Dodecyl stearate enzymatic hydrolysis wastewater purification treatment device
By coordinating the detection unit and controller, the scraping speed and dissolved air parameters are dynamically adjusted, which solves the problem of scum retention in the dodecyl stearate enzymatic hydrolysis wastewater purification device when the temperature changes, and improves the stability of the effluent quality and energy efficiency.
Patent Information
- Application Number
- CN202611585569.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-14
- Publication Date
- 2026-11-17
AI Technical Summary
Existing 12-hydroxystearic acid enzymatic hydrolysis wastewater purification devices have difficulty adapting to changes in temperature and operating conditions in terms of scum scraping speed and start-up/shutdown timing, leading to scum retention and accumulation, which affects the stability of effluent water quality and energy consumption.
The detection unit acquires information such as surface water temperature, influent flow rate, and effluent turbidity of the dissolved air flotation tank. The controller adjusts the sludge scraping cycle and dissolved air operation parameters to dynamically regulate the sludge scraping speed and start/stop timing. Combined with detection feedback, the sludge discharge and dissolved air supply are optimized.
It improves the operational stability of the device, reduces scum retention and removal difficulties, lowers energy consumption, and ensures the continuity and stability of the effluent quality.
Smart Images

Figure CN123105778A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of wastewater purification and treatment equipment, and in particular to a device for purifying and treating wastewater from the enzymatic hydrolysis of dodecyl stearate. Background Technology
[0002] The wastewater from the enzymatic hydrolysis of dodecyl stearate contains residual oils, fatty acids, and suspended impurities. After demulsification and flocculation treatment, oil droplets and flocs can be further separated through a dissolved air flotation (DAF) process. The DAF unit pressurizes a portion of the treated water and dissolves it in air before releasing it into the flotation tank. Microbubbles generated by the depressurization process adhere to the oil droplets and flocs, causing them to float and form scum. A motor-driven scraper then pushes the scum to the collection area and discharges it, reducing the pollution load on subsequent treatment processes.
[0003] During continuous treatment, factors such as front-end temperature control, influent batches, and environmental heat dissipation can cause changes in the water temperature of the flotation tank, which may alter the fluidity of residual oil and the adhesion of scum. For flotation devices using fixed scraping speeds and fixed start-stop intervals, the scraping arrangement is difficult to adapt to these changes in operating conditions. When the scraping interval is too long, scum is prone to stagnation, accumulation, and adhesion to relevant areas, increasing scraping resistance. Simply increasing the scraping speed may exacerbate surface disturbance, causing some oil droplets and flocs to re-enter the water. If the disturbance is reduced by simply decreasing the scraping speed without adjusting the start-up timing and stop time accordingly, the time required to complete one scraping action will be extended, further aggravating scum retention. Therefore, it is difficult to simultaneously ensure timely scum removal and stable effluent water quality.
[0004] Therefore, how to reasonably arrange the scraping speed and start-up / stop timing when the temperature conditions change, while taking into account the timely discharge of scum and the control of scum scraping disturbance, and improving the pertinence of the adjustment of operating parameters when the effluent is abnormal, are the problems that the above-mentioned wastewater flotation treatment device needs to solve. Summary of the Invention
[0005] The purpose of this invention is to provide a device for purifying and treating wastewater from the enzymatic hydrolysis of 12-hydroxystearic acid in order to solve the above-mentioned problems.
[0006] To achieve the above objectives, the present invention adopts the following technical solution: a device for purifying and treating wastewater from the enzymatic hydrolysis of dodecyl stearate, comprising an equipment frame, and an air flotation tank equipped with an inlet pipe and an outlet pipe, and further comprising: The drive unit is mounted on the equipment frame and is connected to the scraper drive located at the top of the flotation tank to drive the scraper to push the scum to the scum collection tank located at one end of the flotation tank. The dissolved air unit is connected between the effluent pipe and the flotation tank to pressurize and dissolve part of the treated water before releasing it into the flotation tank. The detection unit is installed in the flotation tank, related water circuits and sludge scraping transmission parts to obtain information on surface water temperature, influent flow rate, influent and effluent turbidity, liquid level, scraper movement and dissolved air operation. The controller is installed on the equipment rack. The controller determines the upper limit of the sludge scraping cycle based on the surface water temperature and its changing trend obtained by the detection unit. It maintains or tightens the upper limit within the same cycle. It determines the completion status of the specified sweeping action based on the scraper movement information. The controller controls the operation of the drive unit with the operating constraint that the time interval between two consecutive specified sweeping actions does not exceed the upper limit of the sludge scraping cycle. When the effluent turbidity is abnormal and the remaining cycle time meets the diagnostic requirements, the controller performs constant stroke deceleration diagnosis while keeping the dissolved air operating parameters unchanged. It adjusts the scraping speed and start-up timing based on the effluent turbidity response before and after deceleration. When the effluent turbidity remains abnormal, it controls the dissolved air unit to adjust the dissolved air operating parameters step by step while keeping the scraping operation program unchanged.
[0007] Preferably, the drive unit includes a geared drive motor mounted on the equipment frame, sprockets are rotatably arranged on both sides of the flotation tank, a transmission chain is wound between the sprockets on the same side, and the two ends of the scraper are respectively connected to the transmission chains on both sides. Two sprockets located at the same end of the flotation tank are connected by a transverse drive shaft. The output end of the speed reduction drive motor is connected to the transverse drive shaft to drive the drive chains on both sides to move synchronously and cyclically, so that the scraper pushes the scum to the scum collection tank along the length of the flotation tank. A guide plate is connected between the flotation tank and the slag collection tank. The guide surface of the guide plate is matched with the movement trajectory of the scraper when it turns around the sprocket, so that the slag enters the slag collection tank along the guide plate.
[0008] Preferably, the dissolved air unit includes a dissolved air tank and a reflux dissolved air pressurizing pump. The inlet of the reflux dissolved air pressurizing pump is connected to the outlet pipe through a reflux pipe, and its outlet is connected to the dissolved air tank so as to pressurize part of the treated water and deliver it to the dissolved air tank. The dissolved air tank is connected to an air inlet assembly and is connected to the flotation tank through a release pipe. The air inlet assembly supplies air to the dissolved air water preparation channel, and the release pipe releases the dissolved air water into the flotation tank. A baffle is installed at one end of the flotation tank near the inlet pipe, and a release pipe is installed inside the flotation tank on the side of the baffle facing the inlet pipe.
[0009] Preferably, the detection unit includes: The inlet detection component and the outlet detection component are respectively installed on the inlet pipe and the outlet pipe. The inlet detection component obtains the inlet flow rate and inlet turbidity before entering the flotation tank, and the outlet detection component obtains the turbidity of the effluent after flotation treatment. A liquid level detection component is installed on the flotation tank to obtain liquid level information in the flotation tank; a front water temperature detection component, a middle water temperature detection component, and a rear water temperature detection component are installed at intervals along the water flow direction, and their detection ends correspond to the surface water of the inlet section, the middle section, and the outlet section of the flotation tank, respectively. The slag scraper position detection component is located at the output transmission part of the geared drive motor to obtain motion information for determining the scraper running speed, cumulative sweeping stroke and motion phase, as well as reference position information. The dissolved gas pressure detection component is installed on the dissolved gas tank, and its pressure tap is connected to the inside of the dissolved gas tank to obtain the actual dissolved gas pressure; the reflux flow detection component is installed on the reflux pipe to detect the reflux flow rate entering the reflux dissolved gas pressurization pump through the reflux pipe.
[0010] Preferably, the controller includes: The information acquisition module acquires the detection information of the detection unit, forms an operation record corresponding to the detection time, and judges the validity of the detection information, excluding invalid sampling information during detection failure and during the cleaning of detection components from the evaluation of adjustment effect. The cycle management module determines the upper limit of the sludge scraping cycle and the remaining available time based on surface water temperature information, inlet water conditions, and completion records of specified sweeping actions, and generates a sludge scraping operation schedule. The sludge scraping diagnostic module determines the rate reduction diagnostic conditions based on the abnormal turbidity of the effluent and the remaining available time, and generates sludge scraping operation parameters based on the turbidity response of the effluent before and after the rate reduction. The dissolved air regulation module generates step-by-step adjustment instructions for dissolved air operating parameters when the effluent turbidity is continuously abnormal, and determines the dissolved air operating parameters based on the adjusted effluent turbidity response. The execution drive module controls the operation of the drive unit according to the slag scraping operation schedule and slag scraping operation parameters, controls the operation of the dissolved gas unit according to the step adjustment instructions, and feeds back the execution results to the information acquisition module.
