Construction method of the top of LNG ship deck sections, LNG ship deck sections and construction method

By independently constructing the dome and hull top sections during LNG ship construction and simultaneously manufacturing cryogenic units at the assembly site, and using supports and pads for positioning, the problem of the inability to pre-install cryogenic units in traditional LNG ship construction has been solved. This has enabled rapid and precise installation of cryogenic units, improving construction speed and safety.

CN123104876APending Publication Date: 2026-11-17HUDONG ZHONGHUA SHIPBUILDINGGROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611289768.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-25
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In traditional LNG carrier construction, the deck cryogenic unit cannot be pre-installed during the segmented or overall construction phase, resulting in long installation cycles, low structural integrity, high docking accuracy requirements, and large installation errors, which affect construction progress and safety.

Method used

The dome deck and the port and starboard hull tops are constructed independently, and the cryogenic units are manufactured simultaneously on the assembly site. The cryogenic units are positioned using scaffolding and pads and installed in advance. The inverted "eight" shaped tongue and groove design and the same-moment construction process are adopted to ensure docking accuracy and structural integrity.

Benefits of technology

This enables the pre-installation of cryogenic units during the segmentation stage, reducing dock occupancy time, minimizing installation errors, increasing construction speed and structural integrity, and improving construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123104876A_ABST
    Figure CN123104876A_ABST
Patent Text Reader

Abstract

This invention provides a method for constructing the top of an LNG carrier deck section, an LNG carrier deck section, and a construction method thereof. The LNG carrier deck section is divided into a top section, a bottom section, and cryogenic units. Each section is constructed independently, with the cryogenic units prefabricated using the same template. The cryogenic units and outfitting components are pre-installed on each section before being joined to the bottom section, completing the construction of a single LNG carrier deck section. Multiple LNG carrier deck sections are then connected and installed according to the design length to form a complete LNG carrier deck section. This construction method utilizes pre-installed supports on the outer deck as positioning reference points, allowing for rapid alignment and calibration during section docking. Simultaneously, pads adapted for cryogenic unit support frames are pre-attached to the outer deck and outer side plates, forming a unified positioning reference and ensuring precise spatial positioning for cryogenic unit hoisting. This method significantly shortens the dry dock and wharf operation cycle, effectively improving construction efficiency and quality control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of shipbuilding technology, specifically relating to a method for constructing the top of an LNG ship deck section, an LNG ship deck section, and a construction method thereof. Background Technology

[0002] As a high-tech, high-value-added special vessel, liquefied natural gas (LNG) carriers involve numerous complex cryogenic systems and special structures during their construction. The installation of the deck cryogenic unit is one of the key aspects affecting the overall shipbuilding cycle. In traditional LNG carrier construction, the hull top sections and dome deck sections are typically built using a prefabricated assembly method. Because the deck cryogenic unit (including cryogenic piping, supports, and related auxiliary equipment) structurally spans the dome deck and the port and starboard hull top sections, it cannot be pre-installed during the section or prefabricated assembly stage and must be installed on-site during the dry dock assembly stage or even the dock outfitting stage. However, this construction method has the following significant drawbacks: Firstly, the long installation period restricts the overall construction progress because the cryogenic deck units typically employ precision welding processes such as argon arc welding, which are slow to install and have high environmental requirements. Installation in the dock or pier stage is not only limited by working conditions at height and in confined spaces, but also requires coordination of multiple trades working simultaneously, significantly extending dock occupancy time and pier outfitting cycle.

[0003] Secondly, because the cryogenic unit was not pre-installed during the overall section stage, the structural integrity and outfitting integrity of the deck section were both low before hoisting. Subsequent outfitting, commissioning, and other work could not be carried out in advance, affecting the level of parallelism and modularity in the construction process.

[0004] Furthermore, installing cross-section units after the hull has been partially assembled requires extremely high precision in the docking between sections and in the manufacturing of the units themselves. This results in a large amount of on-site adjustment work, which is prone to installation errors and affects the system's sealing performance and operational safety.

