A conventional quartz sand acid leaching heating system and its control method
By designing an acid leaching heating system and a cleaning heat exchanger, the problem of prolonged heating time for graphite heat exchangers was solved, improving production efficiency and reducing costs.
Patent Information
- Application Number
- CN202611037894.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-13
- Publication Date
- 2026-11-17
AI Technical Summary
In the existing technology, after about six months of use in the acid leaching and quartz sand purification process, the heating time of the graphite heat exchanger is prolonged and the steam flow rate is reduced, which seriously affects the production efficiency.
Design a conventional quartz sand acid leaching heating system, including an acid leaching reaction tank, a hot water circulation pipeline, and an acid heat exchange pipeline. By heat exchange and cleaning the inside of the heat exchanger, heating time is reduced and production efficiency is improved.
By cleaning the inside of the heat exchanger, heating time can be shortened, production efficiency can be improved, and steam and electricity costs can be reduced.
Smart Images

Figure CN123108332A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of non-ferrous metal beneficiation technology, and in particular to a conventional quartz sand acid leaching heating system and its control method. Background Technology
[0002] As resources are continuously exploited and utilized, the resources that can directly meet the needs of downstream industries through traditional physical beneficiation are becoming increasingly scarce. The acid leaching chemical purification process used in the non-ferrous metal beneficiation field has been gradually introduced into the quartz sand purification industry. In the acid leaching quartz sand purification process, graphite heat exchangers are used to heat the acid solution. During the production process, it was found that after about six months of use of the heat exchangers in the acid leaching purification production line, the heating time of each acid leaching reaction tank was extended, and the hourly steam flow rate was reduced, which seriously affected the production efficiency of the production line. Summary of the Invention
[0003] The purpose of this invention is to provide a conventional quartz sand acid leaching heating system and its control method to solve one or more technical problems existing in the prior art, and at least provide a beneficial option or create conditions.
[0004] The technical solution adopted to solve the above-mentioned technical problems is as follows: This invention provides a conventional quartz sand acid leaching heating system, comprising: The acid leaching reaction tank has a sand inlet, a sand outlet, an acid circulation inlet, and an acid circulation outlet. An overflow acid pipeline is connected in series with a hot acid circulation tank, an acid pump, a heat exchanger, and an acid leaching reaction tank. The inlet and outlet of the overflow acid pipeline are respectively connected to the acid circulation inlet and the acid circulation outlet. The heat exchanger includes an acid heat exchange pipeline and a hot water exchange pipeline that exchange heat with each other. The overflow acid pipeline is connected to the acid heat exchange pipeline. A hot water circulation pipeline is connected in series with a hot water tank and a hot water pump. The hot water circulation pipeline can form a circulation pipeline with an acid heat exchange pipeline and can also be connected with a hot water exchange pipeline to form a circulation pipeline.
[0005] The beneficial effects of this invention are: During normal operation of a conventional quartz sand acid leaching heating system, the hot water circulation pipeline and the hot water exchange pipeline are connected to form a circulation pipeline. The acid solution from the acid leaching reaction tank sequentially enters the hot acid circulation tank, the acid pump, and the heat exchanger, and then flows back to the acid leaching reaction tank. The acid solution is heated by heat exchange at the heat exchanger. When the system is paused, the hot water circulation pipeline can form a circulation pipeline with the acid heat exchange pipeline. The hot water pump is started to clean the inside of the acid heat exchange pipeline. By cleaning the inside of the heat exchanger, the heating time of the acid leaching reaction tank is reduced, and the production efficiency is improved.
[0006] As a further improvement to the above technical solution, the overflow acid pipeline is also connected in series with an acid filter, which is located between the acid circulation outlet and the acid inlet of the heat exchanger.
[0007] As a further improvement to the above technical solution, it also includes at least one precipitation unit, which is connected in series in the overflow acid pipeline, and the precipitation tank of the at least one precipitation unit is arranged between the acid leaching reaction tank and the acid filter.
[0008] As a further improvement to the above technical solution, the at least one sedimentation unit is connected to a mortar tank, and the mortar tank is connected to the sand inlet through an acid-resistant slag circulation pump.
[0009] As a further improvement to the above technical solution, an intermittent discharge pump is connected between the at least one sedimentation unit and the pipeline of the mortar tank.
[0010] As a further improvement to the above technical solution, it also includes a first branch pipe and a second branch pipe. The first branch pipe connects the hot water circulation pipe and the hot water exchange pipe to form a circulation pipe, and the second branch pipe connects the hot water circulation pipe and the acid heat exchange pipe to form a circulation pipe. Both the first branch pipe and the second branch pipe are equipped with multiple on / off switches.
