Automatic Grinding Fluid Preparation and Delivery System and Control Method

By employing technologies such as independent metering with calibrated measuring cylinders, nitrogen micro-positive pressure inertial protection, low-shear delivery with pneumatic diaphragm pumps, and dual-threshold management of filter differential pressure, the problems of insufficient metering accuracy, insufficient inert atmosphere protection, easy agglomeration of shear-sensitive particles, and filter clogging in existing grinding fluid preparation and delivery systems have been solved, achieving high-precision, stable, and high-capacity automatic preparation and delivery of grinding fluid.

CN123102238APending Publication Date: 2026-11-17杭州中欣晶圆半导体股份有限公司
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202611438049.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-16
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing grinding slurry preparation and delivery systems suffer from problems such as insufficient metering accuracy, inadequate inert atmosphere protection, easy agglomeration of shear-sensitive particles, lack of effective early warning and interlocking mechanisms for filter clogging, and sequential execution of the preparation and supply processes, which limit the stability and capacity of the CMP process.

Method used

It adopts a closed-loop technology that includes independent metering with calibrated measuring cylinders, nitrogen micro-positive pressure inertial protection, low-shear delivery with pneumatic diaphragm pumps, a mixing mechanism of extracorporeal circulation and self-circulation, dual-threshold health management of filter differential pressure, and parallel scheduling of liquid preparation and supply. Through the combination of pneumatic valves and pumps, it achieves accurate metering, stable delivery, and real-time monitoring.

Benefits of technology

It significantly improves the accuracy of grinding slurry formulation and batch consistency, suppresses bubbles and oxidation, protects particle dispersion stability, enables filter health management, improves system capacity and process traceability, and reduces defect risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123102238A_ABST
    Figure CN123102238A_ABST
Patent Text Reader

Abstract

This invention relates to an automatic grinding slurry preparation and delivery system and its control method, belonging to the technical field of grinding slurry preparation and delivery equipment. The system includes a raw material tank quantitatively feeding a graduated measuring tank, which is connected to a mixing reaction tank. The mixing reaction tank forms an external circulation mixing loop via pump MⅡ, a return pipe, and a VA7 pneumatic valve, and transfers the slurry to an intermediate buffer tank via a VA8 pneumatic valve. The intermediate buffer tank is connected to a filter for external slurry supply, and forms a self-circulating mixing branch via a VA11 pneumatic valve and a buffer outlet pipe. The control method includes five steps: quantitative feeding of raw material, mixing, transfer and buffering, circulating supply, and residual cleaning. A flow meter and a level sensor are used to dual-verify the slurry volume, and filter element blockage warning and interlock shutdown are implemented based on filter pressure difference. This achieves precise metering, batch traceability, and parallel mixing and supply processes for grinding slurry preparation. Nitrogen micro-positive pressure protection effectively suppresses bubble generation, ensuring uniform slurry concentration and stable pressure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of grinding fluid preparation and delivery equipment, specifically to an automatic grinding fluid preparation and delivery system and its control method. Background Technology

[0002] Chemical Mechanical Polishing / Planarization (CMP) is a crucial process in semiconductor manufacturing and precision optical component processing for achieving global planarization of wafer or workpiece surfaces. Its process stability directly determines the yield of subsequent processes such as photolithography and etching. Slurry, the most critical consumable chemical in the CMP process, typically consists of nanoscale abrasive particles (such as silica sol, cerium oxide, and alumina), dispersants, pH adjusters, and oxidants, forming a colloidal suspension in an ultrapure water carrier. Slurry is often supplied as a concentrated solution at the application site and needs to be diluted in real-time with ultrapure water (and sometimes oxidants and pH adjusters) according to the process ratio. It is then continuously and stably delivered to the polishing pad surface of the polishing machine via pipelines. The precision of the slurry's formulation, the stability of particle dispersion, and the stability of the supply flow rate and pressure are the three key factors determining the uniformity of the material removal rate (MRR) and the defect density on the wafer surface during CMP.

[0003] Existing technologies have various grinding fluid preparation and delivery methods, which can be broadly classified into the following three categories: The first type is a manual or semi-automatic intermittent solution preparation scheme. Operators manually mix the concentrate and ultrapure water in a preparation tank according to the specified ratio using measuring cylinders, weighing balances, and other instruments, and then manually transfer the mixture to a supply tank for use by the equipment. This scheme was more common in early small-batch production or laboratory settings.

[0004] The second category consists of automated liquid preparation solutions based on weighing or online sensors. For example, patent CN202511207668 discloses a polishing slurry concentration ratio and supply system, which adopts a multi-tank structure consisting of a clear water tank, a concentrated liquid tank, a ratio tank, and a supply tank. A concentration sensor detects the concentration of polishing slurry in the ratio tank in real time and provides feedback for adjustment. Patent CN202310892847.4 discloses a polishing slurry delivery device, which forms a communicating vessel by setting a buffer space and a pressure stabilization space in the liquid storage container, and uses a flow detection device to replace the weighing equipment to achieve accurate measurement. Patent CN202511091728.4 introduces a sensor module, a cloud server, and a data analysis module, and uses artificial intelligence algorithms to adaptively adjust the grinding slurry dilution and mixing process.

[0005] The third category is liquid supply assurance solutions based on filter pressure difference or bypass pressure relief. For example, patent CN202011540110.9 discloses a filter that detects the pressure difference across the filter element using dual pressure sensors, which can be used simultaneously for pipeline leakage detection and automatic sewage discharge; patent CN202422735357 proposes a filter with mechanical and electrical early warning linkage, which triggers mechanical and electrical alarms sequentially when the pressure difference across the filter element reaches a threshold, and opens the bypass valve to relieve pressure to avoid downstream flow interruption.

[0006] Although the above solutions have improved the automation level of grinding fluid preparation and delivery to some extent, the following four prominent problems still exist in practical engineering applications: I. Insufficient metering accuracy in liquid preparation, making it difficult to guarantee batch consistency. The metering accuracy of existing intermittent mixing schemes relies on the long-term stability of concentration sensors or weighing equipment. However, a large number of nanoscale solid particles in the grinding slurry easily deposit on the surface of the concentration sensor (e.g., the optical window of a refractometer is blocked by particles, or the electrodes of a conductivity sensor are covered by particles), leading to drift in measured values, sluggish response, or even complete failure. This forces the system to adopt an intermittent working mode of "detection-stop-cleaning-redetection," severely limiting the continuity and response speed of concentration adjustment. At the same time, the incoming concentrated stock solution itself has batch-to-batch density fluctuations, which are difficult to compensate for by relying solely on a single static mixing ratio. Schemes relying on weighing equipment for metering have inherent limitations such as frequent maintenance of the weighing module, sensitivity to vibration, and high installation space requirements. Failure of any single link in the metering chain will directly cause the actual mixing ratio to deviate from the process setting, resulting in fluctuations in the abrasive solid content and chemical composition in the grinding slurry, ultimately reflected in uneven wafer removal rates and an increase in surface defect rates.

