sea using a barge, erecting a stabilizing platform, driving steel pipe piles, and then installing, leveling, and grouting the converter station jacket 1 to fix it to the seabed. The electromagnetic adsorption device 2 is transported and launched for installation together with the converter station jacket 1, eliminating the need for separate installation work at sea and reducing the time spent at sea. In S2, the aquaculture box 3 is a net cage, comprising an outer box 31 and an inner box 32. During hoisting, the construction vessel lifts the aquaculture box 3 as a whole and slowly lowers it into the inner cavity 11 of the converter station jacket frame 1. The outer box 31 is a steel structure. During lowering, the bottom edge of the outer box 31 is aligned with the guide groove on the lower part 42 of the mooring pad 4, allowing the outer box 31 to slide into the installation position along the guide groove. After the electromagnetic adsorption device 2 is energized, the electromagnet 21 generates magnetic force to attract and fix the outer box 31 to the upper part 41 of the mooring pad 4. The inner box 32 is connected to the lifting ring 22 on the electromagnetic adsorption device 2 via a net rope, and the inner box 32 is detachably installed inside the outer box 31.

[0046] As described above, the converter station jacket 1 is first installed on the seabed, and then the aquaculture tank 3 is hoisted into the inner cavity 11 and fixed by the electromagnetic adsorption device 2. The installation of the aquaculture tank 3 and the converter station jacket 1 does not require underwater welding or mooring operations, which simplifies the construction process, shortens the offshore operation time, and reduces the construction cost.

[0047] Please refer to Figures 1-4 Embodiment 1 of the present invention is as follows: An aquaculture platform based on an offshore wind power converter station jacket includes a converter station jacket 1, an electromagnetic adsorption device 2, and an aquaculture tank 3. The converter station jacket 1 has an inner cavity 11. The electromagnetic adsorption device 2 is connected to the converter station jacket 1. The aquaculture tank 3 is connected to the converter station jacket 1 via the electromagnetic adsorption device 2 and is located within the inner cavity 11. A mooring pad 4 is connected to the converter station jacket 1. The mooring pad 4 includes an upper part 41 and a lower part 42. The lower part 42 is connected to the converter station jacket 1, and the size of the lower part 42 is larger than the size of the upper part 41. The electromagnetic adsorption device 2 includes an electromagnet 21, which is integrated into the upper part 41 of the mooring pad 4. The aquaculture tank 3 is fixed to the mooring pad 4 by the magnetic attraction of the electromagnet 21. The aquaculture box 3 is a net cage, comprising an outer box 31 and an inner box 32. The outer box 31 is connected to the converter station jacket frame 1 via an electromagnetic adsorption device 2. The inner box 32 is located inside the outer box 31. The electromagnetic adsorption device 2 is equipped with a lifting ring 22, and the inner box 32 is equipped with a net rope, which is connected to the lifting ring 22. The top of the converter station jacket frame 1 is equipped with a converter station upper module 5, and the bottom of the converter station upper module 5 is equipped with a feeding device. The converter station upper module 5 is electrically connected to the electromagnetic adsorption device 2 and the feeding device. A winch 7 is installed on the converter station upper module 5. A fishing net 6 is installed inside the aquaculture box 3, and a counterweight is installed at the bottom of the fishing net 6. The fishing net 6 is connected to the winch 7 via a mooring rope. The inner cavity 11 includes an upper inner cavity 111 and a lower inner cavity 112. The breeding box 3 is located in the upper inner cavity 111, and the lower inner cavity 112 is equipped with an artificial reef 8.

[0048] A construction method for an aquaculture platform based on the jacket structure of an offshore wind power converter station: Upon leaving the factory, the electromagnetic adsorption device 2 is installed on the converter station jacket 1 and transported to the sea along with the converter station jacket 1. A barge is used to transport the converter station jacket 1 to the sea, where a stabilization platform is erected, steel pipe piles are driven, and then the converter station jacket 1 is installed, leveled, and grouted to fix it to the seabed. The electromagnetic adsorption device 2 includes a mooring pad 4 and an electromagnet 21. The mooring pad 4 includes an upper part 41 and a lower part 42. The electromagnet 21 is integrated into the upper part 41, and the lower part 42 is welded to the main legs and cross braces of the converter station jacket 1.

