Drinking water equipment and its control methods
The intelligent water supply control method of the dual-heat tank system solves the problem of water being boiled multiple times in drinking water equipment, which affects the taste, and achieves more efficient water resource utilization and optimized user experience.
Patent Information
- Application Number
- CN202611290163.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-24
- Publication Date
- 2026-11-17
AI Technical Summary
In existing water supply equipment, the water in the heating tank is boiled multiple times, resulting in poor taste and affecting the user experience.
The system employs a dual-tank system, which intelligently switches water supply by acquiring the water volume and temperature in each tank. This avoids the need to replenish water and boil it again when a single tank is low on water, ensuring that the water temperature and volume meet the requirements.
It reduces water waste and waiting time, improves the accuracy of water supply and user experience, and ensures that water quality meets demand.
Smart Images

Figure CN123100979A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of drinking water equipment technology, specifically providing a drinking water equipment and its control method. Background Technology
[0002] In daily life, water dispensers, water purifiers and water heaters have become common household appliances in most families.
[0003] Typically, existing water dispensers and water purifier / heating units are equipped with a heating tank. This tank is used to boil the water inside to supply hot water to users. During daily use, if the water in the heating tank is low, the water dispenser will refill the tank and boil the water again before the user can get hot water. However, this process involves re-boiling the water, resulting in water that has already been boiled. Water that has been repeatedly boiled has a poor taste, negatively impacting the user experience.
[0004] Therefore, a new technical solution is needed in this field to solve the above problems. Summary of the Invention
[0005] The present invention aims to solve the above-mentioned technical problems, namely, to solve the problem that existing drinking water equipment easily boils water multiple times, thus affecting the taste.
[0006] The present invention provides a control method for a drinking water device in a first aspect. The drinking water device includes a hot water system, which includes a first heating tank and a second heating tank. The control method includes: in a standby mode, when hot water needs to be supplied, acquiring the volume and temperature of water that has been boiled once in the first heating tank; if the volume of water that has been boiled once in the first heating tank is not less than a first preset volume and the water temperature meets the first preset temperature, then controlling the first heating tank to supply water; if the volume of water that has been boiled once in the first heating tank is less than the first preset volume or the water temperature does not meet the first preset temperature, then injecting unboiled water into the second heating tank (which does not contain boiled water) and boiling it, then controlling the second heating tank to supply water.
[0007] In the preferred embodiment of the control method for the aforementioned drinking water equipment, the step of "if the amount of water that has been boiled once in the first heating tank is less than the first preset water amount or the water temperature does not meet the first preset water temperature, then injecting unboiled water into the second heating tank (which does not contain boiled water) and boiling it, and controlling the second heating tank to supply water externally" specifically includes: if the water temperature of the water that has been boiled once in the first heating tank meets the first preset water temperature, and the amount of water that has been boiled once in the first heating tank is greater than the second preset water amount but not greater than the first preset water amount, then controlling the first heating tank to supply water externally, and simultaneously injecting unboiled water into the second heating tank (which does not contain boiled water) and boiling it, when... When the water volume in the first heating tank decreases to the second preset water volume, the system switches to supply water from the second heating tank. If the water volume in the first heating tank that has been boiled once is not greater than the second preset water volume or the water temperature does not meet the first preset water temperature, the system controls the first heating tank not to supply water, and injects unboiled water into the second heating tank (which does not contain boiled water) and boils it, then controls the second heating tank to supply water. Wherein, the second preset water volume is less than the first preset water volume. And / or the control method further includes: if the water volume in the first heating tank that has been boiled once is less than the first preset water volume or the water temperature does not meet the first preset water temperature, the system controls all the water in the first heating tank to be drained.
[0008] In a preferred embodiment of the control method for the above-mentioned drinking water equipment, the control method further includes: before the second heating tank supplies water to the outside each time, obtaining the water volume and water temperature of the water that has been boiled once in the second heating tank; if the water volume of the water that has been boiled once in the second heating tank is not less than the first preset water volume and the water temperature meets the second preset water temperature, then controlling the second heating tank to supply water to the outside; if the water volume of the water that has been boiled once in the second heating tank is less than the first preset water volume or the water temperature does not meet the second preset water temperature, then injecting unboiled water into the first heating tank (which does not contain boiled water) and boiling it, and controlling the first heating tank to supply water to the outside.
[0009] In a preferred embodiment of the control method for the above-mentioned drinking water equipment, the control method further includes: if the amount of water in the second heating tank that has been boiled once is not greater than the first preset water amount or the water temperature does not meet the second preset water temperature, then the water in the second heating tank is completely drained.
[0010] In the preferred embodiment of the control method for the above-mentioned drinking water equipment, the first preset water volume is the user's habitual single water dispensing volume.
[0011] In a preferred embodiment of the control method for the aforementioned drinking water equipment, the hot water system further includes a hot water system inlet pipe, a hot water system outlet pipe, and a heat exchanger. The hot water system inlet pipe can supply water to the first hot tank and the second hot tank at different times, and the first hot tank and the second hot tank can discharge water through the hot water system outlet pipe at different times. The heat exchanger has a first heat exchange channel and a second heat exchange channel for heat exchange between them. The first heat exchange channel is connected in series with the hot water system inlet pipe, and the second heat exchange channel is connected in series with the hot water system outlet pipe. The control method includes: when cooled boiled water needs to be supplied, controlling the boiled water in the first hot tank to flow out through the hot water system outlet pipe, controlling the hot water system inlet pipe to flow into the second hot tank with room temperature water, or controlling the boiled water in the second hot tank to flow out through the hot water system outlet pipe, and controlling the hot water system inlet pipe to flow into the first hot tank with room temperature water.
[0012] In a preferred embodiment of the control method for the aforementioned drinking water equipment, the hot water system includes a hot water system inlet pipe and a hot water system outlet pipe. The hot water system inlet pipe can supply water to the first hot tank and the second hot tank at different times. The first hot tank and the second hot tank can discharge water from the hot water system outlet pipe at different times. A temperature detection device is installed on the hot water system outlet pipe. The hot water system outlet pipe is connected to a return pipe that allows water in the hot water system outlet pipe to flow back to the first hot tank or the second hot tank. The control method includes: when boiling water in the first hot tank flows out through the hot water system outlet pipe, controlling the hot water system outlet pipe to connect to the second hot tank through the return pipe, so that the hot water system outlet... All water in the pipe flows to the second hot water tank through the return pipe. Simultaneously, the temperature detection device monitors the temperature of the flowing water. If the temperature detected by the temperature detection device reaches the set temperature, the return pipe is disconnected, allowing the hot water system outlet pipe to supply water externally. When boiling water in the second hot water tank flows out through the hot water system outlet pipe, the hot water system outlet pipe is connected to the first hot water tank through the return pipe, ensuring all water in the hot water system outlet pipe flows to the first hot water tank through the return pipe. Simultaneously, the temperature detection device monitors the temperature of the flowing water. If the temperature detected by the temperature detection device reaches the set temperature, the return pipe is disconnected, allowing the hot water system outlet pipe to supply water externally.
