A dual-tower continuous dechlorination system and method based on cascade refueling

The dual-tower continuous dechlorination system with cascaded refrigerant exchange, utilizing a three-zone bed and PLC control, solves the problems of low dechlorinator utilization and inaccurate refrigerant exchange in fixed-bed dechlorination units, achieving cascaded utilization of adsorbent and continuous flue gas purification, while reducing costs and risks.

CN123102087APending Publication Date: 2026-11-17NANJING UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611492267.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-23
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The existing fixed-bed dechlorination unit has a low dechlorination agent utilization rate, requiring shutdown and replacement of the entire tower. It cannot achieve the cascade utilization of the adsorbent, and the lack of online monitoring means leads to inaccurate timing of material replacement, affecting the stable operation and cost-effectiveness of the equipment.

Method used

A dual-tower continuous dechlorination system based on cascade refrigerant replacement is adopted. Through a three-zone bed structure and PLC control unit, the system realizes the cascade utilization of adsorbent and online refrigerant replacement. Combined with real-time monitoring of flue gas flow, bed pressure difference and outlet hydrogen chloride concentration, the timing of refrigerant replacement is optimized.

Benefits of technology

It improves the utilization rate of dechlorinating agents, reduces reagent consumption and operating costs, ensures the continuity and stability of flue gas purification, and reduces adsorbent waste and the risk of exceeding the outlet concentration standard.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123102087A_ABST
    Figure CN123102087A_ABST
Patent Text Reader

Abstract

This invention belongs to the field of flue gas purification technology, specifically relating to a dual-tower continuous dechlorination system and method based on cascade refueling. The system includes two identical adsorption towers, each divided from bottom to top into an inlet reaction zone, an intermediate buffer zone, and an outlet protection zone. Cascade refueling, including stratified discharge and top-level refueling, is achieved through valve timing control. The system can switch between single-tower rotation and dual-tower parallel operation, determining the refueling timing based on flue gas flow rate, bed pressure difference, and outlet hydrogen chloride concentration. During refueling, the flue gas passage remains open, eliminating the need for system shutdown. The adsorption tower to be refueled can be disconnected from the flue gas passage according to the operating mode. The dechlorinator utilization rate is higher than that of traditional whole-tower replacement methods, making it suitable for continuous purification of chlorine-containing flue gas from waste incineration plants, coal-fired boilers, and other similar applications.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of flue gas purification technology, specifically relating to a dual-tower continuous dechlorination system and method based on cascade refueling. Background Technology

[0002] Hydrogen chloride in flue gas is a major acidic pollutant in the flue gas from coal combustion, waste incineration, and industrial kilns. It can corrode equipment and affect the stable operation of downstream denitrification systems. Existing dry dechlorination methods mostly use fixed-bed adsorption towers.

[0003] Due to the constraints of the adsorption breakthrough curve, the adsorption reaction only occurs within a limited mass transfer zone. The adsorbent in the latter part of the bed is discarded before reaching saturation and is replaced with the entire tower. In actual operation, the utilization rate of dechlorinating agents in fixed-bed dechlorination units is usually low. Under some operating conditions, the utilization rate of dechlorinating agents can be as low as about 40%, resulting in high reagent consumption and high operating costs.

[0004] Furthermore, once the adsorbent becomes saturated, the system must be shut down and the tower opened for replacement, with each replacement taking several hours. This means the dechlorination system can only operate intermittently, which is incompatible with the production process of continuous smoke generation upstream and continuous emissions downstream. Existing equipment generally lacks online monitoring methods for bed temperature, pressure difference, and outlet components. Operators cannot monitor the bed saturation status in real time and can only rely on experience to replace the adsorbent periodically. This can easily lead to situations where the adsorbent is replaced too early, resulting in waste, or too late, resulting in excessive outlet concentrations.

[0005] Therefore, it is necessary to develop a dechlorination system that enables the cascade utilization of adsorbents, online material replacement, and bed condition monitoring, in order to improve the utilization rate of dechlorinating agents and ensure continuous purification of flue gas. Summary of the Invention

[0006] The purpose of this invention is to provide a dual-tower continuous dechlorination system and method based on cascade refueling. This system features a three-section bed structure within the tower for removing hydrogen chloride from flue gas. Addressing the problems of traditional fixed-bed dechlorination, such as the need for complete tower refueling, low adsorbent utilization, mandatory shutdown during refueling, and reliance on manual experience to control the timing of refueling, this invention improves adsorbent utilization through a cascade refueling structure, achieving continuous dechlorination without shutdown, and adjusting the refueling timing according to actual operating conditions.