[0049] The upper module 5 of the converter station is installed on top of the converter station jacket 1 using the floating method. The specific construction process is as follows: The upper module 5 of the converter station is slid and towed onto a ship, and then transported at sea by a barge. The barge is pulled into position by cross cables. After being ballasted, the barge carries the upper module 5 of the converter station to the slot of the jacket structure fixed on the seabed. Using LMU-based precise docking and marine load transfer technology, the load of the upper module 5 of the converter station is gradually transferred to the jacket structure 1 of the converter station by utilizing the tides. After the barge separates from the upper module 5 of the converter station, it withdraws and lifts the upper module 5 of the converter station to the design elevation to complete the installation. It should be noted that, according to the draft of the transport ship of the upper module 5 of the converter station, the shackles of the inner box 32 near the water surface should be loosened in advance to avoid the transport ship contacting and damaging the net cage when passing the jacket structure 1 of the converter station. After the upper module 5 of the converter station is installed, divers are dispatched to reconnect the shackles of the inner box 32.

[0050] Install submarine cables to power the converter station, which then supplies power to the electromagnetic adsorption device 2, the feed feeding device, and the monitoring system.

[0051] The bottom netting of the inner casing 32 and outer casing 31, the artificial reef 8, and the monitoring system are prefabricated in the factory and installed on the converter station jacket 1, and launched simultaneously with the converter station jacket 1. The construction vessel lifts the fishing net 6 and transports it into the inner casing 32. Divers connect the hooks of the winches 7 on the working platforms on both sides of the converter station to the mooring lines on both sides of the fishing net 6. Then, counterweights are attached to the fishing net 6, and the fishing net 6 sinks to the bottom of the inner casing 32, with the winches 7 always connected to the fishing net 6. The inner casing 32 is connected to the lifting rings 22 on the mooring pad 4 via shackles on the net ropes and installed inside the inner cavity 11.

[0052] The construction vessel transports the side netting of the outer casing 31 to the vicinity of the converter station jacket 1, and stacks the netting on the construction vessel in a clockwise or counterclockwise order; After the construction vessel approaches the converter station jacket 1, it lifts the mesh panel and lowers it into the sea using the lifting rings on top of the mesh panel. Personnel are stationed on both working platforms on either side of the converter station. First, the winch ropes on the working platforms on both sides of the converter station are lowered to near the sea surface, and the personnel on the construction vessel connect the ropes to the lifting rings on top of the outer mesh frame. Then, the winch ropes on the working platforms on both sides of the converter station are lowered to near the sea surface, and divers descend to the bottom of the outer mesh panel with the ropes, connecting the winch ropes to the lifting rings at the bottom of the outer mesh frame. The ropes should always remain outside the inner box 32 to avoid damaging the mesh box. An underwater robot is deployed to observe and monitor the entire process, with the electromagnetic adsorption device 2 remaining active. Each electromagnetic adsorption device 2 corresponding to an outer mesh panel can be independently controlled. The construction vessel controls the crane to maintain the horizontal and spatial position of the outer mesh panels within the area contained by the mooring pad 4. After the mesh panels enter the designated installation position, the bottom edge of the outer mesh frame is positioned into the guide groove at the bottom of the mooring pad 4 on the cross brace of the converter station jacket 1. Then, the two endpoints of the bottom edge of the outer mesh frame are brought into contact with the mooring pad 4 on the main leg of the converter station jacket 1, aligning the bottom corners of the outer mesh frame with the bottom corners of the mooring pad 4. During this process, the construction vessel assists in adjusting the horizontal and spatial position of the outer mesh panels. If necessary, divers can move the position of the outer mesh frame underwater to ensure precise alignment. At this time, the outer mesh frame should not be too close to the electromagnet 21 to avoid being attracted before alignment. Next, retract the lower winch traction rope and slowly move the bottom edge of the outer grid frame towards the electromagnet 21 on the cross brace until it is attracted. Then, retract the upper winch traction rope and check whether the two sides of the outer grid frame are aligned with the guide grooves on the side of the mooring pad 4 on the main leg of the converter station jacket 1. Slowly move the side of the outer grid frame towards the electromagnet 21 on the main leg until it is attracted. If it is found that the outer grid frame and the mooring pad 4 are not aligned and are attracted during the installation process, the power supply of the electromagnet 21 at that point can be turned off, and the position of the outer grid frame can be finely adjusted until the outer grid frame and the mooring pad 4 are tightly attached. Following the same procedure, complete the installation of the remaining side mesh panels in a clockwise or counterclockwise sequence; The diver disconnected the winch from the lifting ring, the winch retrieved the towing rope, and the construction vessel left the work area.