[0013] In a preferred embodiment of the control method for the above-mentioned drinking water equipment, the drinking water equipment further includes a water softening system, which includes a control valve and a resin tank and a salt tank connected to the control valve. The hot water system is configured to supply water to the salt tank. The control method includes controlling the hot water system to flow hot water into the salt tank when the salt tank needs to be replenished with water to dissolve salt.
[0014] In the preferred embodiment of the control method for the above-mentioned drinking water equipment, the drinking water equipment further includes a reverse osmosis water purification system, wherein the inlet of the reverse osmosis water purification system is connected to the soft water outlet of the soft water system, and the inlet of the hot water system is connected to the pure water outlet of the reverse osmosis water purification system.
[0015] When the above technical solution is adopted, the drinking water equipment includes a hot water system, which includes a first hot water tank and a second hot water tank. The control method includes: in a standby mode, when hot water needs to be supplied, the volume and temperature of the water that has been boiled once in the first hot water tank are obtained; if the volume of the water that has been boiled once in the first hot water tank is not less than a first preset volume and the water temperature meets the first preset temperature, the first hot water tank is controlled to supply water; if the volume of the water that has been boiled once in the first hot water tank is less than the first preset volume or the water temperature does not meet the first preset temperature, unboiled water is injected into the second hot water tank (which does not contain boiled water) and boiled, and the second hot water tank is controlled to supply water.
[0016] With this setup, hot water is supplied to users through a single heating tank. When the amount of hot water in the tank is insufficient to meet the user's current water demand or the temperature of the hot water in the tank is not up to standard, water is added to another heating tank, boiled, and then supplied to the user. This avoids the situation where water is boiled multiple times and its taste is affected when the amount of water in a single heating tank is insufficient.
[0017] Preferably, the step of "if the amount of water that has been boiled once in the first heating tank is less than the first preset water amount or the water temperature does not meet the first preset water temperature, then injecting undried water into the second heating tank (which does not contain boiled water) and boiling it, and controlling the second heating tank to supply water" specifically includes: if the water temperature of the water that has been boiled once in the first heating tank meets the first preset water temperature, and the amount of water that has been boiled once in the first heating tank is greater than the second preset water amount but not greater than the first preset water amount, then controlling the first heating tank to supply water, and simultaneously injecting undried water into the second heating tank (which does not contain boiled water) and boiling it, when the amount of water in the first heating tank... When the water volume decreases to the second preset water volume, the system switches to supply water from the second heating tank. If the volume of water that has been boiled once in the first heating tank is not greater than the second preset water volume or the water temperature does not meet the first preset water temperature, the system controls the first heating tank not to supply water, and injects unboiled water into the second heating tank (which does not contain boiled water) and boils it, then controls the second heating tank to supply water. The second preset water volume is less than the first preset water volume. The control method also includes: if the volume of water that has been boiled once in the first heating tank is less than the first preset water volume or the water temperature does not meet the first preset water temperature, the system controls all the water in the first heating tank to be drained.
[0018] If the water temperature in the first heating tank that has been boiled once meets the first preset water temperature, and the amount of water in the first heating tank that has been boiled once is greater than the second preset water amount but not greater than the first preset water amount, then the first heating tank is controlled to supply water externally. At the same time, unboiled water is injected into the second heating tank, which does not contain boiled water, and boiled. When the water amount in the first heating tank decreases to the second preset water amount, the system switches to the second heating tank to supply water externally. This can reduce the waiting time for users to get hot water and reduce water waste.
[0019] Preferably, the first preset water volume is the user's usual single water intake volume.
[0020] This setting allows for more precise matching of water dispensing operations based on user habits and the amount of water dispensed at one time, further optimizing the user experience.
[0021] Preferably, the hot water system further includes a hot water system inlet pipe, a hot water system outlet pipe, and a heat exchanger. The hot water system inlet pipe can supply water to the first hot tank and the second hot tank at different times. The first hot tank and the second hot tank can discharge water through the hot water system outlet pipe at different times. The heat exchanger has a first heat exchange channel and a second heat exchange channel for heat exchange between them. The first heat exchange channel is connected in series with the hot water system inlet pipe, and the second heat exchange channel is connected in series with the hot water system outlet pipe. The control method includes: when it is necessary to supply cooled boiled water, controlling the boiled water in the first hot tank to flow out through the hot water system outlet pipe and controlling the hot water system inlet pipe to flow into the second hot tank with room temperature water, or controlling the boiled water in the second hot tank to flow out through the hot water system outlet pipe and controlling the hot water system inlet pipe to flow into the first hot tank with room temperature water.
[0022] With this setup, the water used for cooling is stored after heat exchange during the preparation and supply of cooled boiled water, and can then be used to prepare boiled water, thereby reducing water waste and the energy required to heat it into boiling water.
[0023] Preferably, the hot water system includes a hot water system inlet pipe and a hot water system outlet pipe. The hot water system inlet pipe can supply water to the first hot tank and the second hot tank at different times. The first hot tank and the second hot tank can discharge water from the hot water system outlet pipe at different times. A temperature detection device is installed on the hot water system outlet pipe, and the hot water system outlet pipe is connected to a return pipe that allows water in the hot water system outlet pipe to flow back to the first hot tank or the second hot tank. The control method includes: when boiling water in the first hot tank flows out through the hot water system outlet pipe, controlling the hot water system outlet pipe to connect to the second hot tank through the return pipe, so that all the water in the hot water system outlet pipe flows through the return pipe. The water flows to the second hot water tank, and the temperature detection device simultaneously monitors the temperature of the flowing water. If the temperature detected by the temperature detection device reaches the set temperature, the return pipe is disconnected, allowing the hot water system outlet pipe to supply water externally. When the boiling water in the second hot water tank flows out through the hot water system outlet pipe, the hot water system outlet pipe is connected to the first hot water tank through the return pipe, so that all the water in the hot water system outlet pipe flows to the first hot water tank through the return pipe. At the same time, the temperature detection device monitors the temperature of the flowing water. If the temperature detected by the temperature detection device reaches the set temperature, the return pipe is disconnected, allowing the hot water system outlet pipe to supply water externally.
[0024] This setting makes the hot water system's outlet temperature more accurate, meeting users' needs.
[0025] Preferably, the drinking water equipment further includes a water softening system, which includes a control valve and a resin tank and a salt tank connected to the control valve. The hot water system is configured to supply water to the salt tank. The control method includes controlling the hot water system to flow hot water into the salt tank when water needs to be added to dissolve salt in the salt tank.
[0026] By using this setup, the salt in the salt tank can be dissolved using hot water, which can significantly accelerate the salt dissolution rate, shorten the dissolution time, and increase the solubility of salt in water. This allows for the acquisition of a saturated salt solution within the set dissolution time, thereby increasing the salt content in the water, improving the regeneration effect of the ion exchange resin, and increasing the yield and quality of soft water production.
[0027] Preferably, the drinking water equipment also includes a reverse osmosis water purification system, the inlet of which is connected to the soft water outlet of the soft water system, and the inlet of the hot water system is connected to the pure water outlet of the reverse osmosis water purification system.