[0007] Second, the lack of inert atmosphere protection in the tanks and during the transportation process easily leads to bubbles, oxidation, and crystallization. Most existing systems have open or simply sealed tanks for raw materials and mixing solutions during preparation and transfer. Air above the liquid level is drawn in as the liquid level drops, resulting in air bubbles... Continuous dissolution in the polishing slurry—for alkaline polishing slurries (such as cerium oxide systems), Dissolution gradually acidifies the pH, altering the zeta potential of the abrasive surface, weakening the electrostatic repulsion between particles, and triggering the disruption of the colloidal stability of DLVO, thereby inducing particle aggregation and sedimentation of CMP slurry types. Simultaneously, the negative pressure of the barrel drawing in air generates microbubbles in the liquid. These bubbles adhere to the polishing pad surface or enter the wafer-polishing pad contact area with the liquid flow, causing localized lubricant film instability and abrupt changes in removal rate, and even resulting in scratches and defects on the wafer surface.

[0008] Third, the delivery pump and circulation methods are unfriendly to the grinding slurry particle system, and shear-sensitive particles are prone to agglomeration. Existing solutions mostly use centrifugal pumps or screw pumps for raw slurry delivery and circulation mixing. The high-speed rotation of the centrifugal pump blades creates local high-shear zones, applying significant shear stress to the nano-abrasive particles that are originally stable and dispersed by electrostatic repulsion and steric hindrance. This causes the particles to overcome the repulsion energy barrier and agglomerate, forming large-size agglomerates. These agglomerates act as "hard points" during CMP, scratching the wafer surface and forming micro-scratches, which are one of the main defect sources in the CMP process. In addition, some solutions directly leave the slurry in the supply tank after preparation and output it externally, lacking a continuous mixing mechanism. Prolonged standing will cause abrasive particles to settle, resulting in concentration stratification in the tank—that is, the upper layer has a lower abrasive concentration and the lower layer has a higher concentration. This causes the solid content of the grinding slurry output at different times to drift, further aggravating process fluctuations.

[0009] IV. Lack of effective early warning and interlocking mechanisms for filter clogging poses a risk of downstream fluid interruption. Filters are key components in the polishing slurry delivery chain, intercepting large particles and foreign matter. As the filtration process continues, contaminants trapped in the filter element accumulate, gradually increasing the pressure difference across the filter element and decreasing the flow rate. Existing technologies mostly adopt a mode of timed filter element replacement or manual inspection. On the one hand, this cannot detect the degree of filter element clogging in real time, resulting in the dual problems of "over-maintenance" (replacing the filter element before it fails, causing waste of consumables) and "untimely maintenance" (not replacing the filter element even when it is severely clogged, leading to a sudden drop in downstream fluid supply or even fluid interruption). On the other hand, some solutions with early warning functions (such as CN202422735357) are mostly based on a single pressure difference threshold trigger, lacking a graded response mechanism—once the threshold is reached, bypass depressurization or shutdown is triggered. Bypass depressurization will cause unfiltered liquid to directly enter downstream contaminated wafers, while direct shutdown will cause interruption of fluid supply to the CMP machine and scrapping of batches of wafers.

[0010] 5. The sequential execution of the solution preparation and supply processes limits production capacity and makes batch traceability difficult. In existing intermittent solutions, after one batch is prepared, the solution preparation tank must first transfer it to the supply tank before the next batch can be prepared. The two processes are mutually dependent in terms of time, making it difficult to meet the continuous supply requirements of high-cycle CMP production. Furthermore, most solutions lack systematic records of each batch's feed rate, ultrapure water addition, liquid level changes, differential pressure curves, and valve action sequence. If an anomaly occurs in a batch of wafers, it is difficult to trace back to determine whether the cause lies in the solution preparation, transport, or filtration process, resulting in a lack of data support for process optimization and root cause analysis. Summary of the Invention

[0011] This invention primarily addresses the shortcomings of existing technologies by providing an automated grinding slurry preparation and delivery system and its control method. This system features precise metering, inert atmosphere protection, gentle shear delivery, uniform concentration mixing, filter health management, and batch traceability. It achieves this through a complete technical closed loop: independent metering of the measuring cylinder + dual verification of ultrapure water flow rate / level + nitrogen micro-positive pressure inert protection + low-shear delivery by a pneumatic diaphragm pump + dual mixing mechanisms of external and self-circulation + dual threshold health management of filter differential pressure + parallel scheduling of slurry preparation and supply.

[0012] The above-mentioned technical problems of the present invention are mainly solved by the following technical solutions: An automatic grinding slurry preparation and delivery system includes a raw slurry tank, a nitrogen replenishment pipe at the top of the raw slurry tank, a VAO pneumatic valve on the nitrogen replenishment pipe, a mixing reaction tank on the side of the raw slurry tank, a graduated measuring tank between the mixing reaction tank and the raw slurry tank, a measuring tank exhaust pipe at the top of the measuring tank, a VA1 pneumatic valve on the measuring tank exhaust pipe, a measuring tank nitrogen replenishment pipe on the side of the measuring tank exhaust pipe, a VA2 pneumatic valve on the measuring tank nitrogen replenishment pipe, a pump MⅠ between the raw slurry tank and the graduated measuring tank, the pump MⅠ being connected to the upper part of the raw slurry tank and the lower middle part of the graduated measuring tank via pipelines, a VA3 pneumatic valve between the pump MⅠ and the graduated measuring tank, and a VA4 pneumatic valve between the mixing reaction tank and the graduated measuring tank, the VA4 pneumatic valve being connected to the lower part of the graduated measuring tank and the upper part of the mixing reaction tank via pipelines.

[0013] Preferably, the liquid preparation reaction tank is provided with an intermediate buffer tank on its side, and a pump MⅡ is provided between the intermediate buffer tank and the liquid preparation reaction tank. The pump MⅡ is connected to the upper end of the intermediate buffer tank and the lower end of the liquid preparation reaction tank by a phase pipeline. A VA6 pneumatic valve is provided between the MⅡ and the liquid preparation reaction tank, and a VA8 pneumatic valve is provided between the MⅡ and the intermediate buffer tank.

[0014] Preferably, the lower end of the liquid preparation reaction tank and the lower end of the intermediate buffer tank are both provided with drain pipes, and the drain pipes are provided with VA12 pneumatic valves connected to the liquid preparation reaction tank and VA13 pneumatic valves connected to the intermediate buffer tank.

[0015] Preferably, the intermediate buffer tank is equipped with a filter on its side, and a buffer inlet pipe is provided between the lower end of the filter and the drain pipe, located between the lower end of the intermediate buffer tank and the VA13 pneumatic valve. A transfer pump MⅢ is provided on the buffer inlet pipe, and VA9 and VA10 pneumatic valves are respectively provided at both ends of the transfer pump MⅢ. A buffer outlet pipe is provided between the upper end of the filter and the upper end of the intermediate buffer tank, and a one-way valve is provided on the buffer outlet pipe. A VA11 pneumatic valve is provided between the one-way valve and the intermediate buffer tank, and pressure gauges are provided between the one-way valve and the filter, and between the VA10 pneumatic valve and the filter.

[0016] Preferably, pumps MⅠ and MⅡ both include pneumatic pumps, with pump inlet pipes and pump outlet pipes respectively provided on both sides of the pneumatic pump, and a compressed air connecting pipe provided at the upper end of the pneumatic pump.

