Preheating control method, control device and steam oven of steam oven

By controlling the fan at the first operating speed calibrated using a central air intake structure in the steam oven, matching the maximum circulating air volume, and switching the speed after reaching the target temperature, the problems of low preheating efficiency, temperature field uniformity, and noise control are solved, achieving efficient preheating and constant temperature operation.

CN123100983APending Publication Date: 2026-11-17QINGDAO HAIER SMART TECH R & D CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611325700.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-28
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing steam ovens have low heating efficiency during the preheating stage, and it is difficult to balance temperature uniformity and noise control during the constant temperature cooking stage.

Method used

By controlling the fan at a first operating speed calibrated with low wind resistance characteristics based on the central air intake structure during the preheating stage, matching the maximum circulating air volume, and switching to a second operating speed lower than the first operating speed after reaching the target temperature, the uniformity of temperature field and noise requirements during the constant temperature cooking stage are met.

Benefits of technology

It improves heating efficiency and shortens preheating time during the preheating stage, while ensuring uniform temperature distribution and low-noise operation during the constant temperature stage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123100983A_ABST
    Figure CN123100983A_ABST
Patent Text Reader

Abstract

This invention relates to the field of cooking equipment, providing a preheating control method, control device, and steam oven for a steam oven. The method includes: receiving a preheating start command; controlling the heating element to operate at a preset power; and controlling the fan to operate at a first operating speed, wherein the first operating speed is calibrated based on the low wind resistance characteristics of the central air intake structure; acquiring the real-time temperature inside the cooking cavity; and, in response to the real-time temperature reaching a preset target temperature, controlling the fan to switch to a second operating speed, which is lower than the first operating speed. This invention matches the airflow output by the fan during the preheating stage with the maximum circulating airflow of the air intake structure, improving the heating efficiency during the preheating stage and shortening the preheating time; simultaneously, it also takes into account the requirements for temperature field uniformity and low-noise operation during the constant temperature stage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of cooking equipment technology, and in particular to a preheating control method, control device, and steam oven for a steam oven. Background Technology

[0002] Existing steam ovens typically include a cooking cavity, a baffle plate on the wall of the cooking cavity, a fan located on the back of the baffle plate, and a heating element. During the preheating stage, the heating element operates at a preset power, and the fan runs at a fixed speed. Hot air circulates through the air inlets and outlets on the baffle plate, gradually raising the temperature inside the cooking cavity to the target temperature. When the real-time temperature inside the cooking cavity reaches the preset target temperature, the oven exits the preheating stage and enters a constant temperature cooking mode, with the fan continuing to run at the same fixed speed.

[0003] In existing ovens, the fan speed is typically kept constant during the preheating phase. When the baffle uses a low-resistance air intake structure, the airflow at a fixed speed is limited, resulting in a longer preheating time. Furthermore, existing ovens use the same fan speed control logic for both the preheating and constant-temperature cooking phases. During constant-temperature cooking, the fixed-speed hot air circulation makes it difficult to balance the requirements for temperature uniformity and operating noise control. Summary of the Invention

[0004] This invention provides a preheating control method, control device, and steam oven for a steam oven, which addresses the deficiencies in the prior art and achieves the following effects: This invention matches the air volume output by the fan during the preheating stage with the maximum circulating air volume of the air intake structure, thereby improving the heating efficiency during the preheating stage and shortening the preheating time; at the same time, it takes into account the uniformity of the temperature field and the requirements for low-noise operation during the constant temperature stage.

[0005] This invention provides a preheating control method for a steam oven, the steam oven including a cooking cavity, a baffle plate disposed on the wall of the cooking cavity, a fan disposed on the back side of the baffle plate, and a heating element, wherein the baffle plate is provided with a central air inlet structure and an annular air outlet structure surrounding the central air inlet structure, the method comprising: Upon receiving a preheating start command, the heating element is controlled to operate at a preset power, and the fan is controlled to operate at a first operating speed, wherein the first operating speed is calibrated based on the low wind resistance characteristics of the central air intake structure; Obtain the real-time temperature inside the cooking cavity; In response to the real-time temperature reaching the preset target temperature, the fan is controlled to switch to a second operating speed, which is lower than the first operating speed.

[0006] According to some embodiments of the present invention, controlling the fan to operate at a first operating speed includes: Based on the maximum circulating air volume corresponding to the low wind resistance characteristics of the central air intake structure, the target air volume of the fan during the preheating stage is determined. The fan speed corresponding to the target air volume is determined as the first operating speed, so that the fan outputs the maximum circulating air volume that matches the central air intake structure during the preheating stage.

[0007] According to some embodiments of the present invention, the step of controlling the fan to switch to a second operating speed in response to the real-time temperature reaching a preset target temperature includes: When the real-time temperature reaches the preset target temperature, the preheating phase is determined to be over. The fan is controlled to switch from the first operating speed to the second operating speed to enter the constant temperature cooking mode.

[0008] According to some embodiments of the present invention, the method for determining the second operating speed includes: Obtain the target temperature field uniformity requirements and noise limitation requirements within the cooking cavity under the constant temperature cooking mode; Based on the target temperature field uniformity requirement, the minimum fan speed that satisfies the temperature field uniformity is determined, and based on the noise limit requirement, the maximum fan speed that satisfies the noise limit is determined. The speed value within the intersection range between the minimum fan speed and the maximum fan speed is determined as the second operating speed.