[0011] Preferably, when the effluent turbidity exceeds a preset abnormal threshold and continues for a preset judgment time, the sludge scraping diagnosis module compares the current influent flow rate, influent turbidity, liquid level, and surface water temperature with the corresponding information in the benchmark operation record to determine whether the preset comparable operating conditions are met. When the detection information is valid, meets the comparable operating conditions, and the remaining available time meets the time requirements for completing the deceleration diagnosis and the specified sweeping action, the effluent turbidity response that completes the specified sweeping stroke at the benchmark scraping speed in the benchmark operation record is selected as the benchmark response, and a diagnostic speed lower than the benchmark scraping speed is determined within the pre-calibrated allowable scraping speed range; while keeping the dissolved air operating parameters unchanged and the liquid level fluctuation meets the comparable operating conditions, the drive module controls the drive unit to drive the scraper to complete the same sweeping stroke corresponding to the benchmark response at the diagnostic speed; When the detection information is invalid, does not meet the comparable operating conditions, or has insufficient remaining available time, the deceleration diagnosis is suspended; if the above conditions fail during the deceleration diagnosis process, the current response comparison is terminated, and slag scraping is performed according to the running time schedule determined by the cycle management module.
[0012] Preferably, the sludge scraping diagnostic module performs motion phase correspondence between the baseline response and the deceleration diagnostic response based on the pre-calibrated response lag time from sludge scraping disturbance to effluent turbidity change, and obtains the effluent turbidity peak value and average value within the complete response window covering the turbidity change caused by the same sweeping stroke, respectively. When the reduction in the peak turbidity of the effluent relative to the baseline response reaches the preset improvement threshold, the increase in the average turbidity of the effluent does not exceed the preset allowable deviation, and the prescribed sweeping action can be completed within the upper limit of the sludge scraping cycle at the diagnostic speed, the diagnostic speed is determined as the subsequent sludge scraping speed, and the sludge scraping start time is advanced or the stop time is shortened according to the increase in running time. If the reduction in peak turbidity of effluent does not reach the preset improvement threshold, the increase in average turbidity of effluent exceeds the preset allowable deviation, or the diagnostic speed cannot meet the operational constraints, the current diagnostic speed will not be used, and the verified sludge scraping operation procedure will be restored.
[0013] Preferably, after the dissolved air regulation module completes the effect evaluation of the deceleration diagnosis, if the effluent turbidity still exceeds the preset abnormal threshold and continues to reach the preset judgment time, then when the detection information is valid, the comparable operating conditions are met, and the remaining available time meets the regulation and response evaluation requirements, the determined sludge scraping operation program remains unchanged, the treated water return flow rate is used as the adjustment amount, the operation of the dissolved air unit is controlled according to the preset adjustment step size, and the air intake is adjusted in conjunction with the adjustment of the air intake to make the actual dissolved air pressure and return flow rate within the pre-calibrated operating range; After verifying that the actual dissolved air pressure and return flow rate match the adjustment command, the effluent turbidity response is obtained according to the pre-calibrated dissolved air adjustment response lag time and compared with the effluent turbidity response before this adjustment. When the improvement in effluent turbidity reaches the preset effective adjustment threshold, the corresponding dissolved air operating parameters are retained. When the improvement does not reach the preset effective adjustment threshold, no preset deterioration state occurs, the execution feedback is normal, and the preset adjustment number, adjustment amplitude, and adjustment time upper limit are not reached, the next adjustment is executed. When a preset deterioration state occurs, execution feedback is abnormal, detection information or comparable operating conditions fail, or any of the aforementioned adjustment limits are reached, the step-by-step adjustment is stopped, and the operation parameters that have been verified and still meet the current operating constraints are rolled back; if there are no verified operating parameters that meet the current operating constraints, an abnormal prompt message is generated.
[0014] Preferably, the cycle management module determines the completion of a specified sweeping action and records the completion time when the cumulative sweeping stroke reaches a preset specified stroke and the corresponding reference position is confirmed, based on the scraper movement information obtained by the detection unit. The completion time of the last specified sweeping action is used as the timing start point of the current slag scraping cycle. The cycle management module determines the temperature change trend based on the surface water temperature information within the preset sampling period, determines the current operating conditions by combining the influent flow rate and influent turbidity, and determines the upper limit of the candidate cycle based on the calibration correspondence between the operating conditions and the allowable scraping cycle established in advance through actual wastewater scraping tests. At the start of a new slag scraping cycle, the upper limit of the candidate cycle is set as the upper limit of the current slag scraping cycle. Within the same slag scraping cycle, if the newly determined upper limit of the candidate cycle is less than the upper limit of the current slag scraping cycle, the newly determined upper limit of the candidate cycle is used for updating. If the newly determined upper limit of the candidate cycle is greater than or equal to the upper limit of the current slag scraping cycle, the upper limit of the current slag scraping cycle remains unchanged.
[0015] Preferably, the cycle management module determines the elapsed time based on the time difference between the current time and the timing start point, determines the remaining running time based on the unfinished prescribed sweeping stroke and the proposed slag scraping speed, and accumulates the elapsed time, the remaining running time, the planned additional waiting time, and the preset time margin, and compares it with the current upper limit of the slag scraping cycle. Among these, the running time used to complete the remaining prescribed sweeping stroke during the diagnosis period is included in the remaining running time, but is not repeatedly included in the additional waiting time. When the accumulated result does not exceed the current sludge scraping cycle limit, generate sludge scraping start, continue operation, stop or diagnostic instructions according to the plan; when the accumulated result exceeds the current sludge scraping cycle limit, cancel the extra wait and re-determine the operating speed and start time within the pre-calibrated allowable sludge scraping speed range; if the operation constraints still cannot be met after the rescheduling, suspend the diagnostic and step-by-step adjustment and generate water inlet limit prompt information. When the actual motion information of the scraper does not match the drive command of the reduction drive motor and the preset fault judgment condition is met, the execution drive module controls the reduction drive motor to stop running and generates a fault prompt message; after the fault is cleared, the detection information is restored to be valid and the current operating condition is within the applicable range of the calibration correspondence, the operation is resumed according to the newly determined slag scraping operation time schedule.
[0016] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are: 1. In this application, the upper limit of the sludge scraping cycle is determined by detecting the water temperature in the front, middle and rear sections of the flotation tank, combined with the temperature change trend and the influent conditions, and the sludge scraping start and stop schedule is adjusted according to the remaining stroke, so as to reduce the difficulty of scraping caused by sludge retention, accumulation and adhesion, reduce the sludge scraping load fluctuation, and improve the stability of continuous operation of the device.
[0017] 2. In this application, the water quality response time is aligned under comparable operating conditions, the peak and average values of effluent turbidity before and after the rate reduction are compared, and it is determined whether the rate reduction can improve the effluent. A sludge scraping arrangement that takes into account both water quality and cycle requirements is selected to reduce sludge scraping disturbance and scum re-entrainment, and to reduce misadjustment caused by instantaneous turbidity fluctuations.
[0018] 3. In this application, when the effluent is still abnormal after the sludge scraping adjustment, the reflux dissolved air is adjusted in stages. The adjustment effect is evaluated in combination with the actual pressure, reflux flow rate and effluent turbidity. Effective settings are retained and ineffective adjustments are removed in time to reduce the energy consumption and hydraulic disturbance caused by blindly increasing pressure and flow, so that the dissolved air supply is more in line with the actual treatment needs. Attached Figure Description
[0019] Figure 1 A front perspective structural diagram of the purification treatment device provided according to an embodiment of the present invention is shown; Figure 2 A rear three-dimensional structural diagram of the purification treatment device provided according to an embodiment of the present invention is shown; Figure 3 A top view of the purification treatment apparatus provided according to an embodiment of the present invention is shown; Figure 4 A flowchart of the overall electromechanical control system for dissolved air flotation provided according to an embodiment of the present invention is shown. Figure 5 A flowchart illustrating the temperature-constrained slag scraping cycle management process according to an embodiment of the present invention is shown. Figure 6 A flowchart of slag scraping diagnosis and dissolved gas step-by-step adjustment provided according to an embodiment of the present invention is shown.
[0020] Legend: 1. Equipment frame; 2. Flotation tank; 3. Inlet pipe; 301. Inlet detection component; 4. Outlet pipe; 401. Outlet detection component; 5. Gear drive motor; 6. Sprocket; 7. Transmission chain; 8. Scraper; 9. Slag collection tank; 10. Slag guide plate; 11. Dissolved air tank; 12. Release pipe; 13. Air inlet component; 14. Return dissolved air pressurization pump; 15. Return pipe; 16. Liquid level detection component; 17. Front water temperature detection component; 18. Middle water temperature detection component; 19. Back water temperature detection component; 20. Baffle plate; 21. Controller; 22. Slag scraper position detection component; 23. Dissolved air pressure detection component; 24. Return flow rate detection component. Detailed Implementation
[0021] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0022] Please see Figure 1-6 The present invention provides a technical solution: a purification and treatment device for wastewater from the enzymatic hydrolysis of dodecyl stearate, comprising an equipment frame 1, and an air flotation tank 2 equipped with an inlet pipe 3 and an outlet pipe 4, and further comprising: The drive unit is installed on the equipment frame 1 and is connected to the scraper 8 located on the upper part of the flotation tank 2 to drive the scraper 8 to push the scum to the scum collection tank 9 located at one end of the flotation tank 2. The dissolved air unit is connected between the effluent pipe 4 and the flotation tank 2 to pressurize and dissolve part of the treated water and then release it into the flotation tank 2. The detection unit is installed in the flotation tank 2, related water circuits and sludge scraping transmission parts to obtain information on surface water temperature, influent flow rate, influent and effluent turbidity, liquid level, scraper movement and dissolved air operation. The controller 21 is installed on the equipment rack 1. The controller 21 determines the upper limit of the sludge scraping cycle based on the surface water temperature and its changing trend obtained by the detection unit, maintains or tightens the upper limit within the same cycle, determines the completion status of the specified sweeping action based on the scraper movement information, and controls the operation of the drive unit with the time interval between two adjacent specified sweeping actions not exceeding the upper limit of the sludge scraping cycle as the operating constraint. The controller 21 is installed on the equipment frame 1 and electrically connected to the detection unit and each drive component. When the effluent turbidity is abnormal and the remaining cycle time meets the diagnostic requirements, the controller 21 performs constant stroke deceleration diagnosis while keeping the dissolved air operating parameters unchanged. It adjusts the scraping speed and start-up timing according to the effluent turbidity response before and after deceleration. When the effluent turbidity is continuously abnormal, it controls the dissolved air unit to adjust the dissolved air operating parameters step by step while keeping the scraping operation program unchanged.