[0028] With this setup, water is first softened in the resin tank to become soft water with lower hardness. The soft water then flows into the reverse osmosis water purification system, where it is filtered through the reverse osmosis filter to become even cleaner pure water. This pure water then flows into the hot water system, where it is heated in the heating tank to become hot water for the user. This integration of the softening, reverse osmosis, and hot water systems reduces the floor space required compared to separate systems. It also minimizes the impact of calcium and magnesium ions in the water on the lifespan of the reverse osmosis filter, ensuring the quality of the pure water provided by the reverse osmosis system and the hot water provided by the hot water system, thus optimizing the user experience.
[0029] In a second aspect, the present invention also provides a drinking water device, the drinking water device comprising: a memory; a processor; and a computer program, the computer program being stored in the memory and configured to be executed by the processor to implement the control method of the drinking water device as described in any of the above technical solutions.
[0030] It should be noted that the drinking water equipment has all the technical effects of the control method of the drinking water equipment described in any of the above technical solutions, and will not be repeated here. Attached Figure Description
[0031] The preferred embodiments of the present invention are described below with reference to the accompanying drawings, in which: Figure 1 This is a diagram showing the main steps of the control method for the drinking water equipment of the present invention; Figure 2 This is a schematic diagram of the structure of a drinking water device according to an embodiment of the present invention.
[0032] List of reference numerals in the attached diagram: 11. Control valve; 12. Resin tank; 13. Brine tank; 141. First inlet pipe; 142. Soft water outlet pipe; 143. First connecting pipe; 144. Second connecting pipe; 145. Brine suction pipe; 1451. Brine valve; 146. Sewage pipe; 1461. Sewage flow restrictor; 147. Bypass pipe; 1471. Bypass valve; 2. First filter element; 21. Clean water outlet pipe; 31. Booster pump; 32. Reverse osmosis filter element; 33. Second filter element; 341. Three inlet pipes; 3411, Inlet TDS detection device; 3412, First inlet valve; 342, Third connecting pipe; 343, Pure water outlet pipe; 3431, Outlet TDS detection device; 3432, First check valve; 3433, High-pressure switch; 3434, First outlet valve; 344, Wastewater pipe; 3441, Second check valve; 3442, Wastewater valve; 345, Flushing pipe; 3451, Flushing valve; 3452, Third check valve; 41, ... 42. Second hot tank; 43. Second inlet pipe; 431. First inlet pipe section; 4311. Second inlet valve; 432. Second inlet pipe section; 4321. Fourth check valve; 441. First outlet pipe section; 4411. Water pump; 4421. First outlet branch pipe; 4422. Second outlet branch pipe; 443. Second outlet pipe section; 4431. Temperature sensor; 444. Third outlet pipe section; 4441. Second outlet valve; 451. First Branch pipe; 452, Second branch pipe; 453, Third branch pipe; 454, Fourth branch pipe; 461, First three-way valve; 462, Second three-way valve; 463, Third three-way valve; 464, Proportional regulating valve; 471, Return pipe; 4711, Return valve; 472, Overflow pipe; 4721, Overflow valve; 473, Exhaust pipe; 48, Heat exchanger; 481, First heat exchange channel; 482, Second heat exchange channel; 49, Hot water supply pipe; 491, Water supply valve. Detailed Implementation
[0033] First, those skilled in the art should understand that the embodiments described below are merely for explaining the technical principles of the present invention and are not intended to limit the scope of protection of the present invention.
[0034] It should be noted that in the description of the invention, the terms "first," "second," "third," and "fourth" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
[0035] Furthermore, it should be noted that, in the description of this invention, unless otherwise explicitly specified and limited, the term "connection" should be interpreted broadly. For example, it can refer to a fixed connection, a detachable connection, or an integral connection; it can be a direct connection or an indirect connection. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.
[0036] Based on the problem mentioned in the background art that existing water dispensers often result in water being boiled multiple times, affecting the taste, this invention provides a control method for water dispensers. The water dispenser includes a hot water system, which comprises a first heating tank and a second heating tank. For example... Figure 1 As shown, the control methods for drinking water equipment include: Step S1: In standby mode, when hot water needs to be supplied, obtain the water volume and temperature of the water that has been boiled once in the first hot water tank.
[0037] Step S2: If the amount of water that has been boiled once in the first hot tank is not less than the first preset amount of water and the water temperature meets the first preset water temperature, then control the first hot tank to supply water to the outside.
[0038] Step S3: If the amount of water that has been boiled once in the first hot tank is less than the first preset water amount or the water temperature does not meet the first preset water temperature, then inject unboiled water into the second hot tank that does not contain boiled water and boil it, and control the second hot tank to supply water to the outside.
[0039] It should be noted that steps S2 and S3 are parallel steps and there is no specific order between them. Boiling water refers to water that has been boiled; it can be water at or near its boiling point, or cooled boiled water. Unboiled water refers to water that has never been heated to its boiling point; it can be room temperature water, hot water heated below its boiling point, or warm water heated below its boiling point and then cooled.
[0040] Hot water is supplied to users through a hot water tank. When the amount of hot water in the hot water tank is insufficient to meet the user's current water demand or the temperature of the hot water in the hot water tank does not meet the requirements, water is added to another hot water tank and boiled before being supplied to the user. This avoids the situation where water is boiled multiple times and affects the taste because the amount of water in a single hot water tank is insufficient.
[0041] Further, step S3 specifically includes: if the water temperature of the water that has been boiled once in the first heating tank meets the first preset water temperature, and the water volume of the water that has been boiled once in the first heating tank is greater than the second preset water volume but not greater than the first preset water volume, then the first heating tank is controlled to supply water externally, and at the same time, unboiled water is injected into the second heating tank which does not contain boiled water and boiled. When the water volume in the first heating tank decreases to the second preset water volume, the second heating tank is switched to supply water externally; if the water volume of the water that has been boiled once in the first heating tank is not greater than the second preset water volume or the water temperature does not meet the first preset water temperature, then the first heating tank is controlled not to supply water externally, and unboiled water is injected into the second heating tank which does not contain boiled water and boiled, and the second heating tank is controlled to supply water externally; wherein, the second preset water volume is less than the first preset water volume.
[0042] This reduces the waiting time for users to get hot water and also reduces water waste.
[0043] Furthermore, the control method also includes: if the amount of water in the first hot tank that has been boiled once is less than the first preset amount of water or the water temperature does not meet the first preset water temperature, then control all the water in the first hot tank to be drained.
[0044] This setup prepares the first heating tank for the next filling with unheated water and boiling, making it easier for the first heating tank to prepare boiling water next time.
[0045] Furthermore, the control methods also include: Before the second heating tank supplies water to the outside each time, the volume and temperature of the water that has been boiled once in the second heating tank are obtained; if the volume of the water that has been boiled once in the second heating tank is not less than the first preset volume and the water temperature meets the second preset temperature, the second heating tank is controlled to supply water to the outside; if the volume of the water that has been boiled once in the second heating tank is less than the first preset volume or the water temperature does not meet the second preset temperature, unboiled water is injected into the first heating tank which does not contain boiled water and boiled, and the first heating tank is controlled to supply water to the outside.
[0046] With this setup, when supplying hot water through the second heating tank, the volume and temperature of the water that has been boiled once in the second heating tank are first obtained. If the volume of boiled water in the second heating tank is insufficient to meet the user's current water demand or the temperature of the boiled water in the second heating tank does not meet the requirements, water is added to the first heating tank and boiled before being supplied to the user. This effectively avoids the situation where water is boiled multiple times and its taste is affected when the volume of water in a single heating tank is insufficient.