[0009] According to some embodiments of the present invention, controlling the fan to switch from the first operating speed to the second operating speed includes: According to a preset speed reduction gradient, the fan speed is gradually reduced from the first operating speed to the second operating speed to avoid sudden changes in the fan speed.

[0010] According to some embodiments of the present invention, the method further includes: During the process of controlling the fan to operate at a first operating speed, the actual speed of the fan is monitored in real time; In response to the actual rotation speed being lower than a preset percentage of the first operating speed and the duration exceeding a preset stall detection time, the fan is determined to be stalled, the heating element is controlled to stop working, and a fan abnormality warning message is output.

[0011] According to some embodiments of the present invention, the steam oven further includes a door, and the method further includes: During the process of controlling the heating element to operate at a preset power and the fan to operate at a first operating speed, the opening and closing status of the door is monitored in real time; In response to detecting that the door is in an open state, the heating element is controlled to stop working, and the fan speed is controlled to decrease from the first operating speed to a preset safe speed or to stop working. After the heating element stops working and the fan reduces its speed or stops running, the opening and closing status of the door is continuously monitored. In response to detecting that the door has switched from an open state to a closed state, the heating element is controlled to resume operation at the preset power, and the fan speed is controlled to resume from the safe speed or the stopped state to the first operating speed.

[0012] According to some embodiments of the present invention, the central air intake structure includes multiple concentric rings of elongated slots, each ring of elongated slots being evenly distributed along the circumference, the extension direction of the elongated slots being adapted to the curvature of the rings, and the number and length of the elongated slots increasing from the inside to the outside. The annular air outlet structure is a rounded rectangular annular continuous opening, which is arranged along the inner edge of the wind deflector, and the four corners are designed with rounded transitions.

[0013] Secondly, the present invention also provides a preheating control device for a steam oven, the steam oven including a cooking cavity, a baffle plate disposed on the wall of the cooking cavity, a fan disposed on the back side of the baffle plate, and a heating element, the baffle plate being provided with a central air inlet structure and an annular air outlet structure surrounding the central air inlet structure, the device comprising: The first control module is used to receive a preheating start command, control the heating element to work at a preset power, and control the fan to run at a first operating speed, wherein the first operating speed is calibrated based on the low wind resistance characteristics of the central air intake structure. The acquisition module is used to acquire the real-time temperature inside the cooking cavity; The second control module is used to control the fan to switch to a second operating speed when the real-time temperature reaches a preset target temperature. The second operating speed is lower than the first operating speed.

[0014] Thirdly, the present invention also provides a steam oven, comprising a cooking cavity, a baffle plate disposed on the wall of the cooking cavity, a fan disposed on the back side of the baffle plate, a heating element, a memory, a processor, and a computer program stored in the memory and executable on the processor. The baffle plate is provided with a central air inlet structure and an annular air outlet structure surrounding the central air inlet structure. When the processor executes the program, it implements the steps of the preheating control method of the steam oven as described in the first aspect of the present invention. The preheating control method for a steam oven provided by this invention calibrates the first operating speed based on the low wind resistance characteristics of the central air intake structure, ensuring that the air volume output by the fan during the preheating stage matches the maximum circulating air volume of the air intake structure, thereby improving the heating efficiency and shortening the preheating time. By controlling the fan to switch to a second operating speed lower than the first operating speed when the real-time temperature reaches the preset target temperature, the fan speed during the constant-temperature cooking stage is determined according to the requirements for temperature field uniformity and noise limitation, thus balancing the requirements for temperature field uniformity and low-noise operation during the constant-temperature stage. Attached Figure Description

[0015] To more clearly illustrate the technical solutions in this invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.

[0016] Figure 1 This is a schematic diagram of the structure of the baffle plate of the steam oven provided by the present invention.

[0017] Figure 2 This is one of the flowcharts illustrating the preheating control method for the steam oven provided by the present invention.

[0018] Figure 3 This is the second flowchart illustrating the preheating control method for the steam oven provided by this invention.

[0019] Figure 4 The baffle of the steam oven provided by this invention has preheating and temperature rise curves with different air inlets.

[0020] Figure 5 The present invention provides a preheating time curve for the baffle plate of the steam oven with different air inlets.

[0021] Figure 6 This is a schematic diagram of the preheating control device for the steam oven provided by the present invention.

[0022] Figure 7 This is a schematic diagram of the structure of the electronic device provided by the present invention.

[0023] Figure label: 1. Wind deflector; 11. Central air inlet structure; 12. Annular air outlet structure; 110. First control module; 120. Acquisition module; 130. Second control module. Detailed Implementation

[0024] Embodiments of the present invention are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.

[0025] The specific terms used in this specification are for illustrative purposes only and are not intended to limit the illustrated embodiments. For example, expressions such as "same" and "identical" not only indicate a strictly identical state, but also indicate a state with tolerances or differences in the degree of functionality. For example, expressions indicating relative or absolute arrangement such as "in a certain direction," "along a certain direction," "side by side," "perpendicular," "centered on," "concentric," or "coaxial" not only strictly indicate such an arrangement, but also indicate a state of relative displacement by tolerances or angles or distances with the same degree of functionality.