[0017] Preferably, a reflux pipe is provided between the VA8 pneumatic valve and MⅡ, which is connected to the upper end of the liquid preparation reaction tank. A VA7 pneumatic valve is provided on the reflux pipe. An ultrapure water replenishment pipe is provided on the side of the reflux pipe. A VA5 pneumatic valve is provided on the ultrapure water replenishment pipe. An automatic recording flow meter is provided between the VA5 pneumatic valve and the liquid preparation reaction tank.

[0018] Preferably, the liquid preparation reaction tank, intermediate buffer tank, and measuring tank are each equipped with several liquid level sensors. The liquid preparation reaction tank is equipped with Over and Stop liquid level sensors, and the intermediate buffer tank and measuring tank are equipped with Over, Stop, and Low liquid level sensors.

[0019] A control method for an automatic grinding slurry preparation and delivery system is provided, applicable to an automatic grinding slurry preparation and delivery system including a stock solution tank, a mixing reaction tank, an intermediate buffer tank, a measuring tank, and a filter. The stock solution tank and the measuring tank are equipped with pump MⅠ and pneumatic valve VA3; the measuring tank and the mixing reaction tank are equipped with pneumatic valve VA4; the mixing reaction tank and the intermediate buffer tank are equipped with pump MⅡ, pneumatic valves VA6 and VA8, and a return pipe, with pneumatic valve VA7 installed on the return pipe; and the intermediate buffer tank and the filter are equipped with delivery pump MⅢ, pneumatic valve VA9, pneumatic valve VA10, and pneumatic valve VA11. The method includes the following operating steps: Step S1, Quantitative Feeding of Raw Material: The control system opens the VA0 pneumatic valve to introduce nitrogen into the raw material tank, starts pump MⅠ and opens the VA3 pneumatic valve, transferring the raw material from the tank to the measuring tank. The level sensor on the measuring tank collects the level signal in real time. When the level reaches the set measurement value, the control system closes pump MⅠ and the VA3 pneumatic valve. During the feeding process, the control system opens and closes the VA1 pneumatic valve in conjunction with the VA2 pneumatic valve to maintain pressure balance and release pressure inside the measuring tank.

[0020] When the liquid level sensor in the measuring tank detects that the liquid level has reached the Low level, the control system determines to start metering and starts timing; when the liquid level reaches the Stop level, the control system closes pump MⅠ and VA3 pneumatic valve to stop feeding; when the liquid level abnormally reaches the Over level, the control system executes alarm interlock, forcibly closes pump MⅠ and VA3 pneumatic valve, and opens VA1 pneumatic valve to release pressure.

[0021] Step S2, Mixing and Mixing: The control system opens the VA4 pneumatic valve, allowing the stock solution in the measuring tank to flow into the mixing reaction tank by gravity. Simultaneously, the VA5 pneumatic valve opens, allowing ultrapure water to be metered by the automatic flow meter on the ultrapure water replenishment pipe and then introduced into the mixing reaction tank. The control system uses both the cumulative flow value of the automatic flow meter and the liquid level sensor signal in the mixing reaction tank to double-verify the amount of ultrapure water added. When the cumulative flow of the automatic flow meter reaches the set mixing ratio and the liquid level sensor reaches the Stop point, the VA5 pneumatic valve closes. If the deviation between the two exceeds the set threshold, the control system determines that the metering is abnormal and alarms, stopping the mixing process.

[0022] Once the stock solution and ultrapure water reach the set mixing ratio, close pneumatic valves VA4 and VA5. Then, start pump MⅡ, open pneumatic valve VA7, and close pneumatic valve VA8. The grinding solution continuously circulates and mixes along the external circulation loop from the bottom of the mixing tank to pump MⅡ, reflux pipe, and top of the mixing tank. The duration of external circulation mixing is controlled by the control system according to the process setting. After the mixing time is completed, the liquid level sensor of the mixing tank verifies that the liquid level is between the Stop and Over liquid level points. Only then does the control system allow the material transfer operation in step S3 to be executed.

[0023] Step S3, Transfer and Buffering Step: After mixing is completed, the control system closes the VA7 pneumatic valve and opens the VA8 pneumatic valve. Pump MⅡ transports the prepared grinding liquid in the mixing reaction tank to the intermediate buffer tank through the VA6 pneumatic valve. After the transfer is completed, pump MⅡ and VA8 pneumatic valve are closed, and the control system then starts the preparation operation of the next batch of steps S1 to S2, realizing the parallel operation of the liquid preparation process and the liquid supply process.

[0024] When the liquid level sensor in the intermediate buffer tank detects that the liquid level has reached the Over liquid level point, the control system forcibly shuts down pump MⅡ and VA8 pneumatic valve to stop the material transfer; when the liquid level is lower than the Stop liquid level point, the control system prohibits the output of the upward adjustment operation of the external liquid supply flow rate in step S4, and prioritizes the liquid preparation reaction tank to perform the material transfer.

[0025] Step S4, Circulating Liquid Supply Step: The control system starts the delivery pump MⅢ, opens the VA9 pneumatic valve and the VA10 pneumatic valve, and part of the grinding liquid in the intermediate buffer tank flows back to the top of the intermediate buffer tank through the VA11 pneumatic valve and the buffer outlet pipe to form a self-circulating mixture, and the other part is sent to the filter through the VA10 pneumatic valve for filtration and then output.

[0026] The control system collects pressure gauge signals set between the VA10 pneumatic valve and the filter and at the filter outlet in real time, and calculates the pressure difference across the filter. When the pressure difference exceeds the first set threshold, the control system issues a filter element blockage warning. When the pressure difference exceeds the second set threshold, the control system interlocks and shuts down, closing the delivery pump MⅢ and the VA10 pneumatic valve to prevent insufficient liquid supply flow from causing downstream liquid interruption.

[0027] The control system alternately adjusts the opening ratio of the VA10 pneumatic valve and the VA11 pneumatic valve according to a set cycle, so that the grinding fluid in the intermediate buffer tank is dynamically distributed between self-circulation and mixing and external filtration output, ensuring that the concentration of the grinding fluid in the intermediate buffer tank is uniform and the external output flow and pressure are stable.

[0028] Step S5, Residual Discharge and Cleaning Step: When switching batches or cleaning the tank, the control system opens the VA12 pneumatic valve and the VA13 pneumatic valve to discharge the residual liquid at the bottom of the liquid preparation reaction tank and the intermediate buffer tank through the drain pipe.

[0029] When the liquid level sensor of the liquid preparation reaction tank or intermediate buffer tank detects that the liquid level is lower than the Low liquid level point and continues for a set time, the control system determines that the residual liquid has been emptied and automatically closes the VA12 pneumatic valve or VA13 pneumatic valve; after the residual liquid is emptied, the control system starts the cleaning process, and the cleaning waste liquid is also discharged through the drain pipe.

[0030] As a preferred option, during the feeding and transfer steps, the control system controls the opening and closing sequence of pneumatic valves VA1, VA2, and VA0 in a coordinated manner to maintain a slightly positive pressure inert environment inside the raw liquid tank and the measuring tank, preventing air bubbles from being generated during the delivery of the grinding liquid due to pressure buildup or negative pressure in the tank.

