A Multi-Disturbance Adaptive Control Method for the Biochemical Pool of a Dredging Wastewater Treatment Platform
By monitoring the influent water quality and wave level, calculating the water quality and disturbance index, and dynamically adjusting the water level in the biological treatment tank, the problem of inaccurate hydraulic residence time in the platform vessel's biological treatment tank under wave and water quality disturbance was solved, and the system's adaptive control and stable operation were achieved.
Patent Information
- Application Number
- CN202511933287.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-19
- Publication Date
- 2026-11-17
AI Technical Summary
Platform vessel biochemical tanks face problems such as inaccurate hydraulic residence time and poor system stability under wave disturbance and water quality fluctuations, and lack effective intelligent water level control methods.
By monitoring influent water quality parameters and environmental wave levels, calculating comprehensive water quality index and comprehensive disturbance index, and dynamically adjusting the water level of the biological treatment tank, a dual-track decision-making system of water quality and water level is achieved. Combined with water level regulation to optimize system volume and biological environment, adaptive control is formed.
Stable operation of the system was achieved under the dual disturbances of waves and water quality, optimizing processing efficiency, reducing energy consumption, and improving the overall performance of the platform vessel.
Smart Images

Figure CN123105834A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of environmental protection and water treatment technology, and in particular to a multi-disturbance adaptive control method for the biochemical pool of a dredging wastewater treatment platform vessel based on dynamic water level regulation. Background Technology
[0002] With increasingly stringent water environment management standards, domestic requirements and standards for dredged wastewater discharge are constantly rising. Traditional fixed onshore treatment facilities, due to their large footprint, long cycle time, and difficulty in site selection, are no longer suitable for the flexibility and timeliness requirements of mobile dredging operations. Therefore, integrating a complete water treatment system onto a vessel platform to construct a mobile, modular floating treatment facility for efficient in-situ treatment of dredged wastewater has become an inevitable direction for industry development and a fundamental technological breakthrough from the limitations of traditional land-based treatment models.
[0003] The combined AO (anaerobic-aerobic) and MBR (membrane bioreactor) biochemical process has become the preferred technology for platform vessels due to its advantages such as small footprint, relatively flexible water level, high treatment efficiency, and excellent effluent quality. However, applying the AO+MBR process to the special carrier of platform vessels faces severe technical challenges.
[0004] First, there's the issue of wave disturbance. The continuous rocking of the hull not only disrupts the hydraulic flow and activated sludge floc structure within the biological treatment tank, but more importantly, it causes continuous fluctuations in the actual effective water volume. This leads to inaccurate calculations of the hydraulic retention time based on a fixed volume.
[0005] Secondly, water quality fluctuations are another major challenge. While the biological processes in wastewater treatment plants typically have relatively stable hydraulic retention times, the quality of dredged wastewater fluctuates significantly depending on the dredging area, season, and other operating conditions, severely threatening system stability. This is especially true for platform vessel biological treatment tanks; when influent water quality deteriorates and the system has no room for adjustment, a fixed hydraulic retention time strategy cannot balance treatment efficiency with consistently meeting standards, severely limiting the platform vessel's performance.
[0006] Furthermore, the biological treatment tanks of platform vessels face the challenge of the interaction and cross-influence of wave disturbances and water quality fluctuations, lacking a unified method for quantifying and coordinating responses to these two different types of disturbances. Therefore, there is an urgent need for an intelligent water level control method that can overcome the constraints of fixed volume and hydraulic residence time, and can coordinately respond to both wave and water quality disturbances. Summary of the Invention
[0007] To address the problems existing in the prior art, this invention provides a multi-disturbance adaptive control method for the biochemical pool of a dredging wastewater treatment platform vessel.
[0008] Therefore, the present invention adopts the following technical solution:
[0009] A multi-disturbance adaptive control method for the biochemical pool of a dredging wastewater treatment platform vessel includes the following steps:
[0010] S1, monitor the influent water quality parameters of the biological treatment tank of the platform ship, and use the corresponding effluent water quality benchmark values of each water quality parameter value to calculate the comprehensive influent water quality index WQI of the biological treatment tank by weighted summation;
[0011] S2. Based on the mapping relationship between the compensation water level H1 and the influent water quality comprehensive index WQI obtained from S1, determine the compensation water level H1 of the biological treatment tank.