[0026] The terms “center,” “longitudinal,” “lateral,” “length,” “width,” “thickness,” “upper,” “lower,” “front,” “rear,” “left,” “right,” “vertical,” “horizontal,” “top,” “bottom,” “inner,” “outer,” “clockwise,” “counterclockwise,” “axial,” “radial,” and “circumferential” indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing the present invention and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limiting the present invention.

[0027] Furthermore, features specified as "first" or "second" may explicitly or implicitly include one or more of those features. In the description of this invention, unless otherwise stated, "a plurality of" means two or more.

[0028] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0029] The steam oven and its preheating control method of the present invention are described below with reference to the accompanying drawings. Before introducing the method of the present invention, the structure of the steam oven and its baffle plate 1 will be briefly described first: as follows Figure 1As shown, the steam oven includes a cooking cavity, a baffle plate 1 disposed on the wall of the cooking cavity, a fan disposed on the back side of the baffle plate 1, and a heating element. The baffle plate 1 is disposed on the wall of the cooking cavity of the steam oven, typically the rear wall. The baffle plate 1 has a central air inlet structure 11 and an annular air outlet structure 12 surrounding the central air inlet structure 11. The central air inlet structure 11 includes multiple concentric rings of elongated slots, each ring of elongated slots being evenly distributed along the circumference. The extension direction of the elongated slots is adapted to the curvature of the rings they belong to, and the number and length of the elongated slots increase from the inside out. The annular air outlet structure 12 is a rounded rectangular ring with continuous openings, arranged along the inner edge of the baffle plate 1, with rounded corners. The fan is disposed on the back side of the baffle plate 1, i.e., between the baffle plate 1 and the rear wall of the steam oven, with the fan blades facing the central air inlet structure 11. The heating element is disposed around the fan.

[0030] It should be noted that the effective total airflow within the cooking cavity is related to the fan blade diameter. The inlet diameter can be selected within ±15mm of the fan blade diameter. When the inlet diameter is too small, the air intake area is insufficient, limiting airflow intake. When the inlet diameter is too large, the impeller inlet velocity triangle may become mismatched, leading to increased eddy current losses and a tendency for backflow to occur on the outer ring, affecting the uniformity of the cavity temperature field. Simulations show that when the inlet diameter is within the above-mentioned range, the airflow is larger.

[0031] In the central air intake structure 11, the opening width of the elongated slots is less than or equal to 12.5 mm to ensure compliance with safety standards preventing fingers from touching internal moving parts. A certain number of connecting portions are maintained between the elongated slots of each ring, with the width of the connecting portion between two rings being greater than 5 mm to ensure the structural strength of the baffle plate 1. The four corners of each elongated slot are chamfered to facilitate smoother airflow. The opening width of the annular air outlet structure 12 is also less than or equal to 12.5 mm.

[0032] When the fan is running, the airflow in the cooking cavity enters the back side of the baffle plate 1 through the elongated slot of the central air intake structure 11. After being drawn in by the fan, it is heated by the heating element and flows out of the cooking cavity from the annular air outlet structure 12 under the action of centrifugal force, forming a hot air circulation.

[0033] The following describes a preheating control method based on the above-mentioned steam oven structure.

[0034] like Figure 2 and Figure 3 As shown, a preheating control method for a steam oven according to a first aspect embodiment of the present invention includes: Step S1: Receive the preheating start command, control the heating element to work at a preset power, and control the fan to run at a first operating speed, wherein the first operating speed is calibrated based on the low wind resistance characteristics of the central air intake structure 11.

[0035] In step S1 above, receiving the preheating start command means that the control unit of the steam oven receives a signal from the user to start preheating via the operation panel or remote control terminal. The preheating start command is used to trigger the steam oven to switch from standby mode to preheating mode.

[0036] Controlling the heating element to operate at a preset power means that the control unit outputs a preset drive voltage or current to the heating element, causing it to generate heat. The preset power is the rated power or maximum safe power of the heating element, and its purpose is to provide maximum heat output during the preheating stage to shorten the preheating time. Controlling the fan to operate at a first operating speed means that the control unit outputs a corresponding drive signal to the fan motor, causing the fan to rotate at a pre-calibrated first operating speed. The first operating speed is a fan speed pre-calibrated based on the low wind resistance characteristics of the central air intake structure 11 of the baffle 1, and its purpose is to ensure that the fan outputs a circulating air volume matching the air intake structure during the preheating stage.

[0037] Step S2: Obtain the real-time temperature inside the cooking cavity.

[0038] The acquisition of step S2 above can be achieved by collecting current temperature data through a temperature sensor installed inside the cooking cavity and converting the collected data into a temperature value. It can be understood that the real-time temperature reflects the actual temperature state inside the cooking cavity, providing a basis for subsequent temperature judgment.

[0039] Step S3: In response to the real-time temperature reaching the preset target temperature, control the fan to switch to the second operating speed, which is lower than the first operating speed.

[0040] Specifically, the control unit compares the real-time temperature with the preset target temperature. When the real-time temperature reaches the preset target temperature, the control unit adjusts the drive signal output to the fan motor, causing the fan speed to decrease from the first operating speed to the second operating speed.