[0031] As a preferred method, throughout the entire control process, the control system automatically records and stores the feed liquid level data of each batch of raw liquid, the cumulative flow data of the flow meter, the liquid level change data of each liquid level sensor, the differential pressure data of the pressure gauge, and the action sequence of each pneumatic valve and pump MⅠ, pump MⅡ, and transfer pump MⅢ, forming a batch liquid preparation process traceability file.

[0032] The present invention can achieve the following effects: This invention provides an automatic grinding fluid preparation and delivery system and its control method. Compared with the prior art, the specific advantages are as follows: I. Independent Metering and Dual Verification Mechanism for Gradients Significantly Improves Proportioning Accuracy and Batch Consistency. This invention introduces an independent gradable metering container as an intermediate container for raw material metering between the stock solution tank and the mixing reaction tank. Volumetric metering is achieved through Over / Stop / Low level sensors, avoiding the failure of online concentration sensors due to particle deposition. Simultaneously, the ultrapure water addition branch employs dual verification using the cumulative flow value automatically recorded by the flow meter and the level signal from the mixing reaction tank. These two independent metering chains are redundant; if any link drifts or malfunctions, the control system can promptly determine and stop the mixing process based on the deviation threshold, avoiding batch scrapping caused by the failure of a single metering chain in existing technologies. This mechanism ensures that the grinding slurry proportioning accuracy is stably controlled within ±1%, and the relative standard deviation of solid content and chemical composition between batches is significantly lower than that of existing intermittent solutions, providing a source guarantee for the stable output of CMP material removal rates.

[0033] II. Nitrogen micro-positive pressure inert protection mechanism effectively suppresses bubbles, oxidation, and crystallization. A nitrogen replenishment pipe and a VAO pneumatic valve are installed on the raw liquid tank. A dual-pipeline system, consisting of a measuring cylinder exhaust pipe and a measuring cylinder nitrogen replenishment pipe, is installed on the measuring cylinder. Through the sequential coordination of VA1 and VA2, "simultaneous discharge and replenishment" is achieved during the feeding process, maintaining a micro-positive pressure inert atmosphere of 0 to +2 kPa inside the measuring cylinder at all times. This prevents air from being drawn in due to negative pressure caused by a drop in liquid level. On the one hand, nitrogen isolation blocks air... The continuous dissolution of the polishing slurry effectively inhibits particle agglomeration and sedimentation caused by pH acidification in alkaline cerium oxide and other polishing slurry systems. On the other hand, the slightly positive pressure environment fundamentally eliminates air bubble entrainment during the transport process, preventing abrupt changes in removal rate and surface defects caused by air bubbles adhering to the polishing pad surface or entering the wafer-polishing pad contact area. In addition, nitrogen sealing can also isolate oxygen from the oxidative degradation of polishing slurry systems containing reducing additives, extending the effective usage window of the prepared polishing slurry.

[0034] III. Low-shear transport and circulation using pneumatic diaphragm pumps to protect the dispersion stability of grinding slurry particles. Both pumps MⅠ and MⅡ employ pneumatic double-diaphragm pumps, which use compressed air to drive two flexible diaphragms to alternately deform for suction and discharge. With no high-speed rotating blades and no high-shear zone, the shear stress applied to the nano-abrasive particles in the grinding slurry during operation is far lower than that of centrifugal or screw pumps, effectively inhibiting particle agglomeration and secondary growth. Simultaneously, the pneumatic diaphragm pump possesses inherent explosion-proof characteristics, can handle media containing particles, and has strong self-priming capability during dry operation, making it suitable for the gentle transport of viscous suspension systems containing solid particles, such as grinding slurries. Compared to the micro-scratching defects caused by existing centrifugal pumps, this solution reduces the risk of defect density from the source of transport.

[0035] IV. A dual mechanism of external circulation mixing and self-circulation diversion mixing ensures uniform concentration and stable supply pressure. An external circulation mixing loop consisting of pump MⅡ, a return pipe, and a VA7 pneumatic valve is installed on the mixing reaction tank. A self-circulation return branch consisting of VA10, a filter, VA11, a buffer outlet pipe, and a one-way valve is installed on the intermediate buffer tank. Both paths return the circulating liquid to the top of the container, forming a "bottom extraction – top return" convection circulation. In step S4, the control system dynamically adjusts the opening ratio of VA10 and VA11 according to a set cycle, ensuring real-time distribution of the grinding liquid in the intermediate buffer tank between self-circulation mixing and external filtration output. This ensures that the grinding liquid in the tank does not stratify during long-term storage and maintains stable external output flow and pressure. Compared to existing technologies that rely on static supply or simple mechanical stirring, this dual mechanism solves the inherent problem of maintaining uniformity in solid-liquid two-phase systems within large-volume tanks.

[0036] V. Dual-threshold health management of filter differential pressure enables filter cartridge clogging early warning and liquid interruption interlock. Pressure gauges are installed between the VA10 pneumatic valve and the filter, and at the filter outlet. The pressure difference ΔP across the filter is calculated in real time using the difference between their readings, establishing a graded response mechanism of "first threshold early warning + second threshold interlock": When ΔP exceeds the first threshold, the control system issues a filter cartridge clogging early warning, prompting operators to prepare replacement parts in advance; when ΔP exceeds the second threshold, the control system interlocks and shuts down, closing the delivery pump MⅢ and the VA10 pneumatic valve to prevent a sudden drop in liquid supply flow and liquid interruption in downstream CMP equipment due to severe filter cartridge clogging. Compared to the passive mode of "timed replacement + manual inspection" and the crude solution of "stop and bypass immediately" with a single threshold in existing technologies, this mechanism significantly reduces the waste of consumables due to excessive filter cartridge maintenance and the risk of liquid interruption caused by untimely maintenance, realizing an upgrade of the filter from passive replacement to predictive maintenance.

[0037] VI. Parallel scheduling of the liquid preparation and supply processes enhances overall system capacity. By using an intermediate buffer tank as a decoupling buffer between the liquid preparation reaction tank and the filter, the control system starts the next batch of preparation operations (S1-S2) immediately after the material transfer in step S3. This decouples the liquid preparation and supply processes in time, eliminating the capacity loss caused by the sequential waiting of "preparation-material transfer-supply" in existing technologies. Simultaneously, the buffer tank itself provides a certain degree of supply capacity redundancy, maintaining continuous external liquid supply even during short-term pauses in the liquid preparation process, further enhancing the system's adaptability to fluctuations in the cycle time of downstream CMP machines.

[0038] Its full-process batch process traceability archive supports process optimization and defect root cause analysis. The control system automatically records and stores the feed liquid level data for each batch, the cumulative flow data of the flow meters, the liquid level change data of each liquid level sensor, the differential pressure data of the pressure gauge, and the complete action sequence of each pneumatic valve and three pumps, forming a batch-level process traceability archive. When an anomaly occurs in a batch of wafers, the archive data can be used to accurately trace back to the specific link in the process, such as the ratio deviation, filter blockage, circulation interruption, or pressure anomaly, avoiding the problem of not being able to start defect root cause analysis due to the lack of systematic data records in existing technologies. This archive can also serve as a data foundation for process parameter optimization and predictive maintenance of equipment, and after long-term accumulation, it can support data-driven adaptive process tuning.