[0011] As a further improvement to the above technical solution, the on / off switch includes a sixth valve located at the inlet end of the heat exchanger and a fourth valve located on both sides of the outlet end, wherein the sixth valve and the fourth valve are located in the second branch pipeline.
[0012] As a further improvement to the above technical solution, the overflow acid pipeline is provided with a third valve and a fifth valve. The third valve is close to the outlet end of the heat exchanger, and the fifth valve is close to the inlet end of the heat exchanger. The inlet end and outlet end of the second branch pipeline are both connected between the third valve and the fifth valve.
[0013] As a further improvement to the above technical solution, a bypass pipeline is also included. The acid circulation inlet includes a first inlet located on the upper side of the acid leaching reaction tank and a second inlet located at the bottom. The bypass pipeline is connected between the end of the overflow acid pipeline near the first inlet and the second inlet. A second valve is provided on the bypass pipeline, and a first valve is provided on the overflow acid pipeline. The first valve is located between the first inlet and the second valve.
[0014] This invention also provides a control method for a conventional quartz sand acid leaching heating system, applicable to any of the conventional quartz sand acid leaching heating systems described above, comprising: During acid leaching heating, the hot water circulation pipeline is connected to the hot water exchange pipeline, so that the hot water exchange pipeline and the acid heat exchange pipeline can exchange heat. During heat exchanger cleaning, the hot water circulation pipeline is connected to the acid heat exchange pipeline, so that the hot water in the hot water circulation pipeline circulates to clean the acid heat exchange pipeline. Attached Figure Description
[0015] The present invention will be further described below with reference to the accompanying drawings and embodiments; Figure 1 This is a schematic diagram of an embodiment of the conventional quartz sand acid leaching heating system provided by the present invention.
[0016] Icon labels: Acid leaching reaction tank 100, sand inlet 101, sand outlet 102, acid circulation inlet 103, acid circulation outlet 104, first inlet 105, second inlet 106, hot acid circulation tank 200, acid pump 300, heat exchanger 400, first valve 401, second valve 402, third valve 403, fourth valve 404, fifth valve 405, sixth valve 406, hot water tank 500, hot water pump 600, acid filter 700, sedimentation unit 800, mortar tank 900, acid-resistant slag circulation pump 1000. Detailed Implementation
[0017] This section will describe in detail specific embodiments of the present invention. Preferred embodiments of the present invention are shown in the accompanying drawings. The purpose of the drawings is to supplement the textual description with graphics, so that people can intuitively and vividly understand each technical feature and overall technical solution of the present invention, but they should not be construed as limiting the scope of protection of the present invention.
[0018] In the description of this invention, it should be understood that the orientation descriptions, such as up, down, front, back, left, right, etc., are based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limiting this invention.
[0019] In the description of this invention, if there are words such as "several", they mean one or more, "multiple" means two or more, "greater than", "less than", "exceeding" etc. are understood to exclude the number itself, and "above", "below", "within" etc. are understood to include the number itself.
[0020] In the description of this invention, unless otherwise explicitly defined, terms such as "set up," "install," and "connect" should be interpreted broadly, and those skilled in the art can reasonably determine the specific meaning of the above terms in this invention in conjunction with the specific content of the technical solution.
[0021] Conventional quartz sand acid leaching processes typically employ a heating and circulation system consisting of 10 acid leaching reaction tanks (100), 1 hot acid circulation tank (200), 1 circulating acid pump (300), and 1 graphite heat exchanger (400) connected in series to heat the 10 reaction tanks in turn.
[0022] The acid leaching purification production line is designed to produce 200,000 tons of ultra-white refined sand annually. After reaching full capacity, each heat exchanger (model 400) can heat approximately 7 tanks per day, with each tank containing about 100 tons of sand. The average heating time per tank is about 3.3 hours, with an hourly steam flow rate of about 1.1 tons. After about six months of use, the heating time per tank increased to approximately 10 hours, and the hourly steam flow rate decreased to 0.38 tons, severely impacting the production line's efficiency. Through disassembly and production analysis, the following problems were identified.
[0023] 1. By disassembling the graphite heat exchanger 400, most of the vertical acid channels of the graphite blocks inside the heat exchanger 400 were scaled and blocked, while the horizontal steam channels were unobstructed. Part of the bottom acid inlet was visibly blocked by debris. By taking samples of the structural blocks for full chemical analysis, the results of the composition analysis are shown in Table 1 below.