[0041] The preset target temperature is the temperature value expected to be reached during the preheating stage. The second operating speed is lower than the first operating speed. Therefore, the above speed setting allows for maintaining hot air circulation during the constant temperature cooking stage while further reducing operating noise.

[0042] In related technologies, existing steam ovens typically employ a fixed fan speed control strategy during the preheating stage. Most steam ovens have air inlets in their baffles consisting of multiple discrete small round holes or a grid structure. Due to safety standards requiring users to prevent contact with internal moving parts, this structure has limited opening size and total ventilation area, resulting in relatively high actual airflow resistance. With the fan operating under high airflow resistance, the actual amount of circulating air drawn in is limited, and the heat generated by the heating element cannot be quickly carried away and evenly distributed throughout the cooking cavity, making the preheating process time-consuming. Existing technologies have made many improvements to the exhaust or airflow guidance stages, but have not yet organically combined the airflow structure with the preheating control strategy to fully utilize the airflow advantage of a low-resistance airflow structure. The heating element operates at a preset power, and the fan runs at a fixed speed, forming a hot air circulation through the air inlets and outlets on the baffle. When the temperature inside the cooking cavity reaches the preset target temperature, the oven exits the preheating stage, and the fan continues to operate at the fixed speed. In this control strategy, the fan speed is not matched with the characteristics of the air intake structure of the baffle, and the same speed is used in the preheating stage and the constant temperature cooking stage, which cannot take into account both the preheating efficiency and the temperature field uniformity and noise requirements in the constant temperature stage.

[0043] Therefore, to address the technical deficiencies in the aforementioned related technologies, this application provides a preheating control method for a steam oven. This method receives a preheating start command, controls the heating element to operate at a preset power, and controls the fan to operate at a first operating speed calibrated based on the low wind resistance characteristics of the central air intake structure 11. When the real-time temperature reaches the preset target temperature, the fan switches to a second operating speed lower than the first operating speed. This method couples fan speed control with the characteristics of the air intake structure and employs different speed strategies during the preheating and constant temperature stages.

[0044] On one hand, during the preheating stage, the fan operates at a first operating speed. This first operating speed is calibrated based on the low wind resistance characteristics of the central air intake structure 11, ensuring that the airflow output by the fan matches the maximum circulating airflow of the air intake structure. The heating element operates at a preset power, and the heat generated is carried by the airflow drawn in by the fan, flowing out through the annular air outlet structure 12 of the baffle plate 1 into the cooking cavity, forming a hot air circulation. The temperature inside the cooking cavity rises rapidly under the action of the hot air circulation.

[0045] On the other hand, when the real-time temperature reaches the preset target temperature, the control unit determines that the preheating stage has ended and controls the fan to switch to the second operating speed. The second operating speed is lower than the first operating speed, and its value is determined according to the temperature uniformity requirements and noise limitation requirements in the constant temperature cooking mode. The fan operates at the second operating speed to maintain the circulation of hot air in the cooking cavity, keeping the temperature near the preset target temperature.

[0046] Therefore, the above control method matches the fan speed with the air intake structure characteristics during the preheating stage, thereby improving the preheating efficiency, and reduces the fan speed during the constant temperature stage to balance temperature uniformity and noise control.

[0047] To verify the air intake performance of the above-mentioned wind deflector 1 structure, the inventors conducted air volume simulation based on the above-mentioned circular air inlet and elongated air outlet of the wind deflector 1.

[0048] Table 1 Simulation of air volume for different air outlet areas Air outlet type <![CDATA[Air inlet area (mm 2 )]]> <![CDATA[Air outlet area (mm 2 )]]> <![CDATA[Simulated air intake volume(m 3 / h)]]> Small round hole 2197 1369 19.08 Small round hole 2197 2095 27.36 long strip 2197 5592 34.56 long strip 2197 8365 37.44 Under the condition of fixed air outlet size, air volume simulations were conducted for different air outlet areas. As shown in Table 1 above, the simulation results show that as the air outlet area increases, the air volume increases non-linearly, with a maximum increase of nearly 100%. The growth rate shows a clear saturation trend, and further increasing the air outlet area significantly reduces the contribution to performance improvement.

[0049] Table 2 Simulation of air volume at different air inlets

[0050] Under the premise of a fixed elongated air outlet, the airflow of small circular air inlets and annular air inlets with the same inlet diameter was further compared, as well as the airflow of annular air inlets with different inlet diameters. The inlet diameter is represented by the difference between its size and the fan blade diameter D. As shown in Table 2 above, when the inlet diameters are similar, the airflow of the annular air inlet is significantly higher than that of the small circular air inlet. The airflow of the annular air inlets with different inlet diameters first increases and then decreases with increasing inlet diameter, reaching its maximum when the inlet diameter is D+14mm.