[0012] S3, monitoring the influent flow rate Q of the biological treatment tank on the monitoring platform ship. in The environmental wave level W is used to calculate the comprehensive disturbance index IDI by weighted summation;
[0013] S4. Based on the mapping relationship between the anti-disturbance compensation water level H2 and the comprehensive disturbance index IDI obtained in S3, determine the anti-disturbance compensation water level H2 of the biological treatment tank.
[0014] S5. Based on the compensation water level H1 obtained from S2 and the anti-disturbance compensation water level H2 obtained from S4, calculate the target control water level H of the biological treatment tank.
[0015] S6, by adjusting the outlet flow rate Q out The water level in the biological treatment tank is controlled to the target control water level H. When the monitored water level reaches the target control water level, the outflow rate of the biological treatment tank is made equal to the inflow rate to maintain the stability of the water level in the biological treatment tank.
[0016] The influent water quality parameters mentioned in step S1 above include at least one of ammonia nitrogen, total nitrogen, and chemical oxygen demand.
[0017] The formula for calculating the influent water quality comprehensive index (WQI) in step S1 above is as follows:
[0018] WQI=k1·(X1 / X 1-0 )+k2·(X2 / X 2-0 )+k3·(X3 / X 3-0 )+...+k n ·(X n / X n-0 ),
[0019] Where X1, X2, X3...X n The concentration values of various water quality parameters being monitored; X 1-0 X 2-0 X 3-0 ...X n-0 Here are the reference concentrations of the effluent water quality corresponding to the concentrations of each water quality parameter; k1, k2, k3...k nare weight coefficients of the concentration of each water quality parameter, and the sum of all the weight coefficients is 1.
[0020] The mapping relationship between the compensation water level H1 and the inlet water quality comprehensive index WQI described in the above step S2 is:
[0021] When WQI<P1, H1=H a ;
[0022] When P1≤WQI≤P2, H1=H a +(H b -H a )·(WQI-P1) / (P2-P1);
[0023] When WQI>P2, H1=H b ;
[0024] Wherein, H a , H b are preset water level compensation values, H a =[0~0.1m], H b =[0.4~0.6m], and H a <H b ; P1 and P2 are preset WQI thresholds, with the value ranges of P1=[3.0~5.0], P2=[8.0~12.0], and P2>P1.
[0025] The calculation formula of the comprehensive disturbance index IDI described in the above step S3 is:
[0026] IDI=α·(W / W max )+β·|(Q in -Q0) / Q0|,
[0027] Wherein, W is the environmental wave grade; W max is the maximum design wave grade preset by the system; Q in is the measured inlet water flow; Q0 is the system design flow; α and β are preset weight coefficients of the disturbance index, with the value ranges of α=[0.8~1.2] and β=[0.8~1.2], which are used to adjust the contribution ratio of wave disturbance and flow disturbance in the total disturbance.
[0028] The mapping relationship between the anti-disturbance compensation water level H2 and the comprehensive disturbance index IDI described in the above step S4 is:
[0029] When IDI≤D1, H2=H x ;
[0030] When D1<IDI≤D2, H2=H y ;
[0031] When IDI > D2, H2 = H z ;
[0032] Among them, H x H y H z The preset disturbance compensation value has a range of H. x =[0~0.1m],H y =[0.2~0.3m],H z =[0.4~0.6m], and H x <H y <H z D1 and D2 are preset IDI thresholds, with values ranging from D1=[0.5~0.8] and D2=[1.0~1.5].
[0033] The formula for calculating the target control water level H in step S5 above is:
[0034] H=Max(H min ,min(H max ,H0+H1+H2)),
[0035] Among them, H min and H max These represent the minimum and maximum safe water levels of the biological treatment tank, respectively, while H0 is the reference water level of the biological treatment tank.
[0036] Compared with the prior art, the present invention has the following beneficial effects:
[0037] 1. This invention breaks through the limitations of the traditional fixed hydraulic residence time control mode and proposes a dual-track decision-making mechanism of "water quality-water level" and "disturbance-water level". Through dynamic water level regulation, the effective volume and biochemical environment of the system are indirectly and intelligently changed, enabling the treatment process to change from passively following fixed parameters to actively adapting to external dynamic changes. This fundamentally solves the problem of inaccurate process control on platform vessels under fluctuating operating conditions and realizes the system's inherent self-adaptation.