[0005] Therefore, there is an urgent need for a construction method that can pre-install the deck cryogenic unit and improve the integrity of the deck section in order to break through the existing technological bottlenecks. Summary of the Invention

[0006] To achieve the above objectives, the present invention provides the following technical solution: A method for constructing the top of an LNG carrier deck section includes: the top of the LNG carrier deck section comprises: a dome deck section, a port side top section, a starboard side top section, and a cryogenic unit; the port side top section and the starboard side top section are symmetrically arranged on both sides of the dome deck section and connected to the dome deck section; the cryogenic unit spans across the dome deck section, the port side top section, and the starboard side top section; the construction method of the top of the LNG carrier deck section includes the following steps: independently constructing the dome deck section, the port side top section, and the starboard side top section; pre-installing supports on the dome deck section; and attaching pads to the preset installation positions of the cryogenic unit on the dome deck section, the port side top section, and the starboard side top section. Multiple secondary cryogenic units constituting the cryogenic unit are manufactured synchronously on the same jig; a baseline is drawn on the assembly site and multiple piers and support columns are arranged, the piers being used to support the bottom ends of the port and starboard top sections, and the support columns being used to support the top ends of the port and starboard top sections; the port and starboard top sections are hoisted to the assembly site, and then the dome deck section is hoisted and embedded between the port and starboard top sections, the spacing is adjusted, and then welded and fixed; outfitting components are installed on the dome deck section, the port and starboard top sections, and the secondary cryogenic units are positioned and installed using the pads, and multiple secondary cryogenic units are connected to form the complete cryogenic unit.

[0007] In some embodiments, the number of the racks is configured to support at least half the weight of the dome deck section.

[0008] In some embodiments, the purlin is disposed on the supporting dome deck segment along the length of the dome deck segment.

[0009] In some embodiments, the tongue and groove joints between the dome deck section and the port and starboard top sections are machined into an inverted V-shape.

[0010] In some embodiments, the cryogenic unit includes cryogenic piping and a support frame, with the cryogenic piping mounted on top of the segment via the support frame.

[0011] The present invention also provides an LNG ship deck section, the LNG ship deck section comprising a plurality of LNG ship deck segments connected sequentially along the length of the ship, each LNG ship deck segment comprising a segment bottom and a segment top as described in any one of claims 1-5, the segment bottom being located below the segment top; the segment bottom comprising a bottom plate, a port side plate and a starboard side plate, the port side plate and the starboard side plate being symmetrically arranged on both sides of the bottom plate and connected to the bottom plate; the port side top segment being connected to the port side plate, and the starboard side top segment being connected to the starboard side plate, so that the segment top and the segment bottom together enclose a compartment.

[0012] In some embodiments, the side of the dome deck section closest to the compartment is the inner deck, and the side furthest from the compartment is the outer deck; the side of the port and starboard top sections closest to the compartment is the inner sloping sideplate, and the side furthest from the compartment is the outer sloping sideplate; the pad is disposed on the outer deck and the outer sloping sideplate.

[0013] The present invention also provides a method for constructing the above-mentioned LNG ship deck section, the steps of which include: constructing a single top of the LNG ship deck section and a single bottom of the section, connecting the two to form a single LNG ship deck section, and then sequentially connecting multiple LNG ship deck sections to form the LNG ship deck section.

[0014] The present invention also provides a method for constructing the above-mentioned LNG ship deck section, the steps of which include: sequentially connecting the tops of multiple LNG ship deck sections to form a top integral frame, and simultaneously sequentially connecting the bottoms of multiple sections to form a bottom integral frame; hoisting the top integral frame above the bottom integral frame, and connecting the two to form the LNG ship deck section.