[0023] The apparatus of this embodiment is used in the dissolved air flotation stage of the wastewater purification process for 12-hydroxystearic acid enzymatic hydrolysis. The wastewater sequentially passes through regulating filtration, temperature-controlled sediment recovery, and demulsification flocculation before entering the flotation tank 2 via inlet pipe 3. The flotation-treated water is discharged through outlet pipe 4, with a portion recycled to prepare dissolved air water, and the remainder entering subsequent hydrolysis acidification, contact oxidation, and sedimentation filtration stages. The aforementioned pre- and post-flotation treatment stages can be implemented using existing technologies, and this application does not impose any particular limitations on them.
[0024] During operation, the dissolved air water depressurization generates microbubbles. These microbubbles contact and adhere to oil droplets and flocs, causing them to rise and form scum. The scraper 8 transports the scum to the scum collection tank 9. The controller 21 limits the scum scraping interval based on the surface water temperature and inlet water conditions. Furthermore, when the effluent turbidity is abnormal, it first checks whether reducing the scum scraping speed is beneficial, and then adjusts the dissolved air operating parameters in stages if necessary. Both adjustments are constrained by the scum scraping cycle, and the controller determines whether to retain, deactivate, or restore the operating parameters based on detection feedback.
[0025] Specifically, such as Figures 1-3 As shown, the drive unit includes a geared drive motor 5 mounted on the equipment frame 1, sprockets 6 are rotatably arranged on both sides of the flotation tank 2, and a transmission chain 7 is wound between the sprockets 6 on the same side. The two ends of the scraper 8 are connected to the transmission chains 7 on both sides respectively. Two sprockets 6 located at the same end of the flotation tank 2 are connected by a transverse drive shaft. The output end of the reduction drive motor 5 is connected to the transverse drive shaft to drive the drive chains 7 on both sides to move synchronously and cyclically, so that the scraper 8 pushes the scum to the scum collection tank 9 along the length of the flotation tank 2. A guide plate 10 is connected between the flotation tank 2 and the slag collection tank 9. The guide surface of the guide plate 10 is matched with the movement trajectory of the scraper 8 when it turns around the sprocket 6, so that the slag enters the slag collection tank 9 along the guide plate 10.
[0026] The equipment frame 1 supports the flotation tank 2, the geared drive motor 5, and the corresponding pipelines. The flotation tank 2 is fixedly connected to the equipment frame 1. The transverse drive shaft is rotatably supported on the upper support part of the equipment frame 1 via bearing seats. The geared drive motor 5 consists of a motor and a reduction transmission part, and its output end drives the transverse drive shaft to rotate through a coupling or matching transmission component. The above-mentioned support, fastening, and conventional reduction transmission structure can be implemented using existing technology, and this application does not make any special limitations on it.
[0027] Two sprockets 6 on the same transverse drive shaft maintain a defined relative angle. The drive chains 7 on both sides have matching pitch, length, and installation phase. The scraper 8 is fixed to the drive chains 7 on both sides via connectors. During commissioning, the tension of the chains on both sides and the transverse posture of the scraper are adjusted to ensure that the scraper 8 moves synchronously with the chains on both sides. All scrapers share this drive relationship; when the controller 21 adjusts the operating speed of the reduction drive motor 5, the chain conveying speed of each scraper changes accordingly.
[0028] When scraper 8 passes through the effective scraping section, its lower edge contacts the scum near the working liquid level and is conveyed to the scum collection tank 9. As it passes the sprocket 6 at one end of the scum collection tank 9, scraper 8 turns with the chain 7, and the scum is pushed into the scum collection tank 9 along the guide plate 10. Scraper 8 then continues to return along the circulation path. A clearance is maintained between the guide plate 10 and the turning trajectory of scraper 8 to meet the movement requirements, avoiding interference between scraper 8 and guide plate 10 and reducing the fall of scum from the junction. The scum collection tank 9 is connected to a collection container or subsequent sludge treatment passage via a scum discharge interface.
[0029] Specifically, such as Figures 1-3 As shown, the dissolved air unit includes a dissolved air tank 11 and a reflux dissolved air pressurization pump 14. The inlet of the reflux dissolved air pressurization pump 14 is connected to the outlet pipe 4 through a reflux pipe 15, and its outlet is connected to the dissolved air tank 11 to pressurize part of the treated water and deliver it to the dissolved air tank 11. The dissolved air tank 11 is connected to the air inlet assembly 13 and is connected to the flotation tank 2 through the release pipe 12. The air inlet assembly 13 supplies air to the preparation channel of dissolved air water, and the release pipe 12 releases the dissolved air water into the flotation tank 2. A baffle 20 is installed at one end of the air flotation tank 2 near the inlet pipe 3, and a release pipe 12 is installed in the air flotation tank 2 and is located on the side of the baffle 20 facing the inlet pipe 3.
[0030] Specifically, the reflux dissolved air pressurization pump 14 and the dissolved air tank 11 are fixed to their respective support positions on the equipment frame 1. The reflux pipe 15 includes a pre-pump pipe section and a post-pump pipe section respectively located on the inlet and outlet sides of the reflux dissolved air pressurization pump 14. The pre-pump pipe section connects the outlet pipe 4 to the inlet end of the reflux dissolved air pressurization pump 14; the post-pump pipe section connects the outlet end of the reflux dissolved air pressurization pump 14 to the dissolved air tank 11. All pipelines are sealed and connected by joints or flanges and supported by pipe supports.
[0031] In this embodiment, the air supply end of the air intake assembly 13 is connected to the pre-pump pipe section between the return dissolved gas pressurization pump 14 and the dissolved gas tank 11. The air intake assembly 13 may include an air supply pipe connected to an external compressed air source, a pressure regulator, an electrically controlled air intake regulating valve, and a check valve; the check valve is open in the direction of air entering the water passage. The compressed air source and the aforementioned conventional air passage components can be implemented using existing technology, and this application does not impose any particular limitations on them.
[0032] A return dissolved air pressurization pump 14 pressurizes the treated water, and compressed air is injected after the pump, entering the dissolved air tank 11 along with the water. The air and water come into contact in the return pipe 15 and the dissolved air tank 11, further dissolving the air during the residence process in the tank. The release pipe 12 is equipped with a pressure-reducing release structure, which depressurizes the dissolved air water as it enters the flotation tank 2, forming microbubbles. The pressure-reducing release structure can be implemented using existing technology, and this application does not impose any particular limitation on it.
[0033] The baffle 20 is used to guide the water flow near the inlet pipe 3 and the release pipe 12, connecting the air-water contact area near the inlet side with the subsequent separation area, reducing local short-circuiting and disturbance caused by the inlet water directly rushing towards the outlet side. A corresponding flow channel is maintained between the baffle 20 and the pool body, and the specific flow location and cross-section are determined according to the pool structure and design flow rate.
[0034] Specifically, such as Figures 1-3 As shown, the detection unit includes: The inlet water detection component 301 and the outlet water detection component 401 are respectively installed on the inlet pipe 3 and the outlet pipe 4. The inlet water detection component 301 obtains the inlet water flow rate and inlet water turbidity before entering the flotation tank 2, and the outlet water detection component 401 obtains the turbidity of the outlet water after flotation treatment. The influent detection component 301 may include a flow meter and a turbidity meter to measure the flow rate and turbidity of the wastewater entering the flotation tank 2, respectively. The effluent detection component 401 may include a turbidity meter, the detection location of which is selected on the effluent water path after flotation treatment, where it will not directly carry surface scum. The conventional measurement principles and signal interfaces of the flow meter and turbidity meter can be implemented using existing technologies, and this application does not impose any particular limitations on them.
[0035] The influent flow rate is measured for the incoming water before it merges with the dissolved air return water, while the return flow rate is measured for the return water diverted from the treated water. Both are recorded separately. The effluent turbidity record should retain the actual measurement time. When sampling tubes are involved, the sampling delivery time and instrument response time should be included in the response lag time described later.