[0038] 2. By establishing a comprehensive water quality index and a comprehensive disturbance index, water quality fluctuations and physical disturbances of different natures are quantitatively integrated on a unified dimension, and finally coordinated compensation is achieved through water level as the core operational variable.
[0039] 3. Through a simple yet efficient control architecture, multiple operational objectives were simultaneously optimized. In terms of treatment efficiency, water quality-driven dynamic water level ensured sufficient reaction capacity for pollutants under varying loads; in terms of operational stability, disturbance-driven water level increases effectively mitigated phase separation disturbances caused by waves; and in terms of operational economy, the system automatically lowered the water level under optimal operating conditions, reducing energy consumption for stirring and aeration, and avoiding ineffective idleness of tank capacity and energy. Ultimately, while ensuring stable compliance with standards, the overall operational performance of the platform vessel was comprehensively improved. Attached Figure Description
[0040] Figure 1 This is a flowchart of the multi-disturbance adaptive control method of the present invention. Detailed Implementation
[0041] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the following embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0042] This invention provides a multi-disturbance adaptive control method for the biochemical pool of a dredging wastewater treatment platform vessel, such as... Figure 1 As shown, it includes the following steps:
[0043] S1, calculate the comprehensive water quality index (WQI) of the influent to the biological treatment tank.
[0044] The influent water quality parameters of the monitoring platform vessel's biological treatment tank must include at least one of ammonia nitrogen, total nitrogen, and chemical oxygen demand. Based on these water quality parameters, the weighted summation of the influent water quality index (WQI) for the biological treatment tank is calculated using the following formula:
[0045] WQI=k1·(X1 / X 1-0 )+k2·(X2 / X 2-0 )+k3·(X3 / X 3-0 )+...+k n ·(X n / X n-0 ),
[0046] Where X1, X2, X3...X n The concentration values of various water quality parameters being monitored; X 1-0 X 2-0 X 3-0 ...X n-0 Here are the reference concentrations of the effluent water quality corresponding to the concentrations of each water quality parameter; k1, k2, k3...k n represents the weighting coefficients for the concentrations of each water quality parameter, and the sum of all weighting coefficients is 1.
[0047] S2, determining the compensation water level H1 of the biochemical tank.
[0048] The compensation water level H1 of the biochemical tank is determined according to the preset mapping relationship between the compensation water level H1 of the biochemical tank and the comprehensive inlet water quality index WQI obtained in S1, wherein the WQI value is positively correlated with the H1 value. The mapping relationship between the compensation water level H1 and the comprehensive inlet water quality index WQI is as follows:
[0049] When WQI<P1, H1=H a ;
[0050] When P1≤WQI≤P2, H1=H a +(H b -H a )·(WQI-P1) / (P2-P1);
[0051] When WQI>P2, H1=H b ;
[0052] Wherein, H a , H b are preset water level compensation values, H a =[0~0.1m], H b =[0.4~0.6m] (empirical value), and H a <H b ; P1 and P2 are preset WQI thresholds, the value ranges are P1=[3.0~5.0], P2=[8.0~12.0] (empirical value), and P2>P1.
[0053] S3, calculating the integrated disturbance index IDI.
[0054] Monitor the inlet flow Q of the biochemical tank on the monitoring platform ship in and the environmental wave grade W. Based on the inlet flow Q in and the environmental wave grade W, the integrated disturbance index IDI is calculated by weighted summation.
[0055] The calculation formula of the integrated disturbance index IDI is as follows:
[0056] IDI=α·(W / W max )+β·|(Q in -Q0) / Q0|,
[0057] Wherein, W is the environmental wave grade; W max is the maximum design wave grade preset by the system; Q inis the measured influent flow rate; Q0 is the system design flow rate; α and β are preset disturbance index weight coefficients, with the value ranges of α=[0.8 to 1.2] and β=[0.8 to 1.2] (empirical values), which are used to adjust the contribution ratio of wave disturbance and flow disturbance in the total disturbance.