[0024]
[0025] Comparative analysis of the disassembled graphite blocks arranged from top to bottom shows that the first block has a thicker deposition layer and contains a small amount of ultrafine quartz sand powder. This indicates that in the acid leaching process for quartz sand purification, the graphite heat exchanger 400 is used to heat acid solutions such as a mixture of oxalic acid and hydrofluoric acid. During production, the silicate precipitates, metal hydroxides, and residual suspended particles generated by the reaction of the acid solution with impurities in the quartz sand easily deposit on the heat exchange surface, forming hard scale. Increased acid temperature accelerates salt precipitation and reaction rates, further exacerbating scaling.
[0026] Reference Figure 1 The present invention provides a conventional quartz sand acid leaching heating system, which is embodied in the following embodiment: A conventional quartz sand acid leaching heating system includes an acid leaching reaction tank 100, an overflow acid pipe, and a hot water circulation pipe. The acid leaching reaction tank 100 has a sand inlet 101, a sand outlet 102, an acid circulation inlet 103, and an acid circulation outlet 104. The overflow acid pipe is connected in series with a hot acid circulation tank 200, an acid pump 300, a heat exchanger 400, and the acid leaching reaction tank 100. The inlet and outlet of the overflow acid pipe are respectively connected to the acid circulation inlet 103 and the acid circulation outlet 104. The heat exchanger 400 includes an acid heat exchange pipe and a hot water exchange pipe for mutual heat exchange. The heat exchanger 400 can be a graphite heat exchanger 400. The overflow acid pipe is connected to the acid heat exchange pipe. The hot water circulation pipe is connected in series with a hot water tank 500 and a hot water pump 600. The hot water circulation pipe can form a circulation pipe with the acid heat exchange pipe and can also form a circulation pipe with the hot water exchange pipe.
[0027] During normal operation of a conventional quartz sand acid leaching heating system, the hot water circulation pipeline and the hot water exchange pipeline are connected to form a circulation pipeline. The acid solution from the acid leaching reaction tank 100 sequentially enters the hot acid circulation tank 200, the acid pump 300, and the heat exchanger 400, and then flows back to the acid leaching reaction tank 100. The acid solution is heated by heat exchange at the heat exchanger 400. When the system is paused, the hot water circulation pipeline can form a circulation pipeline with the acid heat exchange pipeline. The hot water pump 600 is started to clean the inside of the acid heat exchange pipeline. By cleaning the inside of the heat exchanger 400, the heating time of the acid leaching reaction tank 100 is reduced, thereby improving production efficiency.
[0028] Furthermore, the overflow acid pipeline is also connected in series with an acid filter 700, which is located between the acid circulation outlet 104 and the acid inlet of the heat exchanger 400. The acid filter 700 filters out waste brought in by the quartz sand raw material, reducing pipeline blockage.
[0029] Furthermore, it also includes at least one sedimentation unit 800, which is connected in series in the overflow acid pipeline. The sedimentation tank of the at least one sedimentation unit 800 is located between the acid leaching reaction tank 100 and the acid filter 700. Specifically, the at least one sedimentation unit 800 includes a primary sedimentation tank and a secondary sedimentation tank, which are connected in series in the overflow acid pipeline. The acid first passes through the primary and secondary sedimentation tanks to collect the ultrafine quartz sand contained in the overflow acid, reducing the amount of ultrafine quartz sand entering the heat exchanger 400 and thus reducing the generation of fouling inside the heat exchanger 400. In some other embodiments, the number of sedimentation units 800 can be one or more. The sedimentation unit 800 can also be a sedimentation tank.
[0030] In a further improvement, both the primary and secondary sedimentation tanks are connected to the mortar tank 900. The mortar tank 900 is connected to the sand inlet 101 via an acid-resistant slag circulation pump 1000, which returns the mortar to the acid leaching reaction tank 100 for reaction. In a further improvement, each sedimentation unit 800 is connected to the mortar tank 900 via a periodic discharge pump, which returns the mortar to the acid leaching reaction tank 100.
[0031] Furthermore, it also includes a first branch pipe and a second branch pipe. The first branch pipe connects the hot water circulation pipe and the hot water exchange pipe to form a circulation pipe, and the second branch pipe connects the hot water circulation pipe and the acid heat exchange pipe to form a circulation pipe. Both the first branch pipe and the second branch pipe are equipped with multiple on / off switches.