[0047] Furthermore, the control method also includes: if the amount of water in the second heating tank that has been boiled once is not greater than the first preset water amount or the water temperature does not meet the second preset water temperature, then control all the water in the second heating tank to be drained.
[0048] This prepares the second heating tank for the next filling with unheated water and boiling, making it convenient for the second heating tank to prepare boiling water next time.
[0049] Preferably, the first preset water volume is the user's usual single water intake volume.
[0050] This setting allows for more precise matching of water dispensing operations based on user habits and the amount of water dispensed at one time, further optimizing the user experience.
[0051] It should be noted that the user's habitual single water dispensing volume can be set by the user on the water dispenser, or the water dispenser can first set the first preset water volume as a default single water dispensing volume, store the amount of water dispensed each time the user dispenses water, calculate the user's average single water dispensing volume (i.e. the user's habitual single water dispensing volume), and then reset the first preset water volume to the user's average single water dispensing volume.
[0052] The hot water system also includes a hot water system inlet pipe, a hot water system outlet pipe, and a heat exchanger. The hot water system inlet pipe can supply water to the first hot tank and the second hot tank at different times. The first hot tank and the second hot tank can discharge water through the hot water system outlet pipe at different times. The heat exchanger has a first heat exchange channel and a second heat exchange channel for heat exchange between them. The first heat exchange channel is connected in series with the hot water system inlet pipe, and the second heat exchange channel is connected in series with the hot water system outlet pipe. The control method includes: when it is necessary to supply cooled boiled water, controlling the boiled water in the first hot tank to flow out through the hot water system outlet pipe and controlling the hot water system inlet pipe to flow into the second hot tank with room temperature water, or controlling the boiled water in the second hot tank to flow out through the hot water system outlet pipe and controlling the hot water system inlet pipe to flow into the first hot tank with room temperature water.
[0053] With this setup, the cooled water after heat exchange is stored during the preparation and supply of cooled boiled water, and can be used to prepare boiled water, thereby reducing water waste and the energy consumption required to heat it into boiled water.
[0054] Preferably, the hot water system includes a hot water system inlet pipe and a hot water system outlet pipe. The hot water system inlet pipe can supply water to the first hot tank and the second hot tank at different times. The first hot tank and the second hot tank can discharge water from the hot water system outlet pipe at different times. A temperature detection device is installed on the hot water system outlet pipe, and the hot water system outlet pipe is connected to a return pipe that allows water in the hot water system outlet pipe to flow back to the first hot tank or the second hot tank. The control method includes: when boiling water in the first hot tank flows out through the hot water system outlet pipe, controlling the hot water system outlet pipe to connect to the second hot tank through the return pipe, so that all the water in the hot water system outlet pipe flows through the return pipe. The water flows to the second hot water tank, and the temperature detection device simultaneously monitors the temperature of the flowing water. If the temperature detected by the temperature detection device reaches the set temperature, the return pipe is disconnected, allowing the hot water system outlet pipe to supply water externally. When the boiling water in the second hot water tank flows out through the hot water system outlet pipe, the hot water system outlet pipe is connected to the first hot water tank through the return pipe, so that all the water in the hot water system outlet pipe flows to the first hot water tank through the return pipe. At the same time, the temperature detection device monitors the temperature of the flowing water. If the temperature detected by the temperature detection device reaches the set temperature, the return pipe is disconnected, allowing the hot water system outlet pipe to supply water externally.
[0055] This setting makes the hot water system's outlet temperature more accurate, meeting users' needs.
[0056] Preferably, the drinking water equipment further includes a water softening system, which includes a control valve and a resin tank and a salt tank connected to the control valve. The hot water system is configured to supply water to the salt tank. The control method includes controlling the hot water system to flow hot water into the salt tank when water needs to be added to dissolve salt in the salt tank.
[0057] By using this setup, the salt in the salt tank can be dissolved using hot water, which can significantly accelerate the salt dissolution rate, shorten the dissolution time, and increase the solubility of salt in water. This allows for the acquisition of a saturated salt solution within the set dissolution time, thereby increasing the salt content in the water, improving the regeneration effect of the ion exchange resin, and increasing the yield and quality of soft water production.
[0058] Preferably, the drinking water equipment also includes a reverse osmosis water purification system, the inlet of which is connected to the soft water outlet of the soft water system, and the inlet of the hot water system is connected to the pure water outlet of the reverse osmosis water purification system.
[0059] With this setup, water is first softened in the resin tank to become soft water with lower hardness. The soft water then flows into the reverse osmosis water purification system, where it is filtered through the reverse osmosis filter to become even cleaner pure water. This pure water then flows into the hot water system, where it is heated in the heating tank to become hot water for the user. This integration of the softening, reverse osmosis, and hot water systems reduces the floor space required compared to separate systems. It also minimizes the impact of calcium and magnesium ions in the water on the lifespan of the reverse osmosis filter, ensuring the quality of the pure water provided by the reverse osmosis system and the hot water provided by the hot water system, thus optimizing the user experience.
[0060] The following reference Figure 2 This invention will now be described in detail. Among other things, Figure 2 This is a schematic diagram of the structure of a drinking water device according to an embodiment of the present invention.
[0061] like Figure 2 As shown, the drinking water equipment includes a soft water system, a hot water system, and a reverse osmosis water purification system.
[0062] The soft water system includes a control valve 11, a resin tank 12, and a brine tank 13. The control valve 11 has an inlet (not shown), a soft water outlet (not shown), a first interface (not shown), a second interface (not shown), a brine suction port (not shown), and a drain port (not shown). The inlet and soft water outlet are connected to a first inlet pipe 141 and a soft water outlet pipe 142, respectively; the first interface and the second interface are connected to the resin tank 12 via a first connecting pipe 143 and a second connecting pipe 144, respectively; the brine suction port is connected to the brine tank 13 via a brine suction pipe 145, and a brine valve 1451 is installed on the brine suction pipe 145; the drain port is connected to the drain pipe in the room (not shown) via a drain pipe 146, and a drain flow restrictor 1461 is installed on the drain pipe 146. The drinking water equipment also includes a first filter element 2, whose inlet and outlet are connected in series on the first inlet pipe 141. The drinking water equipment also includes a purified water outlet pipe 21. The inlet end of the purified water outlet pipe 21 is connected to the outlet of the first filter element 2 so that purified water filtered by the first filter element 2 can flow out through the purified water outlet pipe 21. A purified water outlet valve (not shown in the figure) is provided on the purified water outlet pipe 21. Specifically, the first filter element 2 can be a PPC composite filter element, a PP filter element, an activated carbon filter element, or other suitable filter elements. A bypass pipe 147 is connected between the first inlet pipe 141 and the soft water outlet pipe 142. The bypass pipe 147 can selectively connect the first inlet pipe 141 and the soft water outlet pipe 142. Specifically, the first end of the bypass pipe 147 is connected to the section of the first inlet pipe 141 located between the inlet of the first filter element 2 and the inlet of the control valve 11, and the second end of the bypass pipe 147 is connected to the soft water outlet pipe 142. A bypass valve 1471 is provided on the bypass pipe 147.