[0058] S4, determining the anti-disturbance compensation water level H2 of the biochemical tank.
[0059] The anti-disturbance compensation water level H2 of the biochemical tank is determined according to the mapping relationship between the anti-disturbance compensation water level H2 and the comprehensive disturbance index IDI obtained in S3, wherein the IDI value is positively correlated with the H2 value. The mapping relationship between the anti-disturbance compensation water level H2 and the comprehensive disturbance index IDI is as follows:
[0060] When IDI≤D1, H2=H x ;
[0061] When D1<IDI≤D2, H2=H y ;
[0062] When IDI>D2, H2=H z ;
[0063] Herein, H x , H y , H z are preset disturbance compensation values, with the value ranges of H x =[0 to 0.1m], H y =[0.2 to 0.3m], H z =[0.4 to 0.6m] (empirical values), and H x <H y <H z ; D1 and D2 are preset IDI thresholds, with the value ranges of D1=[0.5 to 0.8] and D2=[1.0 to 1.5] (empirical values).
[0064] S5, calculating the final target control water level H based on the compensation water level H1 obtained in S2 and the anti-disturbance compensation water level H2 obtained in S4, wherein the calculation formula is as follows:
[0065] H=Max(H min , min(H max , H0+H1+H2)),
[0066] Herein, H min and H max are the allowable minimum and maximum safe water levels of the biochemical tank respectively, and H0 is the reference water level of the biochemical tank.
[0067] S6, keeping the influent flow rate unchanged, by adjusting the effluent flow rate Q outThe water level in the biological treatment tank is controlled to the target control water level H. When the monitored water level reaches the target control water level, the outflow rate of the biological treatment tank is made equal to the inflow rate to maintain the water level of the biological treatment tank. Thereafter, the actual water level remains stable at the target control water level.
[0068] Example 1
[0069] In this embodiment, the control index of the biological treatment tank of the dredged wastewater treatment platform vessel is determined by NH4. + Composed of -N, TN, and COD, with the following relevant parameters:
[0070] Maximum safe water level H max =3.8m; minimum safe water level H min =2.85m; Design reference water level H0=3.0m; System design flow rate: Q0=1000 m³ / h 3 / d; Total effective area of the biochemical pool: A=105 m 2 ; Effluent water quality benchmark concentration (based on Class III surface water standard): X 1-0 NH4 + -N=1.0mg / L, X 2-0 TN = 1.0 mg / L, X 3-0 COD = 20 mg / L.
[0071] Weighting coefficients for water quality parameter concentrations: k1=0.4, k2=0.4, k3=0.2;
[0072] Preset perturbation index weighting coefficients: α=1.0, β=1.0;
[0073] Preset maximum design wave level: W max =5;
[0074] Preset water level compensation value: H a =0m, H b =0.5 m:
[0075] Preset WQI thresholds: P1=4.0, P2=10.0;
[0076] Preset disturbance compensation value: H x =0m, H y =0.25m, H z =0.5m;
[0077] Preset IDI thresholds: D1=0.6, D2=1.2.
[0078] The process and results of water level adjustment calculations performed by the dredging wastewater treatment platform vessel based on real-time monitoring data at a certain time are as follows:
[0079] (1) Real-time monitoring data: Influent flow rate Q in =50 m 3 / h; Influent ammonia nitrogen concentration X1=10 mg / L; Influent total nitrogen concentration X2=12 mg / L; Influent COD concentration X3=30 mg / L; Environmental wave level W=4.
[0080] (2) Calculate the influent water quality comprehensive index (WQI):
[0081] WQI=k1·(X1 / X 1-0 )+k2·(X2 / X 2-0 )+k3·(X3 / X 3-0 =0.4×(10 / 1)+0.4×(12 / 1)+0.2×(30 / 20)=9.1.
[0082] The WQI value is 9.1, which is between the thresholds P1 (4.0) and P2 (10.0), indicating a moderate pollution load.
[0083] (3) Determine the compensation water level H1:
[0084] Based on the piecewise function, linear interpolation is used:
[0085] H1=H a +(H b -H a )·(WQI-P1) / (P2-P1)=0+(0.5-0)×(9.1-4) / (10-4)=0.425m.