[0039] 8. Automated Residue Discharge and Cleaning Processes Eliminate Batch Cross-Contamination. Independent residue discharge control is achieved for the mixing reaction tank and intermediate buffer tank via a shared drain pipe and VA12 and VA13 pneumatic valves. The system automatically identifies the completion of emptying based on the Low signal and duration from the level sensor, avoiding residual liquid and batch cross-contamination caused by manual discharge. After discharge, the system automatically initiates the cleaning process. Cleaning waste liquid is discharged through the same drain pipe, achieving standardization and unmanned operation of batch switching processes. This effectively reduces the labor intensity of operators and the risk of human error, which is particularly important for process isolation when switching between different grinding slurry formulations.

[0040] Through the two-way synergy of system structure and control methods, significant and verifiable technological advancements have been achieved in eight aspects compared to existing technologies, including liquid metering accuracy, inert atmosphere protection, shear-temperature delivery, uniform concentration mixing, filter health management, parallel process scheduling, batch traceability, and automated residue removal. This has resulted in a complete and engineering-feasible automated grinding slurry preparation and delivery solution, which is particularly suitable for high-end applications with stringent requirements for grinding slurry quality and supply stability, such as semiconductor wafer manufacturing, large-size silicon wafer processing, and precision optical component CMP. Attached Figure Description

[0041] Figure 1 This is a schematic diagram of the structure of the present invention.

[0042] Figure 2 This is a schematic diagram of the structure of the present invention.

[0043] In the diagram: 1. Raw material tank; 2. Pump MⅠ; 3. Raw material tank nitrogen replenishment pipe; 4. VA0 pneumatic valve; 5. VA1 pneumatic valve; 6. Measuring tank exhaust pipe; 7. Measuring tank nitrogen replenishment pipe; 8. VA2 pneumatic valve; 9. VA5 pneumatic valve; 10. Ultrapure water replenishment pipe; 11. Automatic recording flow meter; 12. Liquid level sensor; 13. Return pipe; 14. VA7 pneumatic valve; 15. VA11 pneumatic valve; 16. Buffer outlet pipe; 17. Check valve; 18. Pressure gauge; 19. Filter; 10. Buffer inlet pipe. 20, VA10 pneumatic valve; 21, transfer pump MⅢ; 22, VA9 pneumatic valve; 23, VA13 pneumatic valve; 24, drain pipe; 25, intermediate buffer tank; 26, VA8 pneumatic valve; 27, pump MⅡ; 28, VA6 pneumatic valve; 29, VA12 pneumatic valve; 30, liquid mixing reaction tank; 31, VA4 pneumatic valve; 32, graduated measuring tank; 33, VA3 pneumatic valve; 34, pump inlet pipe; 35, compressed air connecting pipe; 36, pneumatic blower; 37, pump outlet pipe; 38. Detailed Implementation

[0044] The technical solution of the invention will be further described in detail below through embodiments and in conjunction with the accompanying drawings.

[0045] Example: Figure 1 and Figure 2 As shown, an automatic grinding fluid preparation and delivery system includes five main containers: a raw material tank 1, a mixing reaction tank 31, an intermediate buffer tank 26, a measuring tank 33, and a filter 19; as well as three pumps: pump MⅠ2, pump MⅡ28, and delivery pump MⅢ22; 14 pneumatic valves (VA0 to VA13); several level sensors 12; dual pressure gauges 18; one-way valves 17; and an automatic recording flow meter 11, among other detection and execution components.

[0046] The raw liquid metering branch is as follows: A nitrogen replenishment pipe 3 is installed at the top of the raw liquid tank 1, with a VAO pneumatic valve 4. A high-purity nitrogen source is connected to the pipe via the control system, slowly filling the liquid surface above the raw liquid tank to maintain a slightly positive pressure inert atmosphere, isolating it from air and preventing the grinding slurry from absorbing CO2, oxidizing, or crystallizing. The bottom outlet of the raw liquid tank 1 is connected to the inlet of pump MI2 via a pipeline. The outlet of pump MI2 is connected to the lower feed inlet of the graduated measuring cylinder 33 via a VAO pneumatic valve 34. A measuring cylinder exhaust pipe 6 is installed at the top of the graduated measuring cylinder 33, with a VAO pneumatic valve 5. A nitrogen replenishment pipe 7 is connected to the side of the measuring cylinder exhaust pipe 6, with a VAO pneumatic valve 8. The exhaust and nitrogen replenishment pipes work together to achieve "simultaneous exhaust and replenishment" pressure balance during feeding into the graduated measuring cylinder.

[0047] The raw liquid enters the reaction tank branch: the lower part of the measuring tank 33 is connected to the upper part of the liquid preparation reaction tank 31 via the VA4 pneumatic valve 32, and the raw liquid is gravity-flowed by relying on the height difference between the two tanks.

[0048] Ultrapure water and mixing branch: Ultrapure water supply pipe 10 is connected to the liquid preparation reaction tank 31 via pneumatic valve VA5 9, and an automatic recording flow meter 11 is connected in series on the pipe for cumulative measurement. The bottom outlet of the liquid preparation reaction tank 31 is connected to the inlet of pump MⅡ28 via pneumatic valve VA6 29; the outlet of pump MⅡ28 is divided into two paths: one path is connected to the return pipe 13 via pneumatic valve VA7 14 to return to the top of the liquid preparation reaction tank 31, forming an external circulation mixing loop; the other path is connected to the upper end of the intermediate buffer tank 26 via pneumatic valve VA8 27, forming a material transfer branch.

[0049] Buffer and Filter Supply Branch: The lower end of the intermediate buffer tank 26 is connected to the drain pipe 25, on which a VA13 pneumatic valve 24 is installed; the buffer inlet pipe 20 is led out from the lower end of the intermediate buffer tank 26 (located upstream of the VA13 pneumatic valve), and is connected in series with the VA9 pneumatic valve 23, the transfer pump MⅢ 22, the VA10 pneumatic valve 21, and the lower inlet of the filter 19; the upper outlet of the filter 19 is piped to the CMP polishing machine. The upper end of the filter 19 and the upper end of the intermediate buffer tank 26 are connected to the buffer outlet pipe 16, on which a one-way valve 17 and a VA11 pneumatic valve 15 are installed in sequence, forming a self-circulating return branch. A pressure gauge 18 is installed between the VA10 pneumatic valve 21 and the filter 19, and at the outlet end of the filter 19. The difference between the readings of the two gauges is the real-time pressure difference ΔP of the filter 19.

[0050] Residual discharge branch: A branch pipe is connected to the bottom of the liquid preparation reaction tank 31 and the bottom of the intermediate buffer tank 26, and they converge into the common drain pipe 25; the branch pipe of the liquid preparation reaction tank is equipped with a VA12 pneumatic valve 30, the branch pipe of the intermediate buffer tank is equipped with a VA13 pneumatic valve 24, and the outlet of the drain pipe 25 is connected to the waste liquid collection system.

[0051] Liquid level detection configuration: The graduated measuring tank 33 is equipped with three-level liquid level sensors 12 (Low, Stop, Over); the intermediate buffer tank 26 is equipped with three-level liquid level sensors 12 (Low, Stop, Over); and the liquid mixing reaction tank 31 is equipped with two-level liquid level sensors 12 (Stop, Over). All liquid level signals, differential pressure signals, and flow signals are connected to the PLC / DCS control system.