[0051] Based on the aforementioned rapid preheating control method and the structure of the baffle 1, the inventors conducted tests on the preheating speed of the baffle 1 at different air inlets under elongated air outlet conditions. The test conditions involved heating the cooking cavity from 25°C to 200°C, and recording the heating time. Figure 4 and Figure 5 As shown, the test results indicate that, under the same large-area air outlet conditions, the steam oven using a small round-hole air inlet baffle 1 has the slowest preheating speed, while the steam oven using a ring-shaped air inlet baffle 1 with an air inlet diameter of D+14mm has the fastest preheating speed, consistent with the simulation results. The steam oven using the control method of this invention significantly shortens the preheating time to 200℃ compared to steam ovens using traditional fixed-speed control logic.

[0052] like Figure 2 and Figure 3 As shown, according to some embodiments of the present invention, controlling the fan to operate at a first operating speed includes: Based on the maximum circulating air volume corresponding to the low wind resistance characteristics of the central air intake structure 11, the target air volume of the fan in the preheating stage is determined. The fan speed corresponding to the target air volume is determined as the first operating speed so that the fan outputs the maximum circulating air volume that matches the central air intake structure 11 during the preheating stage.

[0053] In this embodiment, during the preheating stage, when the fan is controlled to run at the first operating speed, the control unit first obtains the maximum circulating air volume that the central air intake structure 11 of the baffle 1 can support under low wind resistance conditions. It should be explained that the maximum circulating air volume is determined by the geometry, slot arrangement and opening area of ​​the central air intake structure 11, reflecting the maximum air volume flow rate that the airflow can achieve when passing through the above-mentioned air intake structure.

[0054] The control unit determines this maximum circulating airflow as the target airflow for the preheating stage, serving as the benchmark for subsequent fan speed settings. Subsequently, based on the correlation between fan airflow and speed, the control unit finds the fan speed required to output the target airflow. This correlation can be obtained from the airflow-speed characteristic curve provided at the fan's factory or through experimental calibration. The control unit sets the found speed value as the first operating speed and outputs the corresponding drive signal to the fan motor.

[0055] Therefore, the above process matches the air volume output by the fan during the preheating stage with the maximum circulating air volume that the central air intake structure 11 can support, giving full play to the air volume advantage of the low wind resistance air intake structure, so as to optimize the hot air circulation efficiency in the cooking cavity and shorten the preheating time.

[0056] like Figure 2 and Figure 3 As shown, according to some embodiments of the present invention, in response to the real-time temperature reaching a preset target temperature, controlling the fan to switch to a second operating speed includes: The preheating phase ends when the real-time temperature reaches the preset target temperature. The fan speed is switched from the first operating speed to the second operating speed to enter the constant temperature cooking mode.

[0057] In this embodiment, during the preheating process, the control unit continuously acquires the real-time temperature inside the cooking cavity and compares the real-time temperature with the preset target temperature.

[0058] When the real-time temperature reaches the preset target temperature, it indicates that the temperature inside the cooking cavity has risen to the user-set cooking temperature. Based on this, the control unit determines that the preheating stage is over and it is no longer necessary to maintain the high airflow operation strategy of the preheating stage.

[0059] After the preheating phase, the control unit performs a speed switching operation, adjusting the fan drive signal from the value corresponding to the first operating speed to the value corresponding to the second operating speed. This switches the fan speed from the higher first operating speed to the lower second operating speed, thus putting the steam oven into constant temperature cooking mode. In constant temperature cooking mode, the fan operates at the second operating speed, maintaining hot air circulation within the cooking cavity and stabilizing the cavity temperature near the preset target temperature.

[0060] In some specific embodiments of the present invention, the method for determining the second operating speed includes: To obtain the target temperature field uniformity requirements and noise limitation requirements within the cooking cavity under constant temperature cooking mode; The minimum fan speed that meets the temperature field uniformity requirement is determined based on the target temperature field uniformity requirement, and the maximum fan speed that meets the noise limit requirement is determined based on the noise limit requirement. The speed values ​​within the intersection range between the minimum and maximum fan speeds are determined as the second operating speed.

[0061] It should be noted that in determining the second operating speed, the control unit needs to take into account two constraints in the constant temperature cooking mode, namely temperature field uniformity and operating noise.

[0062] Specifically, the control unit first obtains the target temperature field uniformity requirement within the cooking cavity under the aforementioned constant-temperature cooking mode. Temperature field uniformity refers to the degree of temperature difference at different spatial locations within the cooking cavity, and the target temperature field uniformity requirement specifies the allowable upper limit of temperature deviation at various points within the cavity during the constant-temperature cooking stage. The higher the fan speed, the greater the circulating air volume, and the more uniform the temperature distribution within the cavity. Therefore, based on the aforementioned target temperature field uniformity requirement, the control unit calculates the minimum fan speed required to meet the temperature field uniformity requirement, i.e., at this speed, the circulating air volume is sufficient to ensure that the temperature deviation within the cavity does not exceed the allowable range.

[0063] Simultaneously, the control unit acquires the noise limit requirements under the aforementioned constant temperature cooking mode. Higher fan speeds result in greater operating noise. Based on these noise limit requirements, the control unit calculates the maximum permissible fan speed to meet the noise limits, meaning the fan noise at that speed does not exceed the specified value.

[0064] A range of overlap is formed between the minimum and maximum fan speeds. Any speed value within this range satisfies the requirements for temperature uniformity without exceeding noise limits. The control unit determines the speed value within this overlap range as the second operating speed.