[0086] (4) Calculate the composite disturbance index IDI:
[0087] IDI=α·(W / W max )+β·|(Q in -Q0) / Q0|=1×(4 / 5)+1×|(50-41.67) / 41.67|=1.
[0088] The IDI value is 1.0, which is between the thresholds D1 (0.6) and D2 (1.2), indicating a moderate level of disturbance.
[0089] (5) Determine the anti-disturbance compensation water level H2: According to the piecewise function, H2 = H y =0.25m.
[0090] (6) Synthetic final target control water level H:
[0091] H=Max(H min ,min(H max, H0+H1+H2))=Max[2.85, min(3.8, 3+0.425+0.25)]=3.675.
[0092] The target control water level was set at 3.675m, based on a baseline water level of 3.0m, with an additional 0.425m for water quality compensation and 0.25m for disturbance mitigation compensation. This water level is within a safe range and can simultaneously meet the requirements for both treatment load and disturbance mitigation.
[0093] (7) Intelligent water level coordination control:
[0094] At this time, the reference water level H0 in the biological treatment tank is lower than the target control water level. The outflow rate Q is adjusted accordingly. out The water level is controlled to the target control water level H. When the monitored water level reaches the target control water level, the outflow rate is made equal to the inflow rate, and thereafter the actual water level remains stable at the target control water level.
[0095] This embodiment demonstrates how the system utilizes parameters for precise intelligent decision-making under combined operating conditions of moderate pollution load (WQI=9.1) and moderate disturbance (IDI=1.0). Calculations show that the P1 / P2 and D1 / D2 thresholds can effectively distinguish different operating condition levels and enable the practical application of the linear compensation range. Under this control strategy, the platform vessel ultimately enters and maintains an optimized operating state of "dynamic equilibrium and precise compensation." By precisely adjusting the water level to 3.675m, the system increases the effective volume to 386m³ (3.675*A), and the hydraulic residence time is correspondingly increased by approximately 22%. This adjustment provides sufficient biochemical reaction conditions for pollutant degradation, ensuring that the effluent water quality consistently meets the Class III surface water standard, and also effectively suppresses wave-induced hull sway by moderately raising the water level, maintaining the stability of the biological phase.
[0096] Example 2
[0097] In this embodiment, the control index of the biological treatment tank of the dredged wastewater treatment platform vessel is determined by NH4. + The composition of -N, TN, and COD is the same as in Example 1. The process and results of water level adjustment calculations performed by the dredged wastewater treatment platform vessel based on real-time monitoring data are as follows:
[0098] (1) Real-time monitoring data: Influent flow rate Q in =55 m 3 / h; Influent ammonia nitrogen concentration X1=25 mg / L; Influent total nitrogen concentration X2=30 mg / L; Influent COD concentration X3=80 mg / L; Environmental wave level W=5.
[0099] (2) Calculate the influent water quality comprehensive index (WQI):
[0100] WQI=k1·(X1 / X 1-0 )+k2·(X2 / X 2-0 )+k3·(X3 / X 3-0 = 0.4 × (25 / 1) + 0.4 × (30 / 1) + 0.2 × (80 / 20) = 22.8
[0101] The WQI value of 22.8 far exceeds the threshold P2 (10.0), indicating that the current influent is under extremely high pollution load and the system needs to activate the highest level of water quality compensation.
[0102] (3) Determine the compensation water level H1: According to the piecewise function, H1 = H b =0.5m.
[0103] (4) Calculate the composite disturbance index IDI:
[0104] IDI=α·(W / W max )+β·|(Q in -Q0) / Q0|=1×(5 / 5)+1×|(55-41.67) / 41.67|=1.32.
[0105] The IDI value is 1.32, which exceeds the threshold D2 (1.2), indicating that the system is experiencing extremely high disturbances caused by the combined effects of maximum wave and severe flow surge, and the highest level of disturbance mitigation compensation needs to be activated.
[0106] (5) Determine the anti-disturbance compensation water level H2: According to the piecewise function, H2 = H z =0.5m.
[0107] (6) Synthetic final target control water level H:
[0108] H=Max(H min ,min(H max , H0+H1+H2))=Max[2.85, min(3.8, 3+0.5+0.5)]=3.8m.