[0036] The liquid level detection component 16 is installed on the flotation tank 2 to obtain the liquid level information in the flotation tank 2; the front water temperature detection component 17, the middle water temperature detection component 18 and the rear water temperature detection component 19 are arranged at intervals along the water flow direction, and their detection ends correspond to the surface water of the inlet section, the middle section and the outlet section of the flotation tank 2, respectively. The liquid level detection component 16 can be an ultrasonic liquid level gauge installed on the upper part of the flotation tank 2, and its detection area avoids the obstruction of the movement of the scraper 8 and the area directly impacted by the incoming water.
[0037] The front-end water temperature detection component 17, the middle-end water temperature detection component 18, and the rear-end water temperature detection component 19 can each use a contact-type temperature sensor with a protective sleeve. They are installed along the inlet section, the middle section, and the outlet section via brackets, with their probes located in the surface water of the corresponding area. The front and rear positions are determined by the direction of the treated water flow from the inlet pipe 3 to the outlet pipe 4.
[0038] During commissioning, the immersion depth of each probe relative to the working liquid surface is recorded, and the same detection conditions are used in subsequent calibration and operation. When changes in liquid level cause the probe to emerge from the water surface or the detection depth to exceed the calibration conditions, the relevant temperature information is deemed unsuitable for the current cycle calculation. The aforementioned level gauge, temperature sensor, and conventional installation structure can be implemented using existing technologies, and this application does not impose any particular limitations on them.
[0039] The slag scraping position detection component 22 is set at the output transmission part of the reduction drive motor 5 to obtain motion information and reference position information for determining the running speed, cumulative sweeping stroke and motion phase of the scraper 8. In one specific embodiment, the slag scraper position detection component 22 adopts a rotary encoder. The encoder housing is fixed to the bracket, and its rotation input end is connected to the transverse transmission shaft that drives the sprocket 6. During initial debugging, the designated scraper 8 is placed at a preset mechanical reference position, and the corresponding reading is saved in the controller 21. The controller 21 converts the encoder reading into the continuously accumulated number of transmission shaft revolutions, takes the slag scraping conveying direction as the positive direction, and calculates the cumulative movement distance based on the actual number of sprocket teeth and chain pitch: S=(n-n0)×Z×P; In the formula, S is the cumulative movement distance from the self-adjustment reference position, in meters; n and n0 are the cumulative number of revolutions of the drive shaft corresponding to the current and reference positions, respectively, in revolutions; Z is the number of teeth of sprocket 6; and P is the pitch of drive chain 7, in meters. Z and P are obtained from the actual assembly specifications and verified by low-speed operation with known stroke. When there is an additional transmission ratio between the encoder and the transverse drive shaft, the encoder revolutions are first converted according to this transmission ratio.
[0040] At the two valid detection moments before and after, the conveying speed of scraper 8 is calculated using the following formula: V=(S2-S1) / Δt; In the formula, V is in m / s; S1 and S2 are the cumulative distances traveled between the two points in time, in meters; Δt is the actual time difference between the two points in seconds and is greater than zero. Controller 21 can average the speeds of multiple consecutive sampling intervals to reduce low-speed quantization errors, and the corresponding detection delay is incorporated into the fault determination time and running time margin.
[0041] Controller 21 also stores the chain cycle length Lc, which is determined by the number of chain links and the pitch, and verified by actual movement. The position of movement within one revolution is expressed by the following formula: X = Sm × Lc; In the formula, X represents the position within one revolution along the cyclic path from the reference position, in meters (m); m is the number of complete cycles contained in the cumulative distance S, a non-negative integer; Lc is in meters, and 0 ≤ X < Lc. X represents the motion phase of the scraper 8, and the reference position information is determined by this phase, the cumulative number of revolutions, and the calibrated transmission relationship. Thus, the same rotary encoder provides the information required for speed, stroke, phase, and reference position determination.
[0042] The dissolved gas pressure detection component 23 is installed on the dissolved gas tank 11, and its pressure tap is connected to the inside of the dissolved gas tank 11 to obtain the actual dissolved gas pressure; the reflux flow detection component 24 is installed on the reflux pipe 15 to detect the reflux flow rate entering the reflux dissolved gas pressurization pump 14 through the reflux pipe 15.
[0043] The dissolved gas pressure detection component 23 employs a pressure transmitter, whose pressure tap is connected to the inside of the dissolved gas tank 11 via a pressure tapping interface on the upper part of the tank. The main body is located outside the tank. It is used to obtain the actual working pressure inside the tank and records it uniformly according to the same gauge pressure reference. The reflux flow detection component 24 uses a flow meter suitable for treated water and is installed on the reflux pipe 15 between the outlet pipe 4 and the inlet of the reflux dissolved gas pressurization pump 14. It is used to obtain the reflux flow rate entering the pump. The above pressure and flow rate serve as verification quantities for dissolved gas operating conditions and command execution. Conventional structures for the pressure transmitter and flow meter can be implemented using existing technology, and this application does not impose any particular limitations on them.
[0044] Specifically, such as Figure 4 As shown, the controller 21 includes: The information acquisition module acquires the detection information of the detection unit, forms an operation record corresponding to the detection time, and judges the validity of the detection information, excluding invalid sampling information during detection failure and during the cleaning of detection components from the evaluation of adjustment effect. The cycle management module determines the upper limit of the sludge scraping cycle and the remaining available time based on surface water temperature information, inlet water conditions, and completion records of specified sweeping actions, and generates a sludge scraping operation schedule. The sludge scraping diagnostic module determines the rate reduction diagnostic conditions based on the abnormal turbidity of the effluent and the remaining available time, and generates sludge scraping operation parameters based on the turbidity response of the effluent before and after the rate reduction. The dissolved air regulation module generates step-by-step adjustment instructions for dissolved air operating parameters when the effluent turbidity is continuously abnormal, and determines the dissolved air operating parameters based on the adjusted effluent turbidity response. The execution drive module controls the operation of the drive unit according to the slag scraping operation schedule and slag scraping operation parameters, controls the operation of the dissolved gas unit according to the step adjustment instructions, and feeds back the execution results to the information acquisition module.
[0045] The controller 21 can be a PLC, which receives detection signals through analog input, digital input / output and communication interface; it controls the start, stop and speed of the geared drive motor 5 through motor driver or frequency converter, adjusts the pump frequency through the matching frequency converter of the reflux dissolved gas pressurization pump 14, and sends opening command to the electronically controlled intake regulating valve of intake assembly 13.
[0046] The information acquisition module in controller 21 generates valid operation records with timestamps; the cycle management module determines the cycle upper limit and operation schedule based on water temperature, influent conditions, and mechanical completion records; the sludge scraping diagnosis module determines sludge scraping parameters based on turbidity anomalies and speed reduction responses; the dissolved air regulation module generates step-by-step regulation instructions when the effluent is continuously abnormal; and the execution drive module converts the above arrangements and parameters into drive instructions and sends the execution feedback to the information acquisition module. Each module can be implemented by a program in the same PLC, operating collaboratively in the order of data acquisition, cycle update, diagnosis or regulation, instruction execution, and feedback.
[0047] The information acquisition module generates valid data flags based on communication status, instrument malfunction, measurement range, data update time, and cleaning / maintenance status. Effectiveness evaluation utilizes continuous and valid detection records. Record content includes each detection value, encoder cumulative position, speed command, pump command, intake valve opening, and current control stage. Each detection channel samples periodically to meet instrument response and low-speed motion detection requirements and is associated with a unified timestamp; time, length, flow rate, temperature, pressure, and turbidity are uniformly expressed as s, m, m³ / h, ℃, MPa, and NTU, respectively.
[0048] During equipment commissioning, sensor calibration, mechanical benchmark verification, and basic air flotation operation checks were completed. Representative pretreated dodecyl stearate enzymatic hydrolysis wastewater was used to calibrate the allowable scraping speed range, dissolved air operating range, and the correspondence between operating conditions and allowable scraping cycles. Calibration parameters, benchmark responses, and verified operating procedures are stored in controller 21; the operating procedures include speed, start-up phase, specified stroke, and pause arrangements. For the initial run, reflux is established first, and after confirming unobstructed water flow, air intake is opened. Once the actual pressure, reflux flow rate, and detection data stabilize, and one specified sweeping action is completed to obtain the initial completion time, automatic cycle management begins.
[0049] Sludge scraping diagnosis and dissolved air conditioning are both conducted when the test data is valid, the current operating conditions are comparable to the baseline record, and the cycle time budget is sufficient. Comparability includes influent flow rate, influent turbidity, liquid level, and surface water temperature at three locations, each satisfying the following formula, and the temperature change trends being within the same calibration condition: |XX 基 In the formula |≤δX, X and X 基These are the same detection values from the current and baseline records, respectively, with δX representing the permissible deviation for that value; all three have the same unit. Each deviation is determined based on normal instrument fluctuations and controllable disturbance tests, selecting a range that covers both measurement fluctuations and distinguishes adjustment effects. The complete response window covering the baseline and trial adjustments is compared, and the operating condition fluctuations during each period are checked. If a condition fails or the response record is incomplete, controller 21 terminates the current evaluation and switches to periodic scheduling; the new evaluation uses the complete record obtained again after stabilization.