[0007] The technical solution for achieving the objective of this invention is: a dual-tower continuous dechlorination system based on cascade refueling, comprising:

[0008] Flue gas pretreatment unit: includes a cyclone dust collector and a flue gas temperature regulating heat exchanger. The outlet of the cyclone dust collector is connected to the inlet of the flue gas temperature regulating heat exchanger, and the outlet of the flue gas temperature regulating heat exchanger is connected to the inlet tee main pipe.

[0009] Dual adsorption tower unit: includes a first adsorption tower and a second adsorption tower with the same structure and arranged in parallel. The tower body is divided into an inlet reaction zone, an intermediate buffer zone and an outlet protection zone from bottom to top. The tower is filled with dechlorination agent. Each tower is equipped with an inlet control valve at the inlet end and an exhaust isolation valve at the exhaust end. The top of each tower is connected to the main exhaust pipe of the purified flue gas.

[0010] The cascade refueling unit includes fresh adsorbent silos independently set for each of the two adsorption towers, an upper refueling control valve, a lower refueling control valve, a bottom discharge control valve, and a sealed waste collection tank. The upper refueling control valve connects the outlet protection zone and the intermediate buffer zone of this tower; the lower refueling control valve connects the intermediate buffer zone and the inlet reaction zone of this tower; the outlet of the fresh adsorbent silo is connected to the top feed port of each of the two towers; the bottom of the inlet reaction zone of each of the two towers is connected to the sealed waste collection tank via the bottom discharge control valve.

[0011] Measurement and control unit: includes flue gas temperature transmitter, flow transmitter, differential pressure transmitter, chlorine component analyzer and PLC control unit; the signal output terminals of each transmitter and analyzer are connected to the PLC control unit, and the control output terminal of the PLC control unit is connected to each control valve.

[0012] A method for dechlorination based on the above-mentioned dechlorination system includes the following steps:

[0013] Step (1): The flue gas to be treated is sent to a cyclone dust collector to remove large dust particles, and then sent to a flue gas temperature regulating heat exchanger. The first flue gas temperature transmitter and the second flue gas temperature transmitter collect the flue gas temperature signals after dust removal and heat exchange in real time and send them to the PLC control unit. The PLC control unit adjusts the flow rate of the heat exchange medium in the heat exchanger to adjust the flue gas temperature to 120-180℃. The pretreated flue gas enters the adsorption tower through the inlet three-way main pipe and flows from bottom to top through the inlet reaction zone, the intermediate buffer zone and the outlet protection zone, contacting the particulate dechlorinating agent to remove HCl from the flue gas. During the adsorption process, the upper and lower layer switching control valves are kept closed. As the adsorption proceeds, the bed gradually forms a chlorine load gradient distribution with preferential saturation in the inlet reaction zone, semi-saturation in the intermediate buffer zone and low saturation in the outlet protection zone.

[0014] Step (2): The PLC control unit combines the following three types of signals to determine the material change timing:

[0015] Flow feedforward: The flow transmitter collects the real-time flue gas flow, the inlet chlorine component analyzer collects the inlet hydrogen chloride concentration, and the PLC control unit calculates the inlet chlorine load to generate the baseline refueling interval;

[0016] Bed condition prediction: The first differential pressure transmitter and the second differential pressure transmitter independently monitor the bed resistance change of the corresponding tower; when the differential pressure rise rate exceeds the set threshold, the PLC control unit outputs a pre-change signal;

[0017] Outlet concentration feedback: The chlorine component analyzer at the top of the tower collects the hydrogen chloride concentration at the outlet of the corresponding adsorption tower as a closed-loop correction signal; when the outlet HCl concentration approaches the emission limit, the material replacement cycle is shortened under the premise of meeting the minimum valve action interval and safety interlock conditions; when the outlet hydrogen chloride concentration is continuously lower than the control threshold and maintained for a preset time, the material replacement interval is gradually extended to reduce the material replacement frequency.