[0032] Specifically, the on / off switch includes a sixth valve 406 located at the inlet end of the heat exchanger 400 and a fourth valve 404 located on both sides of the outlet end. The sixth valve 406 and the fourth valve 404 are located in the second branch pipeline.
[0033] The overflow acid pipeline is equipped with a third valve 403 and a fifth valve 405. The third valve 403 is located near the outlet end of the heat exchanger 400, and the fifth valve 405 is located near the inlet end of the heat exchanger 400. The inlet and outlet ends of the second branch pipeline are both connected between the third valve 403 and the fifth valve 405. After each use of the heat exchanger 400, the third valve 403 and the fifth valve 405 can be shut off, and the sixth valve 406 and the fourth valve 404 can be opened to start the hot water pump 600 to clean the graphite blocks inside the heat exchanger 400. The operation is simple, allowing for the cleaning of the graphite blocks inside the heat exchanger 400, while also sharing the hot water tank 500 and the hot water pump 600.
[0034] Further improvements include a bypass pipeline. The acid circulation inlet 103 includes a first inlet 105 located on the upper side of the acid leaching reaction tank 100 and a second inlet 106 located at the bottom. The bypass pipeline connects the overflow acid pipeline near the end of the first inlet 105 to the second inlet 106. A second valve 402 is provided on the bypass pipeline, and a first valve 401 is provided on the overflow acid pipeline, located between the first inlet 105 and the second valve 402. The acid can enter from either the first inlet 105 or the second inlet 106, or simultaneously from both inlets, allowing for rapid and uniform mixing with the liquid in the acid leaching reaction tank 100, thus accelerating the heating rate of the acid leaching reaction tank 100.
[0035] Among them, the various valves mentioned above can be hose valves or solenoid valves.
[0036] This invention also provides a control method for a conventional quartz sand acid leaching heating system, applicable to any of the conventional quartz sand acid leaching heating systems described above, comprising: During acid leaching heating, the hot water circulation pipeline is connected to the hot water exchange pipeline, so that the hot water exchange pipeline and the acid heat exchange pipeline can exchange heat. Specifically, this can be achieved by closing the sixth valve 406 and the fourth valve 404, and opening the fifth valve 405 and the third valve 403. The hot water exchange pipeline, the hot water tank 500, and the hot water pump 600 form a circulation path. At the same time, the acid solution comes out of the acid leaching reaction tank 100 and flows back into the acid leaching reaction tank 100 through the primary sedimentation tank and the secondary sedimentation tank, the acid solution filter 700, the hot acid circulation tank 200, the acid pump 300, and the heat exchanger 400. The acid solution is heated in the heat exchanger 400. During the cleaning of heat exchanger 400, the hot water circulation pipeline is connected to the acid heat exchange pipeline, so that the hot water in the hot water circulation pipeline circulates to clean the acid heat exchange pipeline. Specifically, this can be achieved by closing the sixth valve 406 and the fourth valve 404, and opening the fifth valve 405 and the third valve 403. This forms a circulation path between the acid heat exchange pipeline, the hot water tank 500, and the hot water pump 600, cleaning the internal dirt of the acid heat exchange pipeline of heat exchanger 400 and improving heat exchange efficiency.
[0037] To address the aforementioned problem of graphite block clogging, the graphite blocks were first returned to the factory for cleaning to restore their performance. Then, the process was optimized. By comparing the costs before and after optimization, production efficiency was significantly improved and unit costs were significantly reduced.
[0038] 1.1 Steam Comparison After process optimization, the efficiency of graphite heat exchanger 400 was significantly improved, as detailed in Table 1 below.
[0039]
[0040] As can be seen from the comparison in Table 1, after the repair and process optimization of the graphite heat exchanger 400, the heat exchange time was reduced from 10 hours to 2.44 hours, the steam unit flow rate was restored from 0.68 T / h to the normal 1.1 T / h, the steam consumption per ton was reduced from 68 kg / T to 26.68 kg / T, and the steam unit cost was reduced from 10.61 yuan to 4.19 yuan, a reduction of 6.42 yuan / T.
[0041] 1.2 Electricity Cost Comparison After process optimization, production efficiency was significantly improved, and output increased substantially within the same time frame, as detailed in Table 2 below.
[0042]
[0043] As can be seen from the comparison in Table 2, after the repair and process optimization of the graphite heat exchanger 400, the daily output increased from 200 tons to 700 tons, and the unit electricity cost decreased from 1.18 yuan / ton to 0.34-1.18 yuan / ton, a reduction of 0.84 yuan per unit.