[0050] Specifically, such as Figure 6 As shown, when the effluent turbidity exceeds the preset abnormal threshold and continues for a preset judgment time, the sludge scraping diagnosis module compares the current influent flow rate, influent turbidity, liquid level, and surface water temperature with the corresponding information in the benchmark operation record to determine whether the preset comparable operating conditions are met. When the detection information is valid, the comparable operating conditions are met, and the remaining available time meets the time requirements for completing the deceleration diagnosis and the specified sweeping action, the effluent turbidity response in the benchmark operation record that completes the specified sweeping stroke at the benchmark sludge scraping speed is selected as the benchmark response, and a diagnosis speed lower than the benchmark sludge scraping speed is determined within the pre-calibrated allowable sludge scraping speed range. Under the condition that the dissolved air operating parameters remain unchanged and the liquid level fluctuation meets the comparable operating conditions, the execution drive module controls the drive unit to drive the scraper 8 to complete the same sweeping stroke corresponding to the benchmark response at the diagnosis speed. When the detection information is invalid, the comparable operating conditions are not met, or the remaining available time is insufficient, the deceleration diagnosis is suspended. When the above conditions fail during the deceleration diagnosis process, the current response comparison is terminated, and sludge scraping is performed according to the operating time schedule determined by the cycle management module.
[0051] When the effective effluent turbidity continuously exceeds the preset abnormal threshold and reaches the preset judgment time, the sludge scraping diagnosis module enters a deceleration diagnosis judgment. The abnormal threshold is determined by the effluent requirements and normal fluctuations of this device, and the judgment time is determined based on normal operation and controllable disturbance records, and is longer than negligible short-term measurement fluctuations. The continuous over-limit timer ends when the turbidity returns to within the threshold or the data becomes invalid. If a comparable benchmark record exists, the module extracts the effluent response corresponding to its specified stroke; if a benchmark record has not yet been formed, the benchmark response is obtained first at the verified speed, provided the cycle allows, and the predetermined cycle schedule is executed for the remaining time.
[0052] The permissible scum scraping speed was determined through actual wastewater graded operation tests. The tests started with a speed that could operate stably, and combined with the continuity of scum conveying, the operating status of the chain and scraper, and the effluent response, the lower permissible limit V was determined. 低 Allowable upper limit V 高 and reference speed V 基 Diagnostic speed V 诊 Within this range, the speed reduction step size is selected according to the preset speed reduction step size, satisfying 0 < V. 低 ≤V 诊<V 基 ≤V 高 All speed units are in m / s. When selectable speeds are available and the time budget is sufficient, the execution drive module adjusts the speed through a controlled acceleration and deceleration process and confirms the motion status with encoder feedback; when a diagnostic speed that meets the conditions is lacking, the controller 21 continues to execute the verified cycle schedule.
[0053] The deceleration diagnostic begins with the same motion phase as the baseline response and completes the same specified sweeping stroke. During the diagnostic process, the pump's reflux target and air intake operation settings remain unchanged, the measured dissolved air pressure and reflux flow rate are within the allowable fluctuation range corresponding to the baseline, and the liquid level continuously meets the comparability conditions. These settings focus the comparison on the effluent response caused by changes in the scraping speed.
[0054] The sludge scraping diagnostic module performs motion phase correspondence between the baseline response and the deceleration diagnostic response based on the pre-calibrated response lag time from sludge scraping disturbance to effluent turbidity change, and obtains the peak and average effluent turbidity within the complete response window covering the turbidity change caused by the same sweeping stroke. There is a response lag when the scraper disturbs the water at the effluent detection position, including the hydraulic transport, sampling transport, and instrument response time. During calibration, under stable conditions of influent, liquid level, and dissolved air operation, the time when scraper 8 passes through a known phase and the time when the effluent shows an identifiable and repeatable response are recorded. The test is repeated within the allowable flow rate and liquid level range to obtain the lag time and response tail duration for the corresponding operating conditions. Controller 21 associates motion and effluent data according to "corresponding response time = action time + response lag time", with each time unit being seconds; the stroke can be divided into segments at the same position, and the corresponding response is associated with the actual passage time to ensure that the motion phase before and after deceleration corresponds.
[0055] When the reduction in the peak turbidity of the effluent relative to the baseline response reaches the preset improvement threshold, the increase in the average turbidity of the effluent does not exceed the preset allowable deviation, and the prescribed sweeping action can be completed within the upper limit of the sludge scraping cycle at the diagnostic speed, the diagnostic speed is determined as the subsequent sludge scraping speed, and the sludge scraping start time is advanced or the stop time is shortened according to the increase in running time. If the reduction in peak turbidity of the effluent does not reach the preset improvement threshold, the increase in average turbidity of the effluent exceeds the preset allowable deviation, or the diagnostic speed cannot meet the operational constraints, the current diagnostic speed will not be used, and the verified sludge scraping operation procedure will be restored.
[0056] The baseline and rate-reduction diagnostics use the same statistical duration and sampling interval. The window starts from the response of each initial action, covers the response of the complete specified stroke at the slower speed, and includes the tail segment. Records affected by this action but separated from those affected by other sludge scraping or dissolved gas regulation are selected. The effective turbidity values within the window are summed and divided by the number of effective samples to obtain the average value. The maximum value is taken as the peak value. The unit of measurement for turbidity is NTU, and the number of effective samples is a positive integer. The following differences are calculated from the two windows: Peak value reduction = Baseline peak value - Diagnostic peak value; Average value increase = Diagnostic average value - Baseline average value. Both differences are measured in NTU. The peak improvement threshold is determined based on the peak difference during normal repeated operation and the required degree of improvement, and is a positive value; the average tolerance deviation is determined based on instrument repeatability and allowable effluent fluctuations, and is a non-negative value. When the peak reduction reaches the improvement threshold, the average increase does not exceed the tolerance deviation, and the diagnostic speed meets the cycle budget, controller 21 retains the current speed; other evaluation results correspond to the restoration of the validated sludge scraping procedure. This evaluation reflects the effect of this speed adjustment; subsequent dissolved air regulation is triggered separately by a continued abnormal effluent condition.
[0057] When using a lower speed, the controller 21 starts earlier or shortens the pause based on the increase in running time, and recalculates the acceleration and deceleration process. For the cases where a constant reference speed and a diagnostic speed are used respectively within the same specified stroke, the increase is: Increase in running time = Specified stroke / Diagnostic speed - Specified stroke / Reference speed; In the formula, the unit of travel distance is m, both speeds are positive and the unit is m / s, and the unit of operating time increment is s. By coordinating speed and start-stop schedules, the slag scraping action, which reduces disturbance, still meets the periodic requirement for timely slag removal; after the effluent returns to normal, the sweeping action continues to be executed according to the periodic schedule.
[0058] Specifically, such as Figure 6As shown, after the dissolved air conditioning module completes the effect evaluation of the deceleration diagnosis, if the effluent turbidity still exceeds the preset abnormal threshold and continues to reach the preset judgment time, then, provided that the detection information is valid, comparable operating conditions are met, and the remaining available time meets the adjustment and response evaluation requirements, the established sludge scraping operation procedure remains unchanged. The treated water return flow rate is used as the adjustment amount, and the operation of the dissolved air unit is controlled according to the preset adjustment step size. The air intake rate is also adjusted to ensure that the actual dissolved air pressure and return flow rate are within the pre-calibrated operating range. After verifying that the actual dissolved air pressure and return flow rate match the adjustment command, the effluent turbidity response is obtained according to the pre-calibrated dissolved air conditioning response lag time and compared with the... The effluent turbidity response before the next adjustment is compared; when the improvement in effluent turbidity reaches the preset effective adjustment threshold, the corresponding dissolved air operating parameters are retained; when the improvement does not reach the preset effective adjustment threshold, no preset deterioration state occurs, the execution feedback is normal, and the preset adjustment number, adjustment range, and adjustment time upper limit are not reached, the next adjustment is continued; when a preset deterioration state occurs, the execution feedback is abnormal, the detection information or comparable operating conditions fail, or any adjustment upper limit is reached, the step-by-step adjustment is stopped, and the system reverts to the verified operating parameters that still meet the current operating constraints; when there are no verified operating parameters that meet the current operating constraints, an abnormal prompt message is generated.
[0059] After evaluating the effectiveness of the rate reduction diagnosis, if the effluent turbidity still exceeds the abnormal threshold and continues to reach the judgment duration, then dissolved air step-by-step adjustment will begin when the above evaluation conditions are met. During the adjustment period, the determined scraping speed, specified stroke, start-up phase, and pause schedule will be maintained, with the treated water return flow rate as the adjustment target, and the air inlet valve opening will be adjusted accordingly. This embodiment adopts a method of gradually increasing the return flow target within the calibrated range: Next return flow target = min(current return flow target + adjustment step size, return flow upper limit) In the formula, the units for each flow rate and step size are m³ / h, and the step size is a positive value. The initial target, upper and lower limits of reflux, and step size are determined through actual dissolved air flotation (DAF) operation tests. The tests vary the reflux flow rate and the opening of the air inlet valve within the limits of reflux water supply capacity, pump operating conditions, dissolved air tank processing capacity, and allowable hydraulic load of the flotation tank. The tank pressure, actual reflux flow rate, release status, and effluent response are recorded to form the target range for stable operation and the correspondence between the reflux target and the opening of the air inlet valve.