[0018] When the chlorine component analyzer at the top of the tower detects that the concentration of hydrogen chloride at the outlet of a certain adsorption tower has increased to a set threshold, or when the first differential pressure transmitter or the second differential pressure transmitter detects that the differential pressure of the corresponding tower bed has reached the upper limit, the PLC control unit triggers the cascade material replacement process of that tower.

[0019] Step (3): By combining the opening and closing of the inlet control valve and the exhaust isolation valve, the system switches between the following two operating conditions: when the air volume is less than the set threshold and when the chlorine concentration is less than the set concentration threshold, one adsorption tower is online for adsorption and the other adsorption tower is offline for cascade material replacement. The two towers are rotated periodically. The inlet control valve and exhaust isolation valve of the online tower are opened, and the inlet control valve and exhaust isolation valve of the offline tower are closed. When the flue gas flow rate is greater than the set air volume threshold and the flue gas chlorine pollutant concentration is greater than the set concentration threshold, the flue gas is diverted from the inlet three-way main pipe into the first adsorption tower and the second adsorption tower. The two towers are processed synchronously. When one of the towers needs to replace the material, the inlet control valve of the tower to be replaced is gradually closed, and the flue gas load is smoothly transferred to the other tower. After the inlet control valve is completely closed, the exhaust isolation valve of the tower to be replaced is closed. After the material replacement is completed, the inlet control valve and exhaust isolation valve of the tower are reopened and connected to the parallel system.

[0020] Compared with the prior art, the significant advantages of this invention are:

[0021] This invention divides the adsorption tower bed into three zones. During refueling, only the saturated dechlorinating agent in the inlet reaction zone is discharged, while the semi-saturated dechlorinating agent in the intermediate buffer zone and outlet protection zone is gradually moved down for continued use, eliminating the need for complete tower replacement. Compared to traditional whole-tower replacement methods, dechlorinating agent consumption is reduced, and solid waste emissions are correspondingly lower. The refueling operation is carried out while the flue gas passage remains open, eliminating the need to shut down the tower. The system can continuously process flue gas and is suitable for industrial scenarios with continuous upstream flue gas production.

[0022] This invention features two adsorption towers. By combining the opening and closing of the inlet control valve and the exhaust isolation valve, it can switch between two operating modes: single-tower rotation and dual-tower parallel operation. This is suitable for different working conditions, such as low air volume and low chlorine concentration, and high air volume and high chlorine concentration.

[0023] This invention combines flue gas flow rate, bed pressure difference, and outlet hydrogen chloride concentration to comprehensively determine the timing of refrigerant replacement. Compared with the traditional timed manual refrigerant replacement method, it can reduce adsorbent waste caused by replacing refrigerant too early, and also reduce the risk of outlet concentration exceeding the standard caused by replacing refrigerant too late.

[0024] This invention uses a closed waste collection tank to collect saturated dechlorinating agent, which can reduce dust during the unloading process; fresh dechlorinating agent is always replenished in the outlet protection zone, which helps to maintain a stable outlet hydrogen chloride concentration throughout the entire operation cycle. Attached Figure Description

[0025] Figure 1 This is a schematic diagram of the dual-tower continuous dechlorination system based on cascade material exchange as described in this invention.

[0026] Explanation of reference numerals in the attached figures:

[0027] 1-Cyclone dust collector, 2-Flue gas temperature regulating heat exchanger, 3-Inlet three-way main pipe, 4-Purified flue gas exhaust main pipe, 5-First adsorption tower, 6-Second adsorption tower, 7-Outlet protection zone, 8-Intermediate buffer zone, 9-Inlet reaction zone, 10-Inlet control valve, 11-Exhaust isolation valve, 12-Fresh adsorbent silo, 13-Upper layer switching control valve, 14-Lower layer switching control valve, 15-Bottom layer discharge control valve, 16-Sealed waste collection tank, 17-First flue gas temperature transmitter, 18-Second flue gas temperature transmitter, 19-Flow transmitter, 20-Inlet chlorine component analyzer, 21-First differential pressure transmitter, 22-Second differential pressure transmitter, 23-Top chlorine component analyzer, 24-Dechlorinating agent, 25-PLC control unit. Detailed Implementation

[0028] The present invention will now be described in further detail with reference to the accompanying drawings.