[0044] The preferred embodiments of the present invention have been described in detail above, but the present invention is not limited to the embodiments. Those skilled in the art can make various equivalent modifications or substitutions without departing from the spirit of the present invention, and these equivalent modifications or substitutions are all included within the scope defined by the claims of this application.
Claims
1. A conventional quartz sand acid leaching heating system, characterized in that, include: The acid leaching reaction tank (100) has a sand inlet (101), a sand outlet (102), an acid circulation inlet (103) and an acid circulation outlet (104). An overflow acid pipeline is connected in series with a hot acid circulation tank (200), an acid pump (300), a heat exchanger (400), and an acid leaching reaction tank (100). The inlet and outlet of the overflow acid pipeline are connected to the acid circulation inlet (103) and the acid circulation outlet (104), respectively. The heat exchanger (400) includes an acid heat exchange pipeline and a hot water exchange pipeline that exchange heat with each other. The overflow acid pipeline is connected to the acid heat exchange pipeline. A hot water circulation pipeline is connected in series with a hot water tank (500) and a hot water pump (600). The hot water circulation pipeline can form a circulation pipeline with an acid heat exchange pipeline and can also be connected with a hot water exchange pipeline to form a circulation pipeline.
2. The conventional quartz sand acid leaching heating system according to claim 1, characterized in that, The overflow acid pipeline is also connected in series with an acid filter (700), which is located between the acid circulation outlet (104) and the acid inlet of the heat exchanger (400).
3. The conventional quartz sand acid leaching heating system according to claim 2, characterized in that, It also includes at least one precipitation unit (800), which is connected in series in the overflow acid pipeline, and the precipitation tank of the at least one precipitation unit (800) is disposed between the acid leaching reaction tank (100) and the acid filter (700).
4. The conventional quartz sand acid leaching heating system according to claim 3, characterized in that, The at least one sedimentation unit (800) is connected to a mortar tank (900), which is connected to the sand inlet (101) via an acid-resistant slag circulation pump (1000).
5. The conventional quartz sand acid leaching heating system according to claim 4, characterized in that, An intermittent discharge pump is connected between the pipeline of at least one sedimentation unit (800) and the mortar tank (900).
6. The conventional quartz sand acid leaching heating system according to claim 1, characterized in that, It also includes a first branch pipe and a second branch pipe. The first branch pipe connects the hot water circulation pipe and the hot water exchange pipe to form a circulation pipe. The second branch pipe connects the hot water circulation pipe and the acid heat exchange pipe to form a circulation pipe. Both the first branch pipe and the second branch pipe are equipped with multiple on / off switches.
7. A conventional quartz sand acid leaching heating system according to claim 6, characterized in that, The on / off switch includes a sixth valve (406) located at the inlet end of the heat exchanger (400) and a fourth valve (404) located on both sides of the outlet end. The sixth valve (406) and the fourth valve (404) are located in the second branch pipeline.
8. A conventional quartz sand acid leaching heating system according to claim 6, characterized in that, The overflow acid pipeline is equipped with a third valve (403) and a fifth valve (405). The third valve (403) is close to the outlet end of the heat exchanger (400), and the fifth valve (405) is close to the inlet end of the heat exchanger (400). The inlet and outlet ends of the second branch pipeline are both connected between the third valve (403) and the fifth valve (405).
9. A conventional quartz sand acid leaching heating system according to claim 1, characterized in that, It also includes a side branch pipeline. The acid circulation inlet (103) includes a first inlet (105) located on the upper side of the acid leaching reaction tank (100) and a second inlet (106) located at the bottom. The side branch pipeline is connected between the end of the overflow acid pipeline near the first inlet (105) and the second inlet (106). The side branch pipeline is provided with a second valve (402), and the overflow acid pipeline is provided with a first valve (401). The first valve (401) is located between the first inlet (105) and the second valve (402).
10. A control method for a conventional quartz sand acid leaching heating system, characterized in that, The conventional quartz sand acid leaching heating system according to any one of claims 1 to 9 comprises: During acid leaching heating, the hot water circulation pipeline is connected to the hot water exchange pipeline, so that the hot water exchange pipeline and the acid heat exchange pipeline can exchange heat. When cleaning the heat exchanger (400), the hot water circulation pipeline is connected to the acid heat exchange pipeline, so that the hot water in the hot water circulation pipeline circulates to clean the acid heat exchange pipeline.