[0109] Therefore, the system automatically limits the target control water level to 3.8m. This reflects the highest priority of safety constraints.
[0110] (7) Intelligent water level coordination control
[0111] At this time, the reference water level H0 in the biological treatment tank is lower than the target control water level. The outflow rate Q is adjusted accordingly. out The water level is controlled to the target control water level H. When the monitored water level reaches the target control water level, the outflow rate is made equal to the inflow rate, and thereafter the actual water level remains stable at the target control water level.
[0112] This embodiment demonstrates the system's coordinated control strategy under extremely harsh conditions of extremely high pollution load (WQI=22.8) and extremely high external disturbance (IDI=1.32). By simultaneously activating a dual maximum compensation mechanism for water quality and disturbance resistance, the system pushes the target control water level to the system's permissible safe upper limit (3.8m), forming a "high-level buffer" operating state. In this state, the system's effective volume increases to its maximum design value, significantly extending the actual hydraulic residence time of pollutants in the biological treatment tank, providing a reliable guarantee for deep degradation. Simultaneously, the high-level water effectively enhances the system's inertia, maintaining the stability of the biological phase, fully demonstrating its strong shock resistance and intelligent ability to coordinate treatment effectiveness and operational stability through water level regulation under extreme conditions.
[0113] Example 3
[0114] In this embodiment, the control index of the biological treatment tank of the dredged wastewater treatment platform vessel is determined by NH4. + The composition of -N, TN, and COD is the same as in Example 1. The process and results of water level adjustment calculations performed by the dredged wastewater treatment platform vessel based on real-time monitoring data are as follows:
[0115] (1) Real-time monitoring data: Influent flow rate Q in =40 m 3 / h; Influent ammonia nitrogen concentration X1=2.5mg / L; Influent total nitrogen concentration X2=3.0 mg / L; Influent COD concentration X3=15mg / L; Environmental wave level W=1.
[0116] (2) Calculate the influent water quality comprehensive index (WQI):
[0117] WQI=k1·(X1 / X 1-0 )+k2·(X2 / X 2-0 )+k3·(X3 / X 3-0 =0.4×(2.5 / 1)+0.4×(3 / 1)+0.2×(15 / 20)=2.35.
[0118] The WQI value is 2.35, which is far below the threshold P1 (4.0), indicating that the current influent has an extremely low pollution load and the water quality is excellent.
[0119] (3) Determine the compensation water level H1: According to the piecewise function, H1 = H a =0m.
[0120] (4) Calculate the composite disturbance index IDI:
[0121] IDI=α·(W / W max )+β·|(Q in-Q0) / Q0|=1×(1 / 5)+1×|(40-41.67) / 41.67|=0.24.
[0122] The IDI value is only 0.24, which is far below the threshold D1 (0.6), indicating that the system is in a very calm operating environment with very little wave and flow disturbance.
[0123] (5) Determine the anti-disturbance compensation water level H2: According to the piecewise function, H2 = H x =0m.
[0124] (6) Synthetic final target control water level H:
[0125] H=Max(H min ,min(H max , H0+H1+H2))=Max[2.85, min(3.8, 3+0+0)]=3m.
[0126] Under low load and low disturbance conditions, both types of compensation are zero, so the final target control water level is the design reference water level of 3.0m.
[0127] (7) Intelligent water level coordination control:
[0128] At this point, the reference water level H0 in the biological treatment tank is equal to the target control water level, ensuring that the outflow rate equals the inflow rate. No adjustments are made to maintain the reference water level.
[0129] This embodiment demonstrates the system's intelligent decision-making under extremely low pollution load (WQI=2.35) and extremely low external disturbance (IDI=0.24) conditions, maintaining the target control water level at the design reference water level (3.0m). Under this control strategy, the platform vessel ultimately enters and maintains a state of "reference water level, design volume, and balanced inflow and outflow." This state ensures that the system achieves stable and compliant effluent while avoiding energy waste caused by unnecessarily high water levels. Equipment such as agitators and aeration systems can operate with optimal energy efficiency under design conditions. Simultaneously, the moderate water level provides sufficient buffer capacity for the system to cope with potential inflow fluctuations, fully demonstrating the economic efficiency and stability of this method under favorable operating conditions, achieving a balance between energy conservation and stable operation.