[0015] Compared with the prior art, the construction method for the top of the LNG ship deck section, the LNG ship deck section and construction method provided by the present invention have the following advantages: 1. The construction method provided by this invention breaks through the bottleneck of traditional construction where the cryogenic unit needs to be delayed until the dock for installation. The cryogenic unit and outfitting components are pre-installed during the sectional construction stage, reducing the dock occupation time and the dock outfitting cycle. The commissioning work of the cryogenic unit and outfitting can be carried out in advance, no longer relying on the hull assembly progress, thus improving the construction speed. 2. In this invention, the dome deck sections adopt an inverted "V" shaped tongue and groove design, which facilitates quick alignment with the port and starboard top sections; at the same time, a support is configured on the outer deck as a positioning reference, and the sections are quickly positioned by the support during docking, and then welded after fine adjustment, reducing the risk of rework due to docking errors. 3. In this invention, the low-temperature unit adopts the same construction process, and multiple secondary low-temperature units are prefabricated simultaneously. The interface size and installation hole position are controlled in advance. The segment is configured with pads for positioning the low-temperature unit. When installing the low-temperature unit, it can be quickly positioned, reducing the amount of adjustment work in the overall assembly stage and reducing installation errors. 4. In this invention, the dome deck is constructed and transported with the inner deck as the base surface and the port / starboard top sections are constructed with the inner sloping side plates as the base surface, which can avoid structural deformation or damage to the installation benchmark caused by turning over and improve construction efficiency. 5. The outfitting components installed on the top of the segment in this invention can be pre-assembled into an integrated unit and then installed as a whole, reducing scattered construction on site; 6. This invention provides two segmented connection methods: "integrated docking mode" and "single segment sequential connection mode", as well as two forming schemes: "general assembly site forming" and "dock / wharf forming", which can be flexibly selected according to the general assembly site space, transportation capacity and quality control requirements. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the top structure of the LNG ship deck section provided by the present invention; Figure 2 This is a schematic diagram of the structure of the LNG ship deck section provided by the present invention; Figure 3 This is a schematic diagram of the structure of the low-temperature unit provided by the present invention; Figure 4 This is a top view of the dome deck section provided by the present invention.

[0017] Explanation of icon numbers: 1—LNG ship deck sections; 10—Top of section; 101—Dome deck section; 1011—Inner deck; 1012—Outer deck; 1013—Bustel; 102—Port side top section; 1021—Main deck; 1022—Inner sloping plating; 1023—Outer sloping plating; 103—Starboard side top section; 104—Plate; 105—Seam line; 11—Bottom of section; 111—Bottom plate; 112—Port side plate; 113—Starboard side plate; 114—Compartment; 12—Cryogenic unit; 121—Cryogenic piping; 122—Support frame; 2—Ship centerline; 3—Ground pier; 4—Support column. Detailed Implementation

[0018] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the specific implementation methods of the present invention will be described below with reference to the accompanying drawings. Obviously, the drawings described below are merely some embodiments of the present invention. For those skilled in the art, other drawings and other implementation methods can be obtained based on these drawings without any creative effort.

[0019] To keep the drawings concise, each figure only schematically shows the parts relevant to the invention, and these do not represent the actual structure of the product. Furthermore, to facilitate understanding, in some figures, only one of components with the same structure or function is schematically depicted, or only one is labeled. In this document, "one" not only means "only one," but can also mean "more than one."

[0020] In this document, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to fixed connections, detachable connections, or integral connections; they can refer to mechanical connections or electrical connections; they can refer to direct connections or indirect connections through an intermediate medium; and they can refer to the internal communication between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0021] This invention provides a method for constructing an LNG carrier deck section. The LNG carrier deck section comprises multiple LNG carrier deck segments 1 connected sequentially along the ship's length. Through assembly and pre-installation processes, the construction integrity of each LNG carrier deck segment 1 is significantly improved, and the dry dock and wharf cycle is shortened. Specifically: Each LNG ship deck section 1 includes: the top of the LNG ship deck section (hereinafter referred to as the top of the section 10), the bottom of the LNG ship deck section 1 (hereinafter referred to as the bottom of the section 11), and a cryogenic unit 12 spanning the top of the section 10.

[0022] The top section 10 is the core load-bearing structure of the LNG ship deck section 1, including the dome deck section 101, and the port side top section 102 and starboard side top section 103 symmetrically arranged on both sides of the dome deck section 101. The port side top section 102 and starboard side top section 103 are respectively connected to the dome deck section 101, and the three together form the top section 10.

[0023] The bottom section 11 includes a bottom plate 111, a port side plate 112 and a starboard side plate 113 symmetrically arranged on both sides of the bottom plate 111. One end of the port side plate 112 and the starboard side plate 113 are fixedly connected to the bottom plate 111 to form the bottom section 11. The other end of the port side plate 112 and the starboard side plate 113 are reserved with docking interfaces for precise docking with the port top section 102 and the starboard top section 103, which together enclose and form a compartment 114.