[0029] like Figure 1 As shown, a dual-tower continuous dechlorination system based on cascade refueling includes:

[0030] Flue gas pretreatment unit: includes cyclone dust collector 1 and flue gas temperature regulating heat exchanger 2. The outlet of cyclone dust collector 1 is connected to the inlet of flue gas temperature regulating heat exchanger 2, and the outlet of flue gas temperature regulating heat exchanger 2 is connected to the inlet tee main 3.

[0031] Dual adsorption tower unit: includes a first adsorption tower 5 and a second adsorption tower 6. The two towers have the same structure and are arranged in parallel. The tower body is divided into an inlet reaction zone 9, an intermediate buffer zone 8, and an outlet protection zone from bottom to top. The towers are filled with dechlorination agent 24. Each tower is equipped with an inlet control valve 10 at the inlet end and an exhaust isolation valve 11 at the exhaust end. The top of each tower is connected to the purified flue gas exhaust main pipe 4.

[0032] The cascade refueling unit includes a fresh adsorbent silo 12, an upper refueling control valve 13, a lower refueling control valve 14, a bottom discharge control valve 15, and a sealed waste collection tank 16, each independently configured for one of the two adsorption towers. The upper refueling control valve 13, lower refueling control valve 14, and bottom discharge control valve 15 are all rotary airlock feed valves. The upper refueling control valve 13 connects the outlet protection zone 7 and the intermediate buffer zone 8 of this tower. The lower refueling control valve 14 connects the intermediate buffer zone 8 and the inlet reaction zone 9 of this tower. The outlet of the fresh adsorbent silo 12 is connected to the top feed inlets of both towers. The bottom of the inlet reaction zones of both towers is connected to the sealed waste collection tank 16 via the bottom discharge control valve 15.

[0033] Measurement and control unit: includes flue gas temperature transmitter, flow transmitter 19, differential pressure transmitter, chlorine component analyzer 20 and PLC control unit 25; the signal output terminals of each transmitter and analyzer are connected to PLC control unit 25, and the control output terminals of PLC control unit 25 are connected to each control valve.

[0034] A breathable support partition is provided between the inlet reaction zone 9, the intermediate buffer zone 8 and the outlet protection zone 7, and a screen is laid on the breathable support partition.

[0035] The inlet reaction zone 9, the intermediate buffer zone 8, and the outlet protection zone 7 are each equipped with a discharge port and a replenishment port.

[0036] The discharge port of the intermediate buffer zone 8 is connected to the feed port of the inlet reaction zone 9 via the lower-level shift control valve 14; the discharge port of the outlet protection zone 7 is connected to the feed port of the intermediate buffer zone 8 via the upper-level shift control valve 13.

[0037] The outlet of the fresh adsorbent silo 12 is connected to the replenishment port of the outlet protection zone 7.

[0038] By combining the opening and closing of the intake control valve 10 and the exhaust isolation valve 11, the system can operate in either single-tower rotation mode or dual-tower parallel mode.

[0039] Each adsorption tower is equipped with an independent differential pressure transmitter for monitoring the tower. A flue gas temperature transmitter and an inlet chlorine component analyzer 20 are installed on the pipeline at the front end of the inlet tee main 3. A flow transmitter is installed on the inlet tee main 3. A tower top chlorine component analyzer is installed on the exhaust branch pipeline at the top of each tower.

[0040] The PLC control unit 25 determines the timing of material replacement based on the flue gas flow rate, bed pressure difference, and outlet chlorine concentration signals, and controls each control valve to open and close according to a preset sequence.

[0041] The flue gas temperature control heat exchanger controls the temperature of the flue gas entering the adsorption tower within the range of 120~180℃.

[0042] The sealed waste collection tank 16 has a fully enclosed structure.

[0043] A method for dechlorination based on the above system includes:

[0044] Step 1. The flue gas to be treated first passes through a cyclone dust collector 1 to remove large dust particles, and then enters a flue gas temperature regulating heat exchanger 2 to adjust the flue gas temperature to 120~180℃. During this process, the first flue gas temperature transmitter 17 and the second flue gas temperature transmitter 18 collect the flue gas temperature signals after dust removal and heat exchange in real time and send them to the PLC control unit 25. The PLC control unit 25 adjusts the flow rate of the heat exchange medium in the heat exchanger 2 accordingly to accurately regulate the flue gas temperature to 120~180℃. The pretreated flue gas enters the adsorption tower through the inlet three-way main pipe 3, and flows from bottom to top through the inlet reaction zone 9, the intermediate buffer zone 8, and the outlet protection zone 7, contacting the particulate dechlorination agent 24 to remove HCl from the flue gas.