[0053] Fish fry stocking and harvesting procedures in net cages: The side net is detached, and the work vessel enters: The work vessel, equipped with a fish suction pump, is driven to the side of the converter station jacket 1, where there is no working platform. The winches on the working platforms on both sides of the converter station are connected to the lifting rings at the top and bottom of the side net at that location. Then, the power supply to the electromagnet 21 at that location is disconnected, and the side net sinks to the seabed under gravity. At this point, without the restriction of a working platform, the work vessel can enter the sea area inside the converter station jacket 1 and stop near the inner casing 32.

[0054] Fish release operation: The staff on the work boat directly release the fish fry into the inner box 32.

[0055] Fish collection operation: Simultaneously raise the tow ropes of the winches on both sides of the converter station's working platform, lifting the fishing net 6 upwards, causing the fish to float to the surface. Insert the fish suction pump pipe from the workboat into the fishing net 6, and the fish are sucked into the workboat through the pipe. During this process, the tow rope of the rear winch can be slowly pulled upwards, causing the fishing net 6 to tilt at a certain angle. The fish will gather on the lower side of the net along the tilt direction, allowing all the fish in the net to be sucked into the fish suction pump.

[0056] Side net repositioning: After completing the fish casting or catching operation, control the winch to lower the fishing net 6, and reinstall the side net panels that have sunk to the seabed in place according to the aforementioned outer net cage side net installation process.

[0057] Cage cleaning or replacement procedure: Disassembly and reinstallation of inner enclosure 32: Disassembly of inner enclosure 32 requires divers to descend into the waters between outer enclosure 31 and inner enclosure 32, remove the shackles of inner enclosure 32 one by one, control the winch to pull up the fishing net 6, and then the divers connect inner enclosure 32 to the winch on one side of the converter station working platform, control the winch to pull inner enclosure 32 to the working platform, and at the same time lower the fishing net 6 into the sea. At this time, outer enclosure 31 continues to serve as a temporary aquaculture cage to protect the fish. Finally, the crane on the construction vessel transports inner enclosure 32 from the working platform to the ship.

[0058] After cleaning or replacement, the inner box 32 is transported from the ship to the work platform by a crane on the construction vessel. Personnel on the work platform lower the inner box 32 into the sea and control the winch to pull up the fishing net 6. Divers first connect the net ropes at the four corners of the top of the inner box 32 to the lifting rings 22 on the main legs of the converter station jacket 1, a position above the water surface for easy operation; then connect the remaining net ropes along the water depth direction to the lifting rings 22 on the main legs of the converter station jacket 1, while simultaneously lowering the fishing net 6 into the sea, ensuring that the fishing net 6 is inside the inner box 32; finally, connect the net ropes at the bottom of the inner box 32 to the lifting rings 22 on the cross braces of the converter station jacket 1 to complete the connection.

[0059] Disassembly of outer casing 31: The diver connects the hook of the winch on the construction vessel to the lifting ring on the upper part of the outer net frame, turns off the power of the electromagnetic adsorption device 2, and the outer net panels automatically detach. The winch then retrieves each net panel and lifts it onto the construction vessel.

[0060] Reinstallation of outer casing 31: The reinstallation of outer casing 31 after cleaning or replacement is the same as the aforementioned S5 outer mesh box side mesh installation process.

[0061] The working principle of this invention is as follows: After the converter station jacket 1 is installed on the seabed, the upper module 5 of the converter station is installed on top of the converter station jacket 1. The upper module 5 supplies power to the electromagnetic adsorption device 2 and the feed feeding device, so that the electromagnet 21 integrated on the upper part 41 of the mooring pad 4 remains energized and generates magnetic force. The outer box 31 of the aquaculture tank 3 is fixed to the mooring pad 4 by the magnetic adsorption of the electromagnet 21, thereby realizing the rapid connection and fixation of the aquaculture tank 3 and the converter station jacket 1. The inner box 32 is connected to the lifting ring 22 on the electromagnetic adsorption device 2 by a net rope, so that the inner box 32 is detachably set inside the outer box 31. When replacement or cleaning is required, the inner box 32 can be detachably installed inside the outer box 31. When the inner box 32 is in use, the outer box 31 serves as a temporary aquaculture space to continue protecting the fish and ensure the continuity of aquaculture operations. The feeding device is located on the bottom of the upper module 5 of the converter station to automatically feed the fish in the aquaculture box 3 at fixed times and locations. When it is time to collect the fish, the winch 7 pulls the fishing net 6 upwards via the mooring rope. The counterweight at the bottom of the fishing net 6 keeps the fishing net 6 in an extended state during the aquaculture process. The fish float to the surface with the fishing net 6, and the fish can be collected. When it is time to clean or replace the aquaculture box 3, it is only necessary to disconnect the power supply of the electromagnet 21 to detach the outer box 31 from the mooring pad 4, so as to achieve quick disassembly of the aquaculture box 3 without the need for underwater operations by divers.