[0130] Example 4
[0131] In this embodiment, the control index for the dredged wastewater treatment platform vessel is only total nitrogen, and the relevant parameters are as follows:
[0132] Maximum safe water level H max =3.8m; minimum safe water level H min =2.85m; Design reference water level H0=3.0m; System design flow rate: Q0=1000 m³ / h3 / d; Total effective area of the biochemical pool: A=105m 2 ; Effluent water quality standard concentration value: TN(X) 1-0 =6.0 mg / L.
[0133] Weighting coefficient for water quality parameter concentration: k1=1;
[0134] Preset perturbation index weighting coefficients: α=1.0, β=1.0;
[0135] Preset maximum design wave level: W max =5;
[0136] Preset water level compensation value: H a =0m, H b =0.5 m;
[0137] Preset WQI thresholds: P1=4.0, P2=10.0;
[0138] Preset disturbance compensation value: H x =0m, H y =0.25m, H z =0.5m;
[0139] Preset IDI thresholds: D1=0.6, D2=1.2.
[0140] The process and results of water level adjustment calculations performed by the dredging wastewater treatment platform vessel based on real-time monitoring data at a certain time are as follows:
[0141] (1) Real-time monitoring data: Influent flow rate Q in =50m 3 / h; Total nitrogen concentration X1=45.0mg / L; Environmental wave level W=2.
[0142] (2) Calculate the influent water quality comprehensive index (WQI):
[0143] WQI=(X1 / X 1-0 =45 / 6 = 7.5.
[0144] The WQI value is 7.5, which is between the thresholds P1 (4.0) and P2 (10.0), indicating a moderate pollution load.
[0145] (3) Determine the compensation water level H1:
[0146] Based on the piecewise function, linear interpolation is used:
[0147] H1=H a +(H b -H a)·(WQI-P1) / (P2-P1)=0+(0.5-0)×(7.5-4) / (10-4)=0.29m.
[0148] (4) Calculate the composite disturbance index IDI:
[0149] IDI=α·(W / W max )+β·|(Q in -Q0) / Q0|=1×(2 / 5)+1×|(45-41.67) / 41.67|=0.48.
[0150] The IDI value is 0.48, which is lower than the threshold D1 (0.6), indicating that the system wave and flow disturbances are very small.
[0151] (5) Determine the anti-disturbance compensation water level H2: According to the piecewise function, H2 = H x =0m.
[0152] (6) Synthetic final target control water level H:
[0153] H=Max(H min ,min(H max , H0+H1+H2))=Max[2.85, min(3.8, 3+0.29+0)]=3.29.
[0154] The target control water level was set at 3.29m, based on the baseline water level of 3.0m, with an additional 0.29m for water quality compensation and 0m for disturbance resistance compensation.
[0155] (7) Intelligent water level coordination control:
[0156] At this time, the reference water level H0 in the biological treatment tank is lower than the target control water level. The outflow rate Q is adjusted accordingly. out The water level is controlled to the target control water level H. When the monitored water level reaches the target control water level, the outflow rate is made equal to the inflow rate, and thereafter the actual water level remains stable at the target control water level.
[0157] This embodiment demonstrates the intelligent decision-making process of the system under moderate pollution load (WQI=7.5) and low external disturbance (IDI=0.29) conditions. After accurately identifying the characteristics of the current operating conditions, the system, while maintaining the baseline anti-disturbance strategy, initiates appropriate water quality compensation based on the WQI value, raising the operating water level from the baseline of 3.0m to 3.29m. The hydraulic retention time is correspondingly increased by approximately 10%, providing more sufficient reaction conditions for the biological process, and the effluent quality stably meets the relevant requirements. This embodiment fully demonstrates the system's precise response capability under moderate load conditions, achieving an optimal balance between treatment effect and operating cost through minimal necessary adjustments.