[0063] The reverse osmosis water purification system includes a booster pump 31, a reverse osmosis filter element 32, and a second filter element 33. The inlet of the booster pump 31 is connected to the soft water outlet of the control valve 11 via a third inlet pipe 341. Specifically, the inlet end of the third inlet pipe 341 is connected to a section of the soft water outlet pipe 142 located between the connection point of the soft water outlet pipe 142 and the bypass pipe 147 and the outlet end of the soft water outlet pipe 142. The outlet end of the third inlet pipe 341 is connected to the inlet of the booster pump 31. An inlet TDS detection device 3411 and a first inlet valve 3412 are sequentially installed on the third inlet pipe 341 along its inlet direction. The outlet of the booster pump 31 is connected to the inlet of the reverse osmosis filter element 32 via a third connecting pipe 342. The pure water outlet of the reverse osmosis filter element 32 is connected to a pure water outlet pipe 343. Along the outlet direction of the pure water outlet pipe 343, a TDS detection device 3431, a second filter element 33, a first check valve 3432, a high-pressure switch 3433, and a first outlet valve 3434 are sequentially installed. The wastewater outlet of the reverse osmosis filter element 32 is connected to the drain pipe (not shown in the figure) inside the room via a wastewater pipe 344. Along the outlet direction of the wastewater pipe 344, a second check valve 3441 and a wastewater valve 3442 are sequentially installed. The reverse osmosis water purification system also includes a flushing pipe 345. The inlet end of the flushing pipe 345 is connected to the section of the pure water outlet pipe 343 upstream of the high-pressure switch 3433. Specifically, the inlet end of the flushing pipe 345 is connected to the section of the pure water outlet pipe 343 between the second filter element 33 and the first one-way valve 3432. The outlet end of the flushing pipe 345 is connected to the third inlet pipe 341. Specifically, the outlet end of the flushing pipe 345 is connected to the section of the third inlet pipe 341 between the first inlet valve 3412 and the booster pump 31. A flushing valve 3451 and a third one-way valve 3452 are sequentially arranged on the flushing pipe 345 from its inlet end to its outlet end. The second filter element 33 can be an activated carbon filter element, a mineralization filter element, or other suitable filter element.
[0064] The hot water system includes a first hot water tank 41, a second hot water tank 42, a second inlet pipe 43 serving as the hot water system inlet pipe, and a hot water system outlet pipe. The inlet end of the second inlet pipe 43 is connected to the pure water outlet of the reverse osmosis filter element 32. The second inlet pipe 43 is connected to the inlet of the first hot water tank 41 and the inlet of the second hot water tank 42. The hot water system outlet pipe is connected to the outlet of the first hot water tank and the outlet of the second hot water tank 42. The second inlet pipe 43 can supply water to the first hot water tank 41 and the second hot water tank 42 at different times, and the hot water in the first hot water tank 41 and the second hot water tank 42 can flow out through the hot water system outlet pipe at different times. A temperature detection device is installed on the hot water system outlet pipe, and the hot water system outlet pipe is connected to a return pipe 471 that allows water in the hot water system outlet pipe to flow back to the first hot water tank 41 or the second hot water tank 42 if the water temperature flowing through the temperature detection device does not meet the standard. The hot water system also includes an overflow pipe 472. When the water level in the first hot tank 41 or the second hot tank 42 reaches the preset water level and the water in the hot water system outlet pipe needs to continue to enter the return pipe 471, the overflow pipe 472 can make the water flowing into the return pipe 471 eventually discharged through the overflow pipe 472.
[0065] Specifically, the second inlet pipe 43 includes a first inlet pipe section 431 and a second inlet pipe section 432 connected to the outlet end of the first inlet pipe section 431. The hot water system outlet pipe includes a first outlet pipe section 441, a first outlet branch pipe 4421, a second outlet branch pipe 4422, a second outlet pipe section 443, and a third outlet pipe section 444.
[0066] The inlet end of the first inlet pipe section 431 is the inlet end of the second inlet pipe 43. The inlet end of the first inlet pipe section 431 is connected to the section of the pure water outlet pipe 343 located between the high-pressure switch 3433 and the first outlet valve 3434, thereby indirectly connecting the inlet end of the first inlet pipe section 431 to the pure water outlet of the reverse osmosis filter element 32. The outlet end of the first inlet pipe section 431 is connected to the first inlet port of the first three-way valve 461. The inlet end of the second inlet pipe section 432 is connected to the outlet port of the first three-way valve 461, and the outlet end of the second inlet pipe section 432 is connected to the inlet port of the second three-way valve 462. The first outlet port of the second three-way valve 462 is connected to the inlet of the first hot tank 41 through the first branch pipe 451, and the second outlet port of the second three-way valve 462 is connected to the inlet of the second hot tank 42 through the second branch pipe 452. The outlet of the first hot tank 41 is connected to the first inlet of the third three-way valve 463 via the third branch pipe 453. The outlet of the second hot tank 42 is connected to the second inlet of the third three-way valve 463 via the fourth branch pipe 454. The outlet of the third three-way valve 463 is connected to the inlet of the first outlet pipe section 441. The inlets of the first outlet branch pipe 4421 and the second outlet branch pipe 4422 are both connected to the outlet of the first outlet pipe section 441. The outlet end of the outlet branch pipe 4421 and the outlet end of the second outlet branch pipe 4422 are respectively connected to the first inlet port and the second inlet port of the proportional regulating valve 464. The outlet port of the proportional regulating valve 464 is connected to the inlet end of the second outlet pipe section 443. The inlet end of the third outlet pipe section 444 and the inlet end of the return pipe 471 are both connected to the outlet end of the second outlet pipe section 443. The outlet end of the return pipe 471 is connected to the second inlet port of the first three-way valve 461. A second inlet valve 4311 is installed on the first inlet pipe section 431, a fourth check valve 4321 is installed on the second inlet pipe section 432, and a water pump 4411 is installed on the first outlet pipe section 441. The hot water system includes a heat exchanger 48, which has a first heat exchange channel 481 and a second heat exchange channel 482. The first heat exchange channel 481 is connected in series on the first inlet pipe section 431, and the second heat exchange channel 482 is connected in series on the first outlet branch pipe 4421. A temperature sensor 4431, serving as a temperature detection device, is installed on the second outlet pipe section 443, a second outlet valve 4441 is installed on the third outlet pipe section 444, and a return valve 4711 is installed on the return pipe 471. The inlet end of the overflow pipe 472 is connected to the second inlet pipe section 432, and an overflow valve 4721 is installed on the overflow pipe 472. Water level detection devices (not shown in the figure) are respectively installed in the first hot tank 41 and the second hot tank 42. The first and second inlet ports of the proportional regulating valve 464 can be connected to the outlet port respectively, or they can be connected to the outlet port simultaneously. When connected to the outlet port simultaneously, the ratio of the effective flow area between the first inlet port and the outlet port to the effective flow area between the second inlet port and the outlet port can be adjusted.In addition, exhaust pipes 473 are connected to the top of the first hot tank 41 and the second hot tank 42, respectively.