[0052] A control method for an automatic grinding fluid preparation and delivery system includes the following steps: Step S1, Quantitative Feeding of Raw Liquid: The control system opens the VA0 pneumatic valve 4 to introduce nitrogen into the raw liquid tank 1, starts the pump MⅠ2 and opens the VA3 pneumatic valve 34 to transport the raw liquid in the raw liquid tank 1 to the measuring tank 33; the liquid level sensor 12 on the measuring tank 33 collects the liquid level signal in real time, and when the liquid level reaches the set measurement value, the control system closes the pump MⅠ2 and the VA3 pneumatic valve 34; during the feeding process, the control system opens and closes the VA1 pneumatic valve 5 in conjunction with the VA2 pneumatic valve 8 to maintain the internal pressure balance and exhaust pressure relief of the measuring tank 33.

[0053] When the level sensor 12 of the measuring tank 33 detects that the liquid level has reached the Low level, the control system determines to start metering and starts timing; when the liquid level reaches the Stop level, the control system closes pump MⅠ2 and pneumatic valve 34 of VA3 to stop feeding; when the liquid level abnormally reaches the Over level, the control system executes alarm interlock, forcibly closes pump MⅠ2 and pneumatic valve 34 of VA3, and opens pneumatic valve 5 of VA1 to release pressure.

[0054] Step S2, Mixing and Mixing: The control system opens pneumatic valve VA4 32, allowing the original solution in measuring tank 33 to flow into the mixing reaction tank 31 by gravity; simultaneously, pneumatic valve VA5 9 is opened, and ultrapure water is metered by the automatic flow meter 11 on the ultrapure water replenishment pipe 10 and then introduced into the mixing reaction tank 31; the control system uses the cumulative flow value of the automatic flow meter 11 and the signal of the liquid level sensor 12 in the mixing reaction tank 31 to double verify the amount of ultrapure water added. When the cumulative flow of the automatic flow meter 11 reaches the set ratio value and the liquid level sensor 12 reaches the Stop liquid point, pneumatic valve VA5 9 is closed; if the deviation between the two exceeds the set threshold, the control system determines that the metering is abnormal and alarms, stopping the mixing process.

[0055] Once the stock solution and ultrapure water reach the process-set ratio, close pneumatic valves VA4 32 and VA5 9. Then, start pump MⅡ28, open pneumatic valve VA7 14, and close pneumatic valve VA8 27. The grinding solution continuously circulates and mixes along the external circulation loop from the bottom of the mixing reaction tank 31 to pump MⅡ28, reflux pipe 13, and top of the mixing reaction tank 31. The duration of external circulation mixing is controlled by the control system according to the process-set value. After the mixing time is completed, the liquid level sensor 12 of the mixing reaction tank 31 verifies that the liquid level is between the Stop and Over liquid level points. Only then does the control system allow the material transfer operation in step S3 to be executed.

[0056] Step S3, Transfer and Buffering Step: After mixing is completed, the control system closes VA7 pneumatic valve 14 and opens VA8 pneumatic valve 27. Pump MⅡ28 transports the prepared grinding liquid in the liquid preparation reaction tank 31 to the intermediate buffer tank 26 through VA6 pneumatic valve 29. After the transfer is completed, pump MⅡ28 and VA8 pneumatic valve 27 are closed, and the control system then starts the preparation operation of the next batch of steps S1 to S2, realizing the parallel operation of the liquid preparation process and the liquid supply process.

[0057] When the liquid level sensor 12 of the intermediate buffer tank 26 detects that the liquid level has reached the Over liquid level point, the control system forcibly shuts down the pump MⅡ28 and the pneumatic valve 27 of VA8 to stop the material transfer; when the liquid level is lower than the Stop liquid level point, the control system prohibits the output of the upward adjustment operation of the external liquid supply flow rate in step S4, and prioritizes the scheduling of the liquid mixing reaction tank 31 to perform the material transfer.

[0058] Step S4, Circulating Liquid Supply Step: The control system starts the delivery pump MⅢ22, opens the VA9 pneumatic valve 23 and VA10 pneumatic valve 21, and part of the grinding liquid in the intermediate buffer tank 26 flows back to the top of the intermediate buffer tank 26 through the VA11 pneumatic valve 15 and the buffer outlet pipe 16 to form a self-circulating mixture, and the other part is sent to the filter 19 through the VA10 pneumatic valve 21 for filtration and then output.

[0059] The control system collects the pressure gauge 18 signals set between the VA10 pneumatic valve 21 and the filter 19 and at the outlet of the filter 19 in real time, and calculates the pressure difference across the filter 19. When the pressure difference exceeds the first set threshold, the control system issues a filter blockage warning. When the pressure difference exceeds the second set threshold, the control system interlocks and shuts down, closing the delivery pump MⅢ22 and the VA10 pneumatic valve 21 to prevent insufficient liquid supply flow from causing downstream liquid interruption.

[0060] The control system alternately adjusts the opening ratio of pneumatic valve 21 (VA10) and pneumatic valve 15 (VA11) according to a set cycle, so that the grinding fluid in the intermediate buffer tank 26 is dynamically distributed between self-circulation and mixing and external filtration output, ensuring that the concentration of the grinding fluid in the intermediate buffer tank 26 is uniform and the external output flow and pressure are stable.

[0061] Step S5, Residual Cleaning Step: When switching batches or cleaning the tank, the control system opens pneumatic valves VA12 30 and VA13 24, and discharges the residual liquid at the bottom of the liquid preparation reaction tank 31 and the intermediate buffer tank 26 through the drain pipe 25.

[0062] When the liquid level sensor 12 of the liquid preparation reaction tank 31 or the intermediate buffer tank 26 detects that the liquid level is lower than the Low liquid level point and continues for a set time, the control system determines that the residual liquid has been emptied and automatically closes the VA12 pneumatic valve 30 or the VA13 pneumatic valve 24. After the residual liquid is emptied, the control system starts the cleaning process, and the cleaning waste liquid is also discharged through the drain pipe 25.

[0063] During the feeding and transfer process, the control system controls the opening and closing sequence of pneumatic valves VA1 (5), VA2 (8), and VA0 (4) to maintain a slightly positive pressure inert environment inside the raw liquid tank 1 and the measuring tank 33, preventing air bubbles from being generated during the delivery of the grinding liquid due to pressure buildup or negative pressure in the tank.

[0064] Throughout the entire control process, the control system automatically records and stores the feed liquid level data for each batch of raw liquid, the cumulative flow data of the flow meter 11, the liquid level change data of each liquid level sensor 12, the differential pressure data of the pressure gauge 18, and the action sequence of each pneumatic valve and pump MⅠ2, pump MⅡ28, and transfer pump MⅢ22, forming a batch liquid preparation process traceability file.