[0024] The side of the dome deck section 101 closest to the compartment 114 is the inner deck 1011, and the side furthest from the compartment 114 is the outer deck 1012. Both the port side top section 102 and the starboard side top section 103 are inclined toward the dome deck section 101. Taking the port side top section 102 as an example, the top of the port side top section 102 in the vertical direction is connected to one end of the dome deck section 101, and the bottom of the port side top section 102 in the vertical direction is connected to the bottom end of the section (i.e., the port side plate 112). The bottom end of the port side top section 102 extends outward in the horizontal direction to form the main deck 1021, which is consistent with the decks in other areas. Various outfitting components are also installed on the main deck 1021. These outfitting components include, but are not limited to, basic equipment and protective devices required for navigation operations. The side of the port side top section 102 closest to the bulkhead 114 is the inner sloping side plate 1022, and the side away from the bulkhead 114 is the outer sloping side plate 1023. The structure of the starboard top section 103 is the same as that of the port top section 102, and will not be described again here.

[0025] The aforementioned cryogenic unit 12 extends through the entire top section 10, spanning the port side top section 102, the dome deck section 101, and the starboard side top section 103, and is a key component ensuring the cryogenic environment for LNG transportation. For example... Figure 3 As shown, the cryogenic unit 12 includes a cryogenic pipeline 121 and a support frame 122 for supporting the cryogenic pipeline 121. The cryogenic pipeline 121 is mounted on the top of the section 10 via the support frame 122. The cryogenic pipeline 121 can withstand the extremely low temperature conditions of LNG.

[0026] The construction of each LNG ship deck section 1 consists of two phases: the first phase is the construction of the top 10 of the section, and the second phase is the docking of the top 10 of the section with the bottom 11 of the section. The specific construction steps are as follows: Phase 1: Construction of the top 10 sections Step S10: Segmented and separately constructed, prefabricated in the same manner as the cryogenic unit 12. S101, the dome deck section 101 was constructed independently. The dome deck section 101 uses the inner deck 1011 (the side closest to compartment 114) as the base surface for construction and transportation. This base surface selection reduces the number of times the structure needs to be turned over during subsequent construction, avoiding structural deformation or damage to the installation reference of the cryogenic unit 12 due to turning over. The specific steps are as follows: The tongue and groove joint of dome deck section 101 is machined into an inverted "V" shape to facilitate rapid alignment with the port side top section 102 and starboard side top section 103. Meanwhile, as... Figure 4 As shown, a support frame 1013 for positioning and support is pre-installed on the outer deck 1012 (the side away from the bulkhead 114). The support frame 1013 is set along the length of the dome deck segment 101, and the position of the support frame 1013 on each outer deck 1012 maintains a uniform standard (because it follows the same jig layout diagram during prefabrication), thus making it the positioning reference point for the segment. When subsequent segments are docked with the formed segments, the positions of the support frames 1013 on the outer decks 1012 of the two segments can be aligned to quickly calibrate the hull centerline 2, half-width value, and levelness, avoiding reference offset caused by segment connection and ensuring the docking accuracy of the entire LNG ship deck segment.

[0027] The number of racks 1013 must be sufficient to support at least half the weight of the dome deck section 101, providing stable support for the overall assembly stage and enabling rapid positioning of the dome deck section 101.

[0028] The cryogenic unit 12 is installed at a preset position on the outer deck 1012, and a pad 104 adapted to the support frame 122 of the cryogenic unit 12 is attached in advance to ensure the positioning accuracy of the cryogenic unit 12 during subsequent hoisting.

[0029] The entire transfer was carried out using the inner deck 1011 as the base surface to avoid damage to the outer deck 1012, the joists 1013, and the pads 104.

[0030] S102, hull top sections are constructed independently. Both the port side top section 102 and the starboard side top section 103 are constructed and transported using the inner sloping side plate 1022 (the side closest to compartment 114) as the base surface. This design reduces the number of times the sections need to be turned over, improving construction efficiency. The main steps are as follows: The inner inclined side plate 1022 is used as the base surface for large-scale assembly to ensure the accuracy of the segmented structure; the low temperature unit 12 is installed at the preset position on the outer inclined side plate 1023, and the pad 104 adapted to the support frame 122 of the low temperature unit 12 is attached in advance to form a unified positioning reference with the pad 104 on the dome deck segment 101.

[0031] For the outfitting components that need to be installed on the dome deck section 101 and the top section, they can be pre-assembled into integrated units before overall installation, reducing scattered on-site work and improving construction efficiency and installation accuracy.

[0032] S103, Low Temperature Unit 12 Prefabricated Since the cryogenic unit 12 runs through the top of the entire segment 10, it needs to be composed of multiple secondary cryogenic units 12 located on each segment, so a monolithic construction process is adopted.