[0065] As described above, the above determination method enables the second operating speed to minimize operating noise while ensuring temperature field uniformity, thereby balancing temperature control accuracy and user experience during the constant temperature cooking stage.

[0066] like Figure 2 and Figure 3 As shown, in some specific embodiments of the present invention, controlling the fan to switch from a first operating speed to a second operating speed includes: According to the preset speed reduction gradient, the fan speed is gradually reduced from the first operating speed to the second operating speed to avoid sudden changes in fan speed.

[0067] In this embodiment, during the process of the fan switching from the first operating speed to the second operating speed, the control unit does not use a direct jump method, but gradually reduces the fan speed according to a preset speed reduction gradient.

[0068] The preset speed reduction gradient specifies the rate of decrease in fan speed per unit time, such as a decrease of a certain speed value per second. The control unit outputs a decreasing drive signal to the fan motor in each time interval, causing the fan speed to decrease slowly step by step until the second operating speed is reached.

[0069] It's understandable that if the fan speed abruptly jumps from a higher initial operating speed to a lower second operating speed, the airflow velocity within the cooking cavity will change abruptly, potentially causing unstable disturbances in the hot airflow and affecting the uniformity of temperature distribution. Simultaneously, the sudden speed change will also result in significant mechanical shock and noise. The aforementioned gradient decrease method ensures a smoother speed transition, thus avoiding these problems.

[0070] According to some embodiments of the present invention, the method further includes: During the process of controlling the fan to run at the first operating speed, the actual speed of the fan is monitored in real time; In response to a preset ratio where the actual speed is lower than the first operating speed and the duration exceeds the preset stall detection time, the fan is determined to be stalled, the heating element is controlled to stop working and a fan abnormality warning message is output.

[0071] In this embodiment, while the fan is running at a first operating speed, the control unit monitors the actual speed of the fan in real time through the speed signal fed back by the fan motor.

[0072] When a fan stalls due to obstruction by foreign objects, bearing damage, or motor failure, its actual rotational speed will be significantly lower than the initial operating speed. The control unit compares this actual rotational speed with a preset ratio of the initial operating speed. For example, if the actual rotational speed drops below the preset ratio of the initial operating speed, it is preliminarily determined that the fan may be stalled.

[0073] To avoid misjudgments due to momentary interference, the control unit starts a timer after detecting that the actual speed is lower than a preset ratio, continuously monitoring the duration of the abnormal state. When the duration exceeds the preset stall detection time, it is confirmed that the fan has indeed stalled, rather than experiencing a brief speed fluctuation. At this point, the control unit immediately cuts off the power supply to the heating element, causing it to stop working and preventing heat buildup due to fan failure from damaging the oven or causing safety hazards. Simultaneously, the control unit outputs a fan malfunction warning message, such as through a display screen, buzzer, or indicator light, to notify the user that the fan has malfunctioned.

[0074] According to some embodiments of the present invention, the steam oven further includes a door, and the method further includes: While controlling the heating element to operate at a preset power and the fan to operate at the first operating speed, the opening and closing status of the door is monitored in real time. In response to detecting that the door is open, the heating element is controlled to stop working, and the fan speed is controlled to decrease from the first operating speed to the preset safe speed or to stop working. After the heating element stops working and the fan reduces its speed or stops running, the door's opening and closing status is continuously monitored. In response to detecting that the door has switched from the open state to the closed state, the heating element is controlled to resume operation at a preset power, and the fan speed is controlled to resume from the safe speed or the stopped state to the first operating speed.

[0075] Specifically, while the heating element is operating at a preset power and the fan is running at a first operating speed, the control unit monitors the opening and closing status of the door in real time through the door opening and closing detection device.

[0076] When the control unit detects that the door is open, it indicates that the user may have opened the door during the preheating process, such as to check the food inside or to place ingredients in. To prevent heat loss due to continuous operation of the heating element or burns caused by the user contacting hot components, the control unit immediately cuts off the power supply to the heating element, causing it to stop working. At the same time, the control unit reduces the fan speed from the initial operating speed to a preset safe speed, or stops the fan altogether, to reduce the rate at which hot air diffuses out of the cavity after the door is opened.

[0077] After the heating element stops working and the fan reduces its speed or stops running, the control unit continues to monitor the door's opening and closing status. When the control unit detects that the door has switched from the open state to the closed state, it indicates that the user has completed the operation and closed the door properly. At this time, the control unit restores power to the heating element, allowing it to continue operating at the preset power, and restores the fan speed from the safe speed or the stopped state to the first operating speed, and the steam oven re-enters the preheating process.

[0078] Therefore, the above-mentioned door opening safety protection and automatic recovery mechanism not only ensures user safety, but also avoids the inconvenience of requiring users to manually restart the preheating process after the door is closed again.

[0079] According to some embodiments of the present invention, the multi-ring concentric arrangement of the central air intake structure 11 forms an air intake array of elongated slots expanding outwards in the central region of the baffle plate 1. Each ring of elongated slots is evenly distributed along the circumference, allowing airflow to enter the back side of the baffle plate 1 evenly from all directions, avoiding uneven flow field caused by localized concentrated airflow. The extension direction of the elongated slots is adapted to the curvature of the ring, i.e., the slots extend in an arc along the circumference, allowing airflow to flow along the natural direction of the slots upon entry, reducing flow losses caused by airflow deflection.