[0067] The inlet end of the hot water supply pipe 49 is connected to the section of the third outlet pipe section 444 located between the outlet end of the second outlet valve 4441 and the outlet end of the third outlet pipe section 444. The outlet end of the hot water supply pipe 49 is connected to the section of the brine suction pipe 145 located between the brine valve 1451 and the brine suction port of the control valve 11. A water replenishment valve 491 is installed on the hot water supply pipe 49. The hot water supply pipe 49 is used to transport the hot water heated by the first heating tank 41 or the second heating tank 42 to the brine tank 13.
[0068] When the first three-way valve 461 is in its first state, its outlet port is connected to the first inlet port but not to the second inlet port. When the first three-way valve 461 is in its second state, its outlet port is connected to the second inlet port but not to the first inlet port. By switching the first three-way valve 461 between its first and second states, the second inlet pipe section 432 is selectively connected to either the first inlet pipe section 431 or the return pipe 471. When the first three-way valve 461 is in its third state, its outlet port is not connected to either the first or second inlet port.
[0069] When the second three-way valve 462 is in the first state, its inlet port is connected to the first outlet port but not to the second outlet port. When the second three-way valve 462 is in the second state, its inlet port is connected to the second outlet port but not to the first outlet port. By switching the second three-way valve 462 between the first and second states, the second inlet pipe section 432 can be selectively connected to the first heat tank 41 and the second heat tank 42 via the first branch pipe 451 and the second branch pipe 452, thereby allowing the second inlet pipe 43 to supply water to the first heat tank 41 and the second heat tank 42 at different times. When the second three-way valve 462 is in the third state, its inlet port is not connected to either the first or the second outlet port.
[0070] When the third three-way valve 463 is in the first state, its outlet is connected to the first inlet but not to the second inlet. When the third three-way valve 463 is in the second state, its outlet is connected to the second inlet but not to the first inlet. By switching the third three-way valve 463 between the first and second states, the first outlet pipe section 441 is connected to the first hot tank 41 and the second hot tank 42 via either the third branch pipe 453 or the fourth branch pipe 454. This allows hot water from the first hot tank 41 and the second hot tank 42 to flow out through the hot water outlet pipe at different times, driven by the water pump 4411. When the third three-way valve 463 is in the third state, its outlet is not connected to either the first or second inlet.
[0071] When providing purified water, the purified water outlet valve on the purified water outlet pipe 21 is opened. Under its own water pressure, the water flows through the first inlet pipe 141 and the first filter element 2. The purified water filtered by the first filter element 2 flows out through the purified water outlet pipe 21.
[0072] When providing soft water, the inlet of control valve 11 is connected to the first interface, and the soft water outlet of control valve 11 is connected to the second interface. Water flows through the first inlet pipe 141 and through the first filter element 2. The purified water after being filtered by the first filter element 2 enters control valve 11 through the first inlet pipe 141, and then enters resin tank 12 through the first connecting pipe 143. Soft water is generated in resin tank 12. The soft water flows through the second connecting pipe 144, control valve 11 and soft water outlet pipe 142 in sequence before flowing out.
[0073] When providing pure water, the inlet of control valve 11 is connected to the first interface, and the soft water outlet of control valve 11 is connected to the second interface. The first inlet valve 3412 and the first outlet valve 3434 are opened. The high-pressure switch 3433 detects that the water pressure is lower than the set value, and the booster pump 31 is started. The soft water generated by the soft water system flows from the soft water outlet pipe 142 into the third inlet pipe 341. After being pressurized by the booster pump 31, the soft water flows into the reverse osmosis filter element 32. Pure water and wastewater are generated in the reverse osmosis filter element 32. The pure water flows out through the pure water outlet pipe 343, and the wastewater is discharged through the wastewater pipe 344.
[0074] When providing hot water, if the water level in the first hot tank 41 or the second hot tank 42 is lower than the first water level, the second inlet valve 4311 opens, the first three-way valve 461 switches to the first state, and the second three-way valve 462 switches to either the first or second state. The pure water produced by the reverse osmosis water purification system flows from the pure water outlet pipe 343 into the second inlet pipe 43, and then flows into the first hot tank 41 via the first branch pipe 451 or out of the second hot tank 42 via the second branch pipe 452. When the water level in the first hot tank 41 or the second hot tank 42 rises to the second water level, the second inlet valve 4311 closes, and the reverse osmosis water purification system stops producing pure water. At this time, the first hot tank 41... Alternatively, the second heating tank 42 heats the water inside. When the water in the first heating tank 41 or the second heating tank 42 is heated to the set temperature, the third three-way valve 463 switches to the first or second state, the water pump 4411 starts, the return valve 4711 opens, and the second outlet valve 4441 closes. The water in the first heating tank 41 or the second heating tank 42 is transported to the second outlet pipe section 443 and flows to the return pipe 471. At this time, the temperature sensor 4431 detects the temperature of the flowing water. When the water temperature reaches the set temperature, the second outlet valve 4441 opens and the return valve 4711 closes. The hot water in the second outlet pipe section 443 flows out through the third outlet pipe section 444. During this process, if it is necessary to provide hot water that has not been heated to boiling or boiling water, the second inlet valve 4311 is in the closed state. If cooled boiled water is required, the second inlet valve 4311 is opened, and one of the first heating tank 41 and the second heating tank 42 flows out boiling water. The boiling water flows in two parts to the first outlet branch pipe 4421 and the second outlet branch pipe 4422 respectively. The reverse osmosis water purification system prepares pure water and flows into the other of the first heating tank 41 and the second heating tank 42 through the second inlet pipe 43. The pure water flowing through the second inlet pipe 43 and the boiling water flowing through the first outlet branch pipe 4421 exchange heat at the first heat exchange channel 481 and the second heat exchange channel 482 respectively. The boiling water in the first outlet branch pipe 4421 becomes cooled boiled water at a lower temperature. The cooled boiled water mixes with the boiling water flowing out of the second outlet branch pipe 4422 in the second outlet pipe section 443. By adjusting the proportional regulating valve 464, the temperature of the water in the proportional regulating valve 464 can be changed, thereby providing the user with cooled boiled water at different temperatures.
[0075] In the standby mode, hot water is supplied to the outside through the first heating tank 41, while the second heating tank 42 is on standby.