[0033] According to the pre-designed positioning and marking diagram of the cryogenic unit 12, the secondary cryogenic unit 12 is manufactured. All secondary cryogenic units 12 that need to be docked are built synchronously on the same jig, so as to control the docking accuracy in advance and reduce the amount of adjustment work in the final assembly stage.

[0034] During the construction process, the construction precision of the cryogenic unit 12 was strictly controlled to ensure that the interface dimensions and installation hole positions of each unit were precisely matched with the positions of the pads 104 of the port top section 102, starboard top section 103, and dome deck section 101.

[0035] S11, Preparing the General Assembly Platform like Figure 1 As shown in the diagram, based on the tire layout plan, the hull centerline 2 and rib reference lines are marked on the assembly site, and assembly platform blocks 3 and support columns 4 are placed. The heights of the platform blocks 3 and supports are adjusted to ensure that the levelness of the assembly platform meets the accuracy requirements, providing a stable reference for section positioning.

[0036] Ground piers 3 are arranged at the corresponding positions at the bottom of the port side top section 102 and the starboard side top section 103, and support columns 4 are arranged at the corresponding positions at the top of the port side top section 102 and the starboard side top section 103. Three ground piers 3 are set at the bottom of each top section and three support columns 4 are set at the corresponding top to ensure balanced support. Since the dome deck section 101 will be embedded between the two top sections and connected to the two top sections in the future, no additional support columns 4 are required.

[0037] S12, Top 10 of the Segment Group The port side top section 102 and starboard side top section 103 of the first deck section were hoisted and initially positioned based on the hull centerline 2 and the rib reference line on the assembly platform. The distance between the two top sections was precisely adjusted to ensure sufficient space was reserved for the dome deck section 101 to be embedded.

[0038] Subsequently, the dome deck section 101 was hoisted, embedded between the two top sections, and initially positioned. Fine-tuning was then performed to ensure uniform mating gaps between the dome deck section 101 and the port and starboard top sections 102 and 103. After fine-tuning, welding was carried out for fixation. The joint line 105 between the two top sections and the dome deck section 101 was ground to meet process requirements, completing the assembly of the top 10 of the first deck section.

[0039] S13, Outfitting components and cryogenic unit 12 installation The outfitting components on the main deck 1021, outer side plate 1023, and outer deck 1012 were assembled. All outfitting components were precisely fixed in their designed positions to ensure a secure installation.

[0040] The prefabricated secondary cryogenic unit 12 is hoisted and quickly positioned using pre-attached pads 104 on the port and starboard top sections 102 and dome deck section 101. Then, the spatial position of the cryogenic unit 12 is adjusted according to the pre-designed positioning markings on the support frame 122, ensuring precise alignment of the secondary cryogenic units 12 on each section. After positioning, the secondary cryogenic units 12 are fixed and welded to form a complete cryogenic unit 12. Simultaneously, related bulk components are installed, ultimately constructing the top section 10.

[0041] The second stage involves the connection between the top 10 of segment and the bottom 11 of segment: S20, Segmented Bottom 11 Construction Complete the construction and assembly of the bottom plate 111, the port side plate 112 and the starboard side plate 113 according to the design requirements, and ensure that the dimensions of their docking interfaces are precisely matched with the bottom dimensions of the top sections 10 (port top section 102 and starboard top section 103).

[0042] S21, Segment top 10 and segment bottom 11 are aligned. like Figure 2 As shown, the top 10 of the pre-assembled and assembled section is hoisted above the bottom 11 of the section, aligned with the port side top section 102 and the port side plate 112, and the starboard side top section 103 and the starboard side plate 113, and welded and fixed, finally enclosing to form a compartment 114, completing the construction of the first LNG ship deck section 1.

[0043] Following the steps described above, the construction of the second, third, and finally the last LNG ship deck section 1 will proceed sequentially, using the first deck section as a reference.

[0044] When the top 10 of adjacent sections are aligned, they can be quickly positioned using the racks 1013 on the outer deck 1012, and then fine-tuned and welded together.