[0045] As adsorption proceeds, the bed gradually forms a chlorine loading gradient distribution: the inlet reaction zone is preferentially saturated, the intermediate buffer zone is semi-saturated, and the outlet protection zone is low-saturated.

[0046] During normal adsorption, both the upper layer transfer control valve 13 and the lower layer transfer control valve 14 remain closed.

[0047] Step 2. The PLC control unit 25 combines the following three types of signals to determine the material change timing:

[0048] Flow feedforward: Flow transmitter 19 collects real-time flue gas flow, inlet chlorine component analyzer 20 collects inlet hydrogen chloride concentration, and PLC control unit 25 estimates inlet chlorine load based on this and generates baseline refueling interval.

[0049] Bed condition prediction: The first differential pressure transmitter 21 and the second differential pressure transmitter 22 independently monitor the bed resistance changes of their respective towers. When the rate of increase in differential pressure exceeds a set threshold (e.g., an increase of 50 Pa per minute), the PLC control unit 25 outputs a pre-change signal.

[0050] Outlet concentration feedback: The chlorine component analyzer 23 at the top of the tower collects the hydrogen chloride concentration at the outlet of the corresponding adsorption tower, which serves as a closed-loop correction signal. When the outlet HCl concentration approaches the emission limit (e.g., close to 10 mg / m³), the feedback is corrected. 3 When the minimum valve actuation interval and safety interlock conditions are met, the material change cycle should be appropriately shortened. When the outlet hydrogen chloride concentration remains below the control threshold (e.g., below 5 mg / m³), 3 If the preset time is maintained, the material change interval will be gradually extended to reduce the frequency of material changes.

[0051] When the chlorine component analyzer 23 at the top of the tower detects that the concentration of hydrogen chloride at the outlet of a certain adsorption tower has increased to a set threshold, or when the first differential pressure transmitter 21 or the second differential pressure transmitter 22 detects that the differential pressure of the corresponding tower bed has reached the upper limit, the PLC control unit 25 triggers the cascade material replacement process of that tower.

[0052] First, open the bottom discharge control valve 15 to discharge the saturated dechlorinating agent in the inlet reaction zone 9 into the sealed waste collection tank 16. The discharge volume is precisely determined by the PLC control unit 25 based on the number of rotations or time of the rotary airlock feed valve. If bridging occurs at the discharge port, causing poor material flow, the vibration device at the discharge port can be activated to assist in material flow.

[0053] After discharge is completed, the lower-level switching control valve 14 is opened, and the semi-saturated dechlorinating agent in the intermediate buffer zone 8 falls under its own weight, replenishing the inlet reaction zone 9 in equal amounts; then the upper-level switching control valve 13 is opened, and the low-saturated dechlorinating agent in the outlet protection zone 7 falls under its own weight, replenishing the intermediate buffer zone 8 in equal amounts. After the discharge is in place, the lower-level switching control valve 14 and the upper-level switching control valve 13 are closed in sequence.

[0054] Finally, an equal amount of fresh dechlorinating agent is added from the fresh adsorbent silo 12 to the outlet protection zone 7. This completes a single-round stratified replacement. Throughout the entire replacement process, the system's main flue gas passage remains open, and the system does not require shutdown.

[0055] Step 3. By combining the opening and closing of the inlet control valve 10 and the exhaust isolation valve 11, the system can switch between the following two operating conditions: when the air volume is less than the set threshold and when the chlorine concentration is less than the set concentration threshold, one adsorption tower is online for adsorption, and the other adsorption tower is offline for cascade material replacement. The two towers are rotated periodically. The inlet control valve and exhaust isolation valve of the online tower are open, and the inlet control valve and exhaust isolation valve of the offline tower are closed. When the flue gas flow rate is greater than the set air volume threshold and the flue gas chlorine pollutant concentration is greater than the set concentration threshold, the flue gas is diverted from the inlet three-way main pipe 3 into the first adsorption tower 5 and the second adsorption tower 6. The two towers process synchronously. When one tower needs to replace the material, the inlet control valve of the tower to be replaced is gradually closed to smoothly transfer the flue gas load to the other tower. After the inlet control valve is completely closed, the exhaust isolation valve of the tower to be replaced is closed. After the material replacement is completed, the inlet control valve and exhaust isolation valve of the tower are reopened and connected to the parallel system.