[0080] The number and length of the elongated slots increase from the inside out. The inner rings, closer to the center, have fewer and shorter slots, while the outer rings have more and longer slots. This arrangement causes the air intake area to gradually increase radially outward, matching the air pressure distribution characteristics of low pressure in the center and high negative pressure in the outer edge when the fan rotates. This ensures that the central air intake structure 11 can provide sufficient and uniform airflow during the preheating phase when the fan is running at its first operating speed, reducing airflow resistance.

[0081] The annular air outlet structure 12 is a rounded rectangular annular continuous opening arranged along the inner edge of the baffle plate 1, forming a complete ring of continuous air outlet channels around the central air inlet structure 11. Compared with discrete, dispersed air outlets, the continuous opening has a larger air outlet area and lower air outlet resistance. The four corners adopt a rounded transition design, which allows the airflow to smoothly turn at the corners, avoiding vortices and local pressure loss at right-angle bends, and ensuring that the airflow is evenly distributed into the cooking cavity along the circumference of the baffle plate 1.

[0082] The aforementioned central air intake structure 11 and annular air outlet structure 12 work together to ensure that when the fan is running at the first operating speed, the airflow enters the back side of the baffle plate 1 with low resistance through the central air intake structure 11, is heated by the heating element, and then flows out evenly from the annular air outlet structure 12, forming an efficient and uniform hot air circulation.

[0083] The preheating control device for the steam oven provided by the present invention will be described below. The preheating control device for the steam oven described below can be referred to in correspondence with the preheating control method for the steam oven described above.

[0084] like Figure 6 As shown, the preheating control device for a steam oven according to a second aspect embodiment of the present invention includes: The first control module 110 is used to receive a preheating start command, control the heating element to work at a preset power, and control the fan to run at a first operating speed, wherein the first operating speed is calibrated based on the low wind resistance characteristics of the central air intake structure 11. The acquisition module 120 is used to acquire the real-time temperature inside the cooking cavity; The second control module 130 is used to control the fan to switch to a second operating speed when the real-time temperature reaches the preset target temperature. The second operating speed is lower than the first operating speed.

[0085] A steam oven according to a third aspect of the present invention includes a cooking cavity, a baffle plate 1 disposed on the wall of the cooking cavity, a fan disposed on the back side of the baffle plate 1, a heating element, a memory, a processor, and a computer program stored in the memory and executable on the processor. The baffle plate 1 is provided with a central air inlet structure 11 and an annular air outlet structure 12 surrounding the central air inlet structure 11. When the processor executes the program, it implements the steps of the preheating control method of the steam oven according to the first aspect of the present invention. Figure 7 An example is a schematic diagram of the physical structure of an electronic device, such as... Figure 7 As shown, the electronic device may include a processor 810, a communications interface 820, a memory 830, and a communication bus 840, wherein the processor 810, communications interface 820, and memory 830 communicate with each other via the communication bus 840. The processor 810 can call logic instructions in the memory 830 to execute a preheating control method for the steam oven, including: receiving a preheating start command, controlling the heating element to operate at a preset power, and controlling the fan to operate at a first operating speed, wherein the first operating speed is calibrated based on the low wind resistance characteristics of the central air intake structure 11; acquiring the real-time temperature inside the cooking cavity; and in response to the real-time temperature reaching a preset target temperature, controlling the fan to switch to a second operating speed, the second operating speed being lower than the first operating speed.

[0086] Furthermore, the logical instructions in the aforementioned memory 830 can be implemented as software functional units and, when sold or used as independent products, can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or a part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods of the various embodiments of the present invention. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.

[0087] On the other hand, the present invention also provides a computer program product, which includes a computer program stored on a non-transitory computer-readable storage medium. The computer program includes program instructions. When the program instructions are executed by the computer, the computer can execute the preheating control method for the steam oven provided by the above methods, including: receiving a preheating start instruction, controlling the heating element to operate at a preset power, and controlling the fan to operate at a first operating speed, wherein the first operating speed is calibrated based on the low wind resistance characteristics of the central air intake structure 11; acquiring the real-time temperature inside the cooking cavity; and in response to the real-time temperature reaching a preset target temperature, controlling the fan to switch to a second operating speed, wherein the second operating speed is lower than the first operating speed.

[0088] In another aspect, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon. When executed by a processor, the computer program implements the preheating control method of the steam oven provided above, including: receiving a preheating start command, controlling the heating element to operate at a preset power, and controlling the fan to operate at a first operating speed, wherein the first operating speed is calibrated based on the low wind resistance characteristics of the central air intake structure 11; acquiring the real-time temperature inside the cooking cavity; and in response to the real-time temperature reaching a preset target temperature, controlling the fan to switch to a second operating speed, wherein the second operating speed is lower than the first operating speed.

[0089] The device embodiments described above are merely illustrative. The units described as separate components may or may not be physically separate, and the components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs. Those skilled in the art can understand and implement this without any creative effort.