[0060] The drive module uses the measured value from the return flow detection component 24 as feedback to adjust the frequency of the inverter in the return dissolved gas pressurization pump 14. The corresponding direction and effective range of the pump frequency and return flow are obtained through fixed-frequency testing. Within the effective range where the frequency increases and the flow rate increases, the frequency is slightly increased when the flow rate is below the target allowable range and slightly decreased when it is above the range, and then maintained once it enters the allowable range. The frequency step size, waiting time, and allowable frequency boundary are determined by pump and pipeline testing, and the tank pressure is checked simultaneously during the adjustment process.
[0061] The intake assembly 13 operates in accordance with the calibrated correspondence between the return flow target and the valve opening, and its execution is confirmed by the solenoid valve's position or the completion of the specified action conditions. This adjustment step is confirmed when the absolute value of the difference between the measured return flow rate and the target is within the preset flow rate deviation, the actual tank pressure is within the preset upper and lower limits, and this stability period is maintained. The flow rate deviation is in m³ / h, the pressure is in MPa, and the stability period is in seconds; all parameters are determined based on the equipment's allowable range and stable operation tests. If the action waiting limit is reached but the conditions for confirmation are still not met, the controller 21 switches to abnormal handling.
[0062] The response hysteresis of dissolved air conditioning is calibrated through a controllable backflow step test under a fixed sludge scraping program. The effluent response and tail section are observed starting from the moment when the actual pressure and flow rate reach the execution confirmation conditions. Complete windows of the same length and corresponding sludge scraping phases are selected before and after conditioning, using the aforementioned turbidity statistics method. After completing this step's response evaluation, the setting is then determined to be retained or proceed to the next step. The improvement in effluent turbidity is calculated using the following formula: Improvement in effluent turbidity = Average turbidity before conditioning - Average turbidity after conditioning; The improvement amount is measured in NTU, and the effective adjustment threshold is a positive value greater than the normal repeated measurement fluctuation. When the increase in average turbidity or peak turbidity exceeds its respective allowable value, a deterioration state is formed. The allowable value is a non-negative value calibrated according to normal fluctuation and process tolerance. Controller 21 first checks the execution status, operating condition comparability, deterioration state, and adjustment boundary, and then evaluates the improvement amount; if all operating conditions are effective and the improvement amount reaches the threshold, the current setting is retained. If the improvement amount is lower than the threshold, the aforementioned deterioration state does not occur, and there is still an adjustment margin, the next adjustment step continues.
[0063] The adjustment margin is determined by the preset number of times, the cumulative flow adjustment range relative to the initial target, and the total duration of the entire trial adjustment process. These three factors are recorded as the number of times, m³ / h, and s, respectively, and are accumulated throughout each step. If the next planned execution and observation arrangements are within the upper limits of each factor and there is still actual flow adjustment space, the trial adjustment continues. If any boundary is reached, deterioration or execution anomalies occur, evaluation conditions fail, or the sludge scraping program changes, the trial adjustment ends, and the system reverts to the verified pump frequency, return flow target, and air inlet valve opening that are still applicable to the current operating conditions. The restored pressure and flow rate are then checked. If applicable settings are missing, an output anomaly and inlet water limit warning are displayed.
[0064] Specifically, such as Figure 5 As shown, the cycle management module determines the completion of a specified sweeping action and records the completion time when the cumulative sweeping stroke reaches the preset specified stroke and the corresponding reference position is confirmed, based on the motion information of the scraper 8 obtained by the detection unit. The completion time of the last specified sweeping action is used as the timing start point of the current slag scraping cycle. In this embodiment, one complete cycle of the drive chain 7 is considered a defined sweeping action, with the defined stroke being Lc. The cumulative stroke targets are Lc, 2Lc, and 3Lc sequentially. When the cumulative stroke reaches the next target and the calculated phase passes through the corresponding reference position, the cycle management module records the sampling time at which the target is first confirmed, as the completion time of one mechanical sweep. When adjacent sampling crosses the reference position, the passing event is confirmed by the continuous movement direction and the cumulative number of revolutions. The allowable error of the reference position is determined by the encoder resolution, chain movement gap, and sampling period. Each target corresponds to one completion record.
[0065] The current cycle uses the last mechanical completion time as the starting point for timing, and its corresponding cumulative travel target as the travel baseline. The difference between the current cumulative distance and the target is the completed travel. Travel caused by sampling crossing the target is also included. Timing covers the time spent on operation, pauses, observation, and normal shutdowns. Sampling confirmation errors are included in the operating time margin. The specified travel can also be calibrated based on the number of scrapers, spacing, and effective scum scraping section length, and the start and end phases are determined simultaneously, so that normal scum scraping and diagnosis use the same mechanical action definition. Mechanical completion records are used to measure action intervals, and the scum conveying effect is evaluated by calibration tests and effluent response.
[0066] The cycle management module determines the temperature change trend based on the surface water temperature information within the preset sampling period, determines the current operating conditions by combining the influent flow rate and influent turbidity, and determines the upper limit of the candidate cycle based on the calibration correspondence between the operating conditions and the allowable scraping cycle established in advance through actual wastewater scraping tests. The cycle management module calculates the change trend of surface water temperature at the beginning, middle, and end points, respectively. The rate of change can be expressed as the difference within a preset sampling period: Water temperature change rate = (Current water temperature - Initial water temperature of the period) / Sampling period length; In the formula, the two water temperatures are from the same detection component and are expressed in °C; the sampling period length is expressed in seconds and is greater than zero; the rate of change is expressed in °C / s, with positive and negative values representing temperature rise and fall, respectively, and the absolute value representing the rate of change. Temperature data can be averaged over a short period, and the averaging and differential periods should be kept consistent during calibration and operation. Each temperature and rate of change, along with the influent flow rate and influent turbidity, collectively characterizes the current operating conditions, and their relationship with the sludge scraping cycle is determined by actual wastewater testing.
[0067] When calibrating the corresponding cycle, within the predetermined liquid level, allowable scraping speed, and dissolved air operating range, the water temperature distribution, temperature rise and fall trends, inlet flow rate, and inlet turbidity are varied at three points, and the interval between two adjacent specified sweeping actions is changed in stages. For each stage, the continuity of scum conveying to the scum collection tank 9, the scum adhesion status of the scraper 8 and guide plate 10, the operating status of the mechanism, and the complete effluent turbidity response are recorded. The scum status can be observed and recorded by the operator during the calibration period. The valid conditions are no accumulation or scum adhesion affecting continuous conveying, normal operation of the mechanism, and effluent response meeting process requirements. The allowable interval is confirmed through repeated tests, and then the cycle safety margin is deducted to form the upper limit of the candidate cycle.
[0068] The upper limit of the candidate cycle = the allowable interval confirmed by the test - the safety margin of the cycle; where the time unit is seconds; the safety margin of the cycle is determined based on repeated tests and fluctuations under representative operating conditions, and is a positive value less than the allowable interval. The resulting upper limit of the cycle meets the operational requirements of the specified action within the allowable speed range. The controller 21 stores the intervals of the three water temperatures, their respective rates of change, influent flow rate, and influent turbidity in correspondence with the upper limit of the candidate cycle. The intervals are divided by including the lower endpoint and excluding the upper endpoint, with the outermost upper boundary included in the effective range; overlapping records take the shorter verified cycle. During operation, candidate values are obtained by looking up a table, and the applicable scope is the wastewater batches, pretreatment conditions, and equipment structure covered by the actual test; when the relevant conditions change significantly, the corresponding relationship is updated through verification and calibration.
[0069] At the start of a new slag scraping cycle, the upper limit of the candidate cycle is set as the upper limit of the current slag scraping cycle. Within the same slag scraping cycle, if the newly determined upper limit of the candidate cycle is less than the upper limit of the current slag scraping cycle, the newly determined upper limit of the candidate cycle is used for updating. If the newly determined upper limit of the candidate cycle is greater than or equal to the upper limit of the current slag scraping cycle, the upper limit of the current slag scraping cycle remains unchanged.
[0070] At the start of a new cycle, controller 21 uses the candidate value corresponding to the current operating condition as the cycle upper limit. Within the same cycle, the upper limit is updated using the following formula: Updated cycle upper limit = min(current cycle upper limit, new candidate cycle upper limit); In the formula, min represents taking the smaller value, and the unit of the upper limit for each cycle is seconds. This update method keeps the upper limit of the same cycle unchanged or tightens it according to the operating conditions, and the timing start point always corresponds to the last mechanical completion time; the next cycle is initialized with the new candidate value. Therefore, the waiting time that has occurred when the operating conditions are restored is still included in the current cycle. When the updated upper limit is less than the time already used, the controller 21 rearranges the operation according to the time shortage handling method described later.