[0056] This invention is applicable to the adsorption purification of chlorine-containing flue gas from waste incineration and coal-fired boilers.

Claims

1. A dual-tower continuous dechlorination system based on cascaded material exchange, characterized in that, include: Flue gas pretreatment unit: includes a cyclone dust collector and a flue gas temperature regulating heat exchanger. The outlet of the cyclone dust collector is connected to the inlet of the flue gas temperature regulating heat exchanger, and the outlet of the flue gas temperature regulating heat exchanger is connected to the inlet tee main pipe. Dual adsorption tower unit: includes a first adsorption tower and a second adsorption tower with the same structure and arranged in parallel. The tower body is divided into an inlet reaction zone, an intermediate buffer zone and an outlet protection zone from bottom to top. The tower is filled with dechlorination agent. Each tower is equipped with an inlet control valve at the inlet end and an exhaust isolation valve at the exhaust end. The top of each tower is connected to the main exhaust pipe of the purified flue gas. The cascade refueling unit includes fresh adsorbent silos independently set for each of the two adsorption towers, an upper refueling control valve, a lower refueling control valve, a bottom discharge control valve, and a sealed waste collection tank. The upper refueling control valve connects the outlet protection zone and the intermediate buffer zone of this tower; the lower refueling control valve connects the intermediate buffer zone and the inlet reaction zone of this tower; the outlet of the fresh adsorbent silo is connected to the top feed port of each of the two towers; the bottom of the inlet reaction zone of each of the two towers is connected to the sealed waste collection tank via the bottom discharge control valve. Measurement and control unit: includes flue gas temperature transmitter, flow transmitter, differential pressure transmitter, chlorine component analyzer and PLC control unit; the signal output terminals of each transmitter and analyzer are connected to the PLC control unit, and the control output terminal of the PLC control unit is connected to each control valve.

2. The dual-tower continuous dechlorination system based on cascade material exchange according to claim 1, characterized in that, A breathable support partition is provided between the inlet reaction zone, the intermediate buffer zone and the outlet protection zone, and a screen is laid on the breathable support partition. The inlet reaction zone, the intermediate buffer zone, and the outlet protection zone are each equipped with a discharge port and a replenishment port.

3. The dual-tower continuous dechlorination system based on cascade material exchange according to claim 2, characterized in that, The discharge port of the intermediate buffer zone is connected to the feed port of the inlet reaction zone via the lower-level shift control valve; the discharge port of the outlet protection zone is connected to the feed port of the intermediate buffer zone via the upper-level shift control valve. The upper-level shift control valve, the lower-level shift control valve, and the bottom-level discharge control valve are all rotary airlock feed valves.

4. The dual-tower continuous dechlorination system based on cascade material exchange according to claim 3, characterized in that, The outlet of the fresh adsorbent silo is connected to the replenishment port of the outlet protection zone.

5. The dual-tower continuous dechlorination system based on cascade material exchange according to claim 1, characterized in that, By combining the opening and closing of the intake control valve and the exhaust isolation valve, the system can operate in either single-tower rotation mode or dual-tower parallel mode.

6. The dual-tower continuous dechlorination system based on cascade material exchange according to claim 1, characterized in that, Each adsorption tower is equipped with an independent differential pressure transmitter for monitoring the tower. A flue gas temperature transmitter and an inlet chlorine component analyzer are installed on the pipeline at the front end of the inlet tee. A flow transmitter is installed on the inlet tee. A tower top chlorine component analyzer is installed on the exhaust branch pipeline at the top of each tower.

7. The dual-tower continuous dechlorination system based on cascade material exchange according to claim 1, characterized in that, The PLC control unit determines the timing of material replacement based on the flue gas flow rate, bed pressure difference, and outlet chlorine concentration signals, and controls each control valve to open and close according to the preset sequence.

8. The dual-tower continuous dechlorination system based on cascade material exchange according to claim 1, characterized in that, The sealed waste collection tank has a fully enclosed structure.