[0076] When a user's instruction to boil hot water is received, the volume and temperature of the water that has been boiled once in the first heating tank 41 are obtained (the liquid level in the first heating tank 41 can be detected by the liquid level detection device in the first heating tank 41 and converted into the current water volume, and the water temperature in the first heating tank 41 can be detected by the temperature sensor in the first heating tank 41). If the volume of water that has been boiled once in the first hot water tank 41 is not less than the first preset volume and the water temperature meets the first preset water temperature (such as the user's set water temperature), then the first hot water tank 41 is controlled to supply water to the outside. Specifically, the third three-way valve 463 is controlled to switch to the first state, the second three-way valve 462 is in the third state, the water pump 4411 is started, the return valve 4711 is opened, the second outlet valve 4441 is closed, the water in the first hot water tank 41 is transported to the second outlet pipe section 443 and flows to the return pipe 471. At this time, the temperature sensor 4431 detects the temperature of the flowing water. When the water temperature reaches the first preset water temperature, the second outlet valve 4441 is opened and the return valve 4711 is closed. The hot water in the second outlet pipe section 443 flows out through the third outlet pipe section 444. If the amount of water that has been boiled once in the first heating tank 41 is less than the first preset water volume or the water temperature does not meet the first preset water temperature, then unboiled water is injected into the second heating tank 42 (which does not contain boiled water) and boiled, controlling the second heating tank 42 to supply water externally; specifically, the second inlet valve 4311 opens, the first three-way valve 461 switches to the first state, and the second three-way valve 462 switches to the second state, and the pure water produced by the reverse osmosis water purification system flows from the pure water outlet pipe 343 into the second inlet pipe 43, and then flows out of the second heating tank 42 through the second branch pipe 452; when the water level in the second heating tank 42 rises to the set water level, the second inlet valve 4311 opens. When step 11 is closed, the reverse osmosis water purification system stops producing pure water. At this time, the second heating tank 42 heats the water inside. When the water in the second heating tank 42 boils, the third three-way valve 463 switches to the second state, the water pump 4411 starts, the return valve 4711 opens, and the second outlet valve 4441 closes. The water in the second heating tank 42 is transported to the second outlet pipe section 443 and flows to the return pipe 471. At this time, the temperature sensor 4431 detects the temperature of the flowing water. When the water temperature reaches the first preset water temperature, the second outlet valve 4441 is opened and the return valve 4711 is closed. The hot water in the second outlet pipe section 443 flows out through the third outlet pipe section 444.
[0077] When a user's instruction to provide cooled boiled water is received, the volume and temperature of the water that has been boiled once in the first heating tank 41 are obtained. If the volume of the water that has been boiled once in the first heating tank 41 is not less than the first preset volume and the water temperature meets the first preset temperature (such as the user's set water temperature), then the first heating tank 41 is controlled to supply water externally, and at the same time, the room temperature water in the second inlet pipe 43 is controlled to flow to the second heating tank 42; specifically, the second inlet valve 4311 is opened, the first three-way valve 461 is controlled to switch to the second state, the third three-way valve 463 is controlled to switch to the first state, the return valve 4711 is opened, the second outlet valve 4441 is closed, and the water pump 4411 is started. Water in the hot tank 41 is transported to the second outlet pipe section 443 and flows to the return pipe 471. The ambient temperature pure water provided by the reverse osmosis water purification system flows to the second hot tank 42 through the second inlet pipe 43. The high temperature boiling water flowing through the first heat exchange channel 481 of the heat exchanger 48 is cooled to low temperature boiled water. At this time, the temperature sensor 4431 detects the temperature of the flowing water. When the water temperature reaches the first preset water temperature, the second outlet valve 4441 is opened and the return valve 4711 is closed. The hot water in the second outlet pipe section 443 flows out through the third outlet pipe section 444. If the amount of water that has been boiled once in the first heating tank 41 is less than the first preset water amount or the water temperature does not meet the first preset water temperature, then unboiled water is injected into the second heating tank 42 (which does not contain boiled water) and boiled, controlling the second heating tank 42 to supply water externally. Specifically, the second inlet valve 4311 is opened, the first three-way valve 461 is switched to the first state, and the second three-way valve 462 is switched to the second state. The pure water produced by the reverse osmosis water purification system flows into the second inlet pipe 43 from the pure water outlet pipe 343, and then flows out of the second heating tank 42 through the second branch pipe 452. When the water level in the second heating tank 42 rises to the set water level, the second inlet valve 4311 is closed, the reverse osmosis water purification system stops producing pure water, and the second heating tank 42 heats up. The water inside the second heating tank 42 boils. The third three-way valve 463 switches to the second state, the second inlet valve 4311 opens, the second three-way valve 462 switches to the first state, the return valve 4711 opens, the second outlet valve 4441 closes, the water pump 4411 starts, and the water in the second heating tank 42 is transported to the second outlet pipe section 443 and flows to the return pipe 471. The room temperature pure water provided by the reverse osmosis water purification system flows to the first heating tank 41 through the second inlet pipe 43. At this time, the temperature sensor 4431 detects the temperature of the flowing water. When the water temperature reaches the first preset water temperature, the second outlet valve 4441 is opened and the return valve 4711 is closed. The hot water in the second outlet pipe section 443 flows out through the third outlet pipe section 444.
[0078] If the amount of water in the first hot tank 41 that has been boiled once is less than the first preset amount of water or the water temperature does not meet the first preset water temperature, then all the water in the first hot tank 41 will be drained. Specifically, if the amount of water in the first hot tank 41 that has been boiled once is less than the first preset amount of water or the water temperature does not meet the first preset water temperature, and no hot water is supplied to the outside at this time, the third three-way valve 463 is switched to the first state, the second three-way valve 462 is switched to the third state, the return valve 4711 is opened, the second outlet valve 4441 is closed, the overflow valve 4721 is opened, the water pump 4411 is started, the water in the first hot tank 41 is transported to the second outlet pipe section 443 and flows to the return pipe 471, and is discharged through the overflow pipe 472.
[0079] When the ion exchange resin in the resin tank 12 needs to be regenerated, the water supply valve 491 and the salt valve 1451 are opened, the water pump 4411 is started, and a certain amount of hot water from the first hot tank 41 or the second hot tank 42 is delivered to the salt tank 13. This hot water is used to dissolve the salt in the salt tank 13, thereby obtaining a saturated salt solution with high solubility within a set time. Afterwards, the inlet of control valve 11 is connected to the second interface, the first interface of control valve 11 is connected to the drain port, and the brine suction port is connected to the channel between the inlet and the second interface of control valve 11. Water flows into control valve 11 through the first inlet pipe 141. Under the action of negative pressure, the brine in the brine tank 13 is sucked into control valve 11 through brine suction pipe 145 and mixed with the water flowing into control valve 11 through the first inlet pipe 141 to form mixed brine. The mixed brine flows into resin tank 12 through the second connecting pipe 144. The sodium ions in the brine are replaced by the calcium and magnesium ions in the ion exchange resin. The calcium and magnesium ions enter the water in resin tank 12 and flow through the first connecting pipe 143, control valve 11 and drain pipe 146 in sequence with the water flow before being discharged.
[0080] In another feasible embodiment, unlike the above embodiment, if the water temperature in the first heating tank 41 that has been boiled once meets the first preset water temperature, and the amount of water in the first heating tank 41 that has been boiled once is greater than the second preset water amount but not greater than the first preset water amount, then the first heating tank 41 is controlled to supply water externally, while simultaneously injecting undried water into the second heating tank 42 (which does not contain boiled water) and boiling it. When the water amount in the first heating tank 41 decreases to the second preset water amount, the supply of water externally is switched to the second heating tank 42. If the amount of water in the first heating tank 41 that has been boiled once is not greater than the second preset water amount or the water temperature does not meet the first preset water temperature, then the first heating tank 41 is controlled not to supply water externally, while undried water is injected into the second heating tank 42 (which does not contain boiled water) and boiled, and the second heating tank 42 is controlled to supply water externally. The second preset water amount is less than the first preset water amount. If the amount of water in the first heating tank 41 that has been boiled once is less than the first preset amount of water or the water temperature does not meet the first preset water temperature, then all the water in the first heating tank 41 will be drained.
[0081] In addition, the present invention also provides a drinking water device, which includes: a memory, a processor; and a computer program, the computer program being stored in the memory and configured to be executed by the processor to implement the control method of the drinking water device described in any of the above embodiments.