[0045] In some implementations, to adapt to the efficiency requirements and site constraints of different construction scenarios, the assembly process of the LNG ship deck section can adopt two flexible segmented connection modes to ensure the compatibility and controllability of the construction process: The first mode, the integrated docking mode, involves first connecting the top 10 sections of multiple segments sequentially in the assembly area to form the top frame of the LNG ship deck assembly. Simultaneously, connecting the bottom 11 sections of multiple segments in a dedicated prefabrication area to form the bottom frame of the LNG ship deck assembly. After both assemblies meet the assembly precision requirements, the top frame of the LNG ship deck assembly is hoisted onto the bottom frame of the LNG ship deck assembly. Through unified benchmark calibration and multi-point alignment and fixing, the entire section is docked as a whole. This mode can significantly reduce the frequency of high-altitude operations and improve assembly efficiency.

[0046] The second mode, the single-segment sequential connection mode, adopts the idea of ​​"single-segment forming and segment-by-segment connection". First, the top 10 of a single segment is precisely welded to the bottom 11 of the corresponding segment to form a single LNG ship deck segment 1 with complete structure and independent function. Then, taking the first formed LNG ship deck segment 1 as the benchmark, the subsequent formed single LNG ship deck segments 1 are sequentially connected through the positioning of the outer deck 1012 and the alignment of the ship's centerline 2, etc., to gradually expand into a complete LNG ship deck section. This mode is suitable for scenarios with limited site space and transportation conditions. At the same time, this mode also facilitates the quality control of the segments.

[0047] Furthermore, the forming and transportation of LNG ship deck section 1 can be selected from the following two options based on the construction site conditions, transportation capacity, and project plan: Option 1: Assembly Site Formation Plan: Connect all LNG ship deck sections 1 sequentially at the assembly site to form a complete LNG ship deck assembly, which will then be transported to the dock or pier for direct hoisting and installation.

[0048] Option 2, Dock / Wharf Assembly: Transport each complete LNG ship deck section 1 to a dock or wharf, and connect each LNG ship deck section 1 sequentially according to the reference within the dock / wharf to complete the assembly of the entire LNG ship deck section.

[0049] Based on the two models and two schemes mentioned above, the following construction schemes for the LNG ship deck sections are proposed, with details as follows: Combination 1: Integrated Docking Mode + Assembly Site Formation: Within the assembly site, all top sections (10) are connected sequentially to form a top integrated frame; simultaneously, all bottom sections (11) are welded together to form a bottom integrated frame. The two major assemblies are then docked to form a complete LNG ship deck section. The entire LNG ship deck section is then transported to the dry dock / terminal using a dedicated transport vehicle for direct hoisting and installation.

[0050] Combination 1 is suitable for situations where there is sufficient space in the assembly area. The entire process is completed in the assembly area, and it can be quickly assembled in the dock / wharf, reducing the amount of high-altitude work and adjustment work in the dock, while shortening the occupation period. However, it requires the ability to lift large sections.

[0051] Combination 2, Single-segment sequential connection mode + overall assembly site formation: In the overall assembly site, the top 10 of each individual segment is first connected to the bottom 11 of the corresponding segment to form an independent and complete single LNG ship deck segment 1. This step-by-step completion facilitates phased quality control. Using the first formed single deck segment as a benchmark, all the individual LNG ship deck segments 1 are sequentially connected in the overall assembly site through the ballast 1013 on the outer deck 1012 and the ship's centerline 2 for calibration, forming a complete LNG ship deck section. Finally, the entire section is transported to the dock / wharf for direct hoisting and installation.

[0052] Combination 2 is suitable for situations where there is sufficient space in the overall site. The construction process is flexible, and the subsequent processes can be adjusted in a timely manner after each individual segment is formed, reducing the risk of rework.

[0053] Meanwhile, combination two is also suitable for situations with high quality control requirements, allowing for the batch acceptance of LNG ship deck sections 1. However, it requires the ability to lift large sections.

[0054] Combination 3, Integrated docking mode + dock / terminal forming: In the main assembly site, multiple top 10 sections and corresponding bottom 11 sections are spliced ​​in batches to form the top and bottom overall frames, respectively. These are then transported to the dock / terminal, where the top and bottom overall frames are aligned and welded to form the complete LNG ship deck section.

[0055] The combined solution requires the dock / pivot to have the ability to assemble large assemblies. The combined solution reduces the number of transports per segment, thereby reducing transportation costs and risks.

[0056] Combination 4: Single-section sequential connection mode + dock / dock formation: Within the assembly site, the top 10 of each individual segment is first connected to the bottom 11 of the corresponding segment to form an independent and complete individual LNG ship deck segment 1; each individual LNG ship deck segment 1 is then transported to the dock / wharf; within the dock / wharf, the individual deck segments are sequentially connected to form a complete deck section and the assembly is completed.