9. A method for dechlorination based on the dechlorination system according to any one of claims 1-8, characterized in that, Includes the following steps: Step (1): The flue gas to be treated is sent to a cyclone dust collector to remove large dust particles, and then sent to a flue gas temperature regulating heat exchanger. The first flue gas temperature transmitter and the second flue gas temperature transmitter collect the flue gas temperature signals after dust removal and heat exchange in real time and send them to the PLC control unit. The PLC control unit adjusts the flow rate of the heat exchange medium in the heat exchanger to adjust the flue gas temperature to 120-180℃. The pretreated flue gas enters the adsorption tower through the inlet three-way main pipe and flows from bottom to top through the inlet reaction zone, the intermediate buffer zone and the outlet protection zone, contacting the particulate dechlorinating agent to remove HCl from the flue gas. During the adsorption process, the upper and lower layer switching control valves are kept closed. As the adsorption proceeds, the bed gradually forms a chlorine load gradient distribution with preferential saturation in the inlet reaction zone, semi-saturation in the intermediate buffer zone and low saturation in the outlet protection zone. Step (2): The PLC control unit combines the following three types of signals to determine the material change timing: Flow feedforward: The flow transmitter collects the real-time flue gas flow, the inlet chlorine component analyzer collects the inlet hydrogen chloride concentration, and the PLC control unit calculates the inlet chlorine load to generate the baseline refueling interval; Bed condition prediction: The first differential pressure transmitter and the second differential pressure transmitter independently monitor the bed resistance change of the corresponding tower; when the differential pressure rise rate exceeds the set threshold, the PLC control unit outputs a pre-change signal; Outlet concentration feedback: The chlorine component analyzer at the top of the tower collects the hydrogen chloride concentration at the outlet of the corresponding adsorption tower as a closed-loop correction signal; when the outlet HCl concentration approaches the emission limit, the material replacement cycle is shortened under the premise of meeting the minimum valve action interval and safety interlock conditions; when the outlet hydrogen chloride concentration is continuously lower than the control threshold and maintained for a preset time, the material replacement interval is gradually extended to reduce the material replacement frequency. When the chlorine component analyzer at the top of the tower detects that the concentration of hydrogen chloride at the outlet of a certain adsorption tower has increased to a set threshold, or when the first differential pressure transmitter or the second differential pressure transmitter detects that the differential pressure of the corresponding tower bed has reached the upper limit, the PLC control unit triggers the cascade material replacement process of that tower. Step (3): By combining the opening and closing of the inlet control valve and the exhaust isolation valve, the system switches between the following two operating conditions: when the air volume is less than the set threshold and when the chlorine concentration is less than the set concentration threshold, one adsorption tower is online for adsorption and the other adsorption tower is offline for cascade material replacement. The two towers are rotated periodically. The inlet control valve and exhaust isolation valve of the online tower are opened, and the inlet control valve and exhaust isolation valve of the offline tower are closed. When the flue gas flow rate is greater than the set air volume threshold and the flue gas chlorine pollutant concentration is greater than the set concentration threshold, the flue gas is diverted from the inlet three-way main pipe into the first adsorption tower and the second adsorption tower. The two towers are processed synchronously. When one of the towers needs to replace the material, the inlet control valve of the tower to be replaced is gradually closed, and the flue gas load is smoothly transferred to the other tower. After the inlet control valve is completely closed, the exhaust isolation valve of the tower to be replaced is closed. After the material replacement is completed, the inlet control valve and exhaust isolation valve of the tower are reopened and connected to the parallel system.

10. The method according to claim 9, characterized in that, The specific process of cascade material changeover in step (2) is as follows: Open the bottom discharge control valve to discharge the saturated dechlorinating agent in the inlet reaction zone into the sealed waste collection tank; the discharge volume is determined by the PLC control unit based on the number of rotations or time of the rotary airlock feed valve; if bridging occurs at the discharge port, causing poor material flow, start the vibration device at the discharge port to assist in material flow. After the material discharge is completed, the lower layer switching control valve is opened, and the semi-saturated dechlorinating agent in the intermediate buffer zone falls by its own weight and is added to the inlet reaction zone in equal amount; then the upper layer switching control valve is opened, and the low-saturated dechlorinating agent in the outlet protection zone falls by its own weight and is added to the intermediate buffer zone in equal amount; after the material is discharged into place, the lower layer switching control valve and the upper layer switching control valve are closed in sequence. Fresh adsorbent is added to the outlet protection zone in equal amounts from the fresh adsorbent silo; this completes a single-round stratified replacement. The total flue gas passage of the system remains open throughout the entire replacement process, and the system does not need to be shut down.