[0082] The technical solution of the present invention has been described above with reference to the preferred embodiments shown in the accompanying drawings. However, it will be readily understood by those skilled in the art that the scope of protection of the present invention is obviously not limited to these specific embodiments. Without departing from the principles of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after such changes or substitutions will all fall within the scope of protection of the present invention.
Claims
1. A control method for a drinking water device, characterized in that, The drinking water equipment includes a hot water system, which includes a first hot water tank (41) and a second hot water tank (42). The control method includes: In standby mode, when hot water needs to be supplied, the volume and temperature of the water that has been boiled once in the first hot tank (41) are obtained; If the amount of water that has been boiled once in the first hot tank (41) is not less than the first preset amount of water and the water temperature meets the first preset water temperature, then control the first hot tank (41) to supply water to the outside. If the amount of water that has been boiled once in the first hot tank (41) is less than the first preset water amount or the water temperature does not meet the first preset water temperature, then inject unboiled water into the second hot tank (42) which does not contain boiled water and boil it, and control the second hot tank (42) to supply water to the outside.
2. The control method for the drinking water equipment according to claim 1, characterized in that, The steps of "if the amount of water that has been boiled once in the first hot tank (41) is less than the first preset water amount or the water temperature does not meet the first preset water temperature, then injecting unboiled water into the second hot tank (42) which does not contain boiled water and boiling it, and controlling the second hot tank (42) to supply water to the outside" specifically include: If the water temperature of the water that has been boiled once in the first hot tank (41) meets the first preset water temperature, and the water volume of the water that has been boiled once in the first hot tank (41) is greater than the second preset water volume but not greater than the first preset water volume, then the first hot tank (41) is controlled to supply water to the outside, and at the same time, unboiled water is injected into the second hot tank (42) which does not contain boiled water and boiled. When the water volume in the first hot tank (41) decreases to the second preset water volume, the water supply is switched to the second hot tank (42). If the amount of water that has been boiled once in the first hot tank (41) is not greater than the second preset water amount or the water temperature does not meet the first preset water temperature, then the first hot tank (41) is controlled not to supply water to the outside, and unboiled water is injected into the second hot tank (42) which does not contain boiled water and boiled, and the second hot tank (42) is controlled to supply water to the outside. Wherein, the second preset water volume is less than the first preset water volume; And / or The control method further includes: If the amount of water in the first hot tank (41) that has been boiled once is less than the first preset amount of water or the water temperature does not meet the first preset water temperature, then all the water in the first hot tank (41) will be drained.
3. The control method for the drinking water equipment according to claim 1, characterized in that, The control method further includes: Before the second heating tank (42) supplies water to the outside each time, obtain the water volume and water temperature of the water that has been boiled once in the second heating tank (42); If the amount of water that has been boiled once in the second hot tank (42) is not less than the first preset water amount and the water temperature meets the second preset water temperature, then control the second hot tank (42) to supply water to the outside; If the amount of water that has been boiled once in the second hot tank (42) is less than the first preset water amount or the water temperature does not meet the second preset water temperature, then inject unboiled water into the first hot tank (41) which does not contain boiled water and boil it, and control the first hot tank (41) to supply water to the outside.
4. The control method for the drinking water equipment according to claim 3, characterized in that, The control method further includes: If the amount of water in the second hot tank (42) that has been boiled once is not greater than the first preset water amount or the water temperature does not meet the second preset water temperature, then all the water in the second hot tank (42) will be drained.
5. The control method for the drinking water equipment according to any one of claims 1 to 4, characterized in that, The first preset water volume is the user's usual single water intake volume.
6. The control method for the drinking water equipment according to any one of claims 1 to 4, characterized in that, The hot water system also includes a hot water system inlet pipe, a hot water system outlet pipe, and a heat exchanger (48). The hot water system inlet pipe can supply water to the first hot tank (41) and the second hot tank (42) at different times. The first hot tank (41) and the second hot tank (42) can discharge water through the hot water system outlet pipe at different times. The heat exchanger (48) has a first heat exchange channel (481) and a second heat exchange channel (482) for heat exchange between each other. The first heat exchange channel (481) is connected in series on the hot water system inlet pipe, and the second heat exchange channel (482) is connected in series on the hot water system outlet pipe. The control method includes: When it is necessary to supply cooled boiled water, the boiling water in the first hot tank (41) is controlled to flow out through the outlet pipe of the hot water system, and the inlet pipe of the hot water system is controlled to flow into the second hot tank (42) with room temperature water, or the boiling water in the second hot tank (42) is controlled to flow out through the outlet pipe of the hot water system, and the inlet pipe of the hot water system is controlled to flow into the first hot tank (41) with room temperature water.
7. The control method for the drinking water equipment according to any one of claims 1 to 4, characterized in that, The hot water system includes a hot water system inlet pipe and a hot water system outlet pipe. The hot water system inlet pipe can supply water to the first hot tank (41) and the second hot tank (42) at different times. The first hot tank (41) and the second hot tank (42) can discharge water through the hot water system outlet pipe at different times. The hot water system outlet pipe is equipped with a temperature detection device. The hot water system outlet pipe is connected to a return pipe (471) that allows the water in the hot water system outlet pipe to flow back to the first hot tank (41) or the second hot tank (42). The control method includes: When the boiling water in the first hot water tank (41) flows out through the hot water system outlet pipe, the hot water system outlet pipe is controlled to connect with the second hot water tank (42) through the return pipe (471), so that all the water in the hot water system outlet pipe flows to the second hot water tank (42) through the return pipe (471). At the same time, the temperature detection device is controlled to detect the temperature of the flowing water. If the temperature of the water detected by the temperature detection device reaches the set temperature, the return pipe (471) is disconnected, so that the hot water system outlet pipe supplies water to the outside. When the hot water in the second hot tank (42) flows out through the hot water system outlet pipe, the hot water system outlet pipe is controlled to connect with the first hot tank (41) through the return pipe (471), so that all the water in the hot water system outlet pipe flows to the first hot tank (41) through the return pipe (471). At the same time, the temperature detection device is controlled to detect the temperature of the flowing water. If the temperature of the water detected by the temperature detection device reaches the set temperature, the return pipe (471) is disconnected, so that the hot water system outlet pipe supplies water to the outside.
8. The control method for the drinking water equipment according to any one of claims 1 to 4, characterized in that, The drinking water equipment also includes a water softening system, which includes a control valve (11) and a resin tank (12) and a salt tank (13) connected to the control valve (11). The hot water system is configured to supply water to the salt tank (13). The control method includes: When the salt tank (13) needs to be replenished with water to dissolve salt, the hot water system is controlled to flow hot water into the salt tank (13).
9. The control method for the drinking water equipment according to claim 8, characterized in that, The drinking water equipment also includes a reverse osmosis water purification system, the inlet of which is connected to the soft water outlet of the soft water system, and the inlet of the hot water system is connected to the pure water outlet of the reverse osmosis water purification system.
10. A drinking water device, characterized in that, The drinking water equipment includes: Memory; Processor; and A computer program, stored in the memory and configured to be executed by the processor to implement the control method of the drinking water device according to any one of claims 1 to 9.