[0065] In summary, the automatic grinding fluid preparation and delivery system and its control method include a raw material tank, a measuring tank, a mixing reaction tank, an intermediate buffer tank, and a filter. The raw material tank is quantitatively fed to the measuring tank via pump MⅠ and pneumatic valve VA3. The measuring tank is connected to the mixing reaction tank via pneumatic valve VA4. The mixing reaction tank forms an external circulation mixing loop via pump MⅡ, a return pipe, and pneumatic valve VA7, and transfers the fluid to the intermediate buffer tank via pneumatic valve VA8. The intermediate buffer tank is connected to the filter via pump MⅢ and pneumatic valve VA10 for external fluid supply, and forms a self-circulating mixing branch via pneumatic valve VA11 and the buffer outlet pipe. The control method includes five steps: quantitative feeding of raw material, mixing, transfer and buffering, circulating fluid supply, and residual cleaning. The fluid volume is verified by both a flow meter and a level sensor, and filter element blockage warning and interlock shutdown are implemented based on the filter pressure difference. It enables precise metering, batch traceability, and parallel preparation and supply of polishing slurry. Nitrogen micro-positive pressure protection effectively suppresses bubble generation, ensuring uniform concentration and stable pressure. It is suitable for automated preparation and supply of semiconductor CMP polishing slurry.

[0066] The above description is only a specific embodiment of the present invention, but the structural features of the present invention are not limited thereto. Any changes or modifications made by those skilled in the art within the scope of the present invention are covered by the patent scope of the present invention.

Claims

1. An automatic grinding fluid preparation and delivery system, comprising a raw fluid tank (1), characterized in that: The original liquid tank (1) is provided with a nitrogen replenishment pipe (3) at the upper end, and a VAO pneumatic valve (4) is provided on the nitrogen replenishment pipe (3). A liquid preparation reaction tank (31) is provided on the side of the original liquid tank (1). A graduated measuring tank (33) is provided between the liquid preparation reaction tank (31) and the original liquid tank (1). A measuring tank exhaust pipe (6) is provided at the upper end of the graduated measuring tank (33). A VAO pneumatic valve (5) is provided on the measuring tank exhaust pipe (6). A measuring tank nitrogen replenishment pipe (7) is provided on the side of the measuring tank exhaust pipe (6). 7) A VA2 pneumatic valve (8) is provided on the top. A pump MⅠ (2) is provided between the raw liquid tank (1) and the measuring tank (33). The pump MⅠ (2) is connected to the upper part of the raw liquid tank (1) and the lower part of the measuring tank (33) via a phase pipeline. A VA3 pneumatic valve (34) is provided between the pump MⅠ (2) and the measuring tank (33). A VA4 pneumatic valve (32) is provided between the liquid mixing reaction tank (31) and the measuring tank (33). The VA4 pneumatic valve (32) is connected to the lower part of the measuring tank (33) and the upper part of the liquid mixing reaction tank (31) via a phase pipeline.

2. The abrasive slurry automatic preparation and delivery system according to claim 1, wherein: The liquid preparation reaction tank (31) is provided with an intermediate buffer tank (26) on its side. A pump MⅡ (28) is provided between the intermediate buffer tank (26) and the liquid preparation reaction tank (31). The pump MⅡ (28) is connected to the upper end of the intermediate buffer tank (26) and the lower end of the liquid preparation reaction tank (31) by a pipeline. A VA6 pneumatic valve (29) is provided between the MⅡ (28) and the liquid preparation reaction tank (31). A VA8 pneumatic valve (27) is provided between the MⅡ (28) and the intermediate buffer tank (26).

3. The abrasive slurry automatic preparation and delivery system according to claim 2, wherein: The lower end of the liquid preparation reaction tank (31) and the lower end of the intermediate buffer tank (26) are both provided with drain pipes (25). The drain pipes (25) are provided with VA12 pneumatic valves (30) connected to the liquid preparation reaction tank (31) and VA13 pneumatic valves (24) connected to the intermediate buffer tank (26).

4. The abrasive slurry automatic preparation and delivery system according to claim 3, wherein: The intermediate buffer tank (26) is provided with a filter (19) on its side. The lower end of the filter (19) and the drain pipe (25) are provided with a buffer inlet pipe (20) between the lower end of the intermediate buffer tank (26) and the VA13 pneumatic valve (24). The buffer inlet pipe (20) is provided with a transfer pump MⅢ (22). The two ends of the transfer pump MⅢ (22) are respectively provided with a VA9 pneumatic valve (23) and a VA10 pneumatic valve (21). The upper end of the filter (19) and the upper end of the intermediate buffer tank (26) are provided with a buffer outlet pipe (16). The buffer outlet pipe (16) is provided with a check valve (17). The check valve (17) and the intermediate buffer tank (26) are provided with a VA11 pneumatic valve (15). Pressure gauges (18) are provided between the check valve (17) and the filter (19) and between the VA10 pneumatic valve (21) and the filter (19).

5. The abrasive slurry automatic preparation and delivery system according to claim 2, wherein: The pumps MⅠ (2) and MⅡ (28) both include a pneumatic air pump (37). The pneumatic air pump (37) has a pump inlet pipe (35) and a pump outlet pipe (38) on both sides respectively. The pneumatic air pump (37) has a compressed air connecting pipe (36) at the top.

6. The abrasive slurry automatic preparation and delivery system according to claim 2, wherein: A reflux pipe (13) is provided between the VA8 pneumatic valve (27) and MⅡ (28) and is connected to the upper end of the liquid preparation reaction tank (31). A VA7 pneumatic valve (14) is provided on the reflux pipe (13). An ultrapure water replenishment pipe (10) is provided on the side of the reflux pipe (13). A VA5 pneumatic valve (9) is provided on the ultrapure water replenishment pipe (10). An automatic recording flow meter (11) is provided between the VA5 pneumatic valve (9) and the liquid preparation reaction tank (31).

7. The abrasive slurry automatic compounding and delivery system according to claim 1, wherein: The liquid preparation reaction tank (31), intermediate buffer tank (26), and measuring tank (33) are each equipped with several liquid level sensors (12). The liquid preparation reaction tank (31) is equipped with Over and Stop liquid level sensors (12), and the intermediate buffer tank (26) and measuring tank (33) are equipped with Over, Stop, and Low liquid level sensors (12).