[0071] The cycle management module determines the elapsed time based on the time difference between the current time and the start of the timing, determines the remaining running time based on the unfinished prescribed sweeping stroke and the proposed slag scraping speed, and adds up the elapsed time, the remaining running time, the planned additional waiting time, and the preset time margin, and compares it with the current upper limit of the slag scraping cycle. Among these, the running time used to complete the remaining prescribed sweeping stroke during the diagnosis period is included in the remaining running time, but is not counted again in the additional waiting time. The cycle management module obtains the completed stroke based on the encoder record and determines the remaining stroke and the running time at the planned speed according to the following relationship: Remaining stroke = max(Specified stroke - Completed stroke, 0); Remaining running time = Remaining stroke / Planned speed; In the formula, `max` represents the larger value, and the unit of travel is meters (m); the proposed speed is the positive speed selected for continuing or resuming operation, and the unit is m / s; the remaining running time is in seconds (s). When using segmented speeds, each segment of travel is divided by its corresponding speed and then summed; the extra time for starting, acceleration / deceleration, and stopping is included in the running time margin based on actual measurements. The time arrangement within the cycle satisfies the following formula: Elapsed time + Remaining running time + Extra waiting time + Time margin ≤ Cycle upper limit; In the formula, the time unit is seconds (s). Elapsed time is the time difference between the current moment and the start of the cycle; additional waiting time includes planned pauses, stabilization waits, and response observations requiring separate time; time margin is a positive value determined based on sampling, communication, velocity estimation, and start / stop delays, and is included separately from the cycle safety margin when forming the candidate upper limit. Completed motion is included in the completed journey, subsequent motion is included in the remaining running time, and additional waiting only counts time occupied separately from mechanical operation.
[0072] When the budget meets the above formula, controller 21 starts as planned, continues slag scraping, or schedules a stop and diagnostics. If the budget exceeds the upper limit, the extra waiting time is first cancelled, and then the operating speed and start-up timing are rearranged within the calibrated speed range. If the timeout still occurs after rearrangement, diagnostics and dissolved air commissioning are suspended, and an influent limit warning is output. Operators or existing higher-level process management departments should then take measures to reduce or postpone the influent. The time budget for diagnostics and commissioning covers the execution process, the complete response window, and the remaining specified stroke. The cycle is continuously calculated during the observation period. When subsequent necessary slag scraping makes the window incomparable, controller 21 ends the current comparison and executes the cycle arrangement.
[0073] When the accumulated result does not exceed the upper limit of the current sludge scraping cycle, generate sludge scraping start, continue operation, stop or diagnostic instructions according to the plan; when the accumulated result exceeds the upper limit of the current sludge scraping cycle, cancel the extra wait and re-determine the operating speed and start time within the pre-calibrated allowable sludge scraping speed range; if the operating constraints still cannot be met after the rescheduling, suspend diagnostics and step-by-step adjustment and generate inlet water limit prompt information.
[0074] When the actual motion information of the scraper 8 does not match the drive command of the geared drive motor 5 and the preset fault judgment condition is met, the execution drive module controls the geared drive motor 5 to stop running and generates a fault prompt message; after the fault is cleared, the detection information is restored to be valid and the current operating condition is within the applicable range of the calibration correspondence, the operation is resumed according to the newly determined slag scraping operation time schedule.
[0075] The drive execution status is determined by comparing encoder feedback with similar speed commands. If, after the allowable transition time for starting or changing speed ends, the absolute value of the difference between the two values exceeds the preset speed tolerance and continues to reach the fault judgment time, or if no corresponding shaft rotates after the allowable start time has elapsed following a valid start command, a drive abnormality is determined. If rotation continues after the allowable stop time has elapsed following a stop, a stop abnormality is initiated. The speed tolerance is in m / s, and the judgment time is in seconds, calibrated based on normal start-up, speed change, and low-speed operation records. When the above abnormalities occur, the controller 21 issues a stop command and outputs a fault message.
[0076] The mechanical completion judgment is based on the assumption that the encoder reference is valid and the chain and scraper connections are normal. If the encoder data or reference fails, the judgment will switch to a pending verification state; problems such as broken chains and loose connections will be resolved after shutdown maintenance and reference verification. If the pressure or reflux feedback fails, or the tank pressure exceeds the allowable working boundary, the controller 21 will end the trial adjustment and, depending on the nature of the fault, close the electronically controlled air intake regulating valve, stop the reflux dissolved gas pressurization pump 14, and output a check prompt.
[0077] If the test data is temporarily invalid or the current operating condition exceeds the calibrated range, the controller 21 suspends the corresponding diagnostics and adjustments. If the mechanical conditions are valid and a conservative procedure is applicable to the current operating condition, the necessary slag scraping continues according to that procedure. In other cases, an abnormal output and a water inlet restriction warning are issued. After the fault is cleared, the data is continuously valid and reaches a stable condition, and the mechanical reference is verified, the controller 21 rearranges the operation based on the current operating condition and the retained cycle records. The time elapsed during normal shutdown is included in the original cycle, and the cycle record for the first commissioning is established based on the actual completed specified sweeping actions.
[0078] The aforementioned pre- and post-processing stages, conventional support and fastening and speed reduction transmission, sensors and interfaces, compressed air supply and air circuit components, pressure reduction and release structure, PLC and driver, as well as pressure protection and maintenance pressure relief structure can all be implemented using existing technologies, and this application does not impose any special limitations on them.
[0079] Through the above coordination, the controller 21 determines the sludge scraping cycle based on temperature and inlet water conditions, and mechanically records and coordinates the sludge scraping speed and start / stop schedule to reduce disturbance while timely conveying sludge; then, based on the complete turbidity response and actual pressure and flow feedback, it evaluates the dissolved air regulation effect to ensure that the retained operating settings are adapted to the current treatment conditions.
[0080] The above description of the embodiments enables those skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A device for purifying and treating wastewater from the enzymatic hydrolysis of dodecyl stearate, comprising an equipment frame and a flotation tank equipped with an inlet pipe and an outlet pipe, characterized in that, Also includes: The drive unit is mounted on the equipment frame and is connected to the scraper drive located at the top of the flotation tank to drive the scraper to push the scum to the scum collection tank located at one end of the flotation tank. The dissolved air unit is connected between the effluent pipe and the flotation tank to pressurize and dissolve part of the treated water before releasing it into the flotation tank. The detection unit is installed in the flotation tank, related water circuits and sludge scraping transmission parts to obtain information on surface water temperature, influent flow rate, influent and effluent turbidity, liquid level, scraper movement and dissolved air operation. The controller is installed on the equipment rack. The controller determines the upper limit of the sludge scraping cycle based on the surface water temperature and its changing trend obtained by the detection unit. It maintains or tightens the upper limit within the same cycle. It determines the completion status of the specified sweeping action based on the scraper movement information. The controller controls the operation of the drive unit with the operating constraint that the time interval between two consecutive specified sweeping actions does not exceed the upper limit of the sludge scraping cycle. When the effluent turbidity is abnormal and the remaining cycle time meets the diagnostic requirements, the controller performs constant stroke deceleration diagnosis while keeping the dissolved air operating parameters unchanged. It adjusts the scraping speed and start-up timing based on the effluent turbidity response before and after deceleration. When the effluent turbidity remains abnormal, it controls the dissolved air unit to adjust the dissolved air operating parameters step by step while keeping the scraping operation program unchanged.
2. The device for purifying and treating wastewater from the enzymatic hydrolysis of dodecyl stearate according to claim 1, characterized in that, The drive unit includes a geared drive motor mounted on the equipment frame. Sprockets are rotatably arranged on both sides of the flotation tank. A transmission chain is wound between the sprockets on the same side. The two ends of the scraper are connected to the transmission chains on both sides respectively. Two sprockets located at the same end of the flotation tank are connected by a transverse drive shaft. The output end of the speed reduction drive motor is connected to the transverse drive shaft to drive the drive chains on both sides to move synchronously and cyclically, so that the scraper pushes the scum to the scum collection tank along the length of the flotation tank. A guide plate is connected between the flotation tank and the slag collection tank. The guide surface of the guide plate is matched with the movement trajectory of the scraper when it turns around the sprocket, so that the slag enters the slag collection tank along the guide plate.
3. The device for purifying and treating wastewater from the enzymatic hydrolysis of dodecyl stearate according to claim 1, characterized in that, The dissolved air unit includes a dissolved air tank and a reflux dissolved air pressurization pump. The inlet of the reflux dissolved air pressurization pump is connected to the outlet pipe through a reflux pipe, and its outlet is connected to the dissolved air tank so as to pressurize part of the treated water and deliver it to the dissolved air tank. The dissolved air tank is connected to an air inlet assembly and is connected to the flotation tank through a release pipe. The air inlet assembly supplies air to the dissolved air water preparation channel, and the release pipe releases the dissolved air water into the flotation tank. A baffle is installed at one end of the flotation tank near the inlet pipe, and a release pipe is installed inside the flotation tank on the side of the baffle facing the inlet pipe.