[0057] Combination 4 is suitable for situations where the site space is limited and only a single segment can be prefabricated. Transporting a single LNG ship deck section 1 is more convenient. This solution has the lowest transportation difficulty, does not require large transportation equipment, and has a high construction error tolerance. Problems with a single section will not affect the overall progress and are easy to adjust locally.

[0058] The above are merely preferred embodiments of the present invention. It should be noted that those skilled in the art can make various improvements and modifications without departing from the principle of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.

Claims

1. A method for constructing the top of a segmented deck of an LNG carrier, characterized in that, include: The top of the LNG ship deck section includes: a dome deck section, a port side top section, a starboard side top section, and a cryogenic unit. The port side top section and the starboard side top section are symmetrically arranged on both sides of the dome deck section and connected to the dome deck section. The cryogenic unit is spanned across the dome deck section, the port top section, and the starboard top section; The construction steps of the top of the LNG ship deck section are as follows: The dome deck section, the port side top section, and the starboard side top section are constructed independently. A support is pre-installed on the dome deck section, and pads are attached to the preset installation positions of the cryogenic unit on the dome deck section, the port side top section, and the starboard side top section. Multiple secondary cryogenic units constituting the cryogenic unit are manufactured simultaneously on the same jig; A baseline is drawn on the assembly site and multiple piers and support columns are arranged. The piers are used to support the bottom ends of the port and starboard top sections, and the support columns are used to support the top ends of the port and starboard top sections. The port side top section and the starboard side top section are hoisted to the assembly site, and then the dome deck section is hoisted and embedded between the port side top section and the starboard side top section. After adjusting the spacing, it is welded and fixed. Outfitting components are installed on the dome deck section, the port side top section, and the starboard side top section, and the secondary cryogenic unit is positioned and installed using the pad plate. Multiple secondary cryogenic units are connected to form a complete cryogenic unit.

2. The construction method for the top of the LNG ship deck section according to claim 1, characterized in that, The number of the racks is configured to support at least half the weight of the dome deck section.

3. The construction method for the top of the LNG ship deck section according to claim 1, characterized in that, The purlin is positioned along the length of the dome deck segment on the supporting dome deck segment.

4. The construction method for the top of the LNG ship deck section according to claim 1, characterized in that, The tongue and groove joints between the dome deck section and the port and starboard top sections are machined into an inverted V-shape.

5. The method for constructing the top of the LNG ship deck section according to claim 1, characterized in that, The cryogenic unit includes cryogenic pipelines and a support frame, with the cryogenic pipelines mounted on top of the segment via the support frame.

6. An LNG ship deck section, characterized in that: The LNG ship deck section comprises multiple LNG ship deck segments connected sequentially along the ship's length. Each LNG ship deck segment includes a bottom section and a top section as described in any one of claims 1-5. The bottom section is located below the top section of the LNG ship deck. The bottom section includes a bottom plate, a port side plate, and a starboard side plate. The port side plate and the starboard side plate are symmetrically arranged on both sides of the bottom plate and connected to the bottom plate. The port side top section is connected to the port side plate, and the starboard side top section is connected to the starboard side plate, so that the top and bottom of the sections together enclose a compartment.

7. The LNG ship deck section according to claim 6, characterized in that, The side of the dome deck section closest to the compartment is the inner deck, and the side furthest from the compartment is the outer deck. The side of the port side top section and the starboard side top section closest to the compartment is the inner sloping side plate, and the side furthest from the compartment is the outer sloping side plate; The pad is disposed on the outer deck and the outer sloping side plate.

8. A method for constructing an LNG ship deck section as described in any one of claims 6-7, characterized in that the steps include... include: Construct the top and bottom of a single LNG ship deck segment, connect the two to form a single LNG ship deck segment, and then connect multiple LNG ship deck segments in sequence to form the LNG ship deck assembly.

9. A method for constructing an LNG ship deck section as described in any one of claims 6-7, characterized in that the steps include... include: The top sections of the multiple LNG ship decks are connected sequentially to form a top integral frame, and the bottom sections of the multiple sections are connected sequentially to form a bottom integral frame. The top integral frame is hoisted above the bottom integral frame and the two are connected to form the LNG ship deck section.