Claims
1. A multi-disturbance adaptive control method for the biochemical pool of a dredged wastewater treatment platform vessel, characterized in that, Includes the following steps: S1, monitor the influent water quality parameters of the biological treatment tank of the platform ship, and use the corresponding effluent water quality benchmark values of each water quality parameter value to calculate the comprehensive influent water quality index WQI of the biological treatment tank by weighted summation; S2. Based on the mapping relationship between the compensation water level H1 and the influent water quality comprehensive index WQI obtained from S1, determine the compensation water level H1 of the biological treatment tank. S3, monitoring the influent flow rate Q of the biological treatment tank on the monitoring platform ship. in The environmental wave level W is used to calculate the comprehensive disturbance index IDI by weighted summation; S4. Based on the mapping relationship between the anti-disturbance compensation water level H2 and the comprehensive disturbance index IDI obtained in S3, determine the anti-disturbance compensation water level H2 of the biological treatment tank. S5. Based on the compensation water level H1 obtained from S2 and the anti-disturbance compensation water level H2 obtained from S4, calculate the target control water level H of the biological treatment tank. S6, by adjusting the outlet flow rate Q out The water level in the biological treatment tank is controlled to the target control water level H. When the monitored water level reaches the target control water level, the outflow rate of the biological treatment tank is made equal to the inflow rate to maintain the stability of the water level in the biological treatment tank.
2. The multi-disturbance adaptive control method according to claim 1, characterized in that: The influent water quality parameters mentioned in S1 include at least one of ammonia nitrogen, total nitrogen, and chemical oxygen demand.
3. The multi-disturbance adaptive control method according to claim 2, characterized in that, The formula for calculating the influent water quality comprehensive index (WQI) mentioned in S1 is as follows: WQI=k1·(X1 / X 1-0 )+k2·(X2 / X 2-0 )+k3·(X3 / X 3-0 )+…+k n ·(X n / X n-0 ), Where X1, X2, X3...X n The concentration values of various water quality parameters being monitored; X 1-0 X 2-0 X 3-0 ...X n-0 Here are the reference concentrations of the effluent water quality corresponding to the concentrations of each water quality parameter; k1, k2, k3...k n represents the weighting coefficients for the concentrations of each water quality parameter, and the sum of all weighting coefficients is 1.
4. The multi-disturbance adaptive control method according to claim 3, characterized in that, The mapping relationship between the compensation water level H1 and the influent water quality comprehensive index WQI mentioned in S2 is as follows: When WQI < P1, H1 = H a ; When P1≤WQI≤P2, H1=H a +(H b -H a )·(WQI-P1) / (P2-P1); When WQI > P2, H1 = H b ; Among them, H a H b H is the preset water level compensation value. a =[0~0.1m],H b =[0.4~0.6m], and H a <H b P1 and P2 are preset WQI thresholds, with values ranging from P1=[3.0~5.0] and P2=[8.0~12.0], and P2>P1.
5. The multi-disturbance adaptive control method according to claim 1, characterized in that, The formula for calculating the Integrated Disturbance Index (IDI) mentioned in S3 is as follows: IDI=α·(W / W max )+β·|(Q in -Q0) / Q0|, Where W represents the environmental wave level; W max The maximum design wave level preset by the system; Q in Q0 is the measured influent flow rate; Q0 is the system design flow rate; α and β are preset disturbance index weighting coefficients, with values ranging from α=[0.8~1.2] and β=[0.8~1.2], used to adjust the contribution ratio of wave disturbance and flow disturbance in the total disturbance.
6. The multi-disturbance adaptive control method according to claim 5, characterized in that, The mapping relationship between the anti-disturbance compensation water level H2 and the comprehensive disturbance index IDI mentioned in S4 is as follows: When IDI≤D1, H2=H x ; When D1<IDI≤D2, H2=H y ; When IDI > D2, H2 = H z ; Among them, H x H y H z The preset disturbance compensation value has a range of H. x =[0~0.1m],H y =[0.2~0.3m],H z =[0.4~0.6m], and H x <H y <H z D1 and D2 are preset IDI thresholds, with values ranging from D1=[0.5~0.8] and D2=[1.0~1.5].
7. The multi-disturbance adaptive control method according to claim 6, characterized in that, The formula for calculating the target control water level H mentioned in S5 is as follows: H=Max(H min ,min(H max ,H0+H1+H2)), Among them, H min and H max These represent the minimum and maximum safe water levels of the biological treatment tank, respectively, while H0 is the reference water level of the biological treatment tank.