8. A control method for an automatic grinding slurry preparation and delivery system according to any one of claims 1-7, applied to an automatic grinding slurry preparation and delivery system comprising a raw material tank (1), a mixing reaction tank (31), an intermediate buffer tank (26), a measuring tank (33), and a filter (19), wherein a pump MⅠ (2) and a VA3 pneumatic valve (34) are provided between the raw material tank (1) and the measuring tank (33), and a VA4 pneumatic valve is provided between the measuring tank (33) and the mixing reaction tank (31). (32) A pump MⅡ (28), a VA6 pneumatic valve (29), a VA8 pneumatic valve (27), and a return pipe (13) are provided between the liquid preparation reaction tank (31) and the intermediate buffer tank (26). A VA7 pneumatic valve (14) is provided on the return pipe (13). A transfer pump MⅢ (22), a VA9 pneumatic valve (23), a VA10 pneumatic valve (21), and a VA11 pneumatic valve (15) are provided between the intermediate buffer tank (26) and the filter (19). The following steps are included: Step S1, Raw liquid quantitative feeding step: The control system opens the VA0 pneumatic valve (4) to introduce nitrogen into the raw liquid tank (1), starts the pump MⅠ (2) and opens the VA3 pneumatic valve (34) to transport the raw liquid in the raw liquid tank (1) to the measuring tank (33); the liquid level sensor (12) on the measuring tank (33) collects the liquid level signal in real time. When the liquid level reaches the set measurement value, the control system closes the pump MⅠ (2) and the VA3 pneumatic valve (34); during the feeding process, the control system opens and closes the VA1 pneumatic valve (5) in conjunction with the VA2 pneumatic valve (8) to maintain the internal pressure balance and exhaust pressure relief of the measuring tank (33); When the level sensor (12) of the measuring tank (33) detects that the liquid level has reached the Low liquid level point, the control system determines to start metering and starts timing; when the liquid level reaches the Stop liquid level point, the control system shuts down pump MⅠ (2) and VA3 pneumatic valve (34) to stop feeding; when the liquid level abnormally reaches the Over liquid level point, the control system executes alarm interlock, forcibly shuts down pump MⅠ (2) and VA3 pneumatic valve (34), and opens VA1 pneumatic valve (5) to release pressure; Step S2, Mixing and Mixing Step: The control system opens the VA4 pneumatic valve (32), and the original liquid in the measuring tank (33) flows into the mixing reaction tank (31) by gravity; at the same time, the VA5 pneumatic valve (9) is opened, and ultrapure water is metered by the automatic recording flow meter (11) on the ultrapure water replenishment pipe (10) and then introduced into the mixing reaction tank (31); the control system uses the cumulative flow value of the automatic recording flow meter (11) and the liquid level sensor (12) signal of the mixing reaction tank (31) to double verify the amount of ultrapure water added. When the cumulative flow of the automatic recording flow meter (11) reaches the set ratio value and the liquid level sensor (12) reaches the Stop liquid point, the VA5 pneumatic valve (9) is closed; if the deviation between the two exceeds the set threshold, the control system determines that the metering is abnormal and alarms, and stops the mixing process; When the stock solution and ultrapure water reach the process set ratio liquid level, close the VA4 pneumatic valve (32) and VA5 pneumatic valve (9); then start the pump MⅡ (28) and open the VA7 pneumatic valve (14) and close the VA8 pneumatic valve (27). The grinding liquid continuously circulates and mixes along the external circulation loop from the bottom of the mixing reaction tank (31) to the pump MⅡ (28) to the return pipe (13) to the top of the mixing reaction tank (31). The duration of external circulation mixing is controlled by the control system according to the process set value. After the mixing time ends, the liquid level sensor (12) of the mixing reaction tank (31) verifies that the liquid level is between the Stop and Over liquid level points. Only then can the control system allow the material transfer operation of step S3 to be executed. Step S3, Transfer and Buffer Step: After the mixing is completed, the control system closes the VA7 pneumatic valve (14) and opens the VA8 pneumatic valve (27). Pump MⅡ (28) transports the prepared grinding liquid in the liquid preparation reaction tank (31) to the intermediate buffer tank (26) through the VA6 pneumatic valve (29). After the transfer is completed, pump MⅡ (28) and VA8 pneumatic valve (27) are closed. The control system then starts the preparation operation of the next batch of S1 to S2 steps, so as to realize the parallel operation of the liquid preparation process and the liquid supply process. When the liquid level sensor (12) of the intermediate buffer tank (26) detects that the liquid level has reached the Over liquid level point, the control system forcibly shuts down the pump MⅡ (28) and the VA8 pneumatic valve (27) to stop the material transfer; when the liquid level is lower than the Stop liquid level point, the control system prohibits the output of the upward adjustment operation of the external liquid supply flow rate in step S4, and prioritizes the scheduling of the liquid preparation reaction tank (31) to perform the material transfer. Step S4, Circulating Liquid Supply Step: The control system starts the delivery pump MⅢ (22), opens the VA9 pneumatic valve (23) and the VA10 pneumatic valve (21), and part of the grinding liquid in the intermediate buffer tank (26) flows back to the top of the intermediate buffer tank (26) through the VA11 pneumatic valve (15) and the buffer outlet pipe (16) to form a self-circulating mixture, and the other part is sent to the filter (19) through the VA10 pneumatic valve (21) for filtration and then output to the outside; The control system collects the pressure gauge (18) signals set between the VA10 pneumatic valve (21) and the filter (19) and at the outlet of the filter (19) in real time, and calculates the pressure difference across the filter (19). When the pressure difference exceeds the first set threshold, the control system issues a filter blockage warning. When the pressure difference exceeds the second set threshold, the control system interlocks and shuts down, closing the delivery pump MⅢ (22) and the VA10 pneumatic valve (21) to prevent insufficient liquid supply flow from causing downstream liquid interruption. The control system alternately adjusts the opening ratio of VA10 pneumatic valve (21) and VA11 pneumatic valve (15) according to the set cycle, so that the grinding liquid in the intermediate buffer tank (26) is dynamically distributed between self-circulation and mixing and external filtration output, ensuring that the concentration of grinding liquid in the intermediate buffer tank (26) is uniform and the external output flow and pressure are stable. Step S5, Residual Cleaning Step: When switching batches or cleaning the tank, the control system opens the VA12 pneumatic valve (30) and the VA13 pneumatic valve (24) to discharge the residual liquid at the bottom of the liquid preparation reaction tank (31) and the intermediate buffer tank (26) through the drain pipe (25); When the liquid level sensor (12) of the liquid preparation reaction tank (31) or intermediate buffer tank (26) detects that the liquid level is lower than the Low liquid level and continues for a set time, the control system determines that the residual liquid has been emptied and automatically closes the VA12 pneumatic valve (30) or VA13 pneumatic valve (24). After the residual liquid is emptied, the control system starts the cleaning process, and the cleaning waste liquid is also discharged through the drain pipe (25).

9. The control method of the polishing liquid automatic preparation and delivery system according to claim 8, characterized by: During the feeding and transfer process, the control system controls the opening and closing sequence of VA1 pneumatic valve (5), VA2 pneumatic valve (8) and VA0 pneumatic valve (4) to maintain a slightly positive pressure inert environment inside the raw liquid tank (1) and the measuring tank (33) to prevent the tank from being pressurized or negatively pressurized, which would cause air bubbles to be generated during the delivery of the grinding liquid.

10. The control method for the automatic preparation and delivery system of grinding fluid according to claim 8, characterized in that: Throughout the entire control process, the control system automatically records and stores the raw liquid feed level data for each batch, the cumulative flow data of the flow meter (11), the liquid level change data of each liquid level sensor (12), the differential pressure data of the pressure gauge (18), and the action sequence of each pneumatic valve and pump MⅠ (2), pump MⅡ (28), and transfer pump MⅢ (22), forming a batch liquid preparation process traceability file.

Citation Information

Patent Citations

  • Filter, method for detecting water leakage by adopting filter and filter pollution discharge method

    CN112717516A

  • Polishing liquid delivery device and polishing liquid supply system

    CN116690429B

  • Polishing solution concentration proportioning and supply system and continuous recovery and supply system

    CN120839679A

  • Grinding fluid mixing and supplying system

    CN120921279A

  • Filter with pressure early warning and pressure relief functions

    CN223542601U