4. The device for purifying and treating wastewater from the enzymatic hydrolysis of dodecyl stearate according to claim 1, characterized in that, The detection unit includes: The inlet detection component and the outlet detection component are respectively installed on the inlet pipe and the outlet pipe. The inlet detection component obtains the inlet flow rate and inlet turbidity before entering the flotation tank, and the outlet detection component obtains the turbidity of the effluent after flotation treatment. A liquid level detection component is installed on the flotation tank to obtain liquid level information in the flotation tank; a front water temperature detection component, a middle water temperature detection component, and a rear water temperature detection component are installed at intervals along the water flow direction, and their detection ends correspond to the surface water of the inlet section, the middle section, and the outlet section of the flotation tank, respectively. The slag scraper position detection component is located at the output transmission part of the geared drive motor to obtain motion information for determining the scraper running speed, cumulative sweeping stroke and motion phase, as well as reference position information. The dissolved gas pressure detection component is installed on the dissolved gas tank, and its pressure tap is connected to the inside of the dissolved gas tank to obtain the actual dissolved gas pressure; the reflux flow detection component is installed on the reflux pipe to detect the reflux flow rate entering the reflux dissolved gas pressurization pump through the reflux pipe.
5. The device for purifying and treating wastewater from the enzymatic hydrolysis of dodecyl stearate according to claim 1, characterized in that, The controller is equipped with: The information acquisition module acquires the detection information of the detection unit, forms an operation record corresponding to the detection time, and judges the validity of the detection information, excluding invalid sampling information during detection failure and during the cleaning of detection components from the evaluation of adjustment effect. The cycle management module determines the upper limit of the sludge scraping cycle and the remaining available time based on surface water temperature information, inlet water conditions, and completion records of specified sweeping actions, and generates a sludge scraping operation schedule. The sludge scraping diagnostic module determines the rate reduction diagnostic conditions based on the abnormal turbidity of the effluent and the remaining available time, and generates sludge scraping operation parameters based on the turbidity response of the effluent before and after the rate reduction. The dissolved air regulation module generates step-by-step adjustment instructions for dissolved air operating parameters when the effluent turbidity is continuously abnormal, and determines the dissolved air operating parameters based on the adjusted effluent turbidity response. The execution drive module controls the operation of the drive unit according to the slag scraping operation schedule and slag scraping operation parameters, controls the operation of the dissolved gas unit according to the step adjustment instructions, and feeds back the execution results to the information acquisition module.
6. The device for purifying and treating wastewater from the enzymatic hydrolysis of dodecyl stearate according to claim 5, characterized in that, When the effluent turbidity exceeds the preset abnormal threshold and continues to reach the preset judgment time, the sludge scraping diagnosis module compares the current influent flow rate, influent turbidity, liquid level and surface water temperature with the corresponding information in the benchmark operation record to determine whether the preset comparable operating conditions are met. When the detection information is valid, meets the comparable operating conditions, and the remaining available time meets the time requirements for completing the deceleration diagnosis and the specified sweeping action, the effluent turbidity response that completes the specified sweeping stroke at the benchmark scraping speed in the benchmark operation record is selected as the benchmark response, and a diagnostic speed lower than the benchmark scraping speed is determined within the pre-calibrated allowable scraping speed range; while keeping the dissolved air operating parameters unchanged and the liquid level fluctuation meets the comparable operating conditions, the drive module controls the drive unit to drive the scraper to complete the same sweeping stroke corresponding to the benchmark response at the diagnostic speed; When the detection information is invalid, does not meet the comparable operating conditions, or has insufficient remaining available time, the deceleration diagnosis is suspended; if the above conditions fail during the deceleration diagnosis process, the current response comparison is terminated, and slag scraping is performed according to the running time schedule determined by the cycle management module.
7. The device for purifying and treating wastewater from the enzymatic hydrolysis of dodecyl stearate according to claim 6, characterized in that, The sludge scraping diagnostic module performs motion phase correspondence between the baseline response and the deceleration diagnostic response based on the pre-calibrated response lag time from sludge scraping disturbance to effluent turbidity change, and obtains the effluent turbidity peak value and average value within the complete response window covering the turbidity change caused by the same sweeping stroke. When the reduction in the peak turbidity of the effluent relative to the baseline response reaches the preset improvement threshold, the increase in the average turbidity of the effluent does not exceed the preset allowable deviation, and the prescribed sweeping action can be completed within the upper limit of the sludge scraping cycle at the diagnostic speed, the diagnostic speed is determined as the subsequent sludge scraping speed, and the sludge scraping start time is advanced or the stop time is shortened according to the increase in running time. If the reduction in peak turbidity of effluent does not reach the preset improvement threshold, the increase in average turbidity of effluent exceeds the preset allowable deviation, or the diagnostic speed cannot meet the operational constraints, the current diagnostic speed will not be used, and the verified sludge scraping operation procedure will be restored.
8. The device for purifying and treating wastewater from the enzymatic hydrolysis of dodecyl stearate according to claim 7, characterized in that, After the dissolved air regulation module completes the effect evaluation of the deceleration diagnosis, if the effluent turbidity still exceeds the preset abnormal threshold and continues to reach the preset judgment time, then when the detection information is valid, the comparable operating conditions are met, and the remaining available time meets the regulation and response evaluation requirements, the determined sludge scraping operation program remains unchanged. The treated water return flow rate is used as the adjustment amount, and the operation of the dissolved air unit is controlled according to the preset adjustment step size. The air intake is also adjusted to ensure that the actual dissolved air pressure and return flow rate are within the pre-calibrated operating range. After verifying that the actual dissolved air pressure and reflux flow rate match the adjustment command, the effluent turbidity response is obtained according to the pre-calibrated dissolved air adjustment response lag time and compared with the effluent turbidity response before this adjustment; when the improvement in effluent turbidity reaches the preset effective adjustment threshold, the corresponding dissolved air operating parameters are retained. If the improvement amount does not reach the preset effective adjustment threshold, no preset deterioration state occurs, the execution feedback is normal, and the preset adjustment number, adjustment range, and adjustment time limit are not reached, the next adjustment will continue. When a preset deterioration state occurs, execution feedback is abnormal, detection information or comparable operating conditions fail, or any of the aforementioned adjustment limits are reached, the step-by-step adjustment is stopped, and the operation parameters that have been verified and still meet the current operating constraints are rolled back; if there are no verified operating parameters that meet the current operating constraints, an abnormal prompt message is generated.
9. The device for purifying and treating wastewater from the enzymatic hydrolysis of dodecyl stearate according to claim 5, characterized in that, The cycle management module determines the completion of a specified sweeping action and records the completion time when the cumulative sweeping stroke reaches the preset specified stroke and the corresponding reference position is confirmed, based on the scraper movement information obtained by the detection unit. The completion time of the last specified sweeping action is used as the timing start point of the current slag scraping cycle. The cycle management module determines the temperature change trend based on the surface water temperature information within the preset sampling period, determines the current operating conditions by combining the influent flow rate and influent turbidity, and determines the upper limit of the candidate cycle based on the calibration correspondence between the operating conditions and the allowable scraping cycle established in advance through actual wastewater scraping tests. At the start of a new slag scraping cycle, the upper limit of the candidate cycle is set as the upper limit of the current slag scraping cycle; Within the same slag scraping cycle, if the newly determined upper limit of the candidate cycle is less than the current upper limit of the slag scraping cycle, the newly determined upper limit of the candidate cycle is used for updating; if the newly determined upper limit of the candidate cycle is greater than or equal to the current upper limit of the slag scraping cycle, the current upper limit of the slag scraping cycle remains unchanged.
10. The device for purifying and treating wastewater from the enzymatic hydrolysis of dodecyl stearate according to claim 9, characterized in that, The cycle management module determines the elapsed time based on the time difference between the current time and the timing start point, determines the remaining running time based on the unfinished prescribed sweeping stroke and the proposed slag scraping speed, and accumulates the elapsed time, the remaining running time, the planned additional waiting time, and the preset time margin, and compares it with the current upper limit of the slag scraping cycle. Among them, the running time used to complete the remaining prescribed sweeping stroke during the diagnosis period is included in the remaining running time, and is not counted again in the additional waiting time. When the accumulated result does not exceed the current sludge scraping cycle limit, generate sludge scraping start, continue operation, stop or diagnostic instructions according to the plan; when the accumulated result exceeds the current sludge scraping cycle limit, cancel the extra wait and re-determine the operating speed and start time within the pre-calibrated allowable sludge scraping speed range; if the operation constraints still cannot be met after the rescheduling, suspend the diagnostic and step-by-step adjustment and generate water inlet limit prompt information. When the actual motion information of the scraper does not match the drive command of the reduction drive motor and the preset fault judgment condition is met, the execution drive module controls the reduction drive motor to stop running and generates a fault prompt message; after the fault is cleared, the detection information is restored to be valid and the current operating condition is within the applicable range of the calibration correspondence, the operation is resumed according to the newly determined slag scraping operation time schedule.