[0062] In summary, this invention achieves structural integration of the converter station and aquaculture by setting up aquaculture tanks within the inner cavity of the converter station jacket, effectively utilizing idle space. The electromagnetic adsorption device enables rapid assembly and disassembly of the aquaculture tanks, eliminating the need for underwater divers and simplifying maintenance and fish harvesting processes. The double-layer tank structure ensures continuous aquaculture operations, while the lower artificial reef facilitates ecological restoration. Combined with automatic feeding and convenient fish harvesting, this constitutes a complete aquaculture operation system, solving the problems of idle space in existing converter station jackets and inconvenient assembly and disassembly of aquaculture tanks, achieving both multi-functional space utilization and efficient aquaculture.

[0063] The above description is merely an embodiment of the present invention and does not limit the patent scope of the present invention. Any equivalent modifications made based on the content of the present invention specification and drawings, or direct or indirect applications in related technical fields, are similarly included within the patent protection scope of the present invention.

Claims

1. An aquaculture platform based on the jacket of an offshore wind power converter station, characterized in that, include: The converter station jacket is equipped with an internal cavity; An electromagnetic adsorption device is connected to the converter station jacket structure; The breeding box is connected to the guide frame via the electromagnetic adsorption device and is located in the inner cavity.

2. The aquaculture platform based on the jacket of an offshore wind power converter station according to claim 1, characterized in that, It also includes a mooring pad, which is connected to the converter station jacket, and the electromagnetic adsorption device includes an electromagnet integrated on the mooring pad. The aquaculture box is fixed to the mooring pad by the magnetic attraction of the electromagnet.

3. The aquaculture platform based on the jacket of an offshore wind power converter station according to claim 2, characterized in that, The mooring pad includes an upper part and a lower part, the electromagnet is integrated into the upper part, and the lower part is connected to the converter station jacket.

4. The aquaculture platform based on the jacket of an offshore wind power converter station according to claim 3, characterized in that, The lower part is larger than the upper part.

5. The aquaculture platform based on the jacket of an offshore wind power converter station according to claim 1, characterized in that, The aquaculture box is a net cage, comprising an outer box and an inner box. The outer box is connected to the converter station guide frame via the electromagnetic adsorption device, and the inner box is located inside the outer box.

6. The aquaculture platform based on the jacket of an offshore wind power converter station according to claim 5, characterized in that, The electromagnetic adsorption device is equipped with a lifting ring, and the inner box is equipped with a steel wire mesh rope. The inner box is connected to the lifting ring through the steel wire mesh rope.

7. The aquaculture platform based on the jacket of an offshore wind power converter station according to claim 1, characterized in that, It also includes an upper module of the converter station, the bottom surface of which is provided with a feeding device, and the upper module of the converter station is electrically connected to the electromagnetic adsorption device and the feeding device.

8. The aquaculture platform based on the jacket of an offshore wind power converter station according to claim 7, characterized in that, It also includes a fishing net and a winch. The fishing net is located inside the aquaculture tank and has a counterweight at its bottom. The winch is located on the upper module of the converter station and the fishing net is connected to the winch via a mooring rope.

9. The aquaculture platform based on the jacket of an offshore wind power converter station according to claim 1, characterized in that, The inner cavity includes an upper inner cavity and a lower inner cavity. The aquaculture tank is located in the upper inner cavity, and the lower inner cavity is equipped with an artificial reef.

10. A construction method for an aquaculture platform based on the jacket structure of an offshore wind power converter station as described in any one of claims 1 to 9, characterized in that, Includes the following steps: S1. Provide a converter station jacket, which is equipped with an electromagnetic adsorption device. Use a barge to transport the converter station jacket to the sea, set up a pile stabilization platform, drive steel pipe piles, and then install, level, and grout the converter station jacket to fix it to the seabed. S2. The breeding box is hoisted and placed inside the inner cavity, and the breeding box is connected to the converter station guide frame through an electromagnetic adsorption device.