[0090] Through the above description of the embodiments, those skilled in the art can clearly understand that each embodiment can be implemented by means of software plus necessary general-purpose hardware platforms, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solutions, in essence or the part that contributes to the prior art, can be embodied in the form of a software product. This computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, magnetic disk, optical disk, etc., including several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute the methods of various embodiments or some parts of embodiments.

[0091] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A preheating control method for a steam oven, the steam oven comprising a cooking cavity, a baffle plate disposed on the wall of the cooking cavity, a fan disposed on the back side of the baffle plate, and a heating element, wherein the baffle plate is provided with a central air inlet structure and an annular air outlet structure surrounding the central air inlet structure, characterized in that, The method includes: Upon receiving a preheating start command, the heating element is controlled to operate at a preset power, and the fan is controlled to operate at a first operating speed, wherein the first operating speed is calibrated based on the low wind resistance characteristics of the central air intake structure; Obtain the real-time temperature inside the cooking cavity; In response to the real-time temperature reaching the preset target temperature, the fan is controlled to switch to a second operating speed, which is lower than the first operating speed.

2. The preheating control method of the steam oven according to claim 1, characterized in that, The control of the fan to operate at a first operating speed includes: Based on the maximum circulating air volume corresponding to the low wind resistance characteristics of the central air intake structure, the target air volume of the fan during the preheating stage is determined. The fan speed corresponding to the target air volume is determined as the first operating speed, so that the fan outputs the maximum circulating air volume that matches the central air intake structure during the preheating stage.

3. The preheating control method of the steam oven according to claim 1, wherein The step of controlling the fan to switch to a second operating speed in response to the real-time temperature reaching a preset target temperature includes: When the real-time temperature reaches the preset target temperature, the preheating phase is determined to be over. The fan is controlled to switch from the first operating speed to the second operating speed to enter the constant temperature cooking mode.

4. The preheating control method of the steam oven according to claim 3, wherein The method for determining the second operating speed includes: Obtain the target temperature field uniformity requirements and noise limitation requirements within the cooking cavity under the constant temperature cooking mode; Based on the target temperature field uniformity requirement, the minimum fan speed that satisfies the temperature field uniformity is determined, and based on the noise limit requirement, the maximum fan speed that satisfies the noise limit is determined. The speed value within the intersection range between the minimum fan speed and the maximum fan speed is determined as the second operating speed.

5. The preheating control method of the steam oven according to claim 3, wherein The control of the fan to switch from the first operating speed to the second operating speed includes: According to a preset speed reduction gradient, the fan speed is gradually reduced from the first operating speed to the second operating speed to avoid sudden changes in the fan speed.

6. The preheating control method of a steam oven according to any one of claims 1 to 5, characterized in that, The method further includes: During the process of controlling the fan to operate at a first operating speed, the actual speed of the fan is monitored in real time; In response to the actual rotation speed being lower than a preset percentage of the first operating speed and the duration exceeding a preset stall detection time, the fan is determined to be stalled, the heating element is controlled to stop working, and a fan abnormality warning message is output.

7. The preheating control method of a steam oven according to any one of claims 1 to 5, wherein The steam oven also includes a door, and the method further includes: During the process of controlling the heating element to operate at a preset power and the fan to operate at a first operating speed, the opening and closing status of the door is monitored in real time; In response to detecting that the door is in an open state, the heating element is controlled to stop working, and the fan speed is controlled to decrease from the first operating speed to a preset safe speed or to stop working; After the heating element stops working and the fan reduces its speed or stops running, the opening and closing status of the door is continuously monitored; In response to detecting that the door has switched from an open state to a closed state, the heating element is controlled to resume operation at the preset power, and the fan speed is controlled to resume from the safe speed or the stopped state to the first operating speed.

8. The preheating control method of a steam oven according to any one of claims 1 to 5, characterized in that, The central air intake structure includes multiple concentric rings of elongated slots. The elongated slots in each ring are evenly distributed along the circumference. The extension direction of the elongated slots is adapted to the curvature of the ring. The number of rings and the length of the elongated slots increase from the inside to the outside. The annular air outlet structure is a rounded rectangular annular continuous opening, which is arranged along the inner edge of the wind deflector, and the four corners are designed with rounded transitions.

9. A preheating control device for a steam oven, the steam oven comprising a cooking cavity, a baffle plate disposed on the wall of the cooking cavity, a fan disposed on the back side of the baffle plate, and a heating element, wherein the baffle plate is provided with a central air inlet structure and an annular air outlet structure surrounding the central air inlet structure, characterized in that, The device includes: The first control module is used to receive a preheating start command, control the heating element to work at a preset power, and control the fan to run at a first operating speed, wherein the first operating speed is calibrated based on the low wind resistance characteristics of the central air intake structure. The acquisition module is used to acquire the real-time temperature inside the cooking cavity; The second control module is used to control the fan to switch to a second operating speed when the real-time temperature reaches a preset target temperature. The second operating speed is lower than the first operating speed.

10. A steam oven, comprising a cooking cavity, a baffle plate disposed on the wall of the cooking cavity, a fan disposed on the back side of the baffle plate, a heating element, a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the baffle plate is provided with a central air inlet structure and an annular air outlet structure surrounding the central air inlet structure, characterized in that, When the processor executes the program, it implements the steps of the preheating control method for the steam oven as described in any one of claims 1 to 8.